Student name MUHAMMAD DANISH Student number 00361028
Place inspected AL-REHMAN CONSTRUCTOION SOLUTION Date of inspection 16 / 11/ 2016
Observations Control measures Timescale
1. Poor housekeeping on site. Immediate:- Immediate
Hazard: Clean all unwanted material & Stock Risk of slip and trip Personal injury will properly. Walkways should be free of occur. Materials & Segregate walkways. Consequence: Short-Term Control:- 02- Days Personal injuries. Need to follow & implement the Site inspection. Long-Term Control:- Provide tool-box talk to ensure the 02- Weeks working areas Clean & tidy.
2. Observed the stairs hand rail missing Immediate:- Immediate
but workers using the Stairs. Advised to closed access and display no entry sign- board. Hazard:- Short-Term Control:- Risk of slip & Fall. Instructed o provide scaffoldings pipes to 02- Days hard barricade opening and remove no Consequence:- entry sign-board. Personal injuries. Long-Term Control:- Provide proper hand rail stairs for 01- Weeks permanent use.
3. No spill kit tray available in chemical Immediate:- Immediate
storage area. Provide proper spill kit tray for catch Hazard:- spillage at chemical storage area. And Risk of ground Contamination. area should be ventilated. Consequence:- Short-Term Control:- III-health MSDS should be considered while 05- Days dealing with chemicals Inspection to be needed. Long-Term Control:- Training to be conducting on inspection 01- month chemical storage area & containers. 4. Fire Extinguisher obstructed by Immediate:- All obstruction has to remove and Immediate material. Hazard: provides signage to not store anything Risk of loss material & life due delaying near fire extinguisher. in event of fire. Short-Term Control:- Consequence: Inspection to be carried out of fire stations & follow the site emergency plan. 01- Weeks Material Damage personal loss. 5 Diesel Container stored on site Immediate:- without fire precaution measure. Highly flammable materials to be Hazard:- recovered from location & ignition Source Immediate Risk of major fire & explosion. prohibited. Consequence:- Short-Term Control:- Property & personal loss. Provide proper fire protection to designated area for storage & follow procedure for flammable material. 03- Days Long-Term Control:- Need to provide info. Instruction & training for not to store any flammable material site. 02- Weeks 6. Over loading of block (Material) on Immediate:- the scaffolding above the toe-board. Remove excessive stored blocks from Hazard:- scaffolding platform. Risk of material & objects fall from Long-Term Control:- Immediate height & personal injury. Conducting the training for discussing the Consequence:- consequence of fall object & material Personal injury & Material loss from height. 02-weeks 7. From lifter upload the heavy pipes Immediate:- from trailer on site. Stopped activity and explained about Immediate Hazard: hazards. Un-balance lifting cause of falling Short-Term Control:- objects or injury. Instructed the supervisor for arrange Consequence: crane for lifting. 02-Days Material damage personal injury. Long-Term Control :- Advised to provide third party certificate to the operator. 01- Month
8. Material stored at escape routes of Immediate:-
office. Stored material has removed and need to Hazard:- provide clean & marking exit routes. Immediate Risk of personal injury in emergency Short-Term Control:- evacuation due to entrapment with Need to place prohibitive signage for material. material store in exist routes. 02- Week Consequence:- Long-Term Control :- Personal injury. Training to be given all persons regarding emergency procedure & fire 01- Month evacuation. 9. Chemical Stored in drinking water Immediate:- bottles at site without product labels. Disposal all these bottles with chemical Hazard:- and use proper PPE during disposal. Immediate Risk of occupational health hazards. Short-Term Control:- Consequence:- MSDS Should be provided while strong Health hazard. any chemical and provide appropriate 05- Days small storage. Long-Term Control:- Provide tanning & Supervising for safe use of substance. 01- Month
10. Observed there is improper Immediate:-
technique used for lifting & Carrying the Stop the activity & informed the Immediate blocks from ground to shoulder level. supervisor. Hazard: Short-Term Control Risk of musculoskeletal. Need to implement the proper manual Consequence: handling procedure & safe lifting 01-Week Work related upper limb disorders. technique. 11. Water dropping on live electrical Immediate:- cables from overhead main supply. A/C. Isolate the area & switch off power. Immediate Hazard:- Short-Term Control:- Risk of electrocution and fire. Daily inspection to be carried out by Consequence:- competent person and make precaution 06- Days Fire & explosion. for such situations. Long-Term Control :- Need to provide training on such situations for avoid reoccurrence. 02- Weeks
12. Hot work in progress without proper Immediate:-
PPE & proper ventilation. Stop activity & Provide appropriate PPE Hazard:- & provide fire extinguisher. Immediate Risk of eyes & serious health issue. Short-Term Control:- Consequence:- Provide proper ventilation & implement Severe injury. safe strategy like permit-to-work system. 03- Days Long-Term Control:- Need to provide the training & supervision for such kind of activities. 01- Month 13. Observed that in proper mobile Immediate:- scaffolding is used. Stop activity & provide Complete Immediate Hazard: scaffolding to be erected dismantled by Risk of fall from height. person. Consequence: Short-Term Control Personal injury. Scaffolding checklist should be completed prior to start work on 01-Week scaffolding. Long-Term Control:- Need to provide training to scaffolders regarding scaffolding. Inspection & 02- Weeks supervision should be carried out. 14. Contact with wet cement while Immediate:- working with cement mixer at ground Stop the work and advised to wash floor. hands & face which is contacted with wet Immediate Hazard:- cement. Corrosive if confect with skin. Short-Term Control:- Consequence:- Provide proper resistant long sleeves Dermatitis of skin irritant. gloves & hard water proof boats safety 02- hours glasses. Long-Term Control :- Need to training & supervision to workers on use of proper personal protective 03- days equipment. (PPEs). 15. No edge or sides protection deep Immediate:- excavation. Stop activity & need to shoring to avoid Hazard:- cave in structure & proper access& Immediate Risk of Collapse the structure & serious egress. injury fatalities occur. Short-Term Control:- Consequence:- Need to implement the safe strategy like Serious injury. permit-to-work. 04- Days Long-Term Control:- Need to provide the info training & instruction to worker in order to avoid 01- Month cave in structure & supervise then. 16. Using power tools (Metal cutter) Immediate:- Immediate without guards & proper handle. Stop activity & appropriate ground to be Hazard: fixed. Risk of entanglement with moving parts Short-Term Control puncture by scarf ejected during cutting. All power tools should be inspected by 02-weeks Consequence: checklist. Implement the logout & logout Personal injury. system should be implemented. Long-Term Control:- Need to provide info training on proper 01-month use of power tools and importance of guard also discuss to entanglement hazards.
