COURSE INFORMATION
PREREQUISITE : -
CORE REQUISITE : -
COURSE OUTCOMES
COURSE DESCRIPTION
Upon completion of this course, students will learn how to interpret drawings cable route and do the marking at the end of the cable. Students
are also able to identify structures and make the test work on the switch gear and transformer.
16 HOURS 1. PERFORM POLARITY 1.1 Identify end point of cable. 1.1.1 Record cable routes according to Energy
(2 WEEKS) TEST Commission Standard.
1.2 Identify permanent marking on 1.2.1 Mark the end of the cable according to the
cable. prescribed code by the IEE regulations and
industry usage.
1.3 Identify selected test 1.3.1 Use of test tools and test cable according to IEE
equipment. Regulations.
1.4 Perform polarity test in cable. 1.4.1 Identify types of instrument and procedure testing
according to IEE Regulations.
48 HOURS 2. PERFORM POLARITY 2.1. Check specification and name 2.1.1 Identify information on the name plate according to
(6 WEEKS) SWITCHGEAR TEST plate. IEE Regulations.
2.2 Identify end point of switch 2.2.1 Differentiate the structures used in switch gear the
gear. industry according to energy commission
standard.
2.3 Identify selected test 2.3.1 Use of test tools and test switch gear according to
equipment. IEE Regulations.
2.4 Perform switch gear polarity 2.4.1 Identify types of instrument and procedure testing
test. according to IEE Regulations.
48 HOURS 3. PERFORM POLARITY 3.1 Explain specification and 3.1.1 List of specification and vector group on name
(6 WEEKS) TRANSFOMER TEST vector group on name plate. plate of transformer according to manufacture
standard.
3.2 Identify end point of 3.2.1 Interpret the cause of the terminal building and
transformer. used in industry according to Standard Energy
Commission.
3.4 Apply test equipment. 3.4.1 Utilize the tester appropriate according to IEE
Regulations.