6 INDICES UNIFICADOS
16 SUSTENTO DE METRADOS
17 CRONOGRAMA VALORIZADO
18 ANEXOS
LICITACIN PUBLICA : N 002-2016-MPSI/CS
ENTIDAD : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO
OBRA : MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DE LA CARRETERA TRAMO CRUCE CHIRINOS
- CHIRINOS DEL DISTRITO DE CHIRINOS, PROVINCIA DE SAN IGNACIO CAJAMARCA
CONSORCIO : CONSORCIO VIAL SANTA ERIKA
TOTAL
DESCRIPCIN
(S/.)
ADELANTO DIRECTO
A3 OTROS ( A3 ) 0.00
TOTAL
DESCRIPCIN
(S/.)
PRESUPUESTO BASE ACUMULADO ANTERIOR PRESENTE VALORIZACIN ACUMULADO MES ACTUAL SALDO POR VALORIZAR
PARTIDA DESCRIPCIN
PARCIAL S/. % PARCIAL S/. % PARCIAL S/. % PARCIAL S/. % PARCIAL S/. %
01 OBRAS PROVISIONALES 231,388.80 100.00% 101,900.00 44.04% - 0.00% 101,900.00 44.04% 129,488.80 55.96%
02 TRABAJOS PRELIMINARES 51,471.37 100.00% 21,353.05 41.49% 13,523.30 26.27% 34,876.35 67.76% 16,595.02 32.24%
03 MOVIMIENTO DE TIERRAS 1,704,876.60 100.00% 311,356.01 18.26% 199,607.63 11.71% 510,963.63 29.97% 1,193,912.97 70.03%
PREPARACION DE MATERIAL PARA
04 1,408,728.50 100.00% 270,689.66 19.22% 57,428.83 4.08% 328,118.49 23.29% 1,080,610.01 76.71%
PAVIMENTOS
05 PAVIMENTOS 5,671,300.41 100.00% - 0.00% 147,011.12 2.59% 147,011.12 2.59% 5,524,289.29 97.41%
06 TRANSPORTES 2,755,372.84 100.00% 19,636.71 0.71% 95,397.26 3.46% 115,033.97 4.17% 2,640,338.87 95.83%
07 OBRAS DE ARTE Y DRENAJE 2,344,229.64 100.00% - 0.00% - 0.00% - 0.00% 2,344,229.64 100.00%
09 MITIGACION DEL IMPACTO AMBIENTAL 83,986.73 100.00% 16,234.56 19.33% - 0.00% 16,234.56 19.33% 67,752.17 80.67%
10 CONTROL DE CALIDAD 272,360.00 100.00% 2,550.00 0.94% 3,250.00 1.19% 5,800.00 2.13% 266,560.00 97.87%
COSTO DIRECTO 15,844,306.40 100.00% 743,719.99 4.69% 516,218.14 3.26% 1,259,938.12 7.95% 14,584,368.28 92.05%
GASTOS GENERALES 1,584,430.64 100.00% 74,372.00 4.69% 51,621.81 3.26% 125,993.81 7.95% 1,458,436.83 92.05%
UTILIDAD 1,267,544.51 100.00% 59,497.60 4.69% 41,297.45 3.26% 100,795.05 7.95% 1,166,749.46 92.05%
SUBTOTAL 18,696,281.55 100.00% 877,589.59 4.69% 609,137.40 3.26% 1,486,726.98 7.95% 17,209,554.57 92.05%
LICITACIN PUBLICA : N 002-2016-MPSI/CS
ENTIDAD : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO
OBRA : MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DE LA CARRETERA TRAMO CRUCE CHIRINOS
- CHIRINOS DEL DISTRITO DE CHIRINOS, PROVINCIA DE SAN IGNACIO CAJAMARCA
CONSORCIO : CONSORCIO VIAL SANTA ERIKA
PRESUPUESTO BASE - ABRIL 16 ACUMULADO MES ANTERIOR PRESENTE VALORIZACIN ACUMULADO MES ACTUAL SALDO POR VALORIZAR
PARTIDA DESCRIPCIN UND. METRADO PRECIO S/. PARCIAL S/. METRADO PARCIAL S/. % METRADO PARCIAL S/. % METRADO PARCIAL S/. % METRADO PARCIAL S/. %
01.01 CAMPAMENTOS DE EJECUCION OBRA glb 1.00 66,688.80 66,688.80 0.93 61,900.00 92.82% - - 0.00% 0.93 61,900.00 92.82% 0.07 4,788.80 7.18%
01.02 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS PERSONAL Y HERRAMIENTAS glb 1.00 80,000.00 80,000.00 0.50 40,000.00 50.00% - - 0.00% 0.50 40,000.00 50.00% 0.50 40,000.00 50.00%
01.03 MOVILIZACION Y DESMOVILIZACION PERMANENTE DE EQUIPO DE ASFALTO EN OBRA glb 1.00 84,700.00 84,700.00 - - 0.00% - - 0.00% - - 0.00% 1.00 84,700.00 100.00%
02.01 CARTEL DE OBRA und 2.00 1,500.00 3,000.00 2.00 3,000.00 100.00% - - 0.00% 2.00 3,000.00 100.00% - - 0.00%
02.02 TRAZO Y REPLANTEO km 25.09 1,931.90 48,471.37 9.50 18,353.05 37.86% 7.00 13,523.30 27.90% 16.50 31,876.35 65.76% 8.59 16,595.02 34.24%
03.01.01 CORTE DE MATERIAL SUELTO CON MAQUINARIA m3 47,093.43 5.21 245,356.77 2,186.78 11,393.10 4.64% 3,826.63 19,936.72 8.13% 6,013.40 31,329.81 12.77% 41,080.03 214,026.96 87.23%
