Cleveland Bridge and Engineering

Middle East (Private) Limited

PRE-QUALIFICATION DOCUMENT

February 2015
Page 2 of 56

TABLE OF CONTENTS

Page No.

I. Introduction 3

II. General Information 4 6

III. Fabrication Facilities .. 7 13

A. Fabrication Workshops
B. Welding
C. Surface Preparation and Painting
D. Fabrication Plant and Machinery Jebel Ali Free Zone Facility
E. Field Erection Equipment
F. Fabrication Plant and Machinery Jebel Ali Industrial Area Facility

IV. Steel Work Fabrication Facility Site Layout.14-16

V. Engineering Capability 17-18

VI. Project Management .19

VII. Quality Assurance 20

VIII. Current and Recent Major Projects . 21-31

IX. Client Testimonials .. 32-39

X. Company Licenses and Certificates 40-55


Page 3 of 56

I. INTRODUCTION

Cleveland Bridge & Engineering Middle East (Private) Limited was established in 1977
by an Emiri Decree and is a private joint stock company. It is owned 51% by the Investment
Corporation of Dubai and 49% by Al Rushaid Petroleum Investment Company.

Cleveland Bridge & Engineering is a market leader for the design, steel fabrication,
corrosion protection, erection and project management in the following areas:

Oil and Gas

Petrochemical

Power and Water

Industrial

High Rise Commercial Buildings

Airport Structures Aircraft Hangars

Bridges

Sports and Recreation Facilities

Aluminium Industries

Cleveland Bridge & Engineering provides a comprehensive turnkey package from design
concept through detailed engineering, manufacture and the erection of structural steel and
non-structural components. The company has extensive CAD, project management and
planning software.
Page 4 of 56

II. GENERAL INFORMATION

CONTACT DETAILS

Head Office & Fabrication Facility:

Cleveland Bridge & Engineering Middle East (Private) Limited

P.O. Box 16765

Dubai

United Arab Emirates.

Telephone : +971 4 883 5551

Facsimile : +971 4 883 5416 / +971 4 883 5304

E-mail : contact@clevelandbridge.co.ae

Website : www.clevelandbridge.co.ae

Abu Dhabi office:

Telephone : (971 2) 677 1688

Facsimile : (971 2) 677 0840

E-mail : wael_ashkar@masaood.com
Page 5 of 56

II. GENERAL INFORMATION

PRODUCTS

Light, medium and heavy structural steel fabrication for all types of equipment including:

- Fired Heaters

- Boiler Structures

- Fire Simulators

- Pressure Vessels

- Stack and Flares

- Desalination Units

- Container and Overhead Cranes

CAPACITY

- 70,000 tonnes per annum

MANPOWER

Management + Administration : 13

Accounts + IT : 9

Proposals : 4

Design/Drawing Office : 36

Fabrication : 1077

Contracts : 327

Commercial : 5

Planning : 8
Page 6 of 56

II. GENERAL INFORMATION

SENIOR MANAGEMENT

Managing Director : Michael Mack

Contracts Manager : Phillip Rae

Estimating Manager : John Cameron

Commercial Manager : Ged Barron

Business Development Manager : Moataz Abdelhadi

Design Office Manager : Haytham Ramadan

Works Manager : Mike Roberts

Technical Services & QAManager : Mohammed Shakil

Finance Manager : Hamid Khalid

Safety Manager : Ashish Verma


Page 7 of 56

III. FABRICATION FACILITIES

The Head Office of Cleveland Bridge & Engineering Middle East (Private) Limited
(CBEME) is located in the Jebel Ali Free Zone (JAFZA) area of Dubai together with one of
the fabrication facilities. In addition to this facility there is a second CBEME fabrication
facility located in the Jebel Ali Industrial Area.

Details of these fabrication facilities are as follows:-

1) CBEME JEBEL ALI FREE ZONE FACILITY:

This facility comprises three separate Fabrication Workshops and extensive Surface
Preparation and Painting Areas. The facilities are supported with all necessary infra-structure
including a computer aided design/drawing office. The facility occupies an area of
123,000m2 of which approximately 16,000m2 is covered workshop space. The main area
within the factory comprises the following:

- Main Workshop 9,950 m2

- Heavy Fabrication Workshop 3,400 m2

- Light Fabrication Workshop 860 m2

- Surface Preparation and Paint Yard 6,210 m2

- Assembly Area 10,000 m2

- Material Storage 13,000 m2

- Dispatch Storage 25,200 m2

The Company also has access to an area of approx. 40,000 sq. mtr. adjacent to our facility
which can be utilized for the assembly of major structures. The area has 200 mts. of quay
wall with an 11.5 mts. of water depth thus allowing load outs of major fabrications and
structures.

A. FABRICATION WORKSHOPS

The three fabrication workshops have been designed and equipped to provide CBEME with
the flexibility to produce a multitude of products ranging from conventional structural
steelwork, through to complex plate/ box girders etc.
Page 8 of 56

The Main Workshop consists of four bays each served by overhead cranes and is fully
equipped with three numerically controlled saw and drill lines.

The Heavy Fabrication Workshop is used primarily for heavy plated fabrication work.
The workshop is equipped with 50 tonne and 10 tonne overhead craneage, heavy plate
press and rolls, fully automatic welding equipment and extensive set up and jig
facilities

The fabrication facilities are complemented by the Light Fabrication Workshop which
is used principally for the manufacture of ladders, handrails, platforms and other
secondary structures.

