Sei sulla pagina 1di 169

STANDARD

PHRASEOLOGY

BAHAGIAN PERUNDING, DOKUMENTASI & ICT


CAWANGAN KONTRAK DAN UKUR BAHAN
IBUPEJABAT JKR MALAYSIA
Code Description Unit

DEMOLITION

Information

Note :

The Tenderer is required to visit the site to inspect the construction of the
structure, etc to be demolished, adjacent property, to ascertain from the
Authorities the presence of underground cables, service pipes, safety
precaution and protection require

Location of demolition works as per drawings no.

Temporary works

Temporary screens

Weather proof and dustproof screens; hardboard faced both sides with
timber framing; emulsion painted; dismantling and clearing away on M2
completion

Intruder resistant; 50 x 100 timber framing; lined one side with 25 mesh wire
netting; faced both sides with 12mm plywood; emulsion painted; M2
dismantling and clearing away on completion

Temporary roofs

Metal decking with timber roof trusses; gutter and rainwater complete when
ITEM
necessary; dismantling and clearing away on completion

Demolishing works

The work in this section comprises the demolition of all buildings/structures as


indicated on drawing no.

Demolishing down to ground floor level

Demolishing down to underside of ground floor level

Demolishing down to ground floor level; making good structure and finishing
disturbed

All structures ITEM

............... storey building ..........m x ..........m x ..........m high including


making good demolish surfaces and carting away debris to contractor's own ITEM
dump

Reinforced concrete retaining wall ..........m high including making good


demolish surfaces and carting away debris to contractor's own dump ITEM
(approximately ..........m long)

Reinforced concrete staircase; .......... nos. total riser, ..........mm wide, in two
flights with one half landing; making good demolish surfaces and carting ITEM
away debris to contractor's own dump

Brick walls 230mm thick; making good all works disturbed; making good
ITEM
and extending finishings disturbed (approximately .m2)

Page 2 DEMOLITION
Code Description Unit

Reinforced concrete walls ...mm thick; making good all works disturbed;
ITEM
making good and extending finishings disturbed (approximately .m2)

Precast concrete drain including making good demolish surfaces and


ITEM
carting away debris to contractor's own dump (approximately ...m long)

Chain link fencing ...m high including making good demolish surfaces and
ITEM
carting away debris to contractor's own dump (approximately .m long)

Break up existing road, backfilling and leveling as specified including carting


ITEM
away debris to contractor's own dump (approximate area = ...m2)

Cutting through ...mm thick reinforced concrete walls to form openings; making
good all parts of the structure disturbed; extending finishings and making good
finishings disturbed

Cutting through 230mm thick brick walls to form openings; making good all parts
of the structure disturbed; extending finishings and making good finishings
disturbed

.mm x ..mm; forming square jambs and sill or threshold and inserting
ITEM
lintel or beam (supply included elsewhere)

Forming opening;..mm x ...mm overall size ITEM

Cutting back projections; making good finishings disturbed

Cutting to reduce thickness; making good finishings disturbed

Brick walls; overall size ..mm x ...mm x ...mm thick ITEM

Reinforced concrete walls; overall size .mm x .mm x .mm thick ITEM

Removing fitting and fixtures prior to demolition; carting away to contractor's own
dump

All fittings and equipments ITEM

Windows .mm x .mm (. nos.) ITEM

Doors ..mm x ..mm (.. nos.) ITEM

Paneled doors; ..mm x .mm; locks to be stored for re-use (. nos.) ITEM

Timber partitions; ..mm thick (approximately .. m2) ITEM

Gypsum board partitions with aluminium frames; ..mm thick


ITEM
(approximately .. m2)

Cupboard unit ..mm x ..mm x ..0mm (.nos.) ITEM

W.C. suites; overall size.mm x ..mm x .mm (.nos) ITEM

Wash hand basin including tap ; overall size ..mm x ..mm x ..mm
ITEM
(.nos)

Page 3 DEMOLITION
Code Description Unit

Removing fitting and fixtures prior to demolition; set aside for re-fixing; make
good all works disturbed

Removing fitting and fixtures prior to demolition; to be stored for Employer; make
good all works disturbed

Wash hand basin; overall size ..mm x ..mm x ..mm; tap to be stored
ITEM
for re-use (..nos)

Removing engineering and plumbing installations

UPVC rainwater pipes; ..mm x ..mm ( approximately ..m long) ITEM

Steel floor duct; to be stored for re-use; replacing after services installations
ITEM
(approximately ..m)

UPVC wall duct covers ..mm wide (approximately ..m) ITEM

Removing finishings

Floor finishings;

Ceramic tiles or similar floor tiles including screed; cleaning off for new
ITEM
finishing (approximately .m2)

Carpet or similar floor finishes including underlay; cleaning off for new
ITEM
finishing (approximately ...m2)

Carpet or similar floor finishes; underlay remain for reuse; cleaning off for
ITEM
new finishing (approximately .m2)

Timber skirting; put aside for reuse (approximately ..m) ITEM

Wall finishings;

Ceramic tiles or similar wall tiles including screed; cleaning off for new
ITEM
finishing (approximately ..m2)

Wood paneling or similar wall finishes including timber frame; cleaning off
ITEM
for new finishing (approximately ..m2)

Wall paper or similar wall finishes; cleaning off for new finishing
ITEM
(approximately ..m2)

Ceiling finishings;

Mineral fibre board or similar ceiling finishes with metal and wire suspension
ITEM
system (approximately .m2)

Mineral fibre board or similar ceiling finishes; metal and wire suspension
ITEM
system remain for reuse (approximately ..m2)

Cement board or similar ceiling finishes with metal and wire suspension
ITEM
system (approximately ...m2)

Page 4 DEMOLITION
Code Description Unit

Removing coverings to existing structures

Concrete roof tiles; covered pitched roof; timber construction (approximately


ITEM
..m2)

Concrete roof tiles; covered pitched roof; timber construction; put aside for
ITEM
re-use (approximately ..m2)

Metal decking; covered pitched roof; steel construction (approximately


ITEM
..m2)
Shoring

Providing and erecting

Raking shoring to ..mm thick brick external wall .. m long x .. m high


ITEM
overall; cutting holes in the structure and making good all work disturbed

Vertical shoring to reinforced concrete floor slab .. m x ..m overall,


ITEM
soffits .. m above ground level

Maintaining

Allow for maintaining shoring; as often and whenever necessary;


ITEM
throughout the demolition and repairing period

Clearing away

Dismantling and clearing away on completion; all shoring equipments and


ITEM
tools; making good all works disturbed

Sundries

Credit For Old Materials

The Contractor is to state here the Credit amounts that he will allow for old
materials arising from the demolition works. A separate detailed list is to be ITEM
submitted with the tender and each item on which a credit is allowed shall
be clearly indicated by ..................

Page 5 DEMOLITION
Page 6 DEMOLITION
Code Description Unit

EXCAVATION AND EARTHWORK

SITE PREPARATION

Soil descriptions

For description of soil, trial pits, bore holes, existing services and work near
water please refer to 'Measurement Amplification And Pricing Factor'

Removing hedges; cutting down and grubbing up roots

Hibiscus hedges, average .................mm high M

...................mm hedges, average ................mm high M

Clearing undergrowth

Clearing site of undergrowth, bushes, scrub and the like M2

Removing trees; cutting down and grubbing up roots; filling voids left with material
arising from excavation

Tree stumps; removing existing tree stumps and grubbing up roots; filling voids
left with material arising from excavation

Not exceeding 300mm girth NO

..........mm - ........mm girth NO

Relocating of existing trees

Carefully dig up .................... tree and replant as directed on site as


NO
specified

Protection of trees retained on site

Protect and maintain existing ................... tree on site as specified NO

Lifting turf to be preserved

Deposited in temporary place on site; watering and maintaining for returfing M2

Excavating top soil to be preserved

Average ..........mm deep M2

Clearing site; Alternatif method of measurement

The site clearing is measured as an item and the Contractor is strongly


advised to visit the site as no claim will be entertained on the ground lack of NOTE
knowledge on the extent of the works or any other reasons

Clear all vegetation, trees irrespective of girth, etc., all buildings, structures
or other obstructions which interfere with the execution of the work and ITEM
remove all debris off site; area approximately ......... hectares as per drawing
no. ............

Page 7 EXECAVATION
Code Description Unit

Cutting down trees and clearing site of undergrowth, bushes, scrub and
hedges and grubbing up their roots and filling voids left by removal of roots ITEM
with selected material arising from excavation; approximately ................M2
as per drawing no........

Cutting down trees and removing tree stumps (irrespective of girth), clearing
site of undergrowth, bushes, scrub and hedges and grubbing up their roots ITEM
and filling voids with selected material arising from excavation; area
approximately ....... Hectares, as per drawing no........

EXCAVATION

Excavating to reduce level

Excavating basements and the like starting from formation level

Maximum depth not exceeding 0.25m M3

Maximum depth not exceeding 1.00m M3

Maximum depth not exceeding 2.00m M3

Maximum depth not exceeding 4.00m M3

Maximum depth exceeding .........m but not exceeding ........m M3

EXTRA OVER; excavating in rock met with in excavations of such size or


M3
position by using wedges, lever, special plant, explosive or chemicals

EXTRA OVER; breaking up concrete on the surface of the ground M2

EXTRA OVER; breaking up tar macadam on the surface of the ground M2

EXTRA OVER; breaking up concrete met with in excavations of any depth M3

EXTRA OVER; excavating below ground water level M3

Excavating pit starting from formation level

Excavating pit between piles starting from formation level

To receive pile caps

To receive pile caps; both plan dimensions less than 1.25m

To receive pad footings

To receive bases of stanchions, columns, isolated piers and the like

Maximum depth not exceeding 0.25m (In No: ) M3

Maximum depth not exceeding 1.00m (In No: ) M3

Maximum depth not exceeding 2.00m (In No: ) M3

Maximum depth not exceeding 4.00m (In No: ) M3

Page 8 EXECAVATION
Maximum depth exceeding ........m but not exceeding .......m (In No: ) M3

Code Description Unit

EXTRA OVER; excavating in rock met with in excavations of such size or


M3
position by using wedges, lever, special plant, explosive or chemicals

EXTRA OVER; breaking up concrete on the surface of the ground M2

EXTRA OVER; breaking up tar macadam on the surface of the ground M2

EXTRA OVER; breaking up concrete met with in excavations of any depth M3

EXTRA OVER; excavating below ground water level M3

Excavating trenches starting from formation level

Excavating trenches between piles starting from formation level;

To receive strip foundation

To receive ground beams

Maximum depth not exceeding 0.25m M3

Maximum depth not exceeding 1.00m M3

Maximum depth not exceeding 2.00m M3

Maximum depth not exceeding 4.00m M3

Maximum depth exceeding .........m but not exceeding ........m M3

EXTRA OVER; excavating in rock met with in excavations of such size or


M3
position by using wedges, lever, special plant, explosive or chemicals

EXTRA OVER; breaking up concrete on the surface of the ground M2

EXTRA OVER; breaking up tar macadam on the surface of the ground M2

EXTRA OVER; breaking up concrete met with in excavations of any depth M3

EXTRA OVER; excavating below ground water level M3

Excavating service trenches starting from formation level; grading bottoms;


earthwork support; filling in with sand to a depth of ......mm thick; filling in above
with material arising from excavations; disposing of surplus excavated material by
removing

To receive service pipes; average depth ........m M

To receive cables; average depth .........m M

Excavating around services crossing NO

Excavating alongside services M

Page 9 EXECAVATION
Code Description Unit

DISPOSAL OF WATER

Surface water

Keeping the surface of the site and the excavations free from surface water ITEM

Ground water

Keeping the excavations free from ground water ITEM

DISPOSAL OF EXCAVATED MATERIAL

Disposal on site

Depositing on site in permanent spoil heaps average .........m distant M3

Depositing on site in temporary spoil heaps located at Contractor's


M3
discretion

Deposit, spread, level and compact as directed by S.O. M3

Disposal off site

Removing from site; location at contractor's discretion including provision of


M3
a shoot, dump, payment for royalties, fees, levies and other charges

Topsoil

Preserved topsoil from temporary spoil heap spread on site

Imported top soil from contractor own source to be spread on site

To make up levels over 250mm thick M3

To make up levels not exceeding 250mm thick; average .........mm thick M3

Preserved topsoil depositing on site in temporary spoil heaps for re-use


M3
located at average ......m distant

Removing preserved top soil from site; location at contractor's discretion


including provision of a shoot, dump, payment for royalties, fees, levies and M3
other charges

FILLING

Material arising from excavation

Material arising from excavation to be selected and treated

Material to be obtained off site at contractor own source

Filling to excavation M3

Page 10 EXECAVATION
Filling to excavation; depositing in layers; 250mm maximum thickness M3

To make up levels over 250mm thick M3

To make up levels over 250mm thick; depositing in layers; ...mm maximum


M3
thickness

Code Description Unit

Hardcore as specified

To make up levels over 250mm thick M3

To make up levels over 250mm thick; depositing in layers; ...mm maximum


M3
thickness

To make up levels not exceeding 250mm thick; average 250mm thick M2

Hand packing to form vertical or battering faces

Over 0.25m high M2

Not exceeding 0.25m high; .m height M

Hand packing to form sinkings

.....mm x .....mm M

.....mm x .....mm x .....mm NO

Sand as specified

Filling to excavation M3

Filling to excavation; depositing in layers; 250mm maximum thickness M3

To make up levels over 250mm thick M3

To make up levels over 250mm thick; depositing in layers; .mm maximum


M3
thickness

To make up levels not exceeding 250mm thick; average .mm thick M2

Approved sand blinding spread and levelled on hardcore (measured separately)

.mm Thick to receive concrete bed M2

Approved sand blinding laid and compacted in trench to receive pipe (pipe
measured separately)

..mm Wide x ..mm thick bed under ..mm diameter pipe, compact by
M
hand or mechanical rammer as specified

ANTI TERMITE TREATMENT

Information:

The termite treatment application shall be carried out by a termite control


NOTE
company approved by the S. O.

Page 11 EXECAVATION
Method of treatment shall be submitted to the S. O. for approval. All
relevant documents, certificate of approval, guarantee letter, brouchers and
technical catalogues shall be submitted to the S. O. before commencement NOTE
of works.

The Contractor shall cause the termite control company to provide a


guarantee for a period of ..(....) years whereby within the period, the NOTE
company shall make annual inspection at lease once a year or based on
building owner's report and carry out mainten

Code Description Unit

The Contractor shall be held responsible on all works done by the termite
NOTE
control company.

Surface treatment

Carry out anti termite treatment as specified to underside of the pile caps,
footings, ground beams and the lowest ground slabs and other structures M2
as directed by the S.O

Anti termite chemical soil treatment as specified to the whole site to the
M2
extent shown on drawing no.

ROCK SURFACE

Trimming rock surface

Trimming sides of excavation in rock; fair exposed faces M2

JKR PROBE TEST

Confirmatory JKR Probes Testing

Carry out the JKR Probes or Mackintoch to the depth as specified; each
probes should not be less than 30 blows/300mm penetration; all as per NO
S.O. Instruction

Page 12 EXECAVATION
Page 13 EXECAVATION
Code Description Unit

PILING AND DIAPHRAGM WALLING

INFORMATION

For description of soil, trial pits, bore holes, existing services and work near
NOTE
water please refer to 'Measurement Amplification And Pricing Factor'

BORED CAST IN PLACE CONCRETE PILES

Starting Level

The piling work is expected to start at and measurement have been taken
NOTE
from level as shown on drawing No.........

Plant

Bringing to site and removing from site all plant required for this section of
ITEM
the work.

Maintaining on site all plant required for this section of the work. ITEM

Isolated Bored Piles

Contiguous Bored Piles

.........mm Diameter reinforced in-situ concrete Grade ..........mm

M
Pre boring

Total number of piles. NO

Total concreted length of piles. M

Total bored depth; maximum depth .........m. M

EXTRA OVER for boring through rock; anticipated strata at ........m depth. M

EXTRA OVER for steel permanent casing; ...........mm thick. NO

EXTRA OVER for placing concrete by tremie pipe M

Jetting M

Cutting of top of pile to required level. NO

Forming enlarged bases; maximum ........mm diameter. NO

.......mm Diameter high yield deformed bar as straight and bend bar; vertical
KG
....... - .......mm long.

.......mm Diameter mild steel reinforcement as links, stirrups and binders. KG

Backfilling empty bores with selected material M

Prepare concrete pile head and reinforcement for capping. NO

Page 14 PILING
Code Description Unit

Static Load Test

Allow for ....... number preliminary testing on a group of .......


ITEM
numbers .......mm Diameter pile to a total combined load of .......KN.

Allow for ....... number subsequent testing on a single .......mm Diameter pile
ITEM
to a total combined load of .......KN.

Dynamic Test
Allow for ....... numbers pile dynamic analyzer test (PDA) on ......mm
Diameter piles ITEM

DRIVEN SHELL CAST-IN-PLACE CONCRETE PILES

Starting Level

The piling work is expected to start at and measurement have been taken
NOTE
from level as shown on drawing No.........

Plant

Bringing to site and removing from site all plant required for this section of
ITEM
the work.

Maintaining on site all plant required for this section of the work. ITEM

Micro Piles

.......mm Diameter reinforced in-situ concrete Grade .......

Pre boring M

Bore vertical hole; maximum depth .......m (In No ) M

EXTRA OVER for boring through rock commencing average .......m below
M
starting level

EXTRA OVER for permanent casings .......mm thick steel tube M

Total concreted length of piles (In No ) M

EXTRA OVER for placing concrete by tremie pipe M

Forming enlarged bases; maximum ........mm diameter. NO

API Grade D pipe; .......mm thick; minimum yield strength .......kN; as


M
reinforcement

Backfilling empty bores with selected material M

Cutting off tops to required levels NO

Preparing heads for capping NO

Page 15 PILING
Code Description Unit

Static Load Test

Allow for ....... number preliminary testing on a group of .......


ITEM
numbers .......mm Diameter pile to a total combined load of .......KN.

Allow for ....... number subsequent testing on a single .......mm Diameter pile
ITEM
to a total combined load of .......KN.

Dynamic Test
Allow for ....... numbers pile dynamic analyzer test (PDA) on ......mm
Diameter piles ITEM

PRE-FORMED CONCRETE PILES

Starting Level

The piling work is expected to start at and measurement have been taken
NOTE
from level as shown on drawing No.........

Plant

Bringing to site and removing from site all plant required for this section of
ITEM
the work.

Maintaining on site all plant required for this section of the work. ITEM

Pre-formed reinforced concrete piles, .......mm x .......mm with chamfered corners


and minimum compressive strength of .......N/mm2, galvanised steel shoe
weighing .......kg, head and base plate weighing .......kg cast onto piles.

.......mm x .......mm Pre-formed reinforced concrete Grade ....... piles as specified


complete with head and shoe all as per Engineer's drawings

Preliminary Piles

Test Piles

Raking piles, inclination angle ....... degrees, ratio ....... in .......

Total number of pile 3.00m long. NO

Total number of pile 6.00m long. NO

Total number of pile 9.00m long. NO

Total number of pile 12.00m long. NO

Total length of pile extension not exceeding 3.00m. M

Total length of pile extension exceeding 3.00m. M

Total driven depth. M

Total number of pile extension. NO

Page 16 PILING
Cutting off top of pile to required level. NO

Prepare concrete pile head and reinforcement for capping. NO

Code Description Unit

Static Load Test

Allow for ....... number preliminary testing on a group of .......


ITEM
numbers .......mm Diameter pile to a total combined load of .......KN.

Allow for ....... number subsequent testing on a single .......mm Diameter pile
ITEM
to a total combined load of .......KN.

Dynamic Test
Allow for ....... numbers pile dynamic analyzer test (PDA) on ......mm
Diameter piles ITEM

MH PRE-FORMED PRESTRESSED CONCRETE PILES

Starting Level

The piling work is expected to start at and measurement have been taken
NOTE
from level as shown on drawing No.........

Plant

Bringing to site and removing from site all plant required for this section of
ITEM
the work.

Maintaining on site all plant required for this section of the work. ITEM

SH1 Pre-formed prestressed reinforced concrete piles, .......mm x .......mm with


chamfered corners and minimum compressive strength of .......N/mm2 at 28 days,
galvanised steel shoe weighing .......kg, head and base plate weighing .......kg cast
onto piles.

.......mm x .......mm Pre-formed prestressed reinforced concrete Grade ....... piles as


specified complete with head and shoe all as per Engineer's drawings

Pre-formed prestressed reinforced concrete spun piles, .......mm diameter and


minimum compressive strength of .......N/mm2 at ....... days, galvanised steel shoe
weighing .......kg, head and base plate weighing .......kg cast onto piles.

.......mm Diameter pre-formed prestressed reinforced concrete Grade ....... spun


piles as specified complete with head and shoe all as per Engineer's drawings

Preliminary Piles

Test Piles

Raking piles, inclination angle ....... degrees, ratio ....... in .......

Descriptions Total number of pile 3.00m long. NO

Total number of pile 6.00m long. NO

Total number of pile 9.00m long. NO


Page 17 PILING
Total number of pile 12.00m long. NO

Total length of pile extension not exceeding 3.00m. M

Total length of pile extension exceeding 3.00m. M

Code Description Unit

Total driven depth. M

Total number of pile extension. NO

Cutting off top of pile to required level. NO

Prepare concrete pile head and reinforcement for capping. NO

Static Load Test

Allow for ....... number preliminary testing on a group of .......


ITEM
numbers .......mm Diameter pile to a total combined load of .......KN.

Allow for ....... number subsequent testing on a single .......mm Diameter pile
ITEM
to a total combined load of .......KN.

Dynamic Test
Allow for ....... numbers pile dynamic analyzer test (PDA) on ......mm
Diameter piles ITEM

ISOLATED STEEL PILES

Starting Level

The piling work is expected to start at and measurement have been taken
NOTE
from level as shown on drawing No.........

Plant

Bringing to site and removing from site all plant required for this section of
ITEM
the work.

Maintaining on site all plant required for this section of the work. ITEM

.......mm x .......mm x .......kg/m Universal bearing piles complete with head and shoe
all as per Engineer's drawings

Preliminary Piles

Test Piles

Raking piles, inclination angle ....... degrees, ratio ....... in .......

Total number of pile 3.00m long. NO

Total number of pile 6.00m long. NO

Total number of pile 9.00m long. NO

Total number of pile 12.00m long. NO


Page 18 PILING
Total length of pile extension not exceeding 3.00m. M

Total length of pile extension exceeding 3.00m. M

Total driven depth. M

Total number of pile extension. NO

Code Description Unit

Cutting off top of pile to required level. NO

Prepare concrete pile head and reinforcement for capping. NO

Static Load Test

Allow for ....... number preliminary testing on a group of .......


ITEM
numbers .......mm Diameter pile to a total combined load of .......KN.

