A2 06 Dec 2016 Issued for Review AZ JW

A1 09 Nov 2016 Issued for Review AZ JW CCED


REV DATE DESCRIPTION PREPARED CHECKED APPROVED

CC ENERGY DEVELOPMENT S.A.L


(Oman Branch)

PO # SPO-16-0640

PROJECT

DESIGN & SUPPLY OF PRIMING VESSEL FOR SAIWAN PWRI

SE-06 LINE

TITLE

PROGRESS REPORT
JOB NR. DOCUMENT NR. REV. DATE SHEET

JS1022 JS1022-SP-PRO-001-G04-0001 A2 06 Dec 2016 1 of 6

Doc No: JS1022-SP-PRO-001-G04-0001 progress report as on 06 Dec 2016 Page 1 of 10


PROJECT
CC ENERGY DEVELOPMENT S.A.L
(Oman Branch) DESIGN & SUPPLY OF PRIMING
VESSEL FOR SAIWAN PWRI
SE-06 LINE

JOB NR. DOCUMENT NR. REV. DATE SHEET

JS1022 JS1022-SP-PRO-001-G04-0001 A2 06 Dec 2016 2 of 6


TITLE

PROGRESS REPORT

SHEET REVISIONS SHEET REVISIONS

A1 A2
1 X
2 X
3 X
4 X
5 X
6 X

Doc No: JS1022-SP-PRO-001-G04-0001 progress report as on 06 Dec 2016 Page 2 of 10


TABLE OF CONTENTS

1. SALIENT FEATURES OF THE PROJECT


2. PROJECT/SCOPE OVERVIEW
3. DEFINITIONS & ABBREVIATIONS
3.1 Definitions
3.2 Abbreviations
4. EXECUTIVE SUMMARY
4.1 Progress highlights
4.2 Risk/issues/concerns
4.3 Request for variations
4.4 Key milestone status
4.5 Payment Milestone status
5. PROGRESS SUMMARY
5.1 Project Management
5.2 Engineering
5.3 Procurement
5.4 Manufacturing
5.5 Delivery of Items
6. PROGRESS PHOTOS
7. ATTACHMENTS
7.1 Document Control Register
7.2 Procurement Tracking Register
7.3 Breakdown activities of Manufacturing & weightage Factors
7.4 Updated Overall Project Schedule
7.5 Engineering S Curve
7.6 Procurement S Curve
7.7 Manufacturing S Curve
7.8 Overall S Curve

Doc No: JS1022-SP-PRO-001-G04-0001 progress report as on 06 Dec 2016 Page 3 of 10


1.0 SALIENT FEATURES OF THE PROJECT

Project Title : Design and supply of Priming Vessel for Saiwan PWRI SE-06 Line

Client : CC Energy Development S.A.L (Oman Branch)

Vendor : Premier Production Fabricators LLC

Contract Effective date : 01st November 2016

Contract Duration : 08 to 09 Weeks

Completion Date : 10th January 2017

2.0 PROJECT SCOPE OVERVIEW

CC Energy Development Oman (CCED), hereinafter referred to as COMPANY, placed an order to


Premier Production Fabricators L.L.C. (PROFAB) for the Design & Supply of Priming Vessel for Saiwan
PWRI SE-06 Line.

3.0 DEFINITIONS & ABBREVIATIONS

3.1 DEFINITION

COMPANY: CC Energy Development Oman S.A.L.


CONTRACTOR: Premier Production Fabricators L.L.C.

3.2 ABBREVIATIONS

CCED : CC ENERGY DEVELOPMENT OMAN S.A.L.


PROFAB : PREMIER PRODUCTION FABRICATORS L.L.C.
HSE : HEALTH, SAFETY & ENVIRONMENT
NDT : NON DESTRUCTIVE TEST
QC : QUALITY CONTROL
DCR : DOCUMENT CONTROL REGISTER
ITP : INSPECTION & TEST PLAN

Doc No: JS1022-SP-PRO-001-G04-0001 progress report as on 06 Dec 2016 Page 4 of 10


RFQ : REQUEST FOR QUOTATION
OPS : OVERALL PROJECT SCHEDULE

4.0 EXECUTIVE SUMMARY

Kick off meeting was conducted on 03rd November 2016. Submission of preliminary document for
review and approval took place.

