Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Discussion Forum
Name :
Tel. :
Outside environmental
Date Time
conditions
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Power Quality
orum
Disturbance
Disturbed loads List of alarms
description
Denis Ruest, P.Eng.
November 2012
Part - 1 - Materials
Scrap: 1,500.00 $
Second quality products: 500.00 $
Remanufacturing costs: 0.00 $
Other (Specify): 0.00 $
Total: 2,000.00 $
Part - 2 - Workforce
Improductives: 100.00 $
Cleaning 100.00 $
Process restart: 50.00 $
Overtime to catch-up: 150.00 $
Other (Specify): 0.00 $
Total: 400.00 $
Part - 3 - Lost of Sales
0.00 $
Total: 0.00 $
Part - 4 - Equipements
Damages: 0.00 $
Repairs: 0.00 $
Replacement: 0.00 $
Other (Specify): 0.00 $
Total: 0.00 $
Part - 5 - Risks
Contract Lost: 0.00 $
Litigations: 0.00 $
Delivery: 0.00 $
Penalities: 0.00 $
Other (Specify): 0.00 $
Total: 0.00 $
Grand Total (GTn): 2,400.00 $
30 0 0
=_(=1)^4
_ " " _
International Power Quality
Discussion Forum
To calculate estimated solution effectiveness add the effectiveness of each solutions (=Effectiv
Note 1 :
the estimated annual losses.
Note 2 : The payback period in years is the total acquisition and installation cost divided by the annual
Describe Objectives: Need to increase ride throught capacity of 200 HP Drive for voltage sags and cap
Solution
Comments
No. 1
3% Input Inductor
7,500.00 $
500.00 $
8,000.00 $
100.00 $
50.00 $
150.00 $
(See Note 1)
0%
90%
0%
0%
61% 100 % switching 0% sag
6.00
97.00
0.120
50%
94.61 $
75,000.00 $
-150.00 $
-28,921.91 $
-94.61 $
45,833.48 $
ctiveness of each solutions (=Effectiveness in % * Cost per event * number annual events) and divide this sum by
Solution
Comments
No. 2
0.00 $
0.00 $
0.00 $
0.00 $
0%
0%
0%
0%
0%
0.00 $
0.00 $
0.00 $
0.00 $
0.00 $
0.00 $
N/A
0.00 $
0.00 $
0.00 $
0.00 $
0%
0.00 $
0.00 $
0.00 $
0.00 $
0.00 $
0.00 $
N/A
Solution
Comments
No. 4
0.00 $
0.00 $
0.00 $
0.00 $
0%
0.00 $
0.00 $
0.00 $
0.00 $
0.00 $
0.00 $
N/A