Partner Name SKIPPER LIMITED, KOLKATA Date & Shift 13-02-2017 & Shift-Gen
Client Domestic Team ARNB\VYSG\ADHI
Format No: RTI/DQO/01 Rev0: 30.11.2009
Tower Pic. Containment action /
Issue Observation with Part details Preventive Measures, if any
Type No. Current Status
Accessories Welding Lack of fusion was observed for Rest Plateform. 1 Rework
Hole to hole dimension was observed out of tolerance for Top flange of
GFT-12B Dimension 4 Reject
S-1041B.
GFT-12A Material Bend flanges were observed for S1041 bottom side. 1 Reject
GFT-12A Dimension Thickness, of top flange for S-1041A, was observed 15.06mm. 2 Reject
GFT-12A Dimension 2mm PCD offset, was observed for Bottom flange of S-1041A. 3 Reject
Accessories Welding Lack of fusion was observed for Rest Plateform. Rework 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
GFT-12A Material Bend flanges were observed for S1041 bottom side. Reject 0
GFT-12A Dimension Thickness, of top flange for S-1041A, was observed 15.06mm. Reject 0
GFT-12A Dimension 2mm PCD offset, was observed for Bottom flange of S-1041A. Reject 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
Weekly Consilidated Daily Quality Observations
Partner Name SKIPPER LIMITED, KOLKATA Week No. 7
Client Domestic Team ARNB\VYSG\ADHI
Tower Containment action / Current
Issue Observation with Part details Preventive Measures, if any Target Date Responsibility
Type Status
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0