Sei sulla pagina 1di 320

~~~~~ ---------------~--- ...

~ -~
.

Design, Supply, Installation and Commissioning ofUdipur-


Markichowk-Bharatpur 220 kV Transmission Line

ICB No.: ICB-PMD-MCTLP-016/17-01


Invitation for Bid No.: ICB -PMD-MCTLP-016117-01

id

To
Attention: Mr. Chirantan
Marsyangdi Corridor 220 kV Project
Project Management Directorate
Street Address: Satungal - Bauthali Chowk Marga, Matatirtha Substation
Chandragiri Municipality, Ward No. 11
Floor/Room number: 2nd Floor
City: Kathmandu
ZIP Code: NA
Country: Nepal
From
Larsen & Toubro Limited,
Mount Poonamallee Road,
Manapakkam, P.B. No. 979,
Chennai - 600 089.
(4) Composite Long Rod
Insulator
A *iift!~~mJN:m-~1J10Ji.1
~ Dalian Insulator Group Co., Ltd.
$J;fil ;f:;j!_m;;::lD~iif!iI.ltl:!88 ~ FACTORY ADD. 88 East Liao He Road, DD Port, Dalian, P.R. China P.C.:11&600

Manufacturer'sAuthorization

Date: 5th January, 2017


ICB No.: ICB-PMD-MCTLP-016/17-01

To:
Mr. Chirantan Bikram Rana
Marsyangdi Corridor 220 kV Transmission Line Project
Project Management Directorate
Street Address: Satungal-Bauthali Chowk Marga,
Matatirtha Substation, Chandragiri Municipality, Ward No. 11
2nd Floor, Kathmandu, Nepal

WHEREAS

We Dalian Insulators Group Co., Ltd., who are official manufacturers or agent
authorized by the Manufacturer of Various Insulators,having factories at 88 East
Liao He Road, DD Port, Dalian,P.R China P.C - 116600 do hereby authorize
M/s Larsen & Toubro Limited, India to submit a bid the purpose of which is to
provide the following goods, manufactured by us Composite Insulators, and to
subsequently negotiate and sign the Contract.

We hereby extend our full guarantee and warranty in accordance with Clause 27 of the
General Condit o!j<>n to the goods offered by the above firm

Duly authorized to sign this Authorization on behalf of: Dalian InsulatorsGroup Co.,
Ltd.,

7th Dec 2016


4-46 ffl foxtt POf ,e- u .-"" ..

------------- lfi:NMfEI
Additional Information to be provided by the Bidder to subst ~m_-=J=-if~o
contractor/manufacturer as per Section 3, EQC, 2.5

4. Composite LongRod Insulators Form 2.5.4

$.N. Description Information/Data to be Provided


GENERAL ELIGIBILITY
1 Name of Subcontractor: Dalian Insulator Group Co.,Ltd.
2 Date of Constitution of the Sub-
1915
Contractor:
3 Description of Contract/Supply record
to substantiate that the manufacturer has Yes

~ general manufacturing experience of


at least 10 years as per 2.5.4.(i)
INFORMATION TO 160 kN Attachment Attachment
120kN
$UBSTATIATE EXPERIENCE AS PER No. No.
(210KN)
~.5.4.{ii):
1 Name of the Bidder/Contractor: KEC KEC
2 Name of Subcontractor: Dalian In ulator Group ~o.,Ltd.
3 Name of the Employer: N/A N/A
4 Contract No: KX/74 B/Dalin lnsulato /B/630 KX/7 4 ~/Dalin lnsuk tor/B/630
5 Contract Amount : USD 570456.0) USD 570456 00
6 Contract Agreement Date : 03.04.2009 03.04.2009
7 k::ommissioning Date of the Line : N/A N/A
8 !Warranty Period Completion Date of 30.09.2012 30.09.2012
~he Line:
9 !QUANTITY (In Number) DESIGNED,
MANUFACTURED,TESTED AND SUPPLIED
265050 215556

10 !SATISFACTORY PERFORMANCE
N/A N/A
k::ERTIFICATE ISSUED BY:
11 ISO 9001:2000 (including design in
y y
scope of registration) submitted (Y /N)
12 DATE OF ISSUE OF TYPE TEST
Mar. 28, 2012 Mar. 28, 201 ~
tERTIFICATE
13 rrYPE TEST CERTIFICATE ISSUING
CEPRI CEPRI
!AGENCY

Bidders may add Table Composite Long Rod Insulator Form-2.5.4 as required per
contract executed.
Bidder are requested to provide Attachment No. as per their convenience.

Single-Stage, Two-Envelope Procurement of Plant ICB-PMD-MCTLP-016/17-01


lb foxit PDF ifd,ltor ~-
J:ti:NJ!Jifi (c) by foxH: ~i!J, 2003 - 201:0
Design, Supply, Installation and Commissioning of Kushrna-New
iJfJTifi5

ruca IP ar tiicu ars o fC ompos1it e Long R 0 d I nsu la t ors:


G uaran ee dT ec hni
S.No. Description Unit 120 kN Composite 160 kN Composite
Long Rod Insulator Long Rod Insulator
1. Name & Address of manufacturer Dalian Insulator Grout Co., Ltd. Dalian, Chin.
2. Weight of single unit Kg. 13.4 15.6
3. Size and Designation of Ball & Socket assembly mm 20 20
4. Core diameter mm 24 I
I
24
5. Tolerance on Core Diameter +mm 0.03 0.03
6. Nominal length (Insulation Spacing) mm 2320 2890
7. Tolerance on Nominal length +mm 50 50
8. Dry Arcing distance ~-"--------. ~---
mm 2015 2514
9. Number of sheds Nos. 16big/30small 19big/38small
I . 10. Sheds profile (type) Aerodynamic Aerodynamic
.
11. Shed spacing mm 42/42/46 42/42/46
12. Sheds profile (Regular/Alternating) Alternating Alternating
~
:
13. Shed diameter mm 174/124 174/124
14.I Tolerance on shed diameter +mrn 1 1
15.' Minimum Creepage distance mm 5040 5355
16. Tolerance on Creepage distance mm No less than 5040 No less than 5355
I
17. Guaranteed mechanical strength kN 120 160 I

18. Routine mechanical load kN 60 80


19. Material
Corrosion Resistant Fibe rglass Reinforced Plastic
a)FRP Rod
b) Weather Sheds with% contents of silicon I 20 20
'
i
c) Housing Silicone rubber Silicone rubber
d) End Fittings Hot dip galvanized steel Hot dip galvanized steel
e) Grading Rings Aluminum alloy Aluminum alloy
20. Minimum thickness of sheath covering over the core mm 3 3
21. Purity of zinc used for galvanizing and fittings % 99.99 99.99
22. Number of dips which the end fittings can Nos.
N/A N/A
withstand in standard Ereece test
23. Certified test report of accelerated ageing test of Yes/No Yes/No
5000 hours (enclosed) (Appendix-C of IEC-61109)
--
24. Drawing enclosed Yes/No Yes/No
Date: (Signature) .
Place: (Printed Name) .
(Designation) .
(Common Seal) .

TECHNICAL DATA SHEETS PAGE-18


(VOLUMI-Ill)
Annexure 4 (i)
Manufacturing Experience
132kV /120kN IEC 1965

SOUTH
EBM 33kV/120kN IEC 15 2006
AFRICA
33kV/120kN IEC 258
88kV/70kN IEC 200
765kv CORNA
RING (TWO IEC 84
PARTS
220KN GUY IEC 30

240KV LINE POST IEC 12

CANADA KAYTRONICS INC 765KV CORANA 2006


RING (TWO IEC 60
PARTS
240KV CORAONA
IEC 12
RING POST
240kV CORONA
RING IEC 12
SUSPENSION
240KV/220KN GUY
IEC 38
INSULATOR
240
iw122oKN IEC 227
SUSPENSION
240KV/220KN
IEC 202
BRAZIL KAYTRONICS INC POST INSULATOR 2006
240KV CORONA
IEC 106
RING (POST)
240KV CORONA
RING IEC 106
SUSPENSION
IN COME 33KV LINE POST IEC 2200
NIGERIA 2006
ELECTRIX LTD 33KV TENSION IEC 2500
36KV/12.5KN LINE
IEC 4462
POST
2006
132KV/120KN
IEC 1350
SUSPENSION
AL-HASSEN
132KV /1 OOKN
OMAN ELECTRICALS
LONG ROD
CO., LLC. IEC 1750
INSULATOR
2007
36KV/12.5KN LINE
IEC 1741
POST
115kV/89KN
ANSI 248
COMPOSITE
USA Pincoffs 2007
230KV/89KN
ANSI 200
COMPOSITE

33kV/120kN
IEC 400
COMPOSITE
220kV/160kN
IEC 275
COMPOSITE
SOUTH
EBM 2007
AFRICA
88KV/70KN
IEC 100
COMPOSITE
132kV/120kN
IEC 922
COMPOSITE

COMMUNICATION
115KV /160KN
PHILIPPINE ELECTRICAL ANSI 126 2007
COMPOSITE
EQUIPTMENT

TIAN JIN
HENGSHENG 220KV/1BOKN
AUSTRALIA AS 132 2007
INTERNATIONAL COMPOSITE
TRADE CO.
240kV/220kN POST
IEC 312
INSULATOR
240kV/220kN
IEC 3
C()rnf:Jo~ite
BRAZIL KAYTRONICS INC 240kV/220kN 2007
CORANARING IEC 3
POST
240kV/220kN
COROONA RING IEC 3
SUSPENSION
33KV/12.5KN POST
IEC 16.887
COMPOSITE
OMAN AL HASSAN ELEC. 2007
33KV/120KN POST
IEC 11807
COMPOSITE
420kVj1.00kN
XINJIANG BOLATE IEC 840
KAZAKSTAN TRADING CO.,
COMPOSITE
220kvl16of<N
LTD
COMPOSITE IEC 166
2007
11KV/10KN
KALPATARV IEC 10014
COMPOSITE
KENYA POWER
33kV/10kN
TRANSMISSION IEC 7051
COMPOSITE
69kV/11kN Post
USA LAPP 2008
COMPOSITE
33kV/120kN
IEC 4504
COMPOSITE
SOUTH 66kV/120kN
EBM IEC 12 2008
AFRICA COMPOSITE
132kV /120kN
IEC 1030
COMPOSITE
230kV/133kN
ANSI 4
COMPOSITE
69kV/120
ANSI 30
COMPOS
69kV/111kN
ANSI 400
COMPOSITE
COMMUNICATION
69kV/22.2kN Post
PHILIPPINE ELECTRICAL ANSI 40 2008
COMPOSITE
EQUIPTMENT
132kV/111kN
ANSI 37
COMPOSITE
230kV/111kN
ANSI 38
COMPOSITE
115kV/12kN Post
ANSI 15
COMPOSITE

IEC 312
TIANJIN
IEC
HENGSHENG COMPOSITE
VIETNAM 2008
INTERNATIONAL 110kV/70kN
TRADE CO. IEC 459
COMPOSITE
11 OkV/160kN
IEC 366
COMPOSITE
TIANJIN E&M
INTERNATIONAL 33kV/12.5kN
UK BS 36 2008
TRADE Trade COMPOSITE
GROUP

IEC 75

IEC 50
UTILITY
ENERGYTECH
IEC 412
AND ENGINEERS
PRIVATE LTD.
INDIA 2008
IEC 30

33kV/4kN
IEC 54
COMPOSITE
AREVA
72.5kV/6kN
IEC 48
COMPOSITE
145kV/6kN
IEC
COMPOSITE
11 kV/10kN
KALPATARV IEC 1407
COMPOSITE
KENYA POWER 2008
TRANSMISSION 33kV/10kN
IEC 2350
COMPOSITE
CHINA
REPUBLE OF 330kV /1 OOkN
ELECTRICIAN IEC 36 2008
AZERBAIJAN COMPOSITE
EQUIPMENT CO.
132kV/70kN
IEC 204
COMPOSITE
132kV/125kN
IEC 708
COMPOSITE
COLUMBIA CORONA 2008
220kV/70kN
IEC 288
COMPOSITE
220kV /125kN
IEC 408
COMPOSITE
ABCD TRADING 220kV/120kN
PERU ANSI 18 2008
S.A. COMPOSITE
33kV/70kN
UGANDA NCC IEC 2260 2008
COMPOSITE
33kV/12.5kN Post
IEC 10877
COMPOSITE
33kV/120kN
IEC 4874
COMPOSITE
132kV /320kN
IEC 174
COMPOSITE
OMAN AL HASSAN ELEC. 132kV /160kN 2008
IEC 12
COMPOSITE
132kV/230kN
IEC 18
COMPOSITE
132kV/120kN
IEC 12
COMPOSITE
ZHEJIANG 132kV/80kN
IEC 3600
DOUBLE ARROW COMPOSITE
MALAYSIA 2008
INTERNATIONAL 275kV/80kN
IEC 2400
CO., LTD COMPOSITE
66kV/4kN
IEC 9
POST COMPOSITE
110kV/6kN
IEC 9
POST COMPOSITE
130kV/6kN
IEC 9
ITALY AREVA POST COMPOSITE 2008
150kV/6kN
IEC 9
POST COMPOSITE
20kV/6kN
IEC 9
POST COMPOSITE
265kV/8kN
IEC 3
POST COMPOSITE
OVERSEAS SUPPLY RECOREDS (2009)
Com osite

132KV/6KN
ANSI 257
COMPOSITE
33KV/4KN
ANSI 15
COMPOSITE
11KV/4KN
ANSI 18
COMPOSITE
USA LAPP
110KV/6KN
2009
ANSI 146
COMPOSITE
420KV/8KN
ANSI 110
COMPOSITE
420KV/5KN
ANSI 12
COMPOSITE
33kV/13.25kN
IEC 12
COMPOSITE
33kV/120kN
IEC 1300
COMPOSITE
60kV/120kN
IEC 1164
COMPOSITE
66kV/120kN
IEC 864
COMPOSITE
SOUTH 66kV/13.25kN
AFRICA
EBM
COMPOSITE
IEC 577 2009
88KV/120KN
IEC 350
COMPOSITE
132KV/110KN
IEC 1,142
COMPOSITE
132kV/120kN
IEC 5990
COMPOSITE
132kV/5.3kN
IEC 229
COMPOSITE

IEC 281

TIAN JIN
HENG SHENG
IEC l~I
VIETNAM
INTERNATIONAL 110kV/70kN 2009
IEC 151
TRADE CO. COMPOSITE
110kV/120kN
IEC 121
COMPOSITE

IEC 1664

IEC 1014
PG
IEC 1f9I1~
INDIA 2009
IEC 4,600

SHAN DONG
IEC 58
HUIFENG
24KV/4KN
SWEDEN AB GEVEA IEC 1,000 2009
COMPOSITE
66KV/70KN
DALIAN JIN IEC 129
COMPOSITE
COLUMBIA CHENG TRADE 2009
66KV/125KN
CO. IEC 324
COMPOSITE
60KV/10KN
ANSI 36
COMPOSITE
ABCD TRADING
PERU 60KV/120KN 2009
S.A. ANSI 1,590
COMPOSITE
220kV/120kN
ANSI 18
COMPOSITE
33kV/12.5kN Post
IEC 771
COMPOSITE
33kV/120kN
IEC 1032
COMPOSITE
OMAN AL HASSAN ELEC. 33kV/133kN 2009
