Sei sulla pagina 1di 11

100 750

100

Y10 @300mmc/c
1000 725

Y10@300mmc/c
1:2:4(20mm) R/F conc.
1300 Y10 @225mm c/c
225
Y10 @300mmc/c
400

1200
Y10 @225mm c/c
Y10 @300mmc/c, BW
1:2:4(20mm) R/F conc.
1:3:6(38mm) Lean conc.
1050 450
WING WALL
250

100

1200
SECTION Y - Y SECTION X - X

1
1200

450 100

Y
1200

1050
750
X X
225

Y
PLAN
IRRIGATION DEPARTMENT -NP Project:- Provincial Specific Development Grant IE's OFFICE DDI's OFFICE
Scheme :- Maruthamadukulam LEVELED & CAD CHECKED SUBMITTED CHECKED DESIGN CHECKED APPROVED
MULLAITIVU RANGE
Structure :- Construction of Canal Concrete Lining & Over Crossing
Location :- R.B Main channel - 3+800 to 3+938m
MUTHUIYANKADDU DIVISION Drg.NO :- PSDG/MIK/MAR/Canal Linnig/01 SHEET NO :- 01 OF 02 DATE :- 13.01.2016 R.Sivakumar, TO T.Thayananthan, D'man Eng.N.Vijayaravi, I.E P.Yogachandran, D'man Eng.(Mrs.)M.Joyeskumar, I.E Eng.N.Sriskandarajah, D.D.I
27 )
2+ 4 (R/L
m
m .65m
F.A- 0.327 m2

58 9 2
F.A- 0.665 m2

at
9 3. n -
of ctio
S ill stru
D/S Co n

in g
ve rt an al
C.A- 0.090 m2 C.A- 0.530 m2

ss
C ul C

cro
m rli er

v er
d d Ea

al O
Can
erre se
fro
an sf ro po

ed
lin

p
e l tr n P

Dro
lo ng
Lev es ig

m
0. 30
D

7m
st in ev el

ed

ed
Exi L
g

pos

pos
B ed

P ro

P ro
Datum 90.00 MSL Datum 90.00 MSL
92.63

92.60

Design Levels Design Levels


Datum 90.00 MSL
92.74

92.88

93.08

92.53

92.80

92.90

92.94

92.75

92.76

92.95

93.07

93.11

93.04

93.05
Existing Levels Existing Levels

92.65

92.64

92.63

92.62

92.61

92.60

92.59

92.58
92.58
92.28
92.27

92.26
Distance in m -3.00 -2.00 -1.00 0.00 1.00 2.00 3.00 Distance in m -3.00 -2.00 -1.00 0.00 1.00 2.00 3.00
Design Levels
CS at 3850.00 m CS at 3925.00 m

92.48

92.56

92.53

92.32
92.38
92.94

93.07

93.36

92.76
92.76

91.72

91.56
Existing Levels
F.A- 0.473 m2 Distance in m 3800.00 3825.00 3850.00 3875.00 3900.00 3925.00 3950.00 3975.00 4000.00
3979.00
4025.00
F.A- 1.688 m2 C.A- 0.407 m2
F.A- 0.827 m2
C.A- 0.266 m2
Datum 90.00 MSL Datum 90.00 MSL Datum 90.00 MSL

2
92.64

92.61

92.58
Design Levels Design Levels Design Levels
93.38

92.50

92.48

92.56

92.56

92.58

93.33

92.91

92.93

92.93

92.94

92.96

93.02

93.01

92.75

92.74

92.77

92.76

92.77

92.75

92.73
Existing Levels Existing Levels Existing Levels
Distance in m -3.00 -2.00 -1.00 0.00 1.00 2.00 3.00 Distance in m -3.00 -2.00 -1.00 0.00 1.00 2.00 3.00 Distance in m -3.00 -2.00 -1.00 0.00 1.00 2.00 3.00
CS at 3825.00 m CS at 3900.00 m CS at 3979.00 m
F.A- 2.516 m2 F.A- 2.218 m2 C.A- 0.822 m2
600 100