03.01.02 CORTE DE MATERIAL ORGANICO CON MAQUINARIA PARA MEJORAMIENTO m3 16,020.00 5.10 81,702.00 - - 0.00% - - 0.00% - - 0.00% 16,020.00 81,702.00 100.00%
03.02.01 RELLENO CON MATERIAL PROPIO m3 11,435.39 7.40 84,621.89 - - 0.00% 2,580.50 19,095.70 22.57% 2,580.50 19,095.70 22.57% 8,854.89 65,526.19 77.43%
03.02.02 PREPARACION DE TERRENO EN ZONAS DE RELLENO, INVOLUCRANDO SUELO EXIST m2 75,979.97 1.97 149,680.54 - - 0.00% 13,573.62 26,740.03 17.86% 13,573.62 26,740.03 17.86% 62,406.35 122,940.51 82.14%
03.02.03 MEJORAMIENTO DE SUBRASANTE CON OVER E=50CM m3 32,040.00 12.30 394,092.00 - - 0.00% - - 0.00% - - 0.00% 32,040.00 394,092.00 100.00%
03.03.01 EXTRACCION Y APILAMIENTO DE MATERIAL GRANULAR PARA BASE m3 32,513.75 8.26 268,563.58 24,147.16 199,455.54 74.27% 5,123.00 42,315.98 15.76% 29,270.16 241,771.52 90.02% 3,243.59 26,792.06 9.98%
03.03.02 EXTRACCION Y SELECCION DE MATERIAL CERRO PARA SUB BASE m3 34,081.94 13.68 466,240.94 7,347.03 100,507.37 21.56% 6,690.00 91,519.20 19.63% 14,037.03 192,026.57 41.19% 20,044.91 274,214.37 58.81%
03.04.01 LIMPIEZA DE BORDE DE CAUCE PARA CONFORMACION DE TALUD m3 360.00 5.38 1,936.80 - - 0.00% - - 0.00% - - 0.00% 360.00 1,936.80 100.00%
03.04.02 PIEDRA ACOMODADA EN BORDE DE CAUCE m3 864.00 10.77 9,305.28 - - 0.00% - - 0.00% - - 0.00% 864.00 9,305.28 100.00%
03.04.03 CONFORMACIN DE TALUD DE BORDE CON MATERIAL DE ENCAUCE m3 720.00 4.69 3,376.80 - - 0.00% - - 0.00% - - 0.00% 720.00 3,376.80 100.00%
04.01.01 CARGUIO Y TRANSPORTE DE MATERIAL DE CANTERA A ZONA DE PREPARACION m3 32,513.75 11.21 364,479.14 24,147.16 270,689.66 74.27% 5,123.00 57,428.83 15.76% 29,270.16 328,118.49 90.02% 3,243.59 36,360.65 9.98%
04.01.02 PREPARACION DE BASE GRANULAR m3 32,513.75 19.04 619,061.80 - - 0.00% - - 0.00% - - 0.00% 32,513.75 619,061.80 100.00%
04.02 PREPARACION DE MATERIAL PARA BICAPA 425,187.56 - - - 425,187.56
04.02.01 CARGUIO Y TRANSPORTE DE MATERIAL DE CANTERA A ZONA DE PREPARACION m3 9,902.20 11.21 111,003.66 - - 0.00% - - 0.00% - - 0.00% 9,902.20 111,003.66 100.00%
04.02.02 PREPARACION DE MATERIAL PARA BICAPA m3 2,930.00 107.23 314,183.90 - - 0.00% - - 0.00% - - 0.00% 2,930.00 314,183.90 100.00%
05.01.01 PERFILADO Y COMPACTADO DE LA SUBRASANTE m2 178,647.92 2.39 426,968.53 - - 0.00% 29,488.53 70,477.59 16.51% 29,488.53 70,477.59 16.51% 149,159.39 356,490.94 83.49%
05.01.02 CONFORMACION Y COMPACTACION DE LA SUB BASE E=0.15M m2 163,586.80 4.72 772,129.70 - - 0.00% 16,214.73 76,533.53 9.91% 16,214.73 76,533.53 9.91% 147,372.07 695,596.17 90.09%
05.01.03 CONFORMACION Y COMPACTACION DE LA BASE GRANULAR E=0.15M m2 156,059.80 4.72 736,602.26 - - 0.00% - - 0.00% - - 0.00% 156,059.80 736,602.26 100.00%
05.02 IMPRIMACION ASFALTICA CON EMULSION m2 148,532.80 6.04 897,138.11 - - 0.00% - - 0.00% - - 0.00% 148,532.80 897,138.11 100.00%
05.03 TRATAMIENTO SUPERFICIAL BICAPA m2 148,532.80 19.11 2,838,461.81 - - 0.00% - - 0.00% - - 0.00% 148,532.80 2,838,461.81 100.00%
06.01.01 TRANSPORTE DE MATERIAL ELIMINADO A BOTADERO DISTANCIA HASTA 1 KM m3k 47,093.43 4.99 234,996.22 1,210.94 6,042.57 2.57% 2,221.96 11,087.60 4.72% 3,432.90 17,130.17 7.29% 43,660.53 217,866.05 92.71%
06.01.02 TRANSPORTE DE MATERIAL ELIMINADO A BOTADERO DISTANCIA HASTA >1 KM m3k 155,408.32 2.05 318,587.06 6,631.29 13,594.14 4.27% 6,029.52 12,360.51 3.88% 12,660.81 25,954.65 8.15% 142,747.51 292,632.41 91.85%
06.02.01 TRANSPORTE DE MATERIAL OVER HASTA 1 KM m3k 16,020.00 4.99 79,939.80 - - 0.00% - - 0.00% - - 0.00% 16,020.00 79,939.80 100.00%
06.02.02 TRANSPORTE DE MATERIAL OVER > 1 KM m3k 184,230.00 2.05 377,671.50 - - 0.00% - - 0.00% - - 0.00% 184,230.00 377,671.50 100.00%