IEC 410
COMPOSITE
36kV/12.5kN
IEC 2322
COMPOSITE
132kV/16.5kN
IEC 59
COMPOSITE
132KV/23KN IEC 74

CANADA KAYTRONICS INC IEC 128 2009

CORONA RING IEC 165

11kV/10 KN
MYANMAR CGGC IEC 13 2009
COMPOSITE

AREVA T&D ITALY 36 kV /11.5 KN


ITALY IEC 200
S.P.A COMPOSITE
AREVA T&D 2009
132 kV /120 KN
AUSTRALIA AUSTRALIA IEC 12
COMPOSITE
LIMITED
AREVAT&DOY
USA 345kV /420kN IEC 200 2010
LTD.
33kV/120kN
IEC 1100
COMPOSITE
33kV/13.25kN
IEC 1015
COMPOSITE
66kV/13.25kN
IEC 836
COMPOSITE
66kV/13.25kN
IEC 680
COMPOSITE
88kV/120kN
IEC 2254
COMPOSITE
132kV/13.25kN
SOUTH IEC 1324
EBM COMPOSITE 2010
AFRICA
132kV /120kN
IEC 5870
COMPOSITE
132kV /21 OkN
IEC 542
COMPOSITE

IEC 70

88kV/13.25kN
IEC 204
COMPOSITE
120KN EARTH
IEC 600
LINE COMPOSITE
24KV/4KN
IEC 2000
COMPOSITE
SWEDEN AB GEVEA 2010
36KV/4KN
IEC 3000
COMPOSITE
132KV/80KN
IEC 303
COMPOSITE
132KV /120KN
IEC 1812
COMPOSITE
132KV /160KN
IEC 524
COMPOSITE
33KV/13.25KN
OMAN AL HASSAN ELEC. COMPOSITE IEC 1804 2010
POST

33KV/120KN
IEC 1991
COMPOSITE

33KV COMPOSITE
IEC 3
STAIN INSULATOR
CAPS & PIN AND R
CLIP FOR
EGYPT UMRCO. IEC 37000 2010
COMPOSITE
INSULATOR
22KV/10KN
MOROCCO INES IEC 5000 2010
COMPOSTE POST
ANSI 12309
PG 2010
ANSI

ANSI 3244
66KV/90KN
ANSI 1439
COMPOSITE
66KV/120KN
ANSI 1871
COMPOSITE
132kV/90kN
IEC 3007
COMPOSITE
GETCO
132kV /120kN
2010
IEC 535
COMPOSITE
220kV/90kN
IEC 3290
COMPOSITE
220kV /120kN
IEC 338
COMPOSITE

IEC 1368
JYOTI 2010
IEC 948

INDIA IEC 488


2010
TRANSMISSION
IEC 1672

IEC 135
GAMMON INDIA
LIMITED
2010
IEC 1387

2010
IEC 1473

IEC 6090

IEC 5628

ADAN! POWER IEC 1814


LIMITED 2010

IEC 680
132kV/120kN
IEC 11720
COMPOSITE
132kV /13.25kN
IEC 700
POST COMPOSITE
66kV/13.25kN post
IEC 565
COMPOSITE
66kV/120kN
IEC 1800
SOUTH AFRICA EBM COMPOSITE 2011
33kV/120kN
IEC 1000
COMPOSITE
33kV/13.25kN
IEC 130
COMPOSITE
CORONA RING IEC 100
88kV/120kN
IEC 1200
COMPOSITE
24kV/40kN
IEC 1000
COMPOSITE
SWEDEN AB GEVEA 2011
36kV/40kN
IEC 2000
COMPOSITE
33KV/12.5KN post
IEC 2880
COMPOSITE
33KV/120KN
IEC 607
COMPOSITE
33KV/160KN
IEC 39
COMPOSITE
ALY.
132KV/13KN post
IEC 38
COMPOSITE
132KV/120KN
IEC 221
COMPOSITE
132KV /160KN
IEC 192
COMPOSITE
33KV/120KN
IEC 4700
COMPOSITE
11KV/120KN
IEC 252
OMAN COMPOSITE 2011
11KV/13.25KN
IEC 345
POST COMPOSITE
33KV/13.25KN
IEC 700
POST COMPOSITE
132KV/6.5KN POST
IEC 9
RAY COMPOSITE
11 KV/12.5KN POST
IEC 51
COMPOSITE
11KV/12.5KN
IEC 27
COMPOSITE

33KV/12.5KN
IEC 5760
COMPOSITE
24kV/70kN IEC 330

36Kv POST
IEC 5000
COMPOSITE

22kV POST
IEC 1000
COMPOSITE

MOROCCO INES SILICON RUBBER IEC 40000kg 2011

RODS FIBBER IEC 102000

ADHESIVE IEC 300kg

IEC 2

IEC 36

CANADA KAYTRONICS INC 145kV/20kN POST 2011


IEC 72
COMPOSITE
CORONA RING IEC 72
115KV/9KN POST
IEC 195
ESTONIA PISTRICK 1-V COMPOSITE 2011
C8-1175 IEC 18
66Kv/120kN
IEC 1400
COMPOSITE
KEC 66Kv/12kN IEC 92
KENYA INTERNATIONAL 2011
C4-325 IEC 35
LTD.
11Kv/13kN IEC 1900
11Kv/70kN IEC 200
66kv/12.5KN POST
MYANNAR IGE PTE LTD IEC 60 2011
COMPOSITE
AUSTRALIA GLD FZSW-36/8 IEC 45 2011
CHINA NATIONAL
132kv/120kn
JORDAN EIETRIC WIRE & IEC 6 2011
COMPOSITE
CABLE IMP

69KV/70KN
IEC 99
COMPOSITE

CONMMUNICATIO
NS ELECTRICAL
PHILIPPINE 2011
EQUIPMENT
SUPPLY CO., INC.
IEC 27
120KN
INDIA
COMPOSITE
PG
210KN
IEC
COMPOSITE
66kV/90kN
IEC 5456
COMPOSITE

66kV/120kN
IEC 2770
COMPOSITE
400kV/120kN
IEC 528
COMPOSITE
400kV /160kN
IEC 946
COMPOSITE
400kV/120kN
IEC 528
CORONA RING
GET CO 400kV/160kN
IEC 946
CORONA RING

IEC 3670

IEC
3670

IEC
4244

IEC
4244

IEC 4087

IEC
220KV/90KN
4087
CORONA RING
IEC
4772

IEC
220KV /120KN
4772
CORONA RING

JYOTI IEC

IEC
220KV/160KN
750
CORONA RING

IEC 2940
IEC
2940
IEC

IEC 3274

KALPATARU
IEC 2646
POWER
TRANSMISSION 400kV/120kN IEC
2646
LIMITED CORONA RING~+--------t--.....,._1
IEC

IEC 4448

IEC

IEC 3931

IEC 3003
ADANI POWER
LIMITED IEC 3003

IEC 320

IEC 160
IEC 960
IEC 1182

IEC 1182

ARCHON IEC 864


220kV/120kN
IEC 864
CORONARING
230KV/160KN
IEC 27
COMPOSITE
OVERSEAS SUPPLY RECOREDS (2012)
(Composite)
mechanical
Country or Customers or Q'ty Year of
Cat. No. strength
User Agent (pcs) Shipment
Standard
FXBW-132/120 IEC 2000
FXBW-275/70 IEC 255

FXBW-132/70 IEC 324

FXBW4-66/120 IEC 1620


South Africa EBM FXBW-66/120CT IEC 530 2012

FPS-36/13.25 IEC 120


FPS-66/5.3 IEC 550
FPS-36/5.3 IEC 40
FXBW-88/120BS IEC 2500
FPS-24/4KN IEC 12760
Sweden ABGEVEA 2012
FPS-36/4 IEC 2000
FS-36/12.5 IEC 2500
Oman RAY 2012
FXBW-33/120 IEC 4000
FPS-138/12.5 IEC 1700
FXBW-138/111 IEC 6500
Cuba SKT 2012
FPS-150/31 IEC 200
FXBW-230/222 IEC 520
KEC
Kenya INTERNATIONAL FPS-66/12 IEC 360 2012
LTD
200

Silicon Rubber 70200KG


Morocco INES IEC 230500 2012
Rods Fibber
PCS
Adhesive 40325kg
Silicone Oil 200KG
FPS-150/31
IEC 48
Line Post
Diameter:450
IEC 24
Corona ring
FXBW-275/210 IEC 120
Canada KAYTRONICS INC 2012
Diameter: 295
IEC 120
Corona ring

FZSW-145/20
IEC 6
Station post
mechanical
Country or Customers or Q'ty Year of
Cat. No. strength
User Agent (pcs) Shipment
Standard

HYOSUNG
Jordan FXBW-400/160 IEC 143 2012
CORPORATION

FPS-35/10
NATIONAL IEC 888
Line post
Turkmenistan CONTRACTING 2012
CO. LTD FXBW-10/120 IEC 2832

66kv/12.5KN
IEC 28
Line post
Myanmar IGE PTE LTD 2012
FXBW-66/120 IEC 98
C6-325-2250
ABB IEC 30
Station post
Australia ALSTOM GRID 2012
AUSTRALIA FXBW-132/ 160 IEC 24
LIMITED
FS-35/70
IEC 3
Line post
CELEASCO 2012
FXBW-33170 IEC 3

Philippine FXBW-69/67 IEC 39

TBEA SHENYANG FXBW-69/111 IEC 18


2012
TRANSFORMER
CO., LTD FXBW-230/111 IEC 78

17?<8.~. l~ljl~l~i ~~!: IEC 162


C6-325-2250
C6-650-4495 IEC 21
C6-1050-7595
MANUFACTURAS C4-125 IEC 12
Spain ELECTRICAS,
S.A.U. C1-170 IEC 12
C1-200 IEC 6
2012
FZSW-145/20 IEC 6
C6-650-3750 IEC 94
IEC
C4-325-1813 3
Italy ALSTOM
C6-450-3000 IEC 8

C6-750-7250 IEC
30

CECG TIANJIN
BRANCH
Venezuela FXBW4-230/160 IEC 84
CONSTRUCTION 2012
COMPANY
A
Country or
1\Billil
!)ALllUI INSUUITQJI

Customers or
mechanical
Q'ty Year of
Cat. No. strength
User Agent (pcs) Shipment
Standard
KEC
INTERNATIONAL FXBW-330/120 2012
Ghana IEC 145
LTD

The C8-650
HAPAM B.V. IEC 36 2012
Netherlands Station Post

GAMMON INDIA
Ethiopia FXBW-132/70 IEC 1400 2012
LIMITED

FXBW-138/70 IEC 233


ABCD TRADING IEC 1275
Peru 2012
S.A. IEC 2818
IEC 364
KEC IEC 597 2012
Afghanistan INTERNATIONAL
LTD IEC 828 2012
POWER TRADE TR205
Pakistan AND 11KV Post IEC 48 2012
SERVICES insulator

IEC 14388


,,;,);. "

1055
.=~

ICOMM TELE LTD IEC 646

IEC 1,349
IEC 5,338
IEC 1,162 2012
India GET CO
IEC 9,000
IEC 225
IEC 162
Jaigad Power IEC 288
Transco Limited IEC 456

IEC 1681
ADANI POWER
LIMITED
i~~mllillllU'@ IEC 1422

ESTONIA PISTRIK 1-V C8-1175 IEC 65 2012


A t}J!I!.!!! SUPPLY RECOREDS (2013)
Com osite
mechanical
Country or Customers or Q'ty Year of
Cat. No. strength
User Agent (pcs) Shipment
Standard
FXBW2-33/120 500
FXBW-66/120 6350
FXBW-88/70 1200
FXBW4-88/120B
2250
s
FXBW4-132no 2019
FXBW4-132/120 9500
FXBW2-132/21 0
72
BS
30
South Africa EBM IEC 12 2013
FPS-24/4 2000
FPS-36/5.3 300
FPS-66/5.3 2835
FPS-132/5.3 1680
FPS-138/13.3 47
C2-650 19
C2-1050 4
33KV to ground 1500
Silicon Rubber 1620KG
Kenya KEC IEC 1663 2013
800
Silicon Rubber 45000KG
Morocco INES Rods Fibber IEC 118000PCS 2013
Silicone Oil 200KG
Adhesive 300KG
SINOHYDRO
ENGINEERING
Gabon FXBW-110/70 IEC 766 2013
BUREAU 4
CO.,LTD
C6-550 18
The C6-650 454
HA PAM IEC 2013
Netherlands C8-650 162
C10-750 108
C6-325-2250 24
Spain MESA IEC 2013
C11.5-200-1500 6
Italy ALSTOM C4-250-1300 IEC 42 2013
C4-550-3150 2
C6-250-1612 6
C6-650-3075
mechanical
Country or Customers or Q'ty Year of
Cat. No. strength
User Agent (pcs) Shipment
Standard
C6-650-3750 146
C6-650-4495 33
C6-650-5800 30
C8-550-3900 6
C8-650-4495 129
C8-1050-7595 393
c 15-250-1440 56
BIL-250-1500 21
FZS-36-11.5 400
T4-650-4495 72
GEVEA FPS-36/4 IEC 3000
Sweden 2013
ABB c 10-200-504 IEC 32
FXBW-230/210 144
Diameter: 295
204
Corona rino
Canada Kaytronics Inc. FZS-132/23 IEC 80 2013
Diameter: 305
82
Corona rinq

-
FZSW-145/20 72
174
China Railway No.9 FXBW4-138/120 40
Venezuela IEC 2013
Group FXBW4-115/120 63
FPS-115/7 30
FXBW4-138/111 6000
SKT
Cuba FPS-138/12.5 IEC 2000 2013
(HONGKONG)
XLX-3 Fittings 2000
ABB C12-650-111 I IEC 15
Australia FXBW4-230/160 88 2013
ALSTOM IEC
FPS-220/4 6
SINOHYDRO FXBW-35/70 1135
ENGINEERING
IEC
BUREAU 4 FXSW-35/5 360 2013
CO.,LTD
China
FXBZW4-
ABB SIFANG IEC 17
120/160
nan Jin Kefeng
FZSW-40.5/12.5 IEC 61 2013
Electric Co.,ltd
Faraniroo C8-1425-13020 50
Iran IEC 2013
engineering Co. C10-1425-13020 15

24 2013
HYOSUNG IEC
12
~
a~,.!!!
Country or Customers or
Cat. No.
mechanical
strength
Q'ty Year of
User Agent (pcs) Shipment
Standard
SHAN DONG
FXBW-132/160 IEC 36
TAIKAI GROUP
China National FXBW4-1 32/ 160 60
Electric Wire &
IEC
Cable lmp./Exp
FXBW4-132/80 48
Cor oration CCC
FXB-400/300A 106
ALSTOM Finland IEC
106
1262
ADANI IEC
2651
2296
India 2013
812
PG IEC 4508
486
1580
KEC 66KV/12KN IEC 1300
C12-250-1200 42
SMH IEC
C12.5-325-1850 6
Philippines 2013
CELE FXB-15/?0CT IEC 5000

11KV-80KN 303
11 KV-12.5KN 555
33KV-11KN 150
33KV-80KN 90
33KV-120KN 3312
Oman RAY 33KV POST IEC 250 2013
FPS-69/12.5 1122
FZ-132/6.5 19
FS-36/12.5 3960
FXBW4-132/120 18
FXBW4-132/160 36
384
Afghanistan KFC IEC 2013
306
OVERSEAS SUPPLY RECOREDS (2014)
mechanical
Year of
strength
Shipmen
Standard
UGANDA KALPATARU FXBW-132/100 IEC 845 2014
FXBW-132/70 IEC 3,850
INDIA KALPATARU 2014

KENYA KEG
IRAN YAP IEC 440 2014
IEC 1150
IEC 110
SOUTH EBM IEC 2,000 2014
FRICA FXBW-132/120 IEC 3,000
CK-37 IEC 500
FPS-66/5.3 IEC 50
FXBW4-275/120 IEC 12
ITALY LAPP C ALSTOM ) C6-650-5800 IEC 36 2014
ITALY LAPP C4-325-1813 IEC 36 2014
C6-650-5800 IEC 12
C4-250-1300 IEC 12
Bil-250-1500 IEC 8
C6-650-3750 IEC 3
IETNAM SHAN DONG KAITAI FXBW4-110170 IEC 9 2014
FZSW-126/10 IEC 3
FZS-35/5 IEC 18
INDIA PG 1, 148 2014
408
2,254
244
790
INDIA KALPATARU 520 2014
IEC 1,152
SWEDEN GEVEA IEC 3,000 2014
FPS-2414 IEC 2,000
BN HA PAM C8-650 IEC 24 2014
CANADA Kaytronics IEC 28 2014
CORONA RING IEC 28
FZS-132/23 IEC 22
CORONA RING IEC 22
INDIA KALPATARU IEC 1,536 2014
IEC 2,416
SOUTH EBM c 10-550-4495 IEC 17 2014
FRICA C10-550-4495 IEC 3
ITALY LAPP C6-250-1612 IEC 4 2014

SPAIN MESA C6-325-2250 IEC 130 2014


RUSSIA Ltd. "Caspian-Electro" FZS-1015-420 IEC
,
. \

l/t.-t~~;
......

:;ii/i
... . <.
~~~~t
i