17. Unlocked & open electrical Immediate:-
distribution board on the floor & Need to closed & locked as well Immediate temporary walls. barricade. Hazard:- Short-Term Control:- Risk of electrocution fire. Isolate that area & provide adequate 02- Days Consequence:- warning signage. Fire Explosion. Long-Term Control :- Need to be random inspection by 02- Weeks competent person.
18. Paint containers left open inside the Immediate:- Immediate
electrical room. Cover the containers & stored in Hazard:- designated area. Use appropriate PPE Risk of inhalation absorption of toxic during transfer it. vapours. Long-Term Control:- Consequence:- Training of storage & usage of flammable 02- Weeks IIL Health. chemical material.
19. Observed that naked wires are Immediate:-
placed in the multiple plug sockets. Proper plug & cable provided & replaced Immediate Hazard: the multiple plug socket.. Risk of fire explosion & electrocution. Short-Term Control Consequence: Need to follow the electrical appliance & 04- Days Explosion. wires. Long-Term Control:- Need to provide too-box tall on safe 02- Weeks method while dealing with electrical appliance. 20. Hot work being carried out without Immediate:- Immediate accurate precautions like no fire Stop activity and instruct to place fire extinguisher available near the work. extinguishers. Hazard:- Short-Term Control:- 01- Week Risk of property damage & personal Need to follow the permit to-work injury/death due to fire. system for this activity to avoid such Consequence:- reoccurrence. Loss of property & personal. Long-Term Control :- 01- Month Need to provide training before start activities competent person should monitor activity. 21. Observe the platform of scaffolding Immediate:- created around the floor. Barricade the area & near scaffolding Immediate Hazard:- make warning tape. Risk of falling objects that can result in Short-Term Control:- 02- Days serious injuries or property damage. Advised them to certified lifting belts. Consequence:- Long-Term Control:- Material damage & serious injuries. Training of storage & usage of flammable 01 Week chemical material. 22. Un-safe platform of scaffolding Immediate:- Immediate created around the floor. Barricade the area & near scaffolding Hazard: make working tape. Risk of falling objects & loss it. Short-Term Control Consequence: Arrange fully broadest form at scaffolding. 02- Days Loss Objects. Long-Term Control:- Arrange competent worker for erect 02- Weeks scaffolding. 23. Using lifting crave without banks Immediate:- man at site. Stop the activity & advised to provide Immediate Hazard:- banks man for proper direction. Structure collapse & overtone. Long-Term Control :- Consequence:- Need to conduct training for given 03- Weeks Property & material damage. instructions& information to all worker on such kind of activity.
24. Observed that one of the workers at Immediate:- Immediate
constant site were shouting and yelling Told them zero- tolerance policy and do at the other co-worker to do something. not take part at such circumstances. Hazard:- Short-Term Control:- 02- Days Violence at work. Reporting system will be introduced & Consequence:- Nee to provide training to all workers on Stress & demotivation in front of the their (behaviour issue). other workers. Long-Term Control:- 02 Week Training of storage & usage of flammable chemical material. 25. Security Staff are present at site. Good Practices Maintained
26. Trained first aides are present at Good Practices
site. N.A
27. All employees attend the tool-box
talk & Consult about their daily activities Maintained Good Practices by group.
28. Welfare facilities are available at
site. According to standards do inking Good Practices water, Toilets, hand wash area and first Maintained aid facilities.
29. Provide full body harness hard head Good Practices
helmet with proper chinstrap & other On Going lifting appliance available & stored.
30. Consult with workers on their health Good Practices
& provide health & provide health On Going surveillance.
31. Prohibited on un-authorised entry at Good Practices