2) CBEME JEBEL ALI INDUSTRIAL AREA FACILITY:

This facility comprises of two main fabrication areas and enclosed surface preparation and
painting areas. The facility occupies an area of 130,500M2 and is split into the following
areas:

- Preparation Workshop 7000 M2

- Fabrication Workshop 15000 M2

- Surface preparation and paint work shop 7200 M2

- Assembly Area 6000 M2

- Material Storage 20,000 M2

- Dispatch Storage 30,000 M2

A. PREPARATION / FABRICATION / PAINTING WORKSHOP

These workshops are fully enclosed and inter-linked to provide an efficient flow of materials
from raw material feed to final completed material dispatch.

The area is in excess of 25000 M2 and includes state of the art fabrication machinery serviced
by 14 Nos. over head cranes with capacities of 5 and 10 tonne SWL. Two 20 tonne gantry
cranes handle the offloading, stock control and feeding of raw materials into the workshop.

B. WELDING

CBEME generally uses the following welding procedures:

Shielded metal arc welding (SMAW) using low hydrogen and iron powder electrodes
Flux cored arc welding (FCAW) using the self-shielding method in semi-automatic
mode
Submerged arc welding (SMAW) in automatic and semi-automatic modes
Page 9 of 56

Gas metal arc welding (GMAW)

CBEME is also experienced in other processes such as tungsten-arc, gas metal-arc and electro
slag welding.

Our welders are qualified to ASME IX, AWS D1.1 and BS EN 287.

C. SURFACE PREPARATION AND PAINTING

CBEMEs surface preparation and painting facilities include automatic shot-blasting


machines, manual blast-cleaning and covered paint cells serviced by gantry cranes.

D. FABRICATION PLANT/MACHINERY

The following list covers the major items of plant and machinery at CBEME. The list is
complemented by smaller various items:
Page 10 of 56

FABRICATION PLANT/MACHINERY - JEBEL ALI FREE ZONE FACILITY

S. NO. DESCRIPTION CAPACITY QUANTITY

MAIN WORKSHOP
1 Over Head Crane 1 Tonne 1 No.
2 Over Head Crane 2 Tonne 2 Nos.
3 Over Head Crane 5 Tonne 3 Nos.
4 Over Head Crane 8 Tonne 5 Nos.
5 Over Head Crane 10 Tonnes 4 Nos.
6 Profile Gas Cutting Machine 3 Nos.
7 CNC Profile Gas Cutting Machine 3 Nos.
8 Numerically Controlled Saw 3 Nos.
9 Numerically Controlled Drill 2 Nos.
10 Bend Saw 2 Nos.
11 Plate Bending Machine 3 Nos.
12 Hydraulic Beam Bending Machine 1 No.
13 Hydraulic Pipe Bending Machine 3 Nos.
14 Gas Cutting Machine 21 Nos.
15 Radial Arm Drill Machine 3 Nos.
16 Crop and Punch Machine 3 Nos.
17 Guillotine for Steel Plate 1 No.
18 Portable Rotabroach Drill Machine 10 Nos.
19 Thread Cutting Machine 1 No.
20 Vernet Angle Punch and Crop Machine 1 No.
21 Lathe Machine 2 Nos.
22 6 Module Welding Transformer 4 Nos.
23 Miller 8 Pot Welding Transformer 6 Nos.
24 Welding Machine 44 Nos.
HEAVY BAY
1 Over Head Crane 5 Tonne 2 Nos.
2 Over Head Crane 15 Tonne 1 No.
3 Over Head Crane 20 Tonne 1 No.
4 Over Head Crane 40 Tonne 2 Nos.
5 Over Head Crane 50 Tonne 1 No.
6 Shaping Machine 1 No.
7 Profile Cutting Machine 1 No.
8 Milling Machine 1 No.
9 Gas Cutting Machine 13 Nos.
Page 11 of 56

Computer Controlled Twin Head Submerged


10 Arcwelding Unit Mounted on Column & Boom 1 No.
11 Boring Machine 2 Nos.
12 Hugh Smith Vertical Press 1 No.
13 Wagner Horizontal Rolls 1 No.
14 Parmigiani Horizontal Rolls 1 No.
15 Miller 8 Pot Welding Transformer 8 Nos
16 Welding Machine 64 Nos.
SURFACE PREPARATION AND PAINTING
1 Over Head Crane 5 Tonne 1 No.
2 Over Head Crane 8 Tonne 2 Nos.
3 Over Head Crane 10 Tonne 2 Nos.
4 Over Head Crane 12 Tonne 1 No.
5 Short Blasting Machine 3 Nos.
6 Blasting Pot 40 Nos.
7 Airless Spray Paint Pump 40 Nos.
8 Thinner Recycling 1 No.
MORRIS BAY
1 Over Head Crane 16 Tonne 1 No.
2 Over Head Crane 40 Tonne 1 No.
3 Gas Cutting Machine 3 Nos.
4 Portable Rotabroach Drill Machine 2 Nos.
5 Welding Machine 31 Nos.
MISCELLANEOUS PLANT AND MACHINERY
1 Air Compressors 250 to 825 CFM 29 No.
2 Tractor 6 No.
3 Trailer Unit 4 Nos.
4 Trolley/Trailer 20 to 60 Feet Max 31 Nos.
5 Oxygen-Propane Tanks / System 2 Nos.
Page 12 of 56

