Y10 @300mmc/c
1000 725
Y10@300mmc/c
1:2:4(20mm) R/F conc.
1300 Y10 @225mm c/c
225
Y10 @300mmc/c
400
1200
Y10 @225mm c/c
Y10 @300mmc/c, BW
1:2:4(20mm) R/F conc.
1:3:6(38mm) Lean conc.
1050 450
WING WALL
250
100
1200
SECTION Y - Y SECTION X - X
1
1200
450 100
Y
1200
1050
750
X X
225
Y
PLAN
IRRIGATION DEPARTMENT -NP Project:- Provincial Specific Development Grant IE's OFFICE DDI's OFFICE
Scheme :- Maruthamadukulam LEVELED & CAD CHECKED SUBMITTED CHECKED DESIGN CHECKED APPROVED
MULLAITIVU RANGE
Structure :- Construction of Canal Concrete Lining & Over Crossing
Location :- R.B Main channel - 3+800 to 3+938m
MUTHUIYANKADDU DIVISION Drg.NO :- PSDG/MIK/MAR/Canal Linnig/01 SHEET NO :- 01 OF 02 DATE :- 13.01.2016 R.Sivakumar, TO T.Thayananthan, D'man Eng.N.Vijayaravi, I.E P.Yogachandran, D'man Eng.(Mrs.)M.Joyeskumar, I.E Eng.N.Sriskandarajah, D.D.I
27 )
2+ 4 (R/L
m
m .65m
F.A- 0.327 m2
58 9 2
F.A- 0.665 m2
at
9 3. n -
of ctio
S ill stru
D/S Co n
in g
ve rt an al
C.A- 0.090 m2 C.A- 0.530 m2
ss
C ul C
cro
m rli er
v er
d d Ea
al O
Can
erre se
fro
an sf ro po
ed
lin
p
e l tr n P
Dro
lo ng
Lev es ig
m
0. 30
D
7m
st in ev el
ed
ed
Exi L
g
pos
pos
B ed
P ro
P ro
Datum 90.00 MSL Datum 90.00 MSL
92.63
92.60
92.88
93.08
92.53
92.80
92.90
92.94
92.75
92.76
92.95
93.07
93.11
93.04
93.05
Existing Levels Existing Levels
92.65
92.64
92.63
92.62
92.61
92.60
92.59
92.58
92.58
92.28
92.27
92.26
Distance in m -3.00 -2.00 -1.00 0.00 1.00 2.00 3.00 Distance in m -3.00 -2.00 -1.00 0.00 1.00 2.00 3.00
Design Levels
CS at 3850.00 m CS at 3925.00 m
92.48
92.56
92.53
92.32
92.38
92.94
93.07
93.36
92.76
92.76
91.72
91.56
Existing Levels
F.A- 0.473 m2 Distance in m 3800.00 3825.00 3850.00 3875.00 3900.00 3925.00 3950.00 3975.00 4000.00
3979.00
4025.00
F.A- 1.688 m2 C.A- 0.407 m2
F.A- 0.827 m2
C.A- 0.266 m2
Datum 90.00 MSL Datum 90.00 MSL Datum 90.00 MSL
2
92.64
92.61
92.58
Design Levels Design Levels Design Levels
93.38
92.50
92.48
92.56
92.56
92.58
93.33
92.91
92.93
92.93
92.94
92.96
93.02
93.01
92.75
92.74
92.77
92.76
92.77
92.75
92.73
Existing Levels Existing Levels Existing Levels
Distance in m -3.00 -2.00 -1.00 0.00 1.00 2.00 3.00 Distance in m -3.00 -2.00 -1.00 0.00 1.00 2.00 3.00 Distance in m -3.00 -2.00 -1.00 0.00 1.00 2.00 3.00
CS at 3825.00 m CS at 3900.00 m CS at 3979.00 m
F.A- 2.516 m2 F.A- 2.218 m2 C.A- 0.822 m2
600 100
625
1:1.5
950
Datum 90.00 MSL Datum 90.00 MSL Datum 90.00 MSL TYPICAL SECTI ON
O F CONCRETE CANAL
92.65
92.62
92.59
Design Levels Design Levels Design Levels
93.38
92.56
91.50
92.48
92.56
93.38
93.37
92.30
92.30
92.18
92.36
92.38
92.48
92.66
92.83
93.36
93.37
93.35
93.36
93.35
93.36
93.34
Existing Levels Existing Levels Existing Levels
Distance in m -3.00 -2.00 -1.00 0.00 1.00 2.00 3.00 Distance in m -4.00 -3.00 -2.00 -1.00 0.00 1.00 2.00 3.00 Distance in m -3.00 -2.00 -1.00 0.00 1.00 2.00 3.00
CS at 3800.00 m CS at 3875.00 m CS at 3950.00 m
IRRIGATION DEPARTMENT -NP Project:- Provincial Specific Development Grant IE's OFFICE DDI's OFFICE
Scheme :- Maruthamadukulam LEVELED & CAD CHECKED SUBMITTED CHECKED DESIGN CHECKED APPROVED
MULLAITIVU RANGE
Structure :- Construction of Canal Concrete Lining & Over Crossing
Location :- R.B Main channel - 3+800 to 3+938m
MUTHUIYANKADDU DIVISION Drg.NO :- PSDG/MIK/MAR/Canal Linnig/01 SHEET NO :- 02 OF 02 DATE :- 13.01.2016 R.Sivakumar, TO T.Thayananthan, D'man Eng.N.Vijayaravi, I.E P.Yogachandran, D'man Eng.(Mrs.)M.Joyeskumar, I.E Eng.N.Sriskandarajah, D.D.I
Estimate for the expenses necessary to be Incurred for Construction of Canal Concrete Lining at RB Main channel
of Maruthamadu Tank( 3+800m - 3+980m ) in Muthuiyankaddu Division, Mullaitivu Range Under PSDG 2016.
