L1 L2 H Ties
4T16
R8-150 8T20
8T20
Figure 1
Times Dim Qtt Description Timesi Dim Qtt Description
ing ng
Excavation Concrete
Pad Footing
Excavation of top soil
1/ 1.500 1.5 x 1.5 x0.45
1.500
2.250 1/ 1.500
2.250 m2 top soil
1.500
0.450 1.012
1.012 m3 concrete
Excavation of depth of trench <1.5
Stump
Depth 1.8
Depth 1.800
(-) top soil 0.15 (-) Pad footing 0.450
1.65 (-) Ground beam 0.450
1/ 1.500 (+) lean concrete 0.05 0.900
1.500 1.70 1/ 0.125
1.500 3.375 0.450 0.051 m3 concrete
0.900 0.051
3.375 m3 Lean Concrete
lean concrete thickness = 0.05
Excavation of depth of trench >1.5 1/ 1.500
Depth 1.8 1.500 0.113 m3 lean concrete
(-) top soil 0.15 0.05 0.113
1/ 1.500 1.65 Reinforcement
1.500 (+) l.c 0.05
0.200 1.70 Pad Footing (8T20 B/W)
0.450
(-) trench 1.500
Length = 1.500
0.200 (-) 2cover = 0.060
1.44
1/2/8/ 1.660 26.560 (+) 2 bend
0.450 m3 (2)(5.5)(0.02) = 0.22
1.66
26.560m T20
Times Dim Qtt Description Timesi Dim Qtt Description
ing ng
Ties Link
Length = 1.500
(-) 2 cover 450 R8
2(0.030) = 0.060
1.440
1.440 (4 sides) = 5.760
Length = 0.125
(-) 2 cover
(+) anchorage =
2(15)(0.020) = 0.600 2(0.030) = 0.060
6.360 0.065
(0.065 ) x 2 sides = 0.130
1/1/ 6.360 6.360
6.360 m T20 Length = 0.450
2(0.030) = 0.060
0.390
Stump
(0.39) x 2 sides = 0.780
Length = 1.800 (+) anchorage, 24d
(-) cover = 0.030 24(0.008) = 0.192
1.770 1.102
(-) 2T20 = 0.040
= 1.730 No of Stirrups
(+) lapping Length = 1.800
40(0.016) = 0.64 (-) cover = 0.030
2.370 1.770
(+) bend (-) 2T20 = 0.040
5.5 (0.016) = 0.088 = 1.730
2.458 (-) Ground beam = 0.450
1.280
1/4/
2.458 1/10/ 1.102
9.832 9.832m T16 (1.280/150)+1 = 9.53
11.020
Say, 10
11.020 m R8
Time Dim Qtt Description Timesi Dim Qtt Description
sing ng
Formwork
Pad Footing
Length = 1.5
height = 0.45
+ lean concrete = 0.05
0.500
1/4/ 1.500
0.500 3.000 3.00 m2 sawn timber 25mm thick
Stump
Length = 1.800
(-) Ground beam = 0.450
1.350
(-) Pad Footing = 0.450
0.900
1/2/ 0.125
0.90 0.113 0.113 m2 sawn timber 25mm thick
1/2/ 0.450
0.90 0.81 0.810 m2 sawn timber 25mm thick
Bill of Quantity
Item
Description Quantity Unit Rate RM
No.
Excavation
1 Excavation of top soil, 150mm 2.250 Sq.m
Excavation of trench depth not exceeding
2 3.375 Cu.m
1.5m
Excavation of trench depth exceeding 1.5m
3 but not exceeding 3.0m 0.450 Cu.m
Concrete
Concrete Grade 25
4 1.063 Cu.m
1.012+0.051
5 Lean concrete
0.013 Cu.m
Reinforcement
6
T20,
6.36+26.560 = 32.920m 81.196 Kg
(3.14x0.0102x32.920x7850)
7 T16, (3.14x0.0082x9.832x7850) 15.520 kg
Total Bill RM