FABRICATION PLANT/MACHINERY - JEBEL ALI FREE ZONE FACILITY

S.
NO. DESCRIPTION CAPACITY QUANTITY

FIELD ERECTION EQUIPMENT


1 Power Generators 112 KVA to 400 KVA 12 Nos.
400 AMPS to
2 Welding Machine 500AMPS 1 No.
3 Man lift 4 Nos.
Manitowoc 4100 M with 260 FT Boom + 60FT Fly
4 Jib 210 Tonnes 1 No.
Manitowoc 4000 with 140FT Boom and 40FT Fly
5 Jib 135 Tonnes 1 No.
Manitowoc 3900 with 200FT Boom and 40FT Fly
6 Jib 120 Tonnes 1 No.
7 Manitowoc 3900V with 100FT Boom 90 Tonnes 1 No.
NCK 1405 with 140 FT Boom nad 40FT Boom
8 and 40FT Fly Jib 80 Tonnes 1 No.
9 Grove Crane 18 to 36 Tonnes 7 Nos.
10 Tadano Crane 25 to 60 Tonnes 3 Nos.
11 Link Belt Crane 30 to 100 Tonnes 3 Nos.
12 Fork Lift 4 Tonne Max 4 Nos.
13 Diesel Tanker 450 USG 2 Nos.
14 Pick Up 7 Ton 1 No.
15 Pick Up 3 Ton 4 No.
16 Pick Up 1 Ton 17 No.
17 Portable Rotabroach Drill Machine 15 Nos.
18 Topcon Total Station ( Survey) 14 Nos.
19 Welding Machine 51 Nos.
Page 13 of 56

FABRICATION PLANT/MACHINERY - JEBEL ALI INDUSTRIAL AREA


FACILITY

MACHINERY LIST

S.
NO. DESCRIPTION QUANTITY
1 EOT Crane (10MT) 4
2 EOT Crane (8 MT) 2
3 EOT Crane (5 MT) 8
4 Gantry Cranes (20 MT) 2
5 CNC Profile Cutter (24 mtr x 3 mtr) 1
6 Plate Stripping Machine (15mtr x 3 mtr) 1
7 Drill and Cut line - Kaltenbach 2
8 Plate Processing Machines Kaltenbach 2
9 Angle Line Kaltenbach 1
10 Automatic Grit Blasting Machine Plate & Sections - Rosler 2
11 Manual Blasting and Painting Pots 4
12 Air Compressor (750 CFM) 3
13 Mobile Crane (60 MT) 1
14 MIG Welding Units 20
15 Sub-Arc Welding Unit 2
16 Hydraulic Press Brake (3mtr x 16 Thk) 1
17 Ironworker 2
18 Radial Drill 1
19 Forklift (5 Tonne) 1
20 Tractor Unit 2
21 Trailer 40ft 2
22 Trailer 60ft 2
23 Submerged Arc Gantry Welding Machine 1
24 Hydraulic Flange Straightener Machine 1
25 Tee & H Beam assembly machine 1
26 Miscellaneous Tools & Tackles
27 Pipe Profiling Machine (up to 600 m/m diameter) HGG 600 1
28 Section Rolling Machine (APK 300) 1
Page 14 of 56

IV. FABRICATION FACILITIES

Attached Steel Work Fabrication Facility Site Layout for

1) Fabrication facility in Jebel Ali Free Zone (JAFZA).

2) Fabrication facility in Jebel Ali Industrial Area.


Page 15 of 56
Page 16 of 56
Page 17 of 56

V. ENGINEERING CAPABILITY

The Company also offers an engineering capability, advanced project management


techniques, a skilled work force and high quality fabrication and erection skills.

The Engineering Function comprises:

The Design Office: For the undertaking of designs of structures from first
principals.
The Drawing Office: For the production of shop drawings.

It provides the resources required to:

Offer the Client both design and shop drawing facilities.

Act as an in-house technical support function to both works fabrication and


construction.

Its capabilities include:

Development of basic design data or conceptual designs into drawings from which
steel fabrication and erection can be carried out.

Design/detailing to recognized international codes, standards and recommended


practices (British Standards, American Standards, DIN Standards, Euro Norm
Standards).

Computer Aided Design analysis packages.

Drafting utilizing 3D and 2D drafting packages.


Page 18 of 56

V. ENGINEERING CAPABILITY
Office Facilities:

Hardware

Drafting

25 No. desktop computers

2 No. A0 Plotters

2 No. A4/A3 Laser Printers

1 No. A0 Photocopier/ Scanner

1 No. A3 Scanner

Design

8 No. desktop computers

1 No. A4/A3 Laser printer

Software

14 No. X-Steel (3D drafting software)

3 No. Bo Cad (3D drafting software)

1 No. StruCad (3D drafting software)

4 No. X-Steel Viewers

14 No. Autocad (latest version)

1 No. Cidjoint

6 No. StaadPro (latest version)

3 No. Master Series Moment connections

2 Autocad Lite 2007

1 ETAB (latest version)

STRUMIS Production Monitoring System (latest version)


Page 19 of 56

VI. PROJECT MANAGEMENT

The goal of Cleveland Bridge and Engineering is to provide the Client with a product that:

Meets the required quality standard as laid down in the contract specification.
Is delivered in accordance with the budget and the program.

To meet these aims, an effective project management structure has been established, headed
by the Project Manager, to oversee all aspects of the contract from award to final handover.