06.03.01 TRANSPORTE DE MATERIAL GRANULAR HASTA 1 KM m3k 33,635.49 4.99 167,841.10 - - 0.00% - - 0.00% - - 0.00% 33,635.49 167,841.10 100.00%
06.03.02 TRANSPORTE DE MATERIAL GRANULAR > 1 KM m3k 496,570.01 2.05 1,017,968.52 - - 0.00% - - 0.00% - - 0.00% 496,570.01 1,017,968.52 100.00%
06.04 TRANSPORTE DE MATERIAL DE CERRO PARA SUB BASE 558,368.64 - 71,949.15 71,949.15 486,419.49
06.04.01 TRANSPORTE DE MATERIAL DE CERRO HASTA 1 KM m3k 31,287.23 4.99 156,123.28 - - 0.00% 3,040.72 15,173.19 9.72% 3,040.72 15,173.19 9.72% 28,246.51 140,950.09 90.28%
06.04.02 TRANSPORTE DE MATERIAL DE CERRO >1 KM m3k 196,217.25 2.05 402,245.36 - - 0.00% 27,695.59 56,775.96 14.11% 27,695.59 56,775.96 14.11% 168,521.66 345,469.40 85.89%
PRESUPUESTO BASE - ABRIL 16 ACUMULADO MES ANTERIOR PRESENTE VALORIZACIN ACUMULADO MES ACTUAL SALDO POR VALORIZAR
PARTIDA DESCRIPCIN UND. METRADO PRECIO S/. PARCIAL S/. METRADO PARCIAL S/. % METRADO PARCIAL S/. % METRADO PARCIAL S/. % METRADO PARCIAL S/. %
09.01 MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL glb 1.00 40,586.40 40,586.40 0.40 16,234.56 40.00% - - 0.00% 0.40 16,234.56 40.00% 0.60 24,351.84 60.00%
09.02 ACONDICIONAMIENTO DE DEPOSITO DE MATERIAL EXCEDENTE m3 3,750.00 1.07 4,012.50 - - 0.00% - - 0.00% - - 0.00% 3,750.00 4,012.50 100.00%
09.03 RESTAURACION DE CANTERAS m2 7,000.00 0.57 3,990.00 - - 0.00% - - 0.00% - - 0.00% 7,000.00 3,990.00 100.00%
09.04 REVEGETALIZACION ha 2.95 2,270.45 6,697.83 - - 0.00% - - 0.00% - - 0.00% 2.95 6,697.83 100.00%
09.05 RESTAURACION DE AREAS AFECTADA POR CAMPAMENTOS, PATIO DE MAQUINAS Y m2 1,000.00 3.08 3,080.00 - - 0.00% - - 0.00% - - 0.00% 1,000.00 3,080.00 100.00%
09.06 RESTAURACION DE AREA AFECTADA POR PATIO DE MAQUINAS m2 2,000.00 12.81 25,620.00 - - 0.00% - - 0.00% - - 0.00% 2,000.00 25,620.00 100.00%
10.01 ROTURA DE PROBETAS und 386.00 25.00 9,650.00 - - 0.00% - - 0.00% - - 0.00% 386.00 9,650.00 100.00%
10.02 DENSIDAD DE CAMPO und 1,995.00 50.00 99,750.00 - - 0.00% 50.00 2,500.00 2.51% 50.00 2,500.00 2.51% 1,945.00 97,250.00 97.49%
10.03 LAVADO DE ASFALTO m3 52.00 600.00 31,200.00 - - 0.00% - - 0.00% - - 0.00% 52.00 31,200.00 100.00%
10.04 ENSAYOS DE LABORATORIO glb 1.00 127,920.00 127,920.00 0.02 2,550.00 1.99% 0.01 750.00 0.59% 0.03 3,300.00 2.58% 0.97 124,620.00 97.42%
10.05 DISEO BICAPA und 4.00 960.00 3,840.00 - - 0.00% - - 0.00% - - 0.00% 4.00 3,840.00 100.00%
11.01 FLETE TERRESTRE glb 1.00 52,932.87 52,932.87 - - 0.00% - - 0.00% - - 0.00% 1.00 52,932.87 100.00%
COSTO DIRECTO 15,844,306.40 743,719.99 4.69% 516,218.14 3.26% 1,259,938.12 7.95% 14,584,368.28 92.05%
GASTOS GENERALES 10.00% 1,584,430.64 74,372.00 4.69% 51,621.81 3.26% 125,993.81 7.95% 1,458,436.83 92.05%
UTILIDAD 8.00% 1,267,544.51 59,497.60 4.69% 41,297.45 3.26% 100,795.05 7.95% 1,166,749.46 92.05%
SUBTOTAL 18,696,281.55 877,589.59 4.69% 609,137.40 3.26% 1,486,726.98 7.95% 17,209,554.57 92.05%
LICITACIN PUBLICA : N 002-2016-MPSI/CS
ENTIDAD : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO
OBRA : MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DE LA CARRETERA TRAMO CRUCE CHIRINOS
- CHIRINOS DEL DISTRITO DE CHIRINOS, PROVINCIA DE SAN IGNACIO CAJAMARCA 000189
CONSORCIO : CONSORCIO VIAL SANTA ERIKA
100.00%
90.00%
60.00%
50.00%
40.00%
30.00%
7.95%
20.00%
10.00% 5.50%
NO V IEM B R E
NO V IEM B R E
S ETIEM B R E
S ETIEM B R E
0.00%
DIC IEM B RE
DIC IEM B RE
O CTUB RE
O CTU B RE
FEB RERO
FEB RERO
A G O S TO
MA RZ O
MA RZ O
ENER O
ENER O
A B RIL
A B RIL
MA Y O
JUNIO
JUL IO
VAL N MES / AO PRORAMADO PROGRAMADO PORC. PORC. PORC. PORC. SITUACION DE LA OBRA