......
r- .. L. . -: i

- ... ..... ... ?; \i:i


mechanical
.str~119th
Standard
9~
{p~~)
Shiprn ~~~1
Year1 >>}
POLAND HAPAM c 16-550-1750 IEC 72 2014
c 16-325-800 IEC 8
RUSSIA YUZHNOURALSKIJ LS-080 IEC 768 2014
ARMATURNO-IZOLYA LS-081 IEC 900
TORNY J ZAVOD
UGANDA FXBW-132/70 IEC 1,854 2014

~FGHANISTA
N
SPAIN

SPAIN
KEG

MESA

MESA
4~~~-
FXBW-132/100
220~1--

C6-325-2250

C6-325-2250
IEC
IEC
IEC
IEC

IEC
586
424
871
60

570
2014

2014

2014
ITALY ALSTOM C8-650-4459 IEC 99 2014
C4-650-4495 IEC 48
ITALY ALSTOM C4-650-4495 IEC 12 2014
ITALY ALSTOM C6-550-3075 IEC 4 2014
MOROCCO INES FPS-36/9 IEC 10,000 2014
ITALY LAPP C6-325-2250 IEC 18 2014
~USTRALIAN FZSW-36/8 IEC 35 2014
JORDAN ABB FXBW-4-130/160 IEC 251 2014
FXBW4-132/120 IEC 110
PARAGUAY CONELEC FXBW-66/120 IEC 260 2014
~et1+~2'.(i~~~
l'':/:=-o>,-:o:-:_::.:
:,-::::,:::---:-_{cO-::,-;o;o\'.:p.;~;:1;.
_,@.x. . <
IEC 85
. ~ IEC 45
FPS-66/11 IEC 420
IRAN YAP FXBW-230/120 IEC 702 2014
FXBW-230/160 IEC 356
IRAN YAP FXBW-132/80 IEC 270 2014
FXBW-132/120 IEC 380
SOUTH EBM FPS-132/5.3 IEC 404 2014
~FRICA
SOUTH EMB FXBW2-88/70 IEC 300 2014
AFRICA FXBW4-66/120 IEC 200
FSP-66/5.3 IEC 150
INDIA ARGELIQUE FPS-33/10 IEC 5,029 2014
FXBW-33/70 IEC 1,782
RAN Palayesh Niroo CO. FXBW-750/210 IEC 2 2014
FXBW-400/210 IEC 12
ITALY LAPP C4-325-1813 IEC 12 2014
PHILIPPINES LAPP FXBW4-69/120 IEC 2,268 2014
FPS-69/18 IEC 41
SWEDEN GEVEA FPS-24/4 IEC 2,800 2014
SOUTH EBM FPS4-66/5.3 IEC 300 2014
AFRICA
SOUTH EBM FXBW4-66/120 IEC 150 2014
AFRICA
VIETNAM Tianjin Hengsheng FXBW-24/120 IEC 189, -::: .. 2014
L'"
J

\
,~~
,,.,,,.,.
or I (~~~~~ ~ _ ...
_;,,.;_....... ,._
::::nlvl!:j&.11

;;UlllUc:ffd
'(earp.f
Shipment
~IETNAM Tianjin Hengsheng FXBW-110/70 IEC 73 2014
FXBW-110/120 IEC 413
SPAIN MESA C6-325-2250 IEC 231 20.14
SPAIN DALIAN Naiwei C6-650-4495 IEC 15 2014
HA PAM c 16-325-2283 IEC 12 2014
NETHERILAN HAPAM C8-650-6525 IEC 36 2014
DS
KENYA KEC FXBW-220/120 IEC 226 2014
FXBW-220/120 IEC 250
INDIA ABB AB FXBZW-75/160 IEC 18 2014
LONG ROD
FXBZ-609/210 IEC 8
LONG ROD
FXBZ-203/210 IEC 8
LONG ROD
FXBZ-812/210 IEC 3
LONG ROD
FXBZ-812/210 IEC 3
LONG ROD
INDIA ABB AB FXBZ-609/210 IEC 8 2014
LONG ROD
FXBZ-203/210 IEC 8
LONG ROD
FXBZ-812/210 IEC 3
LONG ROD
FXBZ-812/210 IEC 3
FXBZ-812/210 IEC 3
SYRIA WUHAN Jinhua FXBW4-66/70 IEC 12,000 2014
FXBW4-66/120 IEC 5,000
INDIA KEC FPS-66/12 IEC 351 2014
UGANDA KALPATARU FXBW-132/70 IEC 814 2014
FXBW-132/100 IEC 490
SPAIN
PERU
INDIA

INDIA
MESA
WENLI Guomao

-
C6-325-2250 IEC
IEC
ICl-C&C MAINPURI JV FXBW4-400/120-3335 IEC

MEG HA
FXBW4-400/160-3910 IEC
400-~6~~ IEC
132
50
1,815
2,630
3330
2014
2014
2014

2014
4! ~RP~
1
IEC 7344
SOUTH EBM FPS4-66/5.3 IEC 300 2014
AFRICA FXBM2-66/120 IEC 400
FXBM2-88/70 IEC 300
FXBM4-88/120 IEC 500
SOUTH EBM FPS4-132/5.3 IEC 750 2014
AFRICA
ITALY ALSTOM C6-650-5800 IEC 12 2014
C6-750-7250 IEC 12
ITALY ALSTOM C8-1675-11200 IEC 7 2014
C8-1300-9780 IEC 9
C8-1425-10500 IEC 3
mechanical
Year of
strength
Shipmen
Standard
RUSSIA Caspian - Electro FPS-10/5 IEC 2014
INDIA OIA FXBW-110/120 IEC 402 2014
FXBW-110/90 IEC 873
FXBW-220/120 IEC 462 2014
FXBW-220/160 IEC 354
LAPP C6-650-3750 IEC 18 2014
C6-250-1612 IEC 3
C6-750-4250 IEC 3
TOGO TBEA FXBW-20/40 IEC 6,500 2014
OVERSEAS SUPPLY RECOREDS (2015)