The various activities of this team include:

Taking possession of the contract and ensuring that the Contract requirements are
clearly understood by all parties.
Establishing the Quality requirements and, where deemed necessary, producing
contract specific Quality documentation in place of the general Quality documents.
Developing the Contract program making use of up to date computer aided project
planning packages (PRIMAVERA) to establish the sequence of work and resources
required to successfully complete the work within the constraints of the Contract.
Controlling and coordinating activities throughout the various phases of the contract
to ensure progress is in line with the budget and the program. Establishing clear lines
of communication between CBEME, the Client and the Clients representatives,
suppliers and subcontractors, to enable any changes, queries or deviations from the
specification to be efficiently communicated to relevant parties.
Page 20 of 56

VII. QUALITY ASSURANCE

CBEME operates a quality management system in accordance with BS EN ISO 9001:2008


and ISO 14001:2004 which ensures that services and products conform to the Clients
specified requirements. Bureau Veritas Quality International has certified CBEMEs quality
management system for compliance with BS EN ISO 9001: 2008 and ISO 14001:2004.

CBEME holds ASME U, U2, PP and S Code Symbol stamps from the
American Society of Mechanical Engineers. In addition, CBEME holds an R Code
Symbol stamp from the National Board of Boiler & Pressure Vessel Inspectors, thereby
authorising the company to manufacture and repair pressure vessels and piping to ASME
VIII Div 1 & 2.

Copies of the relevant approval/authorization certificates are enclosed.


Page 21 of 56

VIII. CURRENT AND RECENT MAJOR PROJECTS


Respo
nsibilit
y
Countr
Compl C-
y/
Project Client Tonna etion Constr
Emirat
ge Date uct
e
E-
Engin
eer

A. CURRENT AND RECENT MAJOR PROJECTS

Laing
Dreamworks Box Motiongate Dubai 5562 Active C
ORourke

Theatre Steel Structure for Al Habtoor City - Dubai HLG Dubai 3741 Active C

IMG Theme Park City of Arabia


IM Galadari Dubai 392 Active C
Installation of Rides and Shows
A380 Stands/Gate Room Expansion in Terminal 3 Abu
ALEC 10 Active C
Abu Dhabi International Airport Dhabi
Permasteelisa Abu
Zayed National Museum Mock-up 41 2014 C
Gartner M.E. Dhabi
Abu
T1 Segregation Project Abu Dhabi International Airport ALEC 884 Active C
Dhabi

SP500 PK30 T1 Upgrade Dubai International Airport ALEC Dubai 294 Active C

APM Station Terminal 1 Dubai International Airport ALEC Dubai 2400 Active C

Premier
Third Expansion of The Holy Haram Makkah 4 Nos. Fixed Dome Composite KSA 90 2014 C
Technologies
Premier
Third Expansion of The Holy Haram Makkah Ceremonial Dome Composite KSA 510 Active C
Technologies
Premier
Temporary Mataf Phase II Additional Steelwork Composite KSA 90 2013 C
Technologies
Al Sufouh Transit System Project TR2 Depot Fabrication of Built-
Besix Dubai 300 2013 C
up Section
Hardco Sharja
Sky Light Roof Steelworks for H.H. Collection Building at Sharjah 89 2013 C
Engineering h
IMG Theme Park City of Arabia Supports for Launch Coasters &
IM Galadari Dubai 392 Active C
Spinning Coasters
Hardco
Car Park for Madina High Speed Rail Station Madina, KSA KSA 200 2014 C
Engineering

The Address Hotel Penthouse Structural Steelworks ALEC Dubai 20 2013 C

Premier
Temporary Mataf - Saudi Arabia Composite KSA 116 2013 C
Technology
Page 22 of 56

Samsung Abu
Carbon Black & Delayed Coker (CBDC) Project for TAKREER 7557 Active C
Engineering Dhabi
Dubai International Airport Expansion (Phase III) SP500-
ALEC Dubai 13897 Active C
Concourse 4 & Associated Projects

Dubai World Central Repair of Fire Damaged Halls ALEC Dubai 2500 2013 C

Steelwork for Schindler on Panoramic Elevators at Dubai Schindler


Dubai 75 2013 C
International Airport UAE

SP286-EMC Relocation Dubai Flower Center Modifications ALEC Dubai 268 2013 C

P-954 Waterfront Development Project Phase III-Bahrain Flyover Contrack Bahrai


413 2013 C
Bridge Nass JV n
Engineers
Abu
EOM-Civil Justice Court RoomAbu Dhabi Office Abu 100 2012 C
Dhabi
Dhabi
ENOC Processing Plant ITB-PUR-4458 (PUR#4458) Project ESR
EPCL Dubai 100 2012 C
00380

Dubai International Airport Al Majlis at Terminal 3 ALEC Dubai 80 2012 C

New Doha
NDIA Duty Free Warehouse Facility Truck Park Canopy Intl Airport
Qatar 736 2012 C
Structure Steering
Committee
Saudi Railway Saudi
Haramain High Speed Rail Station Madina K.S.A. 8860 2013 C
Organization Arabia
Lamprell
NEXEN Golden Eagle Area Development Dubai 2250 2012 C
Energy
Permasteelisa Saudi
King Abdullah Financial District (KAFD) Parcel No. - 1.15 231 2013 C
Group Arabia
Ansaldo Saudi
HRSG - Casing, Inlet & Outlet ducts stack & secondary Steelwork 2220 2012 C
Caldaie Arabia
Saudi
Flyover at Intersection of King Abdullah Road Saudi Oger 1566 2012 C
Arabia
Abu
Pipe Racks for ZADCO Satah Full Field Galfar Engg 150 2011 C
Dhabi
Samsung Abu
Shah Gas Development PKG#4 U &O 2776 2012 C
Engineering Dhabi
Abu
Masdar City ACC 1058 2011 C
Dhabi
Abu
The Swoosh Waagner Biro 182 2011 C
Dhabi
Abu
New Banquet Hall HMR 515 2011 C
Dhabi
Abu
The Galleria Sowwah Square Waagner Biro 557 2011 C
Dhabi
Abu
Ruwais Refinery ACC 250 2011 C
Dhabi

