EHS RISK ASSESSMENT

ACTIVITY: INSTALLATION OF LIGHTING PROTECTION POLE, STREET LIGHTING POLE AND LIGHT FITTINGS
PACKAGE NUMBER: CG-4750

Current Risk Final Risk


Task (Steps) Potential Hazard Existing Control Additional Control Prob
Cons. Prob. Risk Cons. Risk
.

Activity shall be carried out


by competent supervision.
Supervisor to ensure all hot
work permit is available prior
to commencement of the
task.
Daily coordination with client.
Working Toolbox talk to be held at
without work site, this will be covered the
6.2 to 6.5 permit. method statement and job 4 2 8
Unauthorized safety analysis.
workers at Toolbox talks to be given
working area. prior to start the job.
Competent workers to be
deployed, supervisor to
ensure work safe system.
Coordination permission
have to be made with civil
contractor before start the
work.

All workers involved in the


activity must be aware of heat
Heat stress. 4 3 12
stress, supervisor to ensure
drinking cold water is available
at the working area.

503406-AD0000-68AF-12303_R01 (2012-01-30) Page 1 of 6


EHS RISK ASSESSMENT

ACTIVITY: INSTALLATION OF LIGHTING PROTECTION POLE, STREET LIGHTING POLE AND LIGHT FITTINGS
PACKAGE NUMBER: CG-4750

Operator must pass third party


competency test for crane
operation and secure competency
certificate.
Operator should attend induction
Unauthorized course for carne operation.
operation of Crane/Boom truck must have:
6.6 crane / boom 1. Valid registration from RTA 4 3 12
truck to Travel.
2. Valid certificate of
conformity or through
crane /boom truck
inspection from approved
certification agencies.
3. Statement of insurance
policy.

Crane must be certified by approved


third party certification agencies.
Gears, chains, and belts should be
inspected, certified and colour
Mechanical Failure 4 3 12
coded to use.
Avoid overloading of transport
equipment.
Lift load for its specific load limit or
safe working load.
Use tag lines or tag ropes to guide
the load towards its destination.
Having no control Supervisor to advice workers not to
4 3 12
of the load walk, come close or stand under
the load.
Assign a certified rigger/banksman.

503406-AD0000-68AF-12303_R01 (2012-01-30) Page 2 of 6


EHS RISK ASSESSMENT

ACTIVITY: INSTALLATION OF LIGHTING PROTECTION POLE, STREET LIGHTING POLE AND LIGHT FITTINGS
PACKAGE NUMBER: CG-4750

Operator can Only certified


be confused rigger/banksman are
if more than authorized to give signal
3 4 12
one person during lifting operation.
giving
instruction or
signal.
Use of sharp
hand tools.
Competency
of electrician.
Use damaged Inspect the hand tools
hand tools before use, ensure the
may slip and condition is good, use hand
injure gloves.
6.8 electrician or Supervisor to ensure the 3 3 9
damage competency of electrician.
property. Inspect heat gun before use,
Use of Heat it is in good condition,
gun ( hot provide fire extinguisher.
blower),
electricity /
Fire.
Use dust mask , safety
Touch- up paint. glass & hand gloves while
2 2 4
doing touch up paint.

503406-AD0000-68AF-12303_R01 (2012-01-30) Page 3 of 6


EHS RISK ASSESSMENT

ACTIVITY: INSTALLATION OF LIGHTING PROTECTION POLE, STREET LIGHTING POLE AND LIGHT FITTINGS
PACKAGE NUMBER: CG-4750

Bad
housekeeping - Maintain good
workers may housekeeping around the area.
6.13 slip, trip & fall All temporary cable
3 2 6
at same should be properly organized.
ground.

Only competent and authorized


Unauthorized person to do the inspection, 2 1 2
workers ensure notified the client with
all necessary documents.

All personnel involve in the


testing must wear P.P.E.'s at
all times (e.g. hard hat, safety
Not using P.P.E.'s 2 1 2
glass, safety shoes, hand
gloves, dust mask, long sleeve
shirt).

NOTE: All Current Risk ranked above C-15 must have additional control measures: Risk = Consequence x Probability (R = C x P)
Tolerable Risk (Low) = 1-6, Medium = 8 -12, (Methods statement), Intolerable Risks (High) = 15 25 (Method Statement plus additional Control Measures in place)
Consequence
Consequence ( Severity) Rating Factors (5) Probability Rating Factors (5) Frequency/Probability
(Severity)
No Safety Health Environ. Financial No Frequency A B C D E
1 First Aid Immediate Minor <AED 1k <1 hr A (1) Practically impossible or Once in 10 years 5 5 10 15 20 25
2 Medical Temporary Short term <AED50K 1-2 hrs B (2) Not likely or Once per year 4 4 8 12 16 20
3 Lost Time Short term Long term >AED300k 2-4 hrs C (3) Could happen or Monthly 3 3 6 9 12 15
4 Disability Long term Serious >AED500k 4-8 hrs D (4) Has happened or Weekly 2 2 4 6 8 10
5 Fatality Fatal Catastrophic >AED1m >1 shift E (5) Common or Daily 1 1 2 3 4 5

503406-AD0000-68AF-12303_R01 (2012-01-30) Page 4 of 6


EHS RISK ASSESSMENT

ACTIVITY: INSTALLATION OF LIGHTING PROTECTION POLE, STREET LIGHTING POLE AND LIGHT FITTINGS
PACKAGE NUMBER: CG-4750

Risk assessment compiled by :

Risk Assessor:
SACHIN BABU EHS ADVISOR 09-04-2012

Name Designation Signature Date

Risk assessment approved by :

EHS Department:

Name Designation Signature Date

Construction:

Name Designation Signature Date

Management:

Name Designation Signature Date

503406-AD0000-68AF-12303_R01 (2012-01-30) Page 5 of 6


EHS RISK ASSESSMENT

ACTIVITY: INSTALLATION OF LIGHTING PROTECTION POLE, STREET LIGHTING POLE AND LIGHT FITTINGS
PACKAGE NUMBER: CG-4750

503406-AD0000-68AF-12303_R01 (2012-01-30) Page 6 of 6