mining
commissioning capabilities
What is Commissioning? Why is Commissioning Important? Ensuring Project Deliver y

W
Commissioning is defined as the process Commissioning ensures that the
e are a community in commissioning, engaging on all levels as part of a by which an equipment, facility, or plant systems and materials that comprise
• Early review of design systems
• Input into Commissioning strategies
(which is installed, or is complete or the Plant meet the Client’s project and the ability to represent the Client
TEAM to ensure that commissioned means commissioned! Through our near completion) is tested to verify requirements and result in successful, as a professional team
if it functions according to its design better built Plants. Therefore it is • Strategies for ensuring maintenance
people, systems and lessons learnt throughout various industries across the globe, objectives or specifications. It is essentially critical that commissioning is involved practices are picked up early to
an independent verification of the in both design and construction prevent breakdown maintenance
Client’s project requirements from phases in order to minimise costs
we deliver innovation, rectification and robust commissioning reviews and solutions. project inception through to handover and maximise benefits. With an
• Ensure documentation requirements
are completed by the D&C team in a
and can continue for the life of the increased focus on sustainability and format designed for the Client
As reinforced by our client base which has remained consistent over 15 active years, project. Commissioning typically begins the consequences of insufficient • Lead D&C teams to gain a smooth
during the project design phase and design review, inadequate equipment transition for the O&M team
we are able to make a difference. Aside from constantly monitoring our knowledge continues for at least one year after capacity, inferior equipment • Detailed communication at all levels
construction is complete. It requires installation, insufficient maintenance through to the Clients’ Management
thorough documentation of system and improper system operation;
and ability, we have provided many solutions for difficult designs or process conditions design, construction quality, functional early commissioning should be
• Integration of systems for best for
project outcomes
performance tests, and operation and implemented into each Project stage • Understanding of Training
leaving clients satisfied they have a manageable and optimised plant to operate. maintenance requirements. The training in order to realise cost savings and requirements for Operations Staff.
of facility operators and staff is also a key successful Project delivery. Over time, • Online/Real time reporting through
component of commissioning as they will continuous commissioning is the best the life of the project (live dashboard
be responsible for plant operations and way to determine whether controls reporting utilising our CVRS system)
maintenance. and equipment function properly.
commissioning






Increased in-house knowledge and improved equipment operation
Better planning and coordination for smoother equipment start-up
Better up-front performance accountability
Improved Plant control and performance
• Commissioning Innovations – demonstrated by using priority management.
software, procedural guidelines and our own system; • Documentation – Experience in production, review &
‘AUTOCOMM’ processing of Commissioning/Design Documentation
capabilities

Key Skills
• Experienced and skilled personnel - Mechanical, Electrical, • Operations experience – to ensure risks are minimised, with
I&C, SCADA/PLC, Process and QA disciplines all of which added value of Process science skill to avert any incidents.
have operational and commissioning experience across • GAP analysis – provided across the board from Design to
various industries Handover enhancing the risks associated with overdesign,
• Defect Management – Clear understanding of Plant elements incorrect procurement, abortive operational costs and
and groups whilst ensuring precise defect reporting and OPEX variance.

Feasibility Studies providing a review to the Client.This is vital with Access Database System to record
Successful feasibility studies with accurate to ensure that a robust commissioning commissioning that eliminates out of date
and experienced environments will reduce management system is implemented and documents, direct commissioning that
CAPEX and OPEX and prolong stable monitored. eliminates third parties attendance and
asset environment. Innovated systems and repetitive costs incurred, as well as tamper
Defect Management
knowledge transfer enables us to collect proof systems fitted on all equipment that CNManagment is a local Australian company with links to an international network of capabilities, predominantly within the
A defect management system is required

