Sei sulla pagina 1di 4

ISO9001:2008 Document No. TI-M-4.2.3-14 version No. 3.

0 Date Effective 03/04/2013


Document title Master List of SCHEDULE OF TECHNICAL REQUIREMENTS OF OHE, PSI & CIVIL
MATERIALS FOR TRACTION INSTALLATION

Research Designs & Standards Organisation


Manak Nagar, Lucknow-226011
TI-M-4.2.3-14
MASTER LIST OF SCHEDULE OF TECHNICAL REQUIREMENTS OF OHE, PSI & CIVIL
MATERIALS FOR TRACTION INSTALLATION.

1.0 Amendment History:

S. No. Amendment Date Version Reasons for Amendment


1. 04/10/2010 1.0 First Issue under new documentation
system for ISO9001.2008 approved by EDTI
on NP-2 of file TI/GEN ISO on 04/10/2010.
2. 01/07/2011 2.0 Second issue under inclusion of TECHNICAL
REQUIREMENTS OF OHE, PSI & CIVIL
MATERIALS FOR TRACTION INSTALLATION.
3 03/04/2013 3.0 Third Issue under inclusion of TECHNICAL
REQUIREMENTS OF OHE, PSI & CIVIL
MATERIALS FOR TRACTION INSTALLATION.

JE/TI DDTI EDTI Printed 2013/03/04


Prepared By Checked by Issued By Page 1 of 4
ISO9001:2008 Document No. TI-M-4.2.3-14 version No. 3.0 Date Effective 03/04/2013
Document title Master List of SCHEDULE OF TECHNICAL REQUIREMENTS OF OHE, PSI & CIVIL
MATERIALS FOR TRACTION INSTALLATION

2.0 Purpose

MASTER LIST OF SCHEDULE OF TECHNICAL REQUIREMENTS OF OHE,PSI & CIVIL


MATERIALS FOR TRACTION INSTALLATION

3.0 Scope of Application

The copies of the documents shall be kept in Documentation Cell and on TI Server.

4.0 Procedure/ Details

SCHEDULE OF TECHNICAL REQUIREMENTS

1. TI/STR/001 0 For Static /Microprocessor /Numeric June 01


Protective Relays for 25 kV AC
Traction System

2. TI/STR/002 0 Control and Relay Panel with Static June 01


/Microprocessor /Numeric
Protective Relays for 25 kV AC
Traction System

3. TI/STR/004 0 Air cooled series Reactor for shunt July 01


Capacitor Banks for Traction Sub-
station

4. TI/STR/005 0 Shunt and series capacitor banks June 01


for Traction Sub-station

5. TI/STR/006 3 25 kV Composite Insulators Apr 07

6. TI/STR/007 0 i) Gear less hand operated June 01


pulling and lifting
machine(Tirfor)
ii) Ratchet Lever Hoist (Pul-Lift)
7. TI/STR/008 0 Control and Distribution Panel with June 01
Manual /Auto changeover facility
for Colour Light Signaling supply for
25 kV AC Traction System

8. TI/STR/009 1 Stainless Steel Wire Ropes July 06


Specification
(TI/SPC/OHE/WR/1060)

9. TI/STR/010 0 Porcelain Insulators July 01

JE/TI DDTI EDTI Printed 2013/03/04


Prepared By Checked by Issued By Page 2 of 4
ISO9001:2008 Document No. TI-M-4.2.3-14 version No. 3.0 Date Effective 03/04/2013
Document title Master List of SCHEDULE OF TECHNICAL REQUIREMENTS OF OHE, PSI & CIVIL
MATERIALS FOR TRACTION INSTALLATION

10. TI/STR/011 0 MCI & SGCI Metal Fittings for 25 kV July 01


Solid Core Porcelain Insulators
11. TI/STR/012 0 Forged steel Hooks for Stay Arm July 01
Insulators
12. TI/STR/013 0 Insulating Oil Aug 01

13. TI/STR/014 0 Traction Power Transformer Aug 01

14. TI/STR/015 0 AC Switchgear for 25 kV Traction Aug 01


application (CB & Interrupter)

15. TI/STR/016 0 Auxiliary Transformers Aug 01

16. TI/STR/017 0 Hard Drawn grooved copper(HDGC) Sep 01


contact wire for 25 kV AC Traction
System
17. TI/STR/018 0 Insulated Cadmium copper Mar 01
Catenary
18. TI/STR/019 0 PS Class Current Transformer June 02

19. TI/STR/020 0 Stranded Cadmium copper Aug 02


Conductors.
20. TI/STR/021 0 Spun pure-stressed cement Dec 02
concrete (PSC) OHE Traction mast
21. TI/STR/023 0 Forged steel fittings Jan.06

22. TI/STR/024 0 Short neutral section assembly Feb.06


(PTFE type ), light weight section
insulator assembly, automatic
switched neutral section Assembly

23. TI/STR/027 1 Manufacture of three pulley type Nov.06


regulating equipment with modified
pulley groove
24. TI/STR/029 0 Manufacture of Galvanised steel Nov.09
stranded wire (GSSW)
25. TI/STR/031 0 Manufacture at Galvanised steel Oct.11
stranded Traction Bond
26. TI/STR/030 0 Schedule of Technical Requirement Aug,11
to manufacture 8-Wheeler Diesel
Electric (Under Slung) Tower Car
27. TI/STR/032 0 Schedule of Technical Requirement Jun,12
for manufacturing of mechanised
Vehicle

JE/TI DDTI EDTI Printed 2013/03/04


Prepared By Checked by Issued By Page 3 of 4
ISO9001:2008 Document No. TI-M-4.2.3-14 version No. 3.0 Date Effective 03/04/2013
Document title Master List of SCHEDULE OF TECHNICAL REQUIREMENTS OF OHE, PSI & CIVIL
MATERIALS FOR TRACTION INSTALLATION

Note: The master list is valid for two year from the date of issue. Thereafter, its validity
ceases to exist. Any updating/ correction in between shall be advised to the customer
separately in the form of a correction slip.

5.0 Referenced Documents

Nil

6.0 Referenced Documents of External Origin

Nil

7.0 Associated Records

Nil

8.0 Responsibility and Authority

Activity Responsible Approver Supporting Consulted Informed


Creation, DD/TI HOD/TI SE/JE/ISO MR/ISO- All groups
maintenance of this Cell through
document Intranet
Cpmpliance of All groups HOD/TI SE/JE concerned
directives contained in charges
in this document

9.0 Abbreviations

JE/TI DDTI EDTI Printed 2013/03/04


Prepared By Checked by Issued By Page 4 of 4