Sei sulla pagina 1di 2

Whether 4 laning

completed. If yes plz


specify mode of
S.No. Corridor Name - Updated Corridor Type State Stretch Length (km)
Google map Average execution i.e EPC or
Link Traffic Annutiy or BOT(Toll)

9 Kandla-Sagar 1 - Economic Corridors GJ Gandhidham - Samkhiyali 53.3 Link 45,800 EPC


10 Kandla-Sagar 1 - Economic Corridors GJ Sanand - Ahmedabad 9.6 Link 100,281 BOT(Toll) under GSRDC
BOT(Toll)

Surat-Nagpur 1 - Economic Corridors

11 GJ Surat Visarwadi 133.2 Link 22,826


12 Kheda - Vadodra 3 - Feeder Route GJ Kheda - Vadodra 69.5 Link 29,055 Do
13 Gandhidham - Mundra 3 - Feeder Route GJ Gandhidham - Mundra 36.4 Link 28,145 -
Strengthening of weak pavement between km 0 t
Jambusar - Bharuch 3 - Feeder Route Link
for widening from intermediate lane to 2 lane wi
between km 1.5
14 GJ Jambusar - Bharuch 41.7 22,385
Jetpur-Rajkot done
under BOT(Toll) and
EW 0 - National Corridor Link
Rajkot to Morbi under
15 GJ Jetpur - Morbi 155.0 35,081
EPC
Status at present
4 laning under 4 laning DPR Status of upgradation from Any other (specify)
implementation. If yes completed and existing 4 lane to 6/8 lanes
plz specify mode of balalnce for (completed and mode/ under
execution i.e EPC or award and implementation and mode/
Annutiy of BOT(Toll) mode balalnce for award & mode/ DPR
under preparation

- - 6 lane completed under BOT(Toll)

Only stretch upto


Navaour is with RO
Gujarat. Rest is
with RO
Maharashtra
Does not pertain to NHAI
BOT(Toll) - - -
ak pavement between km 0 to 1.5, km 11.65 to km 25 and km 25.7 to km 37.2. Ongoing proposal
ntermediate lane to 2 lane with PSS between km 9.5 to 11.65 & 25 to 25.7 of NH66 and Length
between km 1.5 to 9.5 & 37.2 to 45.5 is under DLP