DelayAnalysisReportBasedonTargetProgram *DelayedActivitiesareHiglightedInRed DataDate: 29Dec16

VarianceBL
Original Schedule% Activity% BLProject BLProject Actual/Forecas Actual/Forecas Delayed/O
ActivityID Building Floor ActivityName ProjectFinish TotalFloat
Duration Complete Complete Start Finish tedStart tedFinish nTrack
Date
BuildingC BC 160 0.00% 0.00% 27Nov16 31May17 23Nov16A 1Jun17 1 0 OnTarget
Basement02 97 0.00% 0.00% 27Nov16 19Mar17 27Nov16A 28Mar17 8 56 OnTarget
MEPWorks 83 0.00% 0.00% 27Nov16 2Mar17 27Nov16A 12Mar17 8 70 OnTarget
MEP2ndFixing 52 0.00% 0.00% 27Nov16 25Jan17 27Nov16A 4Feb17 8 101 OnTarget
BCB2MEP1000 BC Basement2 InstallElectricalWiring 10 100.00% 62.00% 27Nov16 7Dec16 27Nov16A 3Jan17 23 119 Delayed
BCB2MEP1010 BC Basement2 InstallLowCurrentWiring 12 100.00% 60.00% 28Nov16 11Dec16 27Nov16A 7Jan17 23 119 Delayed
BCB2MEP1020 BC Basement2 InstallHot&ColdWaterPiping 7 100.00% 86.00% 7Dec16 14Dec16 27Nov16A 10Jan17 23 119 Delayed
BCB2MEP1030 BC Basement2 InstallHVACPipes 10 100.00% 88.00% 7Dec16 18Dec16 27Nov16A 14Jan17 23 119 Delayed
BCB2MEP1040 BC Basement2 InstallDuctsandHangers 10 100.00% 100.00% 11Dec16 21Dec16 27Nov16A 28Dec16A 5 0 OnTarget
BCB2MEP1050 BC Basement2 InstallCableTraysandTrunking 10 100.00% 100.00% 14Dec16 25Dec16 27Nov16A 28Dec16A 2 0 OnTarget
BCB2MEP1060 BC Basement2 InstallLVCables 7 100.00% 0.00% 21Dec16 28Dec16 31Dec16 7Jan17 8 18 Delayed
BCB2MEP1070 BC Basement2 InstallDroppers 12 0.00% 0.00% 10Jan17 23Jan17 19Jan17 1Feb17 8 23 OnTarget
BCB2MEP1080 BC Basement2 MeggeringTest 7 0.00% 0.00% 16Jan17 23Jan17 25Jan17 1Feb17 8 23 OnTarget
BCB2MEP1090 BC Basement2 InstallEarthpit 21 0.00% 0.00% 2Jan17 25Jan17 11Jan17 4Feb17 8 18 OnTarget
MEPFinalFixing 13 0.00% 0.00% 16Feb17 2Mar17 26Feb17 12Mar17 8 18 OnTarget
BCB2MEP2000 BC Basement2 InstallLightFittings 8 0.00% 0.00% 16Feb17 25Feb17 26Feb17 6Mar17 8 18 OnTarget
BCB2MEP2010 BC Basement2 InstallFireCabinets 6 0.00% 0.00% 20Feb17 26Feb17 1Mar17 7Mar17 8 18 OnTarget
BCB2MEP2020 BC Basement2 InstallFireAlarmsandSpeakers 8 0.00% 0.00% 18Feb17 26Feb17 27Feb17 7Mar17 8 18 OnTarget
BCB2MEP2030 BC Basement2 InstallSprinklers 6 0.00% 0.00% 21Feb17 27Feb17 2Mar17 8Mar17 8 18 OnTarget
BCB2MEP2040 BC Basement2 InstallSwitchesandSockets 8 0.00% 0.00% 21Feb17 1Mar17 2Mar17 11Mar17 8 18 OnTarget
BCB2MEP2050 BC Basement2 InstallLowCurrentEquipments 8 0.00% 0.00% 22Feb17 2Mar17 4Mar17 12Mar17 8 18 OnTarget
BCB2MEP2060 BC Basement2 InstallGrillesandDiffussers 8 0.00% 0.00% 22Feb17 2Mar17 4Mar17 12Mar17 8 18 OnTarget
BCB2MEP2070 BC Basement2 InstallPlumpingFinalTittings(FloorDrains,Gratings,F 8 0.00% 0.00% 22Feb17 2Mar17 4Mar17 12Mar17 8 18 OnTarget
Basement01 101 0.00% 0.00% 29Dec16 25Apr17 27Nov16A 28Mar17 24 41 OnTarget
MEPWorks 72 0.00% 0.00% 27Nov16 2Mar17 27Nov16A 12Mar17 8 70 OnTarget
MEP2ndFixing 43 0.00% 0.00% 27Nov16 25Jan17 27Nov16A 4Feb17 8 101 OnTarget
BCB1MEP1000 BC Basement1 InstallElectricalWiring 10 10.00% 68.00% 29Dec16 9Jan17 27Nov16A 3Jan17 6 15 OnTarget
BCB1MEP1010 BC Basement1 InstallLowCurrentWiring 12 0.00% 19.00% 31Dec16 12Jan17 27Nov16A 10Jan17 2 11 OnTarget
BCB1MEP1020 BC Basement1 InstallDrainagepipes 10 0.00% 77.00% 5Jan17 16Jan17 27Nov16A 14Jan17 2 11 OnTarget
BCB1MEP1030 BC Basement1 InstallHot&ColdWaterPiping 7 0.00% 66.00% 12Jan17 19Jan17 27Nov16A 17Jan17 2 11 OnTarget
BCB1MEP1040 BC Basement1 Firefightingpipes 10 0.00% 92.00% 9Jan17 19Jan17 27Nov16A 17Jan17 2 11 OnTarget
BCB1MEP1050 BC Basement1 InstallHVACPipes 10 0.00% 71.00% 12Jan17 23Jan17 27Nov16A 21Jan17 2 11 OnTarget
BCB1MEP1060 BC Basement1 InstallDuctsandHangers 10 0.00% 80.00% 16Jan17 26Jan17 27Nov16A 24Jan17 2 11 OnTarget
BCB1MEP1070 BC Basement1 InstallCableTraysandTrunking 10 0.00% 96.00% 19Jan17 30Jan17 27Nov16A 28Jan17 2 11 OnTarget
BCB1MEP1080 BC Basement1 InstallLVCables 7 0.00% 0.00% 26Jan17 2Feb17 23Jan17 31Jan17 2 11 OnTarget
BCB1MEP1090 BC Basement1 InstallDroppers 12 0.00% 0.00% 4Feb17 16Feb17 31Jan17 14Feb17 2 11 OnTarget
BCB1MEP1100 BC Basement1 MeggeringTest 7 0.00% 0.00% 9Feb17 16Feb17 6Feb17 14Feb17 2 11 OnTarget
MEPFinalfixing 15 0.00% 0.00% 16Feb17 2Mar17 26Feb17 12Mar17 8 18 OnTarget
BCB1MEP2000 BC Basement1 InstallLightFittings 8 0.00% 0.00% 6Mar17 14Mar17 2Mar17 12Mar17 2 11 OnTarget
BCB1MEP2010 BC Basement1 InstallFireCabinets 6 0.00% 0.00% 9Mar17 15Mar17 6Mar17 13Mar17 2 11 OnTarget
BCB1MEP2020 BC Basement1 InstallFireAlarmsandSpeakers 8 0.00% 0.00% 7Mar17 15Mar17 4Mar17 13Mar17 2 11 OnTarget
BCB1MEP2030 BC Basement1 InstallSprinklers 6 0.00% 0.00% 11Mar17 16Mar17 7Mar17 14Mar17 2 11 OnTarget
BCB1MEP2040 BC Basement1 InstallSwitchesandSockets 10 0.00% 0.00% 11Mar17 21Mar17 7Mar17 19Mar17 2 11 OnTarget
BCB1MEP2050 BC Basement1 InstallLowCurrentEquipments 10 0.00% 0.00% 12Mar17 22Mar17 8Mar17 20Mar17 2 11 OnTarget
BCB1MEP2060 BC Basement1 InstallGrillesandDiffussers 8 0.00% 0.00% 14Mar17 22Mar17 11Mar17 20Mar17 2 11 OnTarget
BCB1MEP2070 BC Basement1 InstallPlumpingFinalTittings(FloorDrains,Gratings,F 8 0.00% 0.00% 14Mar17 22Mar17 11Mar17 20Mar17 2 11 OnTarget
Groundfloor 123 0.00% 0.00% 27Nov16 18Apr17 27Nov16A 2May17 11 27 OnTarget
General 33 0.00% 0.00% 27Nov16 3Jan17 27Nov16A 17Jan17 11 117 OnTarget
MEPWorks 18 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BCGFMEP2000 BC GroundFloor InstallWallConduits 18 100.00% 94.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 Delayed
DryArea 69 0.00% 0.00% 18Dec16 7Mar17 27Nov16A 10Apr17 29 22 OnTarget
MEPWorks 58 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BCGFMEPD1000 BC GroundFloor FloorMEPconduitsforScreed 18 0.00% 15.00% 8Jan17 28Jan17 27Nov16A 11Feb17 11 7 OnTarget
BCGFMEPD1010 BC GroundFloor InstallElectricalWiring 18 61.11% 50.00% 18Dec16 7Jan17 27Nov16A 9Jan17 2 33 Delayed
BCGFMEPD1020 BC GroundFloor InstallLowCurrentWiring 18 44.44% 11.00% 21Dec16 10Jan17 19Dec16A 18Jan17 6 29 Delayed
BCGFMEPD1030 BC GroundFloor InstallHVACPipes 18 27.78% 60.00% 25Dec16 14Jan17 27Nov16A 22Jan17 6 29 OnTarget
BCGFMEPD1040 BC GroundFloor Firefightingpipes 18 27.78% 0.00% 25Dec16 14Jan17 1Jan17 22Jan17 6 29 Delayed
BCGFMEPD1050 BC GroundFloor InstallDuctsandHangers 18 11.11% 15.00% 28Dec16 17Jan17 27Nov16A 25Jan17 6 29 OnTarget
BCGFMEPD1060 BC GroundFloor DBInstallation 10 0.00% 0.00% 18Jan17 29Jan17 25Jan17 6Feb17 6 59 OnTarget
BCGFMEPD1070 BC GroundFloor InstallDroppers 12 0.00% 0.00% 9Feb17 22Feb17 15Mar17 28Mar17 29 22 OnTarget
BCGFMEPD1080 BC GroundFloor MeggeringTest 7 0.00% 0.00% 15Feb17 22Feb17 21Mar17 28Mar17 29 22 OnTarget
Wetarea 73 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPWorks 70 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BCGFMEPW1000 BC GroundFloor InstallElectricalWiring 18 11.11% 30.00% 28Dec16 17Jan17 23Dec16A 25Jan17 6 29 OnTarget
BCGFMEPW1010 BC GroundFloor InstallDrainagepipes 18 5.56% 75.00% 29Dec16 18Jan17 27Nov16A 26Jan17 6 29 OnTarget
BCGFMEPW1020 BC GroundFloor InstallHot&ColdWaterPiping 18 0.00% 0.00% 31Dec16 19Jan17 7Jan17 28Jan17 6 29 OnTarget
BCGFMEPW1030 BC GroundFloor InstallHVACPipes 18 0.00% 60.00% 3Jan17 23Jan17 27Nov16A 31Jan17 6 29 OnTarget
BCGFMEPW1040 BC GroundFloor Firefightingpipes 18 0.00% 95.00% 4Jan17 24Jan17 27Nov16A 1Feb17 6 30 OnTarget
BCGFMEPW1050 BC GroundFloor InstallDuctsandHangers 18 0.00% 15.00% 7Jan17 26Jan17 27Nov16A 4Feb17 6 29 OnTarget
BCGFMEPW1060 BC GroundFloor InstallDroppers 12 0.00% 0.00% 6Mar17 19Mar17 19Feb17 4Mar17 13 13 OnTarget
BCGFMEPW1070 BC GroundFloor MeggeringTest 7 0.00% 0.00% 12Mar17 19Mar17 25Feb17 4Mar17 13 13 OnTarget
Corridor/LiftLobby 74 0.00% 0.00% 22Dec16 18Mar17 27Nov16A 1Apr17 11 12 OnTarget
MEPWorks 54 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BCGFMEPCL1000 BC GroundFloor FloorMEPconduitsforScreed 10 0.00% 0.00% 12Feb17 22Feb17 25Feb17 8Mar17 11 12 OnTarget
BCGFMEPCL1010 BC GroundFloor InstallElectricalWiring 18 38.89% 39.00% 22Dec16 11Jan17 17Dec16A 11Jan17 0 13 OnTarget
BCGFMEPCL1030 BC GroundFloor InstallHot&ColdWaterPiping 18 22.22% 23.00% 26Dec16 15Jan17 15Dec16A 15Jan17 0 13 OnTarget
BCGFMEPCL1040 BC GroundFloor Firefightingpipes 18 22.22% 0.00% 26Dec16 15Jan17 31Dec16 19Jan17 4 9 Delayed
BCGFMEPCL1050 BC GroundFloor InstallHVACPipes 18 5.56% 60.00% 29Dec16 18Jan17 27Nov16A 23Jan17 4 9 OnTarget
BCGFMEPCL1060 BC GroundFloor InstallDuctsandHangers 18 0.00% 15.00% 2Jan17 22Jan17 27Nov16A 26Jan17 4 9 OnTarget
BCGFMEPCL1070 BC GroundFloor InstallCableTraysandTrunking 18 0.00% 10.00% 5Jan17 25Jan17 27Nov16A 30Jan17 4 9 OnTarget
BCGFMEPCL1075 BC GroundFloor InstallLowCurrentWiring 18 0.00% 0.00% 9Jan17 29Jan17 14Jan17 2Feb17 4 12 OnTarget
BCGFMEPCL1080 BC GroundFloor InstallLVCables 18 0.00% 0.00% 9Jan17 29Jan17 14Jan17 2Feb17 4 9 OnTarget
BCGFMEPCL1090 BC GroundFloor CorridorHLClearancebyARMAforgridfixing 18 0.00% 0.00% 12Jan17 1Feb17 17Jan17 6Feb17 4 12 OnTarget
BCGFMEPCL1100 BC GroundFloor InstallDroppers 18 0.00% 0.00% 30Jan17 19Feb17 4Feb17 23Feb17 4 9 OnTarget
BCGFMEPCL1110 BC GroundFloor MeggeringTest 18 0.00% 0.00% 30Jan17 19Feb17 4Feb17 23Feb17 4 9 OnTarget
BCGFMEPCL1120 BC GroundFloor CorridorMEPclearanceforBoardclosing 18 0.00% 0.00% 31Jan17 20Feb17 5Feb17 25Feb17 4 9 OnTarget
CommonFinalFinishes 54 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPWorks 36 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BCGFMEPF1000 BC GroundFloor InstallLightFittings 14 0.00% 0.00% 11Mar17 26Mar17 28Feb17 15Mar17 9 9 OnTarget
BCGFMEPF1010 BC GroundFloor InstallFireCabinets 14 0.00% 0.00% 12Mar17 27Mar17 1Mar17 16Mar17 9 9 OnTarget
BCGFMEPF1020 BC GroundFloor InstallFireAlarmsandSpeakers 14 0.00% 0.00% 12Mar17 27Mar17 1Mar17 16Mar17 9 9 OnTarget
BCGFMEPF1030 BC GroundFloor InstallSprinklers 14 0.00% 0.00% 13Mar17 28Mar17 2Mar17 18Mar17 9 9 OnTarget
BCGFMEPF1040 BC GroundFloor InstallSwitchesandSockets 14 0.00% 0.00% 16Mar17 1Apr17 6Mar17 21Mar17 9 9 OnTarget
BCGFMEPF1050 BC GroundFloor InstallLowCurrentEquipments 14 0.00% 0.00% 18Mar17 2Apr17 7Mar17 22Mar17 9 9 OnTarget
BCGFMEPF1060 BC GroundFloor InstallGrillesandDiffussers 14 0.00% 0.00% 18Mar17 2Apr17 7Mar17 22Mar17 9 9 OnTarget
BCGFMEPF1070 BC GroundFloor InstallPlumpingFinalTittings(FloorDrains,Gratings,F 14 0.00% 0.00% 18Mar17 2Apr17 7Mar17 22Mar17 9 9 OnTarget
BCGFMEPF1080 BC GroundFloor InstallKitchenequipments 36 0.00% 0.00% 20Feb17 2Apr17 12Feb17 26Mar17 7 7 OnTarget
FirstFloor 96 0.00% 0.00% 27Nov16 18Mar17 27Nov16A 20Apr17 29 36 OnTarget
DryArea 22 0.00% 0.00% 18Dec16 7Mar17 27Nov16A 10Apr17 29 22 OnTarget
MEPWorks 7 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC1FMEPD1000 BC 1stFloor DBInstallation 7 100.00% 100.00% 27Nov16 4Dec16 27Nov16A 02Dec16A 2 0 OnTarget
WetArea 27 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPWorks 10 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC1FMEPW1000 BC 1stFloor MEPclearanceforBoardclosing 10 100.00% 100.00% 10Dec16 20Dec16 27Nov16A 29Nov16A 19 0 OnTarget
CommonFinalFinishes 61 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPWorks 17 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC1FMEPF1000 BC 1stFloor InstallLightFittings 14 71.43% 10.00% 19Dec16 3Jan17 25Dec16A 18Jan17 13 115 Delayed
BC1FMEPF1010 BC 1stFloor InstallFireCabinets 14 64.29% 100.00% 20Dec16 4Jan17 27Nov16A 01Dec16A 30 0 OnTarget
BC1FMEPF1020 BC 1stFloor InstallFireAlarmsandSpeakers 14 64.29% 0.00% 20Dec16 4Jan17 31Dec16 15Jan17 9 117 Delayed
BC1FMEPF1030 BC 1stFloor InstallSprinklers 14 57.14% 0.00% 21Dec16 5Jan17 1Jan17 16Jan17 9 117 Delayed
BC1FMEPF1040 BC 1stFloor InstallSwitchesandSockets 14 57.14% 20.00% 21Dec16 5Jan17 28Dec16A 12Jan17 5 68 Delayed
BC1FMEPF1050 BC 1stFloor InstallLowCurrentEquipments 14 50.00% 0.00% 22Dec16 7Jan17 31Dec16 15Jan17 7 66 Delayed
BC1FMEPF1060 BC 1stFloor InstallGrillesandDiffussers 14 50.00% 0.00% 22Dec16 7Jan17 31Dec16 15Jan17 7 66 Delayed
BC1FMEPF1070 BC 1stFloor InstallPlumpingFinalfittings(BathTub/Sanitaryware 14 50.00% 0.00% 22Dec16 7Jan17 31Dec16 15Jan17 7 66 Delayed
SecondFloor 79 0.00% 0.00% 10Dec16 11Mar17 27Nov16A 20Mar17 8 63 OnTarget
DryArea 19 0.00% 0.00% 18Dec16 7Mar17 27Nov16A 10Apr17 29 22 OnTarget
MEPWorks 7 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC2FMEPD1000 BC 2ndFloor DBInstallation 7 100.00% 50.00% 22Dec16 29Dec16 27Nov16A 3Jan17 4 98 Delayed
WetArea 42 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPWorks 36 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC2FMEPW1000 BC 2ndFloor WetAreaHLClearancebyARMAforgridfixing 10 100.00% 100.00% 10Dec16 20Dec16 27Nov16A 01Dec16A 17 0 OnTarget
DelayAnalysisReportBasedonTargetProgram *DelayedActivitiesareHiglightedInRed DataDate: 29Dec16
VarianceBL
Original Schedule% Activity% BLProject BLProject Actual/Forecas Actual/Forecas Delayed/O
ActivityID Building Floor ActivityName ProjectFinish TotalFloat
Duration Complete Complete Start Finish tedStart tedFinish nTrack
Date
BC2FMEPW1010 BC 2ndFloor Droppers 12 8.33% 80.00% 29Dec16 11Jan17 27Nov16A 18Jan17 6 88 OnTarget
BC2FMEPW1020 BC 2ndFloor WetAreaMEPclearanceforBoardclosing 12 0.00% 80.00% 7Jan17 19Jan17 27Nov16A 26Jan17 6 88 OnTarget
Corridor/LiftLobby 34 0.00% 0.00% 22Dec16 18Mar17 27Nov16A 1Apr17 11 12 OnTarget
MEPWorks 18 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC2FMEPCL1000 BC 2ndFloor Droppers 12 0.00% 20.00% 1Jan17 14Jan17 27Nov16A 21Jan17 6 68 OnTarget
BC2FMEPCL1010 BC 2ndFloor CorridorMEPclearanceforBoardclosing 12 0.00% 20.00% 8Jan17 21Jan17 27Nov16A 28Jan17 6 68 OnTarget
CommonFinalFinishes 54 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPWorks 17 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC2FMEPF1000 BC 2ndFloor InstallLightFittings 14 0.00% 0.00% 31Jan17 15Feb17 7Feb17 22Feb17 6 85 OnTarget
BC2FMEPF1010 BC 2ndFloor InstallFireCabinets 14 0.00% 100.00% 1Feb17 16Feb17 27Nov16A 05Dec16A 64 0 OnTarget
BC2FMEPF1020 BC 2ndFloor InstallFireAlarmsandSpeakers 14 0.00% 0.00% 1Feb17 16Feb17 31Dec16 15Jan17 28 64 OnTarget
BC2FMEPF1030 BC 2ndFloor InstallSprinklers 14 0.00% 0.00% 2Feb17 18Feb17 1Jan17 16Jan17 28 64 OnTarget
BC2FMEPF1040 BC 2ndFloor InstallSwitchesandSockets 14 0.00% 0.00% 2Feb17 18Feb17 1Jan17 16Jan17 28 64 OnTarget
BC2FMEPF1050 BC 2ndFloor InstallLowCurrentEquipments 14 0.00% 0.00% 4Feb17 19Feb17 2Jan17 17Jan17 28 64 OnTarget
BC2FMEPF1060 BC 2ndFloor InstallGrillesandDiffussers 14 0.00% 0.00% 4Feb17 19Feb17 2Jan17 17Jan17 28 64 OnTarget
BC2FMEPF1070 BC 2ndFloor InstallPlumpingFinalfittings(BathTub/Sanitaryware 14 0.00% 0.00% 4Feb17 19Feb17 2Jan17 17Jan17 28 64 OnTarget
ThirdFloor 93 0.00% 0.00% 27Nov16 14Mar17 26Nov16A 9Apr17 22 46 OnTarget
DryArea 51 0.00% 0.00% 18Dec16 7Mar17 27Nov16A 10Apr17 29 22 OnTarget
MEPWorks 40 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC3FMEPD1000 BC 3rdFloor InstallDuctsandHangers 14 100.00% 100.00% 27Nov16 12Dec16 27Nov16A 29Nov16A 12 0 OnTarget
BC3FMEPD1010 BC 3rdFloor DryAreaMEPHLClearancebyARMAforgridfixing 6 100.00% 100.00% 13Dec16 19Dec16 27Nov16A 19Dec16A 1 0 OnTarget
BC3FMEPD1020 BC 3rdFloor DBInstallation 10 90.00% 50.00% 20Dec16 31Dec16 27Nov16A 4Jan17 4 127 Delayed
BC3FMEPD1030 BC 3rdFloor InstallDropers 6 0.00% 55.00% 1Jan17 7Jan17 27Nov16A 2Jan17 4 90 OnTarget
BC3FMEPD1040 BC 3rdFloor DryAreaMEPclearanceforBoardclosing 6 0.00% 50.00% 5Jan17 11Jan17 27Nov16A 7Jan17 4 90 OnTarget
WetArea 42 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPWorks 36 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC3FMEPW1000 BC 3rdFloor InstallDuctsandHangers 7 100.00% 100.00% 13Dec16 20Dec16 27Nov16A 03Dec16A 16 0 OnTarget
BC3FMEPW1010 BC 3rdFloor WetAreaHLClearancebyARMAforgridfixing 6 100.00% 98.00% 21Dec16 27Dec16 27Nov16A 31Dec16 2 38 Delayed
BC3FMEPW1020 BC 3rdFloor InstallDroppers 12 0.00% 0.00% 31Dec16 12Jan17 31Dec16 12Jan17 0 48 OnTarget
BC3FMEPW1030 BC 3rdFloor WetAreaMEPclearanceforBoardclosing 10 0.00% 0.00% 12Jan17 23Jan17 8Jan17 19Jan17 4 47 OnTarget
Corridor/LiftLobby 49 0.00% 0.00% 22Dec16 18Mar17 27Nov16A 1Apr17 11 12 OnTarget
MEPWorks 35 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC3FMEPCL1000 BC 3rdFloor InstallDuctsandHangers 8 100.00% 100.00% 21Dec16 29Dec16 27Nov16A 29Nov16A 27 0 OnTarget
BC3FMEPCL1010 BC 3rdFloor CorridorHLClearancebyARMAforgridfixing 8 25.00% 0.00% 28Dec16 5Jan17 31Dec16 8Jan17 2 33 Delayed
BC3FMEPCL1020 BC 3rdFloor InstallDroppers 7 0.00% 0.00% 11Jan17 18Jan17 14Jan17 21Jan17 2 33 OnTarget
BC3FMEPCL1030 BC 3rdFloor CorridorMEPclearanceforBoardclosing 10 0.00% 0.00% 19Jan17 30Jan17 22Jan17 1Feb17 2 33 OnTarget
CommonFinalFinishes 48 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPWorks 24 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC3FMEPF1000 BC 3rdFloor InstallLightFittings 14 0.00% 0.00% 1Feb17 16Feb17 4Feb17 19Feb17 2 88 OnTarget
BC3FMEPF1010 BC 3rdFloor InstallFireCabinets 14 0.00% 100.00% 2Feb17 18Feb17 27Nov16A 10Dec16A 61 0 OnTarget
BC3FMEPF1020 BC 3rdFloor InstallFireAlarmsandSpeakers 14 0.00% 0.00% 2Feb17 18Feb17 31Dec16 15Jan17 29 64 OnTarget
BC3FMEPF1030 BC 3rdFloor InstallSprinklers 14 0.00% 0.00% 4Feb17 19Feb17 1Jan17 16Jan17 29 64 OnTarget
BC3FMEPF1040 BC 3rdFloor InstallSwitchesandSockets 14 0.00% 0.00% 4Feb17 19Feb17 1Jan17 16Jan17 29 64 OnTarget
BC3FMEPF1050 BC 3rdFloor InstallLowCurrentEquipments 14 0.00% 0.00% 5Feb17 20Feb17 2Jan17 17Jan17 29 64 OnTarget
BC3FMEPF1060 BC 3rdFloor InstallGrillesandDiffussers 14 0.00% 0.00% 5Feb17 20Feb17 2Jan17 17Jan17 29 64 OnTarget
BC3FMEPF1070 BC 3rdFloor InstallPlumpingFinalTittings(BathTub,FloorDrains, 14 0.00% 0.00% 5Feb17 20Feb17 2Jan17 17Jan17 29 64 OnTarget
BC3FMEPF1080 BC 3rdFloor MEPFinalFixes/Sanitarywares 18 0.00% 0.00% 24Jan17 13Feb17 26Jan17 15Feb17 2 33 OnTarget
ForthFloor 103 0.00% 0.00% 29Nov16 28Mar17 26Nov16A 9Apr17 10 46 OnTarget
DryArea 66 0.00% 0.00% 18Dec16 7Mar17 27Nov16A 10Apr17 29 22 OnTarget
MEPWorks 55 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC4FMEPD1000 BC 4thFloor InstallLowCurrentWiring 10 100.00% 100.00% 1Dec16 12Dec16 27Nov16A 27Nov16A 14 0 OnTarget
BC4FMEPD1010 BC 4thFloor DBInstallation 10 0.00% 20.00% 1Jan17 11Jan17 27Nov16A 8Jan17 3 124 OnTarget
BC4FMEPD1020 BC 4thFloor InstallDroppers 12 8.33% 30.00% 29Dec16 11Jan17 27Nov16A 9Jan17 3 78 OnTarget
BC4FMEPD1030 BC 4thFloor MeggeringTest 12 0.00% 60.00% 12Jan17 25Jan17 27Nov16A 12Jan17 12 78 OnTarget
BC4FMEPD1040 BC 4thFloor DryAreaMEPclearanceforBoardclosing 12 0.00% 30.00% 21Jan17 2Feb17 27Nov16A 21Jan17 12 78 OnTarget
WetArea 59 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPWorks 53 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC4FMEPW1000 BC 4thFloor InstallElectricalWiring 18 100.00% 100.00% 29Nov16 19Dec16 27Nov16A 03Dec16A 15 0 OnTarget
BC4FMEPW1010 BC 4thFloor Firefightingpipes 18 100.00% 100.00% 3Dec16 22Dec16 27Nov16A 17Dec16A 6 0 OnTarget
BC4FMEPW1020 BC 4thFloor InstallHVACPipes 18 100.00% 100.00% 6Dec16 26Dec16 27Nov16A 01Dec16A 22 0 OnTarget
BC4FMEPW1030 BC 4thFloor InstallDuctsandHangers 18 100.00% 100.00% 10Dec16 29Dec16 27Nov16A 28Dec16A 2 0 OnTarget
BC4FMEPW1040 BC 4thFloor WetAreaHLClearancebyARMAforgridfixing 8 62.50% 80.00% 25Dec16 2Jan17 27Nov16A 1Jan17 1 70 OnTarget
BC4FMEPW1050 BC 4thFloor InstallDroppers 12 0.00% 30.00% 9Jan17 22Jan17 27Nov16A 12Jan17 9 106 OnTarget
BC4FMEPW1060 BC 4thFloor MeggeringTest 7 0.00% 60.00% 15Jan17 22Jan17 27Nov16A 12Jan17 9 106 OnTarget
BC4FMEPW1070 BC 4thFloor WetAreaMEPclearanceforBoardclosing 10 0.00% 30.00% 18Jan17 29Jan17 27Nov16A 19Jan17 9 103 OnTarget
Corridor/LiftLobby 73 0.00% 0.00% 6Dec16 28Feb17 27Nov16A 8Feb17 17 97 OnTarget
MEPWorks 59 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC4FMEPCL1000 BC 4thFloor InstallElectricalWiring 18 100.00% 85.00% 6Dec16 26Dec16 27Nov16A 2Jan17 6 129 Delayed
BC4FMEPCL1010 BC 4thFloor InstallHot&ColdWaterPiping 18 100.00% 100.00% 10Dec16 29Dec16 27Nov16A 29Nov16A 27 0 OnTarget
BC4FMEPCL1020 BC 4thFloor Firefightingpipes 18 100.00% 100.00% 10Dec16 29Dec16 27Nov16A 03Dec16A 24 0 OnTarget
BC4FMEPCL1030 BC 4thFloor InstallHVACPipes 18 83.33% 100.00% 13Dec16 2Jan17 27Nov16A 29Nov16A 30 0 OnTarget
BC4FMEPCL1040 BC 4thFloor InstallDuctsandHangers 18 66.67% 97.00% 17Dec16 5Jan17 27Nov16A 31Dec16 5 131 OnTarget
BC4FMEPCL1050 BC 4thFloor InstallCableTraysandTrunking 18 50.00% 100.00% 20Dec16 9Jan17 27Nov16A 28Dec16A 11 0 OnTarget
BC4FMEPCL1060 BC 4thFloor InstallLowCurrentWiring 15 20.00% 100.00% 27Dec16 12Jan17 27Nov16A 17Dec16A 24 0 OnTarget
BC4FMEPCL1070 BC 4thFloor InstallLVCables 18 33.33% 100.00% 24Dec16 12Jan17 27Nov16A 28Dec16A 14 0 OnTarget
BC4FMEPCL1080 BC 4thFloor CorridorHLClearancebyARMAforgridfixing 10 0.00% 50.00% 17Jan17 28Jan17 27Nov16A 4Jan17 20 75 OnTarget
BC4FMEPCL1090 BC 4thFloor InstallDroppers 18 0.00% 0.00% 19Jan17 8Feb17 31Dec16 19Jan17 17 72 OnTarget
BC4FMEPCL1100 BC 4thFloor MeggeringTest 18 0.00% 60.00% 19Jan17 8Feb17 27Nov16A 19Jan17 17 72 OnTarget
BC4FMEPCL1110 BC 4thFloor CorridorMEPclearanceforBoardclosing 10 0.00% 0.00% 1Feb17 12Feb17 12Jan17 23Jan17 17 72 OnTarget
CommonFinalFinishes 41 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPWorks 17 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC4FMEPF1000 BC 4thFloor InstallLightFittings 14 0.00% 0.00% 13Feb17 28Feb17 24Jan17 8Feb17 17 97 OnTarget
BC4FMEPF1010 BC 4thFloor InstallFireCabinets 14 0.00% 100.00% 14Feb17 1Mar17 27Nov16A 13Dec16A 68 0 OnTarget
BC4FMEPF1020 BC 4thFloor InstallFireAlarmsandSpeakers 14 0.00% 0.00% 14Feb17 1Mar17 31Dec16 15Jan17 39 64 OnTarget
BC4FMEPF1030 BC 4thFloor InstallSprinklers 14 0.00% 0.00% 15Feb17 2Mar17 1Jan17 16Jan17 39 64 OnTarget
BC4FMEPF1040 BC 4thFloor InstallSwitchesandSockets 14 0.00% 0.00% 15Feb17 2Mar17 1Jan17 16Jan17 39 64 OnTarget
BC4FMEPF1050 BC 4thFloor InstallLowCurrentEquipments 14 0.00% 0.00% 16Feb17 4Mar17 2Jan17 17Jan17 39 64 OnTarget
BC4FMEPF1060 BC 4thFloor InstallGrillesandDiffussers 14 0.00% 0.00% 16Feb17 4Mar17 2Jan17 17Jan17 39 64 OnTarget
BC4FMEPF1070 BC 4thFloor InstallPlumpingFinalTittings(Bathtub/Sanitaryware, 14 0.00% 0.00% 16Feb17 4Mar17 2Jan17 17Jan17 39 64 OnTarget
FifthFloor 99 0.00% 0.00% 8Dec16 2Apr17 26Nov16A 11Apr17 8 44 OnTarget
MEPWorks 38 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC5FMEPD1000 BC 5thFloor InstallLowCurrentWiring 10 100.00% 100.00% 8Dec16 19Dec16 27Nov16A 22Dec16A 2 0 OnTarget
BC5FMEPD1010 BC 5thFloor DryAreaMEPHLClearancebyARMAforgridfixing 10 100.00% 88.00% 15Dec16 26Dec16 27Nov16A 1Jan17 4 69 Delayed
BC5FMEPD1020 BC 5thFloor DBInstallation 10 90.00% 30.00% 20Dec16 31Dec16 27Nov16A 7Jan17 6 46 Delayed
BC5FMEPD1030 BC 5thFloor InstallDroppers 12 25.00% 0.00% 27Dec16 9Jan17 31Dec16 12Jan17 3 50 Delayed
BC5FMEPD1040 BC 5thFloor MeggeringTest 12 0.00% 0.00% 1Jan17 14Jan17 8Jan17 21Jan17 6 46 OnTarget
BC5FMEPD1050 BC 5thFloor DryAreaMEPclearanceforBoardclosing 14 0.00% 0.00% 5Jan17 21Jan17 12Jan17 28Jan17 6 46 OnTarget
WetArea 48 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPWorks 42 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC5FMEPW1000 BC 5thFloor InstallElectricalWiring 12 100.00% 100.00% 14Dec16 27Dec16 27Nov16A 17Dec16A 10 0 OnTarget
BC5FMEPW1010 BC 5thFloor InstallHVACPipes 10 100.00% 100.00% 18Dec16 28Dec16 27Nov16A 28Dec16A 1 0 OnTarget
BC5FMEPW1020 BC 5thFloor Firefightingpipes 10 100.00% 100.00% 19Dec16 29Dec16 27Nov16A 25Dec16A 5 0 OnTarget
BC5FMEPW1030 BC 5thFloor InstallDuctsandHangers 10 80.00% 98.00% 21Dec16 1Jan17 27Nov16A 31Dec16 1 69 OnTarget
BC5FMEPW1040 BC 5thFloor WetAreaHLClearancebyARMAforgridfixing 10 50.00% 70.00% 25Dec16 4Jan17 27Nov16A 4Jan17 1 69 OnTarget
BC5FMEPW1050 BC 5thFloor InstallDroppers 12 0.00% 0.00% 11Jan17 24Jan17 1Jan17 15Jan17 9 96 OnTarget
BC5FMEPW1060 BC 5thFloor MeggeringTest 7 0.00% 0.00% 17Jan17 24Jan17 7Jan17 15Jan17 9 96 OnTarget
BC5FMEPW1070 BC 5thFloor WetAreaMEPclearanceforBoardclosing 10 0.00% 0.00% 21Jan17 31Jan17 10Jan17 22Jan17 9 93 OnTarget
Corridor/LiftLobby 68 0.00% 0.00% 6Dec16 28Feb17 27Nov16A 8Feb17 17 97 OnTarget
MEPWorks 54 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC5FMEPCL1000 BC 5thFloor InstallElectricalWiring 18 77.78% 100.00% 14Dec16 3Jan17 27Nov16A 17Dec16A 16 0 OnTarget
BC5FMEPCL1010 BC 5thFloor InstallHot&ColdWaterPiping 18 61.11% 100.00% 18Dec16 7Jan17 27Nov16A 29Nov16A 34 0 OnTarget
BC5FMEPCL1020 BC 5thFloor Firefightingpipes 18 61.11% 100.00% 18Dec16 7Jan17 27Nov16A 03Dec16A 31 0 OnTarget
BC5FMEPCL1030 BC 5thFloor InstallHVACPipes 18 44.44% 90.00% 21Dec16 10Jan17 27Nov16A 1Jan17 8 127 OnTarget
BC5FMEPCL1040 BC 5thFloor InstallDuctsandHangers 18 27.78% 98.00% 25Dec16 14Jan17 27Nov16A 4Jan17 8 127 OnTarget
BC5FMEPCL1050 BC 5thFloor InstallCableTraysandTrunking 18 11.11% 100.00% 28Dec16 17Jan17 27Nov16A 17Dec16A 28 0 OnTarget
BC5FMEPCL1060 BC 5thFloor InstallLowCurrentWiring 18 0.00% 100.00% 1Jan17 21Jan17 27Nov16A 17Dec16A 31 0 OnTarget
BC5FMEPCL1070 BC 5thFloor InstallLVCables 18 0.00% 90.00% 1Jan17 21Jan17 25Dec16A 1Jan17 17 70 OnTarget
BC5FMEPCL1080 BC 5thFloor CorridorHLClearancebyARMAforgridfixing 10 0.00% 0.00% 14Jan17 24Jan17 31Dec16 10Jan17 12 70 OnTarget
BC5FMEPCL1090 BC 5thFloor InstallDroppers 18 0.00% 0.00% 22Jan17 11Feb17 2Jan17 22Jan17 17 70 OnTarget
BC5FMEPCL1100 BC 5thFloor MeggeringTest 18 0.00% 0.00% 22Jan17 11Feb17 2Jan17 22Jan17 17 70 OnTarget
BC5FMEPCL1110 BC 5thFloor CorridorMEPclearanceforBoardclosing 10 0.00% 0.00% 4Feb17 14Feb17 15Jan17 25Jan17 17 70 OnTarget
DelayAnalysisReportBasedonTargetProgram *DelayedActivitiesareHiglightedInRed DataDate: 29Dec16
VarianceBL
Original Schedule% Activity% BLProject BLProject Actual/Forecas Actual/Forecas Delayed/O
ActivityID Building Floor ActivityName ProjectFinish TotalFloat
Duration Complete Complete Start Finish tedStart tedFinish nTrack
Date
CommonFinalFinishes 50 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPWorks 17 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC5FMEPF1000 BC 5thFloor InstallLightFittings 14 0.00% 0.00% 25Feb17 12Mar17 5Feb17 20Feb17 17 87 OnTarget
BC5FMEPF1010 BC 5thFloor InstallFireCabinets 14 0.00% 100.00% 26Feb17 13Mar17 27Nov16A 15Dec16A 76 0 OnTarget
BC5FMEPF1020 BC 5thFloor InstallFireAlarmsandSpeakers 14 0.00% 0.00% 26Feb17 13Mar17 31Dec16 15Jan17 49 64 OnTarget
BC5FMEPF1030 BC 5thFloor InstallSprinklers 14 0.00% 0.00% 27Feb17 14Mar17 1Jan17 16Jan17 49 64 OnTarget
BC5FMEPF1040 BC 5thFloor InstallSwitchesandSockets 14 0.00% 0.00% 27Feb17 14Mar17 1Jan17 16Jan17 49 64 OnTarget
BC5FMEPF1050 BC 5thFloor InstallLowCurrentEquipments 14 0.00% 0.00% 28Feb17 15Mar17 2Jan17 17Jan17 49 64 OnTarget
BC5FMEPF1060 BC 5thFloor InstallGrillesandDiffussers 14 0.00% 0.00% 28Feb17 15Mar17 2Jan17 17Jan17 49 64 OnTarget
BC5FMEPF1070 BC 5thFloor InstallPlumpingFinalTittings(Sanitaryware,FloorDra 14 0.00% 0.00% 28Feb17 15Mar17 2Jan17 17Jan17 49 64 OnTarget
SixthFloor 93 0.00% 0.00% 15Dec16 2Apr17 26Nov16A 11Apr17 8 44 OnTarget
DryArea 53 0.00% 0.00% 18Dec16 7Mar17 27Nov16A 10Apr17 29 22 OnTarget
MEPworks 42 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC6FMEPD1000 BC 6thFloor InstallElectricalWiring 10 100.00% 90.00% 15Dec16 26Dec16 27Nov16A 31Dec16 4 6 Delayed
BC6FMEPD1010 BC 6thFloor InstallLowCurrentWiring 10 70.00% 35.00% 22Dec16 2Jan17 27Nov16A 7Jan17 4 46 Delayed
BC6FMEPD1020 BC 6thFloor InstallHVACPipes 8 25.00% 85.00% 28Dec16 5Jan17 27Nov16A 10Jan17 4 46 OnTarget
BC6FMEPD1030 BC 6thFloor InstallDuctsandHangers 10 10.00% 95.00% 29Dec16 9Jan17 27Nov16A 14Jan17 4 46 OnTarget
BC6FMEPD1040 BC 6thFloor DryAreaMEPHLClearancebyARMAforgridfixing 10 0.00% 60.00% 2Jan17 12Jan17 27Nov16A 17Jan17 4 46 OnTarget
BC6FMEPD1050 BC 6thFloor DBInstallation 10 0.00% 20.00% 10Jan17 21Jan17 27Nov16A 8Jan17 11 98 OnTarget
BC6FMEPD1060 BC 6thFloor FloorMEPconduitsforScreed 7 0.00% 0.00% 5Jan17 12Jan17 10Jan17 17Jan17 4 116 OnTarget
BC6FMEPD1070 BC 6thFloor InstallDroppers 12 0.00% 0.00% 14Jan17 26Jan17 18Jan17 31Jan17 4 85 OnTarget
BC6FMEPD1080 BC 6thFloor MeggeringTest 7 0.00% 0.00% 22Jan17 29Jan17 24Jan17 31Jan17 2 85 OnTarget
BC6FMEPD1090 BC 6thFloor DryAreaMEPclearanceforBoardclosing 10 0.00% 0.00% 22Jan17 1Feb17 24Jan17 4Feb17 2 85 OnTarget
WetArea 49 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPworks 43 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC6FMEPW1000 BC 6thFloor InstallElectricalWiring 12 75.00% 79.00% 20Dec16 2Jan17 27Nov16A 7Jan17 4 4 OnTarget
BC6FMEPW1010 BC 6thFloor InstallHVACPipes 12 50.00% 85.00% 24Dec16 5Jan17 27Nov16A 10Jan17 4 49 OnTarget
BC6FMEPW1020 BC 6thFloor InstallDuctsandHangers 12 25.00% 95.00% 27Dec16 9Jan17 27Nov16A 14Jan17 4 49 OnTarget
BC6FMEPW1030 BC 6thFloor WetAreaHLClearancebyARMAforgridfixing 12 0.00% 50.00% 3Jan17 16Jan17 27Nov16A 21Jan17 4 46 OnTarget
BC6FMEPW1040 BC 6thFloor FloorMEPconduitsforScreed 10 0.00% 0.00% 9Jan17 19Jan17 14Jan17 24Jan17 4 57 OnTarget
BC6FMEPW1050 BC 6thFloor InstallDroppers 12 0.00% 0.00% 18Jan17 31Jan17 23Jan17 5Feb17 4 85 OnTarget
BC6FMEPW1060 BC 6thFloor MeggeringTest 10 0.00% 0.00% 21Jan17 31Jan17 25Jan17 5Feb17 4 85 OnTarget
BC6FMEPW1070 BC 6thFloor WetAreaMEPclearanceforBoardclosing 10 0.00% 0.00% 28Jan17 7Feb17 1Feb17 12Feb17 4 82 OnTarget
CorridorLiftLobby 57 0.00% 0.00% 27Dec16 2Mar17 26Nov16A 25Feb17 5 83 OnTarget
MEPworks 43 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC6FMEPCL1000 BC 6thFloor InstallElectricalWiring 12 25.00% 40.00% 27Dec16 9Jan17 27Nov16A 14Jan17 4 4 OnTarget
BC6FMEPCL1010 BC 6thFloor InstallHot&ColdWaterPiping 10 0.00% 100.00% 2Jan17 12Jan17 27Nov16A 29Nov16A 39 0 OnTarget
BC6FMEPCL1020 BC 6thFloor InstallHVACPipes 12 0.00% 85.00% 3Jan17 16Jan17 27Nov16A 1Jan17 13 130 OnTarget
BC6FMEPCL1030 BC 6thFloor InstallDuctsandHangers 10 0.00% 100.00% 9Jan17 19Jan17 27Nov16A 10Dec16A 36 0 OnTarget
BC6FMEPCL1040 BC 6thFloor InstallCableTraysandTrunking 12 0.00% 40.00% 10Jan17 23Jan17 27Nov16A 8Jan17 14 55 OnTarget
BC6FMEPCL1050 BC 6thFloor InstallLowCurrentWiring 12 0.00% 32.00% 11Jan17 24Jan17 27Nov16A 9Jan17 14 59 OnTarget
BC6FMEPCL1060 BC 6thFloor InstallLVCables 7 0.00% 0.00% 19Jan17 26Jan17 3Jan17 11Jan17 14 55 OnTarget
BC6FMEPCL1070 BC 6thFloor CorridorHLClearancebyARMAforgridfixing 10 0.00% 0.00% 19Jan17 30Jan17 14Jan17 24Jan17 5 46 OnTarget
BC6FMEPCL1080 BC 6thFloor FloorMEPconduitsforScreed 6 0.00% 0.00% 28Jan17 2Feb17 22Jan17 28Jan17 5 57 OnTarget
BC6FMEPCL1090 BC 6thFloor InstallDroppers 10 0.00% 0.00% 31Jan17 11Feb17 25Jan17 5Feb17 5 46 OnTarget
BC6FMEPCL1100 BC 6thFloor MeggeringTest 12 0.00% 0.00% 29Jan17 11Feb17 23Jan17 5Feb17 5 46 OnTarget
BC6FMEPCL1110 BC 6thFloor CorridorMEPclearanceforBoardclosing 10 0.00% 0.00% 4Feb17 14Feb17 29Jan17 8Feb17 5 46 OnTarget
CommonfinalFinishes 44 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPworks 17 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC6FMEPF1000 BC 6thFloor InstallLightFittings 14 0.00% 0.00% 15Feb17 2Mar17 11Feb17 26Feb17 4 82 OnTarget
BC6FMEPF1010 BC 6thFloor InstallFireCabinets 14 0.00% 100.00% 16Feb17 4Mar17 27Nov16A 18Dec16A 66 0 OnTarget
BC6FMEPF1020 BC 6thFloor InstallFireAlarmsandSpeakers 14 0.00% 0.00% 16Feb17 4Mar17 31Dec16 15Jan17 41 64 OnTarget