625
1:1.5
950
Datum 90.00 MSL Datum 90.00 MSL Datum 90.00 MSL TYPICAL SECTI ON
O F CONCRETE CANAL

92.65

92.62

92.59
Design Levels Design Levels Design Levels

93.38

92.56

91.50

92.48

92.56

93.38

93.37

92.30

92.30

92.18

92.36

92.38

92.48

92.66

92.83

93.36

93.37

93.35

93.36

93.35

93.36

93.34
Existing Levels Existing Levels Existing Levels
Distance in m -3.00 -2.00 -1.00 0.00 1.00 2.00 3.00 Distance in m -4.00 -3.00 -2.00 -1.00 0.00 1.00 2.00 3.00 Distance in m -3.00 -2.00 -1.00 0.00 1.00 2.00 3.00
CS at 3800.00 m CS at 3875.00 m CS at 3950.00 m
IRRIGATION DEPARTMENT -NP Project:- Provincial Specific Development Grant IE's OFFICE DDI's OFFICE
Scheme :- Maruthamadukulam LEVELED & CAD CHECKED SUBMITTED CHECKED DESIGN CHECKED APPROVED
MULLAITIVU RANGE
Structure :- Construction of Canal Concrete Lining & Over Crossing
Location :- R.B Main channel - 3+800 to 3+938m
MUTHUIYANKADDU DIVISION Drg.NO :- PSDG/MIK/MAR/Canal Linnig/01 SHEET NO :- 02 OF 02 DATE :- 13.01.2016 R.Sivakumar, TO T.Thayananthan, D'man Eng.N.Vijayaravi, I.E P.Yogachandran, D'man Eng.(Mrs.)M.Joyeskumar, I.E Eng.N.Sriskandarajah, D.D.I
Estimate for the expenses necessary to be Incurred for Construction of Canal Concrete Lining at RB Main channel
of Maruthamadu Tank( 3+800m - 3+980m ) in Muthuiyankaddu Division, Mullaitivu Range Under PSDG 2016.

Specifi This estimate provides for all labour, material transport, tools and equipments necessary to be incurred for the construction of above work at
cation Puthukkudiyiruppu Area as per plan and items of the body of the estimate and the instruction given by the officer supervising the work

Si.No Description Qty Unit Rate Amount Total


Preliminaries
Provision for the cost of construction and maintenance of a temporary sheds to
accommodate the Contractor's staff and workmen at the site during the contract
A Item Allow P.sum 8,500.00
period.(After completion of construction paid each materials to be handover to MIK
IE's Office).
Sub Total 8,500.00
ITEM - 1
1.0
RB MAIN CHANNEL CONCRETE LINNING ( 97m, 3+800m - 3+980m )
Secondary growth clearing along the channel & reservation including uprooting
1.1 0.05 ha 66,985.00 3,349.25
stumps, removing all debris outside reservation and burning manually.
Earth cutting along the canal by machinery for canal concrete lining & unusable
1.2 22.00 m3 175.00 3,850.00
earth dumped outside reservation.
Earth cutting along the canal by machinery for canal concrete lining and 60% of
1.3 31.00 m3 200.00 6,200.00
Earth reused for lined canal bund formation and balance to be dumped as waste.
Borrow earth from approved borrow area and forming lined canal bund including
1.4 116.00 m3 295.00 34,220.00
placing, watering and compacting by Manually - Haul 2Km.
Supplying and laying of 1:2:4(20mm) ct.concrete for concrete lining without
1.5 21.35 m3 13,505.00 288,331.75
formwork.
1.6 Furnishing making fixing &removing form work for lining work 262.00 m2 930.00 243,660.00
Furnishing, cutting, bending & placing 10 mm tor steel reinforcement for concrete
1.7 968.00 Kg 250.00 242,000.00
lining.
Sub Total 821,611.00
ITEM - 2
2.0
Construction of Over crossing Piers at 3+875m to 3+882m (03 Nos)
Earth excavation in foundation for Over crossing Pier construction and part return
2.1 1.22 m3 1,175.00 1,433.50
fill to ramp and balance disposed as directed.

