Sei sulla pagina 1di 5

CIVIL ENGINEER

MUHAMMAD IQBAL
BE Civil Engineering
(PEC # CIVIL 28520)

Cell Phone No: +92-345-4258747 , +92-307-0050675


Email: engrmuhammadiqbal@engineer.com

PERMANENT ADDRESS:
CHAK ALI CHAPPA SOUTH KACHA KHUH ROAD ABDUL HAKIM DISTRICT KHANEWAL PUNJAB PAKISTAN

Profile Summary:
A Civil Engineer with more than 8 years extensive experience in Contract Documents preparation, Project
Management, Site management, Planning, QA\QC and at Site execution of structural & all type of finishing
works in building construction including High rise Office building, Residential apartment building, Commercial
plaza, Villas etc ,infrastructure works and also familiar with MEP works.
Currently working as Resident Engineer in public sector Company of Punjab Government.

Key Skills:

Engineering Professional Personal Computer Skills


Site Supervision. Project Management. Problem solving. Primavera P6.
Building Structural Project Planning & Professional manner. AutoCAD.
Works. Scheduling. Safety conscious. MS Office (Word, Excel, Power Point).
Building Finishing People management. Can handle stress. Diploma in Computer Hardware
Works. Quality assurance. Always pro-active. Engineer (2002 2003).
Infrastructure Works HSE reviews. Attention to detail. Diploma in Computer Software
Estimation. Progress Reports. Logical thinker. Engineer (2003).
Good Communication
skills.
Can Handle Project
Independently.

Education:

B.E. Civil Engineering (2004 2008)


Quaid e Awam University of Engineering Science & Technology (Nawabshah)

DAE. Civil Engineering (1997 2001)


Punjab Board of Technical Education Lahore

Professional Affiliations:
Pakistan Engineering Council Registration # Civil / 28520
Associate member of Institution of Engineers Pakistan AMIE (A4630/KAR678) (2001)

Languages:
English
Urdu
Punjabi

1
CIVIL ENGINEER

EMPLOYMENT HISTORY & DUTIES


Starting From Sept 2008 to Till Date

General Summary of the Responsibilities:


Project management, planning scheduling and monitoring.
Project quality assurance & quality control.
Preparation of Bill of Quantities (BOQ) & Tender Documents.
Monitoring and supervision of structural and finishing works.
Preparing daily weekly and monthly progress reports.
Planning the work and efficiently organizing the site facilities in order to meet agreed deadlines.
Preparation and submission of procurement plan, method statements, inspection & test plan (ITPs),
quality control procedure (QCP), risk assessment, etc. as required.
Checking and arranging material and equipment requisition in accordance to BOQ, Construction
drawings, technical specification, quality and cost allowable.
Overseeing the activity duration, manpower, material as per contract specifications drawings and BOQ.
Checking and monitoring QC procedures and guiding QC engineer at site.
Conduction of QA / QC testing and measures to ensure quality as per drawings, contract specifications
& BOQ.
Ensure that the work is being carried out complies with International construction codes & standards,
project BOQ, specifications, COC, work instructions & SOPs.
Preparation, submittal and follow up for material approvals.
Resolving any unexpected technical difficulties and other problems that may arise during execution of
work.
Liaising with architects, the engineers, including attending project progress/technical/ co-ordination
regular meetings to keep them informed of progress and other site issues if arises.
Drawing reviews and discusses with the consultants and designers as per site situations and design
related issues.
Direct supervision of project resources (Labor, materials and plant) ensuring optimum performance
within the scheduled program and budget.
Agreeing a price for materials, and making cost-effective solutions and proposals for the project
execution.
Monitoring and checking of raised IPCs form QS.
Proper closing of all punch items and site instruction memos with coordination of client
Dealing with sub-contractors and monitoring of their work.
Supervision of Pre-mix Asphalt paving road work inside PARCO housing complex.
Preparation of Shop drawings, As built drawings.

Professional Experience History:


Present job:

Company: THE URBAN UNIT


Urban Sector Planning & Management Services Unit(PVT.)LTD.
Government of the Punjab Pakistan.

Project:
Designation: Resident Engineer (18th Apr 2016 to Date )

Project: Development of Tourism Facilities in Soon Valley District Khushab.


Tourism Development Corporation of Punjab. (TDCP)

2
CIVIL ENGINEER

Previous jobs:

Company: DESCON ENGINEERING LIMITED.

Designation: Planning Engineer (8th Feb 2016 to 15th Apr 2016)


Project: Construction of 1230MW Power Plant at Haveli Bhadur Shah, Jhang (Pakistan)
Scope: (EPC) Joint Venture with Power Construction Corporation of China
Client: National Power Parks Management Company (Pvt) Limited.
Engineer : National Engineering Service Pakistan (Pvt) Ltd. [NESPAK]
Lahmeyer International GmbH

Company: GUARANTEE ENGINEERS (PVT) LIMITED.