BC6FMEPF1030 BC 6thFloor InstallSprinklers 14 0.00% 0.00% 18Feb17 5Mar17 1Jan17 16Jan17 41 64 OnTarget
BC6FMEPF1040 BC 6thFloor InstallSwitchesandSockets 14 0.00% 0.00% 18Feb17 5Mar17 1Jan17 16Jan17 41 64 OnTarget
BC6FMEPF1050 BC 6thFloor InstallLowCurrentEquipments 14 0.00% 0.00% 19Feb17 6Mar17 2Jan17 17Jan17 41 64 OnTarget
BC6FMEPF1060 BC 6thFloor InstallGrillesandDiffussers 14 0.00% 0.00% 19Feb17 6Mar17 2Jan17 17Jan17 41 64 OnTarget
BC6FMEPF1070 BC 6thFloor InstallPlumpingFinalTittings(Sanitaryware,FloorDra 14 0.00% 0.00% 19Feb17 6Mar17 2Jan17 17Jan17 41 64 OnTarget
SeventhFloor 116 0.00% 0.00% 27Nov16 10Apr17 26Nov16A 11Apr17 1 44 OnTarget
DryArea 55 0.00% 0.00% 18Dec16 7Mar17 27Nov16A 10Apr17 29 22 OnTarget
MEPworks 38 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC7FMEPD1000 BC 7thFloor InstallElectricalWiring 10 100.00% 67.00% 19Dec16 29Dec16 27Nov16A 3Jan17 4 6 Delayed
BC7FMEPD1010 BC 7thFloor InstallLowCurrentWiring 7 57.14% 32.00% 26Dec16 2Jan17 27Nov16A 7Jan17 4 44 Delayed
BC7FMEPD1020 BC 7thFloor InstallHVACPipes 7 14.29% 85.00% 29Dec16 5Jan17 27Nov16A 10Jan17 4 44 OnTarget
BC7FMEPD1030 BC 7thFloor InstallDuctsandHangers 15 40.00% 41.00% 24Dec16 9Jan17 27Nov16A 14Jan17 4 44 OnTarget
BC7FMEPD1040 BC 7thFloor DryAreaMEPHLClearancebyARMAforgridfixing 18 33.33% 42.00% 24Dec16 12Jan17 27Nov16A 17Jan17 4 44 OnTarget
BC7FMEPD1050 BC 7thFloor FloorMEPconduitsforScreed 10 0.00% 0.00% 14Jan17 24Jan17 18Jan17 29Jan17 4 44 OnTarget
BC7FMEPD1060 BC 7thFloor DBInstallation 10 0.00% 20.00% 10Jan17 21Jan17 27Nov16A 8Jan17 11 68 OnTarget
BC7FMEPD1070 BC 7thFloor InstallDroppers 12 0.00% 0.00% 15Jan17 28Jan17 19Jan17 1Feb17 4 54 OnTarget
BC7FMEPD1080 BC 7thFloor MeggeringTest 7 0.00% 0.00% 22Jan17 29Jan17 25Jan17 1Feb17 3 54 OnTarget
BC7FMEPD1090 BC 7thFloor DryAreaMEPclearanceforBoardclosing 18 0.00% 0.00% 11Jan17 31Jan17 15Jan17 4Feb17 3 54 OnTarget
WetArea 68 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPworks 62 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC7FMEPW1000 BC 7thFloor FloorMEPconduitsforScreed 6 0.00% 0.00% 17Jan17 23Jan17 22Jan17 28Jan17 4 104 OnTarget
BC7FMEPW1010 BC 7thFloor WetAreaHLClearancebyARMAforgridfixing 10 0.00% 30.00% 24Jan17 4Feb17 27Nov16A 10Jan17 22 35 OnTarget
BC7FMEPW1020 BC 7thFloor WetAreaMEPclearanceforBoardclosing 12 0.00% 0.00% 22Feb17 7Mar17 14Jan17 28Jan17 34 37 OnTarget
BC7FMEPW1030 BC 7thFloor InstallElectricalWiring 10 40.00% 67.00% 26Dec16 5Jan17 27Nov16A 10Jan17 4 121 OnTarget
BC7FMEPW1040 BC 7thFloor InstallDrainagepipes 7 0.00% 98.00% 31Dec16 7Jan17 27Nov16A 11Jan17 4 121 OnTarget
BC7FMEPW1050 BC 7thFloor InstallHot&ColdWaterPiping 7 0.00% 100.00% 1Jan17 8Jan17 27Nov16A 17Dec16A 20 0 OnTarget
BC7FMEPW1060 BC 7thFloor InstallHVACPipes 7 0.00% 85.00% 4Jan17 11Jan17 27Nov16A 1Jan17 10 41 OnTarget
BC7FMEPW1070 BC 7thFloor InstallDuctsandHangers 16 12.50% 41.00% 28Dec16 15Jan17 27Nov16A 10Jan17 5 35 OnTarget
BC7FMEPW1080 BC 7thFloor InstallDroppers 12 0.00% 0.00% 30Jan17 12Feb17 4Jan17 18Jan17 22 45 OnTarget
BC7FMEPW1090 BC 7thFloor MeggeringTest 7 0.00% 0.00% 5Feb17 12Feb17 10Jan17 18Jan17 22 45 OnTarget
CorridorLiftLobby 69 0.00% 0.00% 27Dec16 2Mar17 26Nov16A 25Feb17 5 83 OnTarget
MEPworks 53 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC7FMEPCL1000 BC 7thFloor CorridorScreedMEpClearance(Apt) 6 0.00% 78.00% 17Jan17 23Jan17 26Nov16A 28Jan17 4 107 OnTarget
BC7FMEPCL1010 BC 7thFloor CorridorHLClearancebyARMAforgridfixing 10 0.00% 0.00% 4Feb17 14Feb17 8Feb17 19Feb17 4 4 OnTarget
BC7FMEPCL1020 BC 7thFloor CorridorMEPclearanceforBoardclosing 10 0.00% 0.00% 18Feb17 28Feb17 22Feb17 5Mar17 4 4 OnTarget
BC7FMEPCL1030 BC 7thFloor InstallElectricalWiring 12 0.00% 40.00% 2Jan17 15Jan17 27Nov16A 19Jan17 4 4 OnTarget
BC7FMEPCL1035 BC 7thFloor InstallHot&ColdWaterPiping 18 5.56% 98.00% 29Dec16 18Jan17 27Nov16A 23Jan17 4 4 OnTarget
BC7FMEPCL1060 BC 7thFloor InstallHVACPipes 7 0.00% 85.00% 15Jan17 22Jan17 27Nov16A 26Jan17 4 4 OnTarget
BC7FMEPCL1070 BC 7thFloor InstallDuctsandHangers 10 0.00% 85.00% 15Jan17 25Jan17 27Nov16A 30Jan17 4 4 OnTarget
BC7FMEPCL1080 BC 7thFloor InstallCableTraysandTrunking 18 0.00% 0.00% 9Jan17 29Jan17 14Jan17 2Feb17 4 4 OnTarget
BC7FMEPCL1085 BC 7thFloor InstallLowCurrentWiring 12 0.00% 29.00% 19Jan17 1Feb17 27Nov16A 6Feb17 4 4 OnTarget
BC7FMEPCL1090 BC 7thFloor InstallLVCables 7 0.00% 0.00% 25Jan17 1Feb17 30Jan17 6Feb17 4 9 OnTarget
BC7FMEPCL1100 BC 7thFloor InstallDroppers 18 0.00% 0.00% 2Feb17 22Feb17 7Feb17 27Feb17 4 9 OnTarget
BC7FMEPCL1110 BC 7thFloor MeggeringTest 7 0.00% 0.00% 15Feb17 22Feb17 20Feb17 27Feb17 4 9 OnTarget
CommonFinalFinishes 41 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPworks 17 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC7FMEPF1010 BC 7thFloor InstallLightFittings 14 0.00% 0.00% 6Mar17 21Mar17 6Mar17 21Mar17 0 62 OnTarget
BC7FMEPF1020 BC 7thFloor InstallFireCabinets 14 0.00% 100.00% 7Mar17 22Mar17 27Nov16A 20Dec16A 80 0 OnTarget
BC7FMEPF1030 BC 7thFloor InstallFireAlarmsandSpeakers 14 0.00% 0.00% 7Mar17 22Mar17 31Dec16 15Jan17 57 64 OnTarget
BC7FMEPF1040 BC 7thFloor InstallSprinklers 14 0.00% 0.00% 8Mar17 23Mar17 1Jan17 16Jan17 57 64 OnTarget
BC7FMEPF1050 BC 7thFloor InstallSwitchesandSockets 14 0.00% 0.00% 8Mar17 23Mar17 1Jan17 16Jan17 57 64 OnTarget
BC7FMEPF1060 BC 7thFloor InstallLowCurrentEquipments 14 0.00% 0.00% 9Mar17 25Mar17 2Jan17 17Jan17 57 64 OnTarget
BC7FMEPF1070 BC 7thFloor InstallGrillesandDiffussers 14 0.00% 0.00% 9Mar17 25Mar17 2Jan17 17Jan17 57 64 OnTarget
BC7FMEPF1075 BC 7thFloor MEPFinalFixes/Sanitarywares 10 0.00% 0.00% 11Mar17 21Mar17 11Mar17 21Mar17 0 4 OnTarget
BC7FMEPF1080 BC 7thFloor InstallPlumpingFinalTittings(FloorDrains,Floortraps 14 0.00% 0.00% 9Mar17 25Mar17 2Jan17 17Jan17 57 64 OnTarget
EightFloor 118 0.00% 0.00% 30Nov16 16Apr17 26Nov16A 25Apr17 8 32 OnTarget
DryArea 68 0.00% 0.00% 18Dec16 7Mar17 27Nov16A 10Apr17 29 22 OnTarget
MEPworks 51 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC8FMEPD1040 BC 8thFloor InstallElectricalWiring 12 75.00% 75.00% 20Dec16 2Jan17 27Nov16A 7Jan17 4 6 OnTarget
BC8FMEPD1050 BC 8thFloor InstallLowCurrentWiring 12 25.00% 27.00% 27Dec16 9Jan17 27Nov16A 14Jan17 4 119 OnTarget
BC8FMEPD1060 BC 8thFloor InstallHVACPipes 10 30.00% 84.00% 27Dec16 7Jan17 27Nov16A 1Jan17 5 65 OnTarget
BC8FMEPD1070 BC 8thFloor Firefightingpipes 18 44.44% 98.00% 21Dec16 10Jan17 27Nov16A 4Jan17 5 65 OnTarget
BC8FMEPD1080 BC 8thFloor InstallDuctsandHangers 10 0.00% 6.00% 3Jan17 14Jan17 27Nov16A 10Jan17 4 63 OnTarget
BC8FMEPD1085 BC 8thFloor DryAreaMEPHLClearancebyARMAforgridfixing 18 61.11% 50.00% 18Dec16 7Jan17 27Nov16A 9Jan17 2 54 Delayed
BC8FMEPD1086 BC 8thFloor FloorMEPconduitsforScreed 10 0.00% 0.00% 8Jan17 18Jan17 10Jan17 21Jan17 2 54 OnTarget
BC8FMEPD1090 BC 8thFloor DBInstallation 10 0.00% 20.00% 7Jan17 17Jan17 27Nov16A 14Jan17 4 63 OnTarget
BC8FMEPD1100 BC 8thFloor InstallDroppers 12 0.00% 0.00% 8Jan17 21Jan17 10Jan17 23Jan17 2 55 OnTarget
BC8FMEPD1110 BC 8thFloor MeggeringTest 10 0.00% 0.00% 10Jan17 21Jan17 12Jan17 23Jan17 2 55 OnTarget
BC8FMEPD1115 BC 8thFloor DryAreaMEPclearanceforBoardclosing 18 0.00% 0.00% 25Jan17 14Feb17 28Jan17 16Feb17 2 55 OnTarget
DelayAnalysisReportBasedonTargetProgram *DelayedActivitiesareHiglightedInRed DataDate: 29Dec16
VarianceBL
Original Schedule% Activity% BLProject BLProject Actual/Forecas Actual/Forecas Delayed/O
ActivityID Building Floor ActivityName ProjectFinish TotalFloat
Duration Complete Complete Start Finish tedStart tedFinish nTrack
Date
WetArea 64 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPworks 58 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC8FMEPW1000 BC 8thFloor WetAreaScreedMEpClearance 6 0.00% 98.00% 12Jan17 18Jan17 26Nov16A 23Jan17 4 108 OnTarget
BC8FMEPW1010 BC 8thFloor WetAreaHLClearancebyARMAforgridfixing 10 0.00% 20.00% 19Jan17 30Jan17 27Nov16A 19Jan17 9 31 OnTarget
BC8FMEPW1020 BC 8thFloor WetAreaMEPclearanceforBoardclosing 10 0.00% 0.00% 20Feb17 2Mar17 26Jan17 6Feb17 21 31 OnTarget
BC8FMEPW1030 BC 8thFloor InstallElectricalWiring 10 40.00% 53.00% 26Dec16 5Jan17 27Nov16A 10Jan17 4 31 OnTarget
BC8FMEPW1040 BC 8thFloor InstallDrainagepipes 10 30.00% 97.00% 27Dec16 7Jan17 27Nov16A 11Jan17 4 31 OnTarget
BC8FMEPW1050 BC 8thFloor InstallHot&ColdWaterPiping 10 20.00% 90.00% 28Dec16 8Jan17 27Nov16A 12Jan17 4 31 OnTarget
BC8FMEPW1060 BC 8thFloor InstallHVACPipes 10 0.00% 84.00% 1Jan17 11Jan17 27Nov16A 16Jan17 4 31 OnTarget
BC8FMEPW1070 BC 8thFloor InstallDuctsandHangers 16 12.50% 13.00% 28Dec16 15Jan17 27Nov16A 19Jan17 4 31 OnTarget
BC8FMEPW1080 BC 8thFloor InstallDroppers 12 0.00% 0.00% 11Feb17 23Feb17 17Jan17 30Jan17 21 37 OnTarget
BC8FMEPW1090 BC 8thFloor MeggeringTest 10 0.00% 0.00% 13Feb17 23Feb17 19Jan17 30Jan17 21 37 OnTarget
CorridorLiftLobby 63 0.00% 0.00% 27Dec16 2Mar17 26Nov16A 25Feb17 5 83 OnTarget
MEPworks 47 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC8FMEPCL1000 BC 8thFloor CorridorScreedMEpClearance(Apt) 6 0.00% 60.00% 11Feb17 16Feb17 26Nov16A 2Jan17 40 130 OnTarget
BC8FMEPCL1010 BC 8thFloor CorridorHLClearancebyARMAforgridfixing 10 0.00% 0.00% 30Jan17 9Feb17 17Jan17 29Jan17 11 24 OnTarget
BC8FMEPCL1020 BC 8thFloor CorridorMEPclearanceforBoardclosing 10 0.00% 0.00% 19Feb17 1Mar17 6Feb17 18Feb17 11 20 OnTarget
BC8FMEPCL1030 BC 8thFloor InstallElectricalWiring 12 0.00% 40.00% 7Jan17 19Jan17 27Nov16A 8Jan17 11 20 OnTarget
BC8FMEPCL1050 BC 8thFloor InstallHot&ColdWaterPiping 10 0.00% 95.00% 12Jan17 23Jan17 27Nov16A 11Jan17 11 20 OnTarget
BC8FMEPCL1060 BC 8thFloor InstallHVACPipes 10 0.00% 85.00% 16Jan17 26Jan17 27Nov16A 15Jan17 11 20 OnTarget
BC8FMEPCL1070 BC 8thFloor InstallDuctsandHangers 10 0.00% 90.00% 19Jan17 30Jan17 27Nov16A 18Jan17 11 20 OnTarget
BC8FMEPCL1080 BC 8thFloor InstallCableTraysandTrunking 16 0.00% 0.00% 16Jan17 2Feb17 3Jan17 22Jan17 11 20 OnTarget
BC8FMEPCL1085 BC 8thFloor InstallLowCurrentWiring 10 0.00% 26.00% 26Jan17 6Feb17 27Nov16A 25Jan17 11 20 OnTarget
BC8FMEPCL1090 BC 8thFloor InstallLVCables 10 0.00% 0.00% 30Jan17 9Feb17 17Jan17 29Jan17 11 20 OnTarget
BC8FMEPCL1100 BC 8thFloor InstallDroppers 14 0.00% 0.00% 11Feb17 26Feb17 29Jan17 14Feb17 11 20 OnTarget
BC8FMEPCL1110 BC 8thFloor MeggeringTest 10 0.00% 0.00% 19Feb17 1Mar17 6Feb17 18Feb17 11 20 OnTarget
CommonFinalFinishes 41 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPworks 17 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC8FMEPF1010 BC 8thFloor InstallLightFittings 14 0.00% 0.00% 2Mar17 18Mar17 20Feb17 7Mar17 9 74 OnTarget
BC8FMEPF1020 BC 8thFloor InstallFireCabinets 14 0.00% 100.00% 4Mar17 19Mar17 27Nov16A 22Dec16A 75 0 OnTarget
BC8FMEPF1030 BC 8thFloor InstallFireAlarmsandSpeakers 14 0.00% 0.00% 4Mar17 19Mar17 31Dec16 15Jan17 54 64 OnTarget
BC8FMEPF1040 BC 8thFloor InstallSprinklers 14 0.00% 0.00% 5Mar17 20Mar17 1Jan17 16Jan17 54 64 OnTarget
BC8FMEPF1050 BC 8thFloor InstallSwitchesandSockets 14 0.00% 0.00% 5Mar17 20Mar17 1Jan17 16Jan17 54 64 OnTarget
BC8FMEPF1060 BC 8thFloor InstallLowCurrentEquipments 14 0.00% 0.00% 6Mar17 21Mar17 2Jan17 17Jan17 54 64 OnTarget
BC8FMEPF1070 BC 8thFloor InstallGrillesandDiffussers 14 0.00% 0.00% 6Mar17 21Mar17 2Jan17 17Jan17 54 64 OnTarget
BC8FMEPF1075 BC 8thFloor MEPFinalFixes/Sanitarywares 12 0.00% 0.00% 2Mar17 15Mar17 18Feb17 4Mar17 11 20 OnTarget
BC8FMEPF1080 BC 8thFloor InstallPlumpingFinalTittings(FloorDrains,Floortraps 14 0.00% 0.00% 6Mar17 21Mar17 2Jan17 17Jan17 54 64 OnTarget
NinthFloor 123 0.00% 0.00% 4Dec16 25Apr17 26Nov16A 30Apr17 4 28 OnTarget
DryArea 58 0.00% 0.00% 18Dec16 7Mar17 27Nov16A 10Apr17 29 22 OnTarget
MEPworks 41 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC9FMEPD1000 BC 9thFloor DryAreaMEPScreedclearance 10 0.00% 97.00% 12Jan17 23Jan17 26Nov16A 23Jan17 0 38 OnTarget
BC9FMEPD1010 BC 9thFloor DryAreaMEPHLClearancebyARMAforgridfixing 10 0.00% 74.00% 5Jan17 16Jan17 26Nov16A 16Jan17 0 30 OnTarget
BC9FMEPD1020 BC 9thFloor DryAreaMEPclearanceforBoardclosing 10 0.00% 0.00% 29Jan17 8Feb17 18Jan17 30Jan17 8 31 OnTarget
BC9FMEPD1040 BC 9thFloor InstallElectricalWiring 12 50.00% 50.00% 24Dec16 5Jan17 27Nov16A 10Jan17 4 6 OnTarget
BC9FMEPD1050 BC 9thFloor InstallLowCurrentWiring 12 0.00% 16.00% 31Dec16 12Jan17 27Nov16A 17Jan17 4 116 OnTarget
BC9FMEPD1060 BC 9thFloor InstallHVACPipes 12 0.00% 81.00% 31Dec16 12Jan17 27Nov16A 2Jan17 10 39 OnTarget
BC9FMEPD1070 BC 9thFloor InstallDuctsandHangers 18 16.67% 17.00% 27Dec16 16Jan17 27Nov16A 16Jan17 0 30 OnTarget
BC9FMEPD1080 BC 9thFloor DBInstallation 10 0.00% 20.00% 17Jan17 28Jan17 27Nov16A 8Jan17 17 40 OnTarget
BC9FMEPD1090 BC 9thFloor InstallDroppers 12 0.00% 0.00% 17Jan17 30Jan17 16Jan17 30Jan17 0 31 OnTarget
BC9FMEPD1100 BC 9thFloor MeggeringTest 10 0.00% 0.00% 29Jan17 8Feb17 18Jan17 30Jan17 8 31 OnTarget
WetArea 67 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPworks 61 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC9FMEPW1000 BC 9thFloor WetAreaScreedMEpClearance 10 0.00% 100.00% 12Jan17 23Jan17 26Nov16A 22Dec16A 28 0 OnTarget
BC9FMEPW1010 BC 9thFloor WetAreaHLClearancebyARMAforgridfixing 10 0.00% 0.00% 24Jan17 4Feb17 12Jan17 23Jan17 10 24 OnTarget
BC9FMEPW1020 BC 9thFloor WetAreaMEPclearanceforBoardclosing 12 0.00% 0.00% 22Feb17 7Mar17 28Jan17 9Feb17 22 26 OnTarget
BC9FMEPW1030 BC 9thFloor InstallElectricalWiring 12 25.00% 47.00% 27Dec16 9Jan17 27Nov16A 14Jan17 4 24 OnTarget
BC9FMEPW1040 BC 9thFloor InstallDrainagepipes 10 0.00% 94.00% 31Dec16 10Jan17 27Nov16A 15Jan17 4 24 OnTarget
BC9FMEPW1050 BC 9thFloor InstallHot&ColdWaterPiping 10 0.00% 68.00% 1Jan17 11Jan17 27Nov16A 16Jan17 4 24 OnTarget
BC9FMEPW1060 BC 9thFloor InstallHVACPipes 12 0.00% 81.00% 2Jan17 15Jan17 27Nov16A 19Jan17 4 24 OnTarget
BC9FMEPW1070 BC 9thFloor InstallDuctsandHangers 18 5.56% 6.00% 29Dec16 18Jan17 27Nov16A 23Jan17 4 24 OnTarget
BC9FMEPW1080 BC 9thFloor InstallDroppers 12 0.00% 0.00% 22Feb17 7Mar17 28Jan17 9Feb17 22 26 OnTarget
BC9FMEPW1090 BC 9thFloor MeggeringTest 10 0.00% 0.00% 25Feb17 7Mar17 30Jan17 9Feb17 22 26 OnTarget
CorridorLiftLobby 65 0.00% 0.00% 27Dec16 2Mar17 26Nov16A 25Feb17 5 83 OnTarget
MEPworks 49 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC9FMEPCL1000 BC 9thFloor CorridorScreedMEpClearance 10 0.00% 60.00% 1Feb17 12Feb17 26Nov16A 28Jan17 13 107 OnTarget
BC9FMEPCL1010 BC 9thFloor CorridorHLClearancebyARMAforgridfixing 10 0.00% 0.00% 29Jan17 8Feb17 16Jan17 26Jan17 11 24 OnTarget
BC9FMEPCL1020 BC 9thFloor CorridorMEPclearanceforBoardclosing 10 0.00% 0.00% 13Feb17 23Feb17 30Jan17 9Feb17 12 24 OnTarget
BC9FMEPCL1030 BC 9thFloor InstallElectricalWiring 10 10.00% 20.00% 29Dec16 9Jan17 27Nov16A 14Jan17 4 119 OnTarget
BC9FMEPCL1050 BC 9thFloor InstallHot&ColdWaterPiping 10 0.00% 95.00% 14Jan17 24Jan17 27Nov16A 31Dec16 22 33 OnTarget
BC9FMEPCL1060 BC 9thFloor InstallHVACPipes 10 0.00% 80.00% 17Jan17 28Jan17 27Nov16A 3Jan17 22 33 OnTarget
BC9FMEPCL1070 BC 9thFloor InstallDuctsandHangers 16 0.00% 40.00% 14Jan17 31Jan17 27Nov16A 10Jan17 18 30 OnTarget
BC9FMEPCL1080 BC 9thFloor InstallCableTraysandTrunking 18 0.00% 0.00% 15Jan17 4Feb17 31Dec16 19Jan17 13 25 OnTarget
BC9FMEPCL1085 BC 9thFloor InstallLowCurrentWiring 10 0.00% 16.00% 28Jan17 7Feb17 27Nov16A 23Jan17 13 26 OnTarget
BC9FMEPCL1090 BC 9thFloor InstallLVCables 14 0.00% 0.00% 23Jan17 7Feb17 8Jan17 23Jan17 13 25 OnTarget
BC9FMEPCL1100 BC 9thFloor InstallDroppers 14 0.00% 0.00% 8Feb17 23Feb17 24Jan17 8Feb17 13 25 OnTarget
BC9FMEPCL1110 BC 9thFloor MeggeringTest 10 0.00% 0.00% 13Feb17 23Feb17 29Jan17 8Feb17 13 25 OnTarget
CommonFinalFinishes 54 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPworks 21 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC9FMEPF1010 BC 9thFloor InstallLightFittings 14 0.00% 0.00% 6Mar17 21Mar17 11Feb17 26Feb17 20 27 OnTarget
BC9FMEPF1020 BC 9thFloor InstallFireCabinets 14 0.00% 0.00% 7Mar17 22Mar17 12Feb17 27Feb17 20 27 OnTarget
BC9FMEPF1030 BC 9thFloor InstallFireAlarmsandSpeakers 14 0.00% 0.00% 7Mar17 22Mar17 12Feb17 27Feb17 20 27 OnTarget
BC9FMEPF1040 BC 9thFloor InstallSprinklers 14 0.00% 0.00% 8Mar17 23Mar17 13Feb17 28Feb17 20 27 OnTarget
BC9FMEPF1050 BC 9thFloor InstallSwitchesandSockets 14 0.00% 0.00% 8Mar17 23Mar17 13Feb17 28Feb17 20 27 OnTarget
BC9FMEPF1060 BC 9thFloor InstallLowCurrentEquipments 14 0.00% 0.00% 9Mar17 25Mar17 14Feb17 1Mar17 20 27 OnTarget
BC9FMEPF1070 BC 9thFloor InstallGrillesandDiffussers 14 0.00% 0.00% 9Mar17 25Mar17 14Feb17 1Mar17 20 27 OnTarget
BC9FMEPF1075 BC 9thFloor MEPFinalFixes/Sanitarywares 18 0.00% 0.00% 1Mar17 21Mar17 6Feb17 26Feb17 20 24 OnTarget
BC9FMEPF1080 BC 9thFloor InstallPlumpingFinalTittings(FloorDrains,Floortraps 14 0.00% 0.00% 9Mar17 25Mar17 14Feb17 1Mar17 20 27 OnTarget
Tenthfloor 113 0.00% 0.00% 7Dec16 17Apr17 26Nov16A 11Apr17 5 44 OnTarget
DryArea 59 0.00% 0.00% 18Dec16 7Mar17 27Nov16A 10Apr17 29 22 OnTarget
MEPworks 42 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC10FMEPD1000 BC 10thFloor DryAreaMEPScreedclearance 10 0.00% 55.00% 12Jan17 23Jan17 26Nov16A 17Jan17 5 57 OnTarget
BC10FMEPD1010 BC 10thFloor DryAreaMEPHLClearancebyARMAforgridfixing 10 0.00% 0.00% 12Jan17 23Jan17 12Jan17 24Jan17 0 27 OnTarget
BC10FMEPD1020 BC 10thFloor DryAreaMEPclearanceforBoardclosing 10 0.00% 0.00% 5Feb17 15Feb17 30Jan17 11Feb17 5 27 OnTarget
BC10FMEPD1030 BC 10thFloor InstallElectricalWiring 10 10.00% 50.00% 29Dec16 9Jan17 27Nov16A 14Jan17 4 6 OnTarget
BC10FMEPD1040 BC 10thFloor InstallLowCurrentWiring 10 0.00% 13.00% 5Jan17 16Jan17 27Nov16A 21Jan17 4 113 OnTarget
BC10FMEPD1050 BC 10thFloor InstallHVACPipes 10 0.00% 72.00% 5Jan17 16Jan17 27Nov16A 2Jan17 12 39 OnTarget
BC10FMEPD1060 BC 10thFloor Firefightingpipes 10 0.00% 98.00% 9Jan17 19Jan17 27Nov16A 5Jan17 12 39 OnTarget
BC10FMEPD1070 BC 10thFloor InstallDuctsandHangers 16 0.00% 2.00% 5Jan17 23Jan17 27Nov16A 17Jan17 5 32 OnTarget
BC10FMEPD1080 BC 10thFloor DBInstallation 10 0.00% 20.00% 24Jan17 4Feb17 27Nov16A 8Jan17 23 45 OnTarget
BC10FMEPD1090 BC 10thFloor InstallDroppers 12 0.00% 0.00% 24Jan17 6Feb17 24Jan17 7Feb17 0 27 OnTarget
BC10FMEPD1100 BC 10thFloor MeggeringTest 10 0.00% 0.00% 5Feb17 15Feb17 30Jan17 11Feb17 5 27 OnTarget
WetArea 73 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPworks 67 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC10FMEPW1000 BC 10thFloor WetAreaScreedMEpClearance 10 0.00% 77.00% 16Jan17 26Jan17 26Nov16A 30Jan17 3 2 OnTarget
BC10FMEPW1010 BC 10thFloor WetAreaHLClearancebyARMAforgridfixing 10 0.00% 0.00% 28Jan17 7Feb17 16Jan17 26Jan17 10 13 OnTarget
BC10FMEPW1020 BC 10thFloor WetAreaMEPclearanceforBoardclosing 10 0.00% 0.00% 28Feb17 11Mar17 16Feb17 27Feb17 10 13 OnTarget
BC10FMEPW1030 BC 10thFloor InstallElectricalWiring 18 33.33% 47.00% 24Dec16 12Jan17 27Nov16A 17Jan17 4 2 OnTarget
BC10FMEPW1040 BC 10thFloor InstallDrainagepipes 18 27.78% 83.00% 25Dec16 14Jan17 27Nov16A 18Jan17 4 2 OnTarget
BC10FMEPW1050 BC 10thFloor InstallHot&ColdWaterPiping 18 22.22% 57.00% 26Dec16 15Jan17 27Nov16A 19Jan17 4 2 OnTarget
BC10FMEPW1060 BC 10thFloor InstallHVACPipes 12 0.00% 72.00% 5Jan17 18Jan17 27Nov16A 23Jan17 4 2 OnTarget
BC10FMEPW1070 BC 10thFloor Firefightingpipes 10 0.00% 95.00% 9Jan17 19Jan17 27Nov16A 24Jan17 4 1 OnTarget
BC10FMEPW1080 BC 10thFloor InstallDuctsandHangers 16 0.00% 0.00% 4Jan17 22Jan17 9Jan17 26Jan17 4 2 OnTarget
BC10FMEPW1090 BC 10thFloor InstallDroppers 12 0.00% 0.00% 19Feb17 4Mar17 7Feb17 20Feb17 10 19 OnTarget
BC10FMEPW1100 BC 10thFloor MeggeringTest 10 0.00% 0.00% 21Feb17 4Mar17 9Feb17 20Feb17 10 19 OnTarget
CorridorLiftLobby 67 0.00% 0.00% 27Dec16 2Mar17 26Nov16A 25Feb17 5 83 OnTarget
MEPworks 51 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC10FMEPCL1000 BC 10thFloor CorridorScreedMEpClearance 6 0.00% 0.00% 18Feb17 23Feb17 22Jan17 28Jan17 23 64 OnTarget
BC10FMEPCL1010 BC 10thFloor CorridorHLClearancebyARMAforgridfixing 10 0.00% 0.00% 7Feb17 18Feb17 11Jan17 22Jan17 23 30 OnTarget
BC10FMEPCL1020 BC 10thFloor CorridorMEPclearanceforBoardclosing 10 0.00% 0.00% 22Feb17 5Mar17 26Jan17 6Feb17 23 29 OnTarget
BC10FMEPCL1030 BC 10thFloor InstallElectricalWiring 10 0.00% 0.00% 5Jan17 16Jan17 10Jan17 21Jan17 4 113 OnTarget
BC10FMEPCL1050 BC 10thFloor InstallHot&ColdWaterPiping 12 0.00% 54.00% 21Jan17 2Feb17 27Nov16A 5Jan17 24 30 OnTarget
DelayAnalysisReportBasedonTargetProgram *DelayedActivitiesareHiglightedInRed DataDate: 29Dec16
VarianceBL
Original Schedule% Activity% BLProject BLProject Actual/Forecas Actual/Forecas Delayed/O
ActivityID Building Floor ActivityName ProjectFinish TotalFloat
Duration Complete Complete Start Finish tedStart tedFinish nTrack
Date
BC10FMEPCL1060 BC 10thFloor InstallHVACPipes 10 0.00% 80.00% 26Jan17 6Feb17 27Nov16A 9Jan17 24 30 OnTarget
BC10FMEPCL1070 BC 10thFloor InstallDuctsandHangers 12 0.00% 40.00% 28Jan17 9Feb17 27Nov16A 12Jan17 24 30 OnTarget
BC10FMEPCL1080 BC 10thFloor InstallCableTraysandTrunking 16 0.00% 0.00% 26Jan17 13Feb17 31Dec16 17Jan17 23 29 OnTarget
BC10FMEPCL1085 BC 10thFloor InstallLowCurrentWiring 10 0.00% 13.00% 6Feb17 16Feb17 27Nov16A 21Jan17 23 30 OnTarget
BC10FMEPCL1090 BC 10thFloor InstallLVCables 10 0.00% 0.00% 6Feb17 16Feb17 10Jan17 21Jan17 23 29 OnTarget
BC10FMEPCL1100 BC 10thFloor InstallDroppers 14 0.00% 0.00% 18Feb17 5Mar17 22Jan17 6Feb17 23 29 OnTarget
BC10FMEPCL1110 BC 10thFloor MeggeringTest 10 0.00% 0.00% 22Feb17 5Mar17 26Jan17 6Feb17 23 29 OnTarget
CommonFinalFinishes 41 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPworks 17 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC10FMEPF1010 BC 10thFloor InstallLightFittings 14 0.00% 0.00% 7Mar17 22Mar17 23Feb17 11Mar17 10 16 OnTarget
BC10FMEPF1020 BC 10thFloor InstallFireCabinets 14 0.00% 0.00% 8Mar17 23Mar17 25Feb17 12Mar17 10 16 OnTarget
BC10FMEPF1030 BC 10thFloor InstallFireAlarmsandSpeakers 14 0.00% 0.00% 8Mar17 23Mar17 25Feb17 12Mar17 10 16 OnTarget
BC10FMEPF1040 BC 10thFloor InstallSprinklers 14 0.00% 0.00% 9Mar17 25Mar17 26Feb17 13Mar17 10 16 OnTarget
BC10FMEPF1050 BC 10thFloor InstallSwitchesandSockets 14 0.00% 0.00% 9Mar17 25Mar17 26Feb17 13Mar17 10 16 OnTarget
BC10FMEPF1060 BC 10thFloor InstallLowCurrentEquipments 14 0.00% 0.00% 11Mar17 26Mar17 27Feb17 14Mar17 10 16 OnTarget
BC10FMEPF1070 BC 10thFloor InstallGrillesandDiffussers 14 0.00% 0.00% 11Mar17 26Mar17 27Feb17 14Mar17 10 16 OnTarget
BC10FMEPF1075 BC 10thFloor MEPFinalFixes/Sanitarywares 10 0.00% 0.00% 12Mar17 22Mar17 28Feb17 11Mar17 10 13 OnTarget
BC10FMEPF1080 BC 10thFloor InstallPlumpingFinalTittings(FloorDrains,Floortraps 14 0.00% 0.00% 11Mar17 26Mar17 27Feb17 14Mar17 10 16 OnTarget
11thFloor 120 0.00% 0.00% 5Dec16 23Apr17 26Nov16A 11Apr17 10 44 OnTarget
DryArea 63 0.00% 0.00% 18Dec16 7Mar17 27Nov16A 10Apr17 29 22 OnTarget
MEPworks 44 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC11FMEPD1000 BC 11thFloor DryAreaMEPScreedclearance 10 0.00% 100.00% 23Jan17 2Feb17 26Nov16A 26Nov16A 60 0 OnTarget
BC11FMEPD1010 BC 11thFloor DryAreaMEPHLClearancebyARMAforgridfixing 10 0.00% 0.00% 16Jan17 26Jan17 7Jan17 18Jan17 8 36 OnTarget
BC11FMEPD1020 BC 11thFloor DryAreaMEPclearanceforBoardclosing 10 0.00% 0.00% 8Feb17 19Feb17 21Jan17 1Feb17 16 36 OnTarget
BC11FMEPD1040 BC 11thFloor InstallElectricalWiring 12 0.00% 43.00% 31Dec16 12Jan17 27Nov16A 17Jan17 4 6 OnTarget
BC11FMEPD1050 BC 11thFloor InstallLowCurrentWiring 12 0.00% 10.00% 7Jan17 19Jan17 27Nov16A 24Jan17 4 110 OnTarget
BC11FMEPD1060 BC 11thFloor InstallHVACPipes 12 0.00% 38.00% 7Jan17 19Jan17 27Nov16A 8Jan17 11 38 OnTarget
BC11FMEPD1070 BC 11thFloor Firefightingpipes 10 0.00% 78.00% 12Jan17 23Jan17 27Nov16A 11Jan17 11 38 OnTarget
BC11FMEPD1080 BC 11thFloor InstallDuctsandHangers 16 0.00% 0.00% 9Jan17 26Jan17 31Dec16 17Jan17 8 36 OnTarget
BC11FMEPD1090 BC 11thFloor DBInstallation 10 0.00% 20.00% 28Jan17 7Feb17 27Nov16A 8Jan17 26 46 OnTarget
BC11FMEPD1100 BC 11thFloor InstallDroppers 12 0.00% 0.00% 28Jan17 9Feb17 18Jan17 1Feb17 8 36 OnTarget
BC11FMEPD1110 BC 11thFloor MeggeringTest 10 0.00% 0.00% 8Feb17 19Feb17 21Jan17 1Feb17 16 36 OnTarget
WetArea 62 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPworks 59 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC11FMEPW1000 BC 11thFloor WetAreaScreedMEpClearance 10 0.00% 70.00% 22Jan17 1Feb17 26Nov16A 6Feb17 4 1 OnTarget
BC11FMEPW1010 BC 11thFloor WetAreaHLClearancebyARMAforgridfixing 18 0.00% 0.00% 29Jan17 18Feb17 10Jan17 30Jan17 16 25 OnTarget
BC11FMEPW1020 BC 11thFloor WetAreaMEPclearanceforBoardclosing 18 0.00% 0.00% 20Feb17 12Mar17 1Feb17 21Feb17 16 25 OnTarget
BC11FMEPW1030 BC 11thFloor InstallElectricalWiring 12 0.00% 24.00% 3Jan17 16Jan17 27Nov16A 21Jan17 4 1 OnTarget
BC11FMEPW1040 BC 11thFloor InstallDrainagepipes 10 0.00% 25.00% 7Jan17 17Jan17 27Nov16A 22Jan17 4 1 OnTarget
BC11FMEPW1050 BC 11thFloor InstallHot&ColdWaterPiping 10 0.00% 55.00% 8Jan17 18Jan17 27Nov16A 23Jan17 4 1 OnTarget
BC11FMEPW1060 BC 11thFloor InstallHVACPipes 12 0.00% 38.00% 9Jan17 22Jan17 27Nov16A 26Jan17 4 1 OnTarget
BC11FMEPW1070 BC 11thFloor Firefightingpipes 7 0.00% 78.00% 16Jan17 23Jan17 27Nov16A 28Jan17 4 2 OnTarget
BC11FMEPW1080 BC 11thFloor InstallDuctsandHangers 16 0.00% 0.00% 8Jan17 25Jan17 12Jan17 30Jan17 4 1 OnTarget
BC11FMEPW1090 BC 11thFloor InstallDroppers 12 0.00% 0.00% 23Feb17 8Mar17 5Feb17 18Feb17 16 25 OnTarget
BC11FMEPW1100 BC 11thFloor MeggeringTest 7 0.00% 0.00% 5Mar17 12Mar17 14Feb17 21Feb17 16 25 OnTarget
CorridorLiftLobby 66 0.00% 0.00% 27Dec16 2Mar17 26Nov16A 25Feb17 5 83 OnTarget
MEPworks 44 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC11FMEPCL1000 BC 11thFloor CorridorScreedMEpClearance 12 0.00% 95.00% 31Jan17 13Feb17 26Nov16A 18Feb17 4 41 OnTarget
BC11FMEPCL1010 BC 11thFloor CorridorHLClearancebyARMAforgridfixing 21 0.00% 0.00% 17Jan17 9Feb17 22Jan17 14Feb17 4 12 OnTarget
BC11FMEPCL1020 BC 11thFloor CorridorMEPclearanceforBoardclosing 18 0.00% 0.00% 6Feb17 26Feb17 11Feb17 2Mar17 4 12 OnTarget
BC11FMEPCL1030 BC 11thFloor InstallElectricalWiring 12 0.00% 30.00% 7Jan17 19Jan17 27Nov16A 24Jan17 4 12 OnTarget
BC11FMEPCL1050 BC 11thFloor InstallHot&ColdWaterPiping 10 0.00% 52.00% 12Jan17 23Jan17 27Nov16A 28Jan17 4 12 OnTarget
BC11FMEPCL1060 BC 11thFloor InstallHVACPipes 10 0.00% 80.00% 16Jan17 26Jan17 27Nov16A 31Jan17 4 12 OnTarget
BC11FMEPCL1070 BC 11thFloor InstallDuctsandHangers 14 0.00% 5.00% 15Jan17 30Jan17 27Nov16A 4Feb17 4 12 OnTarget
BC11FMEPCL1080 BC 11thFloor InstallCableTraysandTrunking 16 0.00% 0.00% 16Jan17 2Feb17 21Jan17 7Feb17 4 12 OnTarget
BC11FMEPCL1085 BC 11thFloor InstallLowCurrentWiring 10 0.00% 10.00% 26Jan17 6Feb17 27Nov16A 11Feb17 4 12 OnTarget
BC11FMEPCL1090 BC 11thFloor InstallLVCables 7 0.00% 0.00% 30Jan17 6Feb17 4Feb17 11Feb17 4 15 OnTarget
BC11FMEPCL1100 BC 11thFloor InstallDroppers 14 0.00% 0.00% 7Feb17 22Feb17 12Feb17 27Feb17 4 15 OnTarget
BC11FMEPCL1110 BC 11thFloor MeggeringTest 7 0.00% 0.00% 15Feb17 22Feb17 20Feb17 27Feb17 4 15 OnTarget
CommonFinalFinishes 44 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPworks 17 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC11FMEPF1010 BC 11thFloor InstallLightFittings 14 0.00% 0.00% 4Mar17 19Mar17 28Feb17 15Mar17 3 12 OnTarget
BC11FMEPF1020 BC 11thFloor InstallFireCabinets 14 0.00% 0.00% 5Mar17 20Mar17 1Mar17 16Mar17 3 12 OnTarget
BC11FMEPF1030 BC 11thFloor InstallFireAlarmsandSpeakers 14 0.00% 0.00% 5Mar17 20Mar17 1Mar17 16Mar17 3 12 OnTarget
BC11FMEPF1040 BC 11thFloor InstallSprinklers 14 0.00% 0.00% 6Mar17 21Mar17 2Mar17 18Mar17 3 12 OnTarget
BC11FMEPF1050 BC 11thFloor InstallSwitchesandSockets 14 0.00% 0.00% 6Mar17 21Mar17 2Mar17 18Mar17 3 12 OnTarget
BC11FMEPF1060 BC 11thFloor InstallLowCurrentEquipments 14 0.00% 0.00% 7Mar17 22Mar17 4Mar17 19Mar17 3 12 OnTarget
BC11FMEPF1070 BC 11thFloor InstallGrillesandDiffussers 14 0.00% 0.00% 7Mar17 22Mar17 4Mar17 19Mar17 3 12 OnTarget
BC11FMEPF1075 BC 11thFloor MEPFinalFixes/Sanitarywares 10 0.00% 0.00% 9Mar17 20Mar17 6Mar17 16Mar17 3 14 OnTarget
BC11FMEPF1080 BC 11thFloor InstallPlumpingFinalFittings(FloorDrains,Floortraps 14 0.00% 0.00% 7Mar17 22Mar17 4Mar17 19Mar17 3 12 OnTarget
12thFloor 115 0.00% 0.00% 7Dec16 19Apr17 26Nov16A 11Apr17 7 44 OnTarget
DryArea 62 0.00% 0.00% 18Dec16 7Mar17 27Nov16A 10Apr17 29 22 OnTarget
MEPworks 43 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC12FMEPD1000 BC 12thFloor DraAreaMEPScreedclearance 10 0.00% 70.00% 19Jan17 30Jan17 26Nov16A 26Jan17 4 49 OnTarget
BC12FMEPD1010 BC 12thFloor DryAreaMEPHLClearancebyARMAforgridfixing 10 0.00% 0.00% 12Jan17 23Jan17 11Jan17 23Jan17 1 31 OnTarget
BC12FMEPD1020 BC 12thFloor DryAreaMEPclearanceforBoardclosing 10 0.00% 0.00% 5Feb17 15Feb17 25Jan17 6Feb17 9 31 OnTarget
BC12FMEPD1040 BC 12thFloor InstallElectricalWiring 14 14.29% 18.00% 28Dec16 12Jan17 15Dec16A 17Jan17 4 6 OnTarget
BC12FMEPD1050 BC 12thFloor InstallLowCurrentWiring 14 0.00% 10.00% 1Jan17 16Jan17 27Nov16A 21Jan17 4 113 OnTarget
BC12FMEPD1060 BC 12thFloor InstallHVACPipes 14 0.00% 19.00% 1Jan17 16Jan17 27Nov16A 12Jan17 4 33 OnTarget
BC12FMEPD1070 BC 12thFloor Firefightingpipes 10 0.00% 0.00% 9Jan17 19Jan17 4Jan17 16Jan17 4 33 OnTarget
BC12FMEPD1080 BC 12thFloor InstallDuctsandHangers 16 0.00% 0.00% 5Jan17 23Jan17 1Jan17 19Jan17 4 33 OnTarget
BC12FMEPD1090 BC 12thFloor DBInstallation 10 0.00% 20.00% 24Jan17 4Feb17 27Nov16A 8Jan17 23 45 OnTarget
BC12FMEPD1100 BC 12thFloor InstallDroppers 12 0.00% 0.00% 24Jan17 6Feb17 23Jan17 6Feb17 1 31 OnTarget
BC12FMEPD1110 BC 12thFloor MeggeringTest 10 0.00% 0.00% 5Feb17 15Feb17 25Jan17 6Feb17 9 31 OnTarget
WetArea 57 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPworks 51 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC12FMEPW1000 BC 12thFloor WetAreaScreedMEpClearance 12 0.00% 62.00% 19Jan17 1Feb17 26Nov16A 2Feb17 1 3 OnTarget
BC12FMEPW1010 BC 12thFloor WetAreaHLClearancebyARMAforgridfixing 10 0.00% 0.00% 26Jan17 6Feb17 19Jan17 30Jan17 6 16 OnTarget
BC12FMEPW1020 BC 12thFloor WetAreaMEPclearanceforBoardclosing 10 0.00% 0.00% 20Feb17 2Mar17 13Feb17 23Feb17 6 16 OnTarget
BC12FMEPW1030 BC 12thFloor InstallElectricalWiring 12 0.00% 0.00% 3Jan17 16Jan17 8Jan17 21Jan17 4 3 OnTarget
BC12FMEPW1040 BC 12thFloor InstallDrainagepipes 10 0.00% 30.00% 7Jan17 17Jan17 27Nov16A 22Jan17 4 3 OnTarget
BC12FMEPW1050 BC 12thFloor InstallHot&ColdWaterPiping 10 0.00% 27.00% 8Jan17 18Jan17 05Dec16A 23Jan17 4 3 OnTarget
BC12FMEPW1060 BC 12thFloor InstallHVACPipes 12 0.00% 18.00% 9Jan17 22Jan17 27Nov16A 26Jan17 4 3 OnTarget
BC12FMEPW1070 BC 12thFloor Firefightingpipes 10 0.00% 0.00% 12Jan17 23Jan17 17Jan17 28Jan17 4 2 OnTarget
BC12FMEPW1080 BC 12thFloor InstallDuctsandHangers 16 0.00% 0.00% 8Jan17 25Jan17 12Jan17 30Jan17 4 3 OnTarget
BC12FMEPW1090 BC 12thFloor InstallDroppers 12 0.00% 0.00% 11Feb17 23Feb17 4Feb17 16Feb17 6 22 OnTarget
BC12FMEPW1100 BC 12thFloor MeggeringTest 10 0.00% 0.00% 13Feb17 23Feb17 6Feb17 16Feb17 6 22 OnTarget
CorridorLiftLobby 61 0.00% 0.00% 27Dec16 2Mar17 26Nov16A 25Feb17 5 83 OnTarget
MEPworks 41 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC12FMEPCL1000 BC 12thFloor CorridorScreedMEpClearance 12 0.00% 50.00% 28Jan17 9Feb17 18Dec16A 14Feb17 4 92 OnTarget