FWBW-132/120 IEC 150


Netherlands HAPAM C8-650 IEC 5
USA LAPP C8-750-5270 IEC 6
C4-250-1300 IEC 17
BIL-250-1500 IEC 7
Mozambique Changzhou Borui ZSW-252/8-4 IEC 30
IRAN YAP FXBW-400/210 IEC 2,070
SPAIN MESA C4-170 IEC 396
Netherlands HAPAM C4-325-1800 IEC 28 2015
SWEDEN GEVEA FPS-24/4 IEC 2,000 2015
FPS-36/4 IEC 1,000 2015
ETHIOPIA Advait lnfratech Pvt Ltd. FXBW-132/70 IEC 170 2015
FXBW-132/120 IEC 200 2015
INDIA FXBW-400/120 IEC 750 2015
FXBW-400/160 IEC 2,225 2015
FGHANISTAN KEC FXBW-220/160 IEC 2,118 2015
FXBW-220/300 IEC 1,784 2015
USA ALSO TM C6-650-3750 IEC 24 2015
C4-550-3150 IEC 8 2015
USA LAPP FXBW-35/70 IEC 180 2015
ITALY LAPP C6-650-5800 IEC 330 2015
SOUTH AFRICA EBM FXBW-132/70 IEC 160 2015
FXBW-66/120 IEC 320 2015
SOUTH AFRICA EBM CK-37 IEC 500 2015
SPAIN MESA C4-170 IEC 396 2015
SPAIN SA C6-650 IEC 48 201
USA LAPP FXBW4-69/120 IEC 217 2015
ITALY ALSO TM C6-250-1612 IEC 3 15
ITALY ALSO TM
C8-1675-11200 IEC 7 2015
C8-1300-9780 IEC 9 2015
C8-1425-10500 IEC 3 2015
C6-550-3075 IEC 4 2015
EGYPT UMR 160KN END FITTING IEC 2,000 2015
120KN END FITTING IEC 6,000 2015
MOZAMBIQUE FXBW-33/70 IEC 1,39 2015
AIL
FXBW-22/70 IEC 113 2015
ANSl57-4 ANSI 2,056 2015
ANS157-3 ANSI 50 2015
ANSl54-3 ANSI 829 2015
ANSl54-2 ANSI 1,499 2015
FXBW-33/70 IEC 880 2015
MOZAMBIQUE AIL
FXBW-22/70 IEC 313 2015
ANSl57-4 ANSI 1,219 2015
ANSl57-3 ANSI 140 2015
ANSl54-3 ANSI 632 201
ANSl54-2 ANSI 148
orocco INES 24kv-4kn pin insulator IEC 4,000 201
36kv-6kn pin insulator IEC 4,000
Syria Wuhan Huajin FXBW-66/70 IEC 3,000
FXBW-66/120 IEC 1,418
Netherlands HAPAM C6-325 IEC 66
SPAIN MESA C6-325 IEC 120 201
SPAIN MESA C4-170 IEC 396 201
SPAIN MESA C6-325 IEC 120 201
SPAIN MESA C11.5-200 IEC 100 2015
Uganda India
FXBW-132/70 IEC 164 2015
FXBW-132/100 IEC 112 2015
FXBW-132/70 IEC 721 2015
FXBW-132/100 IEC 852 2015
PHILIPPINES LAPP FXB-15/70CT IEC 48 2015
FPS-69/18 IEC 171 2015
ENEZUELA DALIAN RUIYONG FPS-230/6 IEC 4
LSTOM LAPP STAND02D18235 IEC 8
STAND02D18235 IEC 16
STAND02D18235 IEC 3
STAND02D18235 IEC 8 2015
LS TOM LAPP STAND02D18235 IEC 16 2015
STAND02D18235 IEC 32 2015
STAND02D18235 IEC 3 2015
STAND02D18235 IEC 16 2015
LAPP C8-650-3750 IEC 30 2015
ECUADOR QUIPROTEC TR-278 IEC 24 2015
FXBW-69/120 IEC 18 2015
22167 IEC 6 2015
TR-202 IEC 6 2015
SOUTH AFRICA EBM FXBW4-132/120 IEC 3,000 2015
FXBW2-88/70 IEC 750 2015
INDIA INDIA IEC 306 2015
IEC 633 2015
Spain MESA IEC 396 2015
Netherlands HA PAM IEC 12 2015
Netherlands HA PAM IEC 18 2015
PHILIPPINES NGCP IEC 3,006 2015
FXBW-220/70 IEC 541 2015
IEC 276
IRAN YAP IEC 4,830
SWEDEN GEVEA FPS-24/4 IEC 2,000
FPS-36/4 IEC 2,000
INDIA KPTL IEC 30
IEC 120 2015
INDIA BAJAJ IEC 683 2015
IEC 738 2015
SPAIN MESA C6-650 IEC 48 2015
SPAIN MESA C11.5-200 IEC 250 2015
SPAIN MESA C6-650 IEC 48 2015
SPAIN MESA C6-325 IEC 120 2015
Netherlands HAPAM C6-650 IEC 6 2015
INDIA INDIA IEC 211 2015
IEC 1,579 2015
UGANDA INDIA IEC 207 2015
IEC 132 2015
INDIA PGCIL IEC 1,300 2015
IEC 1,700 2015
INDIA JSL IEC 91 2015
~iW*~ittl.1;1~2~;
->>-'_--_-_,,-,,___,,,,,__,,_,_,,,-,,,,,_,-,,,._,-,__, , -,_, i:r!t\>::::v:.~1 ~ .. :-:/0.~.,,~,~''' IEC 1,385 2015
CS45C13LC13L-250/16
LAPP
20
lEC 88 2015
C6-250-1620 IEC 176 2015
KENYA BEIJING FXBW-132/120 IEC 354 2015
FXBW-132/210 IEC 327 2015
NIGERIA FUYANG FXBW 132/70 IEC 1,272 2015
FXBW-132/120 IEC 484 2015
BURMA ROYAL GK PTE LTD FPS-33 IEC 1,579 2015
FXBW-33/70 IEC 1,539 2015
EGYPT UMR Twisted shackle .UN-16 IEC 3,000 2015
Steel dead end 380/50 IEC 4,000 2015
BEIJING
XINGYUANCHENG
CONGO
TRADE DEVELOPMENT
FXBW-220/120-3 IEC 230 2015
CO, LTD.
SOUTH AFRICA EBM CK-37 120KN IEC 1,000 2015
FPS4-66/5.3 IEC
FXBW2-88/70 IEC
UGANDA KEC IEC
IEC
INDIA PGCIL IEC
IEC
INDIA JSL IEC
IEC
FPS-230/94 IEC 6 2015
FXBW4-66/70 IEC 42 2015
SWEDEN Hangzhou Yongde C8-550-4200 IEC 240 2015
SPAIN MESA C11.5-200 IEC 200 2015
SPAIN MESA C11.5-200 IEC 200 2015
SWEDEN GEVEA FPS-24/4 IEC 2,000 2015
FPS-36/4 IEC 2,000 2015
SOUTH AFRICA EBM FXBW4-132/120 IEC 50 2015
FXBW-66/120 IEC 300 2015
KENYA KEC IEC 1,089 2015
IEC 597 2015
INDIA PGCIL IEC 1,824 2015
IEC 1,824 2015
IEC 1,800 2015
IEC 1,800 2015
IEC 2,000 2015
IEC 2,800 2015
FXWB-138/111 IEC 1,848 2015
FPS-138/12.5 IEC 900 2015
INDIA kaytronics R~~~~:<it~l?~ IEC ~;fl; 2015
C5-775-6675 IEC 84 2015
KAZAKHSTAN Basis Energy C4-195 IEC 12 2015
4-195 IEC 36 2015
C8-1550-13020 IEC 184 2015
KENYA SHANGHAI SIYUAN FPQ-33KV/2KN IEC 5,060 2015
FXBW-33KV /70KN IEC 430 2015
FS-33KV/2KN IEC 100 2015
FXBW-11 KV /70KN IEC 29 2015
FP-11KV/5KN IEC 364 2015
LSTOM LAPP FXBW-500/360 IEC 85 2015
FINLAND ALSTOM FXBW-400/200A IEC 50 2015
FXBW-400/2008 IEC 50 2015
Iran LAPP C8-1425-13020 IEC 253 2015
ietnam STD C6-550-3075 IEC 8 2015
Netherlands HA PAM C6-325 IEC 48 2015
Netherlands HA PAM C6-325 IEC 72 2015
Netherlands HA PAM C6-325 IEC 18 2015
SPAIN MESA C6-325 IEC 36 2015
Netherlands HA PAM C6-325 IEC 69 2015
Vietnam AIT C8-1050-6125 IEC 7 2015
Vietnam AIT C6-5550-3075 IEC 6 2015
ietnam AIT C4-125-600 IEC 3 2015
ietnam AIT c 10-550-307 5 IEC 12 2015
ietnam AIT C10-550-lll IEC 2015
504 201
NOIA JSL IEC 2714 201
IEC 1266 2015
INDIA PGCIL IEC 725 2015
IEC 2808 2015
INDIA PGCIL IEC 3300 201
IEC 7332 201
INDIA PGCIL IEC 1242 201
IEC 1800 201
-~------~ -- -------------------- ~

Annexure 4 (ii)
Supply evidence and
Performance Certificates
Date: 2015

To whom so ever it may concern

400 KV and VJrsana


ram power

'""'""<"'" Insulator 120 kn : 480 nos


nn<u">''" Insulator 160 Im < 1672 nos.
2015

To whom so ever it may concern

Co. China have


We Ad11n! Power Umlted,
th the below
insulators for our own SOD KV HVOC tr2nsrr11ssmn Hne trorn
Mundra for evacuation of power from Mundra thermal power
which is, hJv\ng be~ow details:

Silicone Hubber
nos.

fhc above are insta!h~d on our referred 1nmsrnission


ory till the date.

Dosh
Deputy Genera! Contract.
Allani ?over Umlted.
;~;;;

1s"~ -afi CTEEP

Sao Paulo, 22 de Maio de 2013.

Atestado de Fornecimento de Materiais

Atestamos a pedido do interessado,

IMPLO TECNOLOGIA DO BRASIL COMERCIO DE COMPONENTES ELETRICOS L TDA.


CNPJ: 07.051.114/0001-00
Rua Isabel Dias, 140
Sao Paulo-SP

Executou os services abaixo relacionados, de acordo com o contrato

Numero do Contrato: ASCrf/M/122.383/05

Objeto do Contrato:
Fornecimento de Sistema de Restabelecimento Emergencial de Linhas de Transmissao de
138 kV ate 440 kV, constituido de:
M6dulos de estruturas metalicas; mastros auxiliares removiveis; bases de apoio: ferragens
dos estais; ferragem dos condutores; isoladores polimericos; ferramentas para montagem;
Pecas sobressalentes, equipamentos operacionais e containers para armazenamento e
reserva estrateqica da CTEEP.

Descricao detalhada do material fornecido:


SISTEMA DE RESTABELECIMENTO EMERGENCIAL PARA LINHAS DE TRANSMISSAO
DE 138kV A TE 440kV;
CONFORME: ETrrErrEITEL-094/03R06; ET/TE/TEL-066/03 RS; CM/TEM-003/04 R2
(ISOLADOR BASTAO COMPOSTO POLIMERICO);
ET/TE/TEL-070/03 R1 E CM/TEM~015/05 (ISOLADOR PILAR COMPOSTO POUMERICO).

Valor Contratual: R$ 2.995.000,00 (dois rnilhoes, novecentos e noventa e cinco mil reais).

Desernpenho do contrato: Satisfat6rio

Atenciosamente.
"'"~""''--w=-~ r ,1

Enzo Briga~te \1
'
Gerente Depa~mento de Suprimentos
Engenheiro Eletricista
CREA-SP 0601730408
Sao Paulo, May 22, 2013.

Certificate of Delivery of Materials

We certify as per supplier's request,

IMPLO TECNOLOGIA DO BRASIL COMERCIO DE COMPONENTES


ELETRICOS L TOA.
CNPJ: 07.05t11410001-00

Dis Isabel Street, 140


Sao Paulo-SP

Performed the services listed below, according to contract:


Contract Number: ASC/T/M/122.383/05

Purpose of the Contract:


Providing Emergency Restoration System Transmission Lines 138 kV up to
440 kV, consisting of:
Modules of metal structures; auxiliary components; supporting bases,
hardware, tools for assembly, polymer insulators, spares, operating
equipment and containers for storage and strategic reserve CTEEP.

Detailed Description of the material provided:


EMERGENCY RECOVERY SYSTEM FOR TRANSMISSION LINES
ATE OF 138kV 440kV;

CONFORMING TO ET/TE/TE/TEL-094/03R06; ET/TE/TEL-066/03 RS;


CM/TEM-003/04 R2
(COMPOSITE POLYMERIC INSULATOR):
ET/TE/TEL-070/03 R1 E CM/TEM -015/05 (LINE POST COMPOSITE
POLYMERIC INSULATOR).

Contract Value: R$ 2,995,000.00 (two million, nine hundred ninety-five


reais).

Contract Completion: Satisfactory


Kind Regards,
Enzo Brigante
Supply Department Manager
Electrical Engineer
CREA-SP 0601730408
lfl
End User Certificate

We, Changzhi Power transmission project branch department, in

charge of operation and maintenance for Project 500KV Chang- Jin I line,

500KV Chang- Jiu II, III line, 220KV Jiu-Dong I, II line, 220KV Jiu-Hou

I, II line. And this project, we used the porcelain and composite insulators

produced by Dalian Insulator Group Co., Ltd., and the lines had operated

for one year. Since operation, the transmission lines are operating

satisfactorily without any problem. The quality of insulator is reliable and

safe.

Changzhi Power transmission project branch department

Feb.23rd,2009
220 l
1. '
l
1

-22 I
07

20 9
End User Certificate

We, Linfen power supply Co. adopt 600 pieces FXBW-2201110

composite insulators produced by Dalian Insulator Group Co., Ltd. for

220KV Huo-Ming I,11 line. Since operation in July of 2007, the

transmission lines are operating satisfactorily without any problem. The

quality of insulator is reliable and safe.

Linfen power supply Co.