REAL MENSUAL REAL ACUMULADO
MENSUAL ACUMULADO MENSUAL ACUMULADO MENSUAL ACUMULADO
S/. S/. % % S/. S/. % %
01 OCTUBRE 2,016 60,689.27 60,689.27 0.32% 0.32% 187,867.14 187,867.14 1.00% 1.00% ADELANTADA 0.68%
02 NOVIEMBRE 2,016 326,605.96 387,295.23 1.75% 2.07% 689,722.45 877,589.59 3.69% 4.69% ADELANTADA 2.62%
03 DICIEMBRE 2,016 640,533.46 1,027,828.69 3.43% 5.50% 609,137.40 1,486,726.99 3.26% 7.95% ADELANTADA 2.45%
1.020
1.015
1.010
1.005
1.000
0.995
0.990
Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16
lo li AO 2016
MON. INCIDENCIA IU ELEMENTO SIMBOLO FACTOR
Apr-16 Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17
1 100.000% 47 MANO DE OBRA M 0.091 544.12 544.12 544.12 544.12 562.24 562.24 562.24 562.24 562.24
0.091 0.091 0.091 0.094 0.094 0.094 0.094 0.094 - - - - -
2 34.483% 05 AGREGADO GRUESO AG 0.087 441.35 441.35 441.38 440.21 440.26 439.92 437.98 436.38 436.38
65.517% 21 CEMENTO PORTLAND TIPO I CA 462.57 462.57 462.57 462.57 459.08 457.28 459.93 462.57 462.57
0.087 0.087 0.087 0.086 0.086 0.086 0.086 0.086 - - - - -
3 100.000% 13 ASFALTO A 0.131 1,174.50 1,174.50 1,174.50 1,174.50 1,174.50 1,174.50 1,174.50 1,174.50 1,174.50
0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 - - - - -
4 100.000% 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR I 0.253 427.58 427.58 428.47 429.07 429.42 430.96 431.85 433.63 433.63
0.253 0.254 0.254 0.254 0.255 0.256 0.257 0.257 - - - - -
5 28.283% 09 ALCANTARILLA METALICA AM 0.099 214.07 214.07 216.21 215.05 205.40 207.51 210.56 210.81 210.81
71.717% 48 MAQUINARIA Y EQUIPO NACIONAL MA 364.31 364.31 366.60 365.93 365.29 366.57 368.68 368.83 368.83
0.099 0.100 0.099 0.098 0.099 0.100 0.100 0.100 - - - - -
6 100.000% 49 MAQUINARIA Y EQUIPO IMPORTADO MI 0.339 295.61 295.61 298.57 297.17 295.65 298.910 303.08 303.44 303.44
0.339 0.342 0.341 0.339 0.343 0.347 0.348 0.348 - - - - -
COEFICIENTE DE REAJUSTE (K) : 1.000 1.000 1.005 1.003 1.002 1.008 1.014 1.016 1.016 - - - - -
LICITACIN PUBLICA : N 002-2016-MPSI/CS
ENTIDAD : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO
OBRA : MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DE LA CARRETERA TRAMO CRUCE CHIRINOS
- CHIRINOS DEL DISTRITO DE CHIRINOS, PROVINCIA DE SAN IGNACIO CAJAMARCA
CONSORCIO : CONSORCIO VIAL SANTA ERIKA
INDICES UNIFICADOS
MES AO
47 5 21 13 39 9 48 49
ABRIL 2016 544.12 441.35 462.57 1,174.50 427.58 214.07 364.31 295.61
MAYO 2016 544.12 441.38 462.57 1,174.50 428.47 216.21 366.60 298.57
JUNIO 2016 544.12 440.21 462.57 1,174.50 429.07 215.05 365.93 297.17
JULIO 2016 562.24 440.26 459.08 1,174.50 429.42 205.40 365.29 295.65
AGOSTO 2016 562.24 439.92 457.28 1,174.50 430.96 207.51 366.57 298.91
SETIEMBRE 2016 562.24 437.98 459.93 1,174.50 431.85 210.56 368.68 303.08
OCTUBRE 2016 562.24 436.38 462.57 1,174.50 433.63 210.81 368.83 303.44
NOVIEMBRE 2016 562.24 436.38 462.57 1,174.50 433.63 210.81 368.83 303.44
DICIEMBRE 2016
ENERO 2017
FEBRERO 2017
MARZO 2017
ABRIL 2017
MAYO 2017
JUNIO 2017
JULIO 2017
AGOSTO 2017
SETIEMBRE 2017
OCTUBRE 2017
NOVIEMBRE 2017
DICIEMBRE 2017
ENERO 2018
FEBRERO 2018
MARZO 2018
ABRIL 2018
LICITACIN PUBLICA : N 002-2016-MPSI/CS
ENTIDAD : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO
OBRA : MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DE LA CARRETERA TRAMO CRUCE CHIRINOS
- CHIRINOS DEL DISTRITO DE CHIRINOS, PROVINCIA DE SAN IGNACIO CAJAMARCA
CONSORCIO : CONSORCIO VIAL SANTA ERIKA
00 SETIEMBRE 2016
01 OCTUBRE 2016 V1 60,689.27 60,689.27 K0 1.014 R1 849.65 849.65 849.65
02 NOVIEMBRE 2016 V2 326,605.96 387,295.23 K1 1.016 R2 5,225.70 Rr1 121.38 5,347.08 6,196.73