BC12FMEPCL1010 BC 12thFloor CorridorHLClearancebyARMAforgridfixing 21 0.00% 0.00% 17Jan17 9Feb17 16Jan17 8Feb17 1 17 OnTarget
BC12FMEPCL1020 BC 12thFloor CorridorMEPclearanceforBoardclosing 12 0.00% 0.00% 8Feb17 21Feb17 8Feb17 21Feb17 0 16 OnTarget
BC12FMEPCL1030 BC 12thFloor InstallElectricalWiring 10 0.00% 0.00% 5Jan17 16Jan17 10Jan17 21Jan17 4 16 OnTarget
BC12FMEPCL1050 BC 12thFloor InstallHot&ColdWaterPiping 10 0.00% 0.00% 9Jan17 19Jan17 14Jan17 24Jan17 4 16 OnTarget
BC12FMEPCL1060 BC 12thFloor Firefightingpipes 7 0.00% 95.00% 12Jan17 19Jan17 27Nov16A 24Jan17 4 16 OnTarget
BC12FMEPCL1070 BC 12thFloor InstallHVACPipes 10 0.00% 80.00% 12Jan17 23Jan17 27Nov16A 28Jan17 4 16 OnTarget
BC12FMEPCL1080 BC 12thFloor InstallDuctsandHangers 16 0.00% 5.00% 9Jan17 26Jan17 27Nov16A 31Jan17 4 16 OnTarget
BC12FMEPCL1090 BC 12thFloor InstallCableTraysandTrunking 12 0.00% 0.00% 17Jan17 30Jan17 22Jan17 4Feb17 4 16 OnTarget
BC12FMEPCL1095 BC 12thFloor InstallLowCurrentWiring 10 0.00% 10.00% 23Jan17 2Feb17 27Nov16A 7Feb17 4 17 OnTarget
BC12FMEPCL1100 BC 12thFloor InstallLVCables 7 0.00% 0.00% 26Jan17 2Feb17 31Jan17 7Feb17 4 16 OnTarget
BC12FMEPCL1110 BC 12thFloor InstallDroppers 12 0.00% 0.00% 8Feb17 21Feb17 8Feb17 21Feb17 0 16 OnTarget
BC12FMEPCL1120 BC 12thFloor MeggeringTest 7 0.00% 0.00% 14Feb17 21Feb17 14Feb17 21Feb17 0 16 OnTarget
CommonFinalFinishes 45 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPworks 17 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC12FMEPF1010 BC 12thFloor InstallLightFittings 14 0.00% 0.00% 27Feb17 14Mar17 20Feb17 7Mar17 6 19 OnTarget
BC12FMEPF1020 BC 12thFloor InstallFireCabinets 14 0.00% 0.00% 28Feb17 15Mar17 21Feb17 8Mar17 6 19 OnTarget
BC12FMEPF1030 BC 12thFloor InstallFireAlarmsandSpeakers 14 0.00% 0.00% 28Feb17 15Mar17 21Feb17 8Mar17 6 19 OnTarget
BC12FMEPF1040 BC 12thFloor InstallSprinklers 14 0.00% 0.00% 1Mar17 16Mar17 22Feb17 9Mar17 6 19 OnTarget
BC12FMEPF1050 BC 12thFloor InstallSwitchesandSockets 14 0.00% 0.00% 1Mar17 16Mar17 22Feb17 9Mar17 6 19 OnTarget
BC12FMEPF1060 BC 12thFloor InstallLowCurrentEquipments 14 0.00% 0.00% 2Mar17 18Mar17 23Feb17 11Mar17 6 19 OnTarget
BC12FMEPF1070 BC 12thFloor InstallGrillesandDiffussers 14 0.00% 0.00% 2Mar17 18Mar17 23Feb17 11Mar17 6 19 OnTarget
DelayAnalysisReportBasedonTargetProgram *DelayedActivitiesareHiglightedInRed DataDate: 29Dec16
VarianceBL
Original Schedule% Activity% BLProject BLProject Actual/Forecas Actual/Forecas Delayed/O
ActivityID Building Floor ActivityName ProjectFinish TotalFloat
Duration Complete Complete Start Finish tedStart tedFinish nTrack
Date
BC12FMEPF1075 BC 12thFloor MEPFinalFixes/Sanitarywares 10 0.00% 0.00% 4Mar17 14Mar17 25Feb17 7Mar17 6 16 OnTarget
BC12FMEPF1080 BC 12thFloor InstallPlumpingFinalTittings(FloorDrains,Floortraps 14 0.00% 0.00% 2Mar17 18Mar17 23Feb17 11Mar17 6 19 OnTarget
13thFloor 110 0.00% 0.00% 12Dec16 18Apr17 23Nov16A 11Apr17 6 44 OnTarget
General 22 0.00% 0.00% 27Nov16 3Jan17 27Nov16A 17Jan17 11 117 OnTarget
BC13F1000 BC 13thFloor PlasterMEpClearance(H0108,A0107) 14 100.00% 100.00% 12Dec16 27Dec16 11Dec16A 15Dec16A 11 0 OnTarget
DryArea 52 0.00% 0.00% 18Dec16 7Mar17 27Nov16A 10Apr17 29 22 OnTarget
MEPworks 33 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC13FMEPD1000 BC 13thFloor DraAreaMEPScreedclearance 10 0.00% 100.00% 25Jan17 5Feb17 26Nov16A 26Nov16A 62 0 OnTarget
BC13FMEPD1010 BC 13thFloor DryAreaMEPHLClearancebyARMAforgridfixing 10 0.00% 0.00% 18Jan17 29Jan17 5Jan17 17Jan17 10 10 OnTarget
BC13FMEPD1020 BC 13thFloor DryAreaMEPclearanceforBoardclosing 10 0.00% 0.00% 1Feb17 12Feb17 19Jan17 31Jan17 10 10 OnTarget
BC13FMEPD1040 BC 13thFloor InstallElectricalWiring 10 0.00% 5.00% 5Jan17 16Jan17 15Dec16A 21Jan17 4 6 OnTarget
BC13FMEPD1050 BC 13thFloor InstallLowCurrentWiring 10 0.00% 0.00% 9Jan17 19Jan17 14Jan17 24Jan17 4 110 OnTarget
BC13FMEPD1060 BC 13thFloor InstallHVACPipes 12 0.00% 20.00% 9Jan17 22Jan17 23Nov16A 10Jan17 10 10 OnTarget
BC13FMEPD1070 BC 13thFloor Firefightingpipes 10 0.00% 0.00% 15Jan17 25Jan17 2Jan17 14Jan17 10 10 OnTarget
BC13FMEPD1080 BC 13thFloor InstallDuctsandHangers 14 0.00% 0.00% 14Jan17 29Jan17 1Jan17 17Jan17 10 10 OnTarget
BC13FMEPD1090 BC 13thFloor DBInstallation 10 0.00% 0.00% 18Jan17 29Jan17 5Jan17 17Jan17 10 12 OnTarget
BC13FMEPD1100 BC 13thFloor InstallDroppers 12 0.00% 0.00% 30Jan17 12Feb17 17Jan17 31Jan17 10 10 OnTarget
BC13FMEPD1110 BC 13thFloor MeggeringTest 10 0.00% 0.00% 1Feb17 12Feb17 19Jan17 31Jan17 10 10 OnTarget
WetArea 63 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPworks 57 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC13FMEPW1000 BC 13thFloor WetAreaScreedMEpClearance 12 0.00% 58.00% 23Jan17 5Feb17 26Nov16A 9Feb17 4 6 OnTarget
BC13FMEPW1010 BC 13thFloor WetAreaHLClearancebyARMAforgridfixing 18 0.00% 0.00% 30Jan17 19Feb17 14Jan17 2Feb17 14 16 OnTarget
BC13FMEPW1020 BC 13thFloor WetAreaMEPclearanceforBoardclosing 18 0.00% 0.00% 23Feb17 15Mar17 7Feb17 27Feb17 14 16 OnTarget
BC13FMEPW1030 BC 13thFloor InstallElectricalWiring 10 0.00% 0.00% 9Jan17 19Jan17 14Jan17 24Jan17 4 6 OnTarget
BC13FMEPW1040 BC 13thFloor InstallDrainagepipes 10 0.00% 24.00% 10Jan17 21Jan17 23Dec16A 25Jan17 4 6 OnTarget
BC13FMEPW1050 BC 13thFloor InstallHot&ColdWaterPiping 10 0.00% 0.00% 11Jan17 22Jan17 16Jan17 26Jan17 4 6 OnTarget
BC13FMEPW1060 BC 13thFloor InstallHVACPipes 12 0.00% 20.00% 12Jan17 25Jan17 23Dec16A 30Jan17 4 6 OnTarget
BC13FMEPW1070 BC 13thFloor Firefightingpipes 7 0.00% 0.00% 19Jan17 26Jan17 24Jan17 31Jan17 4 5 OnTarget
BC13FMEPW1080 BC 13thFloor InstallDuctsandHangers 16 0.00% 0.00% 11Jan17 29Jan17 16Jan17 2Feb17 4 6 OnTarget
BC13FMEPW1090 BC 13thFloor InstallDroppers 12 0.00% 0.00% 23Feb17 8Mar17 7Feb17 20Feb17 14 22 OnTarget
BC13FMEPW1100 BC 13thFloor MeggeringTest 7 0.00% 0.00% 1Mar17 8Mar17 13Feb17 20Feb17 14 22 OnTarget
CorridorLiftLobby 71 0.00% 0.00% 27Dec16 2Mar17 26Nov16A 25Feb17 5 83 OnTarget
MEPworks 52 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC13FMEPCL1000 BC 13thFloor CorridorScreedMEpClearance 12 0.00% 100.00% 23Jan17 5Feb17 26Nov16A 19Dec16A 42 0 OnTarget
BC13FMEPCL1010 BC 13thFloor CorridorHLClearancebyARMAforgridfixing 21 0.00% 0.00% 30Jan17 22Feb17 14Jan17 6Feb17 14 16 OnTarget
BC13FMEPCL1020 BC 13thFloor CorridorMEPclearanceforBoardclosing 18 0.00% 0.00% 21Feb17 13Mar17 8Feb17 28Feb17 11 13 OnTarget
BC13FMEPCL1030 BC 13thFloor InstallElectricalWiring 10 0.00% 0.00% 12Jan17 23Jan17 17Jan17 28Jan17 4 13 OnTarget
BC13FMEPCL1050 BC 13thFloor InstallHot&ColdWaterPiping 10 0.00% 0.00% 16Jan17 26Jan17 21Jan17 31Jan17 4 13 OnTarget
BC13FMEPCL1060 BC 13thFloor Firefightingpipes 7 0.00% 0.00% 19Jan17 26Jan17 24Jan17 31Jan17 4 13 OnTarget
BC13FMEPCL1070 BC 13thFloor InstallHVACPipes 12 0.00% 60.00% 17Jan17 30Jan17 27Nov16A 4Feb17 4 13 OnTarget
BC13FMEPCL1080 BC 13thFloor InstallDuctsandHangers 14 0.00% 0.00% 18Jan17 2Feb17 23Jan17 7Feb17 4 13 OnTarget
BC13FMEPCL1090 BC 13thFloor InstallCableTraysandTrunking 14 0.00% 0.00% 22Jan17 6Feb17 26Jan17 11Feb17 4 13 OnTarget
BC13FMEPCL1095 BC 13thFloor InstallLowCurrentWiring 10 0.00% 10.00% 7Feb17 18Feb17 27Nov16A 9Jan17 34 37 OnTarget
BC13FMEPCL1100 BC 13thFloor InstallLVCables 7 0.00% 0.00% 2Feb17 9Feb17 7Feb17 14Feb17 4 13 OnTarget
BC13FMEPCL1110 BC 13thFloor InstallDroppers 12 0.00% 0.00% 11Feb17 23Feb17 15Feb17 28Feb17 4 13 OnTarget
BC13FMEPCL1120 BC 13thFloor MeggeringTest 7 0.00% 0.00% 16Feb17 23Feb17 21Feb17 28Feb17 4 13 OnTarget
CommonFinalFinishes 41 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPworks 24 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC13FMEPF1005 BC 13thFloor InstallGYMEquipment 24 0.00% 0.00% 7Mar17 3Apr17 22Feb17 22Mar17 10 10 OnTarget
BC13FMEPF1010 BC 13thFloor InstallLightFittings 14 0.00% 0.00% 12Mar17 27Mar17 27Feb17 14Mar17 11 13 OnTarget
BC13FMEPF1020 BC 13thFloor InstallFireCabinets 14 0.00% 0.00% 13Mar17 28Mar17 28Feb17 15Mar17 11 13 OnTarget
BC13FMEPF1030 BC 13thFloor InstallFireAlarmsandSpeakers 14 0.00% 0.00% 13Mar17 28Mar17 28Feb17 15Mar17 11 13 OnTarget
BC13FMEPF1040 BC 13thFloor InstallSprinklers 14 0.00% 0.00% 14Mar17 29Mar17 1Mar17 16Mar17 11 13 OnTarget
BC13FMEPF1050 BC 13thFloor InstallSwitchesandSockets 14 0.00% 0.00% 14Mar17 29Mar17 1Mar17 16Mar17 11 13 OnTarget
BC13FMEPF1060 BC 13thFloor InstallLowCurrentEquipments 14 0.00% 0.00% 15Mar17 30Mar17 2Mar17 18Mar17 11 13 OnTarget
BC13FMEPF1070 BC 13thFloor InstallGrillesandDiffussers 14 0.00% 0.00% 15Mar17 30Mar17 2Mar17 18Mar17 11 13 OnTarget
BC13FMEPF1075 BC 13thFloor MEPFinalFixes/Sanitarywares 12 0.00% 0.00% 14Mar17 27Mar17 1Mar17 14Mar17 11 16 OnTarget
BC13FMEPF1080 BC 13thFloor InstallPlumpingFinalTittings(FloorDrains,Floortraps 14 0.00% 0.00% 15Mar17 30Mar17 2Mar17 18Mar17 11 13 OnTarget
14thFloor 100 0.00% 0.00% 19Dec16 13Apr17 23Nov16A 16Apr17 2 40 OnTarget
DryArea 50 0.00% 0.00% 18Dec16 7Mar17 27Nov16A 10Apr17 29 22 OnTarget
MEPworks 33 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC14FMEPD1000 BC 14F DraAreaMEPScreedclearance 10 0.00% 100.00% 25Jan17 5Feb17 02Dec16A 19Dec16A 42 0 OnTarget
BC14FMEPD1010 BC 14F DryAreaMEPHLClearancebyARMAforgridfixing 12 0.00% 0.00% 16Jan17 29Jan17 10Jan17 23Jan17 5 26 OnTarget
BC14FMEPD1020 BC 14F DryAreaMEPclearanceforBoardclosing 12 0.00% 0.00% 30Jan17 12Feb17 24Jan17 6Feb17 5 26 OnTarget
BC14FMEPD1040 BC 14F InstallElectricalWiring 10 0.00% 0.00% 5Jan17 16Jan17 10Jan17 21Jan17 4 1 OnTarget
BC14FMEPD1050 BC 14F InstallLowCurrentWiring 10 0.00% 0.00% 9Jan17 19Jan17 14Jan17 24Jan17 4 110 OnTarget
BC14FMEPD1060 BC 14F InstallHVACPipes 12 0.00% 20.00% 9Jan17 22Jan17 23Nov16A 10Jan17 10 10 OnTarget
BC14FMEPD1070 BC 14F Firefightingpipes 10 0.00% 0.00% 15Jan17 25Jan17 2Jan17 14Jan17 10 10 OnTarget
BC14FMEPD1080 BC 14F InstallDuctsandHangers 14 0.00% 0.00% 14Jan17 29Jan17 1Jan17 17Jan17 10 10 OnTarget
BC14FMEPD1090 BC 14F DBInstallation 10 0.00% 0.00% 18Jan17 29Jan17 5Jan17 17Jan17 10 10 OnTarget
BC14FMEPD1100 BC 14F InstallDroppers 12 0.00% 0.00% 30Jan17 12Feb17 24Jan17 6Feb17 5 26 OnTarget
BC14FMEPD1110 BC 14F MeggeringTest 10 0.00% 0.00% 1Feb17 12Feb17 26Jan17 6Feb17 5 26 OnTarget
WetArea 56 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPworks 50 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC14FMEPW1000 BC 14F WetAreaScreedMEpClearance 6 0.00% 95.00% 2Feb17 8Feb17 25Dec16A 13Feb17 4 2 OnTarget
BC14FMEPW1010 BC 14F WetAreaHLClearancebyARMAforgridfixing 10 0.00% 0.00% 22Jan17 1Feb17 26Jan17 6Feb17 4 1 OnTarget
BC14FMEPW1020 BC 14F WetAreaMEPclearanceforBoardclosing 12 0.00% 0.00% 23Feb17 8Mar17 28Feb17 13Mar17 4 1 OnTarget
BC14FMEPW1030 BC 14F InstallElectricalWiring 12 0.00% 0.00% 10Jan17 23Jan17 15Jan17 28Jan17 4 1 OnTarget
BC14FMEPW1040 BC 14F InstallDrainagepipes 10 0.00% 0.00% 14Jan17 24Jan17 18Jan17 29Jan17 4 1 OnTarget
BC14FMEPW1050 BC 14F InstallHot&ColdWaterPiping 10 0.00% 0.00% 15Jan17 25Jan17 19Jan17 30Jan17 4 1 OnTarget
BC14FMEPW1060 BC 14F InstallHVACPipes 12 0.00% 20.00% 16Jan17 29Jan17 23Dec16A 2Feb17 4 1 OnTarget
BC14FMEPW1070 BC 14F Firefightingpipes 5 0.00% 0.00% 25Jan17 30Jan17 30Jan17 4Feb17 4 0 OnTarget
BC14FMEPW1080 BC 14F InstallDuctsandHangers 14 0.00% 0.00% 17Jan17 1Feb17 22Jan17 6Feb17 4 1 OnTarget
BC14FMEPW1090 BC 14F InstallDroppers 10 0.00% 0.00% 19Feb17 1Mar17 23Feb17 6Mar17 4 5 OnTarget
BC14FMEPW1100 BC 14F MeggeringTest 5 0.00% 0.00% 25Feb17 1Mar17 1Mar17 6Mar17 4 5 OnTarget
CorridorLiftLobby 54 0.00% 0.00% 27Dec16 2Mar17 26Nov16A 25Feb17 5 83 OnTarget
MEPworks 38 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC14FMEPCL1000 BC 14F CorridorScreedMEpClearance 6 0.00% 0.00% 11Feb17 16Feb17 15Feb17 21Feb17 4 43 OnTarget
BC14FMEPCL1010 BC 14F CorridorHLClearancebyARMAforgridfixing 10 0.00% 0.00% 31Jan17 11Feb17 5Feb17 15Feb17 4 8 OnTarget
BC14FMEPCL1020 BC 14F CorridorMEPclearanceforBoardclosing 10 0.00% 0.00% 14Feb17 25Feb17 19Feb17 1Mar17 4 8 OnTarget
BC14FMEPCL1030 BC 14F InstallElectricalWiring 10 0.00% 0.00% 12Jan17 23Jan17 17Jan17 28Jan17 4 8 OnTarget
BC14FMEPCL1050 BC 14F InstallHot&ColdWaterPiping 10 0.00% 0.00% 16Jan17 26Jan17 21Jan17 31Jan17 4 8 OnTarget
BC14FMEPCL1060 BC 14F Firefightingpipes 10 0.00% 0.00% 16Jan17 26Jan17 21Jan17 31Jan17 4 8 OnTarget
BC14FMEPCL1070 BC 14F InstallHVACPipes 10 0.00% 60.00% 19Jan17 30Jan17 27Nov16A 4Feb17 4 8 OnTarget
BC14FMEPCL1080 BC 14F InstallDuctsandHangers 12 0.00% 0.00% 21Jan17 2Feb17 25Jan17 7Feb17 4 8 OnTarget
BC14FMEPCL1090 BC 14F InstallCableTraysandTrunking 12 0.00% 0.00% 24Jan17 6Feb17 29Jan17 11Feb17 4 8 OnTarget
BC14FMEPCL1095 BC 14F InstallLowCurrentWiring 10 0.00% 0.00% 30Jan17 9Feb17 4Feb17 14Feb17 4 8 OnTarget
BC14FMEPCL1100 BC 14F InstallLVCables 10 0.00% 0.00% 30Jan17 9Feb17 4Feb17 14Feb17 4 9 OnTarget
BC14FMEPCL1110 BC 14F InstallDroppers 10 0.00% 0.00% 12Feb17 22Feb17 16Feb17 27Feb17 4 10 OnTarget
BC14FMEPCL1120 BC 14F MeggeringTest 10 0.00% 0.00% 12Feb17 22Feb17 16Feb17 27Feb17 4 10 OnTarget
CommonFinalFinishes 41 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPworks 21 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BC14FMEPF1010 BC 14F InstallLightFittings 14 0.00% 0.00% 5Mar17 20Mar17 9Mar17 25Mar17 4 0 OnTarget
BC14FMEPF1020 BC 14F InstallFireCabinets 14 0.00% 0.00% 7Mar17 22Mar17 12Mar17 27Mar17 4 0 OnTarget
BC14FMEPF1030 BC 14F InstallFireAlarmsandSpeakers 14 0.00% 0.00% 7Mar17 22Mar17 12Mar17 27Mar17 4 0 OnTarget
BC14FMEPF1040 BC 14F InstallSprinklers 14 0.00% 0.00% 9Mar17 25Mar17 14Mar17 29Mar17 4 0 OnTarget
BC14FMEPF1050 BC 14F InstallSwitchesandSockets 14 0.00% 0.00% 9Mar17 25Mar17 14Mar17 29Mar17 4 0 OnTarget
BC14FMEPF1060 BC 14F InstallLowCurrentEquipments 14 0.00% 0.00% 11Mar17 26Mar17 15Mar17 30Mar17 4 0 OnTarget
BC14FMEPF1070 BC 14F InstallGrillesandDiffussers 14 0.00% 0.00% 13Mar17 28Mar17 18Mar17 2Apr17 4 0 OnTarget
BC14FMEPF1075 BC 14F MEPFinalFixes/Sanitarywares 12 0.00% 0.00% 9Mar17 22Mar17 14Mar17 27Mar17 4 1 OnTarget
BC14FMEPF1080 BC 14F InstallPlumpingFinalTittings(FloorDrains,Floortraps 14 0.00% 0.00% 13Mar17 28Mar17 18Mar17 2Apr17 4 0 OnTarget
RoofFloor 97 0.00% 0.00% 27Nov16 19Mar17 26Nov16A 27Feb17 18 82 OnTarget
General 33 0.00% 0.00% 27Nov16 3Jan17 27Nov16A 17Jan17 11 117 OnTarget
BCRF1005 BC Roof FAHUinstalaltionandconenction 24 100.00% 70.00% 27Nov16 24Dec16 27Nov16A 8Jan17 12 61 Delayed
BCRF1015 BC Roof Chillersconnection/termination 24 100.00% 83.00% 30Nov16 27Dec16 27Nov16A 11Jan17 12 61 Delayed
BCRF1025 BC Roof HOtwatersolarpanelinstalaltionandconnections 24 95.83% 96.00% 4Dec16 31Dec16 27Nov16A 15Jan17 12 61 OnTarget
ChilledwaterpumpRoom/PumpRoom 72 0.00% 0.00% 27Nov16 18Feb17 26Nov16A 14Feb17 4 93 OnTarget
BCRF1000 BC Roof PlasterMEpClearance 10 100.00% 100.00% 27Nov16 7Dec16 27Nov16A 18Dec16A 8 0 OnTarget
BCRF1030 BC Roof MEPScreedclearance 10 100.00% 100.00% 19Dec16 29Dec16 26Nov16A 26Nov16A 30 0 OnTarget
BCRF1045 BC Roof MEPInstallations/Connections 36 8.33% 40.00% 27Dec16 6Feb17 27Nov16A 24Jan17 11 48 OnTarget
BCRF1050 BC Roof MEPHLClearancebyARMAforceilingpainting 12 83.33% 33.00% 19Dec16 1Jan17 27Nov16A 9Jan17 6 41 Delayed
DelayAnalysisReportBasedonTargetProgram *DelayedActivitiesareHiglightedInRed DataDate: 29Dec16
VarianceBL
Original Schedule% Activity% BLProject BLProject Actual/Forecas Actual/Forecas Delayed/O
ActivityID Building Floor ActivityName ProjectFinish TotalFloat
Duration Complete Complete Start Finish tedStart tedFinish nTrack
Date
BCRF1190 BC Roof MEPFinalFixes 8 0.00% 0.00% 2Feb17 11Feb17 29Jan17 7Feb17 4 41 OnTarget
ElectricalRoom 54 0.00% 0.00% 20Dec16 20Feb17 19Dec16A 27Feb17 5 69 OnTarget
BCRF1480 BC Roof PlasterMEpClearance 6 83.33% 0.00% 25Dec16 31Dec16 31Dec16 7Jan17 5 27 Delayed
BCRF1510 BC Roof MEPScreedclearance 3 0.00% 0.00% 10Jan17 12Jan17 16Jan17 19Jan17 5 27 OnTarget
BCRF1530 BC Roof MEPInstallations/Connections 24 0.00% 0.00% 17Jan17 13Feb17 23Jan17 20Feb17 5 27 OnTarget
BCRF1540 BC Roof MEPHLClearancebyARMAforceilingpainting 10 0.00% 0.00% 10Jan17 21Jan17 16Jan17 28Jan17 5 34 OnTarget
BCRF1550 BC Roof Primer,Stucco,1stCoatPaintingforceiling&Wall 5 0.00% 0.00% 22Jan17 26Jan17 28Jan17 2Feb17 5 34 OnTarget
BCRF1580 BC Roof MEPFinalFixes 3 0.00% 0.00% 14Feb17 16Feb17 20Feb17 23Feb17 5 27 OnTarget
FAHU+SMokeFanRoom 42 0.00% 0.00% 24Dec16 9Feb17 27Nov16A 29Jan17 11 107 OnTarget
BCRF1600 BC Roof PlasterMEpClearance 10 60.00% 100.00% 24Dec16 3Jan17 27Nov16A 01Dec16A 29 0 OnTarget
BCRF1630 BC Roof MEPScreedclearance 10 0.00% 100.00% 1Jan17 11Jan17 27Nov16A 01Dec16A 36 0 OnTarget
BCRF1650 BC Roof MEPInstallations/Connections 24 0.00% 65.00% 7Jan17 2Feb17 27Nov16A 9Jan17 22 62 OnTarget
BCRF1660 BC Roof MEPHLClearancebyARMAforceilingpainting 12 0.00% 30.00% 1Jan17 14Jan17 07Dec16A 9Jan17 5 51 OnTarget
BCRF1700 BC Roof MEPFinalFixes 6 0.00% 0.00% 31Jan17 6Feb17 18Jan17 25Jan17 11 51 OnTarget
StaircaseFInishes 85 0.00% 0.00% 27Nov16 5Mar17 26Nov16A 8Mar17 3 3 OnTarget
BCSTS11020 BC PlasterMEPClearance 24 66.67% 70.00% 12Dec16 8Jan17 26Nov16A 11Jan17 2 2 OnTarget
Roofing 71 0.00% 0.00% 27Nov16 16Feb17 26Nov16A 7Feb17 8 83 OnTarget
BCRFS12070 BC Roof RoofEquipmentInstallation&Conncetion 48 12.50% 30.00% 24Dec16 16Feb17 27Nov16A 7Feb17 8 40 OnTarget
MEPServiceRoomworks 79 0.00% 0.00% 27Nov16 26Feb17 26Nov16A 27Feb17 0 82 OnTarget
BCSRS1SP1710 BC OtherServiceRoomsMEPworkcompletion 36 47.22% 48.00% 11Dec16 21Jan17 27Nov16A 21Jan17 0 39 OnTarget
LVRoom 33 0.00% 0.00% 27Nov16 3Jan17 27Nov16A 8Jan17 4 124 OnTarget
BCLVS11070 BC MEPInstalaltion&Conenctions 24 95.83% 80.00% 4Dec16 31Dec16 27Nov16A 4Jan17 4 21 Delayed
ElectricalRooms/Telephone/WaterMeterRoom 69 0.00% 0.00% 27Nov16 14Feb17 26Nov16A 27Feb17 10 82 OnTarget
BCELS11010 BC MEPClearanceforPlaster 21 100.00% 100.00% 27Nov16 20Dec16 26Nov16A 27Nov16A 21 0 OnTarget
BCELS11030 BC MEPClearanceforScreed(AsApplicable) 21 80.95% 81.00% 11Dec16 3Jan17 26Nov16A 16Jan17 10 5 OnTarget
BCELS11060 BC MEPworkCompletionbyARMA 30 56.67% 57.00% 11Dec16 14Jan17 27Nov16A 14Jan17 0 17 OnTarget
FanRoom 72 0.00% 0.00% 27Nov16 18Feb17 26Nov16A 4Feb17 12 88 OnTarget
BCFNS11030 BC MEPClearanceforScreed(AsApplicable) 12 66.67% 100.00% 21Dec16 3Jan17 26Nov16A 20Dec16A 13 0 OnTarget
BCFNS11070 BC MEPworkCompletionbyARMA 24 8.33% 60.00% 28Dec16 24Jan17 27Nov16A 10Jan17 12 64 OnTarget
GeneratorRoom 45 0.00% 0.00% 27Nov16 17Jan17 27Nov16A 11Jan17 5 102 OnTarget
BCGNS11000 BC GeneratorInstallation&connection 36 80.56% 95.00% 27Nov16 7Jan17 27Nov16A 1Jan17 5 72 OnTarget
Firewaterpump&IrrigationPumproom 45 0.00% 0.00% 11Dec16 31Jan17 27Nov16A 25Jan17 5 96 OnTarget
BCPUS11000 BC PumpInstallation&conenctions 36 47.22% 95.00% 11Dec16 21Jan17 27Nov16A 15Jan17 5 96 OnTarget
Garbageroom 79 0.00% 0.00% 27Nov16 26Feb17 26Nov16A 26Feb17 0 82 OnTarget
BCGRS11010 BC MEPClearanceforPlaster 10 100.00% 100.00% 27Nov16 7Dec16 26Nov16A 27Nov16A 10 0 OnTarget
BCGRS11030 BC MEPClearanceforScreed 6 33.33% 70.00% 28Dec16 3Jan17 26Nov16A 5Jan17 2 124 OnTarget
BCGRS11060 BC MEPworkCompletionbyARMA 21 61.90% 62.00% 15Dec16 8Jan17 27Nov16A 8Jan17 0 30 OnTarget
SwimmingPool&Pumprooms 54 0.00% 0.00% 27Nov16 28Jan17 26Nov16A 13Feb17 14 35 OnTarget
BCSPS11010 BC SwimmingPoolMEPWorksinctesting 42 40.48% 40.00% 11Dec16 28Jan17 27Nov16A 13Feb17 14 35 Delayed
ExternalElevation 78 0.00% 0.00% 27Nov16 25Feb17 26Nov16A 6Mar17 8 75 OnTarget
Pour01WestElevation 62 0.00% 0.00% 27Nov16 6Feb17 26Nov16A 16Feb17 9 90 OnTarget
BCEVS11045 BC MEPCutting&Chasingforconduits 6 100.00% 100.00% 27Nov16 3Dec16 26Nov16A 27Nov16A 6 0 OnTarget
BCEVS11330 BC MEPFittings 10 0.00% 0.00% 19Jan17 30Jan17 30Jan17 9Feb17 9 13 OnTarget
Pour01SouthElevation 61 0.00% 0.00% 4Dec16 12Feb17 26Nov16A 13Feb17 1 93 OnTarget
BCEVS11600 BC MEPCutting&Chasingforconduits 6 100.00% 100.00% 4Dec16 10Dec16 27Nov16A 27Nov16A 12 0 OnTarget
BCEVS11670 BC MEPFittings 10 0.00% 0.00% 25Jan17 5Feb17 26Jan17 6Feb17 1 16 OnTarget
CourtyardNorthElevation 54 0.00% 0.00% 29Nov16 30Jan17 26Nov16A 6Feb17 6 99 OnTarget
BCEVS11240 BC MEPCutting&Chasingforconduits 10 100.00% 100.00% 29Nov16 10Dec16 26Nov16A 27Nov16A 12 0 OnTarget
BCEVS11510 BC MEPFittings 10 0.00% 0.00% 12Jan17 23Jan17 26Jan17 6Feb17 12 99 OnTarget
CourtyardWestElevation 61 0.00% 0.00% 7Dec16 15Feb17 26Nov16A 13Feb17 2 93 OnTarget
BCEVS11700 BC MEPCutting&Chasingforconduits 6 100.00% 100.00% 7Dec16 13Dec16 26Nov16A 27Nov16A 15 0 OnTarget
BCEVS11770 BC MEPFittings 10 0.00% 0.00% 29Jan17 8Feb17 26Jan17 6Feb17 2 16 OnTarget
CourtyardSouthElevation 61 0.00% 0.00% 11Dec16 19Feb17 26Nov16A 13Feb17 5 93 OnTarget
BCEVS11800 BC MEPCutting&Chasingforconduits 6 100.00% 100.00% 11Dec16 17Dec16 26Nov16A 22Dec16A 4 0 OnTarget
BCEVS11870 BC MEPFittings 10 0.00% 0.00% 1Feb17 12Feb17 26Jan17 6Feb17 5 16 OnTarget
Pour02WestElevation 70 0.00% 0.00% 27Nov16 15Feb17 26Nov16A 16Feb17 1 90 OnTarget
BCEVS11070 BC MEPCutting&Chasingforconduits 10 100.00% 100.00% 4Dec16 14Dec16 26Nov16A 27Nov16A 16 0 OnTarget
BCEVS11340 BC MEPFittings 10 0.00% 0.00% 29Jan17 8Feb17 30Jan17 9Feb17 1 13 OnTarget
Pour02NorthElevation 76 0.00% 0.00% 29Nov16 25Feb17 26Nov16A 6Mar17 8 75 OnTarget
BCEVS11250 BC MEPCutting&Chasingforconduits 18 77.78% 25.00% 14Dec16 3Jan17 05Dec16A 15Jan17 10 2 Delayed
BCEVS11520 BC MEPFittings 14 0.00% 0.00% 2Feb17 18Feb17 12Feb17 27Feb17 8 2 OnTarget
EastElevation 69 0.00% 0.00% 6Dec16 23Feb17 26Nov16A 13Feb17 9 93 OnTarget
BCEVS11260 BC MEPCutting&Chasingforconduits 18 83.33% 95.00% 13Dec16 2Jan17 29Nov16A 31Dec16 2 131 OnTarget
BCEVS11530 BC MEPFittings 12 0.00% 0.00% 4Feb17 16Feb17 24Jan17 6Feb17 9 16 OnTarget
ExternalWork 50 0.00% 0.00% 6Feb17 4Apr17 15Feb17 6Apr17 2 2 OnTarget
BCEXS11020 BC ExternalMEPServices 30 0.00% 0.00% 13Feb17 19Mar17 15Feb17 21Mar17 2 2 OnTarget
Testing&Commissioning 54 0.00% 0.00% 27Feb17 30Apr17 1Mar17 2May17 2 25 OnTarget
BCTCS3ME1120 BC Testingandcommissioningforallsystem 48 0.00% 0.00% 27Feb17 23Apr17 1Mar17 25Apr17 2 2 OnTarget
Electrical 36 0.00% 0.00% 27Feb17 9Apr17 1Mar17 11Apr17 2 43 OnTarget
BCTC1070 BC TestingandCommissioningofLVPanels&System 28 0.00% 0.00% 27Feb17 30Mar17 1Mar17 2Apr17 2 43 OnTarget
BCTC1080 BC TestingandCommissioningofMCC's 28 0.00% 0.00% 27Feb17 30Mar17 1Mar17 2Apr17 2 43 OnTarget
BCTC1090 BC TestingandCommissioningofLightningProtectionSys 18 0.00% 0.00% 13Mar17 2Apr17 15Mar17 4Apr17 2 43 OnTarget
BCTC1100 BC TestingandCommissioningofEarthingSystem 18 0.00% 0.00% 20Mar17 9Apr17 22Mar17 11Apr17 2 43 OnTarget
BCTC1110 BC TestingandCommissioningofGenerator 12 0.00% 0.00% 27Mar17 9Apr17 29Mar17 11Apr17 2 43 OnTarget
LowCurrentSystems 28 0.00% 0.00% 27Feb17 30Mar17 1Mar17 2Apr17 2 2 OnTarget
BCTC1160 BC TestCentralBatterySystem 24 0.00% 0.00% 27Feb17 26Mar17 1Mar17 28Mar17 2 2 OnTarget
BCTC1170 BC TestStructuredCabling(data&telecom) 24 0.00% 0.00% 27Feb17 26Mar17 1Mar17 28Mar17 2 2 OnTarget
BCTC1180 BC TestLightingControlSystem 24 0.00% 0.00% 27Feb17 26Mar17 1Mar17 28Mar17 2 2 OnTarget
BCTC1190 BC TestSMATV 24 0.00% 0.00% 27Feb17 26Mar17 1Mar17 28Mar17 2 2 OnTarget
BCTC1200 BC TestVoiceEvacuationSystem 24 0.00% 0.00% 27Feb17 26Mar17 1Mar17 28Mar17 2 2 OnTarget
BCTC1210 BC TestCCTVandAccessControlSystem 18 0.00% 0.00% 27Feb17 19Mar17 1Mar17 21Mar17 2 2 OnTarget
BCTC1220 BC TestGRMSSystem 28 0.00% 0.00% 27Feb17 30Mar17 1Mar17 2Apr17 2 2 OnTarget
BCTC1230 BC TestUPS 12 0.00% 0.00% 18Mar17 30Mar17 20Mar17 2Apr17 2 2 OnTarget
BCTC1240 BC TestAudioVisualSystem 24 0.00% 0.00% 4Mar17 30Mar17 6Mar17 2Apr17 2 2 OnTarget
BCTC1250 BC TestFireAlarmSystem 24 0.00% 0.00% 4Mar17 30Mar17 6Mar17 2Apr17 2 2 OnTarget
FireFightingSystems 27 0.00% 0.00% 6Mar17 5Apr17 8Mar17 8Apr17 2 2 OnTarget
BCTC1300 BC Testing&CommissioningofFirePumps 12 0.00% 0.00% 6Mar17 19Mar17 8Mar17 21Mar17 2 2 OnTarget
BCTC1310 BC Testing&CommissioningofFireFHC's 12 0.00% 0.00% 9Mar17 22Mar17 12Mar17 25Mar17 2 2 OnTarget
BCTC1320 BC Testing&CommissioningofGasFireSuppressionSyste 18 0.00% 0.00% 16Mar17 5Apr17 19Mar17 8Apr17 2 2 OnTarget
DrainageSystems 12 0.00% 0.00% 10Apr17 23Apr17 12Apr17 25Apr17 2 2 OnTarget
BCTC1270 BC TestingandCommissioningofPumps 12 0.00% 0.00% 10Apr17 23Apr17 12Apr17 25Apr17 2 2 OnTarget
BCTC1280 BC TestingandCommissioningofDrainageSystem 12 0.00% 0.00% 10Apr17 23Apr17 12Apr17 25Apr17 2 2 OnTarget
WaterSupplySystem 24 0.00% 0.00% 27Feb17 26Mar17 1Mar17 28Mar17 2 8 OnTarget
BCTC1120 BC TestingandCommissioningofPumps 12 0.00% 0.00% 27Feb17 12Mar17 1Mar17 14Mar17 2 8 OnTarget
BCTC1130 BC TestingandCommissioningofWaterHeaters 24 0.00% 0.00% 27Feb17 26Mar17 1Mar17 28Mar17 2 8 OnTarget
BCTC1140 BC TestingandCommissioningofWaterTank 12 0.00% 0.00% 6Mar17 19Mar17 8Mar17 21Mar17 2 5 OnTarget
BCTC1150 BC WaterSupplyFlushingandChlorination 12 0.00% 0.00% 9Mar17 22Mar17 12Mar17 25Mar17 2 5 OnTarget
HVACSystem 54 0.00% 0.00% 27Feb17 30Apr17 1Mar17 2May17 2 0 OnTarget
BCTC1010 BC FlushingofChilledWaterSystem 24 0.00% 0.00% 27Feb17 26Mar17 1Mar17 28Mar17 2 24 OnTarget
BCTC1015 BC FAHU 18 0.00% 0.00% 6Mar17 26Mar17 8Mar17 28Mar17 2 24 OnTarget
BCTC1020 BC FCU 18 0.00% 0.00% 3Apr17 23Apr17 5Apr17 25Apr17 2 0 OnTarget
BCTC1030 BC WaterBalancing 24 0.00% 0.00% 3Apr17 30Apr17 5Apr17 2May17 2 0 OnTarget
BCTC1040 BC AirBalancing 24 0.00% 0.00% 3Apr17 30Apr17 5Apr17 2May17 2 0 OnTarget
BCTC1050 BC VentilationSystem 18 0.00% 0.00% 10Apr17 30Apr17 12Apr17 2May17 2 0 OnTarget
BMSSystem 24 0.00% 0.00% 27Mar17 23Apr17 29Mar17 25Apr17 2 5 OnTarget
BCTC1260 BC BMSSystemtTesting&Commissioning 24 0.00% 0.00% 27Mar17 23Apr17 29Mar17 25Apr17 2 5 OnTarget
LPGSystem 12 0.00% 0.00% 10Apr17 23Apr17 12Apr17 25Apr17 2 0 OnTarget
BCTC1290 BC Testing&CommissioningofLPGSystem 12 0.00% 0.00% 10Apr17 23Apr17 12Apr17 25Apr17 2 0 OnTarget
BoilerSystem 12 0.00% 0.00% 10Apr17 23Apr17 12Apr17 25Apr17 2 0 OnTarget
BCTC1330 BC Testing&CommissioningofBoilerSystem 12 0.00% 0.00% 10Apr17 23Apr17 12Apr17 25Apr17 2 0 OnTarget
AuthorityApproval 148 0.00% 0.00% 27Nov16 17May17 02Dec16A 18May17 1 1 OnTarget
Transformer&RMUworks(HVApprovals) 61 0.00% 0.00% 27Nov16 5Feb17 02Dec16A 23Jan17 11 37 OnTarget
BCAAMEP1000 BC Transformer/CableProcurement 12 100.00% 100.00% 27Nov16 10Dec16 02Dec16A 02Dec16A 7 0 OnTarget
BCAAMEP1010 BC Transformerinstallation&Connection 28 60.71% 100.00% 11Dec16 11Jan17 08Dec16A 08Dec16A 30 0 OnTarget
BCAAMEP1020 BC AuthorityApprovals 21 0.00% 0.00% 12Jan17 5Feb17 31Dec16 23Jan17 11 37 OnTarget
LVApproval 32 0.00% 0.00% 29Jan17 7Mar17 17Jan17 23Feb17 10 10 OnTarget
BCAAMEP1030 BC RequestforDEWAinspection 0 0.00% 0.00% 0Jan00 29Jan17 0Jan00 17Jan17 8 8 OnTarget
BCAAMEP1040 BC DEWA1stinspection 7 0.00% 0.00% 30Jan17 6Feb17 17Jan17 25Jan17 10 10 OnTarget
BCAAMEP1050 BC ClearDEWAsnag&applyforfinalinspection 6 0.00% 0.00% 7Feb17 13Feb17 25Jan17 1Feb17 10 10 OnTarget
BCAAMEP1060 BC Dewasecondinspection/Approval 7 0.00% 0.00% 14Feb17 21Feb17 1Feb17 9Feb17 10 10 OnTarget
BCAAMEP1070 BC Collection&installationofKWHmeters 12 0.00% 0.00% 22Feb17 7Mar17 9Feb17 23Feb17 10 10 OnTarget
DelayAnalysisReportBasedonTargetProgram *DelayedActivitiesareHiglightedInRed DataDate: 29Dec16
VarianceBL
Original Schedule% Activity% BLProject BLProject Actual/Forecas Actual/Forecas Delayed/O
ActivityID Building Floor ActivityName ProjectFinish TotalFloat
Duration Complete Complete Start Finish tedStart tedFinish nTrack
Date
BCAAMEP1080 BC TemporaryPermenetPower 0 0.00% 0.00% 0Jan00 7Mar17 0Jan00 23Feb17 10 10 OnTarget
WaterSupplyApproval 146 0.00% 0.00% 27Nov16 15May17 31Dec16 17May17 2 0 OnTarget
BCAAMEP1090 BC PaymentforWaterMeters 30 93.33% 0.00% 27Nov16 1Jan17 31Dec16 2Feb17 28 11 Delayed
BCAAMEP1100 BC WaterMeterdelivery 48 0.00% 0.00% 2Jan17 26Feb17 4Feb17 30Mar17 28 11 OnTarget
BCAAMEP1110 BC DEWAInspection 10 0.00% 0.00% 9Mar17 22Mar17 12Mar17 23Mar17 1 5 OnTarget
BCAAMEP1120 BC DewaApproval 10 0.00% 0.00% 23Mar17 3Apr17 26Mar17 5Apr17 2 6 OnTarget
BCAAMEP1130 BC InstalWaterMeter 6 0.00% 0.00% 4Apr17 10Apr17 6Apr17 12Apr17 2 6 OnTarget
BCAAMEP1140 BC Testing&Commisioning 12 0.00% 0.00% 18Apr17 1May17 20Apr17 3May17 2 0 OnTarget
BCAAMEP1150 BC ObtainNOCfromDEWAforWater 12 0.00% 0.00% 2May17 15May17 4May17 17May17 2 0 OnTarget
TelecomApproval 64 0.00% 0.00% 14Feb17 30Apr17 27Feb17 11May17 9 5 OnTarget
BCAAMEP1160 BC CompletionofTelecomroom 0 0.00% 0.00% 0Jan00 14Feb17 0Jan00 27Feb17 10 5 OnTarget
BCAAMEP1170 BC SubmitApplication 3 0.00% 0.00% 15Feb17 19Feb17 27Feb17 2Mar17 8 4 OnTarget
BCAAMEP1180 BC EtisalatInspection 10 0.00% 0.00% 20Feb17 5Mar17 2Mar17 16Mar17 8 4 OnTarget
BCAAMEP1190 BC CoordinationwithEtisalatContractor 12 0.00% 0.00% 6Mar17 19Mar17 16Mar17 30Mar17 9 5 OnTarget
BCAAMEP1200 BC Testing&Commisioning 12 0.00% 0.00% 20Mar17 2Apr17 30Mar17 13Apr17 9 5 OnTarget
BCAAMEP1210 BC Inspection&ApprovalbyEtisalat 12 0.00% 0.00% 3Apr17 16Apr17 13Apr17 27Apr17 9 5 OnTarget
BCAAMEP1220 BC ObtainNOCfromEtisalat 10 0.00% 0.00% 17Apr17 30Apr17 27Apr17 11May17 8 4 OnTarget
GSMApproval(Etisalat) 52 0.00% 0.00% 15Feb17 16Apr17 27Feb17 27Apr17 9 17 OnTarget
BCAAMEP1230 BC RequestforSiteSurvey 3 0.00% 0.00% 15Feb17 19Feb17 27Feb17 2Mar17 8 16 OnTarget
BCAAMEP1240 BC SiteSurveybyEtisalat(AfterStrCompletion) 10 0.00% 0.00% 20Feb17 2Mar17 2Mar17 14Mar17 9 19 OnTarget
BCAAMEP1250 BC CoordinationwithEtisalatContractor 12 0.00% 0.00% 4Mar17 16Mar17 14Mar17 28Mar17 9 19 OnTarget
BCAAMEP1260 BC Testing&Commisioning 12 0.00% 0.00% 20Mar17 2Apr17 30Mar17 13Apr17 9 17 OnTarget
BCAAMEP1270 BC FinalApprovalbyAuthority 10 0.00% 0.00% 3Apr17 13Apr17 13Apr17 25Apr17 9 19 OnTarget
BCAAMEP1280 BC ObtainNOCfromEtisalat 10 0.00% 0.00% 3Apr17 16Apr17 13Apr17 27Apr17 8 14 OnTarget
CivilDefence 30 0.00% 0.00% 5Mar17 16Apr17 8Mar17 19Apr17 3 20 OnTarget
BCAAMEP1290 BC RequestforDCDinspection 0 0.00% 0.00% 0Jan00 5Mar17 0Jan00 8Mar17 3 3 OnTarget
BCAAMEP1300 BC DCDInspection 10 0.00% 0.00% 6Mar17 19Mar17 8Mar17 22Mar17 3 3 OnTarget
BCAAMEP1310 BC ClearDCDsnags&requestfor2ndinspection 6 0.00% 0.00% 20Mar17 27Mar17 22Mar17 30Mar17 3 20 OnTarget
BCAAMEP1320 BC DCDsecondinspection 7 0.00% 0.00% 28Mar17 5Apr17 30Mar17 10Apr17 3 20 OnTarget
BCAAMEP1330 BC IssuanceofCivilDefensecertificate 7 0.00% 0.00% 6Apr17 16Apr17 10Apr17 19Apr17 3 20 OnTarget
CivilDefenceExternalFireHydrant 30 0.00% 0.00% 5Mar17 16Apr17 8Mar17 19Apr17 3 20 OnTarget
BCAAMEP1340 BC RequestforDCDinspection 0 0.00% 0.00% 0Jan00 5Mar17 0Jan00 8Mar17 3 20 OnTarget
BCAAMEP1350 BC DCDInspection 10 0.00% 0.00% 6Mar17 19Mar17 8Mar17 22Mar17 3 20 OnTarget
BCAAMEP1360 BC ClearDCDsnags&requestfor2ndinspection 6 0.00% 0.00% 20Mar17 27Mar17 22Mar17 30Mar17 3 20 OnTarget
BCAAMEP1370 BC DCDsecondinspection 7 0.00% 0.00% 28Mar17 5Apr17 30Mar17 10Apr17 3 20 OnTarget
BCAAMEP1380 BC IssuanceofCivilDefensecertificate 7 0.00% 0.00% 6Apr17 16Apr17 10Apr17 19Apr17 3 20 OnTarget
24X7DirectAlaram 46 0.00% 0.00% 20Mar17 11May17 23Mar17 16May17 4 1 OnTarget
BCAAMEP1390 BC SubmitApplication 3 0.00% 0.00% 20Mar17 22Mar17 23Mar17 27Mar17 3 1 OnTarget
BCAAMEP1400 BC InspectionbyAuthority 6 0.00% 0.00% 23Mar17 30Mar17 28Mar17 4Apr17 3 1 OnTarget
BCAAMEP1410 BC Releaseofestimate 6 0.00% 0.00% 1Apr17 6Apr17 5Apr17 11Apr17 4 1 OnTarget