Allow for ....... number subsequent testing on a single .......mm Diameter pile
ITEM
to a total combined load of .......KN.

Dynamic Test
Allow for ....... numbers pile dynamic analyzer test (PDA) on ......mm
Diameter piles ITEM

INTERLOCKING STEEL PILES

Starting Level

The piling work is expected to start at and measurement have been taken
NOTE
from level as shown on drawing No.........

Plant

Bringing to site and removing from site all plant required for this section of
ITEM
the work.

Maintaining on site all plant required for this section of the work. ITEM

Weldable steel, as specified grade ....... ; .......mm Interlock centres x .......mm web
x .......kg/m Frodingham section ref .......

Weldable steel, as specified grade 50B; 300mm Interlock centres x 150mm web x
50kg/m Larssen section ref ABC

Total area of piles; not exceeding 12.00m long M2

Total area of piles; 12.00m - 24.00m long M2

Total area of piles; exceeding 24.00m long M2

Total driven area of pile M2

EXTRA OVER for one coat Lowca Varnish, as specified type B;before driving M2

EXTRA OVER for corner piles M

EXTRA OVER for junction piles M


Page 19 PILING
EXTRA OVER for closure piles M

EXTRA OVER for taper piles M

Cutting pile horizontally to remove tops to required levels M

Cutting to form holes 100mm x 100mm NO

Total extract area of driven pile M2

Page 20 PILING
Code Description Unit

CONCRETE WORK

Plain In-Situ Concrete Grade 7 as specified; blinding screed; laid on earth or hardcore

Under pile caps

Under pad footings

Under ground beam

Under ground floors slab

Under suspended ground floors slab

Under apron slab

Not exceeding 100mm thick M3

100mm - 150mm Thick M3

150mm - 300mm Thick M3

Exceeding 300mm thick M3

Plain In-Situ Concrete Grade 15 as specified

In apron slab

In ground slab

In ramp

Not exceeding 100mm thick M3

Not exceeding 100mm thick; laid to slope not exceeding 15 degree from M3
horizontal
Not exceeding 100mm thick; laid to slope exceeding 15 degree from horizontal M3

100mm - 150mm Thick M3

100mm - 150mm Thick; laid to slope not exceeding 15 degree from horizontal M3

100mm - 150mm Thick; laid to slope exceeding 15 degree from horizontal M3

150mm - 3000mm Thick M3

150mm - 300mm Thick; laid to slope not exceeding 15 degree from horizontal M3

150mm - 300mm Thick; laid to slope exceeding 15 degree from horizontal M3

Exceeding 300mm thick M3

Exceeding 300mm thick; laid to slope not exceeding 15 degree from horizontal M3

Exceeding 300mm thick; laid to slope exceeding 15 degree from horizontal M3

Page 21 CONCRETE
Code Description Unit

Reinforced In-Situ Concrete Grade as specified

In foundations in trenches M3

In isolated foundation bases to columns (In No. ) M3

In isolated foundation bases to piers (In No. ) M3

In casings to steel grillages (In No. ) M3

In column stumps M3

In column stumps (Provisional) M3

In ground beams M3

In suspended ground beams M3

In casings to steel ground beams M3

In pile caps (In No. ) M3

In pile caps, trowelling top to slope not exceeding 15 degree from horizontal to
M3
unset concrete (In No. )

In pile caps, trowelling top to slope exceeding 15 degree from horizontal to


M3
unset concrete (In No. )

In pad footings (In No. ) M3

In pad footings, trowelling top to slope not exceeding 15 degree from horizontal to unset
M3
concrete (In No. )

In pad footings, trowelling top to slope exceeding 15 degree from horizontal to unset concrete (In M3
No. )

In ground floor bed

In suspended ground floor slab

In apron slab

In ramp

Not exceeding 100mm thick, laid on hardcore M3

Not exceeding 100mm thick; laid on hardcore to slope not exceeding 15 degree from horizontal
M3

Not exceeding 100mm thick; laid on hardcore to slope exceeding 15 degree from horizontal M3

100mm - 150mm Thick, laid on hardcore M3

100mm - 150mm Thick; laid on hardcore to slope not exceeding 15 degree from horizontal M3

100mm - 150mm Thick; laid on hardcore to slope exceeding 15 degree from horizontal M3

Page 22 CONCRETE
Code Description Unit

150mm - 3000mm Thick, laid on hardcore M3

150mm - 300mm Thick; laid on hardcore to slope not exceeding 15 degree from horizontal M3

150mm - 300mm Thick; laid on hardcore to slope exceeding 15 degree from horizontal M3

Exceeding 300mm thick, laid on hardcore M3

Exceeding 300mm thick; laid on hardcore to slope not exceeding 15 degree from horizontal M3

Exceeding 300mm thick; laid on hardcore to slope exceeding 15 degree from horizontal M3

In suspended slab

In suspended floor slab

In roof slab

In gutter slab

In coffered slab

In troughed slab

In lift wells slab

In lift wells roof slab

Not exceeding 100mm thick M3

Not exceeding 100mm thick; laid to slope not exceeding 15 degree from M3
horizontal
Not exceeding 100mm thick; laid to slope exceeding 15 degree from horizontal M3

100mm - 150mm Thick M3

100mm - 150mm Thick; laid to slope not exceeding 15 degree from horizontal M3

100mm - 150mm Thick; laid to slope exceeding 15 degree from horizontal M3

150mm - 3000mm Thick M3

150mm - 300mm Thick; laid to slope not exceeding 15 degree from horizontal M3

150mm - 300mm Thick; laid to slope exceeding 15 degree from horizontal M3

Exceeding 300mm thick M3

Exceeding 300mm thick; laid to slope not exceeding 15 degree from horizontal M3

Exceeding 300mm thick; laid to slope exceeding 15 degree from horizontal M3

EXTRA OVER for Granolithic finishes cast on to unset concrete ***** M2

Labour for treating the surface of unset concrete including depositing,


M2
spreading and levelling Page 23 CONCRETE
Labour for treating the surface of unset concrete including depositing,
M2
spreading and levelling

Code Description Unit

In upstands beam M3

In kerbs M3

In copings M3

In sills M3

In wall

In fascia wall

In fins wall

In gutter wall

In wall of lift wells

In cable trench wall

In top of dormers

In cheek of dormers

Filling to hollow walls

Not exceeding 100mm thick M3

100mm - 150mm Thick M3

150mm - 300mm Thick M3

Exceeding 300mm Thick M3


..

In retaining wall, as per drawing No............ M3


.

In floor beam M3

In roof beam M3

In roof beam, laid to slope not exceeding 15 degree from horizontal M3

In roof beam, laid to slope exceeding 15 degree from horizontal M3

In upper roof beam M3

In isolated beam M3

In ring beam M3

In casing to steel beams M3


Page 24 CONCRETE
In casing to isolated steel beams M3

Code Description Unit

In columns M3

In isolated columns M3

In casing to isolated steel columns M3

In isolated pillars M3

In stiffeners M3

Steps And Staircases

In steps and staircases M3


-----------------------------------------------------------------------

In machine bases, plinths and the like (In No....................) M3

Filling to pockets, volume exceeding 0.10m3 (In No...................) M3

Filling to pockets, volume not exceeding 0.10m3 NO

Joints

Expansion joint as detailed in the Drawing No............ M

Compression joint as detailed in the Drawing No............ M

Water stop as detailed in the Drawing No............ M

Reinforcement bars; hot rolled plain round mild steel

Reinforcement bars; hot rolled deformed high tensile steel

In foundation in trenches

In isolated foundations

In ground beams

In suspended ground beams

In pile caps

In pad footings

In column stumps

In column stumps (Provisional)

In ground floor beds


Page 25 CONCRETE
In suspended ground floor slab

In apron slab

In floor slab

In suspended slab

Code Description Unit

In upper floor slab

In roof slab

In coffered or troughed slab

In lift wells slab

In lift wells roof slab

In columns

In isolated pillars

In stiffeners

In floor beams

In roof beams

In upper beams

In sloping roof beams

In ring beams

In wall

In fascia wall

In fins wall

In gutter wall

In wall of lift wells

In cable trench wall

In steps, staircases, strings and associated landings

In top of dormers

In cheek of dormers

In machine bases, plinths and the like

In isolated columns

In isolated beams
Page 26 CONCRETE
...mm Diameter; straight and bent KG

...mm Diameter; curved bar; ..........mm radius KG

...mm Diameter; Links, stirrups, binders and the like KG

Code Description Unit

Reinforcement; fabric; hard drawn plain round steel, welded as described

In foundation in trenches

In isolated foundations

In ground beams

In suspended ground beams

In pile caps

In pad footings

In column stumps

In column stumps (Provisional)

In ground floor beds

In suspended ground floor slab

In apron slab

In floor slab

In suspended slab

In upper floor slab

In roof slab

In coffered or troughed slab

In lift wells slab

In lift wells roof slab

In columns

In isolated pillars

In stiffeners

In floor beams

In roof beams
Page 27 CONCRETE
In upper beams

In sloping roof beams

In ring beams

In wall

In fascia wall

In fins wall

Code Description Unit

In gutter wall

In wall of lift wells

In cable trench wall

In steps, staircases, strings and associated landings

In top of dormers

In cheek of dormers

In machine bases, plinths and the like

In isolated columns

In isolated beams

Type BRC Ref. No. A193 weighing 3.02 kg/m2, lapped 225mm both sides M2

Type BRC Ref. No. A252 weighing 3.95 kg/m2, lapped 225mm both sides M2

Type BRC Ref. No. A318 weighing 4.99 kg/m2, lapped 225mm both sides M2

Type BRC Ref. No. A393 weighing 6.16 kg/m2, lapped 225mm both sides M2

Type BRC Ref. No. A565 weighing 8.88 kg/m2, lapped 225mm both sides M2

Type BRC Ref. No. .. weighing ..kg/m2, lapped ...mm both sides M2

Type BRC Ref. No. A.. weighing .. kg/m2, lapped ..mm both sides, as
M
tension strip ...........mm wide

Type BRC Ref. No. B385 weighing 4.53 kg/m2, 225mm side and 125 end laps M2

Type BRC Ref. No. B503 weighing 5.93 kg/m2, 225mm side and 125 end laps M2

Type BRC Ref. No. B636 weighing 6.97 kg/m2, 225mm side and 125 end laps M2

Type BRC Ref. No. B785 weighing 8.14 kg/m2, 225mm side and 125 end laps M2

Type BRC Ref. No. B1131 weighing 10.90 kg/m2, 225mm side and 125 end laps M2

Type BRC Ref. No. B.. weighing .. kg/m2, lapped ..mm both sides, as
M
tension strip ...........mm wide
Page 28 CONCRETE
Code Description Unit

Class F1 formwork as specified to foundation and beds

Class F..... formwork as specified to foundation and beds

Class U..... formwork as specified to foundation and beds

To edges and faces of pile caps

To edges and faces of pad footings

To edges and faces of strip footings

To edges of beds

To edges of slabs

To edges of apron slabs

To ground beams

To edges and faces of machine bases

To edges and faces of plinths

Not exceeding 250mm high M

250mm - 500mm High M

250mm - 500mm High M

Over 1.00m high M2

To Column Stumps

To sides of column stumps M2

To sides of column stumps (Provisional) M2

Class F1 formwork as specified to slabs, staircases and landings

Class F..... formwork as specified to slabs, staircases and landings

Class U..... formwork as specified to slabs, staircases and landings


Page 29 CONCRETE
To soffits of slab

To soffits of slab exceeding 200mm thick, 200mm - 300mm

To soffits of slab exceeding 200mm thick, ........mm - .........mm

To sloping upper surface of slab

To soffits of roof slab

To soffits of roof slab exceeding 200mm thick, 200mm - 300mm

To soffits of roof slab exceeding 200mm thick, ........mm - .........mm

To sloping upper surface of roof slab

Code Description Unit

To soffits of coffered slabs square pan overall size 600mm x 600mm x 200mm deep

To soffits of staircases

To soffits of landings

Horizontal M2

Horizontal; soffits exceeding 3.50m high but not exceeding 5.00m high M2

Sloping not exceeding 15 degree from horizontal M2

Sloping not exceeding 15 degree from horizontal; soffits exceeding 3.50m high
M2
but not exceeding 5.00m high

Sloping over 15 degree from horizontal M2

Sloping over 15 degree from horizontal; soffits exceeding 3.50m high but not exceeding 5.00m
M2
high

To edges of slab

To steps in top of slab

To steps in soffits of slab

To risers

To ends and perimeter of openings; exceeding 1.00m girth

Not exceeding 250mm deep M

250mm - 500mm deep M

Exceeding 500mm deep, ...........mm deep M

To edges of staircases flight

.................mm maximum width M

Class F1 formwork as specified to walls


Page 30 CONCRETE
Class F..... formwork as specified to walls

Class U..... formwork as specified to walls

To faces of walls

To faces of walls; ...........mm radius

To inside of stair wells

To inside of lifts wells

To faces of cable trench walls

To one side of wall, other side uphold by existing brick or concrete wall

Vertical surfaces M2

Code Description Unit

Extra over vertical surfaces; exceeding 3.50m high M2

To ends of walls

To ends of battered walls, tapering .........mm at top and .........mm at bottom ends

To sloping top of walls

To sloping soffits of walls

To soffits of walls

To perimeter of openings; exceeding 1.00m girth

Not exceeding 250mm wide M

250mm - 500mm Wide M

exceeding 500mm wide, ...........mm wide M

Class F1 formwork as specified to beams, casings, cantilevers and the like

Class F..... formwork as specified to beams, casings, cantilevers and the like

Class U..... formwork as specified to beams, casings, cantilevers and the like

To sides and soffits of beams

To sides and soffits of roof beams

To sides and soffits of slopping roof beams

To sides and soffits of ring beams; .............mm radius

To sides and soffits of isolated beams

To sides and soffits of beams casing

To sides and soffits of cantilevered beams


Page 31 CONCRETE
To sides and soffits of cantilevered beams casing

To upper surface of beams

To sides and soffits of fascia

To sides and soffits of fin

To faces of gutter walls

Horizontal M2

Horizontal; soffits exceeding 3.50m high but not exceeding 5.00m high M2

Sloping not exceeding 15 degree from horizontal M2

Sloping not exceeding 15 degree from horizontal; soffits exceeding 3.50m high
M2
but not exceeding 5.00m high

Code Description Unit

Sloping not exceeding 15 degree from horizontal; soffits exceeding .............m


M2
high but not exceeding ...........m high

Sloping over 15 degree from horizontal M2

Sloping over 15 degree from horizontal; soffits exceeding 3.50m high but not
M2
exceeding 5.00m high

Sloping over 15 degree from horizontal; soffits exceeding .............m high but
M2
not exceeding ...............m high

Tapering ...........mm - ...............mm high M2

Class F1 formwork as specified to pilasters and columns

Class F..... formwork as specified to pilasters and columns

Class U..... formwork as specified to pilasters and columns

Columns

Pilasters

To sides of columns M2

To sides of isolated columns M2

To sides of circular columns; .........mm radius M2

To sides of pilasters M2

To sides of isolated pilasters M2

To sides of circular pilasters; ...........mm radius M2

To sides of stiffeners M2

Page 32 CONCRETE
To sides of columns, tapering .......mm at top and ......mm at bottom ends M2

PRECAST CONCRETE

Copings, kerbs, lintels, etc.

Lintels

..........mm x ..........mm Precast concrete Grade 25 as specified; reinforced with


and including ....... nos. ........mm diameter high tensile bars and ..........mm M
diameter mild steel stirrups; fair finish on all faces; bedded and jointed in
cement mortar

Padstones

..........mm x ..........mm x ..........mm Thick; reinforced with and including .......


nos. ........mm diameter high tensile bars and ..........mm diameter mild steel NO
stirrups; fair finish on all faces; bedded and jointed in cement mortar

Code Description Unit

Heel stones

..........mm x ..........mm x ..........mm High cast to profile of door frame;


reinforced with and including ....... nos. ........mm diameter high tensile bars NO
and ..........mm diameter mild steel stirrups; fair finish on all faces; bedded and
jointed in cement mortar

Precast concrete; standard or stock pattern units

Cover slab

..........mm x ..........mm x ..........mm Thick ; precast concrete Grade 25 as


specified; reinforced with and including ..........mm diameter mild steel rod NO
reinforcement space at ..........mm centres both ways including 2 nos. notched
lifting holes at ends

..........mm x ..........mm x ..........mm Thick ; precast concrete Grade .... as


specified; reinforced with and including single layer of steel fabric reinforcement NO
Type BRC Ref. No. ...... weighing ....... kg/m2, including 2 nos. notched lifting
holes at ends

Pavement

..........mm Thick approved interlocking concrete pavement as specified laid to


an approved pattern including all necessary excavation, ..........mm thick sand M2
blanket, ..........mm crusher run and restraining block all as per drawing
No. ...............

`Marigold Bronze' or approved equivalent stamp concrete imprint as per


manufacturer's detail including all necessary excavation; ..........mm thick M2
hardcore; ..........mm thick concrete Grade 7 blinding; ..........mm thick concrete
Grade 20 beds and .....

..........mm x ..........mm x ..........mm Thick approved stamp concrete as per M2


manufacturer's detail including allPage necessary
33 excavation ; ..........mm thick base; CONCRETE
..........mm x ..........mm x ..........mm Thick approved stamp concrete as per M2
manufacturer's detail including all necessary excavation ; ..........mm thick base;
..........mm thick compacted sub-base; ..........mm thick crusher run; ..........

Marker Post

Precast concrete Grade 25 as specified marker post, including all moulds finishing
on exposed surfaces and planted in ground, including symbol, lettering and
painting

For fire hydrant NO

For sluice valve NO

Code Description Unit

COMPOSITE CONSTRUCTION

Information:

The contractor shall be deemed to have studied the drawing/specification and


visited the site to determine for himself the extent and/or nature of pre casting,
transportation, multiple handling, hoisting, hoisting equipments, fixing, etc. No
claims will n

If in the opinion of the contractor, the precast components may be cast into
smaller/larger units, he should seek clarification and approval from the S.O. All
costs in connection with any amendments to the precast components shall be
borne by the contract

The contractor shall note that all unplastered surfaces to precast concrete shall
be finished smooth.He shall allow for this in his prices accordingly.

Rates to include for casting in conduits, forming chases, openings etc. for
mechanical and electrical installation.It is the contractor's responsibility to check
the extent of this work from the Mechanical and Electrical drawings.
Supply, load, transport, unload, handle and hoist the following precast concrete
components to required floor level from ground level including placing in position,
additional reinforcement, fixing and bedding, jointing and grouting, temporary formwork,
p

Precast concrete beams; designed mix concrete Grade 25 as specified

Beam Type ..........; size ..........mm x ..........mm x ..........mm high; fair finished to
all faces; hoisting to level 2 approximately ..........m high from ground level; as
per drawing no. ....................

Precast concrete columns; designed mix concrete Grade 25 as specified

Page 34 CONCRETE
Column Type ..........; size ..........mm x ..........mm x ..........mm high; fair finished
to all faces; hoisting to level 2 approximately ..........m high from ground level;
as per drawing no......................

HOLLOW-BLOCK SUSPENDED CONSTRUCTION

Precast concrete floor slabs; designed mix concrete Grade 25 as specified

Hollow cored slab panel Type ...........; size ..........mm x ..........mm x ..........mm NO
Thick; reinforced with lattice girder and main bar; complete with bracket, sealer
and peripheral ties; fair finished to all faces; hoist to .......... level approximately

Precast concrete wall; designed mix concrete grade 25 as specified

Wall panel Type .........; ..........mm x ..........mm x ..........mm thick; complete with NO
and including all reinforcement, formwork/moulding blockouts, forming pockets
and irregular profiles, anchors, spacers, distance piece, fixings, attachments

Page 35 CONCRETE
Code Description Unit

BRICKWORK AND BLOCKWORK

BRICKWORK

FOUNDATION

Clay brick as specified; in cement and sand (1:3)

Cement and sand brick as specified ; in cement and sand (1:3)

Engineering brick; in cement and sand (1:3)

Calcium silicate brick; in cement and sand (1:3)

Walls

Retaining walls

Lift walls

Core walls

Isolated piers

Walls as formwork; temporary strutting

Walls as backing to masonry; cutting and bonding

Walls; raising existing structure; starting ...mm above ground level

Half brick thick M2

Half brick thick; curved .......mean radius M2

75mm Thick brick on edge M2

One brick thick M2

One brick thick; battered M2

One brick thick; curved ......mm mean radius M2

One and a half brick thick; M2

One and a half brick thick; battered M2

One and a half brick thick; curved ..... mm mean radius M2

Page 36 BRICK
Code Description Unit

LOAD BEARING SUPERSTRUCTURE

NON-LOAD BEARING SUPERSTRUCTURE

Clay brick as specified; in cement and sand (1:6)

Cement and sand brick as specified; in cement and sand (1:6)

Engineering brick; in cement and sand (1:6)

Calcium silicate brick; in cement and sand (1:6)

Walls

Retaining walls

Lift walls

Core walls

Isolated piers

Filling existing openings

Skins of hollow walls

Dwarf support walls

Parapet walls

Balustrade walls

Kerbs

Planter box walls

Gutter walls

Walls as formwork; temporary strutting

Walls as backing to masonry; cutting and bonding

Walls; raising existing structure; starting

Half brick thick M2

Half brick thick; curved .......mean radius M2

75mm Thick brick on edge M2

One brick thick M2

One brick thick; battered M2

One brick thick; curved ......mm mean radius M2

One and a half brick thick; M2


Page 37 BRICK
One and a half brick thick; battered M2

Code Description Unit

One and a half brick thick; curved ...... mm mean radius M2

EXTRA OVER; grooved bricks M2

EXTRA OVER; rough arches, bricks on end flat, ....mm thick, .... no. of rings M

EXTRA OVER; rough arches, bricks on edge flat, ....mm thick,... no. of rings M

EXTRA OVER; rough arches, segmental, .......mm thick, ...... no. of rings M

EXTRA OVER; facework M2

EXTRA OVER; fairface M2

Projections

Sunk .......mm x ......mm from general face of wall M

Projecting .......mm x ......mm from general face of wall M

Plain bands; flush; .......mm x ......mm; horizontal M

Plain bands; projecting .......mm x ......mm from face of wall; facing and
M
pointing margins; horizontal

Thickening existing walls

Cutting pocket and bonding new to existing and extra material to


M2
bonding; ......mm thickness

Projection on existing wall; plain bands; flush; .......mm x ......mm; horizontal M

Tapering Walls

Battered one face ..... : ......; average thickness ......mm; M2

Battered both faces .... : .....; average thickness .....mm; M2

Bonding ends of walls

Cutting pocket in existing works and extra material for bonding; ......mm thickness M

BRICK FACEWORK

LOAD BEARING SUPERSTRUCTURE

NON-LOAD BEARING SUPERSTRUCTURE

Facing brick as specified; in cement and sand (1:6) and pointing as specified

Purpose-made brick; ...............