3
Si.No Description Qty Unit Rate Amount Total

2.2 Supplying and laying of 1:3:6(38mm) ct.concrete for pier base without form work. 0.16 m3 13,585.00 2,173.60
Supplying and laying of 1:2:4(20mm) ct.concrete for pier construction without form
2.3 1.00 m3 14,970.00 14,970.00
work.
Supplying and laying of 1:2:4(20mm) ct.concrete for pier construction with form
2.4 1.00 m3 17,730.00 17,730.00
work.
2.5 Furnishing, cutting, bending & placing 10mm tor steel reinforcement for pier. 66.50 Kg 250.00 16,625.00
Sub Total 52,932.10
ITEM - 3
3.0
Construction of Wing walls
Earth excavation in foundation for wing wall construction and part return fill to
3.1 0.40 m3 1,175.00 470.00
ramp and disposed as directed.
Supplying and laying of 1:2:4(20mm) ct.concrete for wings construction without
3.2 0.40 m3 14,970.00 5,988.00
form work.
Supplying and laying of 1:2:4(20mm) ct.concrete for wings construction with form
3.3 0.20 m3 17,730.00 3,546.00
work.
3.4 Furnishing, cutting, bending & placing 10mm tor steel reinforcement for wings. 30.00 Kg 250.00 7,500.00
3.5 Tyding up site after Construction Item Allow sum 353.80
Sub Total 17,857.80
Total Civil Cost 900,900.90
VAT 11% 99,099.10
Grant Total 1,000,000.00

At IE's Office At DDI's Office


Prepared By:- Checked by :
R.Sivakumar,TO P.Yogachandran, D'man.
Checked By : Reviewed & Passed by :
T.Thayananthan, D'man. Eng.(Mrs).M.Joyeskumar,
Irrigation Engineer.
Submitted by : Approved By :
Eng.N.Vijayaravi, Eng.N.Sriskandarajah,
Irrigation Engineer, Deputy Director of Irrigation,
Muthuiyankaddu Division. Mullaitivu Range.

4
Maruthamadu Kulam RB main channel Concrete Lining (3+800 m to 3+980 m)

T D S Description
Preliminaries
A
Provision for the cost of construction and maintenance of a temporary
sheds to accommodate the Contractor's staff and workmen at the site
Item Allow
during the contract period.(After completion of construction paid each
materials to be handover to MIK IE's Office).

ITEM - 1
RB MAIN CHANNEL CONCRETE LINNING ( 3+800m - 3+938m )
1.1
Secondary growth clearing along the channel & reservation including
uprooting stumps, removing all debris outside reservation and burning
manually.
180.00
3.00 540.00
= 540/10000 Say - 0.05 ha
1.2
Earth cutting along the canal for canal concrete lining & unusable earth
dumped outside reservation by manually.
As per quantity sheet
Say - 22.0 m3
1.3

Earth cutting along the canal for canal concrete lining and 60% of Earth
reused for lined canal bund formation and balance to be dumped as waste.

As per quantity sheet


Say - 31.0 m3
1.4
Borrow earth from borrow area and forming lined canal bund including
placing, watering and compacting by Manually - Haul 2Km.
As per quantity sheet
Say - 116.0 m3
1.5
Supplying and laying of 1:2:4(20mm) ct.concrete for concrete lining with
97.00
formwork.
0.95
0.10 9.22
2 97.000
0.100
0.625 12.13
21.34 Say - 21.35 m3
1.6
2 97.000 Furnishing making fixing &removing form work lining work
0.725 140.650
2 97.000
0.625 121.250
261.90 Say - 262.0 m2

5
T D S Description
1.7
Furnishing, cutting, bending & placing 10 mm tor steel reinforcement for
concrete lining.
As per Bar shedule
Say - 968.0 Kg

ITEM - 2
Construction of Over crossing Piers at 3+875m to 3+882m (03 Nos)