BCAAMEP1420 BC Payment 6 0.00% 0.00% 8Apr17 13Apr17 12Apr17 18Apr17 4 1 OnTarget
BCAAMEP1430 BC PanelInstallation 12 0.00% 0.00% 15Apr17 27Apr17 19Apr17 2May17 4 1 OnTarget
BCAAMEP1440 BC ObtainNOC 10 0.00% 0.00% 30Apr17 11May17 3May17 16May17 3 1 OnTarget
LPG 28 0.00% 0.00% 5Apr17 15May17 9Apr17 17May17 2 0 OnTarget
BCAAMEP1450 BC RequestforLPGinspection 0 0.00% 0.00% 0Jan00 5Apr17 0Jan00 9Apr17 1 2 OnTarget
BCAAMEP1460 BC LPGInspection 6 0.00% 0.00% 6Apr17 13Apr17 9Apr17 16Apr17 1 2 OnTarget
BCAAMEP1470 BC ClearLPGsnags&requestfor2ndinspection 5 0.00% 0.00% 16Apr17 20Apr17 17Apr17 23Apr17 1 2 OnTarget
BCAAMEP1480 BC LPGsecondinspection 6 0.00% 0.00% 24Apr17 1May17 26Apr17 3May17 2 0 OnTarget
BCAAMEP1490 BC NOCfromAuthority 10 0.00% 0.00% 2May17 15May17 4May17 17May17 2 0 OnTarget
DubaiPolice 44 0.00% 0.00% 28Mar17 17May17 29Mar17 18May17 1 1 OnTarget
BCAAMEP1500 BC SubmitApplication 3 0.00% 0.00% 28Mar17 30Mar17 29Mar17 2Apr17 1 1 OnTarget
BCAAMEP1510 BC 1stInspectionbyAuthority 10 0.00% 0.00% 2Apr17 13Apr17 3Apr17 16Apr17 1 1 OnTarget
BCAAMEP1520 BC Commets&Rectification 7 0.00% 0.00% 15Apr17 22Apr17 17Apr17 24Apr17 2 2 OnTarget
BCAAMEP1530 BC FinalInspection&Approval 10 0.00% 0.00% 23Apr17 3May17 25Apr17 6May17 2 2 OnTarget
BCAAMEP1540 BC ObtainNOCfromDubaiPolice 10 0.00% 0.00% 4May17 17May17 7May17 18May17 1 1 OnTarget
DMApproval 51 0.00% 0.00% 20Mar17 17May17 22Mar17 18May17 1 1 OnTarget
BCAAMEP1550 BC Requestforinspection 4 0.00% 0.00% 20Mar17 23Mar17 22Mar17 28Mar17 3 3 OnTarget
BCAAMEP1560 BC EHSInspection 12 0.00% 0.00% 20Mar17 2Apr17 22Mar17 5Apr17 3 36 OnTarget
BCAAMEP1570 BC DMfirstinspection 12 0.00% 0.00% 26Mar17 10Apr17 28Mar17 13Apr17 3 3 OnTarget
BCAAMEP1580 BC DMCommentrectification 10 0.00% 0.00% 11Apr17 20Apr17 13Apr17 23Apr17 3 3 OnTarget
BCAAMEP1590 BC DMfinalinspection&Approval 13 0.00% 0.00% 23Apr17 9May17 23Apr17 10May17 1 1 OnTarget
BCAAMEP1600 BC FICconnection 7 0.00% 0.00% 10May17 17May17 10May17 18May17 1 1 OnTarget
BCAAMEP1610 BC StromWaterConnection 7 0.00% 0.00% 10May17 17May17 10May17 18May17 1 1 OnTarget
BCAAMEP1620 BC ObtainBuildingCompletionCertificate 0 0.00% 0.00% 0Jan00 17May17 0Jan00 18May17 1 1 OnTarget
ProjectCloseOut 53 0.00% 0.00% 1Apr17 31May17 2Apr17 1Jun17 1 1 OnTarget
BCPC1000 BC O&MManualSubmission 12 0.00% 0.00% 4May17 17May17 6May17 18May17 1 4 OnTarget
BCPC1010 BC O&MTaining 12 0.00% 0.00% 13May17 25May17 14May17 27May17 1 4 OnTarget
BCPC1020 BC AsBuiltDrawings 48 0.00% 0.00% 1Apr17 25May17 2Apr17 27May17 1 4 OnTarget
BCPC1030 BC FinalSnag/Desnag&Handover 18 0.00% 0.00% 11May17 31May17 13May17 01Jun17* 1 1 OnTarget
BuildingBD BD 81 14.87% 0.00% 27Nov16 28Feb17 26Nov16A 20Mar17 16 64 Delayed
InsideWork(ApartmentsandOthers) 66 0.00% 0.00% 27Nov16 25Apr17 23Nov16A 2May17 5 27 OnTarget
Basement02 55 0.00% 0.00% 27Nov16 19Mar17 27Nov16A 28Mar17 8 56 OnTarget
MEPWorks 49 0.00% 0.00% 27Nov16 2Mar17 27Nov16A 12Mar17 8 70 OnTarget
MEP2ndFix 31 0.00% 0.00% 27Nov16 1Jan17 26Nov16A 23Jan17 19 111 OnTarget
BDB2MEP1100 BD Basement2 MEP2ndfixingcompletion 18 100.00% 90.00% 29Nov16 19Dec16 05Dec16A 10Jan17 19 11 Delayed
BDB2MEP1110 BD Basement2 MEPclearanceforboardclosing 10 80.00% 0.00% 21Dec16 1Jan17 11Jan17 23Jan17 19 11 Delayed
BDB2MEP1120 BD Basement2 InstallElectricalWiring 12 100.00% 85.00% 27Nov16 10Dec16 27Nov16A 1Jan17 19 5 Delayed
BDB2MEP1130 BD Basement2 InstallLowCurrentWiring 12 100.00% 70.00% 29Nov16 12Dec16 05Dec16A 3Jan17 19 128 Delayed
BDB2MEP1140 BD Basement2 InstallHot&ColdWaterPiping 12 100.00% 85.00% 29Nov16 12Dec16 27Nov16A 3Jan17 19 128 Delayed
BDB2MEP1150 BD Basement2 InstallHVACPipes 12 100.00% 100.00% 29Nov16 12Dec16 27Nov16A 28Dec16A 13 0 OnTarget
BDB2MEP1160 BD Basement2 InstallDuctsandHangers 12 100.00% 100.00% 3Dec16 15Dec16 27Nov16A 28Dec16A 10 0 OnTarget
BDB2MEP1170 BD Basement2 InstallCableTraysandTrunking 12 100.00% 100.00% 3Dec16 15Dec16 27Nov16A 28Dec16A 10 0 OnTarget
BDB2MEP1180 BD Basement2 InstallLVCables 12 100.00% 20.00% 6Dec16 19Dec16 26Nov16A 10Jan17 19 11 Delayed
BDB2MEP1190 BD Basement2 InstallDroppers 12 83.33% 0.00% 19Dec16 1Jan17 9Jan17 23Jan17 19 11 Delayed
BDB2MEP1200 BD Basement2 MeggeringTest 10 80.00% 0.00% 21Dec16 1Jan17 11Jan17 23Jan17 19 11 Delayed
BDB2MEP1210 BD Basement2 InstallEarthpit 18 100.00% 90.00% 27Nov16 17Dec16 27Nov16A 8Jan17 19 5 Delayed
MEPFinalFix 10 0.00% 0.00% 11Jan17 22Jan17 17Dec16A 13Feb17 19 11 OnTarget
BDB2MEP2110 BD Basement2 InstallLightFittings 10 0.00% 70.00% 11Jan17 22Jan17 17Dec16A 13Feb17 19 11 OnTarget
BDB2MEP2120 BD Basement2 InstallFireCabinets 10 0.00% 0.00% 11Jan17 22Jan17 1Feb17 13Feb17 19 11 OnTarget
BDB2MEP2130 BD Basement2 InstallFireAlarmsandSpeakers 10 0.00% 0.00% 11Jan17 22Jan17 1Feb17 13Feb17 19 11 OnTarget
BDB2MEP2140 BD Basement2 InstallSprinklers 10 0.00% 0.00% 11Jan17 22Jan17 1Feb17 13Feb17 19 11 OnTarget
BDB2MEP2150 BD Basement2 InstallSwitchesandSockets 10 0.00% 0.00% 11Jan17 22Jan17 1Feb17 13Feb17 19 11 OnTarget
BDB2MEP2160 BD Basement2 InstallLowCurrentEquipments 10 0.00% 0.00% 11Jan17 22Jan17 1Feb17 13Feb17 19 11 OnTarget
BDB2MEP2170 BD Basement2 InstallGrillesandDiffussers 6 0.00% 0.00% 16Jan17 22Jan17 6Feb17 13Feb17 19 11 OnTarget
BDB2MEP2175 BD Basement2 MEPFinalfittings 10 0.00% 0.00% 11Jan17 22Jan17 1Feb17 13Feb17 19 11 OnTarget
BDB2MEP2180 BD Basement2 InstallPlumpingFinalTittings(FloorDrains,Gratings,F 8 0.00% 0.00% 14Jan17 22Jan17 4Feb17 13Feb17 19 11 OnTarget
Basement01 66 0.00% 0.00% 29Dec16 25Apr17 27Nov16A 28Mar17 24 41 OnTarget
MEPWorks 47 0.00% 0.00% 27Nov16 2Mar17 27Nov16A 12Mar17 8 70 OnTarget
MEP2ndFix 29 0.00% 0.00% 27Nov16 1Jan17 26Nov16A 23Jan17 19 111 OnTarget
BDB1MEP1000 BD Basement1 MEP2ndfixingcompletion 18 100.00% 20.00% 29Nov16 19Dec16 26Nov16A 16Jan17 23 13 Delayed
BDB1MEP1010 BD Basement1 MEPclearanceforboardclosing 10 100.00% 0.00% 19Dec16 29Dec16 15Jan17 26Jan17 23 13 Delayed
BDB1MEP1020 BD Basement1 InstallElectricalWiring 12 100.00% 85.00% 27Nov16 10Dec16 27Nov16A 1Jan17 19 126 Delayed
BDB1MEP1030 BD Basement1 InstallLowCurrentWiring 10 100.00% 30.00% 30Nov16 11Dec16 27Nov16A 7Jan17 23 122 Delayed
BDB1MEP1040 BD Basement1 InstallDrainagepipes 10 100.00% 100.00% 1Dec16 12Dec16 27Nov16A 28Dec16A 13 0 OnTarget
BDB1MEP1050 BD Basement1 InstallHot&ColdWaterPiping 10 100.00% 85.00% 3Dec16 13Dec16 27Nov16A 8Jan17 22 122 Delayed
BDB1MEP1060 BD Basement1 InstallHVACPipes 10 100.00% 95.00% 4Dec16 14Dec16 27Nov16A 9Jan17 22 122 Delayed
BDB1MEP1070 BD Basement1 InstallDuctsandHangers 10 100.00% 95.00% 5Dec16 15Dec16 27Nov16A 10Jan17 22 122 Delayed
BDB1MEP1080 BD Basement1 InstallCableTraysandTrunking 10 100.00% 100.00% 5Dec16 15Dec16 27Nov16A 22Dec16A 5 0 OnTarget
BDB1MEP1090 BD Basement1 InstallLVCables 10 100.00% 60.00% 8Dec16 19Dec16 05Dec16A 3Jan17 13 3 Delayed
BDB1MEP1100 BD Basement1 InstallDroppers 12 100.00% 0.00% 17Dec16 29Dec16 12Jan17 26Jan17 23 13 Delayed
BDB1MEP1110 BD Basement1 MeggeringTest 10 100.00% 0.00% 19Dec16 29Dec16 15Jan17 26Jan17 23 13 Delayed
MEPFinalFix 11 0.00% 0.00% 11Jan17 22Jan17 17Dec16A 13Feb17 19 11 OnTarget
BDB1MEP2010 BD Basement1 InstallLightFittings 8 0.00% 70.00% 8Jan17 16Jan17 17Dec16A 13Feb17 23 13 OnTarget
BDB1MEP2020 BD Basement1 InstallFireCabinets 8 0.00% 0.00% 9Jan17 17Jan17 5Feb17 14Feb17 23 13 OnTarget
BDB1MEP2030 BD Basement1 InstallFireAlarmsandSpeakers 8 0.00% 0.00% 9Jan17 17Jan17 5Feb17 14Feb17 23 13 OnTarget
BDB1MEP2040 BD Basement1 InstallSprinklers 10 0.00% 0.00% 8Jan17 18Jan17 4Feb17 15Feb17 23 13 OnTarget
BDB1MEP2050 BD Basement1 InstallSwitchesandSockets 10 0.00% 0.00% 8Jan17 18Jan17 4Feb17 15Feb17 23 13 OnTarget
BDB1MEP2060 BD Basement1 InstallLowCurrentEquipments 10 0.00% 0.00% 9Jan17 19Jan17 5Feb17 16Feb17 23 13 OnTarget
BDB1MEP2070 BD Basement1 InstallGrillesandDiffussers 8 0.00% 0.00% 11Jan17 19Jan17 7Feb17 16Feb17 23 13 OnTarget
BDB1MEP2075 BD Basement1 MEPFinalfittings 8 0.00% 0.00% 8Jan17 16Jan17 4Feb17 13Feb17 23 10 OnTarget
BDB1MEP2080 BD Basement1 InstallPlumpingFinalTittings(FloorDrains,Gratings,F 8 0.00% 0.00% 11Jan17 19Jan17 7Feb17 16Feb17 23 13 OnTarget
DelayAnalysisReportBasedonTargetProgram *DelayedActivitiesareHiglightedInRed DataDate: 29Dec16
VarianceBL
Original Schedule% Activity% BLProject BLProject Actual/Forecas Actual/Forecas Delayed/O
ActivityID Building Floor ActivityName ProjectFinish TotalFloat
Duration Complete Complete Start Finish tedStart tedFinish nTrack
Date
GroundFloor 60 0.00% 0.00% 27Nov16 18Apr17 27Nov16A 2May17 11 27 OnTarget
MEPWorks 12 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BDGFMEP1000 BD GroundFloor InstallWallMEPConduitsforplasterclearance 12 100.00% 85.00% 7Dec16 20Dec16 27Nov16A 3Jan17 11 123 Delayed
RetailArea 36 0.00% 0.00% 30Nov16 10Jan17 27Nov16A 19Jan17 8 114 OnTarget
MEPWorks 36 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BDGFMEPD1030 BD GroundFloor InstallElectricalWiring 20 100.00% 80.00% 30Nov16 22Dec16 27Nov16A 3Jan17 10 12 Delayed
BDGFMEPD1040 BD GroundFloor InstallLowCurrentWiring 20 100.00% 30.00% 1Dec16 24Dec16 27Nov16A 15Jan17 19 118 Delayed
BDGFMEPD1050 BD GroundFloor InstallHVACPipes 20 100.00% 70.00% 1Dec16 24Dec16 27Nov16A 5Jan17 11 4 Delayed
BDGFMEPD1060 BD GroundFloor Firefightingpipes 18 100.00% 100.00% 7Dec16 27Dec16 27Nov16A 25Dec16A 3 0 OnTarget
BDGFMEPD1070 BD GroundFloor InstallDuctsandHangers 21 95.24% 97.00% 7Dec16 31Dec16 27Nov16A 9Jan17 8 4 OnTarget
BDGFMEPD1080 BD GroundFloor DBInstallation 18 77.78% 35.00% 14Dec16 3Jan17 05Dec16A 12Jan17 8 4 Delayed
BDGFMEPD1090 BD GroundFloor InstallDroppers 15 53.33% 0.00% 21Dec16 7Jan17 31Dec16 16Jan17 8 6 Delayed
BDGFMEPD1100 BD GroundFloor MeggeringTest 15 33.33% 0.00% 25Dec16 10Jan17 3Jan17 19Jan17 8 4 Delayed
BDGFMEPD1110 BD GroundFloor MEPclearance 10 0.00% 0.00% 31Dec16 10Jan17 9Jan17 19Jan17 8 4 OnTarget
WetArea 44 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPWorks 41 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BDGFMEPW1000 BD GroundFloor WetAreaHLClearancebyARMAforgridfixing 12 100.00% 0.00% 15Dec16 28Dec16 31Dec16 12Jan17 13 10 Delayed
BDGFMEPW1010 BD GroundFloor WetAreaMEPclearanceforBoardclosing 12 0.00% 0.00% 9Jan17 22Jan17 17Jan17 30Jan17 7 5 OnTarget
BDGFMEPW1020 BD GroundFloor InstallElectricalWiring 15 100.00% 70.00% 6Dec16 22Dec16 27Nov16A 4Jan17 11 13 Delayed
BDGFMEPW1030 BD GroundFloor InstallDrainagepipes 10 100.00% 100.00% 13Dec16 24Dec16 27Nov16A 25Dec16A 0 0 OnTarget
BDGFMEPW1040 BD GroundFloor InstallHot&ColdWaterPiping 10 100.00% 60.00% 14Dec16 25Dec16 27Nov16A 3Jan17 8 4 Delayed
BDGFMEPW1050 BD GroundFloor InstallHVACPipes 15 100.00% 80.00% 10Dec16 26Dec16 27Nov16A 4Jan17 8 4 Delayed
BDGFMEPW1060 BD GroundFloor Firefightingpipes 10 100.00% 100.00% 17Dec16 27Dec16 27Nov16A 25Dec16A 3 0 OnTarget
BDGFMEPW1070 BD GroundFloor InstallDuctsandHangers 14 100.00% 97.00% 13Dec16 28Dec16 27Nov16A 5Jan17 7 4 Delayed
BDGFMEPW1080 BD GroundFloor InstallDroppers 12 0.00% 0.00% 7Jan17 19Jan17 15Jan17 28Jan17 7 4 OnTarget
BDGFMEPW1090 BD GroundFloor MeggeringTest 10 0.00% 0.00% 10Jan17 21Jan17 18Jan17 29Jan17 7 4 OnTarget
Corridor/LiftLobby 43 0.00% 0.00% 6Dec16 28Feb17 27Nov16A 8Feb17 17 97 OnTarget
MEPWorks 37 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BDGFMEPCL1000 BD GroundFloor CorridorMEPClearanceforScreed 10 20.00% 60.00% 28Dec16 8Jan17 06Dec16A 19Jan17 10 13 OnTarget
BDGFMEPCL1010 BD GroundFloor CorridorHLClearancebyARMAforgridfixing 10 0.00% 0.00% 31Dec16 10Jan17 4Jan17 16Jan17 5 5 OnTarget
BDGFMEPCL1020 BD GroundFloor CorridorMEPclearanceforBoardclosing 10 0.00% 0.00% 10Jan17 21Jan17 15Jan17 26Jan17 5 5 OnTarget
BDGFMEPCL1030 BD GroundFloor InstallElectricalWiring 12 100.00% 60.00% 10Dec16 22Dec16 10Dec16A 4Jan17 11 13 Delayed
BDGFMEPCL1050 BD GroundFloor InstallHot&ColdWaterPiping 10 100.00% 60.00% 13Dec16 24Dec16 27Nov16A 5Jan17 11 13 Delayed
BDGFMEPCL1060 BD GroundFloor Firefightingpipes 10 100.00% 100.00% 14Dec16 25Dec16 27Nov16A 25Dec16A 1 0 OnTarget
BDGFMEPCL1070 BD GroundFloor InstallHVACPipes 12 100.00% 70.00% 15Dec16 28Dec16 27Nov16A 9Jan17 10 13 Delayed
BDGFMEPCL1080 BD GroundFloor InstallDuctsandHangers 16 100.00% 97.00% 12Dec16 29Dec16 27Nov16A 10Jan17 10 13 Delayed
BDGFMEPCL1090 BD GroundFloor InstallCableTraysandTrunking 16 93.75% 77.00% 13Dec16 31Dec16 27Nov16A 11Jan17 10 13 Delayed
BDGFMEPCL1095 BD GroundFloor InstallLowCurrentWiring 12 66.67% 0.00% 21Dec16 3Jan17 1Jan17 15Jan17 10 5 Delayed
BDGFMEPCL1100 BD GroundFloor InstallLVCables 10 60.00% 0.00% 24Dec16 3Jan17 3Jan17 15Jan17 10 13 Delayed
BDGFMEPCL1110 BD GroundFloor InstallDroppers 16 0.00% 0.00% 1Jan17 18Jan17 5Jan17 24Jan17 5 4 OnTarget
BDGFMEPCL1120 BD GroundFloor MeggeringTest 10 0.00% 0.00% 9Jan17 19Jan17 14Jan17 25Jan17 5 4 OnTarget
CommonFinalFinishes 26 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPWorks 14 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BDGFMEPF1010 BD GroundFloor InstallLightFittings 14 0.00% 0.00% 16Jan17 31Jan17 22Jan17 6Feb17 5 5 OnTarget
BDGFMEPF1020 BD GroundFloor InstallFireCabinets 14 0.00% 0.00% 16Jan17 31Jan17 22Jan17 6Feb17 5 5 OnTarget
BDGFMEPF1030 BD GroundFloor InstallFireAlarmsandSpeakers 14 0.00% 0.00% 16Jan17 31Jan17 22Jan17 6Feb17 5 5 OnTarget
BDGFMEPF1040 BD GroundFloor InstallSprinklers 14 0.00% 0.00% 16Jan17 31Jan17 22Jan17 6Feb17 5 5 OnTarget
BDGFMEPF1050 BD GroundFloor InstallSwitchesandSockets 14 0.00% 0.00% 16Jan17 31Jan17 22Jan17 6Feb17 5 5 OnTarget
BDGFMEPF1060 BD GroundFloor InstallLowCurrentEquipments 14 0.00% 0.00% 16Jan17 31Jan17 22Jan17 6Feb17 5 5 OnTarget
BDGFMEPF1070 BD GroundFloor InstallGrillesandDiffussers 14 0.00% 0.00% 16Jan17 31Jan17 22Jan17 6Feb17 5 5 OnTarget
BDGFMEPF1075 BD GroundFloor MEPFinalFixes 12 0.00% 0.00% 18Jan17 31Jan17 24Jan17 6Feb17 5 5 OnTarget
BDGFMEPF1080 BD GroundFloor InstallPlumpingFinalTittings(FloorDrains,Gratings,F 14 0.00% 0.00% 16Jan17 31Jan17 22Jan17 6Feb17 5 5 OnTarget
FirstFloor 55 0.00% 0.00% 27Nov16 18Mar17 27Nov16A 20Apr17 29 36 OnTarget
WetArea 18 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPWorks 12 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BD1F1100 BD 1stFloor WetAreaMEPclearanceforBoardclosing 10 100.00% 100.00% 6Dec16 17Dec16 27Nov16A 01Dec16A 14 0 OnTarget
BD1FMEPW1000 BD 1stFloor InstallDroppers 12 100.00% 100.00% 4Dec16 17Dec16 27Nov16A 29Nov16A 16 0 OnTarget
Corridor/LiftLobby 30 0.00% 0.00% 6Dec16 28Feb17 27Nov16A 8Feb17 17 97 OnTarget
MEPWorks 12 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BD1F1150 BD 1stFloor CorridorMEPclearanceforBoardclosing 12 100.00% 100.00% 11Dec16 24Dec16 27Nov16A 28Dec16A 3 0 OnTarget
BD1FMEPCL1010 BD 1stFloor InstallDroppers 12 100.00% 100.00% 11Dec16 24Dec16 27Nov16A 28Dec16A 3 0 OnTarget
CommonFinalFinishes 24 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPWorks 16 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BD1FMEPF1010 BD 1stFloor InstallLightFittings 10 0.00% 10.00% 31Dec16 10Jan17 25Dec16A 22Jan17 10 112 OnTarget
BD1FMEPF1020 BD 1stFloor InstallFireCabinets 14 21.43% 100.00% 27Dec16 11Jan17 27Nov16A 01Dec16A 36 0 OnTarget
BD1FMEPF1030 BD 1stFloor InstallFireAlarmsandSpeakers 14 21.43% 21.00% 27Dec16 11Jan17 21Dec16A 12Jan17 0 120 Delayed
BD1FMEPF1040 BD 1stFloor InstallSprinklers 14 14.29% 14.00% 28Dec16 12Jan17 21Dec16A 14Jan17 0 120 Delayed
BD1FMEPF1050 BD 1stFloor InstallSwitchesandSockets 14 14.29% 14.00% 28Dec16 12Jan17 15Dec16A 14Jan17 0 9 Delayed
BD1FMEPF1060 BD 1stFloor InstallLowCurrentEquipments 14 7.14% 7.00% 29Dec16 14Jan17 21Dec16A 15Jan17 0 9 Delayed
BD1FMEPF1070 BD 1stFloor InstallGrillesandDiffussers 14 7.14% 7.00% 29Dec16 14Jan17 21Dec16A 15Jan17 0 9 Delayed
BD1FMEPF1075 BD 1stFloor MEPFinalFixes/Sanitarywares 10 0.00% 0.00% 2Jan17 14Jan17 15Jan17 26Jan17 11 2 OnTarget
BD1FMEPF1080 BD 1stFloor InstallPlumpingFinalTittings(FloorDrains,Floortraps 14 7.14% 7.00% 29Dec16 14Jan17 21Dec16A 15Jan17 0 9 Delayed
DSide 46 0.00% 0.00% 27Nov16 18Jan17 26Nov16A 8Feb17 18 97 OnTarget
MEPWorks 46 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
D1FMEP1000 BD 1stFloor InstallWallMEPconduitsforplasterclearance 7 100.00% 100.00% 27Nov16 4Dec16 26Nov16A 01Dec16A 3 0 OnTarget
D1FMEP1010 BD 1stFloor InstallFloorMEPconduitsforScreedclearance 7 100.00% 100.00% 4Dec16 11Dec16 27Nov16A 01Dec16A 9 0 OnTarget
D1FMEP1020 BD 1stFloor InstallElectricalWiring 10 100.00% 0.00% 4Dec16 14Dec16 31Dec16 10Jan17 23 122 Delayed
D1FMEP1030 BD 1stFloor InstallDrainagepipes 10 100.00% 100.00% 6Dec16 17Dec16 27Dec16A 28Dec16A 9 0 OnTarget
D1FMEP1040 BD 1stFloor Firefightingpipes 10 100.00% 100.00% 10Dec16 20Dec16 27Nov16A 17Dec16A 4 0 OnTarget
D1FMEP1050 BD 1stFloor InstallHot&ColdWaterPiping 10 100.00% 0.00% 11Dec16 21Dec16 31Dec16 10Jan17 17 6 Delayed
D1FMEP1060 BD 1stFloor InstallDuctsandHangers 12 100.00% 0.00% 10Dec16 22Dec16 31Dec16 12Jan17 18 7 Delayed
D1FMEP1070 BD 1stFloor InstallHVACPipes 12 100.00% 0.00% 12Dec16 25Dec16 2Jan17 15Jan17 18 7 Delayed
D1FMEP1080 BD 1stFloor InstallCableTraysandTrunking 12 100.00% 0.00% 13Dec16 26Dec16 3Jan17 16Jan17 18 7 Delayed
D1FMEP1090 BD 1stFloor InstallLowCurrentWiring 10 100.00% 40.00% 19Dec16 29Dec16 27Nov16A 19Jan17 18 7 Delayed
D1FMEP1100 BD 1stFloor InstallLVCables 10 100.00% 20.00% 19Dec16 29Dec16 30Nov16A 19Jan17 18 7 Delayed
D1FMEP1110 BD 1stFloor InstallDroppers 12 41.67% 0.00% 25Dec16 7Jan17 15Jan17 28Jan17 18 7 Delayed
D1FMEP1120 BD 1stFloor MeggeringTest 10 20.00% 0.00% 28Dec16 8Jan17 18Jan17 29Jan17 18 7 Delayed
D1FMEP1130 BD 1stFloor MEPFinalFixing 10 0.00% 0.00% 8Jan17 18Jan17 29Jan17 8Feb17 18 7 OnTarget
SecondFloor 66 0.00% 0.00% 10Dec16 11Mar17 27Nov16A 20Mar17 8 63 OnTarget
DryArea 34 0.00% 0.00% 18Dec16 7Mar17 27Nov16A 10Apr17 29 22 OnTarget
MEPWorks 22 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BD2FMEPD1000 BD 2ndFloor DryAreaHLClearancebyARMAforgridfixing(205) 3 100.00% 100.00% 5Dec16 7Dec16 27Nov16A 01Dec16A 6 0 OnTarget
BD2FMEPD1010 BD 2ndFloor DryAreaMEPclearanceforBoardclosing 3 100.00% 100.00% 19Dec16 21Dec16 27Nov16A 01Dec16A 18 0 OnTarget
BD2FMEPD1020 BD 2ndFloor InstallDuctsandHangers 10 100.00% 100.00% 27Nov16 7Dec16 27Nov16A 01Dec16A 6 0 OnTarget
BD2FMEPD1030 BD 2ndFloor DBInstallation 10 100.00% 100.00% 1Dec16 12Dec16 27Nov16A 10Dec16A 3 0 OnTarget
BD2FMEPD1040 BD 2ndFloor InstallDroppers 12 100.00% 100.00% 6Dec16 19Dec16 27Nov16A 22Dec16A 2 0 OnTarget
BD2FMEPD1050 BD 2ndFloor MeggeringTest 7 100.00% 100.00% 14Dec16 21Dec16 27Nov16A 28Nov16A 21 0 OnTarget
WetArea 37 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPWorks 31 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BD2FMEPW1000 BD 2ndFloor WetAreaMEPclearanceforBoardclosing 14 85.71% 50.00% 17Dec16 1Jan17 27Nov16A 7Jan17 5 3 Delayed
BD2FMEPW1010 BD 2ndFloor InstallDrainagepipes 12 100.00% 100.00% 27Nov16 10Dec16 27Nov16A 01Dec16A 8 0 OnTarget
BD2FMEPW1020 BD 2ndFloor InstallHot&ColdWaterPiping 12 100.00% 100.00% 28Nov16 11Dec16 27Nov16A 29Nov16A 11 0 OnTarget
BD2FMEPW1030 BD 2ndFloor InstallHVACPipes 12 100.00% 100.00% 1Dec16 14Dec16 27Nov16A 03Dec16A 11 0 OnTarget
BD2FMEPW1040 BD 2ndFloor InstallDuctsandHangers 12 100.00% 100.00% 5Dec16 18Dec16 27Nov16A 01Dec16A 15 0 OnTarget
BD2FMEPW1050 BD 2ndFloor InstallDroppers 12 100.00% 70.00% 14Dec16 27Dec16 27Nov16A 3Jan17 6 6 Delayed
Corridors/LiftLobby 47 0.00% 0.00% 27Nov16 19Jan17 26Nov16A 6Feb17 15 99 OnTarget
MEPWorks 28 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BD2FMEPCL1000 BD 2ndFloor CorridorHLClearancebyARMAforgridfixing 14 100.00% 100.00% 27Nov16 12Dec16 27Nov16A 27Nov16A 14 0 OnTarget
BD2FMEPCL1010 BD 2ndFloor CorridorMEPclearanceforBoardclosing 14 100.00% 0.00% 13Dec16 28Dec16 31Dec16 15Jan17 15 11 Delayed
BD2FMEPCL1020 BD 2ndFloor InstallDroppers 10 100.00% 30.00% 15Dec16 26Dec16 27Nov16A 14Jan17 15 120 Delayed
BD2FMEPCL1030 BD 2ndFloor MeggeringTest 5 100.00% 100.00% 21Dec16 26Dec16 27Nov16A 29Nov16A 24 0 OnTarget
CommonFinalFinishes 51 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPWorks 17 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BD2FMEPF1010 BD 2ndFloor InstallLightFittings 14 0.00% 0.00% 1Jan17 16Jan17 18Jan17 2Feb17 15 11 OnTarget
BD2FMEPF1020 BD 2ndFloor InstallFireCabinets 14 0.00% 0.00% 2Jan17 17Jan17 19Jan17 4Feb17 15 11 OnTarget
BD2FMEPF1030 BD 2ndFloor InstallFireAlarmsandSpeakers 14 0.00% 0.00% 2Jan17 17Jan17 19Jan17 4Feb17 15 11 OnTarget
BD2FMEPF1040 BD 2ndFloor InstallSprinklers 14 0.00% 0.00% 3Jan17 18Jan17 21Jan17 5Feb17 15 11 OnTarget
BD2FMEPF1050 BD 2ndFloor InstallSwitchesandSockets 14 0.00% 0.00% 3Jan17 18Jan17 21Jan17 5Feb17 15 11 OnTarget
BD2FMEPF1060 BD 2ndFloor InstallLowCurrentEquipments 14 0.00% 0.00% 4Jan17 19Jan17 22Jan17 6Feb17 15 11 OnTarget
BD2FMEPF1070 BD 2ndFloor InstallGrillesandDiffussers 14 0.00% 0.00% 4Jan17 19Jan17 22Jan17 6Feb17 15 11 OnTarget
BD2FMEPF1075 BD 2ndFloor MEPFinalFixes/Sanitarywares 12 0.00% 0.00% 4Jan17 17Jan17 22Jan17 4Feb17 15 9 OnTarget
DelayAnalysisReportBasedonTargetProgram *DelayedActivitiesareHiglightedInRed DataDate: 29Dec16
VarianceBL
Original Schedule% Activity% BLProject BLProject Actual/Forecas Actual/Forecas Delayed/O
ActivityID Building Floor ActivityName ProjectFinish TotalFloat
Duration Complete Complete Start Finish tedStart tedFinish nTrack
Date
BD2FMEPF1080 BD 2ndFloor InstallPlumpingFinalTittings(FloorDrains,Floortraps 14 0.00% 0.00% 4Jan17 19Jan17 22Jan17 6Feb17 15 11 OnTarget
DSide 46 0.00% 0.00% 27Nov16 18Jan17 26Nov16A 8Feb17 18 97 OnTarget
MEPWorks 46 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
D2FCIV1100 BD 2ndFloor InstallWallMEPconduitsforplasterclearance 7 100.00% 100.00% 27Nov16 4Dec16 27Nov16A 01Dec16A 3 0 OnTarget
D2FCIV1110 BD 2ndFloor InstallFloorMEPconduitsforScreedclearance 7 100.00% 100.00% 4Dec16 11Dec16 27Nov16A 01Dec16A 9 0 OnTarget
D2FCIV1120 BD 2ndFloor InstallElectricalWiring 10 100.00% 100.00% 4Dec16 14Dec16 27Nov16A 03Dec16A 11 0 OnTarget
D2FCIV1130 BD 2ndFloor InstallDrainagepipes 10 100.00% 100.00% 6Dec16 17Dec16 27Nov16A 28Dec16A 9 0 OnTarget
D2FCIV1140 BD 2ndFloor Firefightingpipes 10 100.00% 100.00% 10Dec16 20Dec16 27Nov16A 17Dec16A 4 0 OnTarget
D2FCIV1150 BD 2ndFloor InstallHot&ColdWaterPiping 10 100.00% 100.00% 11Dec16 21Dec16 27Nov16A 28Dec16A 5 0 OnTarget
D2FCIV1160 BD 2ndFloor InstallDuctsandHangers 12 100.00% 100.00% 10Dec16 22Dec16 27Nov16A 28Dec16A 4 0 OnTarget
D2FCIV1170 BD 2ndFloor InstallHVACPipes 12 100.00% 90.00% 12Dec16 25Dec16 27Nov16A 1Jan17 5 6 Delayed
D2FCIV1180 BD 2ndFloor InstallCableTraysandTrunking 12 100.00% 0.00% 13Dec16 26Dec16 31Dec16 12Jan17 15 4 Delayed
D2FCIV1190 BD 2ndFloor InstallLowCurrentWiring 10 100.00% 30.00% 19Dec16 29Dec16 17Dec16A 16Jan17 15 4 Delayed
D2FCIV1200 BD 2ndFloor InstallLVCables 10 100.00% 20.00% 19Dec16 29Dec16 30Nov16A 16Jan17 15 4 Delayed
D2FCIV1210 BD 2ndFloor InstallDroppers 12 41.67% 0.00% 25Dec16 7Jan17 11Jan17 24Jan17 15 4 Delayed
D2FCIV1220 BD 2ndFloor MeggeringTest 10 20.00% 20.00% 28Dec16 8Jan17 21Dec16A 25Jan17 15 4 OnTarget
D2FCIV1230 BD 2ndFloor MEPFinalFixing 10 0.00% 0.00% 8Jan17 18Jan17 25Jan17 5Feb17 15 4 OnTarget
ThirdFloor 59 0.00% 0.00% 27Nov16 2Feb17 26Nov16A 5Feb17 2 100 OnTarget
DryArea 36 0.00% 0.00% 18Dec16 7Mar17 27Nov16A 10Apr17 29 22 OnTarget
MEPWorks 26 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BD3FMEPD1000 BD 3rdFloor DryAreaHLClearancebyARMAforgridfixing 14 100.00% 100.00% 1Dec16 17Dec16 26Nov16A 22Dec16A 4 0 OnTarget
BD3FMEPD1010 BD 3rdFloor DryAreaMEPclearanceforBoardclosing 14 100.00% 65.00% 13Dec16 28Dec16 27Nov16A 7Jan17 7 8 Delayed
BD3FMEPD1020 BD 3rdFloor InstallElectricalWiring 8 100.00% 100.00% 29Nov16 7Dec16 27Nov16A 03Dec16A 5 0 OnTarget
BD3FMEPD1030 BD 3rdFloor InstallDuctsandHangers 7 100.00% 100.00% 5Dec16 12Dec16 27Nov16A 10Dec16A 3 0 OnTarget
BD3FMEPD1040 BD 3rdFloor DBInstallation 10 100.00% 100.00% 5Dec16 15Dec16 27Nov16A 22Dec16A 5 0 OnTarget
BD3FMEPD1050 BD 3rdFloor InstallDroppers 12 100.00% 5.00% 13Dec16 26Dec16 27Nov16A 12Jan17 14 121 Delayed
BD3FMEPD1060 BD 3rdFloor MeggeringTest 7 100.00% 100.00% 21Dec16 28Dec16 27Nov16A 27Nov16A 28 0 OnTarget
WetArea 38 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPWorks 32 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BD3FMEPW1000 BD 3rdFloor WetAreaMEPclearanceforBoardclosing 10 40.00% 0.00% 26Dec16 5Jan17 3Jan17 15Jan17 8 4 Delayed
BD3FMEPW1010 BD 3rdFloor InstallElectricalWiring 7 100.00% 100.00% 30Nov16 7Dec16 27Nov16A 03Dec16A 5 0 OnTarget
BD3FMEPW1020 BD 3rdFloor InstallDuctsandHangers 10 100.00% 98.00% 30Nov16 11Dec16 27Nov16A 31Dec16 16 0 Delayed
BD3FMEPW1030 BD 3rdFloor InstallDroppers 12 83.33% 0.00% 19Dec16 1Jan17 31Dec16 12Jan17 10 2 Delayed
BD3FMEPW1040 BD 3rdFloor MeggeringTest 5 60.00% 0.00% 27Dec16 1Jan17 8Jan17 12Jan17 10 2 Delayed
Corridor/LiftLobby 37 0.00% 0.00% 6Dec16 28Feb17 27Nov16A 8Feb17 17 97 OnTarget
MEPWorks 29 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BD3FMEPCL1000 BD 3rdFloor CorridorMEPclearanceforBoardclosing 14 57.14% 15.00% 21Dec16 5Jan17 27Nov16A 15Jan17 8 4 Delayed
BD3FMEPCL1010 BD 3rdFloor InstallLVCables 3 100.00% 100.00% 5Dec16 7Dec16 27Nov16A 27Nov16A 10 0 OnTarget
BD3FMEPCL1020 BD 3rdFloor InstallDroppers 10 100.00% 0.00% 4Dec16 14Dec16 31Dec16 10Jan17 23 122 Delayed
BD3FMEPCL1030 BD 3rdFloor MeggeringTest 5 100.00% 100.00% 10Dec16 14Dec16 27Nov16A 29Nov16A 14 0 OnTarget
CommonFinalFinishes 36 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPWorks 21 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BD3FMEPF1000 BD 3rdFloor MEPFinalFixes/Sanitarywares 18 0.00% 0.00% 31Dec16 19Jan17 8Jan17 29Jan17 8 4 OnTarget
BD3FMEPF1010 BD 3rdFloor InstallLightFittings 14 0.00% 0.00% 4Jan17 19Jan17 12Jan17 29Jan17 8 1 OnTarget
BD3FMEPF1020 BD 3rdFloor InstallFireCabinets 14 0.00% 0.00% 5Jan17 21Jan17 14Jan17 30Jan17 8 1 OnTarget
BD3FMEPF1030 BD 3rdFloor InstallFireAlarmsandSpeakers 14 0.00% 0.00% 5Jan17 21Jan17 14Jan17 30Jan17 8 1 OnTarget
BD3FMEPF1040 BD 3rdFloor InstallSprinklers 14 0.00% 0.00% 7Jan17 22Jan17 15Jan17 31Jan17 8 1 OnTarget
BD3FMEPF1050 BD 3rdFloor InstallSwitchesandSockets 14 0.00% 0.00% 7Jan17 22Jan17 15Jan17 31Jan17 8 1 OnTarget
BD3FMEPF1060 BD 3rdFloor InstallLowCurrentEquipments 14 0.00% 0.00% 8Jan17 23Jan17 16Jan17 1Feb17 8 1 OnTarget
BD3FMEPF1070 BD 3rdFloor InstallGrillesandDiffussers 14 0.00% 0.00% 8Jan17 23Jan17 16Jan17 1Feb17 8 1 OnTarget
BD3FMEPF1080 BD 3rdFloor InstallPlumpingFinalTittings(Sanitaryware,FloorDra 14 0.00% 0.00% 8Jan17 23Jan17 16Jan17 1Feb17 8 1 OnTarget
DSide 46 0.00% 0.00% 27Nov16 18Jan17 26Nov16A 8Feb17 18 97 OnTarget
MEPWorks 46 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
D3FCIV1100 3rdFloor InstallWallMEPconduitsforplasterclearance 7 100.00% 100.00% 27Nov16 4Dec16 27Nov16A 10Dec16A 4 0 OnTarget
D3FCIV1110 3rdFloor InstallFloorMEPconduitsforScreedclearance 7 100.00% 100.00% 4Dec16 11Dec16 27Nov16A 10Dec16A 2 0 OnTarget
D3FCIV1120 3rdFloor InstallElectricalWiring 10 100.00% 100.00% 4Dec16 14Dec16 27Nov16A 03Dec16A 11 0 OnTarget
D3FCIV1130 3rdFloor InstallDrainagepipes 10 100.00% 100.00% 6Dec16 17Dec16 27Nov16A 28Dec16A 9 0 OnTarget
D3FCIV1140 3rdFloor Firefightingpipes 10 100.00% 100.00% 10Dec16 20Dec16 27Nov16A 17Dec16A 4 0 OnTarget
D3FCIV1150 3rdFloor InstallHot&ColdWaterPiping 10 100.00% 90.00% 11Dec16 21Dec16 27Nov16A 31Dec16 8 130 Delayed
D3FCIV1160 3rdFloor InstallDuctsandHangers 12 100.00% 60.00% 10Dec16 22Dec16 27Nov16A 4Jan17 11 127 Delayed
D3FCIV1170 3rdFloor InstallHVACPipes 12 100.00% 100.00% 12Dec16 25Dec16 27Nov16A 28Dec16A 2 0 OnTarget
D3FCIV1180 3rdFloor InstallCableTraysandTrunking 12 100.00% 0.00% 13Dec16 26Dec16 31Dec16 12Jan17 15 4 Delayed
D3FCIV1190 3rdFloor InstallLowCurrentWiring 10 100.00% 30.00% 19Dec16 29Dec16 17Dec16A 16Jan17 15 4 Delayed
D3FCIV1200 3rdFloor InstallLVCables 10 100.00% 20.00% 19Dec16 29Dec16 30Nov16A 16Jan17 15 4 Delayed
D3FCIV1210 3rdFloor InstallDroppers 12 41.67% 0.00% 25Dec16 7Jan17 11Jan17 24Jan17 15 4 Delayed
D3FCIV1220 3rdFloor MeggeringTest 10 20.00% 0.00% 28Dec16 8Jan17 15Jan17 25Jan17 15 4 Delayed
D3FCIV1230 3rdFloor MEPFinalFixing 10 0.00% 0.00% 8Jan17 18Jan17 25Jan17 5Feb17 15 4 OnTarget
ForthFloor 59 0.00% 0.00% 29Nov16 28Mar17 26Nov16A 9Apr17 10 46 OnTarget
DryArea 41 0.00% 0.00% 18Dec16 7Mar17 27Nov16A 10Apr17 29 22 OnTarget
MEPWorks 28 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BD4FMEPD1000 BD 4thFloor DryareaPlasterMEPclearance(Hoistarea,Garbage,W 6 100.00% 99.00% 30Nov16 6Dec16 26Nov16A 31Dec16 20 132 Delayed
BD4FMEPD1010 BD 4thFloor DryAreaHLClearancebyARMAforgridfixing 10 100.00% 95.00% 10Dec16 20Dec16 26Nov16A 7Jan17 14 10 Delayed
BD4FMEPD1020 BD 4thFloor DryAreaMEPclearanceforBoardclosing 10 80.00% 0.00% 21Dec16 1Jan17 7Jan17 18Jan17 14 10 Delayed
BD4FMEPD1030 BD 4thFloor InstallDuctsandHangers 7 100.00% 100.00% 1Dec16 8Dec16 27Nov16A 28Dec16A 16 0 OnTarget
BD4FMEPD1040 BD 4thFloor DBInstallation 10 100.00% 100.00% 5Dec16 15Dec16 27Nov16A 22Dec16A 5 0 OnTarget
BD4FMEPD1050 BD 4thFloor InstallDroppers 12 83.33% 0.00% 19Dec16 1Jan17 4Jan17 18Jan17 14 10 Delayed
BD4FMEPD1060 BD 4thFloor MeggeringTest 5 60.00% 75.00% 27Dec16 1Jan17 27Nov16A 18Jan17 14 10 OnTarget
WetArea 36 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPWorks 24 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BD4FMEPW1000 BD 4thFloor WetAreaMEPclearanceforBoardclosing 10 40.00% 0.00% 26Dec16 5Jan17 10Jan17 22Jan17 13 9 Delayed
BD4FMEPW1010 BD 4thFloor InstallDuctsandHangers 10 100.00% 100.00% 10Dec16 20Dec16 27Nov16A 17Dec16A 4 0 OnTarget
BD4FMEPW1020 BD 4thFloor InstallDroppers 12 75.00% 0.00% 20Dec16 2Jan17 4Jan17 18Jan17 13 6 Delayed
BD4FMEPW1030 BD 4thFloor MeggeringTest 5 40.00% 0.00% 28Dec16 2Jan17 12Jan17 18Jan17 13 6 Delayed
Corridor/LiftLobby 29 0.00% 0.00% 6Dec16 28Feb17 27Nov16A 8Feb17 17 97 OnTarget
MEPWorks 23 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BD4FMEPCL1000 BD 4thFloor CorridorMEPclearanceforBoardclosing 14 57.14% 0.00% 21Dec16 5Jan17 5Jan17 22Jan17 13 9 Delayed
BD4FMEPCL1010 BD 4thFloor InstallHot&ColdWaterPiping 5 100.00% 100.00% 15Dec16 20Dec16 27Nov16A 27Nov16A 21 0 OnTarget
BD4FMEPCL1020 BD 4thFloor InstallDuctsandHangers 10 100.00% 100.00% 11Dec16 21Dec16 27Nov16A 29Nov16A 20 0 OnTarget
BD4FMEPCL1030 BD 4thFloor InstallLVCables 7 100.00% 100.00% 15Dec16 22Dec16 27Nov16A 22Dec16A 1 0 OnTarget
BD4FMEPCL1040 BD 4thFloor InstallDroppers 10 100.00% 0.00% 19Dec16 29Dec16 31Dec16 10Jan17 10 0 Delayed
BD4FMEPCL1050 BD 4thFloor MeggeringTest 5 100.00% 0.00% 25Dec16 29Dec16 5Jan17 10Jan17 10 0 Delayed
CommonFinalFinishes 36 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPWorks 17 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BD4FMEPF1010 BD 4thFloor InstallLightFittings 14 0.00% 0.00% 1Jan17 16Jan17 17Jan17 2Feb17 14 10 OnTarget
BD4FMEPF1020 BD 4thFloor InstallFireCabinets 14 0.00% 0.00% 2Jan17 17Jan17 18Jan17 4Feb17 14 10 OnTarget
BD4FMEPF1030 BD 4thFloor InstallFireAlarmsandSpeakers 14 0.00% 0.00% 2Jan17 17Jan17 18Jan17 4Feb17 14 10 OnTarget