Walls

Page 38 BRICK
Retaining walls

Lift walls

Code Description Unit

Core walls

Isolated piers

Filling existing openings

Skins of hollow walls

Dwarf support walls

Parapet walls

Balustrade walls

Kerbs

Planter box walls

Gutter walls

Half brick thick; entirely facing brick M2

Half brick thick; entirely facing brick; curved ...... mm radius on face M2

Half brick thick; entirely facing brick; battered M2

75mm Thick brick on edge; entirely facing brick M2

75mm Thick brick on edge; entirely facing brick; curved ...... mm radius on face M2

One brick thick; entirely facing brick M2

One brick thick; entirely facing brick; curved ......mm radius on face M2

One brick thick; entirely facing brick; battered M

Facework to margin M

Facework to curved margins; ..... mm radius on face M

Facework to shaped margins M

Facework built overhand M

Facework to panels or aprons .....mm x .....mm NO

Fair returns to ends of walls or reveals or openings; .........mm width M

Battered facework; ....... : ....... M2

Facework sunk; set-back; ......mm depth M

Facework projecting; set-forward; .........mm depth M


Page 39 BRICK
EXTRA OVER tile creasing; flush; ........ courses; horizontal M

EXTRA OVER tile creasing; sunk ; ......... courses; ..........mm depth set-back; horizontal M

EXTRA OVER tile creasing; projecting; ......... courses; .......mm depth set-forward; horizontal M

Code Description Unit

Plain bands

Facework to plain bands; flush; ......mm width; horizontal M

Facework to plain bands; sunk ..........mm from face of wall; pointing


M
margins; ..........mm width; horizontal

Facework to plain bands; projecting ............mm from face of wall; pointing


M
margins; .........mm width; horizontal

Ornamental bands and cornices

Facework to flush; ......mm width; horizontal M

Facework to sunk brick-on-edge bands: ......mm from face of wall; pointing


M
margins; ......mm width; raking

Facework to projecting brick-on-end bands; .......mm from face of wall;


M
pointing margins; ......mm width; curved

Facework to moulded plinth cappings; .......mm from face of wall; pointing


M
margins; ......mm width; vertical

Facework to dentil and corbel bands; one course of alternate stretchers and
headers, headers projecting 50mm from face of wall, stretchers flush; one M
course all headers projecting 50mm from face of wall; facing and pointing
margins; 150mm wide; horizontal

Quoins

Facework to quoins; flush; ......mm average girth; straight jointed to general facework M

Facework to quoins; sunk .....mm average girth; pointing margins; .....mm


M
depth set-back; bonded to general facework

Facework to quoins; projecting; .......mm average girth; pointing


M
margins; ......mm depth set-forward; ....... jointed to general facework

Arches and tumblings

Flat arches; .......mm width on face; ..........mm width of exposed soffit; bricks-on-edge M

Flat arches; ........mm width on face; ..........mm width of exposed soffit; bricks-on-ends M

Segmental arches; ........mm width on face; ..........mm width of exposed soffit; bricks-on-ends M

Semi-circular arches; ........mm width on face; ..........mm width of exposed soffit; bricks-on-en M

Bullseyes arches; ........mm width on face; ..........mm width of exposed soffit; bricks-on-ends M

Page 40 BRICK
Tumblings of buttresses size ........mm x ......mm; bricks-on-end M

Code Description Unit

Sills, thresholds, copings and steps

Sills; bricks-on-edge; pointing top and one side

Sills; bricks-on-end; pointing one side

Sills; single cant as specified bricks-on-edge; pointing top and one side

Sills; single bullnose as specified bricks-on-edge; pointing top and one side

Thresholds; bricks laid flat; pointing top

Copings; bricks-on-edge; pointing top and each side

Copings; double bullnose as specified bricks-on-edge; pointing top and each side

Steps; bricks-on-edge; pointing top and one side

Risers to steps; bricks-on-edge; pointing one side

Kerbs; bricks-on-edge; pointing top and one side

Kerbs; single bullnose as specified bricks-on-edge; pointing top and one side

113mm x 75mm; horizontal M

225mm x 113mm; horizontal M

225mm x 113mm; horizontal; set weathering; projecting 100mm from general face of wall M

225mm x 113mm; horizontal; built curved on plan, radius on face ..........mm M

225mm x 113mm; raking M

Corbells; pointing face, each side and returns

.........mm x ........mm total projection x .........mm deep; three courses, each


NO
course projecting 50mm beyond course below

Bases to pilasters; pointing each side

Cappings to pilasters; pointing top and each side

Cappings to isolated piers; pointing top and each side

............mm x ..........mm x ..........mm NO

Bonding ends to existing common brickwork

Page 41 BRICK
Bonding ends to existing brick facework

Bonding ends to existing concrete block facework in 225mm high courses

Half brick walls; cutting 110mm x 110mm x 235mm pockets and block
M
bonding - 1 no./m; extra material

One brick walls; cutting 235mm x 110mm x 235mm pockets and block
M
bonding - 1no./m; extra material

Code Description Unit

BLOCKWORK

NON-LOAD BEARING SUPERSTRUCTURE

Autoclaved aerated concrete blocks as specified; in adhesive mortar

Lightweight concrete blocks as specified; in cement mortar (1:6) with approved


plasticiser; flush smooth pointing as work proceeds

Concrete hollow blocks as specified; in cement mortar (1:6); flush smooth


pointing as work proceeds

Concrete hollow blocks as specified; in white coloured cement mortar (1:6); flush smooth
pointing as work proceeds; work designed to be built without cutting blocks

Walls or partitions

Filling existing openings

Skins of hollow walls

Dwarf support walls

Isolated casings

Walls as formwork; temporary strutting

Walls as backing to masonry; cutting and bonding

Walls; raising existing structure; starting

......mm Thick M2

......mm Thick; finishing fair and pointing one side M2

...... mm Thick; finishing fair and pointing each side M2

........mm Thick of two ........mm thick skins; galvanised expanded steel


M2
mesh ties - 4/m2 built in

........mm Thick of two ........mm thick skins; galvanised expanded steel


M2
mesh ties - 4/m2 built in; finishing fair and pointing one side

........mm thick of two ........mm thick skins; galvanised expanded steel mesh
M2
ties - 4/m2 built in; finishing fair and pointing each side

EXTRA OVER; filling ends of hollow blocks with clay slips in cement mortar (1:4) M
Page 42 BRICK
EXTRA OVER; solid end blocks M

Bonding ends to existing concrete blockwork M

........mm Blockwork; forming ........mm deep pockets and bonding every


M
third course; extra material

........mm Blockwork; cutting ........mm deep pockets and bonding every third
M
course; extra material

Code Description Unit

Glass block as specified, jointing in cement mortar (1:4); flush smooth pointing in
white cement as work proceeds; work designed to be built without cutting blocks

Walls or partitions

Filling existing openings

.....mm Thick M2

.....mm Wide bedding to perimeter of glass blockwork with ........ M

DAMP PROOF COURSE

Bituminous damp proof course as specified; 150mm laps; bedding in cement


mortar (1:1); no allowance in measurement for laps

On horizontal surfaces

On raking surfaces

On vertical surfaces

On curved surfaces

On horizontal surfaces; existing; preparatory brushing down

..........mm Wide M

Over 225mm wide M2

Damp proof course; Nuralite bitumen asbestos; no laps; bedding in cement


mortar (1:6)

On horizontal surfaces

On curve surfaces

Cavity tray unit; 253mm maximum girth x 400mm long; three times bent;
NO
forming cavity gutters in hollow wall

SUNDRIES

Reinforcement bars in walls, hot rolled plain round mild steel


Page 43 BRICK
.........mm; Straight or bent bars KG

Weather fillets in cement mortar (1:3)

Angle fillets in cement mortar (1:3)

.........mm Face width M

..........mm Face width; curved M

Code Description Unit

Raking out joints in brickwork for turned in edges of flashings; pointing with
cement mortar (1:3)

Raking out joints in existing brickwork for turned in edges of flashings; pointing
with cement mortar (1:3)

Raking out and enlarging joints in brickwork for nibs of asphalt; pointing with
cement mortar (1:3)

Raking out and enlarging joints in existing brickwork for nibs of asphalt; pointing
with cement mortar (1:3)

Cutting grooves in brickwork for water bars or the like

Cutting grooves in existing brickwork for turned in edges of flashings; pointing


with cement mortar (1:3)

Horizontal M

Raking M

Stepped M

Vertical M

Curved M

Horizontal; making good fair face or facings M

Raking; making good fair face or facings M

Stepped; making good fair face or facings M

Vertical; making good fair face or facings M

Curved; making good fair face or facings M

Expansion joints in clay brickwork

Expansion joints in clay brickwork

Expansion joints in facing brickwork

Page 44 BRICK
Expansion joints in blockwork

Expansion joints at boundary of clay brickwork

Expansion joints at boundary of engineering brickwork

Expansion joints at boundary of facing brickwork

Expansion joints at boundary of blockwork

15mm Wide; vertical; in 230mm thick wall; filling with approved filler as
M
specified, pointing each side

Code Description Unit

Building in metal windows; building in lugs; bedding in cement mortar (1:3),


pointing with approved mastic one side

50mm Wide x 100mm high; lugs to brick jambs NO

50mm Wide x 100mm high; lugs to brick jambs; plugging and screwing to
NO
brick sill and concrete head

Building in metal windows; cutting and pinning lugs; bedding in cement mortar
(1:3), pointing with approved standard mastic one side

50mm Wide x 100mm high; lugs to existing brick jambs; plugging and
NO
screwing to brick sill and concrete head

Building in metal windows; screwing with galvanised screws; bedding in cement


mortar (1:6), pointing with approved standard mastic one side

50mm Wide x 100mm high; plugging and screwing to brick jambs and sill
NO
and concrete head

Cutting and pinning to brickwork; ends of

Cutting and pinning to existing brickwork; ends of

Cutting and pinning to existing blockwork; ends of

Lintels and the like NO

Steps and the like NO

Timbers and the like NO

Steel sections and the like NO

Brackets and the like NO

Forming openings

.........mm x .........mm ; through .........mm brick wall NO

.........mm x .........mm ; through .........mm brick wall; making good fair face
NO
or facings one side Page 45 BRICK
.........mm x .........mm ; through .........mm brick wall; making good fair face
NO
or facings one side

.........mm x .........mm ; through .........mm block wall NO

Air bricks as specified, clay; square hole pattern; building into prepared openings

Ventilating gratings as specified, galvanised cast iron; square hole pattern;


building into prepared openings

Soot-doors as specified; square hole pattern; building into prepared openings

.........mm x .........mm ; pointing with gauged mortar one side NO

Code Description Unit

Centering to flat soffits of brickwork

Centering to flat soffits of blockwork

.........mm Span; .........mm wide NO

.........mm Span; .........mm wide; support over 3.50m NO

.........mm Span; .........mm wide; support over 5.00m NO

Centering to soffits of brickwork segmental arches

Centering to soffits of brickwork semi-circular arches

Centering to inverts of brickwork invert arches

Centering to soffits and inverts of brickwork bullseye arches

Centering to soffits of blockwork segmental arches

Centering to soffits of blockwork semi-circular arches

.........mm span, .........mm wide; .........mm rise NO

.......mm span, .......mm wide; ......mm rise; supports 3.50m - 5.00m high NO

Page 46 BRICK
Page 47 BRICK
Code Description Unit

MASONRY

DRESSED NATURAL STONEWORK

Natural stonework dressings as specified; bedding and jointing in mason's mortar


(1:3:12); flush smooth pointing as work proceeds; slurrying with weak lime mortar
and cleaning down on completion

Walls

230mm Thick stones; plain and sawn faces - 1

230mm Thick stones; plain and rubbed faces - 1

Facework built against 230mm backing with 3.5mm wall ties - 4/m2 built in;
cutting and pinning to existing work

230mm Thick stones; plain and sawn faces - 1

230mm Thick stones; plain and rubbed faces - 1

NATURAL STONE RUBBLE WORK

Natural stone rubble work as specified; bedding and jointing in mason's mortar
(1:3:12); flush smooth pointing as work proceeds; slurrying with weak lime mortar
and cleaning down on completion

Walls

230mm Thick stones; plain and sawn faces - 1

230mm Thick stones; plain and rubbed faces - 1

Facework built against 230mm backing with 3.5mm wall ties - 4/m2 built in;
cutting and pinning to existing work

230mm Thick stones; plain and sawn faces - 1

230mm Thick stones; plain and rubbed faces - 1

Page 48 MASONRY
Page 49 MASONRY
Code Description Unit

WATERPROOFING AND ASPHALT WORK

DAMP PROOFING AND TANKING

Damp-proofing or tanking as specified (limestone aggregate)

Damp-proofing or tanking as specified (natural rock aggregate)

Damp Proof Membrane as specified

Coverings; two coats of asphalt, totalling 15mm thick; to brickwork base

Coverings; 1 layer of Polythene sheet as specified, 0.125mm thick; laid on hardcore

Covering; "Chemseal" or equivalent polymer cementation flexible waterproofing


slurry as specified at 2kg/m2; lain on concrete slab

Over 300mm wide; flat; subsequently covered M2

Over 300mm wide; sloping 10 - 45 degrees from horizontal; subsequently covered M2

Over 300mm wide; vertical or sloping over 45 degrees from horizontal;


M2
subsequently covered

Over 300mm wide; vertical or sloping over 45 degrees from horizontal;


M2
subsequently covered; carried out overhand

Over 300mm wide; vertical or sloping over 45 degrees from horizontal;


M2
subsequently covered; in confined situations

Over 300mm wide; vertical or sloping over 45 degrees from horizontal;


M2
subsequently covered; on retaining walls

Not exceeding 150mm wide; flat; subsequently covered M

Not exceeding 150mm wide; sloping 10 - 45 degrees from horizontal;


M
subsequently covered

Not exceeding 150mm wide; vertical or sloping over 45 degrees from


M
horizontal; subsequently covered

150mm - 300mm Wide; flat; subsequently covered M

150mm - 300mm wide; sloping 10 - 45 degrees from horizontal;


M
subsequently covered

150mm - 300mm wide; vertical or sloping over 45 degrees from horizontal;


M
subsequently covered

Working into outlet pipes or the like NO

Linings to cesspools; two coats of asphalt, totalling 20mm thick; to concrete base

Linings to sumps; two coats of asphalt, totalling 20mm thick; to concrete base

500mm x 500mm x 200mm NO

500mm x 500mm x 200mm; arrises - 4; internal angle fillets - 4 NO

Page 50 WATERPROOFING
Code Description Unit

Collars to pipes or the like; two coats of asphalt, totalling 20mm thick to metal
base; priming base with bitumen

200mm Diameter x 750mm long; subsequently covered NO

FLOORING AND UNDERLAY

Paving or sub-flooring as specified (limestone aggregate); smooth floated finish

Paving or sub-flooring as specified (limestone aggregate); closing in and matt


finishing; wax dressing; glass fibre tissue isolating membrane

Paving or sub-flooring as specified (natural rock aggregate); smooth floated finish

Paving or sub-flooring as specified (natural rock aggregate); building paper


isolating membrane

Paving or sub-flooring as specified (limestone aggregate); smooth floated finish;


sheathing felt isolating membrane as specified, butt joints

Coverings; two coats of asphalt, 20mm thick; to concrete base

Over 300mm wide; flat M2

Over 300mm wide; flat; subsequently covered M2

Over 300mm wide; sloping 10 - 45 degrees from horizontal M2

Not exceeding 150mm wide; flat M

150mm - 300mm Wide; flat M

Working against frames of manhole covers or the like M

Skirtings; two coats of asphalt, 20mm thick; to brickwork base

Skirtings; two coats of asphalt, 20mm thick; no underlay; to brickwork base

115mm Wide on face; fair edges - 1; coved internal angles - 1 M

PAVING

Paving or sub-flooring as specified (limestone aggregate); smooth floated finish;


sheathing felt isolating membrane as specified, butt joints

Skirtings; two coats of asphalt, 20mm thick; no underlay; to brickwork base

115mm Wide on face; fair edges - 1; coved internal angles - 1 M

Page 51 WATERPROOFING
Code Description Unit

ROOFING

Roofing as specified (limestone aggregate), sand rubbing; sheathing felt isolating


membrane as specified, butt joints

Coverings; 2 coats of asphalt, totalling 20mm thick to concrete base

Over 300mm wide; flat M2

Roofing as specified (limestone aggregate); covering with 13mm limestone chippings in hot
bitumen; sheathing felt isolating membrane as specified butt joints

Coverings; 2 coats of asphalt, totalling 20mm thick to concrete base

Over 300mm wide; flat M2

Roofing as specified; (natural rock aggregate); covering with 13mm white spar
chippings in hot bitumen; glass fibre tissue isolating membrane; 25mm resin
bonded glass fibre slab underlay; 0.127mm polythene vapour barrier; bonding
underlay to vapour barrie

Coverings; 2 coats of asphalt, totalling 20mm thick to concrete base

Coverings; 2 coats of asphalt, totalling 20mm thick to brickwork base, no isolating


membrane; priming base with bitumen

Coverings; 2 coats of asphalt, totalling 20mm thick; bonding underlay with hot
bitumen compound to concrete base, priming base with bitumen

Coverings; 2 coats of asphalt, totalling 20mm thick; fixing lathing with galvanised
steel clout nails to timber

Over 300mm wide; flat M2

Over 300mm wide; flat; subsequently covered M2

Over 300mm wide; sloping 10 - 45 degrees from horizontal M2

Over 300mm wide; vertical M2

Not exceeding 150mm wide; flat M

Not exceeding 150mm wide; sloping 10 - 45 degrees from horizontal M

Not exceeding 150mm wide; vertical M

150mm - 300mm Wide; flat M

150mm - 300mm Wide; sloping 10 - 45 degrees from horizontal M

Working into outlet pipes or the like NO

Fascias; 2 coats of asphalt, totalling 20mm thick, no isolating membrane; to


brickwork base; priming base with bitumen

Page 52 WATERPROOFING
Fascias; 2 coats of asphalt, totalling 20mm thick, no isolating membrane; to
concrete base; priming base with bitumen

Code Description Unit

Skirtings; 2 coats of asphalt, totalling 20mm thick; fixing lathing with galvanised
steel clout nails to timber base

Skirtings; 2 coats of asphalt, totalling 20 thick, no isolating membrane; to


brickwork base; priming base with bitumen

100mm Wide on face; fair edges - 1; arrises - 1 M

100mm Wide on face; drips - 1; arrises - 1 M

100mm Wide on face; fair edges - 1; internal angle fillets - 1 M

100mm Wide on face; internal angle fillets - 1; turning into grooves - 1 M

Average 80mm wide on face; internal angle fillets - 1; turning into grooves - 1 M

100mm Wide on face, on roof slopes; internal angle fillets - 1 M

100mm Wide on face, on roof slopes; internal angle fillets - 1; dressing over
M
tilting fillets - 1; subsequently covered

SUNDRIES

Roof ventilators

Extra-aqua-vents as specified; setting in position NO

Hydrovent Type ..........; fixing with galvanised steel screws to concrete; plugging NO

Page 53 WATERPROOFING
Page 54 WATERPROOFING
Code Description Unit

ROOFING

SLATE OR TILE ROOFING

Roof coverings; interlocking concrete tiles as specified; fixing, lapping and


battens all as per manufacturer's instructions

Roof coverings; Monier `Contour' or approved equivalent interlocking concrete


tiles as specified; fixing, lapping and battens all as per manufacturer's instructions

Roof coverings; clay tiles as specified; fixing, lapping and battens all as per
manufacturer's instructions

Sloping, pitch .............. degrees M2

Sloping, pitch .......... degrees; curved, radius ..........mm M2

EXTRA OVER for double course eaves tile M

EXTRA OVER for double course eaves tile; raking M

EXTRA OVER for eaves tiles M

EXTRA OVER for eaves tiles; raking M

EXTRA OVER for eaves tiles; curved, radius ..........mm M

EXTRA OVER for verges tiles M

EXTRA OVER for valley tiles M

EXTRA OVER for ridge tiles M

EXTRA OVER for hip tiles M

EXTRA OVER for fair ends NO

EXTRA OVER for .......... way apex NO

EXTRA OVER for glass tiles NO

Wall cladding; plain concrete tiles as specified; fixing, lapping and battens all as
per manufacturer's instructions

Vertical M2

Vertical; curved, radius ..........mm M2

EXTRA OVER for ..........