Feb. 19th, 2009


500KV

2007 11 2008 12

145 , FXBW4-S00/160 .~i~f-1 456


FXBW4-500/100

FXB\V4-500/210 107 j?.IJ 2009 7

0
FXBW-220/120 tz:rff:i 1250 5[, itil:lU 2014 ~ 7 faJ 7311:, ~fr fltif,

-: :_/:~::;:::.:~:-:<-:t::::
...
,y
~-

,;}'' . . s '.,..."! ,, '

oo ~ rr tJ2~ E.JJ~~~0 ~.tt~s{}tE0~


;'f ., - '"' -- ~~f ':,_::--;:::_ '.,.,

201~::~7 ,m
\:\
End User Certificate

We, National Grid Liaoning Power Company is in charge


of operation and maintenance for Project Shenyang 220kV
Transmission Line. This line is operated in January 2013.
The 1250 units polymeric insulators FXBW-220/120 are
supplied by Dalian Insulator Group Co., Ltd. From operation
to July 2014, the lines are operating satisfactorily without
any problem. The quality of insulator is reliable and safe.

National Grid Liaoning Power Company


July 2014
HUB EI EHV TRANSMISSION & SUBSTATION COMPANY

End User Certificate

We, HUBEI EHV TRANSMISSION & SUBSTATION COMPANY,

in charge of operation and maintenance for Project Huanggang to

Huangshi 500KV Transmission Line. This line is completed in Nov.,

2007, and operated in Jan. iz", 2008. We used composite insulators

produced by Dalian Insulator Group Co., Ltd. 145 pieces

FXBW4-500/100, 456 pieces FXBW4-500/160, 107 pieces

FXBW4-500/210. From operation to July of 2009, the lines are operating

satisfactorily without any problem. The quality of insulator is reliable and

safe.

HUBEi EHV TRANSMISSION & SUBSTATION COMPANY

Jul. 14th, 2009


J:lr SOOKV

2007 9 2007 20

Cl
un 4-'\
FXBW-500/100 , FXBW-500/160 )J

10 2009 7

'f;,.2., f!Jll ~-
*
. /~7. F.r.r"
rc7.. . ui. }_!1-.....,
1.

fr]
HUBEi EHV TRANSMISSION & SUBSTATION COMPANY

End User Certificate

We, HUBEi ERV TRANSMISSION & SUBSTATION COMPANY,

m charge of operation and maintenance for Project Xinzhou to

Huanggang 500KV Transmission Line. This line was completed in Sep.,

2007, and operated in Nov. 201h, 2007. We used composite insulators

produced by Dalian Insulator Group Co., Ltd. 59 pieces FXBW-500/l 00,

453 pieces FXBW-500/160, 68 pieces FXBW-500/210. From operation to

July of 2009, the lines are operating satisfactorily without any problem.

The quality of insulator is reliable and safe.

HUBEi EHV TRANSMISSION & SUBSTATION COMPANY

Jul. 14th, 2009


ft 0 ~ ffi. m: *#~I@] **6 7Jl500KV~ Egt~fil4tI~~~ ff
TI

lOgt1?o ~~~2013if:5.H~JJ~, T-2013if:6Jj20B19:tz:~

fi,~~ffl*~~~mMfil~~0~~tz:~~~~~,

FXBW-500/160-3f= 9965[, FXBW-500/210-3tz: 1385[,

~201446.H~7911:, ~ff ~~f, -*1~JYlJY1Ifi5J~o


End User Certificate

We, National Grid Hubei Power Company is in charge of


operation and maintenance for Project Muxiao to Baiquan
SOOkV Transmission Line. This line is completed in May
2013, and operated in June 20th, 2013. The polymeric
insulators are supplied by Dalian Insulator Group Co., Ltd.,
including 996 units FXBW4-500/160-3 and 138 units
FXBW4-600/210-3. From operation to June 2014, the lines
are operating satisfactorily without any problem. The
quality of insulator is reliable and safe.

National Grid Hubei Power Company


July 14th, 2014
Annexure 4 (iii)
ISO Certificates
Annexure 4 (iv)
Type Test Report
~ fJ I~ ft!~i$i: ~J~. ~fEz~~jYt!JiXC}flIL'
Quality .Inspection and Test Center
for Equip1ne11t -: of Electric Power

(2010) tfi!-'-? JDC009 --15-

<--A
'f"'''

.Inspection Report

;M .~ t ~-- ~ ;x m 5# LlJ rg :Ea u1ftr ~~. 143 -5-


430074
4006565689
1~ ( 02 7) 59839810
!XX] www.china-qitc.corn
i:g r1fJ *~: huangweimin@sgep .c '

.
-- ..... F"--------------------------------------------------

Quality Inspection and Test Center for Equipment of Electric Power

(20lO)QlTC No.JDC009
1. CLIENT
Dalian lnsulato

2.SAMPLE
Name: 220kV ZEBRA A CSR conductor with 2x2 l OkN composite
~IO) of Dalian Insulator Group Co., Ltd,
sulator Group Co., Ltd.
Type: FXBW-220/210 Sample Number:2
Insulator Drawing No:CK-080109Z2
Hardware Manufacturer: EMI TRANSMISSION LIMITED, INDIA
Hardware Drawing No: EMI/220kV.2 l/DTA-DEA

3. CHECKSTANDARD
JEC6 l 109-2008 Insulators for overhead lines - Composite suspension and tension
insulators for a.c. systems with a nominal voltage greater than IOOOV-Definitions,test
methods and acceptance criteria
IEC60437.: 1997 Radio interference test on high-voltage insulators

4. CHECK CLASSIFICATION
Type Test

5. CHECK DATE
2009-12-31 ~2010-0l-04

6. CHECK CONCLUSION
The results meet the requir

CHECKER: __ %__,~" "'1.~\_kl~~~~~-


__ _f<__
' 4>_' _

VERIFIER:. ~-A~""""g_,____,_\;fl--=i.... _

EXAMINER:. -u-~---t---- 4-U_____ - ----

DATE:. ~;fa_l_o_-_o_;J_-_<J...._St
_

www.china-qitc.com - Page 1 of 5 -
Quality Inspection and Test Center for Equipment of Electric Power Test Report (2010) Q!TC NoJDC009

7. TEST ITEMS and RESULTS


No. Test Item Specified Test Result Evaluation
Lightning Impulse
Withstand voltage:
I050kV
i Applied voltage:
1052kV-1061kV
1 voltage withstand test Pass
Time:15 Time:lS
under dry condition
1 No flashover No puncture, no flashover I
Withstand voltage: Applied voltage:466.0kV
Power frequency voltage
460kV Time: lrnin
2 withstand test under wet Pass
Time: lmin No flashover
condition
No flashover

RIV Test under dry RIV should be less

I 3 condition than lOOO~tV at 160kV


RIV is 288.4V at160.0kV Pass

Annex A. Main inspection Equipments


I Inspection Calibration !
No. Name/type No. Accuracy
Scale valid up to
I Impulse voltage generator 002 5400kV lkV 2010-08-04
Impulse peak voltage
2 080255-42-80 I Class l 2010-08-01
meter64M
Power Frequency Test
3 SB20l 1400kY lkV 2010-10-30
Transformer
I 4 VC980+Digital meter TGY/YQ-023 0.01mV~750V (0.8%+2s) / 2010-04-29
5 RIV measure meter 100181 I I 2010"07-26

Annex B. Test Items


l Lightning impulse voltage withstand test under dry condition/Reterence Standard: JEC
61109)
1.1 Test condition
Air condition: tct=7.0 'C tw= 4.0 'C P=101.7 kPa
K1"'!.05 l K2=0.937

1 .2 Test results
Table 1Impulse voltage withstand test results/Positive)
I Corrected
Applied voltage
Sample No. Wave form voltage Times Result
(kV)
(kV)
No puncture,
1~2 l.2 l/50.2 1034.0
I 1052~106]
I 15
no flashover

2 Power frequency voltage withstand test under wet condition (Reference Standard: !EC
6] 109)
2. I Test condition
Air condition: tJ=7.0 'C P=101.7 kPa
K1=l .OJO
Rain resistance: P4.0=130.0Qm

www.china-qitc.com - Page 2 of 5 -
.
Quality Inspection and Test Center for t1uipment of Uectric Power Test Report (2010) QJTC N<1JDCOO'i

Rainy velocity: vertical 1.5 mm/min


horizontal 1.4 mm/min
2.2 Test results
Table2 Power frequency voltage withstand test results
Corrected voltage Applied voltage Test time
Sample No. Result
(kV) kV min)
464.6 466.0 No flashover
~-- --------~--------~-------~----~------~

3 RIV Test underdry condition(Reference Standard: !EC: 60437)


The insulator string along with complete hardware fittings was subjected to 50 Hz AC
voltage of I 60 kV line to ground under dry condition. The test procedure was in accordance
with IEC 60437.
3.!Test condition: P=lOl.6 kPa
3.2 Test results
Table 3 RIV test results

Sample No.
Applied Voltage i Radio Interference Voltage
kV I ( v
160.0 288.4

The measured RIV value at the test voltage of 160kV(rms) does not exceed the specified limit.

..

.'

-,

. www.china-qitc.corn - Page 3 of 5 -
Quality Inspection and Test Center for Equipment oU:lcctrie Power Test Report (20l0) QITC NoJIXXl09

Annex C. Insulator String Drawing

www.china-qitc.corn - Page 4 of 5 -
Quality Inspection and Test Center for Equipment of Electric Power Test Report (2010) Q!TC NoJOC0()9

Annex D. Insulator Drawing

x s
N
(ij 0
[,J
::: ,,.,c. p{"-! <I"'
co] <l)
'--.. '!;)
~ ~ Q
N <ii ,.i~
v
x
t- lJ~

www.china-qirc.com - Page 5 of 5 -


.Qnality Inspection and Test Center
I .
.: for Equipment of Electric Power

( 20 I 0) ~Ef- JDCOl 0

lnspcction Report

~::lt~'iECi;lr!J5#11J (gJ~.PWJ~ 143 ~


30074
4006565689
][.
.,,. ...
/~ (027) 59839810
IXXJ .rt:
~T-1~~:
Quality Inspection and Test Center for Equipment of Electric Power

Test Report (2010) QITC No.JDCO!O


l. CLIENT

2.SAMPLE
Name: 22 ng for ZEBRA ACSR conductor with l x I 20kN
XB W-220/J 20) of Dalian Insulator Group Co. Ltd.

, ample Number:l
Insulator Drawing No:CK-08010921
Hardware Manufacturer: EMI TRANSMISSION LIMITED, INDIA
Hardware Drawing No: EMI/220kV. l 2/SSA-2751I6

3. CHECK STANDARD
lEC61109-2008 Insulators for overhead lines-Composite suspension and tension ~
. '
insulators for a.c. systems with a nominal voltage greater than 1 OOOV--Definitions,test
methods and acceptance criteria
IEC60437: 1997 Radio interference test on high-voltage insulators

4. CHECK CLASSIFICATION
Type Test

5. CHECK.DATE
2009-12-31~~2010-0 I-

6. CHECK CONCLUSl
The results meet the re

CHECKER: --~~~~-~-
:;- v-~~\_kl_ -~-'
__
VERIFIER: -t ~;]
EXMvllNER:
?ix~. f<.'L I
T"-+~~--~---==--------
~ < .......

APPROVED: Lj41Vg/ POST: __ !i)!_.__~--

www.china-qitc.com - Pagel of 5 -
Quality Inspe<:iion and Tc~t Center for Equipment of E.lectric Power Tes_t_R~ep~o_r1 ~Q~n_c_N_'o_.JD_C_O_l_O
~(2_0_l0_)

7. TEST ITEMS and RESULTS


~-~------- --------~----------~----------~---~
No. Test Item Specified Test Result Evaluation
Withstand voltage: Applied voltage:
Lightning Impulse
1050kV l05lkV~1{)59kV
voltage withstand test Pass
Time:l5 Time:l5
under dry condition
No flashover No uncture, no flashover
Withstand voltage: Applied voltage:466.0kV
Power frequency voltage
460kV Time: lmin
2 withstand test under wet Pass
Time: lmin No flashover
condition
No flashover
>---.........+----------+---
RIV Test under dry RIV should be less
3 than lOOO~tV at 160kV RIV is 278.6V atl60.0kV Pass
condition

AnnexA. Main inspection Equipments


Inspection Calibration
No. Name/type No. Accuracy
Scale valid up to
1
I Impulse voltage generator 002 5400kV 1kV 2010-08-04
Impulse peak voltage
2 080255-42-80 I Class 1 20I0-()8-01
meter 64M
Power Frequency Test
I 3 SB201 1400kV lkV 2010-10-30
Transformer
4 VC980+ Digital meter TGY/YQ-023 0.0lmV-750V (0.8%+25) 2010-04-29
5 RIV measure meter 100181 I I 2010-07-26

Annex B. Test Items


1 Lightning impulse voltage withstand test under dry condition(Reference Standard: IEC
61109)
1.1 Test condition
Air condition: td=7.0 'C t,..= 4.0 C P=lOJ.7 kPa
Ki=l.051 K2=0.937

1.2 Test results


Table I
Impulse voltage withstand test results/Positive)
Corrected
Applied voltage
Sample No. Wave form voltage Times Result
(kV)
(kV)
No puncture,
l 1.23/50.9 1034.0 1051-1059 15
I no flashover

2 Power frequency voltage withstand test under wet condition (Reference Standard: IEC
61109)
2.1 Test condition
Air condition: tJ=7.0 "C P=lOl.7 kPa
K1=1.0JO
Rain resistance: p4,o =130.0Qm
P20 o =87.1 f2-m
Rainy velocity: vertical 1.5 mm/min

www.china-qitc.com - Page 2 of 5 -
Quality Inspection and Test Center for Equipment of Electric Power Test Report (2010) QITC NoJDCOIO

horizontal 1.4 mm/min


2.2 Test results
Table2 Power frequency voltage withstand test results
Corrected voltage Applied voltage Test time
Sample No. Result
(kV) (kV) (min)
l 464.6 466.0 I No flashover