BD4FMEPF1040 BD 4thFloor InstallSprinklers 14 0.00% 0.00% 3Jan17 18Jan17 19Jan17 5Feb17 14 10 OnTarget
BD4FMEPF1050 BD 4thFloor InstallSwitchesandSockets 14 0.00% 0.00% 3Jan17 18Jan17 19Jan17 5Feb17 14 10 OnTarget
BD4FMEPF1060 BD 4thFloor InstallLowCurrentEquipments 14 0.00% 0.00% 4Jan17 19Jan17 21Jan17 6Feb17 14 10 OnTarget
BD4FMEPF1070 BD 4thFloor InstallGrillesandDiffussers 14 0.00% 0.00% 4Jan17 19Jan17 21Jan17 6Feb17 14 10 OnTarget
BD4FMEPF1075 BD 4thFloor MEPFinalFixes/Sanitarywares 12 0.00% 0.00% 4Jan17 17Jan17 19Jan17 2Feb17 13 7 OnTarget
BD4FMEPF1080 BD 4thFloor InstallPlumpingFinalTittings(FloorDrains,Floortraps 14 0.00% 0.00% 4Jan17 19Jan17 21Jan17 6Feb17 14 10 OnTarget
DSide 46 0.00% 0.00% 27Nov16 18Jan17 26Nov16A 8Feb17 18 97 OnTarget
MEPWorks 46 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
D4FCIV1100 BD 4thFloor InstallWallMEPconduitsforplasterclearance 7 100.00% 100.00% 30Nov16 7Dec16 26Nov16A 10Dec16A 1 0 OnTarget
D4FCIV1110 BD 4thFloor InstallFloorMEPconduitsforScreedclearance 7 100.00% 100.00% 7Dec16 14Dec16 03Dec16A 10Dec16A 5 0 OnTarget
D4FCIV1120 BD 4thFloor InstallElectricalWiring 10 100.00% 100.00% 7Dec16 18Dec16 27Nov16A 03Dec16A 14 0 OnTarget
D4FCIV1130 BD 4thFloor InstallDrainagepipes 10 100.00% 100.00% 10Dec16 20Dec16 27Nov16A 28Dec16A 6 0 OnTarget
D4FCIV1140 BD 4thFloor Firefightingpipes 10 100.00% 100.00% 13Dec16 24Dec16 27Nov16A 25Dec16A 0 0 OnTarget
D4FCIV1150 BD 4thFloor InstallHot&ColdWaterPiping 10 100.00% 80.00% 14Dec16 25Dec16 27Nov16A 1Jan17 6 129 Delayed
D4FCIV1160 BD 4thFloor InstallDuctsandHangers 12 100.00% 25.00% 13Dec16 26Dec16 27Nov16A 9Jan17 12 123 Delayed
D4FCIV1170 BD 4thFloor InstallHVACPipes 12 100.00% 100.00% 15Dec16 28Dec16 27Nov16A 28Dec16A 1 0 OnTarget
D4FCIV1180 BD 4thFloor InstallCableTraysandTrunking 12 100.00% 0.00% 17Dec16 29Dec16 31Dec16 12Jan17 12 4 Delayed
D4FCIV1190 BD 4thFloor InstallLowCurrentWiring 10 70.00% 30.00% 22Dec16 2Jan17 17Dec16A 16Jan17 12 4 Delayed
D4FCIV1200 BD 4thFloor InstallLVCables 10 70.00% 20.00% 22Dec16 2Jan17 30Nov16A 16Jan17 12 4 Delayed
D4FCIV1210 BD 4thFloor InstallDroppers 12 16.67% 0.00% 28Dec16 10Jan17 11Jan17 24Jan17 12 4 Delayed
D4FCIV1220 BD 4thFloor MeggeringTest 10 0.00% 0.00% 1Jan17 11Jan17 15Jan17 25Jan17 12 4 OnTarget
D4FCIV1230 BD 4thFloor MEPFinalFixing 10 0.00% 0.00% 11Jan17 22Jan17 25Jan17 5Feb17 12 4 OnTarget
FifthFloor 64 0.00% 0.00% 8Dec16 2Apr17 26Nov16A 11Apr17 8 44 OnTarget
DryArea 44 0.00% 0.00% 18Dec16 7Mar17 27Nov16A 10Apr17 29 22 OnTarget
MEPWorks 36 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
DelayAnalysisReportBasedonTargetProgram *DelayedActivitiesareHiglightedInRed DataDate: 29Dec16
VarianceBL
Original Schedule% Activity% BLProject BLProject Actual/Forecas Actual/Forecas Delayed/O
ActivityID Building Floor ActivityName ProjectFinish TotalFloat
Duration Complete Complete Start Finish tedStart tedFinish nTrack
Date
BD5FMEPD1000 BD 5thFloor DryareaPlasterMEPclearance(Hoistarea,Garbage,W 7 100.00% 99.00% 6Dec16 13Dec16 26Nov16A 3Jan17 17 15 Delayed
BD5FMEPD1010 BD 5thFloor DryAreaHLClearancebyARMAforgridfixing 10 100.00% 45.00% 19Dec16 29Dec16 27Nov16A 19Jan17 17 15 Delayed
BD5FMEPD1020 BD 5thFloor DryAreaMEPclearanceforBoardclosing 10 10.00% 0.00% 29Dec16 9Jan17 18Jan17 30Jan17 17 15 Delayed
BD5FMEPD1030 BD 5thFloor InstallLowCurrentWiring 10 100.00% 100.00% 29Nov16 10Dec16 26Nov16A 27Nov16A 12 0 OnTarget
BD5FMEPD1040 BD 5thFloor InstallDuctsandHangers 10 100.00% 85.00% 3Dec16 13Dec16 27Nov16A 1Jan17 16 1 Delayed
BD5FMEPD1050 BD 5thFloor DBInstallation 10 100.00% 100.00% 10Dec16 20Dec16 27Nov16A 22Dec16A 1 0 OnTarget
BD5FMEPD1060 BD 5thFloor InstallDroppers 12 100.00% 0.00% 14Dec16 27Dec16 31Dec16 12Jan17 14 1 Delayed
BD5FMEPD1070 BD 5thFloor MeggeringTest 7 100.00% 45.00% 20Dec16 27Dec16 15Dec16A 12Jan17 14 1 Delayed
WetArea 41 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPWorks 35 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BD5FMEPW1000 BD 5thFloor WetAreaMEPclearanceforBoardclosing 10 20.00% 0.00% 28Dec16 8Jan17 7Jan17 18Jan17 8 7 Delayed
BD5FMEPW1010 BD 5thFloor InstallElectricalWiring 4 100.00% 100.00% 6Dec16 10Dec16 27Nov16A 03Dec16A 7 0 OnTarget
BD5FMEPW1020 BD 5thFloor InstallHot&ColdWaterPiping 7 100.00% 100.00% 5Dec16 12Dec16 27Nov16A 01Dec16A 10 0 OnTarget
BD5FMEPW1030 BD 5thFloor InstallDuctsandHangers 14 100.00% 85.00% 29Nov16 14Dec16 27Nov16A 2Jan17 15 0 Delayed
BD5FMEPW1040 BD 5thFloor InstallDroppers 12 41.67% 0.00% 25Dec16 7Jan17 3Jan17 17Jan17 8 7 Delayed
BD5FMEPW1050 BD 5thFloor MeggeringTest 5 0.00% 0.00% 3Jan17 8Jan17 12Jan17 18Jan17 8 7 OnTarget
Corridor/liftLobby 31 0.00% 0.00% 6Dec16 28Feb17 27Nov16A 8Feb17 17 97 OnTarget
MEPWorks 25 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BD5FMEPCL1000 BD 5thFloor CorridorMEPclearanceforBoardclosing 14 42.86% 0.00% 24Dec16 8Jan17 2Jan17 18Jan17 8 5 Delayed
BD5FMEPCL1020 BD 5thFloor InstallHot&ColdWaterPiping 10 100.00% 100.00% 11Dec16 21Dec16 27Nov16A 28Dec16A 5 0 OnTarget
BD5FMEPCL1030 BD 5thFloor InstallDuctsandHangers 12 100.00% 100.00% 11Dec16 24Dec16 27Nov16A 29Nov16A 22 0 OnTarget
BD5FMEPCL1040 BD 5thFloor InstallCableTraysandTrunking 7 100.00% 100.00% 18Dec16 25Dec16 07Dec16A 25Dec16A 1 0 OnTarget
BD5FMEPCL1045 BD 5thFloor InstallLowCurrentWiring 12 100.00% 100.00% 15Dec16 28Dec16 27Nov16A 17Dec16A 11 0 OnTarget
BD5FMEPCL1050 BD 5thFloor InstallLVCables 10 100.00% 90.00% 18Dec16 28Dec16 27Nov16A 31Dec16 2 9 Delayed
BD5FMEPCL1060 BD 5thFloor InstallDroppers 12 100.00% 0.00% 17Dec16 29Dec16 31Dec16 12Jan17 12 1 Delayed
BD5FMEPCL1070 BD 5thFloor MeggeringTest 5 100.00% 0.00% 25Dec16 29Dec16 8Jan17 12Jan17 12 1 Delayed
CommonFinalFinishes 36 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPWorks 17 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BD5FMEPF1010 BD 5thFloor InstallLightFittings 14 0.00% 0.00% 4Jan17 19Jan17 24Jan17 9Feb17 17 15 OnTarget
BD5FMEPF1020 BD 5thFloor InstallFireCabinets 14 0.00% 0.00% 5Jan17 21Jan17 25Jan17 11Feb17 17 15 OnTarget
BD5FMEPF1030 BD 5thFloor InstallFireAlarmsandSpeakers 14 0.00% 0.00% 5Jan17 21Jan17 25Jan17 11Feb17 17 15 OnTarget
BD5FMEPF1040 BD 5thFloor InstallSprinklers 14 0.00% 0.00% 7Jan17 22Jan17 26Jan17 12Feb17 17 15 OnTarget
BD5FMEPF1050 BD 5thFloor InstallSwitchesandSockets 14 0.00% 0.00% 7Jan17 22Jan17 26Jan17 12Feb17 17 15 OnTarget
BD5FMEPF1060 BD 5thFloor InstallLowCurrentEquipments 14 0.00% 0.00% 8Jan17 23Jan17 26Jan17 12Feb17 16 15 OnTarget
BD5FMEPF1070 BD 5thFloor InstallGrillesandDiffussers 14 0.00% 0.00% 8Jan17 23Jan17 26Jan17 12Feb17 16 15 OnTarget
BD5FMEPF1075 BD 5thFloor MEPFinalFixes/Sanitarywares 10 0.00% 0.00% 12Jan17 23Jan17 22Jan17 2Feb17 8 7 OnTarget
BD5FMEPF1080 BD 5thFloor InstallPlumpingFinalTittings(FloorDrains,Floortraps 10 0.00% 0.00% 12Jan17 23Jan17 31Jan17 12Feb17 16 15 OnTarget
SixthFloor 62 0.00% 0.00% 15Dec16 2Apr17 26Nov16A 11Apr17 8 44 OnTarget
DryArea 37 0.00% 0.00% 18Dec16 7Mar17 27Nov16A 10Apr17 29 22 OnTarget
MEPWorks 29 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BD6FMEPD1000 BD 6thFloor DryareaPlasterMEPclearance(Hoistarea,Garbage,W 7 100.00% 99.00% 4Dec16 11Dec16 26Nov16A 3Jan17 19 14 Delayed
BD6FMEPD1010 BD 6thFloor DryAreaHLClearancebyARMAforgridfixing 10 100.00% 20.00% 11Dec16 21Dec16 27Nov16A 14Jan17 19 11 Delayed
BD6FMEPD1020 BD 6thFloor DryAreaMEPclearanceforBoardclosing 10 80.00% 0.00% 21Dec16 1Jan17 12Jan17 24Jan17 19 11 Delayed
BD6FMEPD1030 BD 6thFloor InstallLowCurrentWiring 10 100.00% 80.00% 29Nov16 10Dec16 27Nov16A 1Jan17 19 14 Delayed
BD6FMEPD1040 BD 6thFloor InstallDuctsandHangers 12 100.00% 72.00% 30Nov16 13Dec16 27Nov16A 4Jan17 19 4 Delayed
BD6FMEPD1050 BD 6thFloor DBInstallation 10 100.00% 40.00% 6Dec16 17Dec16 27Nov16A 5Jan17 17 14 Delayed
BD6FMEPD1060 BD 6thFloor InstallDroppers 12 100.00% 0.00% 7Dec16 20Dec16 31Dec16 12Jan17 20 2 Delayed
BD6FMEPD1070 BD 6thFloor MeggeringTest 7 100.00% 0.00% 13Dec16 20Dec16 5Jan17 12Jan17 20 2 Delayed
WetArea 33 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPWorks 29 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BD6FMEPW1000 BD 6thFloor WetAreaMEPclearanceforBoardclosing 10 50.00% 0.00% 25Dec16 4Jan17 17Jan17 28Jan17 20 15 Delayed
BD6FMEPW1010 BD 6thFloor InstallElectricalWiring 10 100.00% 100.00% 3Dec16 13Dec16 27Nov16A 10Dec16A 4 0 OnTarget
BD6FMEPW1020 BD 6thFloor InstallDrainagepipes 10 100.00% 100.00% 4Dec16 14Dec16 27Nov16A 01Dec16A 12 0 OnTarget
BD6FMEPW1030 BD 6thFloor InstallHot&ColdWaterPiping 10 100.00% 100.00% 5Dec16 15Dec16 27Nov16A 25Dec16A 7 0 OnTarget
BD6FMEPW1040 BD 6thFloor InstallHVACPipes 10 100.00% 100.00% 8Dec16 19Dec16 27Nov16A 17Dec16A 3 0 OnTarget
BD6FMEPW1050 BD 6thFloor InstallDuctsandHangers 14 100.00% 72.00% 7Dec16 22Dec16 27Nov16A 3Jan17 10 0 Delayed
BD6FMEPW1060 BD 6thFloor InstallDroppers 12 58.33% 0.00% 22Dec16 4Jan17 15Jan17 28Jan17 20 15 Delayed
BD6FMEPW1070 BD 6thFloor MeggeringTest 7 28.57% 0.00% 28Dec16 4Jan17 21Jan17 28Jan17 20 15 Delayed
Corridor/LiftLobby 35 0.00% 0.00% 6Dec16 28Feb17 27Nov16A 8Feb17 17 97 OnTarget
MEPWorks 29 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BD6FMEPCL1000 BD 6thFloor CorridorMEPclearanceforBoardclosing 14 64.29% 0.00% 20Dec16 4Jan17 12Jan17 28Jan17 20 15 Delayed
BD6FMEPCL1020 BD 6thFloor InstallHot&ColdWaterPiping 10 100.00% 85.00% 3Dec16 13Dec16 27Nov16A 1Jan17 16 131 Delayed
BD6FMEPCL1030 BD 6thFloor InstallHVACPipes 10 100.00% 100.00% 6Dec16 17Dec16 27Nov16A 01Dec16A 14 0 OnTarget
BD6FMEPCL1040 BD 6thFloor InstallDuctsandHangers 12 100.00% 90.00% 7Dec16 20Dec16 27Nov16A 1Jan17 9 3 Delayed
BD6FMEPCL1050 BD 6thFloor InstallCableTraysandTrunking 10 100.00% 90.00% 13Dec16 24Dec16 07Dec16A 4Jan17 9 3 Delayed
BD6FMEPCL1055 BD 6thFloor InstallLowCurrentWiring 12 100.00% 85.00% 14Dec16 27Dec16 27Nov16A 8Jan17 9 3 Delayed
BD6FMEPCL1060 BD 6thFloor InstallLVCables 10 100.00% 0.00% 17Dec16 27Dec16 31Dec16 10Jan17 12 6 Delayed
BD6FMEPCL1070 BD 6thFloor InstallDroppers 10 60.00% 0.00% 24Dec16 3Jan17 7Jan17 17Jan17 12 6 Delayed
BD6FMEPCL1080 BD 6thFloor MeggeringTest 7 42.86% 0.00% 27Dec16 3Jan17 10Jan17 17Jan17 12 6 Delayed
CommonFinalFinishes 36 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPWorks 24 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BD6FMEPF1005 BD 6thFloor InstallGYMEquipment 24 4.17% 0.00% 29Dec16 25Jan17 18Jan17 15Feb17 17 15 Delayed
BD6FMEPF1010 BD 6thFloor InstallLightFittings 14 0.00% 0.00% 31Dec16 15Jan17 23Jan17 7Feb17 20 15 OnTarget
BD6FMEPF1020 BD 6thFloor InstallFireCabinets 14 0.00% 0.00% 1Jan17 16Jan17 24Jan17 8Feb17 20 15 OnTarget
BD6FMEPF1030 BD 6thFloor InstallFireAlarmsandSpeakers 14 0.00% 0.00% 1Jan17 16Jan17 24Jan17 8Feb17 20 15 OnTarget
BD6FMEPF1040 BD 6thFloor InstallSprinklers 14 0.00% 0.00% 2Jan17 17Jan17 25Jan17 9Feb17 20 15 OnTarget
BD6FMEPF1050 BD 6thFloor InstallSwitchesandSockets 14 0.00% 0.00% 2Jan17 17Jan17 25Jan17 9Feb17 20 15 OnTarget
BD6FMEPF1060 BD 6thFloor InstallLowCurrentEquipments 14 0.00% 0.00% 3Jan17 18Jan17 26Jan17 11Feb17 20 15 OnTarget
BD6FMEPF1070 BD 6thFloor InstallGrillesandDiffussers 14 0.00% 0.00% 3Jan17 18Jan17 26Jan17 11Feb17 20 15 OnTarget
BD6FMEPF1075 BD 6thFloor MEPFinalFixes/Sanitarywares 10 0.00% 0.00% 4Jan17 15Jan17 28Jan17 7Feb17 20 12 OnTarget
BD6FMEPF1080 BD 6thFloor InstallPlumpingFinalTittings(FloorDrains,Floortraps 14 0.00% 0.00% 3Jan17 18Jan17 26Jan17 11Feb17 20 15 OnTarget
SeventhFloor 64 0.00% 0.00% 27Nov16 8Feb17 26Nov16A 2Mar17 18 79 OnTarget
DryArea 41 0.00% 0.00% 18Dec16 7Mar17 27Nov16A 10Apr17 29 22 OnTarget
MEPWorks 35 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BD7FMEPD1000 BD 7thFloor DryareaPlasterMEPclearance(Hoistarea,Garbage,W 7 100.00% 99.00% 5Dec16 12Dec16 26Nov16A 4Jan17 19 15 Delayed
BD7FMEPD1010 BD 7thFloor DryAreaHLClearancebyARMAforgridfixing 14 100.00% 10.00% 12Dec16 27Dec16 27Nov16A 18Jan17 18 14 Delayed
BD7FMEPD1020 BD 7thFloor DryAreaMEPclearanceforBoardclosing 14 57.14% 0.00% 21Dec16 5Jan17 11Jan17 28Jan17 18 14 Delayed
BD7FMEPD1030 BD 7thFloor InstallLowCurrentWiring 10 100.00% 80.00% 29Nov16 10Dec16 27Nov16A 1Jan17 19 14 Delayed
BD7FMEPD1040 BD 7thFloor InstallDuctsandHangers 14 100.00% 75.00% 27Nov16 12Dec16 27Nov16A 3Jan17 19 14 Delayed
BD7FMEPD1050 BD 7thFloor DBInstallation 10 100.00% 40.00% 4Dec16 14Dec16 27Nov16A 5Jan17 19 14 Delayed
BD7FMEPD1060 BD 7thFloor InstallDroppers 12 100.00% 0.00% 4Dec16 17Dec16 31Dec16 12Jan17 23 2 Delayed
BD7FMEPD1070 BD 7thFloor MeggeringTest 7 100.00% 0.00% 10Dec16 17Dec16 5Jan17 12Jan17 23 2 Delayed
WetArea 40 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPWorks 34 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BD7FMEPW1000 BD 7thFloor WetAreaMEPclearanceforBoardclosing 10 30.00% 0.00% 27Dec16 7Jan17 17Jan17 29Jan17 18 15 Delayed
BD7FMEPW1010 BD 7thFloor InstallElectricalWiring 12 100.00% 100.00% 29Nov16 12Dec16 27Nov16A 22Dec16A 8 0 OnTarget
BD7FMEPW1020 BD 7thFloor InstallDrainagepipes 12 100.00% 100.00% 30Nov16 13Dec16 27Nov16A 17Dec16A 2 0 OnTarget
BD7FMEPW1030 BD 7thFloor InstallHot&ColdWaterPiping 12 100.00% 89.00% 1Dec16 14Dec16 27Nov16A 1Jan17 14 4 Delayed
BD7FMEPW1040 BD 7thFloor InstallDuctsandHangers 16 100.00% 7.00% 30Nov16 18Dec16 27Nov16A 16Jan17 25 7 Delayed
BD7FMEPW1050 BD 7thFloor InstallDroppers 12 100.00% 0.00% 7Dec16 20Dec16 4Jan17 18Jan17 25 7 Delayed
BD7FMEPW1060 BD 7thFloor MeggeringTest 5 100.00% 0.00% 15Dec16 20Dec16 12Jan17 18Jan17 25 7 Delayed
Corridor/LiftLobby 38 0.00% 0.00% 6Dec16 28Feb17 27Nov16A 8Feb17 17 97 OnTarget
MEPWorks 32 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BD7FMEPCL1000 BD 7thFloor CorridorMEPclearanceforBoardclosing 10 30.00% 0.00% 27Dec16 7Jan17 17Jan17 29Jan17 18 15 Delayed
BD7FMEPCL1020 BD 7thFloor InstallHot&ColdWaterPiping 12 100.00% 20.00% 3Dec16 15Dec16 27Nov16A 10Jan17 22 10 Delayed
BD7FMEPCL1030 BD 7thFloor InstallDuctsandHangers 14 100.00% 80.00% 1Dec16 17Dec16 27Nov16A 11Jan17 22 10 Delayed
BD7FMEPCL1040 BD 7thFloor InstallCableTraysandTrunking 10 100.00% 0.00% 10Dec16 20Dec16 3Jan17 15Jan17 22 10 Delayed
BD7FMEPCL1045 BD 7thFloor InstallLowCurrentWiring 12 100.00% 70.00% 11Dec16 24Dec16 27Nov16A 18Jan17 22 7 Delayed
BD7FMEPCL1050 BD 7thFloor InstallLVCables 10 100.00% 0.00% 13Dec16 24Dec16 7Jan17 18Jan17 22 10 Delayed
BD7FMEPCL1060 BD 7thFloor InstallDroppers 10 100.00% 0.00% 17Dec16 27Dec16 10Jan17 22Jan17 22 10 Delayed
BD7FMEPCL1070 BD 7thFloor MeggeringTest 7 100.00% 0.00% 20Dec16 27Dec16 14Jan17 22Jan17 22 10 Delayed
CommonFinalFinishes 36 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPWorks 18 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BD7FMEPF1010 BD 7thFloor InstallLightFittings 14 0.00% 0.00% 2Jan17 17Jan17 23Jan17 8Feb17 18 15 OnTarget
BD7FMEPF1020 BD 7thFloor InstallFireCabinets 14 0.00% 0.00% 3Jan17 18Jan17 24Jan17 9Feb17 18 15 OnTarget
BD7FMEPF1030 BD 7thFloor InstallFireAlarmsandSpeakers 14 0.00% 0.00% 3Jan17 18Jan17 24Jan17 9Feb17 18 15 OnTarget
BD7FMEPF1040 BD 7thFloor InstallSprinklers 14 0.00% 0.00% 4Jan17 19Jan17 25Jan17 11Feb17 18 15 OnTarget
BD7FMEPF1050 BD 7thFloor InstallSwitchesandSockets 14 0.00% 0.00% 4Jan17 19Jan17 25Jan17 11Feb17 18 15 OnTarget
BD7FMEPF1060 BD 7thFloor InstallLowCurrentEquipments 14 0.00% 0.00% 5Jan17 21Jan17 26Jan17 12Feb17 18 15 OnTarget
BD7FMEPF1070 BD 7thFloor InstallGrillesandDiffussers 14 0.00% 0.00% 5Jan17 21Jan17 26Jan17 12Feb17 18 15 OnTarget
BD7FMEPF1075 BD 7thFloor MEPFinalFixes/Sanitarywares 12 0.00% 0.00% 9Jan17 22Jan17 25Jan17 8Feb17 14 12 OnTarget
DelayAnalysisReportBasedonTargetProgram *DelayedActivitiesareHiglightedInRed DataDate: 29Dec16
VarianceBL
Original Schedule% Activity% BLProject BLProject Actual/Forecas Actual/Forecas Delayed/O
ActivityID Building Floor ActivityName ProjectFinish TotalFloat
Duration Complete Complete Start Finish tedStart tedFinish nTrack
Date
BD7FMEPF1080 BD 7thFloor InstallPlumpingFinalTittings(FloorDrains,Floortraps 14 0.00% 0.00% 5Jan17 21Jan17 26Jan17 12Feb17 18 15 OnTarget
EightFloor 59 0.00% 0.00% 30Nov16 16Apr17 26Nov16A 25Apr17 8 32 OnTarget
DryArea 41 0.00% 0.00% 18Dec16 7Mar17 27Nov16A 10Apr17 29 22 OnTarget
MEPWorks 32 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BD8FMEPD1000 BD 8thFloor DryareaPlasterMEPclearance(Hoistarea,Garbage,W 7 100.00% 99.00% 30Nov16 7Dec16 26Nov16A 3Jan17 22 15 Delayed
BD8FMEPD1010 BD 8thFloor DryAreaHLClearancebyARMAforgridfixing 10 100.00% 15.00% 15Dec16 26Dec16 27Nov16A 18Jan17 19 15 Delayed
BD8FMEPD1020 BD 8thFloor DryAreaMEPclearanceforBoardclosing 10 40.00% 0.00% 26Dec16 5Jan17 14Jan17 25Jan17 16 15 Delayed
BD8FMEPD1030 BD 8thFloor InstallElectricalWiring 10 100.00% 100.00% 3Dec16 13Dec16 27Nov16A 10Dec16A 4 0 OnTarget
BD8FMEPD1040 BD 8thFloor InstallLowCurrentWiring 10 100.00% 63.00% 6Dec16 17Dec16 27Nov16A 3Jan17 15 6 Delayed
BD8FMEPD1050 BD 8thFloor InstallDuctsandHangers 12 100.00% 19.00% 7Dec16 20Dec16 27Nov16A 10Jan17 18 9 Delayed
BD8FMEPD1060 BD 8thFloor DBInstallation 10 100.00% 40.00% 7Dec16 18Dec16 27Nov16A 5Jan17 16 14 Delayed
BD8FMEPD1070 BD 8thFloor InstallDroppers 12 100.00% 0.00% 8Dec16 21Dec16 31Dec16 12Jan17 19 8 Delayed
BD8FMEPD1080 BD 8thFloor MeggeringTest 7 100.00% 0.00% 18Dec16 25Dec16 9Jan17 16Jan17 19 8 Delayed
WetArea 35 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPWorks 30 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BD8FMEPW1000 BD 8thFloor WetAreaMEPclearanceforBoardclosing 10 10.00% 0.00% 29Dec16 9Jan17 17Jan17 29Jan17 16 15 Delayed
BD8FMEPW1010 BD 8thFloor InstallElectricalWiring 10 100.00% 100.00% 7Dec16 18Dec16 27Nov16A 22Dec16A 3 0 OnTarget
BD8FMEPW1020 BD 8thFloor InstallDrainagepipes 12 100.00% 90.00% 6Dec16 19Dec16 27Nov16A 1Jan17 10 130 Delayed
BD8FMEPW1030 BD 8thFloor InstallHot&ColdWaterPiping 12 100.00% 64.00% 7Dec16 20Dec16 27Nov16A 4Jan17 12 128 Delayed
BD8FMEPW1040 BD 8thFloor Firefightingpipes 10 100.00% 100.00% 13Dec16 24Dec16 27Nov16A 25Dec16A 0 0 OnTarget
BD8FMEPW1050 BD 8thFloor InstallDuctsandHangers 12 100.00% 19.00% 12Dec16 25Dec16 27Nov16A 10Jan17 14 3 Delayed
BD8FMEPW1060 BD 8thFloor InstallDroppers 12 100.00% 0.00% 15Dec16 28Dec16 31Dec16 14Jan17 14 3 Delayed
BD8FMEPW1070 BD 8thFloor MeggeringTest 10 100.00% 0.00% 18Dec16 28Dec16 2Jan17 14Jan17 14 3 Delayed
Corridor/LiftLobby 27 0.00% 0.00% 6Dec16 28Feb17 27Nov16A 8Feb17 17 97 OnTarget
MEPWorks 21 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BD8FMEPCL1000 BD 8thFloor CorridorMEPclearanceforBoardclosing 12 83.33% 0.00% 19Dec16 1Jan17 3Jan17 16Jan17 13 8 Delayed
BD8FMEPCL1020 BD 8thFloor InstallHot&ColdWaterPiping 10 100.00% 0.00% 10Dec16 20Dec16 31Dec16 10Jan17 18 122 Delayed
BD8FMEPCL1030 BD 8thFloor Firefightingpipes 10 100.00% 100.00% 10Dec16 20Dec16 27Nov16A 17Dec16A 4 0 OnTarget
BD8FMEPCL1040 BD 8thFloor InstallDuctsandHangers 12 100.00% 80.00% 8Dec16 21Dec16 27Nov16A 2Jan17 9 4 Delayed
BD8FMEPCL1050 BD 8thFloor InstallCableTraysandTrunking 10 100.00% 10.00% 14Dec16 25Dec16 27Nov16A 9Jan17 13 8 Delayed
BD8FMEPCL1055 BD 8thFloor InstallLowCurrentWiring 12 100.00% 63.00% 15Dec16 28Dec16 27Nov16A 12Jan17 13 6 Delayed
BD8FMEPCL1060 BD 8thFloor InstallLVCables 10 100.00% 0.00% 18Dec16 28Dec16 2Jan17 12Jan17 13 8 Delayed
BD8FMEPCL1070 BD 8thFloor InstallDroppers 10 80.00% 0.00% 21Dec16 1Jan17 5Jan17 16Jan17 13 8 Delayed
BD8FMEPCL1080 BD 8thFloor MeggeringTest 5 60.00% 0.00% 27Dec16 1Jan17 11Jan17 16Jan17 13 8 Delayed
CommonFinalFinishes 36 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPWorks 17 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BD8FMEPF1010 BD 8thFloor InstallLightFittings 14 0.00% 0.00% 1Jan17 16Jan17 19Jan17 5Feb17 16 15 OnTarget
BD8FMEPF1020 BD 8thFloor InstallFireCabinets 14 0.00% 0.00% 2Jan17 17Jan17 21Jan17 6Feb17 16 12 OnTarget
BD8FMEPF1030 BD 8thFloor InstallFireAlarmsandSpeakers 14 0.00% 0.00% 2Jan17 17Jan17 21Jan17 6Feb17 16 12 OnTarget
BD8FMEPF1040 BD 8thFloor InstallSprinklers 14 0.00% 0.00% 3Jan17 18Jan17 22Jan17 7Feb17 16 12 OnTarget
BD8FMEPF1050 BD 8thFloor InstallSwitchesandSockets 14 0.00% 0.00% 3Jan17 18Jan17 22Jan17 7Feb17 16 12 OnTarget
BD8FMEPF1060 BD 8thFloor InstallLowCurrentEquipments 14 0.00% 0.00% 4Jan17 19Jan17 23Jan17 8Feb17 16 12 OnTarget
BD8FMEPF1070 BD 8thFloor InstallGrillesandDiffussers 14 0.00% 0.00% 4Jan17 19Jan17 23Jan17 8Feb17 16 12 OnTarget
BD8FMEPF1075 BD 8thFloor MEPFinalFixes/Sanitarywares 12 0.00% 0.00% 4Jan17 17Jan17 23Jan17 6Feb17 16 10 OnTarget
BD8FMEPF1080 BD 8thFloor InstallPlumpingFinalTittings(FloorDrains,Floortraps 14 0.00% 0.00% 4Jan17 19Jan17 23Jan17 8Feb17 16 12 OnTarget
RoofFloor 58 0.00% 0.00% 27Nov16 19Mar17 26Nov16A 27Feb17 18 82 OnTarget
General 42 0.00% 0.00% 27Nov16 3Jan17 27Nov16A 17Jan17 11 117 OnTarget
BDRF1090 BD Roof FAHUinstallationandconenction 24 100.00% 100.00% 27Nov16 24Dec16 27Nov16A 05Dec16A 17 0 OnTarget
BDRF1100 BD Roof VRVunitsinstallation/connection/termination 36 80.56% 97.00% 27Nov16 7Jan17 26Nov16A 1Jan17 6 24 OnTarget
BDRF1110 BD Roof GRPWatertankinstallationandconnections 24 58.33% 97.00% 14Dec16 10Jan17 26Nov16A 4Jan17 6 24 OnTarget
FAHURoom 56 0.00% 0.00% 27Nov16 30Jan17 26Nov16A 28Jan17 2 107 OnTarget
BDRF1130 BD Roof PlasterMEpClearance 10 100.00% 100.00% 4Dec16 14Dec16 27Nov16A 10Dec16A 5 0 OnTarget
BDRF1160 BD Roof MEPScreedclearance 10 100.00% 100.00% 12Dec16 22Dec16 27Nov16A 10Dec16A 12 0 OnTarget
BDRF1180 BD Roof MEPInstallations/Connections 32 34.38% 90.00% 18Dec16 23Jan17 27Nov16A 3Jan17 18 22 OnTarget
BDRF1190 BD Roof MEPHLClearancebyARMAforceilingpainting 12 100.00% 50.00% 12Dec16 25Dec16 27Nov16A 5Jan17 10 8 Delayed
BDRF1230 BD Roof MEPFinalFixes 6 0.00% 0.00% 21Jan17 26Jan17 18Jan17 24Jan17 2 6 OnTarget
PumpRoom 56 0.00% 0.00% 27Nov16 30Jan17 26Nov16A 11Feb17 9 4 OnTarget
BDRF1260 BD Roof PlasterMEpClearance 6 100.00% 100.00% 4Dec16 10Dec16 27Nov16A 10Dec16A 1 0 OnTarget
BDRF1290 BD Roof MEPScreedclearance 3 100.00% 100.00% 20Dec16 22Dec16 27Nov16A 10Dec16A 12 0 OnTarget
BDRF1310 BD Roof MEPInstallations/Connections 24 12.50% 15.00% 27Dec16 23Jan17 26Nov16A 23Jan17 1 5 OnTarget
BDRF1320 BD Roof MEPHLClearancebyARMAforceilingpainting 10 90.00% 0.00% 20Dec16 31Dec16 8Jan17 19Jan17 16 5 Delayed
BDRF1360 BD Roof MEPFinalFixes 3 0.00% 0.00% 24Jan17 26Jan17 4Feb17 7Feb17 9 5 OnTarget
Electrical,LC,SMATV,GSMRooms 56 0.00% 0.00% 27Nov16 30Jan17 26Nov16A 5Feb17 5 8 OnTarget
BDRF1380 BD Roof PlasterMEpClearance 10 100.00% 95.00% 13Dec16 24Dec16 27Nov16A 31Dec16 6 5 Delayed
BDRF1410 BD Roof MEPScreedclearance 10 80.00% 20.00% 21Dec16 1Jan17 27Nov16A 14Jan17 11 1 Delayed
BDRF1430 BD Roof MEPInstallations/Connections 24 12.50% 90.00% 27Dec16 23Jan17 26Nov16A 2Jan17 19 23 OnTarget
BDRF1440 BD Roof MEPHLClearancebyARMAforceilingpainting 12 66.67% 0.00% 21Dec16 3Jan17 3Jan17 16Jan17 11 1 Delayed
BDRF1480 BD Roof MEPFinalFixes 6 0.00% 0.00% 21Jan17 26Jan17 26Jan17 1Feb17 5 1 OnTarget
CommonArea 49 0.00% 0.00% 27Nov16 22Jan17 26Nov16A 4Feb17 11 101 OnTarget
MEPservicesroomsandOthers 39 0.00% 0.00% 27Nov16 10Jan17 26Nov16A 4Feb17 21 101 OnTarget
LVRoomB 16 0.00% 0.00% 27Nov16 14Dec16 26Nov16A 5Jan17 19 126 OnTarget
BDSR11100 BD MEPworkCompletionbyARMA 14 100.00% 75.00% 27Nov16 12Dec16 26Nov16A 3Jan17 19 14 Delayed
LVRoomD 19 0.00% 0.00% 27Nov16 18Dec16 26Nov16A 5Jan17 15 127 OnTarget
BDL041050 BD MEPworkCompletionbyARMA 14 100.00% 85.00% 29Nov16 14Dec16 26Nov16A 2Jan17 15 13 Delayed
ElectricalRooms/Telephone/WaterMeterRooms 39 0.00% 0.00% 27Nov16 10Jan17 26Nov16A 22Jan17 9 113 OnTarget
BDEL1000 BD MEPClearanceforPlaster 14 100.00% 100.00% 27Nov16 12Dec16 27Nov16A 01Dec16A 10 0 OnTarget
BDEL1015 BD MEPClearanceforScreed(AsApplicable) 14 100.00% 100.00% 7Dec16 22Dec16 27Nov16A 01Dec16A 19 0 OnTarget
BDEL1060 BD MEPworkCompletionbyARMA 18 100.00% 60.00% 10Dec16 29Dec16 27Nov16A 8Jan17 7 3 Delayed
BDEL1085 BD MEPFinalfittings 4 0.00% 0.00% 3Jan17 7Jan17 14Jan17 18Jan17 9 9 OnTarget
FanRooms 24 0.00% 0.00% 27Nov16 24Dec16 26Nov16A 19Jan17 23 22 OnTarget
BDSR31170 BD MEPworkCompletionbyARMA 18 100.00% 80.00% 29Nov16 19Dec16 26Nov16A 3Jan17 13 24 Delayed
FireWater/IrrigationPump 22 0.00% 0.00% 27Nov16 21Dec16 26Nov16A 5Jan17 13 126 OnTarget
BDFP1020 BD MEPClearanceforScreed(AsApplicable) 3 100.00% 100.00% 4Dec16 6Dec16 27Nov16A 28Nov16A 8 0 OnTarget
BDFP1050 BD MEPworkCompletionbyARMA 18 100.00% 95.00% 28Nov16 18Dec16 27Nov16A 31Dec16 11 27 Delayed
GeneratorRooms 30 0.00% 0.00% 27Nov16 31Dec16 27Nov16A 5Jan17 5 126 OnTarget
BDGN1000 BD MEPClearanceforScreed(AsApplicable) 3 100.00% 100.00% 27Nov16 29Nov16 27Nov16A 27Nov16A 3 0 OnTarget
BDGN1030 BD MEPworkCompletionbyARMA 18 100.00% 85.00% 7Dec16 27Dec16 27Nov16A 2Jan17 5 25 Delayed
GarabageRooms 39 0.00% 0.00% 27Nov16 10Jan17 27Nov16A 16Jan17 5 117 OnTarget
BDGC1020 BD MEPClearanceforScreed(AsApplicable) 3 100.00% 100.00% 4Dec16 6Dec16 27Nov16A 27Nov16A 9 0 OnTarget
BDGC1050 BD MEPworkCompletionbyARMA 18 100.00% 88.00% 30Nov16 20Dec16 27Nov16A 12Jan17 20 16 Delayed
BDGC1070 BD Garbagechuteinstalaltion 24 58.33% 80.00% 14Dec16 10Jan17 27Nov16A 4Jan17 5 23 OnTarget
SwimingPoolandPumpRoom 28 0.00% 0.00% 6Dec16 7Jan17 27Nov16A 4Feb17 24 3 OnTarget
BDRFS2SU1080 BD Roof SwimmingPoolMEPWorks 18 61.11% 35.00% 18Dec16 7Jan17 27Nov16A 4Feb17 24 3 Delayed
StaircaseFinishes 45 0.00% 0.00% 27Nov16 17Jan17 26Nov16A 4Feb17 14 102 OnTarget
BDST1020 BD PlasterMEPClearance 18 100.00% 100.00% 27Nov16 17Dec16 26Nov16A 05Dec16A 11 0 OnTarget
OTS 41 0.00% 0.00% 27Nov16 12Jan17 26Nov16A 23Jan17 9 9 OnTarget
BDOTS1020 BD MEPCutting&Chasingforconduits 12 100.00% 100.00% 30Nov16 13Dec16 27Nov16A 29Nov16A 13 0 OnTarget
BDOTS1090 BD MEPWork 24 50.00% 50.00% 17Dec16 12Jan17 01Dec16A 23Jan17 9 9 OnTarget
Roofing 45 0.00% 0.00% 27Nov16 16Feb17 26Nov16A 7Feb17 8 83 OnTarget
BDRF1080 BD Roof RoofEquipmentInstallation&Conncetion 36 55.56% 97.00% 7Dec16 17Jan17 26Nov16A 1Jan17 15 27 OnTarget
ExternalElevation 51 0.00% 0.00% 27Nov16 25Feb17 26Nov16A 6Mar17 8 75 OnTarget
SouthSide 37 0.00% 0.00% 27Nov16 8Jan17 26Nov16A 8Jan17 1 125 OnTarget
BDELS2SU1090 BD MEPFittings 10 50.00% 100.00% 25Dec16 4Jan17 26Nov16A 26Nov16A 35 0 OnTarget
Westside 51 0.00% 0.00% 27Nov16 24Jan17 26Nov16A 29Jan17 4 1 OnTarget
BDELS1SU1130 BD MEPCutting&Chasingforconduits 10 100.00% 100.00% 4Dec16 14Dec16 26Nov16A 10Dec16A 5 0 OnTarget
BDELS2SU1200 BD MEPFittings 10 0.00% 0.00% 10Jan17 21Jan17 14Jan17 25Jan17 4 1 OnTarget
Northside 49 0.00% 0.00% 27Nov16 22Jan17 26Nov16A 1Feb17 9 2 OnTarget
BDELS1SU1240 BD MEPCutting&Chasingforconduits 12 100.00% 100.00% 1Dec16 14Dec16 27Nov16A 27Nov16A 16 0 OnTarget
BDELS2SU1310 BD MEPFittings 12 0.00% 0.00% 5Jan17 18Jan17 16Jan17 29Jan17 9 2 OnTarget
EastSide 48 0.00% 0.00% 27Nov16 21Jan17 26Nov16A 2Feb17 11 102 OnTarget
BDELS2SU1420 BD MEPFittings 10 0.00% 0.00% 5Jan17 16Jan17 18Jan17 29Jan17 11 3 OnTarget
Courtyardarea 41 0.00% 0.00% 27Nov16 12Jan17 26Nov16A 5Jan17 6 126 OnTarget
BDELS1SU1460 BD MEPCutting&Chasingforconduits 6 100.00% 100.00% 27Nov16 3Dec16 27Nov16A 01Dec16A 2 0 OnTarget
BDELS2SU1530 BD MEPFittings 10 10.00% 100.00% 29Dec16 9Jan17 03Dec16A 03Dec16A 33 0 OnTarget
ExternalWork 32 0.00% 0.00% 6Feb17 4Apr17 15Feb17 6Apr17 2 2 OnTarget
BDEXS1SU1250 BD ExternalMEPServices 18 0.00% 0.00% 18Jan17 7Feb17 28Jan17 16Feb17 8 90 OnTarget
BDEXS2SU1280 BD ExternalWaterFeatureMEPWorks 24 0.00% 0.00% 19Jan17 15Feb17 29Jan17 25Feb17 8 3 OnTarget
Testing&Commissioning 41 0.00% 0.00% 27Feb17 30Apr17 1Mar17 2May17 2 25 OnTarget
BDTCS3ME1100 BD Testing&CommissioningforAllSystem 36 0.00% 0.00% 11Jan17 21Feb17 29Jan17 12Mar17 15 15 OnTarget
Electrical 24 0.00% 0.00% 27Feb17 9Apr17 1Mar17 11Apr17 2 43 OnTarget
BDTC1110 BD TestingandCommissioningofLVPanels&System 24 0.00% 0.00% 11Jan17 7Feb17 29Jan17 26Feb17 15 83 OnTarget
DelayAnalysisReportBasedonTargetProgram *DelayedActivitiesareHiglightedInRed DataDate: 29Dec16
VarianceBL
Original Schedule% Activity% BLProject BLProject Actual/Forecas Actual/Forecas Delayed/O
ActivityID Building Floor ActivityName ProjectFinish TotalFloat
Duration Complete Complete Start Finish tedStart tedFinish nTrack
Date
BDTC1120 BD TestingandCommissioningofMCC's 24 0.00% 0.00% 11Jan17 7Feb17 29Jan17 26Feb17 15 83 OnTarget
BDTC1130 BD TestingandCommissioningofLightningProtectionSys 18 0.00% 0.00% 18Jan17 7Feb17 5Feb17 26Feb17 15 83 OnTarget
BDTC1140 BD TestingandCommissioningofGenerator 10 0.00% 0.00% 28Jan17 7Feb17 14Feb17 26Feb17 15 83 OnTarget
BDTC1150 BD TestingandCommissioningofEarthingSystem 18 0.00% 0.00% 18Jan17 7Feb17 5Feb17 26Feb17 15 83 OnTarget
LowCurrentSystems 24 0.00% 0.00% 27Feb17 30Mar17 1Mar17 2Apr17 2 2 OnTarget
BDTC1200 BD TestAudioVisualSystem 18 0.00% 0.00% 15Jan17 4Feb17 1Feb17 22Feb17 15 15 OnTarget
BDTC1210 BD TestUPS 12 0.00% 0.00% 22Jan17 4Feb17 8Feb17 22Feb17 15 15 OnTarget
BDTC1220 BD TestFireAlarmSystem 24 0.00% 0.00% 8Jan17 4Feb17 25Jan17 22Feb17 15 15 OnTarget
BDTC1230 BD TestCentralBatterySystem 24 0.00% 0.00% 8Jan17 4Feb17 25Jan17 22Feb17 15 15 OnTarget
BDTC1240 BD TestStructuredCabling(data&telecom) 24 0.00% 0.00% 8Jan17 4Feb17 25Jan17 22Feb17 15 15 OnTarget
BDTC1250 BD TestLightingControlSystem 21 0.00% 0.00% 11Jan17 4Feb17 29Jan17 22Feb17 15 15 OnTarget
BDTC1260 BD TestSMATV 21 0.00% 0.00% 11Jan17 4Feb17 29Jan17 22Feb17 15 15 OnTarget
BDTC1270 BD TestVoiceEvacuationSystem 24 0.00% 0.00% 8Jan17 4Feb17 25Jan17 22Feb17 15 15 OnTarget
BDTC1280 BD TestCCTVandAccessControlSystem 18 0.00% 0.00% 15Jan17 4Feb17 1Feb17 22Feb17 15 15 OnTarget
BDTC1290 BD TestGRMSSystem 24 0.00% 0.00% 8Jan17 4Feb17 25Jan17 22Feb17 15 15 OnTarget
FireFightingSystems 15 0.00% 0.00% 6Mar17 5Apr17 8Mar17 8Apr17 2 2 OnTarget
BDTC1300 BD Testing&CommissioningofFireFHC's 10 0.00% 0.00% 11Jan17 22Jan17 29Jan17 9Feb17 15 14 OnTarget
BDTC1310 BD Testing&CommissioningofGasFireSuppressionSyste 15 0.00% 0.00% 5Jan17 22Jan17 23Jan17 9Feb17 15 14 OnTarget
BDTC1320 BD Testing&CommissioningofFirePumps 12 0.00% 0.00% 9Jan17 22Jan17 26Jan17 9Feb17 15 14 OnTarget
DrainageSystems 16 0.00% 0.00% 10Apr17 23Apr17 12Apr17 25Apr17 2 2 OnTarget
BDTC1170 BD TestingandCommissioningofPumps 10 0.00% 0.00% 25Jan17 5Feb17 12Feb17 23Feb17 15 11 OnTarget
BDTC1180 BD TestingandCommissioningofDrainageSystem 15 0.00% 0.00% 26Jan17 12Feb17 13Feb17 2Mar17 15 11 OnTarget
WaterSupplySystem 22 0.00% 0.00% 27Feb17 26Mar17 1Mar17 28Mar17 2 8 OnTarget
BDTC1020 BD TestingandCommissioningofWaterTank 10 0.00% 0.00% 11Jan17 22Jan17 29Jan17 9Feb17 15 14 OnTarget
BDTC1030 BD WaterSupplyFlushingandChlorination 10 0.00% 0.00% 15Jan17 25Jan17 1Feb17 13Feb17 15 14 OnTarget
BDTC1040 BD TestingandCommissioningofPumps 12 0.00% 0.00% 16Jan17 29Jan17 2Feb17 16Feb17 15 14 OnTarget
BDTC1050 BD TestingandCommissioningofWaterHeaters 18 0.00% 0.00% 16Jan17 5Feb17 2Feb17 23Feb17 15 14 OnTarget
HVACSystem 31 0.00% 0.00% 27Feb17 30Apr17 1Mar17 2May17 2 0 OnTarget
BDTC1070 BD Testing&CommissioningofVRFSystem 24 0.00% 0.00% 11Jan17 7Feb17 29Jan17 26Feb17 15 14 OnTarget
BDTC1080 BD DXUnitIndoor 10 0.00% 0.00% 31Jan17 11Feb17 18Feb17 1Mar17 15 14 OnTarget
BDTC1090 BD DXUnitOutdoor 10 0.00% 0.00% 4Feb17 14Feb17 21Feb17 5Mar17 15 14 OnTarget