2.1
Earth excavation in foundation for Over crossing Pier construction and part
3 1.200
return fill to ramp and disposed as directed.
0.450 Say -1.22 m3
0.750 1.215
2.2
Supplying and laying of 1:3:6(38mm) ct.concrete for pier base without
3 1.200
form work.
0.450
0.100 0.162 Say -0.16 m3
2.3
Supplying and laying of 1:2:4(20mm) ct.concrete for pier construction
3 1.200
without form work.
0.225
1.200 0.972 Say -1.0 m3
2.4
Supplying and laying of 1:2:4(20mm) ct.concrete for pier construction with
3 1.050
form work.
0.225
1.400 0.992 Say -1.00 m3
2.5
Furnishing, cutting, bending & placing 10mm tor steel reinforcement for
pier.
3/2 1.100 6.600 Footing
3/4 0.350 4.200
3/2/4 2.610 62.640 Pier Vertical R/F
3/2/6 0.950 34.200 Pier Horizontal R/F
107.640
0.617 10mm bar
66.414 Say -66.50 Kg

ITEM - 3
Construction of Wing walls
3.1
Earth excavation in foundation for wing wall construction and part return
2 3.350
fill to ramp and disposed as directed.
0.100
0.600 0.402 Say -0.40 m3
3.2
Supplying and laying of 1:2:4(20mm) ct.concrete for pier construction
2 3.350
without form work.
0.100
0.600 0.402 Say -0.40 m3
3.3
6
T D S Description
Supplying and laying of 1:2:4(20mm) ct.concrete for pier construction with
2 1.200
form work.
0.100
0.600 0.144 Say -0.15 m3
3.4
Furnishing, cutting, bending & placing 10mm tor steel reinforcement for
pier.
2/2/6 1.100 26.400 Ver.
2/4 0.500 4.000
2/2/3 1.100 13.200
2/3 3.250 19.500
63.100
0.617
38.933 Say - 39.0 Kg
3.5
Tyding up site after Construction

Prepared By:- Checked By:


R.Sivakumar, T.O T.Thayananthan,D'man

7
T D S Description

8
ITEM -1

Cutting & Filling for RB main channel at (3+800m to 3+980m)

Earth Cutting Earth Filling

Mean Area Volume Mean Area Volume


Chainage Distance PM Reading 2 3 PM Reading 2 3
(m ) (m ) (m ) (m )

3800 0 0.000 0.000 0.000 2.516 0.000 0.000


3825 25 0.000 0.000 0.000 1.688 2.102 52.550
3850 25 0.090 0.045 1.125 0.665 1.176 29.400
3875 25 0.000 0.045 1.125 2.218 1.441 36.025
3900 25 0.407 0.203 5.075 0.473 1.345 33.625
3925 25 0.530 0.468 11.700 0.327 0.400 10.000
3950 25 0.822 0.676 16.900 0.000 0.163 4.075
3979 29 0.266 0.544 15.776 0.827 0.413 11.977
51.701 177.652

Earth cutting = 51.701 Say - 31.00 m3


Filling Earth Requirement = 177.652
1. 60% of cutting earth to be used for filling = 31.021 Say - 22.0 m3
3
2. Balance filling Earth to be collected from approved Barrow area = 146.631 Say - 116.0 m

* Bed Level Design Proposed Earlier Canal Constructed bed - 92.65m(R/L).


* Existing Level transferred from Culvert D/S Sill of 93.58m at 2+427 m.
* Proposed 7m long lined Canal Overcrossing start at 3+875 m

Prepared By: Checked By:-


R.Sivakumar, T.O T.Thayananthan, D'man

9
ITEM - 1
Bar Schedule for RB main canal lining of Maruthamadu kulam.

each bars
Length of
Type and

Dimensio
Bar mark

Total No

bending
of bars

length

Shape
Total
Pitch

size

and

n
Reinforcement for Deck
Main 138 0.700 m 0.700m
Y10 - 300mm 323 2.275 734.83 0.875 m

Disribution
Y10 - 300mm 8 97 776.00 138 m
Add Lap 8/16 0.45 57.60
833.60

Total length of 10 mm bar 1,568.43

Weight of 10 mm bar = 1,568.43 x 0.617


= 967.72 kg
= 967.72 kg
Say 968.00 kg

Prepared By:- Checked By:-


R.Sivakumar, TO T.Thayananthan,D'man

10
700
323.333 700
875
2275
16.16666667

11

Potrebbero piacerti anche