Sei sulla pagina 1di 1

DWG NO JOB NO 8 7 6 5 4 3 2 1

NOTES

1. FOR GENERAL NOTES AND SYMBOLS SEE PEFS No.T-13.370.001,

1P-0201A T-13.370.091

1P-0201B T-13.370.091

1P-0221A T-13.370.082

1P-0221A DISC. T-13.370.082

102FC-10012 T-13.370.080

1P-0221B T-13.370.082

1P-0221B DISC. T-13.370.082


102LCA-10007 T-13.370.076

102LCA-10007 T-13.370.076

102LSA-10010 T-13.370.077
N T-13.370.002 AND T-13.370.003.

2. DELETED.
53 53
3. DELETED.
52 52
4. ALL CONNECTIONS AT TOP OF HEADERS.

51 51 5. DRAIN HEADER TO BE BELOW GRADE BUT ENTRENCHED.

50 50
E KEY PLAN: E

2554

2533

2535

4542

7012

4842

1068

7013

2363

5199

MIN
49 49
N
5195
50-1D020721-11023-N
48 1E-0249S1 T-13.370.079 48

50-1D020766-11023-N

50-1D020767-11023-N

50-1D020729-13012-N

50-1D020820-13012-N

50-1D020730-13012-N

50-1D020821-13012-N
47 47
5193
50-1D020722-11374-N
46 1E-0249S1 T-13.370.079 46

45 45
1483
50-1D020714-11374-N
44 102LG-10012 T-13.370.078 44

SLOPE 1:500
43 43

AG
UG
AG AG
1535
UG UG 50-1D020716-11023-N
42 102FCA-10013 T-13.370.078 42
SLOPE 1:500

41 41
MIN MIN
40 40
1186
50-1D020773-13012-N

50-1D020713-13012Q1-N
39 T-13.370.082 102FCSA-10016 39

50-1D020723-13012-N

50-1D020775-13012-N
D 4854 D
50-1D020717-11023-N
50-1D020710-11384-N

38 1E-0249A T-13.370.079 38
383
50-1D020785-13012-N
37 T-13.370.080 102LZA-10019 37
4853
50-1D020718-11374-N
36 1E-0249A T-13.370.079 36

AG
UG
1193
50-1D020733-13012-N
35 T-13.370.082 102FCSA-10035 35
FOR CONTINUATION
5194
SEE DWG T-4.094. 50-1D020719-11023-N
34 1E-0249B T-13.370.079 34
4843
AG 50-1D020724-13012-N AG AG
33 T-13.370.080 102LG-10016 33
UG UG UG
5192
50-1D020720-11374-N
32 1E-0249B T-13.370.079 32
TO U-0200 SLOPE 1:500
2821 CENTRAL AREA 100-1D020501-17201-N
31 757 31

AG
UG
30
GREV line leak. 30
at source : H2S: 85ppm, LEL: 4%.
29 29
1ft away H2S: 5ppm.
UG
28 28
C AG C

27 27

MIN
26 26
2263
50-1D060707-13012Q1-N

50-1D020712-11384-N
25 1E-0601A T-13.370.220 25
1616
50-1D020803-13012-N
24 1P020060 T-13.370.083 24
2264
UG 50-1D060708-13012Q1-N
MIN

23 1E-0601B T-13.370.220 23
AG
UG

AG

22 22

50-1D020802-13012-N

AG
UG
21 21

20 20
PHASE 1
19 19

18 18

4541

1615
17 17

T-13.370.077 102UZ-10201
B B

T-13.370.082 1P020060
16 16

15 15

14 14
AS BUILT
13 13
H 11/02/25 M.TKM S.ASD Y.NMB ISSUED FOR AS BUILT

12 12 G 09/01/09 S.KMT S.ASD Y.NMB ISSUE FOR CONSTRUCTION REV.5

F 08/06/20 S.KMT S.ASD Y.NMB ISSUE FOR CONSTRUCTION REV.4


11 11 E 08/03/14 S.KMT S.ASD Y.NMB ISSUE FOR CONSTRUCTION REV.3

ISSUE DATE MADE CHECK'D APPR'D DESCRIPTION


10 10

9 9 Pearl GTL Project - Qatar HYUNDAI


HEAVY INDUSTRIES CO., LTD.

This document is confidential. Neither the whole nor any part of this document may be used,
8 8 reproduced, copied, stored in any retrieval system or transmitted in any form or by any means
(electronic, mechanical, reprographic, recording or otherwise) or disclosed to any third party
without the prior written consent of Qatar Shell GTL Ltd. All rights reserved.
7 7

6 SLOPE 1:500 6 PROCESS ENGINEERING FLOW SCHEME


TO U-0200 ACID GAS REMOVAL UNIT
A 3232 WEST AREA 100-1D020501-17201-N A
5 756 5 MDEA DRAIN (SD-1) COLLECTION HEADER (3) TRAIN 1
PROJECT/GROUP/LOCATION HP-
HP-3000-
3000-QAT CONTRACTOR PROJECT No 5887
5887
4 4
CONTRACTOR CONTRACT No PI-096
PI-096 ORIGINATING ORGANISATION CHC

3 3 CONTRACTOR NAME CHIYODA HHI-CONSORTIUM

UNIT 1-0200
2 2
CONTRACTOR
1 1
PCWBS JA
DRG No NA (QPG JOB NO 51505)
SCALE NONE PROJECT DRG No T-4.094.758 REV H
A1 841X594 8 7 6 5 4 3 2 1

Potrebbero piacerti anche