BDTC1100 BD AirBalancing 24 0.00% 0.00% 19Jan17 15Feb17 6Feb17 6Mar17 15 14 OnTarget
BMSSystem 24 0.00% 0.00% 27Mar17 23Apr17 29Mar17 25Apr17 2 5 OnTarget
BDTC1160 BD BMSSystemtTesting&Commissioning 24 0.00% 0.00% 11Jan17 7Feb17 29Jan17 26Feb17 15 13 OnTarget
LPGSystem 20 0.00% 0.00% 10Apr17 23Apr17 12Apr17 25Apr17 2 0 OnTarget
BDTC1060 BD Testing&CommissioningofLPGSystem 20 0.00% 0.00% 11Jan17 2Feb17 29Jan17 21Feb17 15 15 OnTarget
BoilerSystem 10 0.00% 0.00% 10Apr17 23Apr17 12Apr17 25Apr17 2 0 OnTarget
BDTC1190 BD Testing&CommissioningofBoilerSystem 10 0.00% 0.00% 18Jan17 29Jan17 5Feb17 16Feb17 15 14 OnTarget
AuthorityApproval 74 0.00% 0.00% 27Nov16 17May17 02Dec16A 18May17 1 1 OnTarget
Transformer&RMUworks(HVApprovals) 36 0.00% 0.00% 27Nov16 5Feb17 02Dec16A 23Jan17 11 37 OnTarget
BDAAMEP1010 BD Transformerinstallation&Connection 24 100.00% 100.00% 27Nov16 24Dec16 26Nov16A 26Nov16A 25 0 OnTarget
BDAAMEP1020 BD AuthorityApproval 12 41.67% 0.00% 25Dec16 7Jan17 31Dec16 12Jan17 5 10 Delayed
LVApproval 33 0.00% 0.00% 29Jan17 7Mar17 17Jan17 23Feb17 10 10 OnTarget
BDAAMEP1030 BD RequestforDEWAinspection 4 100.00% 0.00% 19Dec16 22Dec16 8Jan17 11Jan17 14 12 Delayed
BDAAMEP1040 BD DEWA1stinspection 7 85.71% 0.00% 24Dec16 31Dec16 12Jan17 19Jan17 17 14 Delayed
BDAAMEP1050 BD ClearDEWAsnag&applyforfinalinspection 5 0.00% 0.00% 1Jan17 5Jan17 21Jan17 25Jan17 17 14 OnTarget
BDAAMEP1060 BD Dewasecondinspection/Approval 5 0.00% 0.00% 7Jan17 11Jan17 26Jan17 31Jan17 17 14 OnTarget
BDAAMEP1070 BD Collection&installationofKWHmeters 10 0.00% 0.00% 14Jan17 24Jan17 30Jan17 9Feb17 14 14 OnTarget
BDAAMEP1080 BD TemporarystablePoweron 0 0.00% 0.00% 0Jan00 24Jan17 0Jan00 9Feb17 14 14 OnTarget
BDAAMEP1220 BD Energize 1 0.00% 0.00% 25Jan17 25Jan17 11Feb17 11Feb17 14 14 OnTarget
WaterSupplyApproval 73 0.00% 0.00% 27Nov16 15May17 31Dec16 17May17 2 0 OnTarget
BDAAMEP1090 BD PaymentforWaterMeters 12 100.00% 0.00% 27Nov16 10Dec16 31Dec16 12Jan17 28 7 Delayed
BDAAMEP1100 BD WaterMeterdelivery 12 100.00% 0.00% 11Dec16 24Dec16 14Jan17 26Jan17 29 6 Delayed
BDAAMEP1110 BD DEWAInspection 6 0.00% 0.00% 3Jan17 10Jan17 15Jan17 22Jan17 8 6 OnTarget
BDAAMEP1120 BD DewaApproval 6 0.00% 0.00% 11Jan17 17Jan17 23Jan17 29Jan17 10 8 OnTarget
BDAAMEP1130 BD InstalWaterMeter 3 0.00% 0.00% 18Jan17 21Jan17 30Jan17 1Feb17 10 8 OnTarget
BDAAMEP1140 BD Testing&Commisioning 12 0.00% 0.00% 23Jan17 5Feb17 9Feb17 23Feb17 15 14 OnTarget
BDAAMEP1150 BD ObtainNOCfromDEWAforWater 12 0.00% 0.00% 6Feb17 19Feb17 23Feb17 9Mar17 15 14 OnTarget
TelecomApproval 34 0.00% 0.00% 14Feb17 30Apr17 27Feb17 11May17 9 5 OnTarget
BDAAMEP1160 BD CompletionofTelecomroom 0 0.00% 0.00% 0Jan00 10Jan17 0Jan00 22Jan17 9 9 OnTarget
BDAAMEP1170 BD SubmitApplication 1 0.00% 0.00% 10Jan17 10Jan17 19Jan17 22Jan17 7 6 OnTarget
BDAAMEP1180 BD EtisalatInspection 6 0.00% 0.00% 11Jan17 18Jan17 22Jan17 30Jan17 7 6 OnTarget
BDAAMEP1190 BD CoordinationwithEtisalatContractor 10 0.00% 0.00% 19Jan17 30Jan17 30Jan17 11Feb17 9 8 OnTarget
BDAAMEP1200 BD Testing&Commisioning 10 0.00% 0.00% 31Jan17 11Feb17 11Feb17 22Feb17 9 8 OnTarget
BDAAMEP1210 BD Inspection&ApprovalbyEtisalat 6 0.00% 0.00% 12Feb17 18Feb17 22Feb17 1Mar17 9 7 OnTarget
GSMApproval(Etisalat) 35 0.00% 0.00% 15Feb17 16Apr17 27Feb17 27Apr17 9 17 OnTarget
BDAAMEP1230 BD RequestforSiteSurvey 2 0.00% 0.00% 11Jan17 12Jan17 22Jan17 24Jan17 7 7 OnTarget
BDAAMEP1240 BD SiteSurveybyEtisalat(AfterStrCompletion) 6 0.00% 0.00% 14Jan17 19Jan17 24Jan17 31Jan17 9 9 OnTarget
BDAAMEP1250 BD CoordinationwithEtisalatContractor 10 0.00% 0.00% 21Jan17 31Jan17 31Jan17 12Feb17 9 9 OnTarget
BDAAMEP1260 BD Testing&Commisioning 10 0.00% 0.00% 1Feb17 12Feb17 12Feb17 23Feb17 9 9 OnTarget
BDAAMEP1270 BD FinalApprovalbyAuthority 7 0.00% 0.00% 13Feb17 20Feb17 23Feb17 4Mar17 9 9 OnTarget
BDAAMEP1280 BD ObtainNOCfromEtisalat 6 0.00% 0.00% 13Feb17 20Feb17 23Feb17 5Mar17 8 8 OnTarget
CivilDefence 22 0.00% 0.00% 5Mar17 16Apr17 8Mar17 19Apr17 3 20 OnTarget
BDAAMEP1290 BD RequestforDCDinspection 0 0.00% 0.00% 0Jan00 17Jan17 0Jan00 5Feb17 12 12 OnTarget
BDAAMEP1300 BD DCDInspection 6 0.00% 0.00% 10Jan17 17Jan17 26Jan17 5Feb17 12 12 OnTarget
BDAAMEP1310 BD ClearDCDsnags&requestfor2ndinspection 3 0.00% 0.00% 18Jan17 22Jan17 5Feb17 8Feb17 12 4 OnTarget
BDAAMEP1320 BD DCDsecondinspection 6 0.00% 0.00% 23Jan17 30Jan17 8Feb17 16Feb17 12 4 OnTarget
BDAAMEP1330 BD IssuanceofCivilDefensecertificate 7 0.00% 0.00% 31Jan17 8Feb17 16Feb17 27Feb17 12 4 OnTarget
CivilDefenceExternalFireHydrant 23 0.00% 0.00% 5Mar17 16Apr17 8Mar17 19Apr17 3 20 OnTarget
BDAAMEP1340 BD RequestforDCDinspection 0 0.00% 0.00% 0Jan00 17Jan17 0Jan00 5Feb17 12 11 OnTarget
BDAAMEP1350 BD DCDInspection 6 0.00% 0.00% 18Jan17 25Jan17 5Feb17 13Feb17 12 11 OnTarget
BDAAMEP1360 BD ClearDCDsnags&requestfor2ndinspection 3 0.00% 0.00% 26Jan17 30Jan17 13Feb17 16Feb17 12 11 OnTarget
BDAAMEP1370 BD DCDsecondinspection 7 0.00% 0.00% 31Jan17 8Feb17 16Feb17 27Feb17 12 11 OnTarget
BDAAMEP1380 BD IssuanceofCivilDefensecertificate 7 0.00% 0.00% 9Feb17 19Feb17 27Feb17 8Mar17 12 11 OnTarget
24X7DirectAlaram 49 0.00% 0.00% 20Mar17 11May17 23Mar17 16May17 4 1 OnTarget
BDAAMEP1390 BD SubmitApplication 1 100.00% 0.00% 20Dec16 20Dec16 1Jan17 1Jan17 8 5 Delayed
BDAAMEP1400 BD InspectionbyAuthority 6 100.00% 0.00% 21Dec16 28Dec16 2Jan17 9Jan17 8 5 Delayed
BDAAMEP1410 BD Releaseofestimate 6 16.67% 0.00% 29Dec16 4Jan17 10Jan17 16Jan17 10 6 Delayed
BDAAMEP1420 BD Payment 6 0.00% 0.00% 18Jan17 24Jan17 6Feb17 13Feb17 16 11 OnTarget
BDAAMEP1430 BD PanelInstallation 10 0.00% 0.00% 25Jan17 5Feb17 13Feb17 25Feb17 16 11 OnTarget
BDAAMEP1440 BD ObtainNOC 7 0.00% 0.00% 6Feb17 14Feb17 26Feb17 6Mar17 14 10 OnTarget
LPG 27 0.00% 0.00% 5Apr17 15May17 9Apr17 17May17 2 0 OnTarget
BDAAMEP1450 BD RequestforLPGinspection 0 0.00% 0.00% 0Jan00 12Jan17 0Jan00 23Jan17 7 7 OnTarget
BDAAMEP1460 BD LPGInspection 6 0.00% 0.00% 15Jan17 22Jan17 23Jan17 31Jan17 7 7 OnTarget
BDAAMEP1470 BD ClearLPGsnags&requestfor2ndinspection 5 0.00% 0.00% 23Jan17 29Jan17 31Jan17 7Feb17 7 7 OnTarget
BDAAMEP1480 BD LPGsecondinspection 6 0.00% 0.00% 30Jan17 6Feb17 16Feb17 23Feb17 13 13 OnTarget
BDAAMEP1490 BD NOCfromAuthority 10 0.00% 0.00% 7Feb17 20Feb17 26Feb17 9Mar17 13 13 OnTarget
DubaiPolice 46 0.00% 0.00% 28Mar17 17May17 29Mar17 18May17 1 1 OnTarget
BDAAMEP1500 BD SubmitApplication 3 33.33% 0.00% 29Dec16 2Jan17 15Jan17 17Jan17 11 1 Delayed
BDAAMEP1510 BD 1stInspectionbyAuthority 7 0.00% 0.00% 3Jan17 11Jan17 18Jan17 26Jan17 11 1 OnTarget
BDAAMEP1520 BD Commets&Rectification 7 0.00% 0.00% 12Jan17 19Jan17 28Jan17 4Feb17 13 1 OnTarget
BDAAMEP1530 BD FinalInspection&Approval 7 0.00% 0.00% 4Feb17 11Feb17 21Feb17 1Mar17 15 15 OnTarget
BDAAMEP1540 BD ObtainNOCfromDubaiPolice 7 0.00% 0.00% 12Feb17 20Feb17 1Mar17 12Mar17 13 13 OnTarget
DMApproval 36 0.00% 0.00% 20Mar17 17May17 22Mar17 18May17 1 1 OnTarget
BDAAMEP1550 BD Requestforinspection 3 0.00% 0.00% 15Jan17 17Jan17 31Jan17 5Feb17 12 12 OnTarget
BDAAMEP1560 BD EHSInspection 7 0.00% 0.00% 10Jan17 17Jan17 28Jan17 5Feb17 15 14 OnTarget
BDAAMEP1570 BD DMfirstinspection 7 0.00% 0.00% 18Jan17 26Jan17 5Feb17 14Feb17 12 12 OnTarget
BDAAMEP1580 BD DMCommentrectification 7 0.00% 0.00% 27Jan17 2Feb17 14Feb17 21Feb17 18 16 OnTarget
BDAAMEP1590 BD DMfinalinspection&Approval 7 0.00% 0.00% 5Feb17 13Feb17 21Feb17 2Mar17 12 12 OnTarget
BDAAMEP1600 BD FICconnection 6 0.00% 0.00% 14Feb17 20Feb17 2Mar17 9Mar17 14 14 OnTarget
BDAAMEP1610 BD StromWaterConnection 6 0.00% 0.00% 14Feb17 20Feb17 2Mar17 9Mar17 14 14 OnTarget
BDAAMEP1620 BD ObtainBuildingCompletionCertificate 0 0.00% 0.00% 0Jan00 20Feb17 0Jan00 12Mar17 16 16 OnTarget
ProjectCloseOut1 52 0.00% 0.00% 31Dec16 28Feb17 18Jan17 20Mar17 16 16 OnTarget
BAPC1000 BA O&MManualSubmission 18 0.00% 0.00% 4Feb17 23Feb17 22Feb17 15Mar17 16 12 OnTarget
BAPC1010 BA O&MTaining 15 0.00% 0.00% 7Feb17 23Feb17 26Feb17 15Mar17 16 12 OnTarget
BAPC1030 BA AsBuiltDrawings 48 0.00% 0.00% 31Dec16 23Feb17 18Jan17 15Mar17 16 12 OnTarget
BDTCS3ME1120 BD Snagandcleaning/HandingOver 18 0.00% 0.00% 8Feb17 28Feb17 27Feb17 20Mar17* 16 16 OnTarget
BuildingA BA 133 1.34% 0.00% 27Nov16 30Apr17 02Nov16A 9May17 8 20 Delayed
InsideWork(ApartmentsandOthers) 120 0.00% 0.00% 27Nov16 25Apr17 23Nov16A 2May17 5 27 OnTarget
Basement02 88 0.00% 0.00% 27Nov16 19Mar17 27Nov16A 28Mar17 8 56 OnTarget
MEPWorks 88 0.00% 0.00% 27Nov16 2Mar17 27Nov16A 12Mar17 8 70 OnTarget
DelayAnalysisReportBasedonTargetProgram *DelayedActivitiesareHiglightedInRed DataDate: 29Dec16
VarianceBL
Original Schedule% Activity% BLProject BLProject Actual/Forecas Actual/Forecas Delayed/O
ActivityID Building Floor ActivityName ProjectFinish TotalFloat
Duration Complete Complete Start Finish tedStart tedFinish nTrack
Date
MEP2ndFix 39 0.00% 0.00% 27Nov16 1Jan17 26Nov16A 23Jan17 19 111 OnTarget
BAB2MEP1000 BA Basement2 MEP2ndfixingcompletion 12 100.00% 40.00% 12Dec16 25Dec16 27Nov16A 17Jan17 20 8 Delayed
BAB2MEP1010 BA Basement2 MEPclearanceforboardclosing 10 0.00% 0.00% 31Dec16 10Jan17 23Jan17 2Feb17 20 8 OnTarget
BAB2MEP1020 BA Basement2 InstallElectricalWiring 10 100.00% 90.00% 27Nov16 7Dec16 27Nov16A 31Dec16 20 8 Delayed
BAB2MEP1040 BA Basement2 InstallHot&ColdWaterPiping 10 100.00% 75.00% 29Nov16 10Dec16 26Nov16A 2Jan17 20 8 Delayed
BAB2MEP1050 BA Basement2 InstallHVACPipes 10 100.00% 70.00% 30Nov16 11Dec16 27Nov16A 3Jan17 20 8 Delayed
BAB2MEP1060 BA Basement2 InstallDuctsandHangers 10 100.00% 92.00% 4Dec16 14Dec16 27Nov16A 7Jan17 20 8 Delayed
BAB2MEP1070 BA Basement2 InstallCableTraysandTrunking 12 100.00% 96.00% 5Dec16 18Dec16 27Nov16A 10Jan17 20 8 Delayed
BAB2MEP1075 BA Basement2 InstallLowCurrentWiring 12 100.00% 25.00% 12Dec16 25Dec16 27Nov16A 17Jan17 20 8 Delayed
BAB2MEP1080 BA Basement2 InstallLVCables 10 100.00% 0.00% 14Dec16 25Dec16 7Jan17 17Jan17 20 8 Delayed
BAB2MEP1090 BA Basement2 InstallDroppers 12 25.00% 0.00% 27Dec16 9Jan17 19Jan17 1Feb17 20 7 Delayed
BAB2MEP1100 BA Basement2 MeggeringTest 7 0.00% 0.00% 2Jan17 9Jan17 25Jan17 1Feb17 20 7 OnTarget
BAB2MEP1110 BA Basement2 InstallEarthpit 18 83.33% 50.00% 13Dec16 2Jan17 27Nov16A 25Jan17 20 3 Delayed
MEPFinalFix 40 0.00% 0.00% 11Jan17 22Jan17 17Dec16A 13Feb17 19 11 OnTarget
BAB2MEP2010 BA Basement2 InstallLightFittings 10 0.00% 0.00% 22Jan17 1Feb17 14Feb17 25Feb17 20 2 OnTarget
BAB2MEP2020 BA Basement2 InstallFireCabinets 10 0.00% 0.00% 25Jan17 5Feb17 18Feb17 28Feb17 20 2 OnTarget
BAB2MEP2030 BA Basement2 InstallFireAlarmsandSpeakers 10 0.00% 0.00% 29Jan17 8Feb17 21Feb17 4Mar17 20 2 OnTarget
BAB2MEP2040 BA Basement2 InstallSprinklers 10 0.00% 0.00% 1Feb17 12Feb17 25Feb17 7Mar17 20 2 OnTarget
BAB2MEP2050 BA Basement2 InstallSwitchesandSockets 10 0.00% 0.00% 5Feb17 15Feb17 28Feb17 11Mar17 20 2 OnTarget
BAB2MEP2060 BA Basement2 InstallLowCurrentEquipments 10 0.00% 0.00% 8Feb17 19Feb17 4Mar17 14Mar17 20 2 OnTarget
BAB2MEP2070 BA Basement2 InstallGrillesandDiffussers 10 0.00% 0.00% 12Feb17 22Feb17 7Mar17 18Mar17 20 2 OnTarget
BAB2MEP2075 BA Basement2 MEPFinalfittings 12 0.00% 0.00% 23Feb17 8Mar17 15Mar17 28Mar17 17 8 OnTarget
BAB2MEP2080 BA Basement2 InstallPlumpingFinalTittings(FloorDrains,Gratings,F 10 0.00% 0.00% 15Feb17 26Feb17 11Mar17 21Mar17 20 2 OnTarget
Basement01 83 0.00% 0.00% 29Dec16 25Apr17 27Nov16A 28Mar17 24 41 OnTarget
MEPWorks 83 0.00% 0.00% 27Nov16 2Mar17 27Nov16A 12Mar17 8 70 OnTarget
MEP2ndFix 40 0.00% 0.00% 27Nov16 1Jan17 26Nov16A 23Jan17 19 111 OnTarget
BAB1MEP1020 BA Basement1 InstallElectricalWiring 10 100.00% 65.00% 4Dec16 14Dec16 27Nov16A 3Jan17 17 7 Delayed
BAB1MEP1040 BA Basement1 InstallHot&ColdWaterPiping 10 100.00% 72.00% 7Dec16 18Dec16 26Nov16A 7Jan17 17 7 Delayed
BAB1MEP1050 BA Basement1 InstallHVACPipes 12 100.00% 90.00% 8Dec16 21Dec16 27Nov16A 10Jan17 17 7 Delayed
BAB1MEP1060 BA Basement1 InstallDuctsandHangers 10 100.00% 92.00% 14Dec16 25Dec16 27Nov16A 14Jan17 17 7 Delayed
BAB1MEP1070 BA Basement1 InstallCableTraysandTrunking 12 100.00% 95.00% 15Dec16 28Dec16 27Nov16A 17Jan17 17 7 Delayed
BAB1MEP1075 BA Basement1 InstallLowCurrentWiring 12 83.33% 9.00% 19Dec16 1Jan17 27Nov16A 21Jan17 17 7 Delayed
BAB1MEP1080 BA Basement1 InstallLVCables 10 80.00% 0.00% 21Dec16 1Jan17 10Jan17 21Jan17 17 7 Delayed
BAB1MEP1085 BA Basement1 HLClearancebyARMAforgridfixing 10 80.00% 0.00% 21Dec16 1Jan17 10Jan17 21Jan17 17 7 Delayed
BAB1MEP1090 BA Basement1 InstallDroppers 10 50.00% 0.00% 25Dec16 4Jan17 14Jan17 24Jan17 17 5 Delayed
BAB1MEP1100 BA Basement1 MeggeringTest 10 50.00% 0.00% 25Dec16 4Jan17 14Jan17 24Jan17 17 5 Delayed
BAB1MEP1105 BA Basement1 MEPclearanceforboardclosing 10 0.00% 0.00% 8Jan17 18Jan17 28Jan17 7Feb17 17 7 OnTarget
MEPFinalFix 36 0.00% 0.00% 11Jan17 22Jan17 17Dec16A 13Feb17 19 11 OnTarget
BAB1MEP2010 BA Basement1 InstallLightFittings 10 0.00% 0.00% 28Jan17 7Feb17 16Feb17 27Feb17 17 4 OnTarget
BAB1MEP2020 BA Basement1 InstallFireCabinets 10 0.00% 0.00% 31Jan17 11Feb17 20Feb17 2Mar17 17 4 OnTarget
BAB1MEP2030 BA Basement1 InstallFireAlarmsandSpeakers 10 0.00% 0.00% 4Feb17 14Feb17 23Feb17 6Mar17 17 4 OnTarget
BAB1MEP2040 BA Basement1 InstallSprinklers 10 0.00% 0.00% 7Feb17 18Feb17 27Feb17 9Mar17 17 4 OnTarget
BAB1MEP2050 BA Basement1 InstallSwitchesandSockets 10 0.00% 0.00% 11Feb17 21Feb17 2Mar17 13Mar17 17 4 OnTarget
BAB1MEP2060 BA Basement1 InstallLowCurrentEquipments 10 0.00% 0.00% 14Feb17 25Feb17 6Mar17 16Mar17 17 4 OnTarget
BAB1MEP2070 BA Basement1 InstallGrillesandDiffussers 10 0.00% 0.00% 18Feb17 28Feb17 9Mar17 20Mar17 17 4 OnTarget
BAB1MEP2075 BA Basement1 MEPFinalfittings 12 0.00% 0.00% 25Feb17 9Mar17 14Mar17 27Mar17 15 7 OnTarget
BAB1MEP2080 BA Basement1 InstallPlumpingFinalTittings(FloorDrains,Gratings,F 10 0.00% 0.00% 21Feb17 4Mar17 13Mar17 23Mar17 17 4 OnTarget
GroundFloor 94 0.00% 0.00% 27Nov16 18Apr17 27Nov16A 2May17 11 27 OnTarget
General 39 0.00% 0.00% 27Nov16 3Jan17 27Nov16A 17Jan17 11 117 OnTarget
MEPWorks 18 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BAGFMEP1000 BA GroundFloor MEPClearanceforPlaster 18 94.44% 66.00% 11Dec16 31Dec16 07Dec16A 9Jan17 7 10 Delayed
BAGFMEP1010 BA GroundFloor InstallWallConduits 18 94.44% 60.00% 11Dec16 31Dec16 26Nov16A 9Jan17 7 10 Delayed
DryArea 70 0.00% 0.00% 18Dec16 7Mar17 27Nov16A 10Apr17 29 22 OnTarget
MEPWorks 57 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BAGFMEPD1000 BA GroundFloor DryareaMEPClearanceforScreed 18 55.56% 0.00% 19Dec16 8Jan17 31Dec16 21Jan17 11 16 Delayed
BAGFMEPD1010 BA GroundFloor DryAreaHLClearancebyARMAforgridfixing 24 20.83% 0.00% 25Dec16 21Jan17 3Jan17 30Jan17 8 2 Delayed
BAGFMEPD1020 BA GroundFloor DryAreaMEPclearanceforBoardclosing 24 0.00% 0.00% 12Jan17 8Feb17 22Jan17 18Feb17 8 2 OnTarget
BAGFMEPD1030 BA GroundFloor InstallElectricalWiring 15 100.00% 48.00% 5Dec16 21Dec16 27Nov16A 10Jan17 17 6 Delayed
BAGFMEPD1040 BA GroundFloor InstallLowCurrentWiring 14 100.00% 10.00% 13Dec16 28Dec16 27Nov16A 17Jan17 17 116 Delayed
BAGFMEPD1050 BA GroundFloor InstallHVACPipes 14 100.00% 30.00% 13Dec16 28Dec16 27Nov16A 10Jan17 11 12 Delayed
BAGFMEPD1060 BA GroundFloor InstallDuctsandHangers 14 85.71% 96.00% 17Dec16 1Jan17 27Nov16A 14Jan17 11 12 OnTarget
BAGFMEPD1070 BA GroundFloor InstallDroppers 12 33.33% 0.00% 26Dec16 8Jan17 7Jan17 21Jan17 11 22 Delayed
BAGFMEPD1080 BA GroundFloor MeggeringTest 7 0.00% 0.00% 1Jan17 8Jan17 12Jan17 21Jan17 11 22 OnTarget
WetArea 64 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPWorks 59 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BAGFMEPW1000 BA GroundFloor WetAreaHLClearancebyARMAforgridfixing 24 100.00% 20.00% 27Nov16 24Dec16 31Dec16A 22Jan17 24 5 Delayed
BAGFMEPW1010 BA GroundFloor WetAreaMEPclearanceforBoardclosing 24 0.00% 0.00% 7Jan17 2Feb17 4Feb17 4Mar17 24 5 OnTarget
BAGFMEPW1020 BA GroundFloor InstallElectricalWiring 12 100.00% 48.00% 12Dec16 25Dec16 27Nov16A 14Jan17 17 6 Delayed
BAGFMEPW1030 BA GroundFloor InstallHot&ColdWaterPiping 12 33.33% 34.00% 26Dec16 8Jan17 27Nov16A 8Jan17 0 38 OnTarget
BAGFMEPW1040 BA GroundFloor InstallHVACPipes 12 8.33% 30.00% 29Dec16 11Jan17 27Nov16A 11Jan17 0 38 OnTarget
BAGFMEPW1050 BA GroundFloor InstallDroppers 12 8.33% 0.00% 29Dec16 11Jan17 31Dec16 12Jan17 1 37 Delayed
BAGFMEPW1060 BA GroundFloor MeggeringTest 10 0.00% 0.00% 1Jan17 11Jan17 2Jan17 12Jan17 1 37 OnTarget
Corridor 56 0.00% 0.00% 15Dec16 18Feb17 27Nov16A 9Mar17 17 7 OnTarget
MEPWorks 43 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BAGFMEPCL1000 BA GroundFloor CorridorMEPClearanceforScreed 10 0.00% 0.00% 14Jan17 24Jan17 23Jan17 4Feb17 9 16 OnTarget
BAGFMEPCL1010 BA GroundFloor CorridorHLClearancebyARMAforgridfixing 14 0.00% 0.00% 1Jan17 16Jan17 21Jan17 5Feb17 17 6 OnTarget
BAGFMEPCL1020 BA GroundFloor CorridorMEPclearanceforBoardclosing 14 0.00% 0.00% 18Jan17 2Feb17 7Feb17 22Feb17 17 6 OnTarget
BAGFMEPCL1030 BA GroundFloor InstallElectricalWiring 12 100.00% 48.00% 15Dec16 28Dec16 27Nov16A 17Jan17 17 6 Delayed
BAGFMEPCL1050 BA GroundFloor InstallHot&ColdWaterPiping 12 83.33% 34.00% 19Dec16 1Jan17 27Nov16A 21Jan17 17 6 Delayed
BAGFMEPCL1060 BA GroundFloor InstallHVACPipes 12 58.33% 30.00% 22Dec16 4Jan17 27Nov16A 24Jan17 17 6 Delayed
BAGFMEPCL1070 BA GroundFloor InstallDuctsandHangers 14 42.86% 96.00% 24Dec16 8Jan17 27Nov16A 28Jan17 17 6 OnTarget
BAGFMEPCL1080 BA GroundFloor InstallCableTraysandTrunking 14 21.43% 85.00% 27Dec16 11Jan17 27Nov16A 31Jan17 17 6 OnTarget
BAGFMEPCL1085 BA GroundFloor InstallLowCurrentWiring 10 0.00% 10.00% 4Jan17 15Jan17 27Nov16A 4Feb17 17 6 OnTarget
BAGFMEPCL1090 BA GroundFloor InstallLVCables 10 0.00% 0.00% 4Jan17 15Jan17 24Jan17 4Feb17 17 5 OnTarget
BAGFMEPCL1100 BA GroundFloor InstallDroppers 14 0.00% 0.00% 15Jan17 30Jan17 4Feb17 19Feb17 17 6 OnTarget
BAGFMEPCL1110 BA GroundFloor MeggeringTest 14 0.00% 0.00% 18Jan17 2Feb17 7Feb17 22Feb17 17 6 OnTarget
CommonFinalFinishes 69 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPWorks 23 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BAGFMEPF1010 BA GroundFloor InstallLightFittings 12 0.00% 0.00% 18Feb17 2Mar17 4Mar17 16Mar17 12 6 OnTarget
BAGFMEPF1020 BA GroundFloor InstallFireCabinets 14 0.00% 0.00% 19Feb17 6Mar17 1Mar17 16Mar17 9 6 OnTarget
BAGFMEPF1030 BA GroundFloor InstallFireAlarmsandSpeakers 14 0.00% 0.00% 21Feb17 8Mar17 4Mar17 19Mar17 9 6 OnTarget
BAGFMEPF1040 BA GroundFloor InstallSprinklers 14 0.00% 0.00% 23Feb17 11Mar17 6Mar17 21Mar17 9 6 OnTarget
BAGFMEPF1050 BA GroundFloor InstallSwitchesandSockets 12 0.00% 0.00% 26Feb17 11Mar17 8Mar17 21Mar17 9 6 OnTarget
BAGFMEPF1060 BA GroundFloor InstallLowCurrentEquipments 12 0.00% 0.00% 28Feb17 13Mar17 11Mar17 23Mar17 9 6 OnTarget
BAGFMEPF1070 BA GroundFloor InstallGrillesandDiffussers 14 0.00% 0.00% 28Feb17 15Mar17 11Mar17 26Mar17 9 6 OnTarget
BAGFMEPF1075 BA GroundFloor MEPFinalFixes 12 0.00% 0.00% 19Feb17 4Mar17 5Mar17 18Mar17 12 5 OnTarget
BAGFMEPF1080 BA GroundFloor InstallPlumpingFinalTittings(FloorDrains,Gratings,F 14 0.00% 0.00% 28Feb17 15Mar17 11Mar17 26Mar17 9 6 OnTarget
FirstFloor 94 0.00% 0.00% 27Nov16 18Mar17 27Nov16A 20Apr17 29 36 OnTarget
DryArea 33 0.00% 0.00% 18Dec16 7Mar17 27Nov16A 10Apr17 29 22 OnTarget
MEPWorks 16 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA1FMEPD1010 BA 1stFloor DBInstallation 10 100.00% 65.00% 27Nov16 7Dec16 27Nov16A 3Jan17 23 40 Delayed
BA1FMEPD1020 BA 1stFloor InstallDroppers 10 100.00% 80.00% 4Dec16 14Dec16 27Nov16A 10Jan17 23 40 Delayed
BA1FMEPD1030 BA 1stFloor MeggeringTest 7 100.00% 90.00% 7Dec16 14Dec16 27Nov16A 10Jan17 23 40 Delayed
BA1FMEPD1035 BA 1stFloor DryAreaMEPclearanceforBoardclosing 10 100.00% 0.00% 4Dec16 14Dec16 31Dec16 10Jan17 23 39 Delayed
WetArea 27 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPWorks 18 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA1FMEPW1010 BA 1stFloor InstallDroppers 12 83.33% 10.00% 19Dec16 1Jan17 27Nov16A 11Jan17 9 41 Delayed
BA1FMEPW1020 BA 1stFloor MeggeringTest 10 80.00% 95.00% 21Dec16 1Jan17 27Nov16A 11Jan17 9 41 OnTarget
BA1FMEPW1025 BA 1stFloor WetAreaMEPclearanceforBoardclosing 14 42.86% 0.00% 24Dec16 8Jan17 31Dec16 15Jan17 6 38 Delayed
Corridor 40 0.00% 0.00% 15Dec16 18Feb17 27Nov16A 9Mar17 17 7 OnTarget
MEPWorks 30 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA1FMEPCL1000 BA 1stFloor CorridorHLClearancebyARMAforgridfixing 12 33.33% 35.00% 26Dec16 8Jan17 02Dec16A 8Jan17 0 24 OnTarget
BA1FMEPCL1020 BA 1stFloor InstallDroppers 10 0.00% 0.00% 9Jan17 19Jan17 8Jan17 19Jan17 0 24 OnTarget
BA1FMEPCL1030 BA 1stFloor MeggeringTest 5 0.00% 0.00% 17Jan17 22Jan17 16Jan17 22Jan17 0 24 OnTarget
BA1FMEPCL1035 BA 1stFloor CorridorMEPclearanceforBoardclosing 10 0.00% 0.00% 18Jan17 29Jan17 17Jan17 29Jan17 0 24 OnTarget
CommonFinalFinishes 45 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPWorks 17 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA1FMEPF1010 BA 1stFloor InstallLightFittings 14 0.00% 0.00% 30Jan17 14Feb17 29Jan17 14Feb17 0 25 OnTarget
BA1FMEPF1020 BA 1stFloor InstallFireCabinets 14 0.00% 0.00% 31Jan17 15Feb17 30Jan17 15Feb17 0 25 OnTarget
BA1FMEPF1030 BA 1stFloor InstallFireAlarmsandSpeakers 14 0.00% 0.00% 31Jan17 15Feb17 30Jan17 15Feb17 0 25 OnTarget
BA1FMEPF1040 BA 1stFloor InstallSprinklers 14 0.00% 0.00% 1Feb17 16Feb17 31Jan17 16Feb17 0 25 OnTarget
DelayAnalysisReportBasedonTargetProgram *DelayedActivitiesareHiglightedInRed DataDate: 29Dec16
VarianceBL
Original Schedule% Activity% BLProject BLProject Actual/Forecas Actual/Forecas Delayed/O
ActivityID Building Floor ActivityName ProjectFinish TotalFloat
Duration Complete Complete Start Finish tedStart tedFinish nTrack
Date
BA1FMEPF1050 BA 1stFloor InstallSwitchesandSockets 14 0.00% 0.00% 1Feb17 16Feb17 31Jan17 16Feb17 0 25 OnTarget
BA1FMEPF1060 BA 1stFloor InstallLowCurrentEquipments 14 0.00% 0.00% 2Feb17 18Feb17 1Feb17 18Feb17 0 25 OnTarget
BA1FMEPF1070 BA 1stFloor InstallGrillesandDiffussers 14 0.00% 0.00% 2Feb17 18Feb17 1Feb17 18Feb17 0 25 OnTarget
BA1FMEPF1075 BA 1stFloor MEPFinalFixes/Sanitarywares 10 0.00% 0.00% 1Feb17 12Feb17 31Jan17 12Feb17 0 24 OnTarget
BA1FMEPF1080 BA 1stFloor InstallPlumpingFinalTittings(Sanitaryware,FloorDra 14 0.00% 0.00% 2Feb17 18Feb17 1Feb17 18Feb17 0 25 OnTarget
SecondFloor 95 0.00% 0.00% 10Dec16 11Mar17 27Nov16A 20Mar17 8 63 OnTarget
DryArea 39 0.00% 0.00% 18Dec16 7Mar17 27Nov16A 10Apr17 29 22 OnTarget
MEPWorks 20 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA2FMEPD1010 BA 2ndFloor DBInstallation 10 100.00% 20.00% 8Dec16 19Dec16 27Nov16A 8Jan17 17 8 Delayed
BA2FMEPD1020 BA 2ndFloor InstallDroppers 12 100.00% 0.00% 13Dec16 26Dec16 2Jan17 15Jan17 17 8 Delayed
BA2FMEPD1030 BA 2ndFloor MeggeringTest 10 90.00% 0.00% 20Dec16 31Dec16 9Jan17 19Jan17 17 8 Delayed
BA2FMEPD1035 BA 2ndFloor DryAreaMEPclearanceforBoardclosing 10 90.00% 0.00% 20Dec16 31Dec16 9Jan17 19Jan17 17 8 Delayed
WetArea 31 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPWorks 18 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA2FMEPW1010 BA 2ndFloor InstallDroppers 12 100.00% 0.00% 10Dec16 22Dec16 31Dec16 12Jan17 18 20 Delayed
BA2FMEPW1020 BA 2ndFloor MeggeringTest 10 100.00% 100.00% 12Dec16 22Dec16 11Dec16A 25Dec16A 1 0 OnTarget
BA2FMEPW1025 BA 2ndFloor WetAreaMEPclearanceforBoardclosing 10 100.00% 0.00% 19Dec16 29Dec16 31Dec16 10Jan17 10 36 Delayed
Corridor 44 0.00% 0.00% 15Dec16 18Feb17 27Nov16A 9Mar17 17 7 OnTarget
MEPWorks 25 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA2FMEPCL1000 BA 2ndFloor CorridorHLClearancebyARMAforgridfixing 10 0.00% 0.00% 1Jan17 11Jan17 21Jan17 31Jan17 17 8 OnTarget
BA2FMEPCL1020 BA 2ndFloor InstallDroppers 12 50.00% 0.00% 24Dec16 5Jan17 14Jan17 26Jan17 18 20 Delayed
BA2FMEPCL1030 BA 2ndFloor MeggeringTest 10 40.00% 50.00% 26Dec16 5Jan17 01Dec16A 26Jan17 18 20 OnTarget
BA2FMEPCL1035 BA 2ndFloor CorridorMEPclearanceforBoardclosing 10 0.00% 0.00% 10Jan17 21Jan17 30Jan17 9Feb17 17 8 OnTarget
CommonFinalFinishes 34 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPWorks 26 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA2FMEPF1010 BA 2ndFloor InstallLightFittings 14 0.00% 0.00% 19Jan17 4Feb17 8Feb17 23Feb17 17 8 OnTarget
BA2FMEPF1020 BA 2ndFloor InstallFireCabinets 14 0.00% 0.00% 23Jan17 7Feb17 12Feb17 27Feb17 17 8 OnTarget
BA2FMEPF1030 BA 2ndFloor InstallFireAlarmsandSpeakers 14 0.00% 0.00% 25Jan17 9Feb17 14Feb17 1Mar17 17 8 OnTarget
BA2FMEPF1040 BA 2ndFloor InstallSprinklers 14 0.00% 0.00% 26Jan17 11Feb17 15Feb17 2Mar17 17 8 OnTarget
BA2FMEPF1050 BA 2ndFloor InstallSwitchesandSockets 14 0.00% 0.00% 30Jan17 14Feb17 19Feb17 6Mar17 17 8 OnTarget
BA2FMEPF1060 BA 2ndFloor InstallLowCurrentEquipments 14 0.00% 0.00% 2Feb17 18Feb17 22Feb17 9Mar17 17 8 OnTarget
BA2FMEPF1070 BA 2ndFloor InstallGrillesandDiffussers 14 0.00% 0.00% 2Feb17 18Feb17 22Feb17 9Mar17 17 8 OnTarget
BA2FMEPF1075 BA 2ndFloor MEPFinalFixes/Sanitarywares 10 0.00% 0.00% 24Jan17 4Feb17 13Feb17 23Feb17 17 14 OnTarget
BA2FMEPF1080 BA 2ndFloor InstallPlumpingFinalTittings(Sanitaryware,FloorDra 14 0.00% 0.00% 2Feb17 18Feb17 22Feb17 9Mar17 17 8 OnTarget
ThirdFloor 86 0.00% 0.00% 27Nov16 2Feb17 26Nov16A 5Feb17 2 100 OnTarget
DryArea 50 0.00% 0.00% 18Dec16 7Mar17 27Nov16A 10Apr17 29 22 OnTarget
MEPWorks 39 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA3FMEPD1000 BA 3rdFloor DryAreaMEPHLClearancebyARMAforgridfixing 10 100.00% 95.00% 12Dec16 22Dec16 27Nov16A 7Jan17 13 9 Delayed
BA3FMEPD1020 BA 3rdFloor InstallLowCurrentWiring 10 90.00% 94.00% 20Dec16 31Dec16 27Nov16A 31Dec16 0 5 OnTarget
BA3FMEPD1030 BA 3rdFloor DBInstallation 10 0.00% 20.00% 1Jan17 11Jan17 27Nov16A 8Jan17 3 10 OnTarget
BA3FMEPD1040 BA 3rdFloor InstallDroppers 12 0.00% 0.00% 12Jan17 25Jan17 9Jan17 22Jan17 3 26 OnTarget
BA3FMEPD1050 BA 3rdFloor MeggeringTest 10 0.00% 0.00% 15Jan17 25Jan17 11Jan17 22Jan17 3 29 OnTarget
BA3FMEPD1055 BA 3rdFloor DryAreaMEPclearanceforBoardclosing 10 0.00% 0.00% 15Jan17 25Jan17 11Jan17 22Jan17 3 29 OnTarget
WetArea 45 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPWorks 39 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA3FMEPW1000 BA 3rdFloor WetAreaHLClearancebyARMAforgridfixing 10 100.00% 95.00% 19Dec16 29Dec16 27Nov16A 14Jan17 13 23 Delayed
BA3FMEPW1020 BA 3rdFloor InstallDroppers 12 0.00% 0.00% 19Jan17 1Feb17 16Jan17 29Jan17 3 26 OnTarget
BA3FMEPW1030 BA 3rdFloor MeggeringTest 10 0.00% 0.00% 22Jan17 1Feb17 18Jan17 29Jan17 3 26 OnTarget
BA3FMEPW1035 BA 3rdFloor WetAreaMEPclearanceforBoardclosing 10 0.00% 0.00% 22Jan17 1Feb17 21Jan17 1Feb17 0 23 OnTarget
Corridor 43 0.00% 0.00% 15Dec16 18Feb17 27Nov16A 9Mar17 17 7 OnTarget
MEPWorks 24 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA3FMEPCL1000 BA 3rdFloor CorridorScreedMEpClearance 12 0.00% 100.00% 1Jan17 14Jan17 07Dec16A 07Dec16A 33 0 OnTarget
BA3FMEPCL1010 BA 3rdFloor CorridorHLClearancebyARMAforgridfixing 10 30.00% 0.00% 27Dec16 7Jan17 5Jan17 17Jan17 9 26 Delayed
BA3FMEPCL1030 BA 3rdFloor InstallElectricalWiring 10 90.00% 100.00% 20Dec16 31Dec16 27Nov16A 01Dec16A 26 0 OnTarget
BA3FMEPCL1050 BA 3rdFloor InstallCableTraysandTrunking 10 60.00% 80.00% 24Dec16 3Jan17 27Nov16A 1Jan17 2 37 OnTarget
BA3FMEPCL1055 BA 3rdFloor InstallLowCurrentWiring 10 30.00% 94.00% 27Dec16 7Jan17 27Nov16A 4Jan17 2 37 OnTarget
BA3FMEPCL1060 BA 3rdFloor InstallLVCables 10 30.00% 0.00% 27Dec16 7Jan17 31Dec16 10Jan17 3 32 Delayed
BA3FMEPCL1070 BA 3rdFloor InstallDroppers 10 0.00% 0.00% 3Jan17 14Jan17 7Jan17 17Jan17 3 34 OnTarget
BA3FMEPCL1080 BA 3rdFloor MeggeringTest 12 0.00% 0.00% 1Jan17 14Jan17 4Jan17 17Jan17 3 34 OnTarget
BA3FMEPCL1085 BA 3rdFloor CorridorMEPclearanceforBoardclosing 10 0.00% 0.00% 5Jan17 16Jan17 15Jan17 26Jan17 9 26 OnTarget
CommonFinalFinishes 25 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPWorks 22 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA3FMEPF1010 BA 3rdFloor InstallLightFittings 14 0.00% 0.00% 31Jan17 15Feb17 30Jan17 15Feb17 0 24 OnTarget
BA3FMEPF1020 BA 3rdFloor InstallFireCabinets 14 0.00% 0.00% 1Feb17 16Feb17 31Jan17 16Feb17 0 24 OnTarget
BA3FMEPF1030 BA 3rdFloor InstallFireAlarmsandSpeakers 14 0.00% 0.00% 1Feb17 16Feb17 31Jan17 16Feb17 0 24 OnTarget
BA3FMEPF1040 BA 3rdFloor InstallSprinklers 14 0.00% 0.00% 2Feb17 18Feb17 1Feb17 18Feb17 0 24 OnTarget
BA3FMEPF1050 BA 3rdFloor InstallSwitchesandSockets 14 0.00% 0.00% 2Feb17 18Feb17 1Feb17 18Feb17 0 24 OnTarget
BA3FMEPF1060 BA 3rdFloor InstallLowCurrentEquipments 14 0.00% 0.00% 4Feb17 19Feb17 2Feb17 19Feb17 0 24 OnTarget
BA3FMEPF1070 BA 3rdFloor InstallGrillesandDiffussers 14 0.00% 0.00% 4Feb17 19Feb17 2Feb17 19Feb17 0 24 OnTarget
BA3FMEPF1075 BA 3rdFloor MEPFinalFixes/Sanitarywares 10 0.00% 0.00% 13Feb17 25Feb17 1Feb17 13Feb17 10 23 OnTarget
BA3FMEPF1080 BA 3rdFloor InstallPlumpingFinalTittings(Sanitaryware,FloorDra 14 0.00% 0.00% 4Feb17 19Feb17 2Feb17 19Feb17 0 24 OnTarget
ForthFloor 83 0.00% 0.00% 29Nov16 28Mar17 26Nov16A 9Apr17 10 46 OnTarget
DryArea 40 0.00% 0.00% 18Dec16 7Mar17 27Nov16A 10Apr17 29 22 OnTarget
MEPWorks 23 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA4FMEPD1000 BA 4thFloor DryAreaMEPHLClearancebyARMAforgridfixing 10 100.00% 50.00% 15Dec16 26Dec16 27Nov16A 10Jan17 13 9 Delayed
BA4FMEPD1020 BA 4thFloor InstallHVACPipes 10 90.00% 90.00% 20Dec16 31Dec16 27Nov16A 31Dec16 0 5 OnTarget
BA4FMEPD1030 BA 4thFloor InstallDuctsandHangers 12 66.67% 67.00% 21Dec16 3Jan17 27Nov16A 3Jan17 0 11 OnTarget
BA4FMEPD1040 BA 4thFloor DBInstallation 10 30.00% 20.00% 27Dec16 7Jan17 27Nov16A 8Jan17 1 10 Delayed
BA4FMEPD1050 BA 4thFloor InstallDroppers 12 33.33% 0.00% 26Dec16 8Jan17 9Jan17 23Jan17 13 33 Delayed
BA4FMEPD1060 BA 4thFloor MeggeringTest 10 0.00% 0.00% 31Dec16 10Jan17 14Jan17 25Jan17 13 33 OnTarget
BA4FMEPD1070 BA 4thFloor DryAreaMEPclearanceforBoardclosing 10 0.00% 0.00% 31Dec16 10Jan17 14Jan17 25Jan17 13 33 OnTarget
WetArea 51 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPWorks 45 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA4FMEPW1000 BA 4thFloor WetAreaScreedMEpClearance 12 100.00% 100.00% 17Dec16 29Dec16 08Dec16A 20Dec16A 9 0 OnTarget
BA4FMEPW1010 BA 4thFloor WetAreaHLClearancebyARMAforgridfixing 10 60.00% 50.00% 24Dec16 3Jan17 27Nov16A 4Jan17 1 32 Delayed
BA4FMEPW1030 BA 4thFloor InstallHVACPipes 10 60.00% 74.00% 24Dec16 3Jan17 27Nov16A 3Jan17 0 15 OnTarget
BA4FMEPW1040 BA 4thFloor InstallDuctsandHangers 10 30.00% 63.00% 27Dec16 7Jan17 27Nov16A 7Jan17 0 40 OnTarget
BA4FMEPW1050 BA 4thFloor InstallDroppers 12 16.67% 0.00% 28Dec16 10Jan17 31Dec16 12Jan17 2 38 Delayed
BA4FMEPW1060 BA 4thFloor MeggeringTest 7 0.00% 0.00% 5Jan17 12Jan17 8Jan17 15Jan17 2 38 OnTarget
BA4FMEPW1065 BA 4thFloor WetAreaMEPclearanceforBoardclosing 10 0.00% 0.00% 26Jan17 6Feb17 16Jan17 26Jan17 9 28 OnTarget
Corridor 53 0.00% 0.00% 15Dec16 18Feb17 27Nov16A 9Mar17 17 7 OnTarget
MEPWorks 41 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA4FMEPCL1000 BA 4thFloor CorridorScreedMEPClearance 10 0.00% 0.00% 14Jan17 24Jan17 14Jan17 24Jan17 0 31 OnTarget
BA4FMEPCL1010 BA 4thFloor CorridorHLClearancebyARMAforgridfixing 10 0.00% 0.00% 19Jan17 30Jan17 19Jan17 30Jan17 0 15 OnTarget