M/NO
Underlay

Double sided aluminium foil insulation as specified; laid on and including


M2
chicken wire netting; lapped 150mm at joints

Single sided aluminium foil insulation as specified; laid on and including


M2
chicken wire netting; lapped 150mm at joints

Page 55 ROOFING
Code Description Unit

............... sided aluminium foil insulation as specified; 50mm thick fibre


glass quilt, weighting not less than 9.60 kg/m3; laid on 13mm galvanised M2
chicken wire netting with requisite trying wire

.......... sided aluminium foil insulation as specified; 50mm thick rockwool,


weighting not less than 60 kg/m3; fixed in accordance with manufacturer's M2
instruction

Roof coverings; asbestos cement slates as specified; fixing each slate with one
copper disc rivet and two copper nails to 100mm lap; 38mm x 25mm timber
battens fixed with aluminium alloy round plain head nails

Sloping, pitch .............. degrees M2

Sloping, pitch .......... degrees; curved, radius ..........mm M2

EXTRA OVER for triple course at eaves, with under eaves course slates,
M
eaves course slates and standard slates

EXTRA OVER for triple course at eaves, with under eaves course slates,
M
eaves course slates and standard slates; raking

EXTRA OVER for triple course at eaves, with under eaves course slates,
M
eaves course slates and standard slates; curved, radius ........mm

EXTRA OVER for double course at top edges M

EXTRA OVER for double course at top edges; curved, radius ..........mm M

EXTRA OVER for verges; tile-and-half slates; supplementary fixing with


M
copper rivets

EXTRA OVER for raking verges; tile-and-half slates; supplementary fixing


M
with copper rivets

EXTRA OVER for curved verges; tile-and-half slates; supplementary fixing


M
with copper rivets

EXTRA OVER for ridge tiles, angular; in ........mm effective lengths; socketed; M
supplementary fixing with copper disc rivets and stainless steel clips

EXTRA OVER for ridge tiles, 120 degrees roll top angular; in .......mm effective M
lengths; rebate jointed; supplementary fixing with stainless steel clips

EXTRA OVER for ridge tiles, half round tapering; in .........mm effective
lengths; lap jointed; supplementary fixing with copper disc rivets and M
stainless steel clips

Cladding; asbestos cement slates as specified; fixing each slate with one copper
disc rivet and two copper nails to 100mm lap; 38mm x 25mm timber battens fixed
with aluminium alloy round plain head nails

Vertical M2

Vertical; curved, radius ..........mm M2

Page 56 ROOFING
Code Description Unit

Underlay

Double sided aluminium foil insulation as specified; laid on and including


M2
chicken wire netting; lapped 150mm at joints

Single sided aluminium foil insulation as specified; laid on and including


M2
chicken wire netting; lapped 150mm at joints

............... sided aluminium foil insulation as specified; 50mm thick fibre


glass quilt, weighting not less than 9.60 kg/m3; laid on 13mm galvanised M2
chicken wire netting with requisite trying wire

.......... sided aluminium foil insulation as specified; 50mm thick rockwool,


weighting not less than 60 kg/m3; fixed in accordance with manufacturer's M2
instruction

CORRUGATED OR TROUGHED SHEET ROOFING OR CLADDING

Roof coverings; asbestos cement corrugated sheets as specified; nominal


thickness ..........mm; natural both sides; bedded in bitumen mastic; fixing and
lapping all as per manufacturer's instructions

Roof coverings; zinc corrugated sheets as specified; nominal


thickness ........6mm; natural both sides; fixing and lapping all as per
manufacturer's instructions

Roof coverings; galvanised steel troughed sheet as specified; nominal overall


thickness ..........mm; natural soffit and top surface; fixing and lapping all as per
manufacturer's instructions

Roof coverings; colourbond alluminium troughed sheet as specified; nominal


overall thickness ..........mm; natural soffit and top surface; fixing and lapping all
as per manufacturer's instructions

Roof coverings; polycarbonate troughed sheet as specified; nominal overall


thickness ..........mm; natural soffit and top surface; fixing and lapping all as per
manufacturer's instructions

Flat or sloping not exceeding 50 degrees from horizontal M2

Sloping over 50 degrees from horizontal M2

Approved equivalent ridge capping to match roofing sheet M

Approved equivalent hip capping to match roofing sheet M

EXTRA OVER for .......... rooflights, ........mm x ........mm NO

EXTRA OVER for transparent sheets , ........mm x ........mm NO

EXTRA OVER for ventilator sheets , ........mm x ........mm NO

EXTRA OVER for sheets with soaker flanges for ........mm diameter pipes NO

Page 57 ROOFING
Code Description Unit

Cladding; asbestos cement corrugated sheets as specified; nominal


thickness .....mm; natural both sides; bedded in bitumen mastic; fixing and
lapping all as per manufacturer's instructions

Vertical M2

Approved equivalent vertical angle capping to match roofing sheet M

Underlay

Double sided aluminium foil insulation as specified; laid on and including


M2
chicken wire netting; lapped 150mm at joints

Single sided aluminium foil insulation as specified; laid on and including


M2
chicken wire netting; lapped 150mm at joints

............... sided aluminium foil insulation as specified; 50mm thick fibre


glass quilt, weighting not less than 9.60 kg/m3; laid on 13mm galvanised M2
chicken wire netting with requisite trying wire

.......... sided aluminium foil insulation as specified; 50mm thick rockwool,


weighting not less than 60 kg/m3; fixed in accordance with manufacturer's M2
instruction

ROOF DECKING AND WALL CLADDING

Roof coverings; galvanised steel decks as specified; nominal overall


thickness ..........mm; natural soffit and top surface; fixing and lapping all as per
manufacturer's instructions

Roof coverings; galvanised prepainted steel decks as specified; nominal overall


thickness ..........mm; natural soffit and top surface; fixing and lapping all as per
manufacturer's instructions

Roof coverings; alluminium sheets as specified; nominal overall


thickness ..........mm; natural soffit and top surface; fixing and lapping all as per
manufacturer's instructions

Flat or sloping not exceeding 50 degrees from horizontal M2

Sloping over 50 degrees from horizontal M2

Approved equivalent ridge capping to match metal roof decking M

Approved equivalent hip capping to match metal roof decking M

Cladding; protected metal troughed sheets as specified; nominal thickness


.....mm; standard colour; 150mm end laps and one corrugation side laps, secured
with rivets at average 450mm centres and sealed with mastic tape

Vertical M2

Page 58 ROOFING
Approved equivalent vertical angle capping to match metal decking M

Underlay

Double sided aluminium foil insulation as specified; laid on and including


M2
chicken wire netting; lapped 150mm at joints

Code Description Unit

Single sided aluminium foil insulation as specified; laid on and including


M2
chicken wire netting; lapped 150mm at joints

.............. sided aluminium foil insulation as specified; 50mm thick fibre glass
quilt, weighting not less than 9.60 kg/m3; laid on 13mm galvanised chicken M2
wire netting with requisite trying wire

.......... sided aluminium foil insulation as specified; 50mm thick rockwool,


weighting not less than 60 kg/m3; fixed in accordance with manufacturer's M2
instruction

SHEET METAL FLASHINGS AND GUTTERS

Flashings; galvanised iron sheet as specified; ........ gauge; 150mm lapped joints;
fixing with matching clips and wedges

Flashings; zinc sheet as specified; ........ gauge; 150mm lapped joints; fixing with
matching clips and wedges

Flashings; aluminium sheet as specified; ........ gauge; 150mm lapped joints;


fixing with matching clips and wedges

.........mm Girth; ........ times bent; top edges dressed over battens M

..........mm Girth; one ends wedging into grooves; other ends dressing along
M
corrugations of roof tiling

Gutters; galvanised iron sheet as specified; ..... gauge linings to sloping gutters;
fixing with zinc clips

Gutters; zinc sheet as specified; ..... gauge linings to sloping gutters; fixing with
zinc clips

Gutters; aluminium sheet as specified; ..... gauge linings to sloping gutters; fixing
with zinc clips

..........mm Girth M

..........mm Girth; as per drawing No........ M

Page 59 ROOFING
Page 60 ROOFING
Code Description Unit

WOODWORK

FLOORS

Sawn timber as specified

Wrot timber as specified

..........mm x ..........mm M

..........mm x ..........mm; fixing by bolting M

..........mm x ..........mm board; fixing by bolting M

....mm x ....mm in one continuous lengths exceeding 5.00m but n.e. 5.60m M

.......mm x .......mm in one continuous lengths exceeding 5.00m but n.e.


M
5.60m; fixing by bolting

.....mm x ......mm in one continuous lengths exceeding .....m but n.e......m M

Boarding And Flooring

Boarding to floors, tongued and grooved joints

Boarding to floors, crosstongued joints

........mm Thick M2

.........mm Thick, conical curved; ..........mm radius M2

.........mm Thick; secret fixing M2

.........mm Thick, .........mm x .........mm overall NO

.........mm Thick, conical curved; ..........mm radius NO

........mm Thick, .........mm wide M

.........mm Thick, .........mm wide, conical curved; ..........mm radius M

Skirting

.......mm x .......mm M

.......mm x .......mm in one width M

.......mm x .......mm; crosstongued M

.......mm x .......mm; fixing with screws M

.......mm x .......mm; fixing with screws; countersinking and pellating M

.......mm x .......mm; rounded edges M

.......mm x .......mm; chamfers M

.......mm x .......mm; splays M

Page 61 WOODWORK
.......mm x .......mm; . M

Code Description Unit

Forming holes for pipes, bars, cables and the like

.......mm diameter holes through .......mm thick timber NO

...mm diameter holes through ....mm thick timber; all as per drawing No. .... NO

Forming holes for ducting, trunking and the like

Not exceeding 0.025m2 cross section area through 150mm thick timber NO

Not exceeding 0.025m2 cross section area through .........mm thick timber NO

Exceeding 0.025m2 but not exceeding 0.050m2 cross section area through
NO
150mm thick timber

Exceeding ..........m2 but not exceeding ..........m2 cross section area


NO
through .........mm thick timber

Dowels, bolts with nuts and washers and the like

.........mm Diameter M.S. bolts; .........mm long, including drilling through and
NO
fixing to.........mm thick timber

.........mm Diameter M.S. bolts; .........mm long, including drilling through and
NO
fixing to.........mm thick timber ; all as per drawing No. .........

.........mm Diameter M.S. dowels; .........mm long, including drilling through


NO
and fixing to.........mm thick timber

16mm Diameter M.S. anchor bolt; 200mm long with one end bend and cast
NO
into concrete

16mm Diameter M.S. anchor bolt; 200mm long with one end fishtailed and
NO
cast into concrete

.........mm Diameter M.S. anchor bolt; .........mm long with one end fishtailed
NO
and cast into concrete

WALLS AND PARTITIONS

Sawn timber as specified

Wrot timber as specified

..........mm x ..........mm M

..........mm x ..........mm; fixing by bolting M

....mm x ....mm in one continuous lengths exceeding 5.00m but n.e. 5.60m M

.......mm x .......mm in one continuous lengths exceeding 5.00m but n.e.


M
5.60m; fixing by bolting

.....mm x ......mm in one continuous lengths exceeding .....m but n.e......m M

.....mm x ......mm in one continuous lengths exceeding .....m but


M
n.e......m,fixing by bolting Page 62 WOODWORK
.....mm x ......mm in one continuous lengths exceeding .....m but
M
n.e......m,fixing by bolting

Code Description Unit

Framework to brick walls; to receive wall finish

Framework to partition; to receive wall finish

Framework around concrete columns; to receive wall finish

Framework around false columns; to receive wall finish

Framework around steel stanchions; to receive wall finish

.........mm wide; .........mm x .........mm members at .........mm centres each


M
way

Exceeding 300mm wide; .........mm x .........mm members at .........mm


M2
centres each way

.........mm wide; .........mm x .........mm members at .........mm centres each


M
way; fixing by bolting

Exceeding 300mm wide; .........mm x .........mm members at .........mm


M2
centres each way; fixing by bolting

Boarding to walls, 100mm space between boards

Boarding to walls; rebated joints

Boarding to walls; shiplapped joints

Boarding to walls; tongued, grooved and veed joints

..........mm Thick; vertical M2

.........mm Thick; sloping M2

.........mm Thick; conical curved; 3000mm radius M2

.........mm Thick; vertical; secret fixing M2

.........mm Thick; sloping; secret fixing M2

.........mm Thick; conical curved; ..mm radius; secret fixing M2

........mm Thick; internal; M2

.........mm Thick, .........mm x .........mm overall NO

.........mm Thick, conical curved; ..........mm radius NO

........mm Thick, .........mm wide M

.........mm Thick, .........mm wide, conical curved; ..........mm radius M

Sheet Linings and Casings to walls and partitions

Sheet Linings and Casings to sides of isolated column, reveals of opening, pipe
casings and the like Page 63 WOODWORK
Sheet Linings and Casings to sides of isolated column, reveals of opening, pipe
casings and the like

Sheet Linings and Casings to reveals of opening

Code Description Unit

Sheet Linings and Casings to pipe casings

Cement Board

Asbestos Free Board

Mineral Fibre Board

Fibrous Plasterboard

UAC Superflex Board

Timber Lamited Cladding

Plastic Sheet

.......mm x .......mm x .......mm Thick ; vertical M2

.......mm x .......mm x .......mm Thick ; vertical; fixing by bolting M2

.......mm x .......mm x .......mm Thick; sloping M2

.......mm x .......mm x .......mm Thick; sloping; fixing by bolting M2

.......mm x .......mm Thick; .......mm wide: vertical M

......mm x ....mm Thick; ....mm wide; vertical; fixing by bolting M

.......mm x .......mm Thick; .......mm wide; sloping M

....mm x....mm Thick; ....mm wide; sloping; fixing by bolting M

Edges of isolated column, reveals of opening, pipe casings and the like

Edges of reveals of opening

Edges of pipe casings

Cement Board

Asbestos Free Board

Mineral Fibre Board

Fibrous Plasterboard

UAC Superflex Board

Timber Lamited Cladding

Plastic Sheet

...mm Wide; vertical; fixing by bolting M


Page 64 WOODWORK
...mm Wide; sloping; fixing by bolting M

Code Description Unit

Architraves

.......mm x .......mm M

.......mm x .......mm in one width M

.......mm x .......mm; crosstongued M

.......mm x .......mm; fixing with screws M

.......mm x .......mm; fixing with screws; countersinking and pellating M

.......mm x .......mm; rebates M

.......mm x .......mm; chamfers M

.......mm x .......mm; splays M

.......mm x .......mm; rounded edges M

Forming holes for pipes, bars, cables and the like

.......mm diameter holes through .......mm thick timber NO

....mm diameter holes through ....mm thick timber; all as per drawing No. ..... NO

Forming holes for ducting, trunking and the like

Not exceeding 0.025m2 cross section area through .........mm thick timber NO

Exceeding 0.025m2 but not exceeding 0.050m2 cross section area


NO
through ........mm thick timber

Exceeding ..........m2 but not exceeding ..........m2 cross section area


NO
through .........mm thick timber

Dowels, bolts with nuts and washers and the like

.........mm Diameter M.S. bolts; .........mm long, including drilling through and
NO
fixing to.........mm thick timber

.........mm Diameter M.S. bolts; .........mm long, including drilling through and
NO
fixing to.........mm thick timber ; all as per drawing No. .........

.........mm Diameter M.S. dowels; .........mm long, including drilling through


NO
and fixing to.........mm thick timber

..mm Diameter M.S. anchor bolt; ..mm long with one end bend and cast
NO
into concrete

Page 65 WOODWORK
..mm Diameter M.S. anchor bolt; ..mm long with one end fishtailed and
NO
cast into concrete

Code Description Unit

INSULATIONS

Glass fibre insulation quilt; ..mm thick; butt joints

..... insulation; ....mm thick as specified all as per Manufacturer's detail and
drawing No ........

Fixing across members at ......mm centres with staples M2

Fixing between members at ......mm centres M2

CEILINGS

Sawn timber as specified

Wrot timber as specified

..........mm x ..........mm Ceiling Joist M

.........mm x ..........mm Nogging M

.........mm x ..........mm Beading M

.........mm x ..........mm Ceiling Joist; fixing by bolting M

........mm x ..........mm Nogging; fixing by bolting M

........mm x ..........mm Ceiling Joist in one continuous lengths exceeding


M
5.00m but n.e. 5.60m

........mm x ..........mm Nogging in one continuous lengths exceeding 5.00m


M
but n.e. 5.60m

.......mm x ..........mm Beading in one continuous lengths exceeding 5.00m


M
but n.e. 5.60m

........mm x ..........mm Ceiling Joist in one continuous lengths exceeding


M
5.00m but n.e. 5.60m; fixing by bolting

........mm x ..........mm Nogging in one continuous lengths exceeding 5.00m


M
but n.e. 5.60m; fixing by bolting

.......mm x ..........mm Ceiling Joist in one continuous lengths


M
exceeding ........m but n.e. ......m

.........mm x ..........mm Nogging in one continuous lengths exceeding ........m


M
but n.e. ......m

Page 66 WOODWORK
..........mm x ..........mm Beading in one continuous lengths
M
exceeding ........m but n.e. ......m

..........mm x ..........mm Ceiling Joist in one continuous lengths


M
exceeding ........m but n.e. ......m; fixing by bolting

..........mm x ..........mm Nogging in one continuous lengths


M
exceeding ........m but n.e. ......m; fixing by bolting

Code Description Unit

Boarding to ceilings or beams, 100mm space between boards

Boarding to ceiling or beams, tongued, grooved and veed joints laid diagonally

Boarding to ceilings or beams, rebated joints

Boarding to ceilings or beams, tongued, grooved and veed joints

..mm thick; horizontal; not exceeding 3.50m high above floor level M2

.......mm thick; horizontal; exceeding 3.50m but not exceeding 5.00m high
M2
above floor level

.......mm thick; horizontal; exceeding ..........m but not exceeding ..........m


M2
high above floor level

.......mm thick; sloping; not exceeding 3.50m high above floor level M2

.......mm thick; sloping; exceeding 3.50m but not exceeding 5.00m high
M2
above floor level

........mm thick; sloping; exceeding ..........m but not exceeding ..........m high
M2
above floor level

.......mm thick; horizontal; secret fixing; not exceeding 3.50m high above
M2
floor level

.........mm thick; horizontal; secret fixing; exceeding 3.50m but not


M2
exceeding 5.00m high above floor level

........mm thick; horizontal; secret fixing; exceeding ..........m but not


M2
exceeding ..........m high above floor level

........mm thick; sloping; secret fixing; not exceeding 3.50m high above floor
M2
level

.......mm thick; sloping; secret fixing; exceeding 3.50m but not exceeding
M2
5.00m high above floor level

........mm thick; sloping; secret fixing; exceeding ..........m but not


M2
exceeding ..........m high above floor level

........mm Thick, .........mm x .........mm overall NO

.......mm Thick, conical curved; ..........mm radius NO

........mm Thick, NO
Page 67 WOODWORK
........mm Thick, .........mm wide M

........mm Thick, .........mm wide, conical curved; ..........mm radius M

........mm Thick, .........mm wide, M

Framework around concrete beams; to receive ceiling finish

Framework around steel beams; to receive ceiling finish

Framework to form false ceiling; to receive ceiling finish

Code Description Unit

Framework to duct casings and the likes; to receive ceiling finish

.........mm wide; .........mm x .........mm members at .........mm centres each


M
way

Exceeding 300mm wide; .........mm x .........mm members at .........mm


M2
centres each way

.........mm wide; .........mm x .........mm members at .........mm centres each


M
way; fixing by bolting

Exceeding 300mm wide; .........mm x .........mm members at .........mm


M2
centres each way; fixing by bolting

Sheet linings and casings to sides and soffit of beams and ceilings

Sheet linings and casings to ceilings

Cement Board

Asbestos Free Board

Mineral Fibre Board

Fibrous Plasterboard

UAC Superflex Board

Timber Lamited Cladding

Plastic Sheet

.. Board

....mm x ....mm x ....mm Thick set out symetricall from centre of room;
M2
horizontal

....mm x .....mm x ....mm Thick set out symetricall from centre of room;
horizontal; exceeding 3.50m but not exceeding 5.00m high from ground M2
floor level
....mm x .....mm x ....mm Thick set out symetricall from centre of roo;
horizontal; exceeding ...m but not exceeding ...m high from ground floor
M2
level

....mm x ....mm x ...mm Thick set out symetricall from centre of room;
M2
sloping Page 68 WOODWORK
....mm x ....mm x ...mm Thick set out symetricall from centre of room;
M2
sloping

....mm x .....mm x ....mm Thick set out symetricall from centre of room;
sloping; exceeding 3.50m but not exceeding 5.00m high from ground floor M2
level

....mm x .....mm x ....mm Thick set out symetricall from centre of room;
M2
sloping; exceeding ...m but not exceeding ....m high from ground floor level

....mm x ....mm Thick; ....mm wide; set out symetricall from centre of room;
M
horizontal

......mm x ....mm Thick; ....mm wide; set out symetricall from centre of
room; horizontal; exceeding 3.50m but not exceeding 5.00m high from M
ground floor level

Code Description Unit

......mm x ...mm Thick; ....mm wide; set out symetricall from centre of room;
horizontal; exceeding ....m but not exceeding ...m high from ground floor M
level

EXTRA OVER for forming ........mm x ........mm access panel; not exceeding
NO
3.50m high from floor level

EXTRA OVER for forming ........mm x ........mm access panel; exceeding


NO
3.50m but not exceeding 5.00m high from floor level

EXTRA OVER for forming ........mm x ........mm access panel;


NO
exceeding ........mm but not exceeding ........m high from floor level

Forming holes for pipes, bars, cables and the like

.......mm diameter holes through .......mm thick timber NO

.......mm diameter holes through .......mm thick timber; all as per drawing
NO
No. ...........

Forming holes for ducting, trunking and the like

Not exceeding 0.025m2 cross section area through .........mm thick timber NO

Exceeding ..........m2 but not exceeding ..........m2 cross section area


NO
through .........mm thick timber

FLAT ROOF MEMBERS

PITCH ROOF MEMBERS

Sawn timber as specified

Wrot timber as specified

Wall plate

Valley rafter

Hip rafter

Page 69 WOODWORK
Joist

Strut

Bracing

Post

Purlin

Ridge board

Eaves and verge boarding, fascias and barge boards

......mm x ......mm M

Code Description Unit

......mm x ......mm; fixing by bolting M

....mm x ....mm in one continuous lengths exceeding 5.00m but n.e. 5.60m M

.....mm x .........mm in one continuous lengths exceeding 5.00m but n.e.


M
5.60m; fixing by bolting

.....mm x .........mm in one continuous lengths exceeding ........m but


M
n.e. ......m

.......mm x .........mm in one continuous lengths exceeding ........m but


M
n.e. ......m; fixing by bolting

The following roof truss Type TT1, overall span 7850mm long x 2300mm high
including hoisting into position approximately 16.80m high from ground floor
level; all as per Drawing No.......... (In Nos. 1)

The following roof truss Type .........., overall span ..........mm long x ..........mm
high including hoisting into position approximately ..........m high from ground
floor level; all as per Drawing No.......... (In Nos. ......)

..........mm x ..........mm Rafter M

..........mm x ..........mm Vertical Strut M

..........mm x ..........mm Diagonal Strut M

.........mm x ..........mm Tie beam M

Roof Trusses

Supply and erect timber roof truss Type ....... comprising of rafter, strut, tie
beam and etc., overall span ........mm long and ........mm high, all jointed
together with and including all necessary fixing accessories all as per drawing
No............

Hoisting and placing in position approximately ........m above ground level NO

Page 70 WOODWORK
Paternted Roof Trusses

Notes:

The Contractor shall be responsible for the design, supply, fabrication,


installation and guarantee of the roof truss system in accordance to the
Guidelines and Specification

Design, supply and erect timber roof truss Type TT1 comprising of rafter, strut,
tie beam and etc., overall span 7850mm long and 2300mm high, all jointed
together with and including all necessary fixing accessories

Design, supply and erect timber roof truss Type ....... comprising of rafter, strut,
tie beam and etc., overall span ........mm long and ........mm high, all jointed
together with and including all necessary fixing accessories

Hoisting and placing in position approximately ........m above ground level,


ITEM
measured flat on plan ...............m2

Code Description Unit

Boarding to tops or cheeks of dormers, tongued and grooved joints

........mm thick M2

.........mm Thick, .........mm wide, conical curved; ..........mm radius M2

.........mm Thick, .........mm wide, M2

Boarding to gutter bottoms or sides, .......................joints

........mm thick; flat M2

........mm thick; sloping; to falls M2

.........mm Thick, .........mm wide NO

.........mm Thick, .........mm x .........mm overall M

.........mm Thick, .........mm wide, conical curved; ..........mm radius M2

.........mm Thick, .........mm wide, M2

Boarding to gable end as per drawing No..............

.......mm x ........mm M2

........mm x ........mm; parabolic curved; ........mm and ........mm radii M2

Cleats, Plates, Sprocket; and the like

........mm x ........mm x ........mm Thick NO

.....mm x ....mm x ....mm Thick mild steel plates cut and bend to shape NO

Dowels, bolts with nuts and washers and the like

.........mm Diameter M.S. bolts; .........mm long, including drilling through and
NO
fixing to.........mm thick timber

Page 71 WOODWORK
........mm Diameter M.S. bolts; .........mm long, including drilling through and
NO
fixing to.........mm thick timber ; all as per drawing No. .........