03 DICIEMBRE 2016 V3 640,533.46 1,027,828.69 K2 1.016 R3 10,248.54 Rr2 - Rt1 - 10,248.54 16,445.27
04 ENERO 2017 V4 683,531.49 1,711,360.18 K3 - R3 - Rr2 - Rt2 - - 16,445.27
05 FEBRERO 2017 V5 1,045,052.09 2,756,412.27 K4 - R5 - Rr4 - Rt3 - - 16,445.27
06 MARZO 2017 V6 851,172.43 3,607,584.70 K5 - R6 - Rr5 - Rt4 - - 16,445.27
07 ABRIL 2017 V7 715,922.58 4,323,507.28 K6 - R7 - Rr6 - Rt5 - - 16,445.27
08 MAYO 2017 V8 1,012,746.02 5,336,253.30 K7 - R8 - Rr7 - Rt6 - - 16,445.27
09 JUNIO 2017 V9 973,320.72 6,309,574.01 K8 - R9 - Rr8 - Rt7 - - 16,445.27
10 JULIO 2017 V10 1,799,520.00 8,109,094.01 K9 - R10 - Rr9 - Rt8 - - 16,445.27
11 AGOSTO 2017 V11 1,984,514.26 10,093,608.28 K10 - R11 - Rr10 - Rt9 - - 16,445.27
12 SETIEMBRE 2017 V12 1,805,456.22 11,899,064.50 K11 - R12 - Rr11 - Rt10 - - 16,445.27
13 OCTUBRE 2017 V13 1,673,913.28 13,572,977.78 K12 - R13 - Rr12 - Rt11 - - 16,445.27
14 NOVIEMBRE 2017 V14 1,274,796.52 14,847,774.30 K13 - R14 - Rr13 - Rt12 - - 16,445.27
15 DICIEMBRE 2017 V15 1,495,433.51 16,343,207.81 K14 - R15 - Rr14 - Rt13 - - 16,445.27
16 ENERO 2018 V16 1,550,312.36 17,893,520.17 K15 - R16 - Rr15 - Rt14 - - 16,445.27
17 FEBRERO 2018 V17 418,911.36 18,312,431.53 K16 - R17 - Rr16 - Rt15 - - 16,445.27
18 MARZO 2018 V18 361,179.79 18,673,611.31 K17 - R18 - Rr17 - Rt16 - - 16,445.27
19 ABRIL 2018 V19 22,670.23 18,696,281.55 K18 - R19 - Rr18 - Rt17 - - 16,445.27
00 SETIEMBRE 2016
01 OCTUBRE 2016 V1 187,867.14 187,867.14 K0 1.014 R1 2,630.14 2,630.14 2,630.14
02 NOVIEMBRE 2016 V2 689,722.45 877,589.59 K1 1.016 R2 11,035.56 Rr1 375.73 11,411.29 14,041.43
03 DICIEMBRE 2016 V3 609,137.40 1,486,726.99 K2 1.016 R3 9,746.20 Rr2 - Rt1 - 9,746.20 23,787.63
04 ENERO 2017 V4 - 1,486,726.99 K3 - R3 - Rr2 - Rt2 - - 23,787.63
05 FEBRERO 2017 V5 - 1,486,726.99 K4 - R5 - Rr4 - Rt3 - - 23,787.63
06 MARZO 2017 V6 - 1,486,726.99 K5 - R6 - Rr5 - Rt4 - - 23,787.63
07 ABRIL 2017 V7 - 1,486,726.99 K6 - R7 - Rr6 - Rt5 - - 23,787.63
08 MAYO 2017 V8 - 1,486,726.99 K7 - R8 - Rr7 - Rt6 - - 23,787.63
09 JUNIO 2017 V9 - 1,486,726.99 K8 - R9 - Rr8 - Rt7 - - 23,787.63
10 JULIO 2017 V10 - 1,486,726.99 K9 - R10 - Rr9 - Rt8 - - 23,787.63
11 AGOSTO 2017 V11 - 1,486,726.99 K10 - R11 - Rr10 - Rt9 - - 23,787.63
12 SETIEMBRE 2017 V12 - 1,486,726.99 K11 - R12 - Rr11 - Rt10 - - 23,787.63
13 OCTUBRE 2017 V13 - 1,486,726.99 K12 - R13 - Rr12 - Rt11 - - 23,787.63
14 NOVIEMBRE 2017 V14 - 1,486,726.99 K13 - R14 - Rr13 - Rt12 - - 23,787.63
15 DICIEMBRE 2017 V15 - 1,486,726.99 K14 - R15 - Rr14 - Rt13 - - 23,787.63
16 ENERO 2018 V16 - 1,486,726.99 K15 - R16 - Rr15 - Rt14 - - 23,787.63
17 FEBRERO 2018 V17 - 1,486,726.99 K16 - R17 - Rr16 - Rt15 - - 23,787.63
18 MARZO 2018 V18 - 1,486,726.99 K17 - R18 - Rr17 - Rt16 - - 23,787.63
19 ABRIL 2018 V19 - 1,486,726.99 K18 - R19 - Rr18 - Rt17 - - 23,787.63
REAJUSTE REAJUSTE
REAJUSTE REAJUSTE REAL RECONOCIDO DEL
SITUACIN DE RECONOCIDO
VAL N MES PROGRAMADO ACUMULADO MES
LA OBRA ACUMULADO
ACUMULADO DEL MES
DEL MES R
00 SETIEMBRE 2016
01 OCTUBRE 2016 V1 849.65 2,630.14 ADELANTADA 2,630.14 Rr1 2,630.14
02 NOVIEMBRE 2016 V2 6,196.73 14,041.43 ADELANTADA 14,041.43 Rr2 11,411.29
03 DICIEMBRE 2016 V3 16,445.27 23,787.63 ADELANTADA 23,787.63 Rr2 9,746.20
04 ENERO 2017 V4 - - - Rr4 -
05 FEBRERO 2017 V5 - - - Rr5 -
06 MARZO 2017 V6 - - - Rr6 -
07 ABRIL 2017 V7 - - - Rr7 -
08 MAYO 2017 V8 - - - Rr8 -
09 JUNIO 2017 V9 - - - Rr9 -
10 JULIO 2017 V10 - - - Rr10 -
11 AGOSTO 2017 V11 - - - Rr11 -
12 SETIEMBRE 2017 V12 - - - Rr12 -
13 OCTUBRE 2017 V13 - - - Rr13 -
14 NOVIEMBRE 2017 V14 - - - Rr14 -