BA4FMEPCL1020 BA 4thFloor CorridorMEPclearanceforBoardclosing 10 0.00% 0.00% 29Jan17 8Feb17 29Jan17 8Feb17 0 15 OnTarget
BA4FMEPCL1030 BA 4thFloor InstallElectricalWiring 10 60.00% 60.00% 24Dec16 3Jan17 27Nov16A 3Jan17 0 15 OnTarget
BA4FMEPCL1050 BA 4thFloor InstallHVACPipes 10 30.00% 30.00% 27Dec16 7Jan17 27Nov16A 7Jan17 0 15 OnTarget
BA4FMEPCL1060 BA 4thFloor InstallDuctsandHangers 10 0.00% 90.00% 31Dec16 10Jan17 27Nov16A 10Jan17 0 15 OnTarget
BA4FMEPCL1070 BA 4thFloor InstallCableTraysandTrunking 14 7.14% 35.00% 29Dec16 14Jan17 27Nov16A 14Jan17 0 15 OnTarget
BA4FMEPCL1075 BA 4thFloor InstallLowCurrentWiring 12 0.00% 69.00% 4Jan17 17Jan17 27Nov16A 17Jan17 0 15 OnTarget
BA4FMEPCL1080 BA 4thFloor InstallLVCables 10 0.00% 0.00% 7Jan17 17Jan17 7Jan17 17Jan17 0 26 OnTarget
BA4FMEPCL1090 BA 4thFloor InstallDroppers 10 0.00% 0.00% 14Jan17 24Jan17 14Jan17 24Jan17 0 28 OnTarget
BA4FMEPCL1100 BA 4thFloor MeggeringTest 10 0.00% 0.00% 14Jan17 24Jan17 14Jan17 24Jan17 0 28 OnTarget
CommonFinalFinishes 32 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPWorks 17 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA4FMEPF1000 BA 4thFloor MEPFinalFixes/Sanitarywares 12 0.00% 0.00% 9Feb17 22Feb17 9Feb17 22Feb17 0 15 OnTarget
BA4FMEPF1010 BA 4thFloor InstallLightFittings 10 0.00% 0.00% 11Feb17 21Feb17 11Feb17 21Feb17 0 23 OnTarget
BA4FMEPF1020 BA 4thFloor InstallFireCabinets 14 0.00% 0.00% 7Feb17 22Feb17 7Feb17 22Feb17 0 23 OnTarget
BA4FMEPF1030 BA 4thFloor InstallFireAlarmsandSpeakers 14 0.00% 0.00% 7Feb17 22Feb17 7Feb17 22Feb17 0 23 OnTarget
BA4FMEPF1040 BA 4thFloor InstallSprinklers 14 0.00% 0.00% 8Feb17 23Feb17 8Feb17 23Feb17 0 23 OnTarget
BA4FMEPF1050 BA 4thFloor InstallSwitchesandSockets 10 0.00% 0.00% 8Feb17 19Feb17 8Feb17 19Feb17 0 23 OnTarget
BA4FMEPF1060 BA 4thFloor InstallLowCurrentEquipments 10 0.00% 0.00% 9Feb17 20Feb17 9Feb17 20Feb17 0 23 OnTarget
BA4FMEPF1070 BA 4thFloor InstallGrillesandDiffussers 14 0.00% 0.00% 5Feb17 20Feb17 5Feb17 20Feb17 0 23 OnTarget
BA4FMEPF1080 BA 4thFloor InstallPlumpingFinalTittings(Sanitaryware,FloorDra 14 0.00% 0.00% 5Feb17 20Feb17 5Feb17 20Feb17 0 23 OnTarget
FifthFloor 79 0.00% 0.00% 8Dec16 2Apr17 26Nov16A 11Apr17 8 44 OnTarget
DryArea 42 0.00% 0.00% 18Dec16 7Mar17 27Nov16A 10Apr17 29 22 OnTarget
MEPWorks 31 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA5FMEPD1000 BA 5thFloor DryAreaMEPHLClearancebyARMAforgridfixing 12 66.67% 0.00% 21Dec16 3Jan17 3Jan17 17Jan17 12 9 Delayed
BA5FMEPD1020 BA 5thFloor InstallLowCurrentWiring 10 90.00% 69.00% 20Dec16 31Dec16 27Nov16A 3Jan17 2 7 Delayed
BA5FMEPD1030 BA 5thFloor InstallHVACPipes 10 90.00% 78.00% 20Dec16 31Dec16 27Nov16A 2Jan17 1 10 Delayed
BA5FMEPD1040 BA 5thFloor InstallDuctsandHangers 12 66.67% 0.00% 21Dec16 3Jan17 31Dec16 12Jan17 8 3 Delayed
DelayAnalysisReportBasedonTargetProgram *DelayedActivitiesareHiglightedInRed DataDate: 29Dec16
VarianceBL
Original Schedule% Activity% BLProject BLProject Actual/Forecas Actual/Forecas Delayed/O
ActivityID Building Floor ActivityName ProjectFinish TotalFloat
Duration Complete Complete Start Finish tedStart tedFinish nTrack
Date
BA5FMEPD1050 BA 5thFloor DBInstallation 10 30.00% 20.00% 27Dec16 7Jan17 27Nov16A 16Jan17 8 3 Delayed
BA5FMEPD1060 BA 5thFloor InstallDroppers 12 0.00% 0.00% 4Jan17 17Jan17 17Jan17 31Jan17 12 9 OnTarget
BA5FMEPD1070 BA 5thFloor MeggeringTest 10 0.00% 0.00% 14Jan17 24Jan17 26Jan17 7Feb17 12 9 OnTarget
BA5FMEPD1075 BA 5thFloor DryAreaMEPclearanceforBoardclosing 12 0.00% 0.00% 11Jan17 24Jan17 24Jan17 7Feb17 12 9 OnTarget
WetArea 49 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPWorks 43 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA5FMEPW1000 BA 5thFloor WetAreaHLClearancebyARMAforgridfixing 18 0.00% 0.00% 4Jan17 24Jan17 31Dec16 19Jan17 4 8 OnTarget
BA5FMEPW1020 BA 5thFloor InstallDrainagepipes 8 0.00% 100.00% 1Jan17 9Jan17 27Nov16A 17Dec16A 21 0 OnTarget
BA5FMEPW1030 BA 5thFloor InstallHVACPipes 10 0.00% 78.00% 10Jan17 21Jan17 27Nov16A 2Jan17 17 21 OnTarget
BA5FMEPW1040 BA 5thFloor InstallDuctsandHangers 14 0.00% 0.00% 9Jan17 24Jan17 31Dec16 15Jan17 8 12 OnTarget
BA5FMEPW1050 BA 5thFloor InstallDroppers 12 0.00% 0.00% 15Jan17 28Jan17 5Jan17 18Jan17 8 30 OnTarget
BA5FMEPW1060 BA 5thFloor MeggeringTest 10 0.00% 0.00% 17Jan17 28Jan17 8Jan17 18Jan17 8 30 OnTarget
BA5FMEPW1065 BA 5thFloor WetAreaMEPclearanceforBoardclosing 18 0.00% 0.00% 30Jan17 19Feb17 17Jan17 6Feb17 11 14 OnTarget
Corridor 61 0.00% 0.00% 15Dec16 18Feb17 27Nov16A 9Mar17 17 7 OnTarget
MEPWorks 42 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA5FMEPCL1000 BA 5thFloor CorridorScreedMEpClearance 12 0.00% 0.00% 18Jan17 31Jan17 18Jan17 31Jan17 0 31 OnTarget
BA5FMEPCL1010 BA 5thFloor CorridorHLClearancebyARMAforgridfixing 21 0.00% 0.00% 4Jan17 28Jan17 3Jan17 26Jan17 1 5 OnTarget
BA5FMEPCL1020 BA 5thFloor CorridorMEPclearanceforBoardclosing 18 0.00% 0.00% 26Jan17 15Feb17 25Jan17 14Feb17 1 5 OnTarget
BA5FMEPCL1040 BA 5thFloor InstallHot&ColdWaterPiping 10 10.00% 50.00% 29Dec16 9Jan17 27Nov16A 4Jan17 4 9 OnTarget
BA5FMEPCL1050 BA 5thFloor InstallHVACPipes 12 0.00% 0.00% 31Dec16 12Jan17 31Dec16 12Jan17 0 5 OnTarget
BA5FMEPCL1060 BA 5thFloor InstallDuctsandHangers 12 0.00% 90.00% 3Jan17 16Jan17 27Nov16A 16Jan17 0 5 OnTarget
BA5FMEPCL1070 BA 5thFloor InstallCableTraysandTrunking 12 0.00% 0.00% 7Jan17 19Jan17 7Jan17 19Jan17 0 5 OnTarget
BA5FMEPCL1075 BA 5thFloor InstallLowCurrentWiring 12 0.00% 69.00% 10Jan17 23Jan17 27Nov16A 23Jan17 0 5 OnTarget
BA5FMEPCL1080 BA 5thFloor InstallLVCables 12 0.00% 0.00% 10Jan17 23Jan17 10Jan17 23Jan17 0 8 OnTarget
BA5FMEPCL1090 BA 5thFloor InstallDroppers 10 0.00% 0.00% 29Jan17 8Feb17 28Jan17 7Feb17 1 11 OnTarget
BA5FMEPCL1100 BA 5thFloor MeggeringTest 12 0.00% 0.00% 26Jan17 8Feb17 25Jan17 7Feb17 1 11 OnTarget
CommonFinalFinishes 34 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPWorks 25 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA5FMEPF1010 BA 5thFloor InstallLightFittings 14 0.00% 0.00% 15Feb17 2Mar17 13Feb17 28Feb17 2 5 OnTarget
BA5FMEPF1020 BA 5thFloor InstallFireCabinets 14 0.00% 0.00% 19Feb17 6Mar17 16Feb17 4Mar17 2 5 OnTarget
BA5FMEPF1030 BA 5thFloor InstallFireAlarmsandSpeakers 14 0.00% 0.00% 22Feb17 9Mar17 20Feb17 7Mar17 2 5 OnTarget
BA5FMEPF1040 BA 5thFloor InstallSprinklers 14 0.00% 0.00% 23Feb17 11Mar17 21Feb17 8Mar17 2 5 OnTarget
BA5FMEPF1050 BA 5thFloor InstallSwitchesandSockets 14 0.00% 0.00% 27Feb17 14Mar17 25Feb17 12Mar17 2 5 OnTarget
BA5FMEPF1060 BA 5thFloor InstallLowCurrentEquipments 14 0.00% 0.00% 28Feb17 15Mar17 26Feb17 13Mar17 2 5 OnTarget
BA5FMEPF1070 BA 5thFloor InstallGrillesandDiffussers 14 0.00% 0.00% 28Feb17 15Mar17 26Feb17 13Mar17 2 5 OnTarget
BA5FMEPF1075 BA 5thFloor MEPFinalFixes/Sanitarywares 12 0.00% 0.00% 18Feb17 2Mar17 15Feb17 28Feb17 2 10 OnTarget
BA5FMEPF1080 BA 5thFloor InstallPlumpingFinalTittings(Sanitaryware,FloorDra 14 0.00% 0.00% 28Feb17 15Mar17 26Feb17 13Mar17 2 5 OnTarget
SixthFloor 76 0.00% 0.00% 15Dec16 2Apr17 26Nov16A 11Apr17 8 44 OnTarget
DryArea 44 0.00% 0.00% 18Dec16 7Mar17 27Nov16A 10Apr17 29 22 OnTarget
MEPWorks 25 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA6FMEPD1000 BA 6thFloor DryAreaMEPHLClearancebyARMAforgridfixing 10 30.00% 30.00% 27Dec16 7Jan17 25Dec16A 21Jan17 12 13 OnTarget
BA6FMEPD1020 BA 6thFloor InstallLowCurrentWiring 10 60.00% 70.00% 24Dec16 3Jan17 27Nov16A 7Jan17 2 7 OnTarget
BA6FMEPD1030 BA 6thFloor InstallHVACPipes 10 60.00% 48.00% 24Dec16 3Jan17 27Nov16A 5Jan17 1 7 Delayed
BA6FMEPD1040 BA 6thFloor InstallDuctsandHangers 12 41.67% 0.00% 25Dec16 7Jan17 31Dec16 12Jan17 5 3 Delayed
BA6FMEPD1050 BA 6thFloor DBInstallation 10 0.00% 20.00% 31Dec16 10Jan17 27Nov16A 16Jan17 5 3 OnTarget
BA6FMEPD1060 BA 6thFloor InstallDroppers 12 0.00% 0.00% 8Jan17 21Jan17 21Jan17 4Feb17 12 13 OnTarget
BA6FMEPD1070 BA 6thFloor MeggeringTest 10 0.00% 0.00% 10Jan17 21Jan17 23Jan17 4Feb17 12 13 OnTarget
BA6FMEPD1080 BA 6thFloor DryAreaMEPclearanceforBoardclosing 10 0.00% 0.00% 10Jan17 21Jan17 23Jan17 4Feb17 12 13 OnTarget
WetArea 54 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPWorks 48 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA6FMEPW1000 BA 6thFloor WetAreaScreedMEpClearance 3 0.00% 100.00% 4Jan17 7Jan17 26Nov16A 19Dec16A 17 0 OnTarget
BA6FMEPW1010 BA 6thFloor WetAreaHLClearancebyARMAforgridfixing 12 0.00% 0.00% 10Jan17 23Jan17 31Dec16 14Jan17 9 15 OnTarget
BA6FMEPW1020 BA 6thFloor WetAreaMEPclearanceforBoardclosing 18 0.00% 0.00% 28Jan17 16Feb17 17Jan17 7Feb17 9 15 OnTarget
BA6FMEPW1030 BA 6thFloor InstallDrainagepipes 10 60.00% 98.00% 24Dec16 3Jan17 27Nov16A 5Jan17 1 12 OnTarget
BA6FMEPW1040 BA 6thFloor InstallHot&ColdWaterPiping 10 50.00% 90.00% 25Dec16 4Jan17 27Nov16A 7Jan17 1 12 OnTarget
BA6FMEPW1050 BA 6thFloor InstallHVACPipes 10 20.00% 48.00% 28Dec16 8Jan17 27Nov16A 10Jan17 1 15 OnTarget
BA6FMEPW1060 BA 6thFloor InstallDuctsandHangers 16 31.25% 65.00% 25Dec16 11Jan17 27Nov16A 14Jan17 1 15 OnTarget
BA6FMEPW1070 BA 6thFloor InstallDroppers 12 0.00% 0.00% 28Jan17 9Feb17 17Jan17 31Jan17 9 21 OnTarget
BA6FMEPW1080 BA 6thFloor MeggeringTest 10 0.00% 0.00% 30Jan17 9Feb17 19Jan17 31Jan17 9 21 OnTarget
Corridor 54 0.00% 0.00% 15Dec16 18Feb17 27Nov16A 9Mar17 17 7 OnTarget
MEPWorks 35 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA6FMEPCL1040 BA 6thFloor InstallHot&ColdWaterPiping 8 0.00% 50.00% 31Dec16 8Jan17 27Nov16A 10Jan17 1 12 OnTarget
BA6FMEPCL1050 BA 6thFloor InstallHVACPipes 12 8.33% 0.00% 29Dec16 11Jan17 31Dec16 14Jan17 1 12 Delayed
BA6FMEPCL1060 BA 6thFloor InstallDuctsandHangers 12 0.00% 85.00% 2Jan17 15Jan17 27Nov16A 17Jan17 1 12 OnTarget
BA6FMEPCL1070 BA 6thFloor InstallCableTraysandTrunking 12 0.00% 0.00% 5Jan17 18Jan17 7Jan17 21Jan17 1 12 OnTarget
BA6FMEPCL1075 BA 6thFloor InstallLowCurrentWiring 7 0.00% 70.00% 15Jan17 22Jan17 27Nov16A 24Jan17 1 12 OnTarget
BA6FMEPCL1080 BA 6thFloor InstallLVCables 12 0.00% 0.00% 9Jan17 22Jan17 10Jan17 24Jan17 1 15 OnTarget
BA6FMEPCL1085 BA 6thFloor CorridorHLClearancebyARMAforgridfixing 10 0.00% 0.00% 16Jan17 26Jan17 16Jan17 28Jan17 0 12 OnTarget
BA6FMEPCL1090 BA 6thFloor InstallDroppers 10 0.00% 0.00% 18Jan17 29Jan17 19Jan17 31Jan17 1 19 OnTarget
BA6FMEPCL1100 BA 6thFloor MeggeringTest 5 0.00% 0.00% 24Jan17 29Jan17 25Jan17 31Jan17 1 19 OnTarget
BA6FMEPCL1110 BA 6thFloor CorridorMEPclearanceforBoardclosing 12 0.00% 0.00% 25Jan17 7Feb17 25Jan17 8Feb17 0 12 OnTarget
CommonFinalFinishes 30 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPWorks 22 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA6FMEPF1010 BA 6thFloor InstallLightFittings 14 0.00% 0.00% 15Feb17 2Mar17 8Feb17 25Feb17 6 12 OnTarget
BA6FMEPF1020 BA 6thFloor InstallFireCabinets 14 0.00% 0.00% 19Feb17 6Mar17 12Feb17 28Feb17 6 12 OnTarget
BA6FMEPF1030 BA 6thFloor InstallFireAlarmsandSpeakers 14 0.00% 0.00% 20Feb17 7Mar17 13Feb17 1Mar17 6 12 OnTarget
BA6FMEPF1040 BA 6thFloor InstallSprinklers 14 0.00% 0.00% 21Feb17 8Mar17 14Feb17 2Mar17 6 12 OnTarget
BA6FMEPF1050 BA 6thFloor InstallSwitchesandSockets 14 0.00% 0.00% 22Feb17 9Mar17 15Feb17 4Mar17 6 12 OnTarget
BA6FMEPF1060 BA 6thFloor InstallLowCurrentEquipments 14 0.00% 0.00% 23Feb17 11Mar17 16Feb17 5Mar17 6 12 OnTarget
BA6FMEPF1070 BA 6thFloor InstallGrillesandDiffussers 14 0.00% 0.00% 25Feb17 12Mar17 18Feb17 6Mar17 6 12 OnTarget
BA6FMEPF1075 BA 6thFloor MEPFinalFixes/Sanitarywares 12 0.00% 0.00% 15Feb17 1Mar17 8Feb17 22Feb17 6 16 OnTarget
BA6FMEPF1080 BA 6thFloor InstallPlumpingFinalTittings(Sanitaryware,FloorDra 14 0.00% 0.00% 25Feb17 12Mar17 18Feb17 6Mar17 6 12 OnTarget
SeventhFloor 99 0.00% 0.00% 27Nov16 8Feb17 26Nov16A 2Mar17 18 79 OnTarget
DryArea 44 0.00% 0.00% 18Dec16 7Mar17 27Nov16A 10Apr17 29 22 OnTarget
MEPWorks 31 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA7FMEPD1000 BA 7thFloor DryAreaMEPHLClearancebyARMAforgridfixing 12 16.67% 20.00% 28Dec16 10Jan17 21Dec16A 24Jan17 12 25 OnTarget
BA7FMEPD1010 BA 7thFloor DryAreaMEPclearanceforBoardclosing 12 0.00% 0.00% 14Jan17 26Jan17 24Jan17 7Feb17 10 25 OnTarget
BA7FMEPD1020 BA 7thFloor InstallLowCurrentWiring 10 60.00% 70.00% 24Dec16 3Jan17 27Nov16A 7Jan17 2 7 OnTarget
BA7FMEPD1030 BA 7thFloor InstallHVACPipes 10 60.00% 48.00% 24Dec16 3Jan17 27Nov16A 5Jan17 1 6 Delayed
BA7FMEPD1040 BA 7thFloor InstallDuctsandHangers 14 50.00% 0.00% 22Dec16 7Jan17 31Dec16 15Jan17 7 118 Delayed
BA7FMEPD1050 BA 7thFloor DBInstallation 10 0.00% 20.00% 8Jan17 18Jan17 27Nov16A 8Jan17 9 10 OnTarget
BA7FMEPD1060 BA 7thFloor InstallDroppers 12 0.00% 0.00% 11Jan17 24Jan17 24Jan17 7Feb17 12 25 OnTarget
BA7FMEPD1070 BA 7thFloor MeggeringTest 7 0.00% 0.00% 19Jan17 26Jan17 30Jan17 7Feb17 10 25 OnTarget
WetArea 79 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPWorks 50 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA7FMEPW1000 BA 7thFloor WetAreaScreedMEpClearance 12 0.00% 0.00% 5Jan17 18Jan17 9Jan17 22Jan17 3 4 OnTarget
BA7FMEPW1010 BA 7thFloor WetAreaHLClearancebyARMAforgridfixing 12 0.00% 0.00% 16Jan17 29Jan17 19Jan17 1Feb17 3 4 OnTarget
BA7FMEPW1020 BA 7thFloor WetAreaMEPclearanceforBoardclosing 12 0.00% 0.00% 6Feb17 19Feb17 9Feb17 22Feb17 3 5 OnTarget
BA7FMEPW1030 BA 7thFloor InstallDrainagepipes 10 60.00% 96.00% 24Dec16 3Jan17 27Nov16A 5Jan17 1 6 OnTarget
BA7FMEPW1040 BA 7thFloor InstallHot&ColdWaterPiping 10 50.00% 90.00% 25Dec16 4Jan17 27Nov16A 7Jan17 1 6 OnTarget
BA7FMEPW1050 BA 7thFloor InstallHVACPipes 12 33.33% 48.00% 26Dec16 8Jan17 27Nov16A 10Jan17 1 6 OnTarget
BA7FMEPW1060 BA 7thFloor InstallDuctsandHangers 14 21.43% 0.00% 27Dec16 11Jan17 31Dec16 15Jan17 3 4 Delayed
BA7FMEPW1070 BA 7thFloor InstallDroppers 12 0.00% 0.00% 1Feb17 14Feb17 5Feb17 18Feb17 3 9 OnTarget
BA7FMEPW1080 BA 7thFloor MeggeringTest 7 0.00% 0.00% 7Feb17 14Feb17 11Feb17 18Feb17 3 9 OnTarget
Corridor 64 0.00% 0.00% 15Dec16 18Feb17 27Nov16A 9Mar17 17 7 OnTarget
MEPWorks 45 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA7FMEPCL1000 BA 7thFloor CorridorScreedMEpClearance 12 0.00% 0.00% 15Jan17 28Jan17 17Jan17 30Jan17 2 32 OnTarget
BA7FMEPCL1010 BA 7thFloor CorridorHLClearancebyARMAforgridfixing 12 0.00% 0.00% 19Jan17 1Feb17 23Jan17 5Feb17 3 8 OnTarget
BA7FMEPCL1020 BA 7thFloor CorridorMEPclearanceforBoardclosing 12 0.00% 0.00% 31Jan17 13Feb17 4Feb17 16Feb17 3 8 OnTarget
BA7FMEPCL1030 BA 7thFloor InstallElectricalWiring 10 60.00% 100.00% 24Dec16 3Jan17 27Nov16A 05Dec16A 26 0 OnTarget
BA7FMEPCL1050 BA 7thFloor InstallHot&ColdWaterPiping 10 30.00% 50.00% 27Dec16 7Jan17 27Nov16A 4Jan17 2 20 OnTarget
BA7FMEPCL1060 BA 7thFloor InstallHVACPipes 12 16.67% 0.00% 28Dec16 10Jan17 31Dec16 12Jan17 2 16 Delayed
BA7FMEPCL1070 BA 7thFloor InstallDuctsandHangers 12 0.00% 75.00% 1Jan17 14Jan17 27Nov16A 16Jan17 2 16 OnTarget
BA7FMEPCL1080 BA 7thFloor InstallCableTraysandTrunking 12 0.00% 0.00% 4Jan17 17Jan17 7Jan17 19Jan17 2 16 OnTarget
BA7FMEPCL1085 BA 7thFloor InstallLowCurrentWiring 7 0.00% 70.00% 14Jan17 21Jan17 27Nov16A 23Jan17 2 16 OnTarget
BA7FMEPCL1090 BA 7thFloor InstallLVCables 12 0.00% 0.00% 8Jan17 21Jan17 10Jan17 23Jan17 2 19 OnTarget
BA7FMEPCL1100 BA 7thFloor InstallDroppers 10 0.00% 0.00% 2Feb17 13Feb17 6Feb17 16Feb17 3 8 OnTarget
BA7FMEPCL1110 BA 7thFloor MeggeringTest 5 0.00% 0.00% 8Feb17 13Feb17 12Feb17 16Feb17 3 8 OnTarget
CommonFinalFinishes 30 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPWorks 20 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA7FMEPF1010 BA 7thFloor InstallLightFittings 10 0.00% 0.00% 15Feb17 26Feb17 19Feb17 1Mar17 3 16 OnTarget
DelayAnalysisReportBasedonTargetProgram *DelayedActivitiesareHiglightedInRed DataDate: 29Dec16
VarianceBL
Original Schedule% Activity% BLProject BLProject Actual/Forecas Actual/Forecas Delayed/O
ActivityID Building Floor ActivityName ProjectFinish TotalFloat
Duration Complete Complete Start Finish tedStart tedFinish nTrack
Date
BA7FMEPF1020 BA 7thFloor InstallFireCabinets 14 0.00% 0.00% 12Feb17 27Feb17 15Feb17 2Mar17 3 16 OnTarget
BA7FMEPF1030 BA 7thFloor InstallFireAlarmsandSpeakers 14 0.00% 0.00% 12Feb17 27Feb17 15Feb17 2Mar17 3 16 OnTarget
BA7FMEPF1040 BA 7thFloor InstallSprinklers 14 0.00% 0.00% 13Feb17 28Feb17 16Feb17 4Mar17 3 16 OnTarget
BA7FMEPF1050 BA 7thFloor InstallSwitchesandSockets 10 0.00% 0.00% 13Feb17 23Feb17 16Feb17 27Feb17 3 16 OnTarget
BA7FMEPF1060 BA 7thFloor InstallLowCurrentEquipments 14 0.00% 0.00% 9Feb17 25Feb17 13Feb17 28Feb17 3 16 OnTarget
BA7FMEPF1070 BA 7thFloor InstallGrillesandDiffussers 14 0.00% 0.00% 9Feb17 25Feb17 13Feb17 28Feb17 3 16 OnTarget
BA7FMEPF1075 BA 7thFloor MEPFinalFixes/Sanitarywares 12 0.00% 0.00% 19Feb17 4Mar17 22Feb17 7Mar17 3 4 OnTarget
BA7FMEPF1080 BA 7thFloor InstallPlumpingFinalTittings(Sanitaryware,FloorDra 14 0.00% 0.00% 9Feb17 25Feb17 13Feb17 28Feb17 3 16 OnTarget
EightFloor 87 0.00% 0.00% 30Nov16 16Apr17 26Nov16A 25Apr17 8 32 OnTarget
DryArea 44 0.00% 0.00% 18Dec16 7Mar17 27Nov16A 10Apr17 29 22 OnTarget
MEPWorks 25 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA8FMEPD1000 BA 8thFloor DryAreaMEPHLClearancebyARMAforgridfixing 12 8.33% 8.00% 29Dec16 11Jan17 27Dec16A 12Jan17 0 13 Delayed
BA8FMEPD1010 BA 8thFloor DryAreaMEPclearanceforBoardclosing 12 0.00% 0.00% 12Jan17 25Jan17 12Jan17 26Jan17 0 33 OnTarget
BA8FMEPD1020 BA 8thFloor InstallLowCurrentWiring 10 20.00% 70.00% 28Dec16 8Jan17 27Nov16A 11Jan17 2 7 OnTarget
BA8FMEPD1030 BA 8thFloor InstallHVACPipes 10 20.00% 20.00% 28Dec16 8Jan17 21Dec16A 8Jan17 0 4 OnTarget
BA8FMEPD1040 BA 8thFloor InstallDuctsandHangers 10 0.00% 0.00% 1Jan17 11Jan17 1Jan17 11Jan17 0 4 OnTarget
BA8FMEPD1050 BA 8thFloor DBInstallation 10 0.00% 20.00% 4Jan17 15Jan17 27Nov16A 15Jan17 0 4 OnTarget
BA8FMEPD1060 BA 8thFloor InstallDroppers 12 0.00% 0.00% 12Jan17 25Jan17 12Jan17 26Jan17 0 33 OnTarget
BA8FMEPD1070 BA 8thFloor MeggeringTest 7 0.00% 0.00% 18Jan17 25Jan17 18Jan17 26Jan17 0 33 OnTarget
WetArea 70 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPWorks 47 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA8FMEPW1000 BA 8thFloor WetAreaScreedMEpClearance 10 0.00% 0.00% 14Jan17 24Jan17 9Jan17 19Jan17 4 9 OnTarget
BA8FMEPW1010 BA 8thFloor WetAreaHLClearancebyARMAforgridfixing 10 0.00% 0.00% 18Jan17 29Jan17 14Jan17 24Jan17 4 9 OnTarget
BA8FMEPW1020 BA 8thFloor WetAreaMEPclearanceforBoardclosing 10 0.00% 0.00% 12Feb17 22Feb17 7Feb17 18Feb17 4 9 OnTarget
BA8FMEPW1030 BA 8thFloor InstallElectricalWiring 10 0.00% 100.00% 1Jan17 11Jan17 27Nov16A 03Dec16A 35 0 OnTarget
BA8FMEPW1040 BA 8thFloor InstallDrainagepipes 12 0.00% 100.00% 31Dec16 12Jan17 27Nov16A 13Dec16A 27 0 OnTarget
BA8FMEPW1050 BA 8thFloor InstallHot&ColdWaterPiping 8 0.00% 90.00% 5Jan17 14Jan17 27Nov16A 31Dec16 12 17 OnTarget
BA8FMEPW1060 BA 8thFloor InstallHVACPipes 12 0.00% 0.00% 4Jan17 17Jan17 31Dec16 12Jan17 4 9 OnTarget
BA8FMEPW1070 BA 8thFloor InstallDuctsandHangers 12 0.00% 0.00% 8Jan17 21Jan17 3Jan17 16Jan17 4 9 OnTarget
BA8FMEPW1080 BA 8thFloor InstallDroppers 12 0.00% 0.00% 2Feb17 15Feb17 29Jan17 11Feb17 4 15 OnTarget
BA8FMEPW1090 BA 8thFloor MeggeringTest 7 0.00% 0.00% 8Feb17 15Feb17 4Feb17 11Feb17 4 15 OnTarget
Corridor 46 0.00% 0.00% 15Dec16 18Feb17 27Nov16A 9Mar17 17 7 OnTarget
MEPWorks 35 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA8FMEPCL1000 BA 8thFloor CorridorHLClearancebyARMAforgridfixing 12 0.00% 0.00% 19Jan17 1Feb17 15Jan17 28Jan17 4 15 OnTarget
BA8FMEPCL1010 BA 8thFloor CorridorMEPclearanceforBoardclosing 12 0.00% 0.00% 31Jan17 13Feb17 26Jan17 8Feb17 4 15 OnTarget
BA8FMEPCL1030 BA 8thFloor InstallHot&ColdWaterPiping 10 0.00% 50.00% 4Jan17 15Jan17 27Nov16A 4Jan17 9 20 OnTarget
BA8FMEPCL1040 BA 8thFloor InstallHVACPipes 12 0.00% 0.00% 5Jan17 18Jan17 31Dec16 12Jan17 5 16 OnTarget
BA8FMEPCL1050 BA 8thFloor InstallDuctsandHangers 10 0.00% 0.00% 11Jan17 22Jan17 5Jan17 16Jan17 5 16 OnTarget
BA8FMEPCL1060 BA 8thFloor InstallCableTraysandTrunking 12 0.00% 0.00% 12Jan17 25Jan17 7Jan17 19Jan17 5 16 OnTarget
BA8FMEPCL1065 BA 8thFloor InstallLowCurrentWiring 10 0.00% 70.00% 18Jan17 29Jan17 27Nov16A 23Jan17 5 16 OnTarget
BA8FMEPCL1070 BA 8thFloor InstallLVCables 10 0.00% 0.00% 18Jan17 29Jan17 12Jan17 23Jan17 5 23 OnTarget
BA8FMEPCL1080 BA 8thFloor InstallDroppers 10 0.00% 0.00% 25Jan17 5Feb17 19Jan17 30Jan17 5 23 OnTarget
BA8FMEPCL1090 BA 8thFloor MeggeringTest 7 0.00% 0.00% 29Jan17 5Feb17 23Jan17 30Jan17 5 23 OnTarget
CommonFinalFinishes 30 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPWorks 25 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA8FMEPF0995 BA 8thFloor InstallGYMEquipment 24 0.00% 0.00% 18Feb17 16Mar17 31Dec16 26Jan17 42 44 OnTarget
BA8FMEPF1010 BA 8thFloor InstallLightFittings 10 0.00% 0.00% 22Feb17 5Mar17 18Feb17 28Feb17 4 17 OnTarget
BA8FMEPF1020 BA 8thFloor InstallFireCabinets 14 0.00% 0.00% 19Feb17 6Mar17 14Feb17 1Mar17 4 17 OnTarget
BA8FMEPF1030 BA 8thFloor InstallFireAlarmsandSpeakers 10 0.00% 0.00% 23Feb17 6Mar17 19Feb17 1Mar17 4 17 OnTarget
BA8FMEPF1040 BA 8thFloor InstallSprinklers 14 0.00% 0.00% 20Feb17 7Mar17 15Feb17 2Mar17 4 17 OnTarget
BA8FMEPF1050 BA 8thFloor InstallSwitchesandSockets 10 0.00% 0.00% 20Feb17 2Mar17 15Feb17 26Feb17 4 17 OnTarget
BA8FMEPF1060 BA 8thFloor InstallLowCurrentEquipments 10 0.00% 0.00% 21Feb17 4Mar17 16Feb17 27Feb17 4 17 OnTarget
BA8FMEPF1070 BA 8thFloor InstallGrillesandDiffussers 14 0.00% 0.00% 16Feb17 4Mar17 12Feb17 27Feb17 4 17 OnTarget
BA8FMEPF1075 BA 8thFloor MEPFinalFixes/Sanitarywares 12 0.00% 0.00% 21Feb17 6Mar17 16Feb17 1Mar17 4 9 OnTarget
BA8FMEPF1080 BA 8thFloor InstallPlumpingFinalTittings(Sanitaryware,FloorDra 14 0.00% 0.00% 16Feb17 4Mar17 12Feb17 27Feb17 4 17 OnTarget
NinthFloor 85 0.00% 0.00% 4Dec16 25Apr17 26Nov16A 30Apr17 4 28 OnTarget
DryArea 44 0.00% 0.00% 18Dec16 7Mar17 27Nov16A 10Apr17 29 22 OnTarget
MEPWorks 25 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA9FMEPD1000 BA 9thFloor DryAreaMEPHLClearancebyARMAforgridfixing 10 0.00% 0.00% 4Jan17 15Jan17 3Jan17 14Jan17 1 25 OnTarget
BA9FMEPD1010 BA 9thFloor DryAreaMEPclearanceforBoardclosing 10 0.00% 0.00% 15Jan17 25Jan17 14Jan17 24Jan17 1 25 OnTarget
BA9FMEPD1020 BA 9thFloor InstallElectricalWiring 10 20.00% 27.00% 28Dec16 8Jan17 27Nov16A 11Jan17 2 7 OnTarget
BA9FMEPD1030 BA 9thFloor InstallLowCurrentWiring 10 0.00% 61.00% 1Jan17 11Jan17 27Nov16A 15Jan17 2 7 OnTarget
BA9FMEPD1040 BA 9thFloor InstallHVACPipes 10 0.00% 0.00% 1Jan17 11Jan17 31Dec16 10Jan17 1 2 OnTarget
BA9FMEPD1050 BA 9thFloor InstallDuctsandHangers 10 0.00% 0.00% 4Jan17 15Jan17 3Jan17 14Jan17 1 2 OnTarget
BA9FMEPD1060 BA 9thFloor DBInstallation 10 0.00% 20.00% 8Jan17 18Jan17 27Nov16A 17Jan17 1 2 OnTarget
BA9FMEPD1070 BA 9thFloor InstallDroppers 12 0.00% 0.00% 12Jan17 25Jan17 11Jan17 24Jan17 1 25 OnTarget
BA9FMEPD1080 BA 9thFloor MeggeringTest 7 0.00% 0.00% 18Jan17 25Jan17 17Jan17 24Jan17 1 25 OnTarget
WetArea 65 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPWorks 47 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA9FMEPW1000 BA 9thFloor WetAreaScreedMEpClearance 10 0.00% 0.00% 11Jan17 22Jan17 14Jan17 25Jan17 2 4 OnTarget
BA9FMEPW1010 BA 9thFloor WetAreaHLClearancebyARMAforgridfixing 10 0.00% 0.00% 16Jan17 26Jan17 18Jan17 30Jan17 2 4 OnTarget
BA9FMEPW1020 BA 9thFloor WetAreaMEPclearanceforBoardclosing 10 0.00% 0.00% 8Feb17 19Feb17 11Feb17 22Feb17 2 5 OnTarget
BA9FMEPW1030 BA 9thFloor InstallElectricalWiring 10 20.00% 27.00% 28Dec16 8Jan17 27Nov16A 11Jan17 2 4 OnTarget
BA9FMEPW1040 BA 9thFloor InstallDrainagepipes 12 25.00% 93.00% 27Dec16 9Jan17 27Nov16A 12Jan17 2 4 OnTarget
BA9FMEPW1050 BA 9thFloor InstallHot&ColdWaterPiping 10 0.00% 90.00% 31Dec16 10Jan17 27Nov16A 14Jan17 2 4 OnTarget
BA9FMEPW1060 BA 9thFloor InstallHVACPipes 12 0.00% 0.00% 1Jan17 14Jan17 3Jan17 17Jan17 2 4 OnTarget
BA9FMEPW1070 BA 9thFloor InstallDuctsandHangers 12 0.00% 0.00% 4Jan17 17Jan17 7Jan17 21Jan17 2 4 OnTarget
BA9FMEPW1080 BA 9thFloor InstallDroppers 12 0.00% 0.00% 26Jan17 8Feb17 29Jan17 12Feb17 2 14 OnTarget
BA9FMEPW1090 BA 9thFloor MeggeringTest 5 0.00% 0.00% 4Feb17 8Feb17 6Feb17 12Feb17 2 14 OnTarget
Corridor 62 0.00% 0.00% 15Dec16 18Feb17 27Nov16A 9Mar17 17 7 OnTarget
MEPWorks 43 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA9FMEPCL1000 BA 9thFloor CorridorScreedMEpClearance 12 0.00% 0.00% 9Jan17 22Jan17 11Jan17 25Jan17 2 37 OnTarget
BA9FMEPCL1010 BA 9thFloor CorridorHLClearancebyARMAforgridfixing 21 0.00% 0.00% 7Jan17 30Jan17 9Jan17 2Feb17 2 4 OnTarget
BA9FMEPCL1020 BA 9thFloor CorridorMEPclearanceforBoardclosing 18 0.00% 0.00% 29Jan17 18Feb17 31Jan17 21Feb17 2 4 OnTarget
BA9FMEPCL1030 BA 9thFloor InstallElectricalWiring 8 0.00% 40.00% 31Dec16 8Jan17 27Nov16A 11Jan17 2 5 OnTarget
BA9FMEPCL1050 BA 9thFloor InstallHot&ColdWaterPiping 10 0.00% 50.00% 1Jan17 11Jan17 27Nov16A 15Jan17 2 5 OnTarget
BA9FMEPCL1060 BA 9thFloor InstallHVACPipes 12 0.00% 0.00% 2Jan17 15Jan17 4Jan17 18Jan17 2 5 OnTarget
BA9FMEPCL1070 BA 9thFloor InstallDuctsandHangers 10 0.00% 0.00% 8Jan17 18Jan17 10Jan17 22Jan17 2 5 OnTarget
BA9FMEPCL1080 BA 9thFloor InstallCableTraysandTrunking 12 0.00% 0.00% 9Jan17 22Jan17 11Jan17 25Jan17 2 5 OnTarget
BA9FMEPCL1085 BA 9thFloor InstallLowCurrentWiring 10 0.00% 61.00% 15Jan17 25Jan17 27Nov16A 29Jan17 2 5 OnTarget
BA9FMEPCL1090 BA 9thFloor InstallLVCables 10 0.00% 0.00% 15Jan17 25Jan17 17Jan17 29Jan17 2 18 OnTarget
BA9FMEPCL1100 BA 9thFloor InstallDroppers 10 0.00% 0.00% 22Jan17 1Feb17 24Jan17 5Feb17 2 18 OnTarget
BA9FMEPCL1110 BA 9thFloor MeggeringTest 7 0.00% 0.00% 25Jan17 1Feb17 28Jan17 5Feb17 2 18 OnTarget
CommonFinalFinishes 32 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPWorks 20 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA9FMEPF1010 BA 9thFloor InstallLightFittings 10 0.00% 0.00% 21Feb17 4Mar17 23Feb17 7Mar17 2 4 OnTarget
BA9FMEPF1020 BA 9thFloor InstallFireCabinets 14 0.00% 0.00% 18Feb17 5Mar17 20Feb17 8Mar17 2 4 OnTarget
BA9FMEPF1030 BA 9thFloor InstallFireAlarmsandSpeakers 14 0.00% 0.00% 18Feb17 5Mar17 20Feb17 8Mar17 2 4 OnTarget
BA9FMEPF1040 BA 9thFloor InstallSprinklers 10 0.00% 0.00% 23Feb17 6Mar17 26Feb17 9Mar17 2 4 OnTarget
BA9FMEPF1050 BA 9thFloor InstallSwitchesandSockets 14 0.00% 0.00% 23Feb17 11Mar17 26Feb17 14Mar17 2 4 OnTarget
BA9FMEPF1060 BA 9thFloor InstallLowCurrentEquipments 14 0.00% 0.00% 25Feb17 12Mar17 27Feb17 15Mar17 2 4 OnTarget
BA9FMEPF1070 BA 9thFloor InstallGrillesandDiffussers 14 0.00% 0.00% 25Feb17 12Mar17 27Feb17 15Mar17 2 4 OnTarget
BA9FMEPF1075 BA 9thFloor MEPFinalFixes/Sanitarywares 12 0.00% 0.00% 20Feb17 6Mar17 21Feb17 7Mar17 1 5 OnTarget
BA9FMEPF1080 BA 9thFloor InstallPlumpingFinalTittings(Sanitaryware,FloorDra 14 0.00% 0.00% 25Feb17 12Mar17 27Feb17 15Mar17 2 4 OnTarget
TenthFloor 105 0.00% 0.00% 7Dec16 17Apr17 26Nov16A 11Apr17 5 44 OnTarget
DryArea 48 0.00% 0.00% 18Dec16 7Mar17 27Nov16A 10Apr17 29 22 OnTarget
MEPWorks 29 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA10FMEPD1000 BA 10thFloor DryAreaMEPHLClearancebyARMAforgridfixing 10 0.00% 0.00% 8Jan17 18Jan17 3Jan17 14Jan17 4 10 OnTarget
BA10FMEPD1010 BA 10thFloor DryAreaMEPclearanceforBoardclosing 10 0.00% 0.00% 19Jan17 30Jan17 15Jan17 25Jan17 4 28 OnTarget
BA10FMEPD1020 BA 10thFloor InstallElectricalWiring 10 20.00% 20.00% 28Dec16 8Jan17 23Dec16A 11Jan17 2 7 OnTarget
BA10FMEPD1030 BA 10thFloor InstallLowCurrentWiring 10 0.00% 55.00% 4Jan17 15Jan17 27Nov16A 18Jan17 2 7 OnTarget
BA10FMEPD1040 BA 10thFloor InstallHVACPipes 10 0.00% 0.00% 4Jan17 15Jan17 31Dec16 10Jan17 4 5 OnTarget
BA10FMEPD1050 BA 10thFloor InstallDuctsandHangers 10 0.00% 0.00% 8Jan17 18Jan17 3Jan17 14Jan17 4 5 OnTarget
BA10FMEPD1060 BA 10thFloor DBInstallation 10 0.00% 20.00% 8Jan17 18Jan17 27Nov16A 14Jan17 4 5 OnTarget
BA10FMEPD1070 BA 10thFloor InstallDroppers 12 0.00% 0.00% 17Jan17 30Jan17 12Jan17 25Jan17 4 28 OnTarget
BA10FMEPD1080 BA 10thFloor MeggeringTest 7 0.00% 0.00% 23Jan17 30Jan17 18Jan17 25Jan17 4 28 OnTarget
WetArea 66 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPWorks 55 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA10FMEPW1000 BA 10thFloor WetAreaScreedMEpClearance 10 90.00% 90.00% 20Dec16 31Dec16 21Dec16A 19Jan17 17 1 OnTarget
BA10FMEPW1010 BA 10thFloor WetAreaHLClearancebyARMAforgridfixing 10 0.00% 0.00% 8Jan17 18Jan17 12Jan17 24Jan17 5 1 OnTarget
BA10FMEPW1030 BA 10thFloor InstallElectricalWiring 10 20.00% 20.00% 28Dec16 8Jan17 28Dec16A 11Jan17 2 5 OnTarget
DelayAnalysisReportBasedonTargetProgram *DelayedActivitiesareHiglightedInRed DataDate: 29Dec16
VarianceBL
Original Schedule% Activity% BLProject BLProject Actual/Forecas Actual/Forecas Delayed/O
ActivityID Building Floor ActivityName ProjectFinish TotalFloat
Duration Complete Complete Start Finish tedStart tedFinish nTrack
Date
BA10FMEPW1040 BA 10thFloor InstallDrainagepipes 12 25.00% 80.00% 27Dec16 9Jan17 27Nov16A 12Jan17 2 5 OnTarget
BA10FMEPW1050 BA 10thFloor InstallHot&ColdWaterPiping 10 0.00% 85.00% 31Dec16 10Jan17 27Nov16A 14Jan17 2 5 OnTarget
BA10FMEPW1060 BA 10thFloor InstallHVACPipes 12 0.00% 0.00% 1Jan17 14Jan17 3Jan17 17Jan17 2 5 OnTarget
BA10FMEPW1070 BA 10thFloor Firefightingpipes 5 0.00% 98.00% 10Jan17 15Jan17 27Nov16A 18Jan17 2 6 OnTarget
BA10FMEPW1080 BA 10thFloor InstallDuctsandHangers 12 0.00% 0.00% 4Jan17 17Jan17 7Jan17 21Jan17 2 5 OnTarget
BA10FMEPW1090 BA 10thFloor InstallDroppers 12 0.00% 0.00% 30Jan17 12Feb17 4Feb17 18Feb17 5 9 OnTarget
BA10FMEPW1100 BA 10thFloor MeggeringTest 5 0.00% 0.00% 7Feb17 12Feb17 12Feb17 18Feb17 5 9 OnTarget
BA10FMEPW1105 BA 10thFloor WetAreaMEPclearanceforBoardclosing 10 0.00% 0.00% 11Feb17 21Feb17 15Feb17 27Feb17 5 1 OnTarget
Corridor 66 0.00% 0.00% 15Dec16 18Feb17 27Nov16A 9Mar17 17 7 OnTarget
MEPWorks 47 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA10FMEPCL1000 BA 10thFloor CorridorScreedMEpClearance 12 91.67% 92.00% 18Dec16 31Dec16 21Dec16A 19Jan17 17 29 OnTarget
BA10FMEPCL1010 BA 10thFloor CorridorHLClearancebyARMAforgridfixing 12 0.00% 0.00% 16Jan17 29Jan17 14Jan17 28Jan17 1 15 OnTarget
BA10FMEPCL1020 BA 10thFloor CorridorMEPclearanceforBoardclosing 12 0.00% 0.00% 28Jan17 9Feb17 25Jan17 8Feb17 1 15 OnTarget
BA10FMEPCL1030 BA 10thFloor InstallElectricalWiring 10 20.00% 100.00% 28Dec16 8Jan17 27Nov16A 27Nov16A 37 0 OnTarget
BA10FMEPCL1050 BA 10thFloor InstallHot&ColdWaterPiping 12 8.33% 50.00% 29Dec16 11Jan17 27Nov16A 5Jan17 5 19 OnTarget
BA10FMEPCL1060 BA 10thFloor Firefightingpipes 5 0.00% 98.00% 7Jan17 11Jan17 27Nov16A 5Jan17 5 19 OnTarget
BA10FMEPCL1070 BA 10thFloor InstallHVACPipes 12 0.00% 0.00% 2Jan17 15Jan17 31Dec16 12Jan17 2 16 OnTarget
BA10FMEPCL1080 BA 10thFloor InstallDuctsandHangers 10 0.00% 0.00% 8Jan17 18Jan17 5Jan17 16Jan17 2 16 OnTarget
BA10FMEPCL1090 BA 10thFloor InstallCableTraysandTrunking 12 0.00% 0.00% 9Jan17 22Jan17 7Jan17 19Jan17 2 16 OnTarget
BA10FMEPCL1095 BA 10thFloor InstallLowCurrentWiring 12 0.00% 55.00% 12Jan17 25Jan17 27Nov16A 23Jan17 2 16 OnTarget
BA10FMEPCL1100 BA 10thFloor InstallLVCables 4 0.00% 0.00% 22Jan17 25Jan17 19Jan17 23Jan17 2 23 OnTarget
BA10FMEPCL1110 BA 10thFloor InstallDroppers 10 0.00% 0.00% 22Jan17 1Feb17 19Jan17 30Jan17 2 23 OnTarget
BA10FMEPCL1120 BA 10thFloor MeggeringTest 5 0.00% 0.00% 28Jan17 1Feb17 25Jan17 30Jan17 2 23 OnTarget