.........mm Diameter M.S. dowels; .........mm long, including drilling through


NO
and fixing to.........mm thick timber

........mm Diameter M.S. anchor bolt; .........mm long with one end bend and
NO
cast into concrete

........mm Diameter M.S. anchor bolt; .........mm long with one end fishtailed
NO
and cast into concrete

DOORS

Flush Door

Timber doors; .....mm thick as specified

Timber doors; .....mm thick as specified complete with all necessary timber
framing

Code Description Unit

Overall size ....mm x ....mm high door (Type ....) NO

Overall size ....mm x .....mm high door (Type ...) all as per drawing No ..... NO

Panelled Door

Louvred Door

Timber doors; .....mm thick as specified to Manufacturer's detail

Timber doors; .....mm thick as specified complete with all necessary timber
framing

Overall size ....mm x ....mm high door (Type ....) NO

Overall size ....mm x .....mm high door (Type ...) all as per drawing No ..... NO

Fire Rated Door

Timber door; ..... hour rated as specified; all manufactured to the approval of
Fire Authorities including obtaining the related testing certificates
Timber door; ..... hour rated as specified all as per Manufacturer's detail and to
the approval of Fire Authorities including obtaining the related testing
certificates

Timber door; ..... hour rated as specified complete with all necessary timber
framing and ironmongeries; all manufactured to the approval of Fire Authorities
including obtaining the related testing certificates

Overall size ....mm x ....mm high door (Type ....) NO

Overall size ....mm x .....mm high door (Type ...) all as per drawing No ..... NO

PVC Door

Supply and fix in position approved PVC door as specified

Page 72 WOODWORK
Supply and fix in position approved PVC door complete with all necessary
timber framing

Overall size ....mm x ....mm high door (Type ....) NO

Overall size ....mm x .....mm high door (Type ...) all as per drawing No ..... NO

Door frame and lining (In ......... sets)

Jamb

Head

Mullion

Transome

.....mm x ......mm (Extreme) size M

...mm x .....mm (Extreme) size; once rebated M

.....mm x .....mm (Extreme) size; twice rebated M

Code Description Unit

.....mm x .....mm (Extreme) size; ..... rebated M

.....mm x .....mm (Extreme) size; once splayed M

.....mm x ......mm (Extreme) size; ....... splayed M

Door Frame Set

Overall size ....mm x ....mm high (Type ....) all as per drawing No................. NO

Overall size ....mm x ....mm high (Type ....) all as per manufacturer's detail
NO
and drawing No .....

Composite Door, Frame and Lining Sets

Overall size ....mm x ....mm high door (Type ....) all as per drawing No....... NO

Overall size ....mm x ....mm high (Type ....) all as per manufacturer's detail
NO
and drawing No .....

Architraves

Cover Fillet

Stops

Glazing beads

.......mm x .......mm M

.......mm x .......mm in one width M

.......mm x .......mm; crosstongued M

Page 73 WOODWORK
.......mm x .......mm; countersinking and pellating M

.......mm x .......mm; chamfers M

.......mm x .......mm; once rebated M

.......mm x .......mm; twice rebated M

.......mm x .......mm; M

.......mm x .......mm; once splayed M

.......mm x .......mm; M

......mm x .......mm; rounded edges M

.......mm x .......mm; Sawn ground M

Code Description Unit

Ironmongery

Supply and fix the following ironmongery to timber or metal including providing
requisite matching screws all as per drawing No..............

Supply and fix the following ironmongery to timber or metal including providing
requisite matching screws all as per manufacturer's details

Lockset

Upright three lever mortices lockset with stainless steel finish lever handles
NO
furniture

Upright three lever mortices lockset with satin chrome finish lever handle
NO
furniture

Cylindrical lockset with satin chrome steel finish lever handles furniture NO

Cylindrical lockset with stainless steel finish lever handle furniture approved
NO
manufacture fixed to timber door

Sliding door lockset NO

Casement lockset NO

Bathroom hook NO

Hinges

......mm x ......mm galvanised steel butt hinges NO

.......mm x ....mm heavy duty stainless steel butt hinges NO

Page 74 WOODWORK
`.......' or approved equivalent ........mm x ....mm x ......mm thick stainless
NO
steel hinges

Back flap hinges NO

Cranked hinges NO

Hurling hinges NO

Hook and band hinges NO

Lift-off hinges NO

Rising hinges NO

Spring hinges NO

Tee hinges NO

Floor spring

Single action floor springs and top centres NO

Double action floor springs and top centres NO

Code Description Unit

Door closer

Over head door closers NO

Concealed overhead door closers NO

Door stopper

Rubber door stop NO

Catches

Magnetic catches NO

Mortices catches NO

Roller catches NO

Sliding door catches NO

Sliding window catches NO

Accessories

....mm x ....mm Stainless steel push plate NO

`.......' or approved equivalent ......mm x ......mm stainless steel push plate NO

....mm x .....mm Stainless steel door pull NO

`.......' or approved equivalent ....mm x ......mm stainless steel door pull NO


Page 75 WOODWORK
WINDOWS

Top Hung Casement Window

Side Hung Casement Window

Composite Window

Fixed Louvred Vent

Sash Window

Window Surrounds

Latern Lights

Skylight Sets

Overall size .....mm x .....mm high window (Type ...) NO

Overall size .....mm x .....mm high window (Type ...), complete with all
necessary framing, accessories, beading, fixing screws and glazing panel NO
(measured seperately) all to manufacturer's detail

Overall size .....mm x .....mm high window (Type ...), complete with all
necessary framing, accessories, beading, fixing screws and ............. NO
glazing panel all to manufacturer's detail

Code Description Unit

Overall size .....mm x .....mm high window (Type .....) all as per drawing
No ...... NO

Cill

.......mm x .......mm; once rebated, weathered, throated, splayed M

Architraves

Cover Fillet

Stops

Glazing beads

Window Boards

Nosings

Bed Moulds

.......mm x .......mm M

.......mm x .......mm in one width M

.......mm x .......mm; crosstongued M

.......mm x .......mm; countersinking and pellating M

.......mm x .......mm; chamfers M


Page 76 WOODWORK
.......mm x .......mm; once rebated M

.......mm x .......mm; twice rebated M

.......mm x .......mm; ..rebated M

.......mm x .......mm; once splayed M

.......mm x .......mm; splayed M

......mm x .......mm; rounded edges M

.......mm x .......mm; Sawn ground M

STAIRCASES AND SHORT FLIGHTS OF STEPS

Wrot timber as specified

....mm wide x ....mm high (overall) in ..... No of .......mm thick x .....mm wide
NO
steps and landing all as per drawing No .........

Code Description Unit

BALUSTRADES

Wrot timber as specified

.......mm x .......mm x .....mm High baluster NO

Overall size .....mm x .....mm high (Type ...) timber balustrades including all
NO
connection joints; all as per drawing No.................

Overall size .....mm x .....mm high (Type ...) decorative timber balustrades
NO
including all connection joints; all as per drawing No...........

Timber Grille

Decorative timber grille (Type ......) overall size ..........mm x .........mm


NO
x .........mm thick; all as per drawing No .....

Decorative timber grille (Type ......) overall size ..........mm x .........mm


x .........mm thick; comprising of ..........mm x ............mm thick rounded top NO
and bottom rails fixed to concrete, ...........mm x ..............mm thick vertical
studs and

Decorative timber grille (Type ......) overall size ..........mm x .........mm


x .........mm thick; comprising of ..........mm x ............mm thick rounded top NO
and bottom rails fixed to concrete, ...........mm x ..............mm thick vertical
studs and

Page 77 WOODWORK
Handrails

Picture Rails

Dado Rails

.......mm x .......mm M

.......mm x .......mm in one width M

.......mm x .......mm; crosstongued M

.......mm x .......mm; countersinking and pellating M

.......mm x .......mm; chamfers M

.......mm x .......mm; once rebated M

.......mm x .......mm; twice rebated M

.......mm x .......mm; ..rebated M

.......mm x .......mm; once splayed M

.......mm x .......mm; splayed M

......mm x .......mm; rounded edges M

Code Description Unit

FITTINGS

Chipboard of post form type as specified including all ironmongeries, painting or


varnishing

Nyatoh wood as specified including all ironmongeries, painting or varnishing

............. wood as specified including all ironmongeries, painting or varnishing

Kitchen cabinet; overall size .....mm x .......mm x ........mm high (Type .....)
NO
as per drawing No.........

Low level cabinet; overall size .......mm x .......mm x ........mm high


NO
(Type .....) as per drawing No.........

High level wall hung cabinet; overall size .....mm x ......mm x .........mm high
NO
(Type.......) as per drawing No.........

'L' Shaped cabinet; overall size .....mm x ......mm x ........mm high (Type .....)
NO
as per drawing No.........

....... cabinet; overall size .......mm x .......mm x ........mm high (Type .....) as
NO
per drawing No.........

Wardrobe; overall size .......mm x .......mm x........mm high (Type.....) as per


NO
drawing No......... Page 78 WOODWORK
Wardrobe; overall size .......mm x .......mm x........mm high (Type.....) as per
NO
drawing No.........

Shoes cabinet; overall size ......mm x .....mm x ......mm high (Type.....) as


NO
per drawing No.........

Solid surface 'L' shaped counter; overall size ......mm x .......mm x ........mm
NO
high (Type.....) as per drawing No.........

Solid surface counter; overall size .......mm x .......mm x ........mm high


NO
(Type.....) as per drawing No.........

......counter; overall size .......mm x .......mm x ........mm high (Type.....) as


NO
per drawing No.........

........; overall size .......mm x .......mm x ........mm high (Type....) as per


NO
drawing No.........

FITTINGS (UNFRAMED FIXINGS)

Isolated Shelves as per drawing No.........

Work Tops as per drawing No.........

Benches as per drawing No.........

Notice boards as per drawing No.........

.......mm x .......mm M

........mm x ..........mm x ...........mm long NO

Page 79 WOODWORK
Code Description Unit

STRUCTURAL STEELWORK

INFORMATION

UNFABRICATED STEELWORK

Hot Rolled Structural Steel Works as specified welded fabrication and bolted site
connections

Cold Formed Structural Steel as specified and bolted site connections

Beams

Girders

Columns

Stanchions

Purlins

Joist

Hanger

Plates & Flats

Single members;......mm x ......mm x ...... kg/m H-section each .....mm long;


KG
(In No ......)

Single members; .....mm x .....mm x ...... kg/m universal columns;


KG
each .....mm long; (In No ......)

Single members; .....mm x .....mm x ..... kg/m universal beams; each .....mm
KG
long; (In No .....)

Single members; .....mm x .....mm x ..... kg/m castellated universal beams;


KG
each .....mm long; (In No .....)

Single members; .....mm x .....mm x ..... kg/m Lip channel; each .....mm
KG
long; (In No .....)

Single members; .....mm x .....mm x ..... kg/m angle; each .....mm long; (In
KG
No .....)

Single members; .....mm x .....mm x ...... kg/m angle cleat; each .....mm
KG
long; (In No .....)

Single members; .....mm x .....mm x ..... kg/m Hollow section each .....mm
KG
long; (In No .....)

KG
Single members; .....mm x .....mm x ..... kg/m; each .....mm long; (In No .....)

Page 80 STRUCTURAL STEEL WORKS


Code Description Unit

FABRICATED

Hot Rolled Structural Steel Works as specified welded fabrication and bolted site
connections; at ..... Level

Cold Formed Structural Steel as specified fabricated, welded and bolted; at .....
Level

Built-up members; Portal frames; at ... level; as per drawing no ... (In No .....)

....mm x .....mm x ..... kg/m; universal columns; each ....mm long;(In No ...) KG

.....mm x .....mm x.... kg/m; universal beams; each .....mm long; (In No ...) KG

Built-up members; Roof trusses; at ..... level, overall size each .....mm
span, .....mm high rise, as per drawing No ..... (In No .....)

.....mm x .....mm x ..... kg/m rafter each .....mm long; (In No .....) KG

.....mm x .....mm x ..... kg/m strut each .....mm long; (In No .....) KG

.....mm x .....mm x ..... kg/m tie each .....mm long; (In No .....) KG

.....mm x .....mm x ..... kg/m tie beam each .....mm long; (In No .....) KG

Fittings

Caps; ......mm x ......mm x ......mm Thick; (In No ......) KG

Bases; ......mm x ......mm x ......mm Thick; (In No ......) KG

Gussets; ......mm x ......mm x ......mm Thick; (In No ......) KG

End plates; ......mm x ......mm x ......mm Thick; (In No ......) KG

Splice plates; ......mm x ......mm x ......mm Thick; (In No ......) KG

Cleats; ......mm x ......mm x ......mm long; (In No ......) KG

Brackets; ......mm x ......mm x ......mm long; (In No ......) KG

Stiffeners; ......mm x ......mm x ......mm Thick; (In No ......) KG

Distance pieces; ......mm x ......mm x ......mm Thick; (In No ......) KG

Separators; ......mm x ......mm x ......mm Thick; (In No ......) KG

Packings; ......mm x ......mm x ......mm Thick; (In No ......) KG

`PATENTED' proprietary roof trusses system

Notes:

The Contractor shall be responsible for the design, supply, fabrication,


installation and guarantee of the roof truss system in accordance to the ITEM
Guidelines and Specification
Page 81 STRUCTURAL STEEL WORKS
Code Description Unit

Pitch roof with and including all necessary supports and associated ITEM
members as specified, overall area approximately .....m2
(measured flat on plan) including design and built, supply,
fabrication, erection, fixing and hoisting in position

Flat roof with and including all necessary supports and associated ITEM
members as specified, overall area approximately .....m2
(measured flat on plan) including design and built, supply,
fabrication, erection, fixing and hoisting in position

CONNECTIONS, FIXINGS AND ANCHORAGES

Anchorage, packings and wedges for stanchions

Anchorage and packings for beam and purlins

.....mm x .....mm x .....mm NO

Steel fixing to faces of concrete, brickwork or stone

.....mm x .....mm x .....mm NO

Shear and treaded studs

......mm Diameter .....mm long NO

High strength friction grip bolts

......mm Diameter .....mm long NO

Holes, countersunk holes and tapped holes

.....mm Diameter holes; including drilling through .....mm thick metal NO

.....mm Diameter countersunk holes; including drilling through NO


.....mm thick metal

Site welded connections

.....mm x .....mm universal columns and .....mm x .....mm beams NO

Driving rivets and countersinking rivet heads on site

......mm Diameter .....mm long KG

Shop and site black bolts, nuts and washers

......mm Diameter .....mm long KG

.......mm Diameter holding down bolt NO

Page 82 STRUCTURAL STEEL WORKS


Code Description Unit

SURFACE TREATMENT

Surface treatments off site; blast cleaning; one coat red lead primer

Surface treatments off site; blast cleaning; one coat zinc chromate primer

Surface treatments off site; power wire brushing; two coats red lead primer

Surface treatments off site; blast cleaning; one coat epoxy resin two pack zinc
rich primer; one coat calcium plumbate primer

General surfaces; structural steelworks M2

Surface treatments off site; Power wire brushing; galvanising B.S.729

Surface treatments off site; Blast cleaning; galvanising, B.S.729

General surfaces; structural steelworks TON

ERECTION

Erection of structural steelwork including all sites operations and off loading

Total weight in ..... tonnes ITEM

Trial erection of structural steelwork at location as directed by the S.O.

Total weight in ..... tonnes ITEM

Page 83 STRUCTURAL STEEL WORKS


Page 84 STRUCTURAL STEEL WORKS
Code Description Unit

METALWORK

Metal Frames For Doors And Windows

Galvanised steel as specified

Aluminium; in ....... finish as specified

Overall size ......mm x .....mm for door type...... NO

Overall size ......mm x .....mm for window type ...... NO

DOORS

Galvanised steel as specified

Aluminium; in ......finish as specified

Sliding door; glazed with ....mm thick ..... sheet glass; complete to
manufacturer's detail; as per drawings No ......

Glass door; glazed with ....mm thick ..... sheet glass; complete to
manufacturer's detail; as per drawings No ......

Louvred door complete to manufacturer's detail; as per drawings No ......

Fire door to manufacturer's detail; as per drawings No ......

Roller shutter complete to manufacturer's detail; as per drawings No .......

Type ......; overall size ......mm x ......mm NO

WINDOWS

Galvanised steel as specified

Aluminium; in ......finish as specified

Casement window; glazed with .....mm thick ....... sheet glass; complete to
manufacturer's detail; as per drawings No ......

Casement window; consisting of .....no top hung panels and .....no side hung
panels; glazed with .....mm thick ...... sheet glass; coupling mullion,
assembling; fixing by bolting; fixing with screws complete with matching
restrainer and latch set and .......

Louvred window complete with frames as specified; glazed with .....mm


thick ..... glass louver blades; as per drawings No ......

Type ......; overall size ......mm x ......mm NO

ROOFLIGHTS, LAYLIGHTS AND PAVEMENT LIGHTS

...... in aluminium framing, including all necessary fixing and all as per
drawings No .......
NO
Page 85 METALWORK
.......mm Wide x ..... mm length

Code Description Unit

BALUSTRADES & STAIRCASES

Galvanised steel as specified

Aluminium; in ......finish as specified

Stainless steel

Wrought iron

Staircases; composite

.....mm x .....mm (overall length); in ..... no. of risers and ..... no. of landings NO

Handrails

......mm x ......mm in welded joints M

.....mm diameter in welded joints M

Handrails brackets NO

Isolated balustrades

Newels

......mm x ......mm in welded joints NO

.....mm diameter in welded joints NO

Railing/Framed balustrading; composite

Railing/balustrading in hollow section; ......mm x ......mm x .....mm thick


handrail; .....mm x......mm x....mm thick baluster; ....mm x .....mm x ......mm
thick intermediate rails welded together to pattern; as per drawings No ......

Railing/balustrading in hollow section handrail, balustrades and intermediate


rails welded together to pattern complete including painting works ; as per
drawings No ......

Overall size ......mm x ......mm ; Type ..... NO

SUNDRIES

Galvanised steel as specified

Aluminium; in ......finish as specified

Stainless steel

Wrought iron

Duct covers complete with frames

.....mm width x .....mm thick NO

Page 86 METALWORK
Code Description Unit

Gates, Collapsible gates and Revolving shutters

.....mm x .....mm Gates;complete with frames, guides, tracks and fastening;


NO
approximate weight .....kg; as per drawings No .....

.....mm x .....mm Collapsible Gates;complete with frames, guides, tracks


NO
and fastening; approximate weight .....kg; as per drawings No .....

.....mm x .....mm Revolving shutters;complete with frames, guides, tracks


NO
and fastening; approximate weight ......kg; as per drawings No .....

Cloakroom Fitings, Cycle-racks, Storage racks

...mm x ...mm x ...mm ; Cloakroom Fitings;Type..; as per drawings No NO

.....mm x .....mm x .....mm ; Cycle-racks; Type ...; as per drawings No ... NO

.....mm x .....mm x .....mm ; Storage racks; Type ...; as per drawings No .... NO

Grilles

Grilles complete with framing, ironmongeries and painting, all as per drawings
No .....

Security grille comprising of .....mm x .....mm x .....mm thick framing and filled
with .....mm diameter rod at every .....mm centres and set vertically in welded
joints; as per drawings No .....

Security grille comprising of ......mm x ......mm x.....mm thick angle frame,


....mm x ......mm x......mm thick hollow section intermediate frame and infilled
with .....mm x .....mm x .....mm thick hollow section mild steel grille set to
pattern; as per drawing No.

Grille panel; fixed to concrete and brickwall with and including requisite fixing
and plates; all as per drawings No .....

.....mm x .....mm overall size, (Type .....) NO

Gratings

Grating comprising of .....mm .....mm x .....mm thick angle framing and filled
with .....mm diameter rod at every .....mm centres and set vertically in welded
joints

Grating for sump cover, all welded connections, comprising ....mm x .....mm
x ....mm thick angle framing welded to anchor bar with fishtail and embedded
to concrete, ....mm thick cover framing and filled with ......mm diameter bar
at ....mm centres ..

....mm x ....mm overall size NO

Ladders

.....mm diameter x .....mm long cat ladder cast to brickwall/concrete with


NO
approved brackets
Page 87 METALWORK
Code Description Unit

FITTINGS AND FURNISHING

Compactable arm cabinet

Compactable arm cabinet; Stainless steel with seamless welding construction


and smooth polish as per drawings no

Refuse bin

Refuse bin collection container; galvanised steel finished with painting;


including all necessary fixing materials as per drawings no........

Letter box

Letter box; stainless steel with seamless welding construction and smooth
polish; with individual compartments each size ....mm x ....mm x .....mm deep;
openable front panel with requisite lockset and keys fixed to concrete or
brickwall including all necessary.............

Clothes lines

Clothes lines;galvanised iron in welded joints; consisting .

.....mm x .....mm x .....mm High NO

PLATES, BARS

Floor plates

.....mm x .....mm x .....mm Thick overall M2

SHEET METAL, WIREMESH AND EXPANDED METAL

Expanded metal

A layer of `........' or other equal and approved equivalent expanded


metal fixed under plaster to wall

Not exceeding 300mm wide; M

Over 300mm wide M2

HOLES, BOLTS, SCREWS AND RIVETS

Bolts complete with nuts and washers

Anchor-bolts complete with nuts and washers

Ragbolts complete with nuts and washers

.....mm Diameter x .....mm length NO


Page 88 METALWORK
Screwing, at ....mm centres M

Tap Screwing; at ....mm centres M

Riveting, at ....mm centres M

Page 89 METALWORK
Code Description Unit

PLUMBING AND MECHANICAL ENGINEERING INSTALLATIONS

COLD WATER INSTALLATION; PIPEWORK

Cold Water System; internally

Cold Water System; externally

Acrylonitrile Butadiene Styrene (ABS) pipes as specified

Stainless steel pipes as specified

Galvanised mild steel pipes as specified

Supply pipes and fittings, from and including first stopcock from incoming
mains to water storage tanks to sanitary appliances and scour and overflow ITEM
pipes from water storage tanks, including all necessary excavation,
connections with requisite connectors

STORAGE WATER TANK

Poly water tank as specified complete with all accessories and fittings
of approved manufacturer to JBA approval, hoisted and placed in
position at approximately .......mm above ground level in accordance to
manufacturer's instruction all as per drawing No.

Fibreglass Reinforce Polyester (FRP) water tank as specified


complete with all accessories and fittings of approved manufacturer to
JBA approval, hoisted and placed in position at approximately .......mm
above ground level in accordance to manufacturer's instruction all as
per drawing No.
High Density Polyethylene (HDPE) water tank as specified complete
with all accessories and fittings of approved manufacturer to JBA
approval, hoisted and placed in position at approximately .......mm
above ground level in accordance to manufacturer's instruction all as
per drawing No.