Football and Tennis Court EO Dubai 128 2011 E,C

Zayed National Museum Mubadala UAE 457 2011 C


Page 23 of 56

Doha International Airport NADIA Qatar 8,500 2011 C

Abu
Abu Dhabi Financial Center Mubadala 2,700 2010 C
Dhabi

Emal Alumina Silo 8 EMAL Dubai 2,050 2011 C

Arabian
Falcon Head Steelwork Qatar 2010 C
Profile 140
Al Habtoor
Abu
Zayed University Feature Roof Murray & 2011 C
Dhabi 8,970
Roberts

New Exhibition Hall at World Trade Centre DWTC Dubai 2010 C


4,000

Steel Coke Silo No. 5 EMAL Dubai 2009 C


1,500

Abu
Tressles and Towers for EMAL EMAL 2009 C
Dhabi 600

Dubai
PJ - 4096 Dubai Olympic Sports Complex Dubai 2010 C
Municipality 6,000

Dubai International Airport Expansion Phase II Concourse III AX Government


Dubai 2012 C
125 Internal Steelwork of Dubai DCA 24,500

Fabrication of Structures of Ice Rink Eversendai Dubai 2008 C


850

Down Town Jebel Ali Project Limitless Dubai 2008 C


250

8 Nos. D 18 Type Potshells for Dubal DUBAL Dubai 2009 C


250

13 Nos - D 18 Type Potshells for Dubal Dubal Dubai 2009 C


350
Structural Steel Work for New Doha International Airport
Eversendai Qatar 2008 C
700

Tanks for New Doha International Airport Punj Lloyd Qatar 2007 C
1,100
H.H. Gen.
Shaikh
Al Lissaili Camel Tracks Grandstand Mohammed Dubai 2008 C
257
Bin Rashid Al
Maktoum
Al Habtoor
Abu
Abu Dhabi International Airport Transfer Baggage Facility Murray & 2008 C
Dhabi 265
Roberts
Sohar
1 No. Crane Gantry Oman 2008 C
Aluminium 40

Sohar
6 Nos. Raising Beams Oman 2008 C
Aluminium 100

Project 56B Dubal Potline 6B DUBAL Dubai 2009 C


3,000
Sohar
11 No. PTM Cranes Aluminium Oman 2008 C
750
Smelter

Dubai Exhibition City DWTC Dubai 2009 C


21,000

Dubal 56 B Project
DUBAL Dubai 2009 C
Potroom steelwork 1,100
Page 24 of 56

Abu
Tanks for OGD 111 GASCO 2007 C
Dhabi 1,200

Fabrication of Pot Shells DUBAL Dubai 2007 C


1,100

Olefin Plant Rabigh Refinery Saudi Aramco KSA 2008 C


3,500

Dubal 79B Project


DUBAL Dubai 2006 C
Potroom Building 3,800

Fabrication of Pot Shells DUBAL Dubai 2005 C


5,300

9 Ethylene Cracking Furnace


Saudi Aramco KSA 2008 C
Rabigh Refinery 5,400

Emirates Engineering Centre Hanger H Emirates


Dubai 2,600 2008 C
Dubai International Airport Airlines

Silo No. 7 Alumina Storage DUBAL Dubai 2007 EC


2,000

Dubai International Airport Expansion Phase II Government


Dubai 2012 C
Concourse III AX 126 Shell Only of Dubai DCA 9,000

Naptha Hydrotreater Reformer ENOC Dubai 2009 C


3,500

Dubai International Airport Expansion Phase II Terminal III, Government


Dubai 2007 C
Concourse II and Car Park AX 060 of Dubai DCA 30,700
Government
Dubai International Airport Terminal 1 Expansion of Dubai Dubai 2006 C
2,000
DCA
Union
Dubai Autodrome Dubai 2004 C
Properties 2,450
Khalifa Sport
City
Khalifa Stadium Qatar 2004 C
Development 400
Committee
Government
Dubai International Airport Dubai Flower Centre Dubai 2004 C
of Dubai DCA 1,300

Potshells Manufacture DUBAL Dubai 2004 C


18,000

Royal Court,
Royal Flight Hangar, Seeb Oman 2004 C
Oman 3,000

Abu
New H. Q. Building, Adnoc ADNOC 2004 C
Dhabi 6,000

U.A.E. Offset Fujaira


Fujairah Desalination 5 No. Tanks 2003 C
Doosan Ind. h 10,000
U.A.E. Offset
Fujaira
Fujairah Desalination 9 No. Tanks Group Punj 2004 C
h 10,130
Lloyd