15 DICIEMBRE 2017 V14 - - - Rr15 -
16 ENERO 2017 V15 - - - Rr16 -
17 FEBRERO 2018 V16 - - - Rr17 -
18 MARZO 2018 V17 - - - Rr18 -
19 ABRIL 2018 V18 - - - Rr19 -
00 SETIEMBRE 2016
01 OCTUBRE 2016 187,867.14 187,867.14 - 18,696.28 18,696.28 1,850,931.87
02 NOVIEMBRE 2016 689,722.45 877,589.59 18,696.28 68,989.28 87,685.56 1,781,942.59
03 DICIEMBRE 2016 609,137.40 1,486,726.99 87,685.56 60,987.13 148,672.69 1,720,955.46
04 ENERO 2017 - 1,486,726.99 148,672.69 - 148,672.69 1,720,955.46
05 FEBRERO 2017 - 1,486,726.99 148,672.69 - 148,672.69 1,720,955.46
06 MARZO 2017 - 1,486,726.99 148,672.69 - 148,672.69 1,720,955.46
07 ABRIL 2017 - 1,486,726.99 148,672.69 - 148,672.69 1,720,955.46
08 MAYO 2017 - 1,486,726.99 148,672.69 - 148,672.69 1,720,955.46
09 JUNIO 2017 - 1,486,726.99 148,672.69 - 148,672.69 1,720,955.46
10 JULIO 2017 - 1,486,726.99 148,672.69 - 148,672.69 1,720,955.46
11 AGOSTO 2017 - 1,486,726.99 148,672.69 - 148,672.69 1,720,955.46
12 SETIEMBRE 2017 - 1,486,726.99 148,672.69 - 148,672.69 1,720,955.46
13 OCTUBRE 2017 - 1,486,726.99 148,672.69 - 148,672.69 1,720,955.46
14 NOVIEMBRE 2017 - 1,486,726.99 148,672.69 - 148,672.69 1,720,955.46
15 DICIEMBRE 2017 - 1,486,726.99 148,672.69 - 148,672.69 1,720,955.46
16 ENERO 2018 - 1,486,726.99 148,672.69 - 148,672.69 1,720,955.46
17 FEBRERO 2018 - 1,486,726.99 148,672.69 - 148,672.69 1,720,955.46
18 MARZO 2018 - 1,486,726.99 148,672.69 - 148,672.69 1,720,955.46
19 ABRIL 2018 - 1,486,726.99 148,672.69 - 148,672.69 1,720,955.46
LICITACIN PUBLICA : N 002-2016-MPSI/CS
ENTIDAD : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO
OBRA : MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DE LA CARRETERA TRAMO CRUCE CHIRINOS
- CHIRINOS DEL DISTRITO DE CHIRINOS, PROVINCIA DE SAN IGNACIO CAJAMARCA
CONSORCIO : CONSORCIO VIAL SANTA ERIKA
DEDUCCIN
VALORIZACIN MONTO VALORIZADO K DE REAJUSTE D Dr Dt
DEL MES
DEL MES DE
N MES / AO S/. (MES ANTERIOR) DEL MES ANTERIOR DEL MES SIGUIENTE D + Dr + Dt
VALORIZACIN
00 SETIEMBRE 2016
TOTAL : 1,486,726.99
(Imr - Ima)
F O R M U L A: D = CI x V x ------------------- (EN CONCORDANCIA CON D.S. NO. 011-79-VC Y D.S. NO. 017-79-VC)
Imo
DONDE ; D : DEDUCCION DEL REAJUSTE GENERADO POR EL ADELANTO DE MATERIALES ( SIN IGV ).
Ci : COEFICIENTE DE INCIDENCIA DEL MATERIAL QUE SE DIO EL ADELANTO.
V : MONTO DEL COMPONENTE EN S/. DE LA VALORIZACION MENSUAL.
Imr : INDICE DE PRECIOS DEL MATERIAL A LA FECHA DEL REAJUSTE.
Ima : INDICE DE PRECIO DEL MATERIAL A LA FECHA EFECTIVA DEL ADELANTO.
Imo : INDICE DE PRECIO DEL MATERIAL A LA FECHA DEL PRESUPUESTO BASE (Abril-2016)
VALORIZACION ADELANTO MONTO COEFICIENTE % MAX. ADEL. MES MONTO ADELANTO SALDO DEL
VALORIZADO INCIDENCIA PARTIC. POR DE Imr Ima Imo MAXIMO ADELANTO POR
DEDUCCION
N MES FECHA MONTO
V UTILIZAR REAJUSTE UTILIZABLE UTILIZADO UTILIZAR
2 Nov-16 NOV. 2016 674,595.82 689,722.45 0.131 100.000% 90,670.91 Dec-16 1,174.50 1,174.50 1,174.50 674,595.82 90,670.91 583,924.91 -
3 Dec-16 609,137.40 0.131 100.000% 80,077.20 Jan-17 1,174.50 1,174.50 1,174.50 583,924.91 80,077.20 503,847.71 -
4 Jan-17 - 0.131 100.000% 0.00 Feb-17 1,174.50 1,174.50 1,174.50 503,847.71 - 503,847.71 -
5 Feb-17 - 0.131 100.000% 0.00 Mar-17 1,174.50 1,174.50 1,174.50 503,847.71 - 503,847.71 -
6 Mar-17 - 0.131 100.000% 0.00 Apr-17 1,174.50 1,174.50 1,174.50 503,847.71 - 503,847.71 -
7 Apr-17 - 0.131 100.000% 0.00 May-17 1,174.50 1,174.50 1,174.50 503,847.71 - 503,847.71 -
8 May-17 - 0.131 100.000% 0.00 Jun-17 1,174.50 1,174.50 1,174.50 503,847.71 - 503,847.71 -
TOTAL -
2 Nov-16 NOV. 2016 1,318,426.63 689,722.45 0.131 100.000% 90,670.91 Dec-16 1,174.50 1,174.50 1,174.50 1,318,426.63 90,670.91 1,227,755.72 -