Stainless steel water tank as specified complete with all accessories


and fittings of approved manufacturer to JBA approval, hoisted and
placed in position at approximately .......mm above ground level in
accordance to manufacturer's instruction all as pet drawing No.

..mm x ..mm x ..mm High NO

..mm Diameter x ..mm high NO

SANITARY INSTALLATION PIPEWORK

Soil, Waste and Vent Pipes; internally

UPVC pipes Class D as specified

Cast iron pipes as specified

Waste water, soil and vent pipes with and including all requisite fittings from
sanitary appliances and from floor traps and outlet grating to connecting ITEM
manholes or water channel drains including all necessary excavation,
concrete casing around pipework,..............

Page 90 PLUMBING
Code Description Unit

SANITARY INSTALLATION; FITTINGS

Supply and fix the following Sanitary Fittings and accessories, including jointing
and connecting to services and soil and waste pipes and making good all work
disturbed; internally

Basin

Approved 560mm x 410mm in vitreous china with one 30mm diameter


chromium-plated tap,one vitreous china blank tap hole stopper, 30mm NO
diameter chromium-plated waste outlet trap with 40mm seal; pair of painted
iron brackets including plugged and screwed bracket

Approved 560mm x 410mm x 300mm deep in vitreous china for clinical with
one 30mm diameter chromium-plated tap,one vitreous china blank tap hole NO
stopper, 30mm diameter chromium-plated waste outlet trap with 40mm seal
and set in opening in concrete worktop
Approved 560mm x 410mm vitreous china counter top vanity basin
complete with plastic bottle trap; waste plug and chain complete with pillar
tap; bright chrome plated with metal handle including making good wall NO
tiling around

Sink

Approved 1200mm x 410mm x 300mm deep stainless steel with single bowl
with single drainer complete with two 30mm diameter chromium-plated NO
inclined high neck pillar tap, 30mm diameter chromium-plated waste outlet
fittings with plugs and chain stay, ........

Water Closet

Supply and fix disable toilet set equipment in pack set for the disabled
NO
unisex water closet facility complete as per drawing no.

Approved back inlet squatting in white vitreous china pan with S or P trap
conversion bend; complete with pair of tread plates and high level cistern NO
with flush pipe, cover and brackets with 20mm diameter ball valve and
chromium plated chain pull; bedding .......

Approved pedestal in vitreous china pan with S or P trap; 6 litres cistern


with valveless fittings and plastics flush bend; 1 high pressure ball valve NO
plastics float; plastics seat and cover; pan with S or P trap conversion bend;
fixing pan with screws and ........

Shower

Approved equivalent complete with arm and hand wall flanged with stop
NO
cock handle

Soap Holder

Approved equivalent 150mm x 100mm semi recessed dish in vitreous china


NO
fixed to tiled wall

Soap Dispenser

Page 91 PLUMBING
Approved equivalent 100mm x 100mm x 300mm deep; 1 litres in container
with elbow arm level dispensing complete with key insert opening and self NO
locking cover.

Code Description Unit

Paper Towel Dispenser

Approved 300mm x 100mm x 500mm deep NO

Toilet Roll Holder

150mm x 100mm x 50mm in vitreous china complete with plastic roller NO

Robe Hook

Complete with one pair fischer bolts NO

Towel Rail

Screw to wall complete with 900mm chrome plated bar, plastic rail insert
NO
and accessories fixing screws and plug

Tap and Hand Bidet

Approved 12mm diameter chromium plated pillar tap NO

Approved 12mm diameter chromium plated screw down bib tap NO

Approved hand bidet set with 12mm chrome plated right angle valve with
ball level metal handle and quarter-turn ceramic disc headparts complete NO
with flexible hose with nozzle spray and wall hook.

Mirror

500mm x 300mm x 20mm Thick approved bevelled edge plate glass


complete with 15mm thick waterproof plywood backing and fixed with NO
chromium plated dome headed fixing screws and cork washers

Floor Trap

Approved 100mm diameter stainless steel with openable grating NO

Approved 150mm x 150mm heavy duty plastic with 100mm diameter


NO
integral hinged cover and standard perforated cleanout

RAINWATER INSTALLATION; GUTTERWORK

Cast iron half round gutters and fittings; bolted and mastic joints

uPVC half round gutters and fittings; push fit connector joints;
gutterwork and supports self coloured grey as specified

uPVC box gutters and fittings; push fit connector joints; gutterwork and
supports self coloured grey as specified

100 mm diameter; joints in the running length; supports at average 500 centres

In standard fascia brackets fixed with galvanized screws to timber M

Page 92 PLUMBING
In standard fascia brackets fixed with self tapping screws to plain metal M

In standard galvanized steel side rafter brackets fixed with galvanized


M
screws to timber

Code Description Unit

In standard galvanized steel side rafter brackets fixed with galvanized bolts
M
to plain metal

EXTRA OVER for stopped ends NO

EXTRA OVER for stopped ends with outlets NO

EXTRA OVER for running outlets NO

EXTRA OVER for angles NO

EXTRA OVER for angles 45 degrees NO

EXTRA OVER for outlets for 100 pipe NO

RAINWATER INSTALLATION; PIPEWORK

Cast iron pipe and fittings as specified externally

uPVC pipes and fittings; push fit joints; pipework and supports self coloured grey
as specified; externally

.. pipework; joints in the running length

. pipework; joints in the running length; embedded in the concrete or screed

Laid in position M

In standard holderbats fixed with galvanized screws to timber M

In standard holderbats fixed with galvanized bolts to plain metal M

In standard bracket including all necessary fixings to wall or column M

EXTRA OVER for swan neck NO

EXTRA OVER for bend NO

EXTRA OVER for shoes NO

Sundries

Balloon grating to suit and set on top of rainwater pipe

.mm Diameter NO

Dome complete with frame and mesh grating embedded to concrete and suit to
..mm diameter pipe outlet

.mm Diameter NO

Page 93 PLUMBING
Code Description Unit

BUILDER'S WORK

Stool

Plain Concrete Grade 15 as specified

Not exceeding 100mm thick M3

100mm - 150mm thick M3

150mm - 300mm thick M3

Exceeding 300mm thick M3

Class F1 formwork as specified to edge of

Not exceeding 250mm high M

250mm - 500mm high M


Semi-glazed ceramic floor tiles, mm x 300mm x 300mm as specified;
bedded and jointed in cement mortar (1:3); pointing with grout in white
cement; on and including 20mm thick cement and sand (1:3) screeded
bed

Floor; level, falls and crossfalls and to slope not exceeding 15 M2


degrees from horizontal

To drop 50mm high M

Water Tank Support

Rolled steel joist water tank support, hoisted and placed in position at
approximately 3500mm above ground floor level, and painted with one
coat undercoat and one coat gloss enamel paint

150mm x 100mm x 25Kg/m M

Sawn pressure treated timber Group 'B' as specified

150mm x 100mm Bearer M

Plinth

Reinforced concrete Grade 30 as specified

Not exceeding 100mm thick M3

100mm - 150mm thick M3

150mm - 300mm thick M3


Page 94 PLUMBING
Exceeding 300mm thick M3

Class F1 formwork as specified to edge of

Not exceeding 250mm high M

250mm - 500mm high M

Code Description Unit

TESTING

Cold Water Installation

Pipework

On completion of the plumbing installation test all cold water piping ITEM
and make good any defects and leave the whole in perfect working
order to the entire satisfaction of the Superintending Officer

Sanitary Installation

On completion of the sanitary installation test all appliances and ITEM


fittings, make good any defects and leave the whole in perfect
working order to the approval of the Superintending Officer.

Page 95 PLUMBING
Page 96 PLUMBING
Code Description Unit

FLOOR, WALL AND CEILING FINISHINGS

FLOOR

In situ Finishings

Cement paving as specified

Waterproofed paving as specified

Granolithic paving as specified

Insitu terazzo as specified

..mm Thick to floors; level, falls,falls and crossfalls and to slope not
M2
exceeding 15 degrees from horizontal

..mm Thick to floors; level, falls, falls and crossfalls and to slope
M2
exceeding 15 degrees from horizontal

Bed and Backing

Screeded bed as specified; to receive tiles slab and block finishing

Floated bed as specified; to receive timber flooring and fitted carpeting

Trowelled bed as specified; to receive flexible sheet finishing

.mm Thick to receive tile; level, falls, falls and crossfalls and to slope not
M2
exceeding 15 degree from horizontal; on concrete base

.mm Thick to receive tile; level, falls, falls and crossfalls and to slope
M2
exceeding 15 degree from horizontal; on concrete base

EXTRA OVER for scupper drain .mm x ..mm; curved profile M

EXTRA OVER for scupper drain ..mm x..mm; retangular profile M

Tile, Slab and Block Finishing

Homogeneous floor tiles; ..mm x ..mm x..mm as specified

Semi-glazed ceramic floor tiles, ..mm x ..mm x..mm as specified

Ceramic floor tiles, ..mm x ..mm x ..mm as specified

Page 97 FINISHES
Code Description Unit

Marble slab, ..mm x ..mm x ..mm as specified

Granite slab, ..mm x ..mm x ..mm as specified

Level, falls, falls and crossfalls and to slope not exceeding 15 degrees from
M2
horizontal

Level, falls, falls and crossfalls and to slope exceeding 15 degrees from
M2
horizontal

Level, falls, falls and crossfalls and to slope not exceeding 15 degrees from
M2
horizontal; work to a pattern or in more than one colour as per drawing No.

Flexible Sheet Finishings

Approved Vinyl flooring; ..mm thick as specified

Linoleum or approved equivalent;...mm thick

PVC tiles, ..mm x ..mm x ..mm thick as specified

Level, falls, falls and crossfalls and to slope not exceeding 15


M2
degrees from horizontal

Level, falls, falls and crossfalls and to slope exceeding 15 degrees


M2
from horizontal

Level, falls, falls and crossfalls and to slope not exceeding 15 M2


degrees from horizontal; work to a pattern or in more than one
colour as per drawing No.

Level, falls, falls and crossfalls and to slope exceeding 15 degrees M2


from horizontal; work to a pattern or in more than one colour as per
drawing No.
Level, falls, falls and crossfalls and to slope exceeding 15 degrees
from horizontal; curved work; conical or spherical; ..mm radius; as
M2
per drawing No.

Level, falls, falls and crossfalls and to slope not exceeding 15 M2


degrees from horizontal; curved work; conical or spherical; ..mm
radius; as per drawing No.

EXTRA OVER isolated special unit as per drawing No. NO

Page 98 FINISHES
Work in one piece overall size ..mm x...mm as per drawing No. NO

Code Description Unit

Work in one piece overall size ..mm x...mm as per drawing No. NO

..mm x ...mm x ..mm High timber skirting with top rounded M


edge with ..mm x ..mm sawn ground

..mm High to skirtings M

..mm High to risers M

..mm High to edge of slab M

Sundries

Galvanised steel dividing strips; setting in bed or finishing

Brass dividing strips; setting in bed or finishing

Aluminium dividing strips; setting in bed or finishing

Ebonite dividing strips; setting in bed or finishing

......mm x ......mm; flat section M

WALL

In situ Finishings

Plain plaster as specified

Granolithic plaster as specified

Shanghai plaster as specified

Textured finished plaster as specified

Lath plaster as specified

Barium plaster as specified

Approved ..mm thick skim coat as per manufacturer's instruction


and S.O's approval

Page 99 FINISHES
Code Description Unit

..mm Thick to walls on concrete work base M2

..mm Thick to walls on brickwork or blockwork base M2

..mm Thick to sides of isolated column M2

Forming groove lines ..mm thick in plastered surface M

Forming recesses ..mm x ..mm in plastered surface M

Bed and Backing

Screeded backing as specified; to receive tiles slab and block finishing

Floated backing as specified; to receive timber boarding

Trowelled backing as specified; to receive flexible sheet finishing

..mm Thick to walls M2

..mm Thick to walls; curved work; conical or spherical; ..mm radius M2

..mm Thick to sides of isolated column M2

..mm Thick to sides of isolated column;curved work; conical or spherical;


M2
..mm radius

Tile, Slab and Block Finishing

Mocaic wall tiles ..mm x ..mm x..mm thick as specified

Glazed wall tiles ..mm x..mm x ..mm thick as specified

Ceramic wall tiles, ..mm x ...mm x .mm as specified

Granite wall tiles, ..mm x ..mm x ..mm as specified

Marble wall tiles,..mm x..m x ..mm as specified

Page 100 FINISHES


Hardwood timber strip as specified

To wall M2

To wall; work to a pattern or in more than one colour as per drawing No. M2

Code Description Unit

To wall; curved work; conical or spherical; .mm radius M2

To isolated column M2

To isolated column; work to a pattern or in more than one colour as per


M2
drawing No.

To isolated column; curved work; conical or spherical; ..mm radius M2

EXTRA OVER isolated special unit as per drawing No. NO

Work in one piece overall size ..mm x ..mm as per drawing No. NO

Moulding
Glass Reinforced Concrete as per manufacturer's instruction and S.O's
approval

Fibrous Plaster as per manufacturer's instruction and S.O's approval

Architraves; ..mm girth M

Cornices; .mm girth M

Undercut moulding; ..mm girth M

Fibrous Plaster

Plain slab covering ...mm thick on and including all necessary framing; butt
joint and filled with approved filling as per drawing No.

Panelled slab covering ..mm thick on and including all necessary framing;
butt joint and filled with approved filling as per drawing No.

To wall M2

To wall; curved work; conical or spherical;..mm radius M2

Page 101 FINISHES


Forming opening not exceeding 0.50m2 NO

Forming opening exceeding 0.50m2 M2

To isolated column M2

To isolated pilaster M2

Code Description Unit

To isolated;curved work; conical or spherical; ..mm radius M2

..mm x ..mm overall size arches NO

...mm Girth coves M

..mm Girth mouldings M

..mm Girth cornices M

..mm x ..mm overall size consoles NO

..mm x ..mm overall size overdoors NO

..mm x ..mm overall size canopies NO

CEILING

In situ Finishings

Plain plaster as specified

Textured finished plaster as specified

Barium plaster as specified

Approved ..mm thick skim coat as per manufacturer's instruction and S.O's
approval

.mm Thick to ceiling on concrete work surface M2

..mm Thick to ceiling on concrete work surface; 3.50m - 5.00m above


M2
floor level

..mm Thick to ceiling on concrete work surface; ..m -..m above floor
M2
level

Page 102 FINISHES


..mm Thick to ceiling on concrete work surface; ..m -..m above floor
M2
level

..mm Thick to top, sides and soffit of isolated beam M2

..mm Thick to top, sides and soffit of isolated beam; 3.50m - 5.00m above
M2
floor level

..mm Thick to top, sides and soffit of isolated beam; ...m - ..m above
M2
floor level

Code Description Unit

Moulding

Glass Reinforced Concrete as per manufacturer's instruction and


S.O's approval

Fibrous Plaster as per manufacturer's instruction and S.O's approval

Ceiling ribs; ..mm girth M

Cornices; ..mm girth M

Undercut moulding;..mm girth M

Suspended Ceiling, Linings and Support Works

Asbestos free cement flat sheet as specified; ..mm x ..mm x


..mm thick

Mineral fibre board;..mm x ..mm x ..mm thick

Cement board; ..mm x ..mm x .....mm thick

Fibrous plaster board; ...mm x ...mm x ...mm thick


Linings to ceilings with and including ceiling suspension system as specified
M2

Linings to ceilings with and including ceiling suspension system as M2


specified; 3.50m - 5.00m above floor level

EXTRA OVER for forming ..mm x ...mm access panel and including all NO
necessary framing

Page 103 FINISHES


Aluminium Strip

Approved aluminium strip ceiling of approved colour size .mm x


..mm x ..mm thick

Linings to ceilings fixed on and including aluminium suspension system all M2


in accordance with the manufacturer's instruction

Code Description Unit

Linings to ceilings fixed on and including aluminium suspension system all


in accordance with the manufacturer's instruction; 3.50m - 5.00m above M2
floor level

EXTRA OVER for forming ..mm x ..mm access panel and including all NO
necessary framing

Fibrous Plaster

Plain slab covering ..mm thick on and including all necessary


framing and suspension system; butt joint and filled with approved
filling as per drawing No.

Panelled slab covering ...mm thick on and including all necessary


framing and suspension system; butt joint and filled with approved
filling as per drawing No.

Linings to ceilings M2

Linings to ceilings; 3.50m - 5.00m above floor level M2

Forming opening exceeding 0.50m2 M2

Forming opening exceeding 0.50m2 (Provisional) M2

Forming opening not exceeding 0.50m2 NO

Forming opening not exceeding 0.50m2 (Provisional) NO

EXTRA OVER for forming ..mm x .mm access panel NO

Casing to top, sides and soffit of isolated beam M2

Page 104 FINISHES


Casing to top, sides and soffit of isolated beam; 3.50m - 5.00m above floor M2
level

..mm x ..mm overall size dome NO

..mm x ..mm overall size groined soffit NO

..mm Girth coves M

..mm Girth mouldings M

...mm Girth cornices M

Code Description Unit

STAIRCASE AREA

In situ Finishings

Cement paving as specified

..mm Thick to landing slab; level,falls, falls and crossfalls and to slope not M2
exceeding 15 degrees from horizontal

...mm Thick to Riser; ..mm high M

..mm Thick to Treads; ..mm wide M

EXTRA OVER for forming ..mm deep groove lines M

EXTRA OVER ...mm x ..mm wide non-slip nosing tile M

Plain plaster as specified

Approved skim coat as per manufacturer's instruction and S.O's approval

..mm Thick to sloping soffit of staircases M2

..mm Thick to soffit of landings M2

...mm Thick to sides of raking open string; ...mm width M

Bed and Backing

Screeded bed as specified; to receive tiles slab and block finishing

Page 105 FINISHES


Floated bed as specified; to receive timber flooring and fitted carpeting

Trowelled bed as specified; to receive flexible sheet finishing

...mm Thick to landing slab; level,falls, falls and crossfalls and to slope M2
not exceeding 15 degrees from horizontal

..mm Thick to Riser; ...mm high M

...mm Thick to Treads; ...mm wide M

Code Description Unit

Tile, Slab and Block Finishing

Homogeneous floor tiles; ..mm x...mm x ..mm as specified

Semi-glazed ceramic floor tiles, ..mm x ..mm x..mm as specified

Ceramic floor tiles, .mm x ..mm x ..mm as specified

Marble slab,..mm x ..mm x.mm as specified

Granite slab, ..mm x ..mm x..mm as specified

To landing slab; level,falls, falls and crossfalls and to slope not exceeding M2
15 degrees from horizontal

Riser; ..mm high M

Treads; ...mm wide M

EXTRA OVER for forming ...mm deep groove lines M

EXTRA OVER ...mm x ...mm wide non-slip nosing tile M

Fitted Carpeting

Underlay

Underlay to carpeting with and including tackless grippers plugged to M2


concrete base

Page 106 FINISHES


Underlay to carpeting with and including tackless grippers plugged to
concrete base

Approved heavy duty loop carpet fixed all in accordance with


manufacturer's instruction and S.O's approval

Approved cut pile construction carpet fixed all in accordance with


manufacturer's instruction and S.O's approval

Approved carpet tile ..mm x ..mm x ...mm thick fixed all in


accordance with manufacturer's instruction and S.O's approval

To landing slab; level,falls, falls and crossfalls and to slope not exceeding M2
15 degrees from horizontal

Riser;..mm high M

Treads; ..mm wide M

Code Description Unit

Hardwood timber strip as specified

Parquet in ...mm x ...mm panel with an approved pattern as specified

To landing slab; level,falls, falls and crossfalls and to slope not exceeding M2
15 degrees from horizontal

Riser;.mm high M

Treads; ..mm wide M

DRY LINING AND PARTITION

Gypsum Board Partition

Lining on both sides with and including zinc coated frameworks and all
necessary accessories all as per drawing No.

Lining on both sides with and including aluminium frameworks and all
necessary accessories all as per drawing No.

Overall height .mm M2

Page 107 FINISHES


Page 108 FINISHES
Code Description

GLAZING

GLASS IN OPENINGS

Clear float glass as specified

Tinted float glass as specified

Clear figured (obscured) glass as specified

Grey / Tinted figured glass as specified

Toughened / Tempered glass as specified

Laminated glass as specified

Clear and polished wired glass as specified

...................... glass as specified

.......mm Thick to metal rebates with glazing compound

......mm Thick to timber rebates with glazing compound

Not exceeding 0.10m2; in ........ nr. of panes

0.10m2 - 0.50m2

0.50m2 - 1.00m2

Over 1.00m2

Glass Louvres

Size ....mm long x ....mm wide x ....mm thick with grouted edges and
house in grooves of timber frame

Size .....mm long x .....mm wide x .....mm thick with grouted edges and
house in grooves of metal frame

Size .....mm long x .....mm wide x .....mm thick with grouted edges and
house in clips of adjustable louvred metal frame

Labours On Glass

Sandblasting to ............glass as specified

Grinding to ............glass as specified

Page 109 GLAZING


.......mm long x.......mm wide onto .......mm long x .......mm wide x .......mm
thick pane; partly obscured

.......mm long x.......mm wide onto .......mm long x .......mm wide x .......mm
thick pane; fully obscured

Embossing

Acid work as specified all as per drawing No......

Code Description

Patent Glazing

............ glass as specified, to roofs as per drawing No.....

............ glass as specified, to skylights as per drawing No.....

............ glass as specified, to lantern lights as per drawing No.....

............ glass as specified, to vertical surfaces as per drawing No.....

EXTRA OVER for opening, size .....mm x .....mm

EXTRA OVER for opening, .....mm diameter

Domelights

............ glass as specified, .....mm x .....mm x .....mm high overall size all
as per drawing No.....