Alumina Storage Silo No 6 DUBAL Dubai, 2003 EC


1,400

Government Bahrai
Shk. Khalifa Bin Salman Bridge 2003 C
of Bahrain n 6,000

Dubai World Trade Centre DWTC Dubai 2002 C


1,600

Jebel Ali K
Alstom Dubai 2002 C
HRSG Boiler 2,500
Page 25 of 56

Saudi
Berri Gas Project Aramco 2002 C
Arabia 3,300

Shopping Centre Al Hamed Al Ain 2002 C


6,000

Petrochemical Plant Q-Chem Qatar 2002 C


6,000

Columbia
Nordural Expansion Iceland 2001 C
Ventures 2,500

General Ind. Abu


Re-bar Rolling Mill 2000 C
Corp. Dhabi 5,000

Dabhol LNG Enron India 2000 C


5,000

Condor Expansion DUBAL Dubai 2000 C


17,500

Ghazlan Desalination Plant SCECO EAST KSA 1999 C


775

Saudi Iron &


Hot & Cold Rolling Mills at Hadeed KSA 1999 C
Steel Co 2,000

Jetty Structures for Jamnagar Refinery Reliance India 1999 C


6,000

H.H. Sheikh
Emirates Towers Dubai 1999 C
Maktoum 4,500

Electric Arc Furnace Expansion QASCO Qatar 1999 C


3,000

QAFAC /
Fired Heaters for Methanol / MTBE Facility Qatar 1998 C
Chiyoda 1,650
Colombia
Cathode Shells Aluminium Iceland 1997 C
2,100
Corp.
Emirates
3 Bay 777 Hangar Dubai 1997 C
Airlines 1,500

MEW /
Sabiya Power Station Kuwait 1997 C
Hyundai 22,000

Sahil,
Sahil Field Development Project ADCO 1996 C
UAE 820

4Aweer Power Station H 6 Exhausts Stacks & Supports DEWA Dubai 1996 C
1,150

Falcon Expansion DUBAL Dubai 1996 C


17,500

Middle
Flight Hangar Private 1996 C
East 1,500

West Bay &


2 No. 18 Storey Office Building Qatar 1996 C
Salam Group 1,900

Pakista
Hub River Power Station Daelim 1996 C
n 4,100

Yanbu Cement Plant KHD A.G. KSA 1995 C


2,350

Abu
Onshore Gas Development ADNOC 1995 C
Dhabi 4,150

Hong
Tsing Ma Bridge CSEL / MES 1995 C
Kong 3,900
Page 26 of 56

B. AIRPORTS
A380 Stands/Gate Room Expansion in Terminal 3 Abu
ALEC 10 Active C
Abu Dhabi International Airport Dhabi
Abu
T1 Segregation Project Abu Dhabi International Airport ALEC 884 Active C
Dhabi

SP500 PK30 T1 Upgrade Dubai International Airport ALEC Dubai 294 Active C

APM Station Terminal 1 Dubai International Airport ALEC Dubai 2400 Active C

Dubai International Airport Expansion (Phase III) SP500-


ALEC Dubai 13897 Active C
Concourse 4 & Associated Projects

Dubai World Central Repair of Fire Damaged Halls ALEC Dubai 2500 2013 C

Steelwork for Schindler on Panoramic Elevators at Dubai Schindler


Dubai 75 2013 C
International Airport UAE

Dubai International Airport Al Majlis at Terminal 3 ALEC Dubai 80 2012 C

Dubai International Airport Expansion Phase II Concourse III AX Government


Dubai 2012 C
125 Internal Steelwork of Dubai DCA 24,500

Dubai International Airport Expansion Phase II Government


Dubai 2012 C
Concourse III AX 126 Shell Only of Dubai DCA 9,000

Doha International Airport NADIA Qatar 8,500 2011 C

Emirates Engineering Centre Hanger H Emirates


Dubai 2,600 2008 C
Dubai International Airport Airlines

Dubai International Airport Expansion Phase II Terminal III, Government


Dubai 2007 C
Concourse II and Car Park AX 060 of Dubai DCA 30,700

Government
Dubai International Airport Terminal 1 Expansion Dubai 2006 C
of Dubai DCA 2,000

Government
Dubai International Airport Dubai Flower Centre Dubai 2004 C
of Dubai DCA 1,300

Royal Court,
Royal Flight Hangar, Seeb Oman 2004 C
Oman 3,000

Emirates
3 Bay 777 Hangar Dubai 1997 C
Airlines 1,500

C. OIL, GAS AND PETROCHEMICAL

Samsung Abu
Carbon Black & Delayed Coker (CBDC) Project for TAKREER 7557 Active C
Engineering Dhabi
ENOC Processing Plant ITB-PUR-4458 (PUR#4458) Project ESR
EPCL Dubai 100 2012 C
00380
Lamprell
NEXEN Golden Eagle Area Development Dubai 2250 2012 C
Energy
Abu
Pipe Racks for ZADCO Satah Full Field Galfar Engg 150 2011 C
Dhabi
Abu
Shah Gas Development PKG#4 U &O Samsung 2776 2012 C
Dhabi
Page 27 of 56

