Sei sulla pagina 1di 1

MADYA SCHOOL EXTENTION BLOCK

MATERIALS
ITEM QUANTITY RATE COST
RAFT FOUNDATION 25 m3 50 1500
BRICK STRUCTURE 60 m2 20 1200
STEEL UPRIGHTS 53m 10 530
STEEL HORIZONTALS 200m 4.50 900
WALL TIMBERS 200m 3 600
ROOF TIMBER 150m 4 600
CHROMADEC 70m 8 560
WALL CLADDING 50m2 6 300
ASBESTOS ROOF 65 SHEETS 30 1950
ALUMINIUM WINDOWS 7 200 1400
SLIDING DOORS 3 500 1500
PAINTING 300 2 600

TOTAL MATERIALS 11640


LABOUR AT 30% 11640 3492
PROJECT TOTAL 15132

PROJECT TIMELINE
TASK TIME
FOUNDATION WORKS 2 DAYS
BRICKWORKS 4 DAYS
STEEL WORKS 4 DAYS
ROOFING WORKS 2 DAYS
CLADDING AND PAINTING 2 DAYS

TOTAL CONSTRUCTION TIME 14 DAYS