MIRRORS

.....mm x .....mm x .....mm Thick approved bevelled edge plate glass mirror
complete with 20mm thick waterproof plywood backing and fixed with
chromium plated dome headed fixing screws and cork washers

Page 110 GLAZING


Page 111 GLAZING
Unit

M2

M2

M2

M2

Page 112 GLAZING


M2

M2

M2

Unit

M2

M2

M2

M2

NO

NO

NO

NO

Page 113 GLAZING


Page 114 GLAZING
Code Description

PAINTING AND DECORATING

NEW WORK

REPAINTING AND REDECORATION WORK

Walls

One coat alkali-resisting primer and two coats acrylic weathershield


paint to general surfaces as specified

One coat alkali-resisting primer and two coats emulsion paint to


general surfaces as specified

........ coats epoxy paint on general surfaces as specified

Isolated surfaces not exceeding 0.5 m2

On plastered isolated columns; not exceeding 150mm girth

On plastered isolated columns; 150mm - 300mm girth

On plastered isolated columns; over 300mm girth

On plastered wall; not exceeding 150mm girth

On plastered wall; 150mm - 300mm girth

On plastered wall; over 300mm girth

On precast concrete wall; not exceeding 150mm girth

On precast concrete wall; 150mm - 300mm girth

On precast concrete wall; over 300mm girth

Painting to Woodwork

One coat aluminium wood primer before fixing as specified

Knot, stop, and prime with one coat aluminium wood primer, one
undercoat and two coats gloss enamel paint as specified

Two coats varnish as specified

Isolated surfaces not exceeding 0.5 m2

General surfaces of timber; not exceeding 150mm Girth

General surfaces of timber; 150mm - 300mm Girth

General surfaces of timber; over 300mm Girth

Page 115 PAINTING


Code Description

Painting to Metalwork

Etching one coat metallic primer, one undercoat and two coats gloss
enamel paint as specified

...... coat red iron oxide metal primer and ...... coats high gloss enamel
paint as specified

Isolated surfaces not exceeding 0.5 m2

General surfaces of metal; not exceeding 150mm girth

General surfaces of metal; 150mm - 300mm girth

General surfaces of metal; over 300mm girth

Ceilings

Two coats acrylic weathershield paint to general surfaces as specified

Two coats acrylic weathershield paint to general surfaces as specified;


3.50m - 5.00m above ground level

Two coats emulsion paint to general surfaces as specified

Two coats emulsion paint to general surfaces as specified; 3.50m -


5.00m above ground level

Isolated surfaces not exceeding 0.50 m2

On ceiling board; not exceeding 150mm girth

On ceiling board; 150mm - 300mm girth

On ceiling board; over 300mm girth

To soffit of plastered isolated beams; not exceeding 150mm girth

To soffit of plastered isolated beams; 150mm - 300mm girth

To soffit of plastered isolated beams; over 300mm girth

Page 116 PAINTING


To soffit of plastered suspended slab; not exceeding 150mm girth

To soffit of plastered suspended slab; 150mm - 300mm girth

To soffit of plastered suspended slab; over 300mm girth

On plaster ceiling; not exceeding 150mm girth

On plaster ceiling; 150mm - 300mm girth

On plaster ceiling; over 300mm girth

Code Description

Painting to Woodwork

Knot, stop, and prime with one coat aluminium wood primer, one
undercoat and two coats gloss enamel paint as specified

Isolated surfaces not exceeding 0.5 m2

General surfaces of timber; not exceeding 150mm Girth

General surfaces of timber; 150mm - 300mm Girth

General surfaces of timber; over 300mm Girth

Painting to Metalwork

Etching one coat metallic primer, one undercoat and two coats gloss
enamel paint as specified

..... coat red iron oxide metal primer and ..... coats high gloss enamel
paint as specified

Isolated surfaces not exceeding 0.5 m2

General surfaces of metal; not exceeding 150mm girth

General surfaces of metal; 150mm - 300mm girth

General surfaces of metal; over 300mm girth

Page 117 PAINTING


Staircases

One coat alkali-resisting primer and two coats acrylic weathershield


paint to general surfaces as specified

One coat alkali-resisting primer and two coats emulsion paint to


general surfaces as specified

To soffit of landing slab; not exceeding 150mm girth

To soffit of landing slab; 150mm - 300mm girth

To soffit of landing slab; over 300mm girth

To sloping soffit of staircase; not exceeding 150mm girth

To sloping soffit of staircase; 150mm - 300mm girth

To sloping soffit of staircase; over 300mm girth

To sides of raking open string; not exceeding 150mm girth

To sides of raking open string; 150mm - 300mm girth

To sides of raking open string; over 300mm girth

Code Description

Painting to Woodwork

Knot, stop, and prime with one coat aluminium wood primer, one
undercoat and two coats gloss enamel paint as specified

Isolated surfaces not exceeding 0.5 m2

General surfaces of timber; not exceeding 150mm Girth

General surfaces of timber; 150mm - 300mm Girth

General surfaces of timber; over 300mm Girth

Painting to Metalwork

Etching one coat metallic primer, one undercoat and two coats gloss
enamel paint as specified

Page 118 PAINTING


..... coat red iron oxide metal primer and ..... coats high gloss enamel
paint as specified

Isolated surfaces not exceeding 0.5 m2

General surfaces of metal; not exceeding 150mm girth

General surfaces of metal; 150mm - 300mm girth

General surfaces of metal; over 300mm girth

Cornices

Two coats acrylic weathershield paint to general surfaces as specified

Two coats acrylic weathershield paint to general surfaces as specified;


3.50m - 5.00m above ground level

Two coats emulsion paint to general surfaces as specified

Two coats emulsion paint to general surfaces as specified; 3.50m -


5.00m above ground level

On cornices; not exceeding 150mm girth

On cornices; 150mm - 300mm girth

On cornices; over 300mm girth

Painting to Woodwork

Knot, stop, and prime with one coat aluminium wood primer, one
undercoat and two coats gloss enamel paint as specified

General surfaces of timber cornices; not exceeding 150mm girth

General surfaces of timber cornices; 150mm - 300mm girth

General surfaces of timber cornices; over 300mm girth

Code Description

Skirtings, Dado Rails, Picture Rails, Wall-Mouldings, Cappings and Margin

Two coats acrylic weathershield paint to general surfaces as specified

Two coats emulsion paint to general surfaces as specified

Page 119 PAINTING


To wall-mouldings; not exceeding 150mm girth

To wall-mouldings; 150mm - 300mm girth

To wall-mouldings; over 300mm girth

To cappings; not exceeding 150mm girth

To cappings; 150mm - 300mm girth

To cappings; over 300mm girth

Knot, stop, and prime with one coat aluminium wood primer, one
undercoat and two coats gloss enamel paint as specified

General surfaces of timber skirtings; not exceeding 150mm girth

General surfaces of timber skirtings; 150mm - 300mm girth

General surfaces of timber skirtings; over 300mm girth

General surfaces of dado rails; not exceeding 150mm girth

General surfaces of dado rails; 150mm - 300mm girth

General surfaces of dado rails; over 300mm girth

General surfaces of picture rails; not exceeding 150mm girth

General surfaces of picture rails; 150mm - 300mm girth

General surfaces of picture rails; over 300mm girth

General surfaces of wall-mouldings; not exceeding 150mm girth

General surfaces of wall-mouldings; 150mm - 300mm girth

General surfaces of wall-mouldings; over 300mm girth

General surfaces of cappings; not exceeding 150mm girth

General surfaces of cappings; 150mm - 300mm girth

General surfaces of cappings; over 300mm girth

General surfaces of margins; not exceeding 150mm girth

General surfaces of margins; 150mm - 300mm girth

General surfaces of margins; over 300mm girth

Page 120 PAINTING


Code Description

Floor

Floor dressing to general surfaces as specified

On timber floor; not exceeding 150mm girth

On timber floor; over 300mm girth

Doors and Windows

Painting to Woodwork

Knot, stop, and prime with one coat aluminium wood primer, one
undercoat and two coats gloss enamel paint as specified

Two coats varnish as specified

On surfaces of panel door (measured flat overall); not exceeding


150mm girth

On surfaces of panel door (measured flat overall); 150mm - 300mm girth

On surfaces of panel door (measured flat overall); over 300mm girth

On surfaces of glazed panel door (measured flat overall); in small panes;


not exceeding 0.10m2

On surfaces of glazed panel door (measured flat overall); in medium panes;


exceeding 0.10 - 0.50m2

On surfaces of glazed panel door (measured flat overall); in large panes;


exceeding 0.50 - 1.00m2

On surfaces of glazed panel door (measured flat overall); in extra large


panes; exceeding 1.00m2

On surfaces of windows (measured flat overall); in small panes; not


exceeding 0.10m2

On surfaces of windows (measured flat overall); in medium panes;


exceeding 0.10 - 0.50m2

On surfaces of windows (measured flat overall); in large panes; exceeding


0.50 - 1.00m2

On surfaces of windows (measured flat overall); in extra large panes;


exceeding 1.00m2

On surfaces of timber frame; not exceeding 150mm girth

Page 121 PAINTING


On surfaces of timber frame; 150mm - 300mm girth

On surfaces of timber frame; over 300mm girth

On surfaces of timber lining; not exceeding 150mm girth

On surfaces of timber lining; 150mm - 300mm girth

On surfaces of timber lining; over 300mm girth

Code Description

Painting to Metalwork

Etching one coat metallic primer, one undercoat and two coats gloss
enamel paint as specified

On surfaces of metal door (measured flat overall); not exceeding


150mm girth

On surfaces of metal door (measured flat overall); 150mm - 300mm girth

On surfaces of metal door (measured flat overall); over 300mm girth

On surfaces of door grille (measured flat overall)

On surfaces of windows (measured flat overall); in small panes; not


exceeding 0.10m2

On surfaces of windows (measured flat overall); in medium panes;


exceeding 0.10 - 0.50m2

On surfaces of windows (measured flat overall); in large panes; exceeding


0.50 - 1.00m2

On surfaces of windows (measured flat overall); in extra large panes;


exceeding 1.00m2

On surfaces of window grille (measured flat overall)

On surfaces of metal frame; not exceeding 150mm girth

On surfaces of metal frame; 150mm - 300mm girth

On surfaces of metal frame; over 300mm girth

On surfaces of metal lining; not exceeding 150mm girth

On surfaces of metal lining; 150mm - 300mm girth

Page 122 PAINTING


On surfaces of metal lining; over 300mm girth

Structural Metalwork

Painting to Metalwork

Etching one coat metallic primer, one undercoat and two coats
gloss enamel paint as specified

..... coat red iron oxide metal primer and ..... coats high gloss
enamel paint as specified

Isolated surfaces; member of roof trusses; not exceeding 0.5 m2

General surfaces of members of roof trusses; not exceeding


150mm girth

General surfaces of members of roof trusses; 150mm - 300mm girth

General surfaces of members of roof trusses; over 300mm girth

Code Description

General surfaces of other metalwork; not exceeding 150mm girth

General surfaces of other metalwork; 150mm - 300mm girth

General surfaces of other metalworks; over 300mm girth

Railings, Fences and Gates

Concrete and brickwall fence

One coat alkali-resisting primer and two coats acrylic weathershield


paint to general surfaces as specified

One coat alkali-resisting primer and two coats emulsion paint to


general surfaces as specified

...... coats epoxy paint on general surfaces as specified

On plastered isolated post; not exceeding 150mm girth

On plastered isolated post; 150mm - 300mm girth

On plastered isolated post; over 300mm girth

On plastered fencing wall; over 300mm girth

Page 123 PAINTING


On precast concrete post; not exceeding 150mm girth

On precast concrete post; 150mm - 300mm girth

On precast concrete post; over 300mm girth

Timber Railling, Fence and Gates

Knot, stop, and prime with one coat aluminium wood primer, one
undercoat and two coats gloss enamel paint as specified

General surfaces of timber railings; not exceeding 150mm Girth

General surfaces of timber railings; 150mm - 300mm Girth

General surfaces of timber railings (measured nett overall)

General surfaces of timber fencing and gates (measured nett overall)

Metal Railling, Fence and Gates

Etching one coat metallic primer, one undercoat and two coats gloss
enamel paint as specified

..... coat red iron oxide metal primer and ..... coats high gloss enamel
paint as specified

General surfaces of metal railings; not exceeding 150mm Girth

General surfaces of metal railings; 150mm - 300mm Girth

General surfaces of metal railings (measured nett overall)

Code Description

General surfaces of metal fencing and gates (measured nett overall)

General surfaces of ornamental fencing and gates (measured nett overall)

Gutters

One coat alkali-resisting primer and two coats acrylic weathershield


paint to general surfaces as specified

On plastered valley and parapet gutters; not exceeding 150mm girth

On plastered reinforced concrete valley and parapet gutters; 150mm -


300mm girth

Page 124 PAINTING


On plastered concrete valley and parapet gutters; over 300mm girth

On plastered concrete eaves gutters; not exceeding 150mm girth

On plastered concrete eaves gutters; 150mm - 300mm girth

On plastered concrete eaves gutters; over 300mm girth

Etching one coat metallic primer, one undercoat and two coats gloss
enamel paint as specified

On uPVC gutters; not exceeding 150mm girth

On uPVC gutters; 150mm - 300mm girth

On uPVC gutters; over 300mm girth

On metal gutters; not exceeding 150mm girth

On metal gutters; 150mm - 300mm girth

On metal gutters; over 300mm girth

Pipes, Ducts, etc.

Etching one coat metallic primer, one undercoat and two coats gloss
enamel paint as specified

On uPVC pipes; not exceeding 150mm girth

On uPVC pipes; 150mm - 300mm girth

On uPVC pipes; over 300mm girth

On metal pipes; not exceeding 150mm girth

On metal pipes; 150mm - 300mm girth

On metal pipes; over 300mm girth

Signwriting

xxxxxxx

Decorative Paper

xxxxxxx

Page 125 PAINTING


Unit

NO

M2

M2

M2

NO

M2

Page 126 PAINTING


Unit

NO

M2

NO

M2

M2

Page 127 PAINTING


M

M2

M2

Unit

NO

M2

NO

M2

Page 128 PAINTING


M

M2

M2

M2

Unit

NO

M2

Page 129 PAINTING


NO

M2

M2

M2

Unit

Page 130 PAINTING


M

M2

M2

M2

M2

M2

M2

M2

M2

Page 131 PAINTING


Unit

M2

M2

Page 132 PAINTING


M

M2

M2

Unit

M2

M2

M2

M2

M2

M2

M2

M2

Page 133 PAINTING


M2

NO

M2

Unit

M2

M2

M2

Page 134 PAINTING


M

M2

M2

M2

M2

Unit

M2

M2

Page 135 PAINTING


M2

M2

M2

M2

M2

M2

Page 136 PAINTING


Code Description Unit

DRAINAGE

EXCAVATION

Soil descriptions

For description of soil, trial pits, bore holes, existing services and work near
Note
water please refer to 'Measurement Amplification And Pricing Factor'

Excavating trenches starting from formation level; earthwork support, part return,
fill in and ram and remainder deposit, spread and level within site

To receive drain pipes not exceeding 200mm nominal size, not exceeding
M
2.00m average 1.00m deep

To receive drain pipes not exceeding 200mm nominal size, not exceeding
M
2.00m average 1.00m deep, curved on plan

To receive drain pipes not exceeding 200mm nominal size, .....m - .....m;
M
average .....m deep

To receive drain pipes not exceeding 200mm nominal size, .....m - .....m;
M
average .....m deep, curved on plan

To receive drain pipes .....mm nominal size, not exceeding .....m;


M
average .....m deep

To receive drain pipes .....mm nominal size, not exceeding .....m;


M
average .....m deep, curved on plan

To receive drain pipes .....mm nominal size, .....m - .....m; average .....m dee M

To receive drain pipes .....mm nominal size, .....m - .....m; average .....m
M
deep, curved on plan
To receive surface water drain not exceeding 300mm wide; average ...m
deep
M

To receive surface water drain not exceeding 300mm wide; average ......m
M
deep, curved on plan

To receive surface water drain exceeding 300mm wide; maximum depth not
M3
exceeding ........m

To receive surface water drain exceeding 300mm wide; maximum depth not
M3
exceeding ........m, curved on plan

EXTRA OVER; excavating in rock met with in excavations of such size or


M
position by using wedges, lever, special plant, explosive or chemicals

EXTRA OVER; breaking up concrete on the surface of the ground M

EXTRA OVER; breaking up tar macadam on the surface of the ground M

EXTRA OVER; breaking up concrete met with in excavations of any depth M

EXTRA OVER; excavating below ground water level M


Page 137 DRAINAGE
Code Description Unit

DRAIN

Pipework

Vitrified clay pipe and fittings as specified; laid and jointed in trench on
and including Class ........ bedding as specified

High Density Polyethylene Corrugated (Profile) Double Wall Server


pipe to DIN 16961 or equivalent and fittings as specified; laid and
jointed in trench on and including standard bedding as specified

......mm Nominal size; not exceeding 2.00m average 1.00m deep M

......mm Nominal size; .....m - .....m; average .....m deep M

Surface Water Channels

Precast concrete Grade 20 concealed surface water drain pipe and


fittings as specified; laid and jointed in trench, on and including
150mm thick reinforced concrete Grade 30 as specified bed,
reinforced with one layer of BRC DA8; all as per drawing no. ..

Precast concrete Grade 20 surface water drain pipe and fittings as


specified; laid and jointed in trench, on and including 150mm thick
reinforced concrete Grade 30 as specified bed, reinforced with one
layer of BRC DA8; all as per drawing no. .....

......mm Nominal size; average 1.00m deep M

......mm Nominal size; average .....m deep M

Precast concrete block drain with minimum 75mm thick sides and
bottom, cast in suitable lengths, finished fair on exposed surfaces;
bedded, jointed and pointed in cement mortar (1:3); on and including
150mm thick reinforced concrete Grade 30, reinforced with one layer
of BRC DA8; all as per drawing no. ..

230mm x 230mm; average 1.00m deep M

.....mm x .....mm; average ......m deep M

EXTRA OVER for cascaded drain, ....... no of steps and ........mm total drop NO

The following in ........ numbers manholes

ALTERNATIF 1

Manholes to sizes and details as specified, complete with and


including vitrified clay channel, cast iron manhole cover and frame; pit
excavation commencing from formation level; disposal of surplus
excavated materials; all as per drawing no. PKR/CT(A01)1

Page 138 DRAINAGE


Internal plan size .....mm x .....mm; to invert .....m deep NO

Code Description Unit

ALTERNATIF 2

Excavating pit starting from reduced level; to receive manhole

Maximum depth not exceeding .....m (In No: ) M3

Maximum depth exceeding .....m - .....m (In No: ) M3

EXTRA OVER; excavating in rock met with in excavations of


such size or position by using wedges, lever, special plant, M3
explosive or chemicals

EXTRA OVER; breaking up concrete on the surface of the ground M2

EXTRA OVER; breaking up tar macadam on the surface of the ground M2

EXTRA OVER; breaking up concrete met with in excavations of any depth M3

EXTRA OVER; excavating below ground water level M3

The following in ........ numbers sumps

ALTERNATIF 1

Brick sump constructed with 225mm thick brickwall in cement mortar


(1:3); 50mm thick lean concrete, 200mm thick concrete Grade 20 as
specified bed; 225mm x 150mm thick rebated concrete Grade 20
topping to receive mild steel grating (measured separately);

Internal plan size .....mm x .....mm; to invert .....m deep NO

ALTERNATIF 2 (MEASURE IN DETAIL)

Excavating pit starting from reduced level; to receive manhole

Maximum depth not exceeding .....m (In No: ) M3

Maximum depth exceeding .....m - .....m (In No: ) M3

EXTRA OVER; excavating in rock met with in excavations of


such size or position by using wedges, lever, special plant, M3
explosive or chemicals

EXTRA OVER; breaking up concrete on the surface of the ground M2

EXTRA OVER; breaking up tar macadam on the surface of the ground M2

EXTRA OVER; breaking up concrete met with in excavations of any depth M3

EXTRA OVER; excavating below ground water level M3

Page 139 DRAINAGE


Code Description Unit

Sewage Treatment Plant

The Contractor shall take note that the following scope of work shall
be under his responsibilities and shall price the works in accordance
with drawing Nos. .....

Supply and install complete, the whole system of Sewage


Treatment Plant designed to suit ............ PE population (purchased ITEM
through Government approved suppliers) strictly in accordance with
manufacturer's instruction including filling tanks with water

Connections To Existing Works

Connect ......mm diameter pipes to existing .....mm diameter


pipework including all requisite connectors and fittings all as per NO
drawing No. ..........................., test all connections and make good
any defects and leave the whole pipework in perfect

Connections To Public Sewer

Allow a Provisional Sum of Ringgit Malaysia ............... Only


SUM
(RM...........00) for connection to Public sewer

Testing Drains

Test the whole of the Sewerage System in the presence of the S.O
with water or other approved means before trenches are filled in, ITEM
make good any defect, re-test and on completion leave the whole
system in perfect working order to the entire satisfaction of the S.O

Page 140 DRAINAGE


Page 141 DRAINAGE
Code Description Unit

SITE PREPARATION AND EARTHWORKS

SITE PREPARATION

Soil descriptions

For description of soil, trial pits, bore holes, existing services and work near
water please refer to 'Measurement Amplification And Pricing Factor'

Cutting down trees and grubbing up roots; removing from site; filling voids left
with material arising from excavation

Not exceeding 300mm girth at 1.00m above ground level NO

300mm - 600mm girth at 1.00m above ground level NO

Grubbing up stumps and roots of previously felled trees; removing from site; filling
voids left with material arising from excavation

300mm - 600mm girth at 1.00m above ground level NO

Cutting down hedges and grubbing up roots; removing from site

1000mm hedges, average 500mm high M

Hibiscus hedges, average 700mm high M

Excavating top soil to be preserved

Average 250mm deep M2

Clearing site

Information

Notwithstanding the Standard method of measurement, the site clearing is


measured as an item and the Contractor is strongly advised to visit the site
as no claim will be entertained on the ground lack of knowledge on the
extent of the works

Clear all vegetation, trees irrespective of girth, etc., all buildings, structures
or other obstructions which interfere with the execution of the work and ITEM
remove all debris off site; area approximately 4.50 hectares as per drawing
no.