Ruwais Refinery ACC UAE 250 2011 C

Olefin Plant Rabigh Refinery Saudi Aramco KSA 2008 C


3,500

9 Ethylene Cracking Furnace


Saudi Aramco KSA 2008 C
Rabigh Refinery 5,400

Naptha Hydrotreater Reformer ENOC Dubai 2009 C


3,500

Saudi
Berry Gas Project Aramco 2002 C
Arabia 3,300

Petrochemical Plant Q-Chem Qatar 2002 C


6,000

Dabhol LNG Enron India 2000 C


5,000

Jetty Structures for Jamnagar Refinery Reliance India 1999 C


6,000

Abu
Sahil Field Development Project ADCO 1996 C
Dhabi 820

Abu
On Shore Gas Development ADNOC 1995 C
Dhabi 4,150

MTBE Complex DUGAS Dubai 1994 C


2,600

D. POWER

Dubai, 2,500
Jebel Ali K HRSG Boiler Alstom 2002 C
U.A.E T

5,000
Dabhol LNG Enron India 2000 C
T

MEW /
Sabiya Power Station Kuwait 22,000 1997 C
Hyundai
T
1,150
Aweer Power Station H Exhaust Stacks & Supports DEWA Dubai 1996 C
T

Pakista 4,100
Hub River Power Daelim 1995 C
n T

2,300
G Station Extension DEC Dubai 1993 C
T

E. INDUSTRIAL AND ALUMINIUM

Emal Alumina Silo 8 EMAL Dubai 2,050 2011 C

Steel Coke Silo No. 5 EMAL Dubai 2009 C


1,500

Abu
Tressles and Towers for EMAL EMAL 2009 C
Dhabi 600

8 Nos. D 18 Type Potshells for Dubal DUBAL Dubai 2009 C


250

13 Nos - D 18 Type Potshells for Dubal DUBAL Dubai 2009 C


350

Sohar
1 No. Crane Gantry Oman 2008 C
Aluminium 40
Page 28 of 56

Sohar
6 Nos. Raising Beams Oman 2008 C
Aluminium 100

Project 56B Dubal Potline 6B DUBAL Dubai 2009 C


3,000
Sohar
11 No. PTM Cranes Aluminium Oman 2008 C
750
Smelter
Dubal 56 B Project
DUBAL Dubai 2009 C
Potroom steelwork 1,100

Fabrication of Pot Shells DUBAL Dubai 2007 C


1,100

Dubal 79B Project


DUBAL Dubai 2006 C
Potroom Building 3,800

Fabrication of Pot Shells DUBAL Dubai 2005 C


5,300

400
8 Nos. Pots for Dubal DUBAL Dubai 2004 C
T

Potshells Manufacture DUBAL Dubai 18,000 2004 C


T
Columbia 2,500
Nordural Expansion Iceland 2001 C
Ventures T

General Ind. Abu 5,000


Re-bar Rolling Mill 2000 C
Corp. Dhabi T

3,000
Electric Arc Furnace Expansion QASCO Qatar 2000 C
T

Condor Expansion DUBAL Dubai 17,500 1999 C


T
Saudi Iron & 2,000
Hot & Cold Rolled Mills at Hadeed KSA 1999 C
Steel Co. T
Colombia
2,100
Cathode Shell Aluminium Iceland 1997 C
T
Corp.

Falcon Expansion DUBAL Dubai 17,500 1996 C


T
2,350
Yanbu Cement Plant KHD. AG KSA 1995 C
T

Bahrai
Potline 4 ALBA 11,900 1992 C
n
T
8,950
DEEP Expansion DUBAL Dubai 1991 C
T

F. COMMERCIAL BUILDINGS

Theatre Steel Structure for Al Habtoor City - Dubai HLG Dubai 3741 Active C

IMG Theme Park City of Arabia


IM Galadari Dubai 392 Active C
Installation of Rides and Shows
Permasteelisa Abu
Zayed National Museum Mock-up 41 2014 C
Gartner M.E. Dhabi
Premier
Third Expansion of The Holy Haram Makkah 4 Nos. Fixed Dome Composite KSA 90 2014 C
Technologies
Page 29 of 56

Premier
Third Expansion of The Holy Haram Makkah Ceremonial Dome Composite KSA 510 Active C
Technologies
Premier
Temporary Mataf Phase II Additional Steelwork Composite KSA 90 Active C
Technologies
Al Sufouh Transit System Project TR2 Depot Fabrication of Built-
Besix Dubai 300 2013 C
up Section
IMG Theme Park City of Arabia Supports for Launch Coasters &
IM Galadari Dubai 392 Active C
Spinning Coasters
Hardco Sharja
Sky Light Roof Steelworks for H.H. Collection Building at Sharjah 89 2013 C
Engineering h
Hardco
Car Park for Madina High Speed Rail Station Madina, KSA KSA 200 2014 C
Engineering

The Address Hotel Penthouse Structural Steelworks ALEC Dubai 20 2013 C

Premier
Temporary Mataf - Saudi Arabia Composite KSA 116 Active C
Technology

SP286-EMC Relocation Dubai Flower Center Modifications ALEC Dubai 268 2013 C

Saudi Railway Saudi


Haramain High Speed Rail Station Madina K.S.A. 8860 2013 C
Organization Arabia
P-954 Waterfront Development Project Phase III-Bahrain Flyover Contrack Bahrai
413 2013 C
Bridge Nass JV n
Permasteelisa Saudi
King Abdullah Financial District (KAFD) Parcel No. - 1.15 231 2013 C
Group Arabia
Engineers
Abu
EOM-Civil Justice Court RoomAbu Dhabi Office Abu 100 2012 C
Dhabi
Dhabi
New Doha
NDIA Duty Free Warehouse Facility Truck Park Canopy Intl Airport
Qatar 736 2012 C
Structure Steering
Committee
Saudi
Flyover at Intersection of King Abdullah Road Saudi Oger 1566 2012 C
Arabia
Masdar City Abu
ACC 1058 2011 C
Dhabi
Abu
The Swoosh Waagner Biro 182 2011 C
Dhabi
Abu
New Banquet Hall HMR 515 2011 C
Dhabi
Abu
The Galleria Sowwah Square Waagner Biro 557 2011 C
Dhabi