3 RIV Test underdry condition(Reference Standard: IEC: 60437)


The insulator string along with complete hardware fittings was subjected to 50 Hz AC
voltage of ! 60 kV line to ground under dry condition. The test procedure was in accordance
with lEC 60437.
3. lTest condition: tct=7.0C tw=5SC P=10L6 kPa
3.2 Test results
Table 3 RIV test results
Applied Voltage Radio Interference Voltage
Sample No.
(kV) (uV)

1~2 160.0 278.6


--
The measured RIV value at the test voltage of l60kV(rms) does not exceed the specified limit.

www.china-qitc.com - Page 3 of5 -


(2010) QITCNo.JDCOlO
Qualit)" Inspection and Test Center for Equipment of mectric Power Test Report

Annex C. Insulator String Drawing

www.china-qitc.com - Page 4 of 5 -
QualilJ Inspection and Test Center for Equipment of Electric Power Test Report 12010) Q!TC No JDC(llO

Annex D. InsulatorDrawing

0
.:.:. (~.;J

....
(I)
::fC
s
i;>J
(">.i
9
!2i
~
u
4) '
0
0 ~ .E ..;;!
r:'. ~ N
0
d f!,\"'
I- ~
_,

., m'"
~~
g "O
s:

:( .9
,. t~
43
~ ~
"J(
<;
. ""'
"1.':: R
C>
0
~
+., ''~,'. . . <, /
r-:
"'"' mer
~5
c,
~
~
t()
o
!!!
~- 9'1/J"-r-'~~~~~
...-;:
$
.s 'Ell
(;7,;0
;s
.s: (J)c: 0
"' c
;;; E t1
~ " ~o
,Q

..'l
"1'1 E 0) $ 'lL ~
;,; (I) :J !'; ii <( 0

www.china-qitc.com Page 5 of5


No* 201201 SE
ElectricPowerlndustry;Quality lnrpection &.Test Center of
Electric Power Equipment &Instruments
INSPECTt<lN AND TEST REPORT
Quality Inspection & .TesfGenterof
fint & lnstrotnents

Rep6rt tto ... 201201a:e


< Page2 of6
Power Equipment ~no Instruments
s eie
Electric Power Jndustry Quality Inspection and Test Center of Electric Power and Instruments
4of6

Parameter and configuration of test specimen are listed Table 1 and shown in

Fig.A 1.
The insulators were energized at a voltage of 19.8KV a.c.(approximately
35kV/mm creepage distance). The layout of test specimen is shown in Fig.2.

Table 1 Parameter of test specimen

300kN SML
No.1, No.2
Composite insulator for HVAC overhead line
693mm
Shown in
180mm/130mm
55mm
End-fitting crimping technology and Assembly sheds on
production process an extruded sheeth technology

Fig. 2 Layout of test specimen

During the test the leakage current of each insulator was leakage
Electric Power "'"'"'""''
insulator & Arrester sra1'111m

e current trend of insulators


overcurrent trip-out occurred.
insulator were cleaned and a inspection.
No shed, or interface is punctured. There were no permanent marks
tracking.
Electric Power Power
! nsulator & Arre-.5ier

Appendix A Drawing of AC Composite Insulator

Fig. A1 Drawing of AC Composite Insulator


20110006740 No. 2012081 E
ti
CNAS l1592

Electric Power Industry Quality Inspection & Test Center


of Electric Power Equipment & Instruments

INSPECTION AND TEST REPORT


(Power Insulator & Arrester Station) No. 2012081E

For Product: A.C. Rod suspension composite insulators


,,,11''1'(1'",,,,,..,,,,,,,,~* .

Model: FXBW-2~tn~.o(1:20)
I "';;,'
3:; ---r;:'::, ;-
Manufacturer: Dalian fnsolatof up ,Co. ~ Ltd. 1

~ - ~
'{\, id
Consignor: Dalian lrt-J;Jl~tor Group Gt//,Ltd .
.,"~. .. . '~"}/

Test Type: Design test,'"r'YPe"4r:{;,Sampling test and Routine test

Mar. 28, 2012

Quality Inspection and Test Center:

Address: XiaoYingOonglu No.15, QingHe, Beijing, China


Post Code: 100192
Tel: +86 -1062931468
Fax: +86 -1062913139
1. This test report is invalid without the seal of

Inspection and test center.

2. This test report is invalid without the signature of


complier, chief checker, auditor and ratifier.

3. This test report is invalid if it is altered.


4. The demurral for this report should be submitted to
the Inspection center within fifteen days after receive the

report. Or it will not be accepted due to exceed the time

limit.

5. This report is only responsible for the test samples

which have been tested.

6. This report is invalid if it is copied partly.

Notice: By the authorization of CNCA and SGCC, Quality Inspection &


Test Center of Electric Power Equipment & Instruments of Electric
Power Industry Department was renamed to Electric Power Industry
Quality Inspection & Test Center of Electric Power Equipment &
Instruments.
Electric Power Industry Quality Inspection & Test Center of
Electric Power Equipment & Instruments
INSPECTION AND TEST REPORT
Report No. 2012081E
Page 1of15
Sample A.G. Rod suspension
Serial No. I
Name composite insulators
Address of
Type FXBW-220/100(120) Dahan, Liaoning, China
Consignor
Dalian Insulator Group Co., Sample Getting
Consignor Being send
Ltd. mode
-------------------- r---

Sample
Sample No. No. 1 - No. 22 Oct, 2011
Receiving Date

Quantity 22units Inspection Date Nov, 2011 to Mar., 2012

Dalian Insulator Group Co .


Manufacturer Blank hereinafter
Ltd.
Design test, Type tests,
Test Type I I
Sampling test and Routine test

Test Items Reference to the page 2 I

Date of
Oct., 2011 I I
Production

Standards
IEC 61109:2008 Insulators for overhead lines - Composite suspension and tension
which
insulators for a.c. systems with a nominal voltage greater than 1000 V -Definitions,
inspection
test methods and acceptance criteria
based on

All test results of the FXBW-220/100(120) composite insulators are


satisfactory with IEC 61109:2008.

Inspection
Results
A::~0T: ./
Seal oflns'pe.ction nd Test Center

Ratifier~~~; Su~;,tio~ Jte: Mar.28, 2012


>- ,_ ~.~ ~- //
r. II
./

Note
Electric Power Industry Quality Inspection & Test Center of
Electric Power Equipment & Instruments
INSPECTIONAND TEST REPORT
Report No.2012081E
Page 2of15

Test items and results


Inspection
Test No. Inspection Items Page No.
results

1 Tests on interfaces and connections of metal fittings Passed 4

2 Assembled core load-time test Passed 7

, d\.-1\11 iQ and erosion test Passed B


Design
Tests for the core material Passed 8
tests
5 Flammability test Passed 9

6 Hardness test Passed 9

7 Accelerated weathering test Passed 10

1 Dry lightning impulse withstand voltage test Passed 10

Type tests 2 Wet power-frequency withstand voltage test Passed 10

3 Damage limit proof test and test of the tightness of


Passed 10
the interface between endfrttings and insulator housing

1 Verification of dimensions Passed 11

2 Verification of locking system Passed 12


Sampling
3 Verification of tightness of the interface between end
tests fitting and insulator housing and of the specified Passed 12
mechanical load (SML)
-------"~-- ----------- -----
4 Galvanizing test Passed 13

' 1 Visual examination Passed 13


Routine
tests
2 Routine mechanical load test Passed 14

Approved by: "7~ 'V'"/~


Reported by: ._,.,,,.;y>r,
I
1
Electric Power Industry Quality Inspection and Test Center of Electric Power Equipment and Instruments
(Power lrisulator & ArresterStation) No.2012081
E Page3 of 15
Based on Standards of IEC61109:2008, Electric Power Industry Quality
Inspection & Test Genter of Electric Power Equipment & Instruments (Power
Insulator & Arrester Station) did inspections and tests on FXBW-220/100( 120) A.C.
rod suspension composite insulators with $18mm core diameter which were
produced by Dalian Insulator Group Co., Ltd .. These tests include: design tests, type
tests, sampling tests and routine tests.
The number and serial number of samples were shown in Table I .

Table J The number and serial number of samples


Specimen
No. Test items Specimen serial No.
quantity
1 Tests on interfaces and connections of metal fitting 3 pcs No.12- No.14
r-. . ..
2 Assembled core load-time test
f ---'""'''"'"'"''''""'"'''''"""'"' "'""""'""""''"""'"' - ""''"""'""''""'''' ,....... '""'' , . _.,_ __ ,, _,_,.
6 pcs ...,.,,__ .,,,
No.15 - No.20
, .. .,. "-'"""-""".,_" __,,...,.___.,w,~.----

3Tracking and erosion test 2 pcs No.21 - No.22


.-- ... , . ,,_ .. ---------------------.. .,. ---.--~<"'- -------------.---------- ---------- .,.__,..,_.._.,,..._ ------------ -------~._.- -----------~--~---------.-----------
4 Tests for the core material
-----------=- --~----- ,_.,..,m-----------~--""""' ,.-.-,.,,.,., .... ,.,,__""" -~------------
Design 4.1 Dye penetration test 10 pcs 1# - 10#
test ................. -~--~---------------- ..---------+-------------- ..
4.2 Water diffusion test 6pcs 11#-16#
- """""'"~-~-------.->"<- .> - < --------------..._,,,,,.,,,,_N,._,,, _.,,.,,,.,,,.,._ ~.~ - ----

5 Flammability test 5pcs No: A1 -AS


6 Hardness test 2pcs No: A6-A7
7 Accelerated weathering test 3 pcs No: AS- A 10
1 Dry lightning impulse withstand voltage test
t----------- ---------- ___,....,....,,..
1 pcs ., __ ~~,. . . ,..,..._
No.11 ~~

Type test 2 Wet power-frequencywithstand voltage test 1pcs No.11


""'4 Damageiimitproof test tightnessof the andtestofthe . 4 pcs No.8 - No.11
interface between endfittinqs and insulator housinq
1 Verification of dimensions 7 pcs No.1 - No7
1------ -------.,~~-----------------~-MN<"'----d~.~---~~~-~ ----~---.,-- ----------~~-----~--
2 Verification of locking system 3 pcs No.5 - No. 7
Sample 3 Verification of tightnessofthe. interface t>etWeenend f-------~----------------------
test fitting and insulator housing and of the specified 5 pcs No.1 - No.5
__!!!-~~~~-'!i~<:1_1}oad(Sf\llJL . e--------- . _. _
4 Galvanizing test 3 pcs No.5 - No.7

Routine 1 Visual inspection 7pcs No.1- No.7


test 2 Routine mechanical test ?pcs No.1-No7
Electric Power Industry Quality Inspection and Test Center of Electric Power Equipment and Instruments
(Power Insulator & Arrester Station) No. 2012081E Page4of15

1 Design test
1.1 Tests on interfaces and connections of metal fittings
1.1.1 Test specimens and preliminary test
The samples were 3 units (No.12-No.14). The insulation length of samples was
about 844 mm. The tests were conducted as following items.
1.1.2 Dry power frequency voltage test
The test results were shown in Table 1.
Table 1 Results of dry power frequency voltage test
Atmosphere condition: b =102.8 kPa, td =6.0 C, t, = 3 C, L 0c 0.844 m
--... ~.-=------~------~------------------
Correction cori-ecteciva1ue
Sample Flashover voltage (kV)
coefficient (kV)
- ------~~----- ,~

No. 3 4 5 Average Kt kV

No. 12 328 334 330 331 329 330.4 0.988 334


No. 13 340 335 334 332 330 334.2 0.987 339
No. 14 331 330 329 332 327 329.8 0.988 334
1.1.3 Prestressing
1.1.3.1 Load Suddenly released test
After test 1.1.2, the samples (No.12-No.14) were put into a thermal mechanical
test chamber, of which the temperature was -25 'C (similar to normal working
condition), by using a 45# steel test rod to connected with the load device.Then a
load of about 30% of SML with axial direction was added to the test rod.
Load suddenly released test was repeated with five times on each sample. The
test results were shown in Table 2.
Table 2 Results of load suddenly released test
Sample I
Load released (kN) Ambient temperature CC} i Results
No.
I
No. 12 (37 ""'39) kN -25 "C II Passed
No. 13 (36 - 39) kN 25 C Passed
No.14 (37 - 39) kN -- 25 C Passed
1.1.3.2 Thermal-mechanical test
After test 1.1.3.1, the samples(No.12-No.14)were used in the
thermal-mechanical test The thermal-mechanical test includes 4 temperature cycles,
and each cycle has two process, one is a cooling process, of which the lowest
temperature is -35 5 "C, and the other is a heating process, of which the highest
temperature is 50 ~t5 "C. The time for each cycle is 24th, and the lowest or the
highest temperature is not less than 8h. During the test, a load of 50% SML was
continuously added on the sample. After the last cycle, the load would be released at
room temperature.
The results are shown in Table 3.
Electric Power Industry Quality Inspection and Test Center of Electric Power Equipment and Instruments
(Power Insulator & ArresterStation) No.2012081 E Page5of15
Table 3 Results of process of thermal-mechanical test