Cutting down trees and clearing site of undergrowth, bushes, scrub and
hedges and grubbing up their roots and filling voids left by removal of roots
ITEM
with selected material arising from excavation; approximately 1.00m

EARTHWORKS

Excavate to formation level in all types of soil except rock, including grading
M3
sides to slope

EXTRA OVER; excavating in rock met with in excavations of such size or


M3
position by using wedges, lever, special plant, explosive or chemicals

EXTRA OVER; excavating below ground water level M3


Page 142 SITE PREPARATION
Code Description Unit

DISPOSAL OF EXCAVATED MATERIAL

Disposal on site

Depositing on site in permanent spoil heaps average 100.00m distant M3

Depositing on site in temporary spoil heaps located at Contractor's


M3
discretion

Deposit, spread, level and compact as directed by S.O. M3

Disposal off site

Removing from site including provision of a shoot, dump, payment for


M3
royalties, fees, levies and other charges

Top soil, preserved topsoil from temporary spoil heap spread on site

To make up levels over 250mm thick M3

To make up levels not exceeding 250mm thick; average 150mm thick M2

Imported top soil from contractor own source to be spread on site

To make up levels over 250mm thick M3

To make up levels not exceeding 250mm thick; average 150mm thick M2


----------------------

Preserved topsoil depositing on site in temporary spoil heaps for re-use


M3
located at average .m distant

Removing preserved top soil from site including provision of a shoot, dump,
M3
payment for royalties, fees, levies and other charges

FILLING

Material arising from excavation

Material arising from excavation to be selected and treated

Material to be obtained off site at contractor own source

Filling to excavation M3

Filling to excavation; depositing in layers; 250mm maximum thickness M3

To make up levels over 250mm thick M3

To make up levels over 250mm thick; depositing in layers; 250mm


M3
maximum thickness

To make up levels not exceeding 250mm thick; average 250mm thick M2

Page 143 SITE PREPARATION


Page 144 SITE PREPARATION
Code Description Unit

ROAD WORKS

ROADS

Subgrade Preparation

Excavate surface to reduce level commencing from formation level, get out
and deposit excavated material within road shoulder as specified

Maximum depth not exceeding 0.25m M2

Maximum depth not exceeding 1.00m M2

EXTRA OVER; breaking up concrete on the surface of the ground M2

EXTRA OVER; breaking up tar macadam on the surface of the ground M2

Trim, grade and compact formation surfaces to required gradients, cambers,


falls and cross falls as specified

To receive sand blanket/blinding (measured separately) M2

Sub-base

Sand blanket/blinding or approval equivalent material as sub-base compacted


to required gradients, cambers, falls and cross falls as specified

..mm Thick, to receive crusher run M2

..mm Thick, to receive crusher run; slopping not exceeding 15 degree


M2
from horizontal

...mm Thick, to receive crusher run; slopping exceeding 15 degree from


M2
horizontal

Road-base

Crusher run spread, levelled and compacted to required gradients, cambers,


falls and cross falls as specified

..mm Thick, to receive bitumen binder M2

..mm Thick, to receive bitumen binder; slopping not exceeding 15 degree


M2
from horizontal

..mm Thick, to receive bitumen binder; slopping exceeding 15 degree


M2
from horizontal

Surfacing

Asphaltic concrete binder course as specified

Bituminous macadam as specified

Mass concrete Grade 25/20 in pavement as specified

Page 145 ROAD


Code Description Unit

..mm Thick M2

..mm Thick, slopping not exceeding 15 degree from horizontal M2

..mm Thick, slopping exceeding 15 degree from horizontal M2

Reinforcement; fabric; hard drawn plain round steel, welded as specified

Type BRC Ref. No. ..weighing ...kg/m2 M2

Road side table

Form road side table with material arising from excavation for making up
M3
level, well spread, grade, level and compact

Kerbs, Channels and Edging

In-situ concrete slipform/extruded kerbs

Concrete barrier kerb Type . overall size ..mm x ...mm high using
kerb extrusion machine line, level and gradient including prepared bases as M
per Drawing No.

EXTRA OVER for kerbs with drain inlet opening NO

Precast concrete kerbs

.....mm long x .....mm wide x .....mm high Precast concrete Grade ..... as
specified kerbs Type ..... (standard Barrier), splayed top, finished fair on M
exposed surfaces, bedded, jointed and pointed in cement mortar (1:3),
including all necessary formwork, reinforcement

.....mm long x .....mm wide x .....mm high Precast concrete Grade .....as
specified kerbs Type *....(semi Mountable), splayed top, finished fair on M
exposed surfaces, bedded, jointed and pointed in cement mortar (1:3),
including all necessary formwork, reinforcement

EXTRA OVER for kerbs with drain inlet opening NO

Prepare and apply .. coat approved alkali resisting primer sealer and
M
..coats emulsion paint as specified to concrete kerbs

Scupper Drain

Excavate trench for scupper drain starting from reduce level

Maximum depth not exceeding 0.25m M3

Maximum depth not exceeding 1.00m M3

UPVC pipes Class...as specified

...mm Diameter scupper drain cast in short length and laid to falls on and
including ...mm thick concrete Grade 15 surround, bedded and jointed in M
cement mortar (1:3) including all
Pagenecessary
146 formwork ROAD
...mm Diameter scupper drain cast in short length and laid to falls on and
including ...mm thick concrete Grade 15 surround, bedded and jointed in M
cement mortar (1:3) including all necessary formwork

Code Description Unit

Labour and materials connecting scupper drain outlet drain pipe to roadside
NO
drain including making good on completion

Road Marking

Prepare and apply..mm thick reflectorised thermoplastic acrylic weather coat


road paint on premix road to form

..mm Wide, centre line M

..mm Wide, edge line M

..mm Wide, stop line M

`Turn left or right' direction arrows NO

Road Furniture

Road Signage

BERHENTI signage overall size 600mm diameter in circular shaped sign


plate moulded on including 75mm diameter x 3.2mm thick steel post NO
2700mm long complete with necessary foundation, painting, lettering and
fixing brackets.etc

.......... signage overall size 600mm diameter in circular shaped sign plate
moulded on including 75mm diameter x 3.2mm thick steel post 2700mm NO
long complete with necessary foundation, painting, lettering and fixing
brackets.etc

Road Hump signage plate overall size 600mm x 600mm in square shapes
sign plate moulded on including 75mm diameter x 3.2mm thick steel post NO
2700mm long complete with necessary foundation, painting, lettering and
fixing brackets.etc all as per drawing No.

......... signage plate overall size 600mm x 600mm in square shapes sign
plate moulded on including 75mm diameter x 3.2mm thick steel post NO
2700mm long complete with necessary foundation, painting, lettering and
fixing brackets.etc all as per drawing No.

Guardrail

Approved hot-dip galvanised guardrail constructed of 127mm x 64mm x


14.90 kg/m channel as post overall length 1.83m long at 4.00m centres with M
end driven to a depth of 1120mm with and approved method by the S.O
and fixed to fencing angle post

Supply and install in position corrugated steel beam guardrail; Double Rail
inclusive of galvanised steel post at .. centres spacing, bedded into M
concrete ..mm depth; reflector strip and including all necessary
excavation, filling, compaction

Page 147 ROAD


Code Description Unit

Road Hump

...mm Width x ...mm Thick curved-on-section asphaltic concrete road


hump complete with..mm wide white line at ..mm centres as per NO
drawing No.

..mm Width yellow bar at ..m centres as per drawing No. M

Pavement

Excavate surface to reduce level commencing from formation level, including


grading to falls and cambers to received pavement units

Maximum depth not exceeding 0.25m M3

Maximum depth not exceeding 1.00m M3

Sand blanket/blinding or approval equivalent material as base compacted as


specified on soft ground

..mm Thick, level and to falls M2

Precast concrete paving blocks; ..joints, symmetrical half bond layout; covering
with washed non-staining sand, compacting with plate vibrator, sweeping off
surplus; external

..mm x ...mm x ...mm units to pavings on sand, granular or blinded


M2
hardcore base; level or to falls; not exceeding 300mm wide

..mm x ...mm x ...mm units to pavings on sand, granular or blinded


M2
hardcore base; level or to falls; exceeding 300mm wide

Page 148 ROAD


Page 149 ROAD
Code Description Unit

FENCING, TURFING AND PLANTING

OPEN TYPE FENCING

Post-and-wire Fencing

......strands....... gauge straining wires by using........ ;and .........gauge


strands galvanised barbed wire, .. ....mm x .......mm x ........mm thick
mild steel angle post at .........mm centres; mild steel angle braces at
turns, corners and at every .........

............. post at .........mm centres; ....nos ......mm x


......mm , ..................horizontal rails by using .............., including plain
concrete Grade ....... as specified pad foundation size ......mm x
......mm x ......mm deep; all necessary .........

Post-and-rail Fencing

............ post at .........mm centres; .....nos .........mm x


.........mm, ..................horizontal rails by using .............., including plain
concrete Grade ....... as specified pad foundation size ......mm x
......mm x ......mm deep; all necessary

Chain-link and Wire-mesh Fencing

......mm Square mesh, ....... gauge PVC coated chain link fence; .......
strands ....... gauge PVC coated straining wires; ......mm x.......mm
x ......mm thick mild steel angle post at ......mm centres; mild steel
angle braces at turns, corners and at every......

Security fencing; 64mm Square mesh, 10 gauge PVC coated chain


link fence; 3 strands 8 gauge PVC coated straining wires; 3 strands 12
gauge PVC coated barbed wires top; 57mm x 57mm x 6mm thick mild
steel angle post at 3000mm centres; mild steel angle brace

......mm Square mesh, ....... gauge galvanised steel chain link


fence; ....... strands ....... gauge galvanised steel straining wires;
......mm x.......mm x ......mm thick mild steel angle post at ......mm
centres; mild steel angle braces at turns, corner .....

Security fencing; 64mm Square mesh, 10 gauge galvanised steel


chain link fence; 3 strands 8 gauge galvanised steel straining wires; 3
strands 12 gauge galvanised steel barbed wires top; 57mm x 57mm x
6mm thick mild steel angle post at 3000mm centres; mild

Cleft-pale Fencing

Fencing; ...........mm x ...........mm mild steel hollow section post ...........


at ........... centers: ........... number of line wires ........... gauge; tied to
post.; ...........mm x ...........mm timber pales at ...........mm

Page 150 FENCING,TURFING & PLANTING


Code Description Unit

Palisade Fencing

Fencing; ...........mm x ...........mm mild steel hollow section post ...........


at ........... centers: with ........... number ...........mm x ...........mm hollow
section horizontal rails; welded all members together,

Fencing; wooden palisade; B.S.1722; concrete posts; softwood rails,


pales and stumps pressure impregnated with preservative

Metal Bar Fencing


...........mm height fencing; ...........mm x ...........mm mild steel hollow
section post at ........... centers; ...........mm x ...........mm mild steel bars
infill; welded all members together to pattern as per drawings
no ...........

.......overall .....mm high M

.......overall .....mm high, fencing laid sloping M

.......overall .....mm high, fencing laid across sloping ground M

.....set out to curve but straight between posts .....mm high M

.......curve fencing overall ......mm high, .....mm radius M

CLOSED TYPE FENCING

Closed-boarded Fencing
...........mm x ...........mm Mild steel hollow section post ...........
at ........... centers with ........... number ...........mm x ...........mm hollow
section horizontal rails; welded all members together; ...........mm
x ...........mm timber board

...........mm height fencing; close boarded; concrete posts with


weathered tops; timber rails, pales, cappings, gravel boards and
centre stumps, pressure impregnated with preservative; three lines
galvanised barbed wire; galvanised fittings and accessories

Built-up Concrete Fencing

...........mm x ...........mm Reinforced concrete Grade ........ as specified


post at ...........mm centers; infill with ...........mm thick brickwall in
between post; plastered all expose surfaces; all necessary excavation,
formwork and painting complete

Corrrugated Fencing

...........mm x ...........mm Mild steel hollow section post ...........


at ........... centers: with ........... number ...........mm x ...........mm hollow
section horizontal rails; welded all members together; ...........mm thick
corrugated metal caldding........

Page 151 FENCING,TURFING & PLANTING


Code Description Unit

Decorative Fencing

Fencing; comprising of ...........mm x ...........mm x ...........mm High


reinforced concrete Grade ........ as specified post with lamp
(measured separately) on top at every ...........mm centres; .....mm
thick brickwall ........mm height; plaster all externally....

Fencing; comprising of ......mm x ......mm concrete post at every


.......mm centres;........mm thick brickwall at .......mm height in between
post, ........mm x .......mm concrete coping on top of column and
wall, .......mm thickt decorative wrought iron

.......overall .....mm high M

.......overall .....mm high, fencing laid sloping M

.......overall .....mm high, fencing laid across sloping ground M

.....set out to curve but straight between posts .....mm high M

.......curve fencing overall ......mm high, .....mm radius M

GATES
...mm x .....mm Decorative double leaf mild steel sliding gate;
comprising .....mm x .....mm x .....mm thick mild steel as frame
including fabrication and welding, ironmongeries and bottom of NO
each leaf fitted with rollers and all necessary accessories,
complete......

...mm x .....mm Mild steel gates in two equal panel, constructed


of ...mm x ...mm x ....mm thick hollow section frames and braces, NO
infill with ....mm x ....mm x ....mm thick hollow section horizontal and
vertical members all welded together, and hanging ......
...mm x .....mm Decorative double leaf gate overall size .....mm
x .....mm with and including frames, top, intermediate and bottom
rail with vertical members all welded together and hanging with NO
approved ironmongeries and painting to steel works all as per
drawing ....

...mm x .....mm Gates; impregnated wrought softwood; framed


ledged and braced; ...........mm x ...........mm stiles and top NO
rail; ...........mm x ...........mm middle, bottom rails and braces; filled
in with ...........mm x ...........mm vertical pales at .........
...mm x .....mm Gates; mild steel solid rectangular framework; solid
square bar vertical infilling at ...........mm centres; as per drawing
NO
no ...........

SUNDRIES

Special Post

Page 152 FENCING,TURFING & PLANTING


EXTRA OVER for ends post ...........mm ...........mm x ...........mm
height; bedded in and including plain concrete Grade 20 as NO
specified pad foundation size ...........mm x ...........mm x ...........mm
deep; all necessary excavation, formwork and painting

Code Description Unit

EXTRA OVER for ........ post ...........mm ...........mm x ...........mm


height; bedded in and including plain concrete Grade 20 as NO
specified pad foundation size ...........mm x ...........mm x ...........mm
deep; all necessary excavation, formwork and painting

SEEDING AND TURFING

Spot Turfing

....mm x ....mm Turves as specified obtained from Contractor's own


source; spot turf at ....mm centres, trimming, levelling and grading
surfaces; ....mm thick top soil as specified, watering and tendering until
well established; replacing badly grow turves

To flat ground M2

To slopes and embankments M2

Close Turfing

....mm x ....mm Turves as specified obtained from Contractor's own


source; trimming, levelling and grading surfaces; ....mm thick top soil
as specified, watering and tendering until well established; replacing
badly grow turves

To flat ground M2

To slopes and embankments M2

Close Turfing to Football and Playing Fields

.....mm x .....mm Turves as specified obtained from Contractor's own


source; trimming, levelling and grading surfaces; .....mm thick top soil;
watering and tendering until well established as specified; replacing
badly grow turves

To flat ground M2

Hydro seeding

Supply, plant and maintain turves using seeding sprayed technique;


with application of seed mixture at a rate 0.03kg/m2 complete with
fertilisers and mulchfibre and including installation of "Fibromat"
biodegradable erosion control blanket; watering and .......

To flat ground M2

To slopes and embankments M2

Page 153 FENCING,TURFING & PLANTING


Code Description Unit

PLANTING

Supply, plant and maintain as specified, the following landscaping work


as shown in the drawing no......

Tree

Tabebuia Pentaphylla; 75mm diameter x 2.00m height. NO

Bauhinia Purpurea; 75mm diameter x 2.00m height. NO

Callistemon Viminalis; 75mm diameter x 2.00m height. NO

Erythrina Glauca; 75mm diameter x 2.00m height. NO

Lagerstroemia Floribunda; 75mm diameter x 2.00m height. NO

Palm

Carpentaria Acuminata; 100mm diameter x 2.00m height. NO

Chrysalidocarpus Lutescens; 50mm diameter x 1.50m height. NO

Livinstonia Humilis; 150mm diameter x 3.00m height. NO

Shrub

Hymenocallis Speciosa Variegated; 300mm x 300mm overall height. NO

Ixora Sunkist; 300mm x 300mm overall height. NO

Heliconia Lady Diana; 300mm x 300mm overall height. NO

Heliconia Fire Flash; 300mm x 300mm overall height. NO

Alpinia Zerumbet Var; 300mm x 300mm overall height. NO

Canna Red; 500mm x 500mm overall height. NO

Canna Yellow; 500mm x 500mm overall height. NO

Relocation and Protection of Existing Trees

Dug up, prepare for, relocated within site and maintain all as specified
and as shown in drawing no......

Tree

Tabebuia Pentaphylla; 75mm diameter x 2.00m height. NO

Page 154 FENCING,TURFING & PLANTING


Palm

Carpentaria Acuminata; 100mm diameter x 2.00m height. NO

Shrub

Hymenocallis Speciosa Variegated; 300mm x 300mm overall height. NO

Page 155 FENCING,TURFING & PLANTING


Code Description Unit

EXTERNAL WATER RETICULATIONS

Excavation

Excavate service trenches starting from .... level; grading bottoms;


earth work support; backfilled with material arising from excavations;
remainder spread and levelled within site

To receive .mm diameter pipe; average depth ...m M

Bedding

.mm thick (overall consolidated thickness) sand bedding M2

..mm thick (overall consolidated thickness) compacted sand bedding M3

Pipework

High Density Polyethylene (HDPE) PN

..mm Diameter pipe laid and jointed in trench (measured separately) M

Cast Iron Fittings

..mm Diameter flanged end sluice valve NO

..mm Diameter double office flanged end air valve with isolating
NO
valve complete with off-take tee

..mm Diameter duckfoot bend NO

Mild steel fittings

High Density Polyethylene (HDPE) PN

..mm x ..mm x ..mm All Flanged Tee NO

..mm x ...degree Flanged bend NO

Pillar Hydrant

..mm Diameter approved cast iron double outlet pillar hydrant to


B.S 2035 complete with 150mm diameter double flanged adaptor, NO
offtake tee, cast iron extension piece and complete with outlet caps
and fastening chains, ...mm diameter ..

Thrust Block

Diaphram block, concrete support, thrust block, end cap, anchor block
and the like

....mm x ....mm x ....mm Mass concrete Grade (1:3:6-38mm NO


aggregate) as specified blocks

Page 156 WATER RECT


Code Description Unit

Indicator Post

Standard precast concrete (1:2:4-19mm aggregate) as described


indicator posts size 130mm x 130mm x 920mm high splayed edges all
round at one side reinforced with 4 nos. of 10mm diameter mild steel
mainbars and 6mm diameter mild steel stirrups at .

Sluice valve indicator post NO

Air valve indicator post NO

Hydrant valve indicator post NO

Valve chamber
....mm x .....mm (internal dimension) precast concrete valve
chamber constructed of 100mm thick (wall thickness) standard
block sections covered with 6mm thick steel plate cover including all NO
excavation, backfilling and removal surplus excavated material
and .........

Sampling point

Allow sampling point as requested by local Authorities NO

Locating and tapping into Jabatan Bekalan Air's water main

Allow for locating, arranging, attending, liaising and obtaining


approval from Jabatan Bekalan Air for temporary water shut-off, ITEM
cutting off from existing water mains and tapping to ....mm diameter
mild steel pipe including coated cast airon offtake tee, .........

Sterrillisation

Sterrillisation as specified including cost water and chlorine solution


to the approval of the Architect and the Authorities for all pipes and ITEM
fittings.

Connection

Allow for connection of *mm Diameter mild steel pipe to existing


main water supply with and including requisite adaptors, connectors ITEM
and bolts complete and make good any defect upon completion

Testing

On completion of the water reticulation system test and commision


as specified all pipes and fitting and make good all defects, re-test ITEM
and leave whole in perfect working order to the satisfaction of the
Architect and Authorities

Page 157 WATER RECT


Page 158 WATER RECT
Code Description Unit

PROVISIONAL SUMS

The following Provisional Sums provided shall be expended as directed


by the Superintending Officer or deducted in whole or in part if not
expended
MECHANICAL WORKS

Air-conditioning and Ventilation System


Allow a Provisional Sum of Ringgit Malaysia One Million One
Hundred Thousand Only (RM1,100,000.00) for Air Conditioning and SUM
Ventilation System Installation.

Fire Fighting System


Allow a Provisional Sum of Ringgit Malaysia One Hundred Sixty
Five Thousand Only (RM165,000.00) for Fire Fighting System SUM
Installation.

Hot Water System

Allow a Provisional Sum of Ringgit Malaysia One Hundred And Ten SUM
Thousand Only (RM110,000.00) for Hot Water System Installation.

Dental Chair System


Allow a Provisional Sum of Ringgit Malaysia Four Hundred And
Forty Thousand Only (RM440,000.00) for Dental Chair System SUM
Installation.

ELECTRICAL WORKS

Electrical Installation
Allow a Provisional Sum of Ringgit Malaysia One Million Eight
Hundred Thousand Only (RM1,800,000.00) for Electrical SUM
Installation.

Telephone and IT Infrastructure Installation

Allow a Provisional Sum of Ringgit Malaysia One Hundred Eighty SUM


Thousand Only (RM180,000.00) for Telephone and IT Infrastructure
Installation.

Extra Low Voltage Appliances Installation

Allow a Provisional Sum of Ringgit Malaysia One Hundred Eighty SUM


Thousand Only (RM180,000.00) for Extra Low Voltage Appliances
Installation.

ARCHITECTURAL WORKS

Interior Design

Allow a Provisional Sum of Ringgit Malaysia Three Hundred SUM


Thousand Only (RM300,000.00) for Interior Design works.

Built-in Furniture

Allow a Provisional Sum of Ringgit Malaysia Seven Hundred SUM


Thousand Only (RM700,000.00) for supply and installation of Built-
In Furniture.
Page 159 PROV SUMS
Code Description Unit

Ironmongeries

Allow a Provisional Sum of Ringgit Malaysia One Hundred And SUM


Sixty Thousand Only (RM160,000.00) for supply and installation of
Ironmongeries.

Signages and Graphic

Allow a Provisional Sum of Ringgit Malaysia Two Hundred SUM


Thousand Only (RM200,000.00) for supply and installation of
Internal and External Signages and Graphic.

Landscaping

Allow a Provisional Sum of Ringgit Malaysia One Hundred And Fifty SUM
Thousand Only (RM150,000.00) for Landscaping works.

MISCELLANEOUS

Telephone Rental and Calls Changes

Allow a Provisional Sum of Ringgit Malaysia Five Thousand Only SUM


(RM5,000.00) for Telephone Rental and Calls changes.

PRIME COST SUMS

The following Prime Cost Sums are provided for works to be executed by
Nominated Sub-Contractors

MECHANICAL WORKS

Air-conditioning and Ventilation System

Allow a Sum of Ringgit Malaysia One Million One Hundred SUM


Thousand Only (RM1,100,000.00) for Air Conditioning and
Ventilation System Installation.

ADD for Main Contractor's profit %

Allow for attendance as described in the 'Preliminaries' upon the ITEM


Nominated Sub-Contractor executing the above work

Lift System

Allow a Sum of Ringgit Malaysia One Million Eight Hundred SUM


Thousand Only (RM1,800,000.00) for Lift System Installation.

ADD for Main Contractor's profit %

Allow for attendance as described in the 'Preliminaries' upon the ITEM


Nominated Sub-Contractor executing the above work

Page 160 PROV SUMS


Code Description Unit

ELECTRICAL WORKS

Electrical Installation
Allow a Provisional Sum of Ringgit Malaysia One Million Eight
Hundred Thousand Only (RM1,800,000.00) for Electrical SUM
Installation.

ADD for Main Contractor's profit %

Allow for attendance as described in the 'Preliminaries' upon the ITEM


Nominated Sub-Contractor executing the above work

Page 161 PROV SUMS


Page 162 PROV SUMS
Code Description Unit
Code Description Unit
Code Description Unit
Code Description Unit
Code Description Unit
Code Description Unit

Potrebbero piacerti anche