Sei sulla pagina 1di 18

International Power Quality

Discussion Forum

Power Quality Tools - Disturbance

Name :
Tel. :

Outside environmental
Date Time
conditions

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Power Quality
orum

Power Quality Tools - Disturbance Log Sheet

Company and address:


Info:

Disturbance
Disturbed loads List of alarms
description
Denis Ruest, P.Eng.
November 2012

List of generated Estimate of scrap Persons-hours


Total downtime
scrap material material affected
Cost of manpower
Other information
losses
International Power Quality
Discussion Forum

Power Quality Tools - L


Cost of losses for event
type 1

ex. Voltage sag

Part - 1 - Materials
Scrap: 1,500.00 $
Second quality products: 500.00 $
Remanufacturing costs: 0.00 $
Other (Specify): 0.00 $
Total: 2,000.00 $
Part - 2 - Workforce
Improductives: 100.00 $
Cleaning 100.00 $
Process restart: 50.00 $
Overtime to catch-up: 150.00 $
Other (Specify): 0.00 $
Total: 400.00 $
Part - 3 - Lost of Sales
0.00 $
Total: 0.00 $
Part - 4 - Equipements
Damages: 0.00 $
Repairs: 0.00 $
Replacement: 0.00 $
Other (Specify): 0.00 $
Total: 0.00 $
Part - 5 - Risks
Contract Lost: 0.00 $
Litigations: 0.00 $
Delivery: 0.00 $
Penalities: 0.00 $
Other (Specify): 0.00 $
Total: 0.00 $
Grand Total (GTn): 2,400.00 $

Estimated number of annual events (NbE): 10


Estimated Annual Losses
(EAL): 75,000.00 $
Denis Ruest, P.Eng.
November 2012

Quality Tools - Losses Evaluation Sheet


Cost of losses for event Cost of losses for event Cost of losses for event
type 2 type 3 type 4

ex. voltage transient ex. Short interruption ex. Interruption

1,000.00 $ 0.00 $ 0.00 $


300.00 $ 0.00 $ 0.00 $
0.00 $ 0.00 $ 0.00 $
0.00 $ 0.00 $ 0.00 $
1,300.00 $ 0.00 $ 0.00 $

100.00 $ 0.00 $ 0.00 $


100.00 $ 0.00 $ 0.00 $
50.00 $ 0.00 $ 0.00 $
150.00 $ 0.00 $ 0.00 $
0.00 $ 0.00 $ 0.00 $
400.00 $ 0.00 $ 0.00 $

0.00 $ 0.00 $ 0.00 $


0.00 $ 0.00 $ 0.00 $

0.00 $ 0.00 $ 0.00 $


0.00 $ 0.00 $ 0.00 $
0.00 $ 0.00 $ 0.00 $
0.00 $ 0.00 $ 0.00 $
0.00 $ 0.00 $ 0.00 $

0.00 $ 0.00 $ 0.00 $


0.00 $ 0.00 $ 0.00 $
0.00 $ 0.00 $ 0.00 $
0.00 $ 0.00 $ 0.00 $
0.00 $ 0.00 $ 0.00 $
0.00 $ 0.00 $ 0.00 $
1,700.00 $ 0.00 $ 0.00 $

30 0 0
=_(=1)^4
_ " " _
International Power Quality
Discussion Forum

Part - 1 - Equipment and Comissionning


Acquisition:
Commissionning:
Other (specify):
Total:
Part - 2 - Auxiliairies
Swithgear or Panel:
Transformer:
Labor:
Other (specify):
Total:
Total Acquisition and Installation Cost:
Part - 3 - Annual Maintenance
Parts:
Labor (inspection, cleaning, etc.):
Long Term Maintenance (batteries, etc):
Other (specify):
Total:
Part - 4 - Solution effectiveness to solve problem
Estimated Effectiveness for Event type 1 in % (EE%1)
Estimated Effectiveness for Event type 2 in % (EE%2)
Estimated Effectiveness for Event type 3 in % (EE%3)
Estimated Effectiveness for Event type 4 in % (EE%4)
Estimated Global Effectiveness (%) (EE%):
Part - 5 - Electrical Efficiency Level
Power rating in kVA:
Efficiency Level (%):
Electricy Cost ($/kWh):
Duty cycle (average usage):
Annual Electric Losses:
Part - 6 - Payback (simple method)
Annual Losses (Losses Evaluation):
Annual Maintenance Cost:
Cost of passtrought disturbances:
Annual Electrical Losses:
Annual Savings:

Payback period (years):

To calculate estimated solution effectiveness add the effectiveness of each solutions (=Effectiv
Note 1 :
the estimated annual losses.

Note 2 : The payback period in years is the total acquisition and installation cost divided by the annual
Describe Objectives: Need to increase ride throught capacity of 200 HP Drive for voltage sags and cap

Solution
Comments
No. 1

3% Input Inductor
7,500.00 $
500.00 $

8,000.00 $

1,500.00 $ Box for inductors


0.00 $
2,000.00 $ 2 days
200.00 $ connectors, etc.
3,700.00 $
11,700.00 $

100.00 $

50.00 $
150.00 $
(See Note 1)
0%
90%
0%
0%
61% 100 % switching 0% sag

6.00
97.00
0.120
50%
94.61 $

75,000.00 $
-150.00 $
-28,921.91 $
-94.61 $
45,833.48 $

0.26 (See Note 2)

ctiveness of each solutions (=Effectiveness in % * Cost per event * number annual events) and divide this sum by

nstallation cost divided by the annual savings


Denis Ruest, P.Eng.
November 2012 - rev mai
2013

city of 200 HP Drive for voltage sags and capacitor switchings.

Solution
Comments
No. 2

0.00 $

0.00 $
0.00 $

0.00 $

0%
0%
0%
0%
0%
0.00 $

0.00 $
0.00 $
0.00 $
0.00 $
0.00 $

N/A

ual events) and divide this sum by


%=(_(=1)^4
% _ _ " "
_)/
Solution
Comments
No. 3

0.00 $

0.00 $
0.00 $

0.00 $

0%
0.00 $

0.00 $
0.00 $
0.00 $
0.00 $
0.00 $

N/A
Solution
Comments
No. 4

0.00 $

0.00 $
0.00 $

0.00 $

0%
0.00 $

0.00 $
0.00 $
0.00 $
0.00 $
0.00 $

N/A

Potrebbero piacerti anche