I. Introduction 3
A. Fabrication Workshops
B. Welding
C. Surface Preparation and Painting
D. Fabrication Plant and Machinery Jebel Ali Free Zone Facility
E. Field Erection Equipment
F. Fabrication Plant and Machinery Jebel Ali Industrial Area Facility
I. INTRODUCTION
Cleveland Bridge & Engineering Middle East (Private) Limited was established in 1977
by an Emiri Decree and is a private joint stock company. It is owned 51% by the Investment
Corporation of Dubai and 49% by Al Rushaid Petroleum Investment Company.
Cleveland Bridge & Engineering is a market leader for the design, steel fabrication,
corrosion protection, erection and project management in the following areas:
Petrochemical
Industrial
Bridges
Aluminium Industries
Cleveland Bridge & Engineering provides a comprehensive turnkey package from design
concept through detailed engineering, manufacture and the erection of structural steel and
non-structural components. The company has extensive CAD, project management and
planning software.
Page 4 of 56
CONTACT DETAILS
Dubai
E-mail : contact@clevelandbridge.co.ae
Website : www.clevelandbridge.co.ae
E-mail : wael_ashkar@masaood.com
Page 5 of 56
PRODUCTS
Light, medium and heavy structural steel fabrication for all types of equipment including:
- Fired Heaters
- Boiler Structures
- Fire Simulators
- Pressure Vessels
- Desalination Units
CAPACITY
MANPOWER
Management + Administration : 13
Accounts + IT : 9
Proposals : 4
Design/Drawing Office : 36
Fabrication : 1077
Contracts : 327
Commercial : 5
Planning : 8
Page 6 of 56
SENIOR MANAGEMENT
The Head Office of Cleveland Bridge & Engineering Middle East (Private) Limited
(CBEME) is located in the Jebel Ali Free Zone (JAFZA) area of Dubai together with one of
the fabrication facilities. In addition to this facility there is a second CBEME fabrication
facility located in the Jebel Ali Industrial Area.
This facility comprises three separate Fabrication Workshops and extensive Surface
Preparation and Painting Areas. The facilities are supported with all necessary infra-structure
including a computer aided design/drawing office. The facility occupies an area of
123,000m2 of which approximately 16,000m2 is covered workshop space. The main area
within the factory comprises the following:
The Company also has access to an area of approx. 40,000 sq. mtr. adjacent to our facility
which can be utilized for the assembly of major structures. The area has 200 mts. of quay
wall with an 11.5 mts. of water depth thus allowing load outs of major fabrications and
structures.
A. FABRICATION WORKSHOPS
The three fabrication workshops have been designed and equipped to provide CBEME with
the flexibility to produce a multitude of products ranging from conventional structural
steelwork, through to complex plate/ box girders etc.
Page 8 of 56
The Main Workshop consists of four bays each served by overhead cranes and is fully
equipped with three numerically controlled saw and drill lines.
The Heavy Fabrication Workshop is used primarily for heavy plated fabrication work.
The workshop is equipped with 50 tonne and 10 tonne overhead craneage, heavy plate
press and rolls, fully automatic welding equipment and extensive set up and jig
facilities
The fabrication facilities are complemented by the Light Fabrication Workshop which
is used principally for the manufacture of ladders, handrails, platforms and other
secondary structures.
This facility comprises of two main fabrication areas and enclosed surface preparation and
painting areas. The facility occupies an area of 130,500M2 and is split into the following
areas:
These workshops are fully enclosed and inter-linked to provide an efficient flow of materials
from raw material feed to final completed material dispatch.
The area is in excess of 25000 M2 and includes state of the art fabrication machinery serviced
by 14 Nos. over head cranes with capacities of 5 and 10 tonne SWL. Two 20 tonne gantry
cranes handle the offloading, stock control and feeding of raw materials into the workshop.
B. WELDING
Shielded metal arc welding (SMAW) using low hydrogen and iron powder electrodes
Flux cored arc welding (FCAW) using the self-shielding method in semi-automatic
mode
Submerged arc welding (SMAW) in automatic and semi-automatic modes
Page 9 of 56
CBEME is also experienced in other processes such as tungsten-arc, gas metal-arc and electro
slag welding.
Our welders are qualified to ASME IX, AWS D1.1 and BS EN 287.