About Us
and process data efficiently. prohibit changes by unauthorised parties. UK. Founded in 1995, under the CNGroup of companies, our proven capabilities are based on decades of research and hands-
to ensure all defects are identified,
on practical experience culminating in a broad and continuing client database. Employing approximately 300 people across 3
Pre-Commissioning recorded and recommendations are made Process Support
countries, we have proven success in areas of commissioning, client tenders, innovation studies, project engineering, concept of
In readiness for the commissioning of the for rectification. Following a review of the Commissioning
design and rectification of design and construction GAPS.
system as a whole, individual pieces of Plan, the team are able to further support
Design Challenge & Innovation
equipment/instruments are required to the project through; open communication
Understanding the different stages of a
function in isolation. This is a vital element with all project groups, ensure compliance
project in order to realise savings. This is Clive Neame Andrew Rogers André Bosch
in achieving successful commissioning. of statutory requirements for bulk transfer
achieved through understanding the scope Managing Director Commissioning Manager OM Technical Manager
of water, supply technical reports &
Process Commissioning and development of strategies, focusing Creator and owner of the CNGroup of Recently completing a successful role as Backed by extensive experience in
discussion papers, review process model,
A planned and structured approach on increased efficiency. Additionally, companies, Clive has over 15 years of Commissioning Manager for the Southern the maintenance, construction and
Our Leaders
provide recommendations to analyse the
by ensuring the process design is fully milestones are developed and documents management and commissioning experience Regional Water Pipeline Alliance; one of telecommunication industry. André
requirements for control and targets for
understood and reviewed. produced by the O&M Documentation across a number of continents. Renowned the largest water infrastructure projects in has experience in the development
chemical dosing and optimised methods.
Team to ensure project timeframes are for his ability to innovate commissioning Australia, Andrew Rogers has since joined of Maintenance Strategies and the
Reliability Performance
met. PLC, SCADA & Telemetry programmes, he brings a rich blend of CNManagement in a senior role to guide Computerised Maintenance Management
A planned schedule for assessing the
The team are able to design, review and commercial and personal experience and a their Queensland operations. With an System (CMMS) as the vehicle to
reliability of the system and understanding Project Commissioning Engineering
commission any configuration of work in proven track record in delivering successful extensive knowledge of water and waste deliver the vision of various service and
the resource requirements to prepare for Completion of Work Method Statements
the aspects of Data and I/O Management. results on a global scale. water processes, Andrew’s awareness and manufacturing industries. Prior positions
unforeseen events. and Risk Assessments for all works and
The availability of PLC, Telemetry and experience within the Australian Water include Maintenance Engineer for Brisbane
procedures for the site, prior to the Wet
Commissioning Review SCADA engineers provides the client with
Testing using CN Equipment to bring Industry is highly valued and recognized. Water, John Holland Constructions, Capral
An independent assessment of the significant commercial potential and allows Aluminium and Boral Plasterboard.
services into a commissioned state. The key
commissioning process for the purpose of in-house management of these areas.
values include; Early Start Commissioning
Intelligent Systems
Autocomm is a web based dashboard project
management system for the Water/Oil & Gas industries
that provides commissioning visibility throughout the
project’s life cycle. The program software is designed
to ensure clients, project managers and the general • Tailored to P&IDs – direct interface with design using Asset and P&ID Tags.
public (at an agreed level of access) have access to • Live Status - for the Installation, Testing & Commissioning of the entire Plant.
real-time project programme information. The ability • Central Resource - Live progress reports and project documentation.
to readily access information from anywhere ensures • Online access portal - allows anywhere, anytime review
that the client and project members are never apart. • Defect Management - provides a systematic method for documenting, tracking and following up on
Clients have access to the project overview and are critical issues & defects.
able to track as well as report on the project’s progress, • Multiuser access – through designated logins to ensure access levels, tracking and accountability
without the expense of managing extensive resource • Avoids GAPS - created when fast tracking programmes
profiles on staff or contractors. (Avoiding client gaps). • Audit trail - allows continual audit, accountability & transparency

Case Stud y - Adelaide Aqua • Reporting – Each asset was assigned reports (Delivery,
Installation, Pre-commissioning, Available). Each report
Utilising Autocomm, the commissioning team was able to was dependant on its previous to eliminate any fast-
effectively realise the project requirements. The system was tracking and prevent future risks associated with it.
tailored to meet the needs of the multinational consortium, • Document Management - Operational Philosophies and
Adelaide Aqua. The following measures were implemented: GA’s for each plant area were made available for quick
referencing and download
• Asset and P&ID tagging – a compiled list of assets received • Defect Management – Throughout the reporting phase,
from the project were able to be streamlined into specific a defect option was linked to each report in order to
filters and uploaded to the database. Assets were then highlight the number of defects and assign a priority.
tagged specifically to its P&ID Drawing and assigned its
Project Outcome
relevant OM Manual.
• First Water Review - Intelligent P&ID’s were created with In implementing Autocomm, the project is able to; reduce its
the ability to view isolation points overall project risk profile and realise significant time and cost
• Flow Level Display - Ability to view multiple commissioning value to all project control functions. Additionally, Clients have
flow levels access to a live status overview of their project utilising the
• HV-LV Display - Energisation of HV-LV Systems Dashboard function to display milestones.
www.cngmanagement.com

CNMANAGEMENT
Australia
Waterfront Place, Level 25, 1 Eagle Street, Brisbane QLD 4000
Ph: (07) 3229 0255
Email: info@cngmanagement.com

UK Scotland
7 Woodstone Court, Pier Road, Rhu Scotland G848LH
Ph: +44 (0) 7767845032
Email: john@cngroupuk.com

UK Yorkshire
9 The Wend, Carlton in Craven Yorkshire BD233EE
Ph: +44 (0) 7802518925
Email: dave@cngroupuk.com

Potrebbero piacerti anche