This article gives an example of calculation for a typical balanced cement plug job.
Parameters to be Calculated
The following parameters shall be calculated for the setting of a balanced plug.
Hole Data
12.1/4in hole was drilled to 7 153 ft. The hole was logged and RFT measurements done. All logs showed a good hole, in gauge, with an average hole
size of 12.1/2in and a hole capacity of 0.1518 bbls/ft.
The RFT measurement showed the following:
Depth Reservoir Pressure EMG Mud Pressure Over balance
(ft) (psi) psi/ft (psi) (psi)
4 167 1 823 0.438 1 970 147
4 856 2 103 0.433 2 295 193
5 332 2 333 0.438 2 522 189
6 480 2 864 0.442 3 065 201
7 153 3 161 0.442 3 382 221
It was decided to plug back to 6 660 ft. Minimum required overbalance is 102 psi above 4 922 ft and 152 psi deeper down.
The plug will be set with the balanced plug method. A 591 ft 3.1/2in tubing stinger will be run on 5in DP.
Hole Size: 12.1/4in
Average size: 12.1/2in
Capacity: 0.1518 bbls/ft
Content: mud
Gradient: 0.4686 psi/ft
Surface lines 2 bbls
Tubular Data
Additives
The formation pressure, EMG 0.442 psi/ft, needs to be overcome, with a safety margin of 152 psi, in all circumstances. The depth at which the
hydrostatic head of the mud column is just enough to provide this safety margin is:
D x 0.4686 = D x 0.4421 + 152 gives D = 5 742 ft.
This means that, assuming pressure communication does exist from 6480 ft to
5 742 ft, any preflush/spacers is not allowed to rise higher than 5 742 ft. With a planned TOC at 6 660 ft yields a maximum spacer length of 919 ft. If
however, the actual TOC, due to excess cement being pumped, would be higher than 6 660 ft a spacer of exactly 919 ft could rise beyond 5 742 ft. The
spacer is therefore limited to 656 ft annular length.
656 ft annular length occupies a volume of : 98 ft stinger:
398 ft x 558 ft x (0.1518 - 0.01202) bbls/ft = 13.8 bbls.
558 ft DP : 558 ft x (0.1518 0 - 0.0249) = 70.8 bbls
Total Pre-Flush volume = 84.5 bbls
To balance the plug the height of afterflush in the DP has to be 656 ft as well:
98 ft stinger : 98 ft x 0.0086 bbls/ft = 0.843 bbls
558 ft DP: 558 ft x 0.0178 bbls/ft = 9.9 bbls
Total Post Flush Volume = 10.8 bbls
Material Requirements
Slurry Volume
Slurry volume = plug back length x average hole size
= 493 ft x 0.1518
= 74.8 bbls (logs show 75.5 bbls)
Allowing for an excess of 10 %.
Total slurry volume = 1.1 x 75.5 bbls = 83 bbls = 466 cu.ft
An excess of 10 % means an additional 49 ft plug length, which is in agreement with the reduced spacer length.
Dry Cement
Cement needed
= slurry volume/yield
= 466 cu.ft/1.15 cu.ft/sk
Total cement = 405 sk cement
Mixwater
Mixwater required:
for 405 sk cement: 405 sk x 5 gal/sk = 2025 gal = 48.2 bbls
excess 10 %: 0.10 x 48.2 bbls = 4.8 bbls
dead volume tanks: 18.9 bbls
Total Mixwater Required : 71.9 bbls.
Additives
All additives are liquids and added to the mixwater. The use of the additives is calculated back to a concentration mixed in the mixwater:
To obtain whole numbers of drums D080 to be used, the volume of mixwater is adjusted to 74.5 bbls, by increasing the percentage excess to 12 %. The
numbers then become 3.5 drums of D603, 8 drums of D080 and 1.6 drums of D047, to be mixed in 74.5 bbls site water.
The total mix fluid to be held by the mix tank on the rig is:
74.5 bbls + (8 drums x 0.358 bbls/drum) + (3.5 drums x 0.358 bbls/drum) + (1.6 drums x 0.113 bbls/drum) = 78.8 bbls
Displacement Volumes
To calculate the volume to displace accurately, the TOC with the stinger in the cement, has to be calculated.
String + annulus OH - tubing total capacity
= 0.1518 bbls/ft - 0.0034 bbls/ft = 0.1484 bbls/ft.
String + annulus OH - DP total capacity
= 0.1518 bbls/ft - 0.00783 bbls/ft = 0.144 bbls/ft.
83 bbls slurry occupies 83 bbls / 0.1484 bbls/ft = 559 ft annular height (i.e. 559 ft along the tubular).
The highest estimate of TOC gives the maximum displacement volume allowed:
TOC = 7 153 ft -561 ft = 6 592 ft
Top of water, afterflush in DP, will be at 6 592 ft - 656 ft = 5 936 ft
Total volume to displace = 5 936 ft + 3 ft overstand of DP + vol. Surf. Lines
= 5 939 ft x 0.0178 bbls/ft + 2 bbls
= 107.7 bbls
Allowing for under displacement of 1 stand of DP (2 bbls):
Displacement Volume = 105.7 bbls.
Displacement Rates
When the cement reaches the end of the stinger the pump rate has to be slowed down to meet plug flow condition (< 30 ft/min annular velocity) during
placement of the slurry.
The total string volume
= ( 6 562 ft x 0.0178 bbls/ft) + (591 ft x 0.00863 bbls/ft)
= 122 bbls
Thus pumping should be slowed down after string volume minus slurry volume minus afterflush has been displaced:
= 122 bbls - 83 bbls - 10.8 bbls
= 28.2 bbls
Accepting an annular velocity of 30 ft/min yields (not taking any U-tubing effects into account) a maximum pumprate Q of:
Q (max) = (0.1518 - 0.01202) bbls/ft x 30 ft/min = 4.2 bbls/min