D. FABRICATION PLANT/MACHINERY
The following list covers the major items of plant and machinery at CBEME. The list is
complemented by smaller various items:
Page 10 of 56
MAIN WORKSHOP
1 Over Head Crane 1 Tonne 1 No.
2 Over Head Crane 2 Tonne 2 Nos.
3 Over Head Crane 5 Tonne 3 Nos.
4 Over Head Crane 8 Tonne 5 Nos.
5 Over Head Crane 10 Tonnes 4 Nos.
6 Profile Gas Cutting Machine 3 Nos.
7 CNC Profile Gas Cutting Machine 3 Nos.
8 Numerically Controlled Saw 3 Nos.
9 Numerically Controlled Drill 2 Nos.
10 Bend Saw 2 Nos.
11 Plate Bending Machine 3 Nos.
12 Hydraulic Beam Bending Machine 1 No.
13 Hydraulic Pipe Bending Machine 3 Nos.
14 Gas Cutting Machine 21 Nos.
15 Radial Arm Drill Machine 3 Nos.
16 Crop and Punch Machine 3 Nos.
17 Guillotine for Steel Plate 1 No.
18 Portable Rotabroach Drill Machine 10 Nos.
19 Thread Cutting Machine 1 No.
20 Vernet Angle Punch and Crop Machine 1 No.
21 Lathe Machine 2 Nos.
22 6 Module Welding Transformer 4 Nos.
23 Miller 8 Pot Welding Transformer 6 Nos.
24 Welding Machine 44 Nos.
HEAVY BAY
1 Over Head Crane 5 Tonne 2 Nos.
2 Over Head Crane 15 Tonne 1 No.
3 Over Head Crane 20 Tonne 1 No.
4 Over Head Crane 40 Tonne 2 Nos.
5 Over Head Crane 50 Tonne 1 No.
6 Shaping Machine 1 No.
7 Profile Cutting Machine 1 No.
8 Milling Machine 1 No.
9 Gas Cutting Machine 13 Nos.
Page 11 of 56
S.
NO. DESCRIPTION CAPACITY QUANTITY
MACHINERY LIST
S.
NO. DESCRIPTION QUANTITY
1 EOT Crane (10MT) 4
2 EOT Crane (8 MT) 2
3 EOT Crane (5 MT) 8
4 Gantry Cranes (20 MT) 2
5 CNC Profile Cutter (24 mtr x 3 mtr) 1
6 Plate Stripping Machine (15mtr x 3 mtr) 1
7 Drill and Cut line - Kaltenbach 2
8 Plate Processing Machines Kaltenbach 2
9 Angle Line Kaltenbach 1
10 Automatic Grit Blasting Machine Plate & Sections - Rosler 2
11 Manual Blasting and Painting Pots 4
12 Air Compressor (750 CFM) 3
13 Mobile Crane (60 MT) 1
14 MIG Welding Units 20
15 Sub-Arc Welding Unit 2
16 Hydraulic Press Brake (3mtr x 16 Thk) 1
17 Ironworker 2
18 Radial Drill 1
19 Forklift (5 Tonne) 1
20 Tractor Unit 2
21 Trailer 40ft 2
22 Trailer 60ft 2
23 Submerged Arc Gantry Welding Machine 1
24 Hydraulic Flange Straightener Machine 1
25 Tee & H Beam assembly machine 1
26 Miscellaneous Tools & Tackles
27 Pipe Profiling Machine (up to 600 m/m diameter) HGG 600 1
28 Section Rolling Machine (APK 300) 1
Page 14 of 56
V. ENGINEERING CAPABILITY
The Design Office: For the undertaking of designs of structures from first
principals.
The Drawing Office: For the production of shop drawings.
Development of basic design data or conceptual designs into drawings from which
steel fabrication and erection can be carried out.
V. ENGINEERING CAPABILITY
Office Facilities:
Hardware
Drafting
2 No. A0 Plotters
1 No. A3 Scanner
Design
Software
1 No. Cidjoint
The goal of Cleveland Bridge and Engineering is to provide the Client with a product that:
Meets the required quality standard as laid down in the contract specification.
Is delivered in accordance with the budget and the program.
To meet these aims, an effective project management structure has been established, headed
by the Project Manager, to oversee all aspects of the contract from award to final handover.
Taking possession of the contract and ensuring that the Contract requirements are
clearly understood by all parties.
Establishing the Quality requirements and, where deemed necessary, producing
contract specific Quality documentation in place of the general Quality documents.
Developing the Contract program making use of up to date computer aided project
planning packages (PRIMAVERA) to establish the sequence of work and resources
required to successfully complete the work within the constraints of the Contract.