Designation: Project Engineer / Planning Engineer (15th Oct 2014 to 31st -Dec-2015)
Project: FFBL Head Office Building DHA Phase II Islamabad Pakistan.
Scope: Strengthening of Structural members of the building, Architectural & ID works,
Mezzanine floor (Steel Structure)
Project Cost: 550 Million
Client: Fauji Fertilizer Bin Qasim Limited
Management Consultants: AAA Partnership (Pvt) Ltd
Design Consultants: Arshad Shahid Abdullah

Responsibilities

Project planning scheduling and monitoring


Assisting Project Manager in all project related Issues.
Monitoring and supervision of structural and finishing works.
Preparing daily weekly and monthly progress reports.
Raising material and equipment requisition in accordance to BOQ, drawings & technical specifications.
Monitoring QC procedures and guiding QC engineer at site.
Ensure that the work is being carried out complies with International construction codes & standards,
project BOQ, specifications, COC, work instructions & SOPs.
Preparation, submittal and follow up for material approvals.
Resolving any unexpected technical difficulties and other problems that may arise during execution of
work.
Liaising with The Engineers, including attending project progress/technical/ co-ordination regular
meetings to keep them informed of progress and other site issues if arises.
Drawing reviews and discusses with the consultants and designers as per site situations and design
related issues.
Direct supervision of Steel structure mezzanine floor fabrication & installation.
Close coordination with QS for preparation of IPCs.

Designation: Planning Engineer / Project Engineer (22nd Jan 14 to 15th Oct 2014)
Project: World Trade Center Islamabad DHA Phase II Islamabad Pakistan.
Scope: Structure works, making openings in existing slabs for Atrium etc,
Mezzanine floor (Steel Structure), Wet works (Block Work, Plaster, Flooring)
Project Cost: 2.5 Billion Approx
Client: AL-GURAIR GIGA PAKISTAN (PVT) LTD
Management Consultants: NESPAK (Finishing Works), ARCH VISION PLUS (Structure Works)

3
CIVIL ENGINEER

Company: TIJAARAT DEVELOPERS (PVT) LIMITED.

Designation: Project Manager (1st August 2013 to 30th November 2013)


Planning Engineer / Assistant Project Manager (1st Sep 2012 to 31th July 2013)
Project: Construction of High Standard Houses (58 Units) at Canyon Views DHA Phase II
Extension Emaar Pakistan Islamabad.
Scope: Structure, Architecture & ID Works, Infrastructure works (Sewerage, Rain water
drain, etc)
Project Cost: 330 million
Client: Emaar Pakistan
Management Consultants: EA (Engineering Associates) till 11th Sep 2013
Management Consultants: NESPAK from 11th Sep 2013 to date.

Responsibilities:

Project management, planning scheduling and monitoring.


Monitoring and supervision of structural and finishing works.
Close coordination with Project Director for timely delivery of required labor, material & equipments.
Preparing daily weekly and monthly progress reports.
Planning the work and efficiently organizing the site facilities in order to meet agreed deadlines.
Preparation and submission of procurement plan, method statements, inspection & test plan (ITPs),
quality control procedure (QCP), risk assessment, etc. as required.
Ensure that the work is being carried out complies with International construction codes & standards,
project BOQ, specifications, COC, work instructions & SOPs.
Preparation, submittal and follow up for material approvals.
Resolving any unexpected technical difficulties and other problems that may arise during execution of
work.
Liaising with architects, the engineers, including attending project progress/technical/ co-ordination
regular meetings to keep them informed of progress and other site issues if arises.
Drawing reviews and discusses with the consultants and designers as per site situations and design
related issues.
Direct supervision of project resources (Labor, materials and plant) ensuring optimum performance
within the scheduled program and budget.
Agreeing a price for materials, and making cost-effective solutions and proposals for the project
execution.
Monitoring and checking of raised IPCs form QS.
Dealing with sub contractors and monitoring of their work.

Company: MAJEED ASSOCIATES ENGINEERS & CONTRACTORS.

Designation: Project Engineer (1st Apr 2010 to 30th May 2012)


Project 1: Construction of Multistory Regional Office Building Azmat Wasti Road Multan
Scope: Structure, Architecture, ID & External Developments work.
Project Cost: 120 million
Client: Honda Atlas Pvt Ltd
Project 2: Construction of High Rise Regional Office Building near High Court Multan
Scope: Structure Works (2 basements + 7 floors)
Project Cost: 80 million
Client: Habib Bank Limited Pakistan
Design Consultants: Collaborative Design Karachi
Management Consultants: PCM (Dubai)

4
CIVIL ENGINEER

Company: ERECTION ENGINEERS & CONTRACTORS.

Designation: ` Site Engineer (1st Sept 2008 to 30th Mar 2010)


Project: Construction of Residential Apartment Building & Infrastructure works
Scope: 16 flat 4 story building, Infrastructure works Included (Road work premix
asphalt, Storm Water drain, Sewerage line, Water supply, Gas line, Electrical
cables LT & HT, parking sheds & Electric Poles) + Single story office &
Commercial building.
Project Cost: 75 million
Client: PARCO mid Country Oil Refinery
Consultants: Technia Consulting & Management Engineers

Personal Information:
Father Name: Muhammad Ramzan
NIC #: 36102-4946177-5
Passport #: HS1331771
Date of Birth: 01-01-1982
Marital Status: Married
Nationality: Pakistan
Domicile: Punjab (Khanewal)

Potrebbero piacerti anche