Sample Load -
Cycle 1 Cycle 2 I Cycle 3 Cycle 4 _
T cool T heat T cool T heat T cool T heat T cool I T heat
No. (kN) ('C) ("C} CC} CC) CC) ("C) CC) CCJ~-
No.12 60 :I: 1 -34--36 +49-+51 -34--36 +49-+51
------- -------- ----

No.13 60:t 1 -34--36 +49-+51 -34--36 +49-+51

No.14 60: 1 -34--36 +49-+51 -34--36 +49-+51


Results Passed
After the test, the insulation length of the samples was measured and
compared with their original length. The results were shown in Table 4.
Table 4 Length change of specimen
Sample Load ______ L_ef!9!'li"!!r:Dl
__ ---- Length changed
No. (kN) Before test After test (mm)
No.12 601 1073 0
No.13 60:.L1 1073 0
No.14 601 1075 1075 0
1.1.3.3 Water immersion test
After test 1.1.3.2, the samples (No.12-No.14) were immersed in the boiled salt
water(0.1 % NaCl dissolved) for 42h. The test conditions were shown in Table 5.
After the immersion test and the solution naturally cooled to 50C, the samples
were taken out. And then, the following test 1.1.5, 1.1.6 and 1.1.7 were finished one
by one within 48h.
Table 5 Process of water immersion test
Sample - .. -- seecific value. ___ ------,.------------~-~--~
Test value
.-------- - ----"'----
No. Weight of NaCl Boiling time- Weiqht of NaCl Start time Stop time
No.12
2012.2.3 2012.2.5
No.13 0.1% 42h 0.1%
No.14
. 16: 00 10 : 00
l

1.1.4 Verification tests


1.1.4.1 Visual examination
After test 1.1.3.3, no cracks were found on each sample (No.12-No.14) by the
visual inspection.
1.1.4.2 Steep-front impulse voltage test
After test 1.1.4.11 the impulse voltage test with steep-front method was
processed on the samples (No. 12-No.14). The test results were shoown in Table 6.
The waveforms of the test voltage were shown in Fig. 6 (a) and Fig.6 (b).
Electric Power Industry Quality Inspection and Test Center of Electric Power Equipment and Instruments
(Power Insulator & Arrester Station) No.2012081E Page 6 of 15
Table 6 Results of steep-front impulse voltage test

Sample Section
Ol~lty__
_____ P_o_s_it_iv_e-r'p~o_l_ar_itv~---+----N_e--~Q_: at_iv----re
No. of Puncture No. of Puncture
No. No.
Shots & failure shots & failure
No.1 25 N 25 N
No.12 No.2 25 N 25 N
No.3 25 N 25 N
~------------ ------ ~---~---~,---1-----+""-------+--- - ----~---,>.w"~-----

No.1 25 N 25 N
No.13 No.2 25 N 25 N
No.3 25 N 25 N
1--------1-----~-,------- -"'~-~-~-.--~--~--;----------+-----
No.1 25 N 25 N

No.14 No.2 25 N 25 N
No.3
......
25 N 25
.
N
............. ----

Steepness Specified 1000 - 1500


kV/s Tested
______________
1033-1422 1024- 1453
- ,,,,,,.,,.._,~_,,

excursion Specified
-------
kV Tested 554-610 I 552 - 620

.iiM
u ,: ,'\ ~l Oil V -~11 :""''"
' ,;~, J. ( '1) I!~\.' , i_lU.U',:

'
i
i \ ; . ' "''
I

';. i;
i :)
1l ! l-l!
))!.
:.t ,
t v ... - ,. \~L-, ...
I

Figure 1(a) Positive polarity Figure 1(b) Negative polarity


1.1.4.3 Dry power frequency voltage test
After test 1.1.4.2, the dry power frequency voltage test was processed on the
samples (No.12-No. 14). The average value of flashover voltage should not be less
than 80% of that determined in 1.1.2. The results were shown in Table 7.
Electric Power Industry Quality Inspection and Test Center of Electric Power Equipment and Instruments
(Power Insulator & Arrester Station) No-2012081 E Page 7 of 15
Table 7 Results of dry power frequency voltage test

Flashover voltage (kV) Based


Sample
---------- --------.,----"""-M-~_,.,.- ---~--------
,-"---,.~.----~-------~""''''"---- . ... Value Results
No. Corrected
1 2 3 4 5 Average (kV)
Value
No. 12 331 330 334 329 331 331.0 334 334 Passed
No. 13 330 332 330 329 331 330.4 333 339 Passed

No. 14 329 331 332 328 330 330.0 333 334 Passed

After the test the withstand voltage with a value of 80% of average flashover
voltage determined in 1 .1.2 was applied on each samole for 30 minutes. The test
results were shown in Table 8.

Table 8 Voltage withstand test results


Atmosphere condition: b ==102.2 kPa, t0 ==6.0 C, tw == 4 C, L = 0.844 rn, Kr ""O 992
--- - ~~- ------~----------- ------ . , ----------------------- ..--------------------- ---------~---
Specified Corrected Applied
Sample Time Tempera-ture rise
Value Value Value Results
No. (min) (K)
(kV) (kV) (kV)
No. 12 267.2 266 270 30 0 Passed

No. 13 270.4 269 270 30 0 Passed


No. 14 267.2 266 270 30 0 Passed
1.2 Assembled core load-time test
1.2.1 Specimen
Choose 6 pcs short samples which are same core, same technic interface and
connection of metal fitting, the insulating length is 844 mm, Serial No is No.15-No.
20.
1.2.2 Mechanical-load test
1.2.2.1 Determination of the average failing load of the core of the assembled
insulator MAV
3 samples, Sample No. is No. 15- No. 17 to carry out the test, the test results
are shown in Table 9.

Table 9 Result of assembled core average failing load test

Mechanical failing load (kN)


Sample No. ------.--"""'""-- -'-'--""'" -----"-~-w~w.~--><--'-

Failing value (kN) Failing form Average

No.15 171 Fitting pull out


No.16 177 Fitting pull out 171.7

No.17 167 Fitting pullout I


1.2.2.2 Verification of the 96 h withstand load
3 sapmes, Sample No is No.18-No.20, carry out the mechanical strenqth-tirne
curve slope test (top used the strengthen fitting), the results "".~iW:J:l)n Table 10.
io,.,,~\
Electric Power Industry Quality Inspection and Test Center of Electric Power Equipment and Instruments
(Power Insulator & ArresterStation) No.2012081E Page8of15
Table 10 Results of assembled insulator mechanical strength-time curve slope test
Specified value Tested value
Sample Withstand
Tension toad Duration Tension load Duration Result
No. l or not
(kN) (h) (kN) (h)
I -- "- ,.,... - . - .......... , . .,_
No.18 Withstand
171.7)'. 60%
No.19 96 104 96 Withstand Passed
"'103.0
No.20 Withstand
1.3 Traking and erosion test
2 pinsulators (No.21-No.22) were used in this test. The creep age distance of
samples was 618mm. The test voltage is 17.9 kV. This test was carried out in a
moisture-sealed corrosion-proof chamber. The results were shown in table 11.

Table 11 Test results of the tracking and erosion test


Test conditions Specified value Testing value Test results

Water flow rate (kg/m3.h) 0.40.1 0.320.45


No tracking or erosion
Size of droplets (um) 5 . 10 5 10
occur on the shed or
NaCl content of water (kg/m3) 80.4 8
sheath.
Temperature CC) 205 202
The specimens passed
Test voltage (kV) 14-20 17.9
this test
Test time (h) 1000 1000

1.4 Tests for the core material


1.4.1 Dye penetration test
1.4.1.1 Specimen
Specimen: 10pcs core. diameter is <I) 1 Bmm. The length is 1 Omm 0.5mm
1.4.1.2 Test procedure
The 10 specimens, Sample No. is 1#-10# were placed (fibers vertical) on a
layer of steel or glass balls of same diameter 2 mm a glass vessel. A dye, 1%
alcohol solution of fuchsin, its level being 3mm higher than the level of the balls.
After 15min, there was no dye rise by capillarity through the core.
1.4.1.3 Test result
10 specimens which length are 9.Bmm-10.3 mm, were carried out test
according to above procedure, after 15min, there is no dye penetrate. The test
passed.
1.4.2 Water diffusion test
1.4.2.1Specimen:
6 pcs core, diameter is Cll18mm, the length is (30+0.5)mm, Sample No.: from
11#-16#.
1.4.2.2 Pretreating procedure
a. 6 specimens were boiled in a glass container for (1000.5) h in deionized
water with 0.1% by weight of NaCl.
b. After test, pick up the specimens, and put them into another container with

G ()
Electric Power Industry Quality Inspection and Test Center of Electric Power Equipment and Instruments
Insulator & Arrester No.2012081E 9 of 15
tap water for 15min.
c. After 3h when specimens picking up from boiling container, carry out the test.
1.4.2.3 Voltage test
Tests were carried out with''voltage test pole" and "withstand test loop", test
results are shown in Table 12.

Table 12 Result of water diffusion test


Sample No. 11# 14# 15# 16#
Length of sample
30 30 30 30
(mm)--~
Time of boiling
Prestressing 100 00 100 100 100
Time of in ambient
15 15 15 15 15 15
. T!31:r!P~f~~l:'~~\o\1~~!3' . . \1!1.Lr:1). . . - ,;;N---
---
A~[:!lied voltage (kV) 12 12 12 12
__ YY.l!hs!~.!1.dtirll.E? .. _tf!llQ) 1 1 1
-----~--------

Voltage Test Leakage Specified


1000
current Value
(A) Test value 15 15 12
Results
1.5 Flammability test
5 specimens (No.A 1 - No.AS) were used in the flammability test. The length,
width and thickness of specimen were (1255) mm, (13.00.3) mm, and(3.00.2)
mm. The test is intended to check the housing material for ignition and
self-extinguishing properties, according to the criterion IEC 60707. The results were
shown in Table 13.

Table 13 Test results of flammability test


__ ____g_ateg21:.i8_~~-----
Items Requirements of Test
FV 0 results
Flaming combustion time after each application of the test flame s 10 0.45-4.07
for each test specime_!!.:...(tai1,_!ai21__ . ----. --------
Total flaming combustion time for the 10 flame applications for s
50 16.73
1--------~e~a_c_h_s_e_t o_f_5~s~n.:iens. {ta), s ------~---------+----
Glowing combustion time after the second removal of the test s
30
--- fl_a_m_e_:_l~i)~~
--------------- ----- . --- --~~~-10.1
Flaming or glowing combustion up to the holding clamp Null Null
Dripping flaming particles that ignite dry absorbent surgical cotton
Null Null
1--------- !'?.~~~<:l ~Q9 m.!!' belo.\-\1,_!t_:l.~_te~~ecim.~~ _ .
Results FV-0

1.6 Hardness test


Two specimens of housing material for hardness measurement were taken from
the housing of two insulators .. Then the samples were kept immersed in boiling
de-ionized water with 0.1 % by weight of NaCl for 42h. After boiling, the hardness of
samples were measured again.
Electric Power Industry Quality Inspection and Test Genter of Electric Power Equipment and Instruments
(Power Insulator & Arrester Station) No.2012081E Page 1 O of_..1.E_
Table 14 Test records of hardness test
Hardness measurement j Hardness measurement
sample
before boiling 1 after boiling
Change of
~ e~~~-r-at-ur-e I
------~1----Te-m--p--e~ature
hardness
No. Hardness Hardness
'C 'C I
i

A6 22 70 23 73 4.3%

A7 22 69 23 72 4.3%

1.7Acceleratedweathering test
Three specimens(No.A8- No.A10) of shed and housing material were subjected
the 1 OOOh UV light test by Xenon-arc methods.
After the test, markings on shed or housing. housing material were legible and
there was no surface degradations such as cracks and raised areas.
The test was passed.

2 Type test
2.1 Dry lightning impulse withstand voltage test
The test result of sample (No.11) was shown in Table 15.

Table 15 Results of dry lightning impulse withstand voltage test

Atmosphere condition: b;;:; 102.BkPa, td ;:;14 C, tw = 12C, L ''2.08 m, Kt= 0.995

Sample Specified value Corrected voltage Applied voltage Flashover times


Results
No. (kV) (kV) (kV) /Withstand times
-----+-------
No.11 1000 995 1046 -1058 0/15 Passed
2.2 Wet power-frequency withstand voltage test
The test result of sample (No.11) was shown in Table 16.