Controlling and coordinating activities throughout the various phases of the contract
to ensure progress is in line with the budget and the program. Establishing clear lines
of communication between CBEME, the Client and the Clients representatives,
suppliers and subcontractors, to enable any changes, queries or deviations from the
specification to be efficiently communicated to relevant parties.
Page 20 of 56
CBEME holds ASME U, U2, PP and S Code Symbol stamps from the
American Society of Mechanical Engineers. In addition, CBEME holds an R Code
Symbol stamp from the National Board of Boiler & Pressure Vessel Inspectors, thereby
authorising the company to manufacture and repair pressure vessels and piping to ASME
VIII Div 1 & 2.
Laing
Dreamworks Box Motiongate Dubai 5562 Active C
ORourke
Theatre Steel Structure for Al Habtoor City - Dubai HLG Dubai 3741 Active C
SP500 PK30 T1 Upgrade Dubai International Airport ALEC Dubai 294 Active C
APM Station Terminal 1 Dubai International Airport ALEC Dubai 2400 Active C
Premier
Third Expansion of The Holy Haram Makkah 4 Nos. Fixed Dome Composite KSA 90 2014 C
Technologies
Premier
Third Expansion of The Holy Haram Makkah Ceremonial Dome Composite KSA 510 Active C
Technologies
Premier
Temporary Mataf Phase II Additional Steelwork Composite KSA 90 2013 C
Technologies
Al Sufouh Transit System Project TR2 Depot Fabrication of Built-
Besix Dubai 300 2013 C
up Section
Hardco Sharja
Sky Light Roof Steelworks for H.H. Collection Building at Sharjah 89 2013 C
Engineering h
IMG Theme Park City of Arabia Supports for Launch Coasters &
IM Galadari Dubai 392 Active C
Spinning Coasters
Hardco
Car Park for Madina High Speed Rail Station Madina, KSA KSA 200 2014 C
Engineering
Premier
Temporary Mataf - Saudi Arabia Composite KSA 116 2013 C
Technology
Page 22 of 56
Samsung Abu
Carbon Black & Delayed Coker (CBDC) Project for TAKREER 7557 Active C
Engineering Dhabi
Dubai International Airport Expansion (Phase III) SP500-
ALEC Dubai 13897 Active C
Concourse 4 & Associated Projects
Dubai World Central Repair of Fire Damaged Halls ALEC Dubai 2500 2013 C
SP286-EMC Relocation Dubai Flower Center Modifications ALEC Dubai 268 2013 C
New Doha
NDIA Duty Free Warehouse Facility Truck Park Canopy Intl Airport
Qatar 736 2012 C
Structure Steering
Committee
Saudi Railway Saudi
Haramain High Speed Rail Station Madina K.S.A. 8860 2013 C
Organization Arabia
Lamprell
NEXEN Golden Eagle Area Development Dubai 2250 2012 C
Energy
Permasteelisa Saudi
King Abdullah Financial District (KAFD) Parcel No. - 1.15 231 2013 C
Group Arabia
Ansaldo Saudi
HRSG - Casing, Inlet & Outlet ducts stack & secondary Steelwork 2220 2012 C
Caldaie Arabia
Saudi
Flyover at Intersection of King Abdullah Road Saudi Oger 1566 2012 C
Arabia
Abu
Pipe Racks for ZADCO Satah Full Field Galfar Engg 150 2011 C
Dhabi
Samsung Abu
Shah Gas Development PKG#4 U &O 2776 2012 C
Engineering Dhabi
Abu
Masdar City ACC 1058 2011 C
Dhabi
Abu
The Swoosh Waagner Biro 182 2011 C
Dhabi
Abu
New Banquet Hall HMR 515 2011 C
Dhabi
Abu
The Galleria Sowwah Square Waagner Biro 557 2011 C
Dhabi
Abu
Ruwais Refinery ACC 250 2011 C
Dhabi
Abu
Abu Dhabi Financial Center Mubadala 2,700 2010 C
Dhabi
Arabian
Falcon Head Steelwork Qatar 2010 C
Profile 140
Al Habtoor
Abu
Zayed University Feature Roof Murray & 2011 C
Dhabi 8,970
Roberts
Abu
Tressles and Towers for EMAL EMAL 2009 C
Dhabi 600
Dubai
PJ - 4096 Dubai Olympic Sports Complex Dubai 2010 C
Municipality 6,000
Tanks for New Doha International Airport Punj Lloyd Qatar 2007 C
1,100
H.H. Gen.