Football and Tennis Court EO Dubai 128 2011 E,C

Abu
Abu Dhabi Financial Center Mubadala 2,700 2010 C
Dhabi

Arabian
Falcon Head Steelwork Qatar 2010 C
Profile 140
Al Habtoor
Abu
Zayed University Feature Roof Murray & 2011 C
Dhabi 8,970
Roberts
Page 30 of 56

New Exhibition Hall at World Trade Center DWTC Dubai 2010 C


4,000

Dubai
PJ - 4096 Dubai Olympic Sports Complex Dubai 2010 C
Municipality 6,000

Fabrication of Structures of Ice Rink Eversendai Dubai 2008 C


850

Down Town Jebel Ali Project Limitless Dubai 2008 C


250
Structural Steel Work for New Doha International Airport
Eversendai Qatar 2008 C
700

Dubai Exhibition City DWTC Dubai 2009 C


21,000

Abu 6,000
New H. Q. Building, Adnoc ADNOC 2004 C
Dhabi, T

Dubai 1,600
Dubai World Trade Centre Dubai, 2002 C
Government T

3,000
Shopping Centre Al Hamed Al Ain 2002 EC
T

H.H. Sheikh 4,500


Emirates Towers Dubai 1999 C
Maktoum T

A.G. Al Abu 2,200


Bin Ghanem Tower 1997 C
Mazroui Dhabi T

Conference Hall Roof Steelwork Govt. of Qatar Qatar 650 T 1997 C

Mohammed
Masaood Building Dubai 550 T 1996 C
Bin Masaood

West Bay & 1,900


2 No. 18 Storey Office Buildings Qatar 1996 C
Salam Group T

Saif Bin Abu


Bin Darwish Building 754 T 1996 C
Darwish Dhabi

Parker Valley Hong 1,375


Dorset House Developments 1992 C
Estates Kong T

G. FIRE HEATERS, BOILERS & DESALNATION PLANTS

Ansaldo Saudi
HRSG - Casing, Inlet & Outlet ducts stack & secondary Steelwork 2220 2012 C
Caldaie Arabia

Panelized Furnace Casing & Steel Work for JUPC Project JUPC K.S.A. 707 T 2008 C

Ethylene Cracking Furnaces, ADNOC-Borouge, Petrochemical Abu 1,200


Selas 2001 C
Complex Dhabi T

Ghazlan Desalination Plant Sceco East K.S.A. 775 T 2001 C

Foster 1,800
Methanol/MTBE Plant, Qatar Qatar 1999 C
Wheeler T

H. TANK FABRICATION

Tanks for New Doha International Airport Punj Lloyd Qatar 2007 C
1,100

Abu
Tanks for OGD 111 GASCO 2007 C
Dhabi 1,200
Page 31 of 56

Silo No. 7 Alumina Storage DUBAL Dubai 2007 EC


2,000
U.A.E. Offset
Fujaira
Fujairah Desalination 9 No. Tanks Group Punj 10,130 2004 C
h
Lloyd Ltd., T
U.A.E. Offset Fujaira
Fujairah Desalination 5 No. Tanks 10,000 2003 C
Doosan Ind. h
T
1,400
Alumina Storage Silo DUBAL Dubai, 2003 C
T

4 No. Potable Water Tanks for Al-Taweelah 71.0 mtr. dia x 18 mtr. Abu 4,500
CMS 2003 C
high Dhabi, T

4 Nos. Potable Water Tanks for Umm Al Naar 71.0 mtr. dia x 18 Abu 4,500
ADWEA 2002 C
mtr. high Dhabi, T
C
1 No. Water Tank for Rebar Mill General Ind. Abu
90.0 T 2000
25.0 mtr.dia x 5.0 mtr. high Corp. Dhabi,

5000
Dabhol LNG Enron India 2000 C
T

Abu
4 Nos. of Tanks for Sulphuric acid 20.0 mtr. x 7.5 mtr. high ADNOC 586 T 2000 C
Dhabi
Page 32 of 56

IX. CLIENT TESTIMONIALS

Al Habtoor Engineering - Murray & Roberts JV

Dr. Binnewies Engineers

Engineers Office

Al Habtoor Engineering - Murray & Roberts

Saudi Oger Ltd.

Waagner Biro

WSP Middle East

Hardco Engineering Co.


Page 33 of 56
Page 34 of 56
Page 35 of 56
Page 36 of 56
Page 37 of 56
Page 38 of 56
Page 39 of 56
Page 40 of 56
Page 41 of 56

X. COMPANY LICENSE AND CERTIFICATES

Commercial License 2 pages

Industrial License 3 pages

Abu Dhabi License

ISO 9001:2008 Certificate

ISO 14001:2004 Certificate

OHSAS 18001:2007

U / U2 / S / PP / R Certificates
Page 42 of 56
Page 43 of 56
Page 44 of 56
Page 45 of 56
Page 46 of 56
Page 47 of 56
Page 48 of 56
Page 49 of 56
Page 50 of 56
Page 51 of 56
Page 52 of 56
Page 53 of 56
Page 54 of 56
Page 55 of 56
Page 56 of 56