4.1 PROGRESS HIGHLIGHT

Documentation:

DCR: submitted and approved


Engineering Design: submitted and approved
Quality document (5/10): submitted and approved
Stage inspection schedule,
welding procedure,
welder performance qualification,
welding repair procedure,
pressure test procedure.

Procurement:

Flanges/ Forgings received

Fabrication:

Nozzle fabrication is in progress as of this date.

4.2 Risk/Issues/Concerns

Internal Blasting will be carried out prior to closing of the priming vessel: Approval requested
from CCED. These details are listed in the surface preparation and painting procedure that will be
submitted on the 6th Dec 2016.

4.3 Request for Variations

Currently no such situation

4.4 Key Milestone status

Milestone will be achieved at the end of the project.

4.5 Payment Milestone status

As per the purchase order terms and conditions

Doc No: JS1022-SP-PRO-001-G04-0001 progress report as on 06 Dec 2016 Page 5 of 10


5.0 PROGRESS SUMMARY

5.1 PROJECT MANAGEMENT


There are no concerns or comments at this point. Everything is going as per schedule and
fabrication has initiated. Expected date of completion for the project would be 10 th Jan 2017 as
mentioned earlier.

5.2 ENGINEERING
Tasks Completed (1/1)
a) Engineering design (drawing and calculation):

Design (rev A1) submitted and received comments 16 th-20th Nov 2016
Revised Design (rev A2) submitted and received approval 21 st-22nd Nov 2016
Redesign submitted and received approval with comments: 1 st- 5th Dec 2016

5.3 PROCUREMENT

Tasks Completed (1/3)


a) Flanges and Forgings:

Placed order for flanges after negotiation with shortlisted vendors 22 nd-24th Nov 2016
Arrival of flanges on site, inspection and approval of flanges. 5 th Dec 20 16

Tasks Pending (2/3)


a) Plates for Shell, R.F- Pads:

Placed order for Plate after negotiation with shortlisted vendors 19 th-20th Nov 2016
Arrival of Plates on site, inspection and approval of Plates Awaiting Arrival

b) Dish Heads:

Placed order for Dish Heads after negotiation with shortlisted 22 nd-24th Nov 2016
Vendors.
Arrival of Dish Heads on site, inspection and approval of Dish Awaiting Arrival
Heads

5.4 MANUFACTURING

Pipes and flanges have been received. 1 st- 5th Dec 2016
Cutting and marking of pipes has initiated. 6 th Dec 2016
Rolling of manway neck completed. 6 th Dec 2016
Structural base fabrication is in progress. 5 th Dec 2016

5.5 DELIVERY OF ITEMS

Doc No: JS1022-SP-PRO-001-G04-0001 progress report as on 06 Dec 2016 Page 6 of 10


So far completion and delivery as per overall project schedule

6.0 PROGRESS PHOTOS

Fig a1: Flanges 2 and 6 (WNRF and Blind) in workshop

Fig a2: Flanges 2 and 6 (WNRF and Blind) in workshop

Doc No: JS1022-SP-PRO-001-G04-0001 progress report as on 06 Dec 2016 Page 7 of 10


Fig b1: Nozzle Neck Fabrication

Fig c1: Flange for Man hole

Doc No: JS1022-SP-PRO-001-G04-0001 progress report as on 06 Dec 2016 Page 8 of 10


Fig d1: 2 and 6 pipe for nozzle

Fig d2: 2 and 6 pipe for nozzle (markings)

Doc No: JS1022-SP-PRO-001-G04-0001 progress report as on 06 Dec 2016 Page 9 of 10


7.0 ATTACHMENTS:

7.0 Updated Overall Project schedule

7.1 Updated Document Control Register

7.2 Procurement Tracking Register

7.3 Breakdown activities of Manufacturing & Weightage Factors

7.4 S curve for Engineering (revised)

7.5 S Curve for procurement (revised)

7.6 S Curve for manufacturing (revised)

7.7 Overall S Curve (revised)

Doc No: JS1022-SP-PRO-001-G04-0001 progress report as on 06 Dec 2016 Page 10 of 10

Potrebbero piacerti anche