Shaikh
Al Lissaili Camel Tracks Grandstand Mohammed Dubai 2008 C
257
Bin Rashid Al
Maktoum
Al Habtoor
Abu
Abu Dhabi International Airport Transfer Baggage Facility Murray & 2008 C
Dhabi 265
Roberts
Sohar
1 No. Crane Gantry Oman 2008 C
Aluminium 40
Sohar
6 Nos. Raising Beams Oman 2008 C
Aluminium 100
Dubal 56 B Project
DUBAL Dubai 2009 C
Potroom steelwork 1,100
Page 24 of 56
Abu
Tanks for OGD 111 GASCO 2007 C
Dhabi 1,200
Royal Court,
Royal Flight Hangar, Seeb Oman 2004 C
Oman 3,000
Abu
New H. Q. Building, Adnoc ADNOC 2004 C
Dhabi 6,000
Government Bahrai
Shk. Khalifa Bin Salman Bridge 2003 C
of Bahrain n 6,000
Jebel Ali K
Alstom Dubai 2002 C
HRSG Boiler 2,500
Page 25 of 56
Saudi
Berri Gas Project Aramco 2002 C
Arabia 3,300
Columbia
Nordural Expansion Iceland 2001 C
Ventures 2,500
H.H. Sheikh
Emirates Towers Dubai 1999 C
Maktoum 4,500
QAFAC /
Fired Heaters for Methanol / MTBE Facility Qatar 1998 C
Chiyoda 1,650
Colombia
Cathode Shells Aluminium Iceland 1997 C
2,100
Corp.
Emirates
3 Bay 777 Hangar Dubai 1997 C
Airlines 1,500
MEW /
Sabiya Power Station Kuwait 1997 C
Hyundai 22,000
Sahil,
Sahil Field Development Project ADCO 1996 C
UAE 820
4Aweer Power Station H 6 Exhausts Stacks & Supports DEWA Dubai 1996 C
1,150
Middle
Flight Hangar Private 1996 C
East 1,500
Pakista
Hub River Power Station Daelim 1996 C
n 4,100
Abu
Onshore Gas Development ADNOC 1995 C
Dhabi 4,150
Hong
Tsing Ma Bridge CSEL / MES 1995 C
Kong 3,900
Page 26 of 56
B. AIRPORTS
A380 Stands/Gate Room Expansion in Terminal 3 Abu
ALEC 10 Active C
Abu Dhabi International Airport Dhabi
Abu
T1 Segregation Project Abu Dhabi International Airport ALEC 884 Active C
Dhabi
SP500 PK30 T1 Upgrade Dubai International Airport ALEC Dubai 294 Active C
APM Station Terminal 1 Dubai International Airport ALEC Dubai 2400 Active C
Dubai World Central Repair of Fire Damaged Halls ALEC Dubai 2500 2013 C
Government
Dubai International Airport Terminal 1 Expansion Dubai 2006 C
of Dubai DCA 2,000
Government
Dubai International Airport Dubai Flower Centre Dubai 2004 C
of Dubai DCA 1,300
Royal Court,
Royal Flight Hangar, Seeb Oman 2004 C
Oman 3,000
Emirates
3 Bay 777 Hangar Dubai 1997 C
Airlines 1,500
Samsung Abu
Carbon Black & Delayed Coker (CBDC) Project for TAKREER 7557 Active C
Engineering Dhabi
ENOC Processing Plant ITB-PUR-4458 (PUR#4458) Project ESR
EPCL Dubai 100 2012 C
00380
Lamprell
NEXEN Golden Eagle Area Development Dubai 2250 2012 C
Energy
Abu
Pipe Racks for ZADCO Satah Full Field Galfar Engg 150 2011 C
Dhabi
Abu
Shah Gas Development PKG#4 U &O Samsung 2776 2012 C
Dhabi
Page 27 of 56
Saudi
Berry Gas Project Aramco 2002 C
Arabia 3,300
Abu
Sahil Field Development Project ADCO 1996 C
Dhabi 820
Abu
On Shore Gas Development ADNOC 1995 C
Dhabi 4,150
D. POWER
Dubai, 2,500
Jebel Ali K HRSG Boiler Alstom 2002 C
U.A.E T
5,000
Dabhol LNG Enron India 2000 C
T
MEW /
Sabiya Power Station Kuwait 22,000 1997 C
Hyundai
T
1,150
Aweer Power Station H Exhaust Stacks & Supports DEWA Dubai 1996 C