Specifi This estimate provides for all labour, material transport, tools and equipments necessary to be incurred for the construction of above work at
cation Puthukkudiyiruppu Area as per plan and items of the body of the estimate and the instruction given by the officer supervising the work
3
Si.No Description Qty Unit Rate Amount Total
2.2 Supplying and laying of 1:3:6(38mm) ct.concrete for pier base without form work. 0.16 m3 13,585.00 2,173.60
Supplying and laying of 1:2:4(20mm) ct.concrete for pier construction without form
2.3 1.00 m3 14,970.00 14,970.00
work.
Supplying and laying of 1:2:4(20mm) ct.concrete for pier construction with form
2.4 1.00 m3 17,730.00 17,730.00
work.
2.5 Furnishing, cutting, bending & placing 10mm tor steel reinforcement for pier. 66.50 Kg 250.00 16,625.00
Sub Total 52,932.10
ITEM - 3
3.0
Construction of Wing walls
Earth excavation in foundation for wing wall construction and part return fill to
3.1 0.40 m3 1,175.00 470.00
ramp and disposed as directed.
Supplying and laying of 1:2:4(20mm) ct.concrete for wings construction without
3.2 0.40 m3 14,970.00 5,988.00
form work.
Supplying and laying of 1:2:4(20mm) ct.concrete for wings construction with form
3.3 0.20 m3 17,730.00 3,546.00
work.
3.4 Furnishing, cutting, bending & placing 10mm tor steel reinforcement for wings. 30.00 Kg 250.00 7,500.00
3.5 Tyding up site after Construction Item Allow sum 353.80
Sub Total 17,857.80
Total Civil Cost 900,900.90
VAT 11% 99,099.10
Grant Total 1,000,000.00
4
Maruthamadu Kulam RB main channel Concrete Lining (3+800 m to 3+980 m)
T D S Description
Preliminaries
A
Provision for the cost of construction and maintenance of a temporary
sheds to accommodate the Contractor's staff and workmen at the site
Item Allow
during the contract period.(After completion of construction paid each
materials to be handover to MIK IE's Office).
ITEM - 1
RB MAIN CHANNEL CONCRETE LINNING ( 3+800m - 3+938m )
1.1
Secondary growth clearing along the channel & reservation including
uprooting stumps, removing all debris outside reservation and burning
manually.
180.00
3.00 540.00
= 540/10000 Say - 0.05 ha
1.2
Earth cutting along the canal for canal concrete lining & unusable earth
dumped outside reservation by manually.
As per quantity sheet
Say - 22.0 m3
1.3
Earth cutting along the canal for canal concrete lining and 60% of Earth
reused for lined canal bund formation and balance to be dumped as waste.
5
T D S Description
1.7
Furnishing, cutting, bending & placing 10 mm tor steel reinforcement for
concrete lining.
As per Bar shedule
Say - 968.0 Kg
ITEM - 2
Construction of Over crossing Piers at 3+875m to 3+882m (03 Nos)
2.1
Earth excavation in foundation for Over crossing Pier construction and part
3 1.200
return fill to ramp and disposed as directed.
0.450 Say -1.22 m3
0.750 1.215
2.2
Supplying and laying of 1:3:6(38mm) ct.concrete for pier base without
3 1.200
form work.
0.450
0.100 0.162 Say -0.16 m3
2.3
Supplying and laying of 1:2:4(20mm) ct.concrete for pier construction
3 1.200
without form work.
0.225
1.200 0.972 Say -1.0 m3
2.4
Supplying and laying of 1:2:4(20mm) ct.concrete for pier construction with
3 1.050
form work.
0.225
1.400 0.992 Say -1.00 m3
2.5
Furnishing, cutting, bending & placing 10mm tor steel reinforcement for
pier.
3/2 1.100 6.600 Footing
3/4 0.350 4.200
3/2/4 2.610 62.640 Pier Vertical R/F
3/2/6 0.950 34.200 Pier Horizontal R/F
107.640
0.617 10mm bar
66.414 Say -66.50 Kg
ITEM - 3
Construction of Wing walls
3.1
Earth excavation in foundation for wing wall construction and part return
2 3.350
fill to ramp and disposed as directed.
0.100
0.600 0.402 Say -0.40 m3
3.2
Supplying and laying of 1:2:4(20mm) ct.concrete for pier construction
2 3.350
without form work.
0.100
0.600 0.402 Say -0.40 m3
3.3
6
T D S Description
Supplying and laying of 1:2:4(20mm) ct.concrete for pier construction with
2 1.200
form work.
0.100
0.600 0.144 Say -0.15 m3
3.4
Furnishing, cutting, bending & placing 10mm tor steel reinforcement for
pier.
2/2/6 1.100 26.400 Ver.
2/4 0.500 4.000
2/2/3 1.100 13.200
2/3 3.250 19.500
63.100
0.617
38.933 Say - 39.0 Kg
3.5
Tyding up site after Construction
7
T D S Description
8
ITEM -1
9
ITEM - 1
Bar Schedule for RB main canal lining of Maruthamadu kulam.
each bars
Length of
Type and
Dimensio
Bar mark
Total No
bending
of bars
length
Shape
Total
Pitch
size
and
n
Reinforcement for Deck
Main 138 0.700 m 0.700m
Y10 - 300mm 323 2.275 734.83 0.875 m
Disribution
Y10 - 300mm 8 97 776.00 138 m
Add Lap 8/16 0.45 57.60
833.60
10
700
323.333 700
875
2275
16.16666667
11