3 Dec-16 609,137.40 0.131 100.000% 80,077.20 Jan-17 1,174.50 1,174.50 1,174.50 1,227,755.72 80,077.20 1,147,678.52 -
4 Jan-17 - 0.131 100.000% 0.00 Feb-17 1,174.50 1,174.50 1,174.50 1,147,678.52 - 1,147,678.52 -
5 Feb-17 - 0.131 100.000% 0.00 Mar-17 1,174.50 1,174.50 1,174.50 1,147,678.52 - 1,147,678.52 -
6 Mar-17 - 0.131 100.000% 0.00 Apr-17 1,174.50 1,174.50 1,174.50 1,147,678.52 - 1,147,678.52 -
7 Apr-17 - 0.131 100.000% 0.00 May-17 1,174.50 1,174.50 1,174.50 1,147,678.52 - 1,147,678.52 -
8 May-17 - 0.131 100.000% 0.00 Jun-17 1,174.50 1,174.50 1,174.50 1,147,678.52 - 1,147,678.52 -
TOTAL -
2 Nov-16 NOV. 2016 60,628.73 689,722.45 0.087 65.517% 39,196.54 Dec-16 462.57 462.57 462.57 60,629.12 39,196.54 21,432.58 -
3 Dec-16 609,137.40 0.087 65.517% 34,616.94 Jan-17 462.57 462.57 462.57 21,432.58 21,432.58 - -
4 Jan-17 - 0.087 65.517% 0.00 Feb-17 462.57 462.57 462.57 - - - -
5 Feb-17 - 0.087 65.517% 0.00 Mar-17 462.57 462.57 462.57 - - - -
6 Mar-17 - 0.087 65.517% 0.00 Apr-17 462.57 462.57 462.57 - - - -
7 Apr-17 - 0.087 65.517% 0.00 May-17 462.57 462.57 462.57 - - - -
8 May-17 - 0.087 65.517% 0.00 Jun-17 462.57 462.57 462.57 - - - -
TOTAL -
2 Nov-16 NOV. 2016 434,000.00 689,722.45 0.103 100.000% 71,041.41 Dec-16 1,174.50 1,174.50 1,174.50 434,000.00 71,041.41 362,958.59 -
3 Dec-16 609,137.40 0.103 100.000% 62,741.15 Jan-17 1,174.50 1174.50 1,174.50 362,958.59 62,741.15 300,217.44 -
4 Jan-17 - 0.103 100.000% 0.00 Feb-17 1,174.50 1174.50 1,174.50 300,217.44 - 300,217.44 -
5 Feb-17 - 0.103 100.000% 0.00 Mar-17 1,174.50 1174.50 1,174.50 300,217.44 - 300,217.44 -
6 Mar-17 - 0.103 100.000% 0.00 Apr-17 1,174.50 1174.50 1,174.50 300,217.44 - 300,217.44 -
7 Apr-17 - 0.103 100.000% 0.00 May-17 1,174.50 1174.50 1,174.50 300,217.44 - 300,217.44 -
8 May-17 - 0.103 100.000% 0.00 Jun-17 1,174.50 1174.50 1,174.50 300,217.44 - 300,217.44 -
TOTAL -
2 Nov-16 NOV. 2016 92,484.00 689,722.45 0.103 28.283% 20,092.64 Dec-16 210.81 210.81 214.07 93,914.19 20,092.64 73,821.55 -
3 Dec-16 609,137.40 0.103 28.283% 17,745.08 Jan-17 210.81 210.81 214.07 73,821.55 17,745.08 56,076.47 -
4 Jan-17 - 0.103 28.283% 0.00 Feb-17 210.81 210.81 214.07 56,076.47 - 56,076.47 -
5 Feb-17 - 0.103 28.283% 0.00 Mar-17 210.81 210.81 214.07 56,076.47 - 56,076.47 -
6 Mar-17 - 0.103 28.283% 0.00 Apr-17 210.81 210.81 214.07 56,076.47 - 56,076.47 -
7 Apr-17 - 0.103 28.283% 0.00 May-17 210.81 210.81 214.07 56,076.47 - 56,076.47 -
8 May-17 - 0.103 28.283% 0.00 Jun-17 210.81 210.81 214.07 56,076.47 - 56,076.47 -
TOTAL -
2 Nov-16 NOV. 2016 174,452.46 689,722.45 0.087 34.483% 20,629.98 Dec-16 436.38 436.38 441.35 176,439.33 20,629.98 155,809.35 -
3 Dec-16 609,137.40 0.087 34.483% 18,219.64 Jan-17 436.38 436.38 441.35 155,809.35 18,219.64 137,589.71 -
4 Jan-17 - 0.087 34.483% 0.00 Feb-17 436.38 436.38 441.35 137,589.71 - 137,589.71 -
5 Feb-17 - 0.087 34.483% 0.00 Mar-17 436.38 436.38 441.35 137,589.71 - 137,589.71 -
6 Mar-17 - 0.087 34.483% 0.00 Apr-17 436.38 436.38 441.35 137,589.71 - 137,589.71 -
7 Apr-17 - 0.087 34.483% 0.00 May-17 436.38 436.38 441.35 137,589.71 - 137,589.71 -
8 May-17 - 0.087 34.483% 0.00 Jun-17 436.38 436.38 441.35 137,589.71 - 137,589.71 -
TOTAL -
(Imr - Ima)
F O R M U L A: D = CI x V x ------------------- (EN CONCORDANCIA CON D.S. NO. 011-79-VC Y D.S. NO. 017-79-VC)
Imo
DONDE ; D : DEDUCCION DEL REAJUSTE GENERADO POR EL ADELANTO DE MATERIALES ( SIN IGV ).
Ci : COEFICIENTE DE INCIDENCIA DEL MATERIAL QUE SE DIO EL ADELANTO.
V : MONTO DEL COMPONENTE EN S/. DE LA VALORIZACION MENSUAL.