CommonFinalFinishes 33 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPWorks 17 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA10FMEPF1010 BA 10thFloor InstallLightFittings 14 0.00% 0.00% 18Feb17 5Mar17 22Feb17 11Mar17 5 4 OnTarget
BA10FMEPF1020 BA 10thFloor InstallFireCabinets 14 0.00% 0.00% 19Feb17 6Mar17 23Feb17 12Mar17 5 4 OnTarget
BA10FMEPF1030 BA 10thFloor InstallFireAlarmsandSpeakers 14 0.00% 0.00% 19Feb17 6Mar17 23Feb17 12Mar17 5 4 OnTarget
BA10FMEPF1040 BA 10thFloor InstallSprinklers 14 0.00% 0.00% 20Feb17 7Mar17 25Feb17 13Mar17 5 4 OnTarget
BA10FMEPF1050 BA 10thFloor InstallSwitchesandSockets 14 0.00% 0.00% 20Feb17 7Mar17 25Feb17 13Mar17 5 4 OnTarget
BA10FMEPF1060 BA 10thFloor InstallLowCurrentEquipments 14 0.00% 0.00% 21Feb17 8Mar17 26Feb17 14Mar17 5 4 OnTarget
BA10FMEPF1070 BA 10thFloor InstallGrillesandDiffussers 14 0.00% 0.00% 21Feb17 8Mar17 26Feb17 14Mar17 5 4 OnTarget
BA10FMEPF1075 BA 10thFloor MEPFinalFixes/Sanitarywares 12 0.00% 0.00% 20Feb17 5Mar17 25Feb17 11Mar17 5 1 OnTarget
BA10FMEPF1080 BA 10thFloor InstallPlumpingFinalTittings(Sanitaryware,FloorDra 14 0.00% 0.00% 21Feb17 8Mar17 26Feb17 14Mar17 5 4 OnTarget
EleventhFloor 81 0.00% 0.00% 18Dec16 21Mar17 26Nov16A 19Mar17 2 24 OnTarget
DryArea 44 0.00% 0.00% 18Dec16 7Mar17 27Nov16A 10Apr17 29 22 OnTarget
MEPWorks 25 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA11FMEPD1000 BA 11thFloor DryAreaMEPHLClearancebyARMAforgridfixing 10 0.00% 0.00% 8Jan17 18Jan17 3Jan17 14Jan17 4 31 OnTarget
BA11FMEPD1010 BA 11thFloor DryAreaMEPclearanceforBoardclosing 10 0.00% 0.00% 18Jan17 29Jan17 14Jan17 24Jan17 4 31 OnTarget
BA11FMEPD1020 BA 11thFloor InstallElectricalWiring 10 0.00% 0.00% 1Jan17 11Jan17 3Jan17 15Jan17 2 4 OnTarget
BA11FMEPD1030 BA 11thFloor InstallLowCurrentWiring 10 0.00% 30.00% 4Jan17 15Jan17 27Nov16A 18Jan17 2 4 OnTarget
BA11FMEPD1040 BA 11thFloor InstallHVACPipes 10 0.00% 0.00% 4Jan17 15Jan17 31Dec16 10Jan17 4 5 OnTarget
BA11FMEPD1050 BA 11thFloor InstallDuctsandHangers 10 0.00% 0.00% 8Jan17 18Jan17 3Jan17 14Jan17 4 5 OnTarget
BA11FMEPD1060 BA 11thFloor DBInstallation 10 0.00% 20.00% 8Jan17 18Jan17 27Nov16A 14Jan17 4 5 OnTarget
BA11FMEPD1070 BA 11thFloor InstallDroppers 12 0.00% 0.00% 16Jan17 29Jan17 11Jan17 24Jan17 4 31 OnTarget
BA11FMEPD1080 BA 11thFloor MeggeringTest 7 0.00% 0.00% 22Jan17 29Jan17 17Jan17 24Jan17 4 31 OnTarget
WetArea 65 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
MEPWorks 56 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA11FMEPW1000 BA 11thFloor WetAreaScreedMEpClearance 12 66.67% 67.00% 21Dec16 3Jan17 21Dec16A 23Jan17 17 2 OnTarget
BA11FMEPW1010 BA 11thFloor WetAreaHLClearancebyARMAforgridfixing 10 0.00% 0.00% 10Jan17 21Jan17 16Jan17 28Jan17 6 2 OnTarget
BA11FMEPW1020 BA 11thFloor WetAreaMEPclearanceforBoardclosing 10 0.00% 0.00% 13Feb17 23Feb17 19Feb17 2Mar17 6 2 OnTarget
BA11FMEPW1030 BA 11thFloor InstallElectricalWiring 10 0.00% 0.00% 1Jan17 11Jan17 3Jan17 15Jan17 2 2 OnTarget
BA11FMEPW1040 BA 11thFloor InstallDrainagepipes 12 0.00% 80.00% 31Dec16 12Jan17 27Nov16A 16Jan17 2 2 OnTarget
BA11FMEPW1050 BA 11thFloor InstallHot&ColdWaterPiping 12 0.00% 85.00% 1Jan17 14Jan17 27Nov16A 17Jan17 2 2 OnTarget
BA11FMEPW1060 BA 11thFloor InstallHVACPipes 12 0.00% 0.00% 4Jan17 17Jan17 7Jan17 21Jan17 2 2 OnTarget
BA11FMEPW1070 BA 11thFloor Firefightingpipes 10 0.00% 15.00% 8Jan17 18Jan17 27Nov16A 22Jan17 2 3 OnTarget
BA11FMEPW1080 BA 11thFloor InstallDuctsandHangers 12 0.00% 0.00% 8Jan17 21Jan17 10Jan17 24Jan17 2 2 OnTarget
BA11FMEPW1090 BA 11thFloor InstallDroppers 12 0.00% 0.00% 2Feb17 15Feb17 8Feb17 22Feb17 6 5 OnTarget
BA11FMEPW1100 BA 11thFloor MeggeringTest 7 0.00% 0.00% 8Feb17 15Feb17 14Feb17 22Feb17 6 5 OnTarget
Corridor 64 0.00% 0.00% 15Dec16 18Feb17 27Nov16A 9Mar17 17 7 OnTarget
MEPWorks 45 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA11FMEPCL1000 BA 11thFloor CorridorScreedMEpClearance 12 66.67% 67.00% 21Dec16 3Jan17 21Dec16A 23Jan17 17 38 OnTarget
BA11FMEPCL1010 BA 11thFloor CorridorHLClearancebyARMAforgridfixing 10 0.00% 0.00% 22Jan17 1Feb17 24Jan17 5Feb17 2 11 OnTarget
BA11FMEPCL1020 BA 11thFloor CorridorMEPclearanceforBoardclosing 10 0.00% 0.00% 31Jan17 11Feb17 2Feb17 14Feb17 2 11 OnTarget
BA11FMEPCL1030 BA 11thFloor InstallElectricalWiring 10 0.00% 0.00% 1Jan17 11Jan17 3Jan17 15Jan17 2 11 OnTarget
BA11FMEPCL1050 BA 11thFloor InstallHot&ColdWaterPiping 10 0.00% 50.00% 4Jan17 15Jan17 27Nov16A 18Jan17 2 11 OnTarget
BA11FMEPCL1060 BA 11thFloor Firefightingpipes 10 0.00% 98.00% 4Jan17 15Jan17 27Nov16A 18Jan17 2 11 OnTarget
BA11FMEPCL1070 BA 11thFloor InstallHVACPipes 12 0.00% 0.00% 5Jan17 18Jan17 8Jan17 22Jan17 2 11 OnTarget
BA11FMEPCL1080 BA 11thFloor InstallDuctsandHangers 10 0.00% 0.00% 11Jan17 22Jan17 14Jan17 25Jan17 2 11 OnTarget
BA11FMEPCL1090 BA 11thFloor InstallCableTraysandTrunking 12 0.00% 0.00% 12Jan17 25Jan17 15Jan17 29Jan17 2 11 OnTarget
BA11FMEPCL1095 BA 11thFloor InstallLowCurrentWiring 10 0.00% 30.00% 18Jan17 29Jan17 27Nov16A 1Feb17 2 11 OnTarget
BA11FMEPCL1100 BA 11thFloor InstallLVCables 10 0.00% 0.00% 18Jan17 29Jan17 21Jan17 1Feb17 2 14 OnTarget
BA11FMEPCL1110 BA 11thFloor InstallDroppers 10 0.00% 0.00% 25Jan17 5Feb17 28Jan17 8Feb17 2 16 OnTarget
BA11FMEPCL1120 BA 11thFloor MeggeringTest 7 0.00% 0.00% 29Jan17 5Feb17 31Jan17 8Feb17 2 16 OnTarget
CommonFinalFinishes 24 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPWorks 17 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA11FMEPF1010 BA 11thFloor InstallLightFittings 10 0.00% 0.00% 27Feb17 9Mar17 5Mar17 16Mar17 6 3 OnTarget
BA11FMEPF1020 BA 11thFloor InstallFireCabinets 14 0.00% 0.00% 23Feb17 11Mar17 1Mar17 18Mar17 6 3 OnTarget
BA11FMEPF1030 BA 11thFloor InstallFireAlarmsandSpeakers 14 0.00% 0.00% 23Feb17 11Mar17 1Mar17 18Mar17 6 3 OnTarget
BA11FMEPF1040 BA 11thFloor InstallSprinklers 14 0.00% 0.00% 25Feb17 12Mar17 2Mar17 19Mar17 6 3 OnTarget
BA11FMEPF1050 BA 11thFloor InstallSwitchesandSockets 10 0.00% 0.00% 25Feb17 7Mar17 2Mar17 14Mar17 6 3 OnTarget
BA11FMEPF1060 BA 11thFloor InstallLowCurrentEquipments 10 0.00% 0.00% 26Feb17 8Mar17 4Mar17 15Mar17 6 3 OnTarget
BA11FMEPF1070 BA 11thFloor InstallGrillesandDiffussers 14 0.00% 0.00% 21Feb17 8Mar17 27Feb17 15Mar17 6 3 OnTarget
BA11FMEPF1075 BA 11thFloor MEPFinalFixes/Sanitarywares 10 0.00% 0.00% 26Feb17 9Mar17 2Mar17 14Mar17 4 2 OnTarget
BA11FMEPF1080 BA 11thFloor InstallPlumpingFinalTittings(Sanitaryware,FloorDra 14 0.00% 0.00% 21Feb17 8Mar17 27Feb17 15Mar17 6 3 OnTarget
TwelthFloor 99 0.00% 0.00% 27Nov16 21Mar17 26Nov16A 25Mar17 3 19 OnTarget
General 13 0.00% 0.00% 27Nov16 3Jan17 27Nov16A 17Jan17 11 117 OnTarget
BA12F1000 BA 12thFloor PlasterMEpClearance(H0108,A0107) 8 100.00% 100.00% 27Nov16 5Dec16 26Nov16A 26Nov16A 9 0 OnTarget
DryArea 40 0.00% 0.00% 18Dec16 7Mar17 27Nov16A 10Apr17 29 22 OnTarget
MEPWorks 28 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA12FMEPD1000 BA 12thFloor DraAreaMEPScreedclearance 12 0.00% 97.00% 19Jan17 1Feb17 29Nov16A 31Dec16 29 35 OnTarget
BA12FMEPD1010 BA 12thFloor DryAreaMEPHLClearancebyARMAforgridfixing 10 0.00% 0.00% 8Jan17 18Jan17 10Jan17 22Jan17 2 9 OnTarget
BA12FMEPD1020 BA 12thFloor DryAreaMEPclearanceforBoardclosing 10 0.00% 0.00% 18Jan17 29Jan17 21Jan17 1Feb17 2 9 OnTarget
BA12FMEPD1030 BA 12thFloor InstallElectricalWiring 10 0.00% 0.00% 1Jan17 11Jan17 3Jan17 15Jan17 2 1 OnTarget
BA12FMEPD1040 BA 12thFloor InstallLowCurrentWiring 10 0.00% 22.00% 2Jan17 12Jan17 27Nov16A 16Jan17 2 1 OnTarget
BA12FMEPD1050 BA 12thFloor InstallHVACPipes 10 0.00% 0.00% 5Jan17 16Jan17 8Jan17 19Jan17 2 1 OnTarget
BA12FMEPD1060 BA 12thFloor InstallDuctsandHangers 10 0.00% 0.00% 8Jan17 18Jan17 10Jan17 22Jan17 2 1 OnTarget
BA12FMEPD1070 BA 12thFloor DBInstallation 10 0.00% 20.00% 8Jan17 18Jan17 27Nov16A 22Jan17 2 1 OnTarget
BA12FMEPD1080 BA 12thFloor InstallDroppers 12 0.00% 0.00% 16Jan17 29Jan17 18Jan17 1Feb17 2 9 OnTarget
BA12FMEPD1090 BA 12thFloor MeggeringTest 7 0.00% 0.00% 22Jan17 29Jan17 24Jan17 1Feb17 2 9 OnTarget
WetArea 59 0.00% 0.00% 28Dec16 22Mar17 27Nov16A 7Mar17 13 74 OnTarget
BA12FMEPW1000 BA 12thFloor WetAreaScreedMEpClearance 12 41.67% 42.00% 25Dec16 7Jan17 21Dec16A 26Jan17 17 7 OnTarget
BA12FMEPW1010 BA 12thFloor WetAreaHLClearancebyARMAforgridfixing 18 0.00% 0.00% 4Jan17 24Jan17 19Jan17 9Feb17 14 7 OnTarget
BA12FMEPW1020 BA 12thFloor WetAreaMEPclearanceforBoardclosing 18 0.00% 0.00% 31Jan17 20Feb17 15Feb17 8Mar17 14 7 OnTarget
BA12FMEPW1030 BA 12thFloor InstallElectricalWiring 10 0.00% 0.00% 1Jan17 11Jan17 3Jan17 15Jan17 2 4 OnTarget
BA12FMEPW1040 BA 12thFloor InstallDrainagepipes 12 0.00% 0.00% 31Dec16 12Jan17 2Jan17 16Jan17 2 5 OnTarget
BA12FMEPW1050 BA 12thFloor InstallHot&ColdWaterPiping 12 0.00% 46.00% 3Jan17 16Jan17 27Nov16A 19Jan17 2 5 OnTarget
BA12FMEPW1060 BA 12thFloor InstallHVACPipes 12 0.00% 0.00% 7Jan17 19Jan17 9Jan17 23Jan17 2 5 OnTarget
BA12FMEPW1070 BA 12thFloor Firefightingpipes 10 0.00% 0.00% 12Jan17 23Jan17 15Jan17 26Jan17 2 5 OnTarget
BA12FMEPW1080 BA 12thFloor InstallDuctsandHangers 12 0.00% 0.00% 11Jan17 24Jan17 14Jan17 28Jan17 2 5 OnTarget
BA12FMEPW1090 BA 12thFloor InstallDroppers 12 0.00% 0.00% 29Jan17 11Feb17 13Feb17 27Feb17 14 1 OnTarget
BA12FMEPW1100 BA 12thFloor MeggeringTest 5 0.00% 0.00% 6Feb17 11Feb17 21Feb17 27Feb17 14 1 OnTarget
Corridor 58 0.00% 0.00% 15Dec16 18Feb17 27Nov16A 9Mar17 17 7 OnTarget
MEPWorks 39 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA12FMEPCL1000 BA 12thFloor CorridorScreedMEpClearance 12 41.67% 42.00% 25Dec16 7Jan17 21Dec16A 26Jan17 17 35 OnTarget
BA12FMEPCL1010 BA 12thFloor CorridorHLClearancebyARMAforgridfixing 10 0.00% 0.00% 18Jan17 29Jan17 1Feb17 13Feb17 13 3 OnTarget
BA12FMEPCL1020 BA 12thFloor CorridorMEPclearanceforBoardclosing 10 0.00% 0.00% 28Jan17 7Feb17 11Feb17 22Feb17 13 3 OnTarget
BA12FMEPCL1030 BA 12thFloor InstallElectricalWiring 10 0.00% 0.00% 1Jan17 11Jan17 3Jan17 15Jan17 2 4 OnTarget
BA12FMEPCL1050 BA 12thFloor InstallHot&ColdWaterPiping 10 0.00% 50.00% 3Jan17 14Jan17 27Nov16A 17Jan17 2 4 OnTarget
BA12FMEPCL1060 BA 12thFloor Firefightingpipes 10 0.00% 98.00% 3Jan17 14Jan17 27Nov16A 17Jan17 2 4 OnTarget
BA12FMEPCL1070 BA 12thFloor InstallHVACPipes 12 0.00% 0.00% 3Jan17 16Jan17 5Jan17 19Jan17 2 4 OnTarget
DelayAnalysisReportBasedonTargetProgram *DelayedActivitiesareHiglightedInRed DataDate: 29Dec16
VarianceBL
Original Schedule% Activity% BLProject BLProject Actual/Forecas Actual/Forecas Delayed/O
ActivityID Building Floor ActivityName ProjectFinish TotalFloat
Duration Complete Complete Start Finish tedStart tedFinish nTrack
Date
BA12FMEPCL1080 BA 12thFloor InstallDuctsandHangers 14 0.00% 0.00% 3Jan17 18Jan17 5Jan17 22Jan17 2 4 OnTarget
BA12FMEPCL1090 BA 12thFloor InstallCableTraysandTrunking 12 0.00% 0.00% 9Jan17 22Jan17 11Jan17 25Jan17 2 4 OnTarget
BA12FMEPCL1095 BA 12thFloor InstallLowCurrentWiring 10 0.00% 22.00% 15Jan17 25Jan17 27Nov16A 29Jan17 2 4 OnTarget
BA12FMEPCL1100 BA 12thFloor InstallLVCables 12 0.00% 0.00% 12Jan17 25Jan17 15Jan17 29Jan17 2 19 OnTarget
BA12FMEPCL1110 BA 12thFloor InstallDroppers 10 0.00% 0.00% 22Jan17 1Feb17 24Jan17 5Feb17 2 19 OnTarget
BA12FMEPCL1120 BA 12thFloor MeggeringTest 5 0.00% 0.00% 28Jan17 1Feb17 30Jan17 5Feb17 2 19 OnTarget
CommonFinalFinishes 24 0.00% 0.00% 11Feb17 19Mar17 20Feb17 28Mar17 8 41 OnTarget
MEPWorks 16 0.00% 0.00% 4Dec16 24Dec16 27Nov16A 7Jan17 11 7 OnTarget
BA12FMEPF1010 BA 12thFloor InstallLightFittings 10 0.00% 0.00% 22Feb17 5Mar17 9Mar17 21Mar17 14 5 OnTarget
BA12FMEPF1020 BA 12thFloor InstallFireCabinets 14 0.00% 0.00% 19Feb17 6Mar17 6Mar17 22Mar17 14 5 OnTarget
BA12FMEPF1030 BA 12thFloor InstallFireAlarmsandSpeakers 10 0.00% 0.00% 23Feb17 6Mar17 11Mar17 22Mar17 14 5 OnTarget
BA12FMEPF1040 BA 12thFloor InstallSprinklers 14 0.00% 0.00% 20Feb17 7Mar17 7Mar17 23Mar17 14 5 OnTarget
BA12FMEPF1050 BA 12thFloor InstallSwitchesandSockets 14 0.00% 0.00% 20Feb17 7Mar17 7Mar17 23Mar17 14 5 OnTarget
BA12FMEPF1060 BA 12thFloor InstallLowCurrentEquipments 10 0.00% 0.00% 26Feb17 8Mar17 13Mar17 25Mar17 14 5 OnTarget
BA12FMEPF1070 BA 12thFloor InstallGrillesandDiffussers 14 0.00% 0.00% 21Feb17 8Mar17 8Mar17 25Mar17 14 5 OnTarget
BA12FMEPF1075 BA 12thFloor MEPFinalFixes/Sanitarywares 10 0.00% 0.00% 21Feb17 5Mar17 8Mar17 20Mar17 13 7 OnTarget
BA12FMEPF1080 BA 12thFloor InstallPlumpingFinalTittings(Sanitaryware,FloorDra 14 0.00% 0.00% 21Feb17 8Mar17 8Mar17 25Mar17 14 5 OnTarget
RoofFloor 71 0.00% 0.00% 27Nov16 19Mar17 26Nov16A 27Feb17 18 82 OnTarget
General 42 0.00% 0.00% 27Nov16 3Jan17 27Nov16A 17Jan17 11 117 OnTarget
BARF1050 BA Roof FAHUinstallationandconenction 24 100.00% 100.00% 27Nov16 24Dec16 26Nov16A 28Dec16A 3 0 OnTarget
BARF1060 BA Roof VRVunitsinstallation/connection/termination 36 80.56% 81.00% 27Nov16 7Jan17 27Nov16A 7Jan17 0 73 OnTarget
BARF1070 BA Roof GRPWatertankinstallationandconnections 24 58.33% 75.00% 14Dec16 10Jan17 27Nov16A 10Jan17 0 73 OnTarget
PumpRoom 42 0.00% 0.00% 27Nov16 30Jan17 26Nov16A 11Feb17 9 4 OnTarget
BARF1100 BA Roof PlasterMEpClearance 6 100.00% 100.00% 27Nov16 3Dec16 27Nov16A 10Dec16A 5 0 OnTarget
BARF1130 BA Roof MEPScreedclearance 6 100.00% 100.00% 5Dec16 11Dec16 27Nov16A 10Dec16A 2 0 OnTarget
BARF1150 BA Roof MEPInstallations/Connections 24 70.83% 71.00% 11Dec16 7Jan17 01Dec16A 7Jan17 0 52 OnTarget
BARF1160 BA Roof MEPHLClearancebyARMAforceilingpainting 6 100.00% 0.00% 5Dec16 11Dec16 31Dec16 5Jan17 22 42 Delayed
BARF1200 BA Roof MEPFinalFixes 6 0.00% 0.00% 4Jan17 10Jan17 16Jan17 22Jan17 10 42 OnTarget
ElectricalRoom 62 0.00% 0.00% 20Dec16 20Feb17 19Dec16A 27Feb17 5 69 OnTarget
BARF1230 BA Roof PlasterMEpClearance 6 100.00% 100.00% 21Dec16 27Dec16 19Dec16A 22Dec16A 5 0 OnTarget
BARF1260 BA Roof MEPScreedclearance 3 0.00% 0.00% 7Jan17 9Jan17 2Jan17 4Jan17 4 27 OnTarget
BARF1280 BA Roof MEPInstallations/Connections 24 0.00% 0.00% 14Jan17 9Feb17 9Jan17 5Feb17 4 27 OnTarget
BARF1290 BA Roof MEPHLClearancebyARMAforceilingpainting 10 0.00% 0.00% 7Jan17 17Jan17 2Jan17 12Jan17 4 34 OnTarget
BARF1330 BA Roof MEPFinalFixes 3 0.00% 0.00% 11Feb17 13Feb17 6Feb17 8Feb17 4 27 OnTarget
FAHURoom 50 0.00% 0.00% 27Nov16 30Jan17 26Nov16A 28Jan17 2 107 OnTarget
BARF1360 BA Roof PlasterMEpClearance 10 60.00% 100.00% 24Dec16 3Jan17 19Dec16A 20Dec16A 13 0 OnTarget
BARF1390 BA Roof MEPScreedclearance 10 0.00% 100.00% 1Jan17 11Jan17 26Nov16A 26Nov16A 41 0 OnTarget
BARF1410 BA Roof MEPInstallations/Connections 24 0.00% 0.00% 7Jan17 2Feb17 31Dec16 26Jan17 6 35 OnTarget
BARF1420 BA Roof MEPHLClearancebyARMAforceilingpainting 12 0.00% 0.00% 1Jan17 14Jan17 1Jan17 14Jan17 0 35 OnTarget
BARF1460 BA Roof MEPFinalFixes 6 0.00% 0.00% 31Jan17 6Feb17 24Jan17 30Jan17 6 35 OnTarget
RoofFinishes 48 0.00% 0.00% 25Jan17 2Apr17 4Feb17 11Apr17 8 31 OnTarget
BARF1530 BA Roof RoofFloortiling 18 100.00% 98.00% 27Nov16 17Dec16 26Nov16A 31Dec16 11 86 Delayed
BARF1540 BA Roof RoofSoftLandscaping 24 20.83% 0.00% 25Dec16 21Jan17 31Dec16 26Jan17 5 68 Delayed
CommonArea 96 0.00% 0.00% 27Nov16 22Jan17 26Nov16A 4Feb17 11 101 OnTarget
MEPservicesroomsandOthers 42 0.00% 0.00% 27Nov16 10Jan17 26Nov16A 4Feb17 21 101 OnTarget
LVRoomD 30 0.00% 0.00% 27Nov16 18Dec16 26Nov16A 5Jan17 15 127 OnTarget
BAL041050 BA MEPworkCompletionbyARMA 21 100.00% 65.00% 4Dec16 27Dec16 26Nov16A 8Jan17 9 8 Delayed
LVRoomB 30 0.00% 0.00% 27Nov16 14Dec16 26Nov16A 5Jan17 19 126 OnTarget
BASR11100 BA MEPworkCompletionbyARMA 21 95.24% 67.00% 7Dec16 31Dec16 26Nov16A 7Jan17 6 8 Delayed
ElectricalRooms/Telephone/WaterMeterRooms 40 0.00% 0.00% 27Nov16 10Jan17 26Nov16A 22Jan17 9 113 OnTarget
BAEL1000 BA MEPClearanceforPlaster 18 100.00% 92.00% 27Nov16 17Dec16 26Nov16A 1Jan17 12 9 Delayed
BAEL1020 BA MEPClearanceforScreed(AsApplicable) 18 100.00% 60.00% 8Dec16 28Dec16 26Nov16A 12Jan17 12 9 Delayed
BAEL1035 BA MEPworkCompletionbyARMA 30 63.33% 43.00% 8Dec16 11Jan17 27Nov16A 19Jan17 6 45 Delayed
FanRooms 36 0.00% 0.00% 27Nov16 24Dec16 26Nov16A 19Jan17 23 22 OnTarget
BAFA1020 BA MEPworkCompletionbyARMA 21 100.00% 53.00% 3Dec16 26Dec16 26Nov16A 10Jan17 13 52 Delayed
FireWater/IrrigationPump 34 0.00% 0.00% 27Nov16 21Dec16 26Nov16A 5Jan17 13 126 OnTarget
BAFP1010 BA MEPClearanceforScreed(AsApplicable) 14 100.00% 100.00% 29Nov16 14Dec16 27Nov16A 10Dec16A 5 0 OnTarget
BAFP1030 BA MEPworkCompletionbyARMA 24 100.00% 65.00% 28Nov16 25Dec16 27Nov16A 9Jan17 12 54 Delayed
GeneratorRooms 42 0.00% 0.00% 27Nov16 31Dec16 27Nov16A 5Jan17 5 126 OnTarget
BAGN1010 BA MEPClearanceforPlaster 6 100.00% 100.00% 1Dec16 7Dec16 05Dec16A 05Dec16A 3 0 OnTarget
BAGN1030 BA MEPClearanceforScreed(AsApplicable) 7 100.00% 100.00% 8Dec16 15Dec16 27Nov16A 10Dec16A 6 0 OnTarget
BAGN1060 BA MEPworkCompletionbyARMA 21 80.95% 81.00% 11Dec16 3Jan17 27Nov16A 3Jan17 0 58 OnTarget
GarabageRooms 33 0.00% 0.00% 27Nov16 10Jan17 27Nov16A 16Jan17 5 117 OnTarget
BAGR1000 BA MEPClearanceforPlaster 10 100.00% 100.00% 27Nov16 7Dec16 26Nov16A 10Dec16A 1 0 OnTarget
BAGR1020 BA MEPClearanceforScreed(AsApplicable) 10 100.00% 100.00% 7Dec16 18Dec16 27Nov16A 10Dec16A 8 0 OnTarget
BAGR1060 BA MEPworkCompletionbyARMA 18 100.00% 40.00% 7Dec16 27Dec16 27Nov16A 11Jan17 13 51 Delayed
SwimingPoolandPumpRoom 30 0.00% 0.00% 6Dec16 7Jan17 27Nov16A 4Feb17 24 3 OnTarget
BARFS2SU1080 BA Roof SwimmingPoolMEPWorks 24 62.50% 15.00% 13Dec16 9Jan17 27Nov16A 6Feb17 24 29 Delayed
StaircaseFinishes 76 0.00% 0.00% 27Nov16 17Jan17 26Nov16A 4Feb17 14 102 OnTarget
BAST1020 BA PlasterMEPClearance 18 83.33% 65.00% 13Dec16 2Jan17 27Nov16A 22Jan17 16 69 Delayed
OTS 69 0.00% 0.00% 27Nov16 12Jan17 26Nov16A 23Jan17 9 9 OnTarget
BAOTS1020 BA MEPCutting&Chasingforconduits 14 100.00% 91.00% 27Nov16 12Dec16 26Nov16A 1Jan17 16 131 Delayed
BAOTS1090 BA MEPWork 30 0.00% 0.00% 11Jan17 14Feb17 31Dec16 2Feb17 10 17 OnTarget
Roofing 47 0.00% 0.00% 27Nov16 16Feb17 26Nov16A 7Feb17 8 83 OnTarget
BARF1040 BA Roof RoofEquipmentInstallation&Conncetion 32 43.75% 58.00% 14Dec16 19Jan17 26Nov16A 15Jan17 5 49 OnTarget
ExternalElevation 86 0.00% 0.00% 27Nov16 25Feb17 26Nov16A 6Mar17 8 75 OnTarget
SouthSide 50 0.00% 0.00% 27Nov16 8Jan17 26Nov16A 8Jan17 1 125 OnTarget
BAEV1180 BA MEPFittings 12 0.00% 100.00% 3Jan17 16Jan17 26Nov16A 26Nov16A 45 0 OnTarget
Westside 42 0.00% 0.00% 27Nov16 24Jan17 26Nov16A 29Jan17 4 1 OnTarget
BAEV1230 BA MEPFittings 10 30.00% 0.00% 27Dec16 7Jan17 23Jan17 4Feb17 23 21 Delayed
Northside 86 0.00% 0.00% 27Nov16 22Jan17 26Nov16A 1Feb17 9 2 OnTarget
BAEV1040 BA MEPCutting&Chasingforconduits 14 50.00% 70.00% 22Dec16 7Jan17 26Nov16A 16Jan17 7 98 OnTarget
BAEV1280 BA MEPFittings 10 0.00% 0.00% 16Feb17 27Feb17 23Jan17 2Feb17 21 21 OnTarget
EastSide 72 0.00% 0.00% 27Nov16 21Jan17 26Nov16A 2Feb17 11 102 OnTarget
BAEV1110 BA MEPCutting&Chasingforconduits 14 35.71% 72.00% 25Dec16 9Jan17 02Dec16A 3Jan17 5 128 OnTarget
BAEV1330 BA MEPFittings 6 0.00% 0.00% 19Feb17 25Feb17 28Jan17 2Feb17 19 21 OnTarget
ExternalWork 46 0.00% 0.00% 6Feb17 4Apr17 15Feb17 6Apr17 2 2 OnTarget
BAEX1010 BA ExternalMEPServices 28 0.00% 0.00% 9Mar17 10Apr17 13Feb17 18Mar17 21 50 OnTarget
BAEX1060 BA ExternalWaterFeatureMEPWorks 28 0.00% 0.00% 23Mar17 24Apr17 27Feb17 1Apr17 21 21 OnTarget
Testing&Commissioning 56 0.00% 0.00% 27Feb17 30Apr17 1Mar17 2May17 2 25 OnTarget
BATCS3ME1100 BA Testing&CommissioningforAllSystem 48 0.00% 0.00% 12Feb17 8Apr17 22Feb17 18Apr17 9 8 OnTarget
Electrical 24 0.00% 0.00% 27Feb17 9Apr17 1Mar17 11Apr17 2 43 OnTarget
BATC1030 BA TestingandCommissioningofLVPanels&System 24 0.00% 0.00% 21Feb17 20Mar17 4Mar17 30Mar17 9 7 OnTarget
BATC1040 BA TestingandCommissioningofLightningProtectionSys 18 0.00% 0.00% 28Feb17 20Mar17 11Mar17 30Mar17 9 7 OnTarget
BATC1050 BA TestingandCommissioningofGenerator 10 0.00% 0.00% 9Mar17 20Mar17 20Mar17 30Mar17 9 7 OnTarget
BATC1060 BA TestingandCommissioningofEarthingSystem 18 0.00% 0.00% 28Feb17 20Mar17 11Mar17 30Mar17 9 7 OnTarget
BATC1070 BA TestingandCommissioningofMCC's 24 0.00% 0.00% 21Feb17 20Mar17 4Mar17 30Mar17 9 7 OnTarget
LowCurrentSystems 24 0.00% 0.00% 27Feb17 30Mar17 1Mar17 2Apr17 2 2 OnTarget
BATC1180 BA TestFireAlarmSystem 24 0.00% 0.00% 12Feb17 11Mar17 22Feb17 21Mar17 9 8 OnTarget
BATC1190 BA TestCentralBatterySystem 18 0.00% 0.00% 19Feb17 11Mar17 1Mar17 21Mar17 9 8 OnTarget
BATC1200 BA TestStructuredCabling(data&telecom) 24 0.00% 0.00% 12Feb17 11Mar17 22Feb17 21Mar17 9 8 OnTarget
BATC1210 BA TestSMATV 18 0.00% 0.00% 19Feb17 11Mar17 1Mar17 21Mar17 9 8 OnTarget
BATC1220 BA TestVoiceEvacuationSystem 24 0.00% 0.00% 12Feb17 11Mar17 22Feb17 21Mar17 9 8 OnTarget
BATC1230 BA TestCCTVandAccessControlSystem 18 0.00% 0.00% 19Feb17 11Mar17 1Mar17 21Mar17 9 8 OnTarget
BATC1240 BA TestAudioVisualSystem 18 0.00% 0.00% 19Feb17 11Mar17 1Mar17 21Mar17 9 8 OnTarget
BATC1250 BA TestUPS 10 0.00% 0.00% 28Feb17 11Mar17 11Mar17 21Mar17 9 8 OnTarget
BATC1260 BA TestLightingControlSystem 18 0.00% 0.00% 19Feb17 11Mar17 1Mar17 21Mar17 9 8 OnTarget
BATC1270 BA TestGRMSSystem 24 0.00% 0.00% 12Feb17 11Mar17 22Feb17 21Mar17 9 8 OnTarget
FireFightingSystems 15 0.00% 0.00% 6Mar17 5Apr17 8Mar17 8Apr17 2 2 OnTarget
BATC1300 BA Testing&CommissioningofGasFireSuppressionSyste 15 0.00% 0.00% 21Feb17 9Mar17 4Mar17 20Mar17 9 6 OnTarget
BATC1310 BA Testing&CommissioningofFirePumps 10 0.00% 0.00% 27Feb17 9Mar17 9Mar17 20Mar17 9 6 OnTarget
BATC1320 BA Testing&CommissioningofFireFHC's 10 0.00% 0.00% 27Feb17 9Mar17 9Mar17 20Mar17 9 6 OnTarget
DrainageSystems 15 0.00% 0.00% 10Apr17 23Apr17 12Apr17 25Apr17 2 2 OnTarget
BATC1080 BA TestingandCommissioningofPumps 12 0.00% 0.00% 26Feb17 11Mar17 8Mar17 21Mar17 9 4 OnTarget
BATC1090 BA TestingandCommissioningofDrainageSystem 15 0.00% 0.00% 22Feb17 11Mar17 5Mar17 21Mar17 9 4 OnTarget
WaterSupplySystem 24 0.00% 0.00% 27Feb17 26Mar17 1Mar17 28Mar17 2 8 OnTarget
BATC1140 BA TestingandCommissioningofWaterTank 10 0.00% 0.00% 19Feb17 1Mar17 1Mar17 12Mar17 9 6 OnTarget
BATC1150 BA WaterSupplyFlushingandChlorination 10 0.00% 0.00% 19Feb17 1Mar17 1Mar17 12Mar17 9 6 OnTarget
BATC1160 BA TestingandCommissioningofPumps 12 0.00% 0.00% 16Feb17 1Mar17 27Feb17 12Mar17 9 6 OnTarget
BATC1170 BA TestingandCommissioningofWaterHeaters 24 0.00% 0.00% 2Feb17 1Mar17 13Feb17 12Mar17 9 6 OnTarget
HVACSystem 20 0.00% 0.00% 27Feb17 30Apr17 1Mar17 2May17 2 0 OnTarget
DelayAnalysisReportBasedonTargetProgram *DelayedActivitiesareHiglightedInRed DataDate: 29Dec16
VarianceBL
Original Schedule% Activity% BLProject BLProject Actual/Forecas Actual/Forecas Delayed/O
ActivityID Building Floor ActivityName ProjectFinish TotalFloat
Duration Complete Complete Start Finish tedStart tedFinish nTrack
Date
BATC1100 BA Testing&CommissioningofVRFSystem 20 0.00% 0.00% 21Feb17 15Mar17 4Mar17 26Mar17 9 6 OnTarget
BATC1110 BA DXUnitIndoor 10 0.00% 0.00% 5Mar17 15Mar17 15Mar17 26Mar17 9 6 OnTarget
BATC1120 BA DXUnitOutdoor 10 0.00% 0.00% 5Mar17 15Mar17 15Mar17 26Mar17 9 6 OnTarget
BATC1130 BA AirBalancing 20 0.00% 0.00% 21Feb17 15Mar17 4Mar17 26Mar17 9 6 OnTarget
BMSSystem 24 0.00% 0.00% 27Mar17 23Apr17 29Mar17 25Apr17 2 5 OnTarget
BATC1280 BA BMSSystemtTesting&Commissioning 24 0.00% 0.00% 23Feb17 22Mar17 6Mar17 2Apr17 9 6 OnTarget
LPGSystem 20 0.00% 0.00% 10Apr17 23Apr17 12Apr17 25Apr17 2 0 OnTarget
BATC1020 BA Testing&CommissioningofLPGSystem 20 0.00% 0.00% 12Feb17 6Mar17 22Feb17 16Mar17 9 5 OnTarget
BoilerSystem 10 0.00% 0.00% 10Apr17 23Apr17 12Apr17 25Apr17 2 0 OnTarget
BATC1290 BA Testing&CommissioningofBoilerSystem 10 0.00% 0.00% 19Feb17 1Mar17 1Mar17 12Mar17 9 6 OnTarget
AuthorityApproval 107 0.00% 0.00% 27Nov16 17May17 02Dec16A 18May17 1 1 OnTarget
Transformer&RMUworks(HVApprovals) 61 0.00% 0.00% 27Nov16 5Feb17 02Dec16A 23Jan17 11 37 OnTarget
BAAAMEP1640 BA Transformer/CableProcurement 12 100.00% 100.00% 27Nov16 10Dec16 26Nov16A 27Nov16A 12 0 OnTarget
BAAAMEP1650 BA Transformerinstallation&Connection 28 60.71% 100.00% 11Dec16 11Jan17 30Nov16A 30Nov16A 37 0 OnTarget
BAAAMEP1660 BA AuthorityApprovals 21 0.00% 0.00% 12Jan17 5Feb17 31Dec16 23Jan17 11 17 OnTarget
LVApproval 32 0.00% 0.00% 29Jan17 7Mar17 17Jan17 23Feb17 10 10 OnTarget
BAAAMEP1670 BA RequestforDEWAinspection 0 0.00% 0.00% 0Jan00 18Jan17 0Jan00 22Jan17 1 0 OnTarget
BAAAMEP1680 BA DEWA1stinspection 7 0.00% 0.00% 19Jan17 26Jan17 22Jan17 30Jan17 2 1 OnTarget
BAAAMEP1690 BA ClearDEWAsnag&applyforfinalinspection 6 0.00% 0.00% 28Jan17 2Feb17 30Jan17 6Feb17 2 1 OnTarget
BAAAMEP1700 BA Dewasecondinspection/Approval 7 0.00% 0.00% 4Feb17 11Feb17 6Feb17 14Feb17 2 1 OnTarget
BAAAMEP1710 BA Collection&installationofKWHmeters 12 0.00% 0.00% 12Feb17 25Feb17 14Feb17 28Feb17 2 1 OnTarget
BAAAMEP1720 BA TemporaryPermenetPower 0 0.00% 0.00% 0Jan00 25Feb17 0Jan00 28Feb17 2 1 OnTarget
WaterSupplyApproval 106 0.00% 0.00% 27Nov16 15May17 31Dec16 17May17 2 0 OnTarget
BAAAMEP1730 BA PaymentforWaterMeters 24 100.00% 10.00% 27Nov16 25Dec16 25Dec16A 24Jan17 26 8 Delayed
BAAAMEP1740 BA WaterMeterdelivery 36 11.11% 0.00% 26Dec16 5Feb17 24Jan17 7Mar17 26 8 Delayed
BAAAMEP1750 BA DEWAInspection 10 0.00% 0.00% 12Jan17 25Jan17 29Jan17 9Feb17 11 3 OnTarget
BAAAMEP1760 BA DewaApproval 10 0.00% 0.00% 26Jan17 6Feb17 11Feb17 21Feb17 13 4 OnTarget
BAAAMEP1770 BA InstalWaterMeter 6 0.00% 0.00% 7Feb17 13Feb17 7Mar17 14Mar17 25 8 OnTarget
BAAAMEP1780 BA Testing&Commisioning 12 0.00% 0.00% 2Mar17 15Mar17 14Mar17 28Mar17 11 8 OnTarget
BAAAMEP1790 BA ObtainNOCfromDEWAforWater 12 0.00% 0.00% 16Mar17 29Mar17 28Mar17 11Apr17 11 8 OnTarget
TelecomApproval 60 0.00% 0.00% 14Feb17 30Apr17 27Feb17 11May17 9 5 OnTarget
BAAAMEP1800 BA CompletionofTelecomroom 0 0.00% 0.00% 0Jan00 11Jan17 0Jan00 26Jan17 13 4 OnTarget
BAAAMEP1810 BA SubmitApplication 3 0.00% 0.00% 12Jan17 16Jan17 29Jan17 31Jan17 11 4 OnTarget
BAAAMEP1820 BA EtisalatInspection 10 0.00% 0.00% 17Jan17 30Jan17 1Feb17 14Feb17 11 4 OnTarget
BAAAMEP1830 BA CoordinationwithEtisalatContractor 12 0.00% 0.00% 31Jan17 13Feb17 15Feb17 28Feb17 13 5 OnTarget
BAAAMEP1840 BA Testing&Commisioning 12 0.00% 0.00% 14Feb17 27Feb17 1Mar17 14Mar17 13 5 OnTarget
BAAAMEP1850 BA Inspection&ApprovalbyEtisalat 12 0.00% 0.00% 28Feb17 13Mar17 15Mar17 28Mar17 13 5 OnTarget
BAAAMEP1860 BA ObtainNOCfromEtisalat 7 0.00% 0.00% 14Mar17 22Mar17 29Mar17 6Apr17 11 4 OnTarget
GSMApproval(Etisalat) 52 0.00% 0.00% 15Feb17 16Apr17 27Feb17 27Apr17 9 17 OnTarget
BAAAMEP1870 BA RequestforSiteSurvey 3 0.00% 0.00% 12Jan17 16Jan17 29Jan17 31Jan17 11 5 OnTarget
BAAAMEP1880 BA SiteSurveybyEtisalat(AfterStrCompletion) 10 0.00% 0.00% 17Jan17 28Jan17 1Feb17 12Feb17 13 6 OnTarget
BAAAMEP1890 BA CoordinationwithEtisalatContractor 12 0.00% 0.00% 29Jan17 11Feb17 13Feb17 26Feb17 13 6 OnTarget
BAAAMEP1900 BA Testing&Commisioning 12 0.00% 0.00% 14Feb17 27Feb17 1Mar17 14Mar17 13 4 OnTarget
BAAAMEP1910 BA FinalApprovalbyAuthority 10 0.00% 0.00% 28Feb17 11Mar17 15Mar17 26Mar17 13 6 OnTarget
BAAAMEP1920 BA ObtainNOCfromEtisalat 10 0.00% 0.00% 28Feb17 13Mar17 15Mar17 28Mar17 11 3 OnTarget
CivilDefence 45 0.00% 0.00% 5Mar17 16Apr17 8Mar17 19Apr17 3 20 OnTarget
BAAAMEP1930 BA RequestforDCDinspection 0 0.00% 0.00% 0Jan00 25Jan17 0Jan00 29Jan17 1 4 OnTarget
BAAAMEP1940 BA DCDInspection 10 0.00% 0.00% 26Jan17 8Feb17 29Jan17 12Feb17 1 4 OnTarget
BAAAMEP1950 BA ClearDCDsnags&requestfor2ndinspection 6 0.00% 0.00% 9Feb17 16Feb17 12Feb17 20Feb17 1 16 OnTarget
BAAAMEP1960 BA DCDsecondinspection 7 0.00% 0.00% 12Mar17 20Mar17 21Mar17 29Mar17 7 5 OnTarget
BAAAMEP1970 BA IssuanceofCivilDefensecertificate 7 0.00% 0.00% 21Mar17 29Mar17 30Mar17 9Apr17 7 5 OnTarget
CivilDefenceExternalFireHydrant 30 0.00% 0.00% 5Mar17 16Apr17 8Mar17 19Apr17 3 20 OnTarget
BAAAMEP1980 BA RequestforDCDinspection 0 0.00% 0.00% 0Jan00 25Jan17 0Jan00 29Jan17 1 16 OnTarget
BAAAMEP1990 BA DCDInspection 10 0.00% 0.00% 26Jan17 8Feb17 29Jan17 12Feb17 1 16 OnTarget
BAAAMEP2000 BA ClearDCDsnags&requestfor2ndinspection 6 0.00% 0.00% 9Feb17 16Feb17 12Feb17 20Feb17 1 16 OnTarget
BAAAMEP2010 BA DCDsecondinspection 7 0.00% 0.00% 19Feb17 27Feb17 20Feb17 1Mar17 1 16 OnTarget
BAAAMEP2020 BA IssuanceofCivilDefensecertificate 7 0.00% 0.00% 28Feb17 8Mar17 1Mar17 12Mar17 1 16 OnTarget
24X7DirectAlaram 46 0.00% 0.00% 20Mar17 11May17 23Mar17 16May17 4 1 OnTarget
BAAAMEP2030 BA SubmitApplication 3 0.00% 0.00% 15Jan17 17Jan17 17Jan17 22Jan17 2 15 OnTarget
BAAAMEP2040 BA InspectionbyAuthority 6 0.00% 0.00% 18Jan17 25Jan17 22Jan17 30Jan17 2 15 OnTarget
BAAAMEP2050 BA Releaseofestimate 6 0.00% 0.00% 26Jan17 1Feb17 30Jan17 6Feb17 3 18 OnTarget
BAAAMEP2060 BA Payment 6 0.00% 0.00% 2Feb17 8Feb17 6Feb17 13Feb17 3 18 OnTarget
BAAAMEP2070 BA PanelInstallation 12 0.00% 0.00% 9Feb17 22Feb17 13Feb17 27Feb17 3 18 OnTarget
BAAAMEP2080 BA ObtainNOC 10 0.00% 0.00% 23Feb17 8Mar17 27Feb17 13Mar17 2 15 OnTarget
LPG 30 0.00% 0.00% 5Apr17 15May17 9Apr17 17May17 2 0 OnTarget
BAAAMEP2090 BA RequestforLPGinspection 0 0.00% 0.00% 0Jan00 14Feb17 0Jan00 2Feb17 8 14 OnTarget
BAAAMEP2100 BA LPGInspection 6 0.00% 0.00% 15Feb17 22Feb17 5Feb17 12Feb17 8 14 OnTarget
BAAAMEP2110 BA ClearLPGsnags&requestfor2ndinspection 5 0.00% 0.00% 23Feb17 1Mar17 13Feb17 19Feb17 8 14 OnTarget
BAAAMEP2120 BA LPGsecondinspection 6 0.00% 0.00% 7Mar17 14Mar17 19Mar17 26Mar17 8 5 OnTarget
BAAAMEP2130 BA NOCfromAuthority 10 0.00% 0.00% 15Mar17 28Mar17 27Mar17 9Apr17 8 5 OnTarget
DubaiPolice 55 0.00% 0.00% 28Mar17 17May17 29Mar17 18May17 1 1 OnTarget
BAAAMEP2140 BA SubmitApplication 3 0.00% 0.00% 26Jan17 30Jan17 29Jan17 1Feb17 1 9 OnTarget
BAAAMEP2150 BA 1stInspectionbyAuthority 10 0.00% 0.00% 31Jan17 13Feb17 1Feb17 15Feb17 1 9 OnTarget
BAAAMEP2160 BA Commets&Rectification 7 0.00% 0.00% 14Feb17 21Feb17 15Feb17 23Feb17 1 11 OnTarget
BAAAMEP2170 BA FinalInspection&Approval 10 0.00% 0.00% 7Mar17 18Mar17 18Mar17 28Mar17 9 8 OnTarget
BAAAMEP2180 BA ObtainNOCfromDubaiPolice 10 0.00% 0.00% 19Mar17 30Mar17 29Mar17 11Apr17 8 7 OnTarget
DMApproval 43 0.00% 0.00% 20Mar17 17May17 22Mar17 18May17 1 1 OnTarget
BAAAMEP2190 BA Requestforinspection 3 0.00% 0.00% 9Feb17 13Feb17 12Feb17 15Feb17 1 4 OnTarget
BAAAMEP2200 BA EHSInspection 10 0.00% 0.00% 9Feb17 20Feb17 12Feb17 23Feb17 2 33 OnTarget
BAAAMEP2210 BA DMfirstinspection 10 0.00% 0.00% 14Feb17 27Feb17 15Feb17 1Mar17 1 4 OnTarget
BAAAMEP2220 BA DMCommentrectification 6 0.00% 0.00% 28Feb17 5Mar17 1Mar17 7Mar17 1 6 OnTarget
BAAAMEP2230 BA DMfinalinspection&Approval 10 0.00% 0.00% 12Mar17 23Mar17 21Mar17 3Apr17 7 6 OnTarget
BAAAMEP2240 BA FICconnection 6 0.00% 0.00% 25Mar17 30Mar17 4Apr17 10Apr17 9 7 OnTarget
BAAAMEP2250 BA StromWaterConnection 6 0.00% 0.00% 25Mar17 30Mar17 4Apr17 10Apr17 9 7 OnTarget
BAAAMEP2260 BA ObtainBuildingCompletionCertificate 0 0.00% 0.00% 0Jan00 30Mar17 0Jan00 11Apr17 10 8 OnTarget
ProjectCloseOut 68 0.00% 0.00% 1Apr17 31May17 2Apr17 1Jun17 1 1 OnTarget
BDPC1000 BD O&MManualSubmission 18 0.00% 0.00% 18Mar17 6Apr17 29Mar17 18Apr17 10 8 OnTarget
BDPC1010 BD O&MTaining 15 0.00% 0.00% 21Mar17 6Apr17 2Apr17 18Apr17 10 8 OnTarget
BDPC1030 BD AsBuiltDrawings 48 0.00% 0.00% 11Feb17 6Apr17 22Feb17 18Apr17 10 8 OnTarget
BDPC1040 BD Snagandcleaning/HandingOver 18 0.00% 0.00% 10Apr17 30Apr17 19Apr17 09May17* 8 8 OnTarget