T
Pakista 4,100
Hub River Power Daelim 1995 C
n T
2,300
G Station Extension DEC Dubai 1993 C
T
Abu
Tressles and Towers for EMAL EMAL 2009 C
Dhabi 600
Sohar
1 No. Crane Gantry Oman 2008 C
Aluminium 40
Page 28 of 56
Sohar
6 Nos. Raising Beams Oman 2008 C
Aluminium 100
400
8 Nos. Pots for Dubal DUBAL Dubai 2004 C
T
3,000
Electric Arc Furnace Expansion QASCO Qatar 2000 C
T
Bahrai
Potline 4 ALBA 11,900 1992 C
n
T
8,950
DEEP Expansion DUBAL Dubai 1991 C
T
F. COMMERCIAL BUILDINGS
Theatre Steel Structure for Al Habtoor City - Dubai HLG Dubai 3741 Active C
Premier
Third Expansion of The Holy Haram Makkah Ceremonial Dome Composite KSA 510 Active C
Technologies
Premier
Temporary Mataf Phase II Additional Steelwork Composite KSA 90 Active C
Technologies
Al Sufouh Transit System Project TR2 Depot Fabrication of Built-
Besix Dubai 300 2013 C
up Section
IMG Theme Park City of Arabia Supports for Launch Coasters &
IM Galadari Dubai 392 Active C
Spinning Coasters
Hardco Sharja
Sky Light Roof Steelworks for H.H. Collection Building at Sharjah 89 2013 C
Engineering h
Hardco
Car Park for Madina High Speed Rail Station Madina, KSA KSA 200 2014 C
Engineering
Premier
Temporary Mataf - Saudi Arabia Composite KSA 116 Active C
Technology
SP286-EMC Relocation Dubai Flower Center Modifications ALEC Dubai 268 2013 C
Abu
Abu Dhabi Financial Center Mubadala 2,700 2010 C
Dhabi
Arabian
Falcon Head Steelwork Qatar 2010 C
Profile 140
Al Habtoor
Abu
Zayed University Feature Roof Murray & 2011 C
Dhabi 8,970
Roberts
Page 30 of 56
Dubai
PJ - 4096 Dubai Olympic Sports Complex Dubai 2010 C
Municipality 6,000
Abu 6,000
New H. Q. Building, Adnoc ADNOC 2004 C
Dhabi, T
Dubai 1,600
Dubai World Trade Centre Dubai, 2002 C
Government T
3,000
Shopping Centre Al Hamed Al Ain 2002 EC
T
Mohammed
Masaood Building Dubai 550 T 1996 C
Bin Masaood
Ansaldo Saudi
HRSG - Casing, Inlet & Outlet ducts stack & secondary Steelwork 2220 2012 C
Caldaie Arabia
Panelized Furnace Casing & Steel Work for JUPC Project JUPC K.S.A. 707 T 2008 C
Foster 1,800
Methanol/MTBE Plant, Qatar Qatar 1999 C
Wheeler T
H. TANK FABRICATION
Tanks for New Doha International Airport Punj Lloyd Qatar 2007 C
1,100
Abu
Tanks for OGD 111 GASCO 2007 C
Dhabi 1,200
Page 31 of 56
4 No. Potable Water Tanks for Al-Taweelah 71.0 mtr. dia x 18 mtr. Abu 4,500
CMS 2003 C
high Dhabi, T
4 Nos. Potable Water Tanks for Umm Al Naar 71.0 mtr. dia x 18 Abu 4,500
ADWEA 2002 C
mtr. high Dhabi, T
C
1 No. Water Tank for Rebar Mill General Ind. Abu
90.0 T 2000
25.0 mtr.dia x 5.0 mtr. high Corp. Dhabi,
5000
Dabhol LNG Enron India 2000 C
T
Abu
4 Nos. of Tanks for Sulphuric acid 20.0 mtr. x 7.5 mtr. high ADNOC 586 T 2000 C
Dhabi
Page 32 of 56
Engineers Office
Waagner Biro
OHSAS 18001:2007
U / U2 / S / PP / R Certificates
Page 42 of 56
Page 43 of 56
Page 44 of 56
Page 45 of 56
Page 46 of 56
Page 47 of 56
Page 48 of 56
Page 49 of 56
Page 50 of 56
Page 51 of 56
Page 52 of 56
Page 53 of 56
Page 54 of 56
Page 55 of 56
Page 56 of 56