Imr : INDICE DE PRECIOS DEL MATERIAL A LA FECHA DEL REAJUSTE.
Ima : INDICE DE PRECIO DEL MATERIAL A LA FECHA EFECTIVA DEL ADELANTO.
2 Nov-16 NOV. 2016 135,328.47 689,722.45 0.087 34.483% 20,629.98 Dec-16 436.38 436.38 441.35 136,869.75 20,629.98 116,239.77 -
3 Dec-16 609,137.40 0.087 34.483% 18,219.64 Jan-17 436.38 436.38 441.35 116,239.77 18,219.64 98,020.13 -
4 Jan-17 - 0.087 34.483% 0.00 Feb-17 436.38 436.38 441.35 98,020.13 - 98,020.13 -
5 Feb-17 - 0.087 34.483% 0.00 Mar-17 436.38 436.38 441.35 98,020.13 - 98,020.13 -
6 Mar-17 - 0.087 34.483% 0.00 Apr-17 436.38 436.38 441.35 98,020.13 - 98,020.13 -
7 Apr-17 - 0.087 34.483% 0.00 May-17 436.38 436.38 441.35 98,020.13 - 98,020.13 -
8 May-17 - 0.087 34.483% 0.00 Jun-17 436.38 436.38 441.35 98,020.13 - 98,020.13 -
TOTAL -
2 Nov-16 NOV. 2016 849,340.20 689,722.45 0.087 65.517% 39,196.54 Dec-16 462.57 462.57 462.57 849,345.71 39,196.54 810,149.17 -
3 Dec-16 609,137.40 0.087 65.517% 34,616.94 Jan-17 462.57 462.57 462.57 810,149.17 34,616.94 775,532.23 -
4 Jan-17 - 0.087 65.517% 0.00 Feb-17 462.57 462.57 462.57 775,532.23 - 775,532.23 -
5 Feb-17 - 0.087 65.517% 0.00 Mar-17 462.57 462.57 462.57 775,532.23 - 775,532.23 -
6 Mar-17 - 0.087 65.517% 0.00 Apr-17 462.57 462.57 462.57 775,532.23 - 775,532.23 -
7 Apr-17 - 0.087 65.517% 0.00 May-17 462.57 462.57 462.57 775,532.23 - 775,532.23 -
8 May-17 - 0.087 65.517% 0.00 Jun-17 462.57 462.57 462.57 775,532.23 - 775,532.23 -
TOTAL -
DEDUCCION EN EL MES = -
LICITACIN PUBLIC : N 002-2016-MPSI/CS
ENTIDAD : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO
OBRA : MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DE LA CARRETERA TRAMO CRUCE CHIRINOS
- CHIRINOS DEL DISTRITO DE CHIRINOS, PROVINCIA DE SAN IGNACIO CAJAMARCA
CONSORCIO : CONSORCIO VIAL SANTA ERIKA
TOTAL 3,739,256.31 - - - - - - - -
IZACION DE LOS ADELANTOS PARA MATERIALES N 01
674,595.82
1,318,426.63
60,628.73
434,000.00
92,484.00
174,452.46
135,328.47
849,340.20
3,739,256.31
LICITACIN PUBLICA : N 002-2016-MPSI/CS
ENTIDAD : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO
OBRA : MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DE LA CARRETERA TRAMO CRUCE CHIRINOS
- CHIRINOS DEL DISTRITO DE CHIRINOS, PROVINCIA DE SAN IGNACIO CAJAMARCA
CONSORCIO : CONSORCIO VIAL SANTA ERIKA
METRADO ACUMULADO A
METRADO METRADO
CONTRACTUAL PRESENTE MES
PARTIDA DESCRIPCIN UND. Nov-16 Dec-16
01.02 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS PERSONAL Y HERRAMIENTAS glb 1.00 0.50 0.50 -
02 TRABAJOS PRELIMINARES - -
03 MOVIMIENTO DE TIERRAS - -
03.01 EXPLANACIONES - -
03.01.01 CORTE DE MATERIAL SUELTO CON MAQUINARIA m3 47,093.43 2,186.78 6,013.40 3,826.63
03.02 TERRAPLENES - -
03.02.02 PREPARACION DE TERRENO EN ZONAS DE RELLENO, INVOLUCRANDO SUELO EXIST m2 75,979.97 - 13,573.62 13,573.62
03.03.01 EXTRACCION Y APILAMIENTO DE MATERIAL GRANULAR PARA BASE m3 32,513.75 24,147.16 29,270.16 5,123.00
03.03.02 EXTRACCION Y SELECCION DE MATERIAL CERRO PARA SUB BASE m3 34,081.94 7,347.03 14,037.03 6,690.00
04.01.01 CARGUIO Y TRANSPORTE DE MATERIAL DE CANTERA A ZONA DE PREPARACION m3 32,513.75 24,147.16 29,270.16 5,123.00
04.01.02 PREPARACION DE BASE GRANULAR m3 32,513.75 - - -
05 PAVIMENTOS - -
06 TRANSPORTES - -
06.01.01 TRANSPORTE DE MATERIAL ELIMINADO A BOTADERO DISTANCIA HASTA 1 KM m3k 47,093.43 1,210.94 3,432.90 2,221.96
06.01.02 TRANSPORTE DE MATERIAL ELIMINADO A BOTADERO DISTANCIA HASTA >1 KM m3k 155,408.32 6,631.29 12,660.81 6,029.52
METRADO ACUMULADO A
METRADO METRADO
CONTRACTUAL PRESENTE MES
PARTIDA DESCRIPCIN UND. Nov-16 Dec-16
07.03 CUNETAS - -
08 SEALIZACION - -
METRADO ACUMULADO A
METRADO METRADO
CONTRACTUAL PRESENTE MES
PARTIDA DESCRIPCIN UND. Nov-16 Dec-16
10 CONTROL DE CALIDAD - -
11 VARIOS - -