Table 16 Results of Wet power frequency withstand voltage test


=
V\tmosphere condition: b 102.8kPa, td =13 C, tw:::: 9.5"C, L=2.08 m. Kt 1.006
~rtificial rain parameters for wet test Water resistivity 920m
Horizontal component of the rain: 1.4 mm/min; Vertical component of the rain: 1.5 mm/min
Sample
No.
I Specified value
. . ___ (kV)____
Corrected voltage
(kV)
Applied voltage
_(kV) _____
Withstand time
(min)
Results
--~-----. --- ------w---------------- -----------

No.11 395 397 399 1 Passed

2.3 Damage limit proof test and test of the tightness of the interface between
endfittings and insulator housing
2.3.1 Specimen
4 specimens of same core and technic assembly of the interface between end
fitting and insulator housing. This test has been carried out on four composite
insulators Sample No. is No.8-No.11
2.3.2 Test procedure
a. Under room temperature, applied 70% of SML tensile load on 4 specimens,

1{~~\
u>
Electric Power Industry Quality Inspection and Test Center of Electric Power Equipment and Instruments
Insulator & Arrester No.2012081 E 11 of 15
then keep them under this value for 96 h.
b. After 96h withstand test, one sample shall be subjected to crack indication by
dye penetration..
2.3.3 Test results and acceptance criterion
a. After 96 h tensile test with 70% of SML mechanical load, No.8 shall be
subjected to crack indication by dye penetration. After the dye penetration test, cut
the end fitting into 2 pieces. if there are some cracks happen, inspect whether the
crack has reached the core, The test results are shown in Table 17 (a).
Table.17 (a) Result of dye penetration of interface between insulator end fitting and housing
70% SML
Dye I Inspection the core dye
Tensile Interface
Sample No. Duration duration penetration after cut the Result
load inspection
(h) (min) end fitting into 2 pieces
(kN)

Specified 84 96 20
Should Should not penetrate to I
No.8 not crack core j Passed
~---.. -- .. --~-
84 96 20 No crack No penetration

b. No.9-No.11 specimens, after 70% of SML mechanical load, 96 h tensile,


should carry out the 100% SML for 1 min withstand test. the results are shown in
Table 17 (b).
c. No.9-No.11 specimens, after 70% of SML mechanical load, 96 h tensile, and
100% SML for 1 min withstand test, should carry out mechanical failing load test, the
test results are shown in Table 17 (c).
Table 17 (b) Results of 70% SML 96 h tensile and 100% SML for 1 min tensile load test
Specified mechanical load withstand
70% SML withstand test
Sample u~-.-~~-----------"' -----~------ ~~~~---~--~~ test
---~-------
Result
No. Tensile Duration Withstand Tensile Duration Withstand
load (kN) (h) or not load (kN) (min) or not
No.9 84 96 No damage 120 1 No damage
No.10 84 96 No damage 1 120 1 No damage Passed
No.11 84 96 No damage I 120 1 No damage

Table 17 (c) Results of mechanical failing load test


Mechanical failing
Sample No. Failing mode Result
load (kN}
No.9 173 Pin broken I
I
No.10 165 Pin broken Passed
No.11 162 Pin broken I
3 Sam pie test
3.1 Verification of dimension
7 samples (No.1 - No.7). The test results are shown in Table 18.
Electric Power Industry Quality Inspection and Test Center of Electric Power Equipment and Instruments
(Power Insulator & Arrester Station) No.2012081
E Page 12 of 15
Table 18 Results of dimension and creepage distance inspection

Insulating Spacing Creepage


Dimension Gauge distance L height H distance S
mm mm mm
Result
Cap Pin
Specified value 2121 J. 30 2350 t 30 ?6340
Go No-go Go No-go
~
No.1 Go No-go Go No-go 2124 2353 6402

No.2 Go No-go Go No-go 2122 2351 6398

No.3 Go No-go Go No-go 2122 2351 6399


Tested
No A Go No-go Go No-go 2124 2353 6401 Passed
value
No.5 Go No-go Go No-go 2123 2352 6398
No.6 Go No-go Go No-go 2123 2352 6398
No.7 Go No-go Go No-go 2121 2350 6397
3.2 Verification of locking system
Applied tensile load along the axis of locking device, under SON-SOON pull out
load, the device should move from locking position to coupling position. Each
specimen should be carried out test for 3 times. Then applied more than 500N pull
out load on specimen, the specimens should not pull out from socket.
Test results are shown in table 19.
Table 19 Result of verification of locking system
Sample Pull __<?ut load (N) Max. load ;:::5QQN
- Result
No. 1st 2nd 3rd Pull out result
No.5 188 226 338 No pull out
No.6 193 234 346 No pull out Passed
No.7 179 245 335 No pull out
3.3 Verification of tightness of the interface between end fitting and insulator
housing and of the specified mechanical load (SML)
a. Select 1 specimen from E2 at random, carry out the cracks inspection
using dye penetration method according to ISO 3452, to verify the tightness of
the interface between end fitting and insulator housing. The inspecting area: all
areas of interface between housing and end fitting, including end fitting virtual
extent area. The specimen: FXBW-220/100(120) (120kN as specified value),
Sample No. is No.5, the test results are shown in Table 20(a).
Electric Power Industry Quality Inspection and Test Center of Electric Power Equipment and Instruments
(Power Insulator & Arrester Station) No.2012081E Page 13 of 15
Table 20(a) verification of tightness of the interface between end fitting and insulator housing

Dip-dye Withstand
70% SML
Sample No. duration duration Visual inspection Result
(kN)
(min) (min)

Specified value 20 84 1 Should no crack


No.5 --~.~-------.,..,.. ......... .,.,.,...,.,.,, .... ,-,.,.~. ~"--------------. ------------ -------_,,, __ Passed
Tested value 20 84 1 No crack
b. In room temperature, E1: 4 samples of FXBW-220/100(120) composite
insulators, (Sample No. is No.1-No.4), applied 100% SML on each sample,
withstand 1 min. Then carry out the mechanical failing load test. The test results are
shown in Table 20(b).

Table 20(b) Result of specified mechanical withstand and failing load test
Tensile mechanical Mechanical
Sam pl Duration (min) Withstand I Failing
e No.
load (kN)
or not i
!
failing load iI
mode
Specified Tested Specified Tested I (kN) I
No.1 122 1 Withstand 172 Pin broken
I
No.2 122 1 Withstand 165 Pin broken
120 1
No.3 121 1 Withstand 162 Pin broken
No.4 122 1 Withstand 169 Pin broken
---- ---~------------~ - ~~--- - ~----- ---- --- ------- --.- - ---.---------------
Result Passed
3.4 Galvani.zing test
3 samples of FXBW-220/100(120) (Sample No.: No.5-No.7), choose 10 points
on each pin, cap to measure cap and pin galvanizing thickness using magnetic
method. The test results are shown in Table 21.
Table 21 Result of galvanizing thickness test
Specified Tested value of galvanizing thickness
Measured position value im Result
1m No.26 No.28
107 109
Pin Passed
Total average valu~---- _ __ ..!::.~~--------1--------~---1_0. .o__ -
__7__ -., __. -+---~-- ..

Cap
-~~~t'...~.1.1~r~Q~y~1~~-- 1.. ::::: 1 o + 1 oa L 0
1 6............ .............. 1 10 ,
Passed
Total average value ;~ 85 108.0

4 Routine test
4.1 Visual inspection
Under room temperature, 7 samples of FXBW-220/100(120)(Sample No:No.1-No.7)
carry out the visual inspection. The test results are shown in Table 22.
Electric Power Industry Ou ality Inspection and Test Center of Electric Power Equipment and Instruments
(Power Insulator & Arrester Station) No.2012081E Page 14of15
Table 22 Results of visual inspection
Result of visual
s The standard of visual inspection
ins ection
Conclusion

The end fittings should be according


to drawing, and the insulator color
sho uld meet the drawings too.
All samples meet the
Theb elow defects are allowed on standards; the raised
No.1-No.7 Passed
insulator surface: surface and interface are
Thesu rface defect area isn't beyond smooth.
25mm 2, the total area is not more
than 0 .2%, and the depth ~:; 1 mm
4.2 Routine mechan ical test
Under room te rnperature, 7 samples of FXBW-220/100(120)(Sample No.
No.1-No.7) carry ou t the routine mechanical tensile load test, withstand for more
than 1 O s. The test re suits are shown in Table 23.
Table 23 Result of routine mechanical load test
-
Specif ed value Tested value
Sample --- ----------------- ------------------- -------------
----------------~~--,..--
Withstand
Tensile Duration Tensile load Duration Result
No. or no
road (s) (kN) (s)
~50%SML
No.1- 10
That is: ?: 10 s 60 Withstand Passed
No?
F~60kN

5 Conclusions
All test results of the FXBW-220/100( 120) composite insulators manufactured
by Dalian Insulator G roup Co., Ltd. are satisfactory with IEC 61109:2008.

'"
Electric Power Industry Quality Inspection and Test Center of Electric Power Equipment and Instruments
(Power Insulator & ArresterStation)No.2012081E Page 15 of 15
Appendix: Drawing of FXBW-220/100(120) compositeinsulator

1mo

~-
Report No. 2006-F-O 1

Test Report of 5000 h


Multi-Stress Ageing Test on
Silicone Rubber Insulators

High Voltage Laboratory

Department of Electrical Engineering, Tsinghua University

March 1, 2006
High Voltage Laboratory, Tsinghua University Report No.: 2006-F-O I

Client: Dalian Insulator Co. Ltd.

Test Engineer: Mr. Li Zhenyu and Mr. Li Xuesong

Reviewed by

Technical Principal: Professor Liang Xidong


Signature:

Approved by

Directorof
Laboratory:Professor Zhou Yuanxiang
Signature:
High Voltage Laboratory. Tsinghua University Report No.: 2006-F-O I

Table of Contents

Chapter 1 About the Test -1 -


1.1 Test content - 1 -

12 Test period - I -

13 Specimens - 1 -

1.4 Test Procedure -2-


1.5 Leakage current measurement.. -3-

1.6 Test Parameters -3-

Chapter 2 Test Results -5-


2.1 Pollution accumulation of AC specimens in test -5-

2.2 Hydrophobicity change of AC specimen -7-

2.2.1 Hydrophobicity loss of AC specimen -7-

2.2.2 Hydrophobicity recovery of AC specimen - I0 -

2.3 Leakage current of AC and DC specimens in ageing test - 12 -

2.4 Erosion status of AC specimen - 14 -

Chapter 3 Conclusions - 16-

References - 17-

Appendix--Test Equipment - 18-


High Voltage Laboratory, Tsinghua University Report No.: 2006-F-OI

Chapter 1 About the Test

1.1 Test content

5000h multi-stress ageing test of AC Silicone Rubber (SR) polymeric insulator


under AC voltage.

The test was carried out in accordance with IEC 61109.

12 Test period

27 June 2005 - 22 January 2006. Time of total test: 5000 h.

13 Specimens

Test specimens are manufactured by Dalian Insulator Co. Ltd.


The dimension and shed profile of AC SR insulator are all the same. Figure 1-1
shows the photos of specimens. Figure 1-1 also shows the shed number of specimen in
this report: 1#, 2#, 3#, 4# and 5#, numbered from hot end. Table 1 show the dimension
and shed profile parameters of specimen.
All specimens are cleaned by de-ionized water and rest for 2 days in room
temperature before test.

Figure 1-1 Photo of specimen

-I-
High Voltage Laboratory, Tsinghua University Report No.: 2006-F-OJ

Table 1-1 Dimension and shed profile parameters of specimen


Specimen Shed diameter Spacing Spacing Core Creepage Arcing
(cm) between between diameter distance distance
neighbor large and (cm) (cm) (cm)
large sheds small shed
(cm) (cm)

12.0 6.0 2.5 81 33.5


AC specimen 14.5/11.0
(large/small)

1.4 Test Procedure

Figure 1-2 is the procedure of this multi-stress aging test. The total time of the ageing
test is 5000 h, and one day per cycle. That means the test last for 208 days or 208 cycles.

Humidification
Humidificatioo

Cha.uffage 50 C
Heating 50 -c

P'ul.f! deminer~H~ee
Demio~rali?~d .-~if'

Brouillard salin: 7 kglm:>


Salt fog: 7 kyim'.!

Simulation de rayonnement
solajra
Solar radiation simulation

Tension: U,.,f,f3 kV
Voltage: Urrf{3 kV
0 2 4 6 8 10 12 14 16 rn 20 22 24
Tcmps/Tirna

D Hors service
Out of opH<'!tion

Figure 1-2 Example of an accelerated weather ageing cycle under operating voltages
~
En service
In operation

-2-
High Voltage Laboratory, Tsinghua University Report No.: 2006-F-O I

1.5 Leakage current measurement

The leakage current is measured when specimen in fog chamber.

The definition of "one pulse" in leakage current measurement is:


(1) The peak value of the plus must be 5mA or above; and
(2) The interval between two pluses is not less than O.ls.
Waveform of the leakage current and its characteristics are saved in computer.
Leakage current of test specimen in fog chamber is measured continuously.

{a)
5m+ ~-8-A-A-A-11-.-
V VlJ1fV V'"
o ~
t

I . 1 o:!.l.1S .,1

{b)
5m+v~-~-A-JI,---
0
V VlJ - ~-A-~-11--.-
V V vv . .t

Figure 1-3 Definition of "one pulse" in leakage current measurement

1.6 Test Parameters

(I) Test Voltage


The AC insulator is energized at an AC voltage of23.4 kV (effective value), 50
Hz. The specific creapage distance is 34.6 mm/kV if calculated as phase to ground
voltage, or 20mm/k.Vif calculated as phase to phase voltage.
(2)Artificial rain
Artificial rain is applied at both the beginning and the end of fog phase in fog
chamber. The adopted time of rain is 1 min at the end of fog phase. In addition,
there are 30s rain when specimens just be exchanged from UV chamber into
fog chamber in order to shorten the time of wetting. Conductivity of water used
for the rain is about I 0 - 20 Siem.
(3) Heating
Heating temperature is 50 I C in the test procedure.

-3-
High Voltage Laboratory, Tsinghua University Report No.: 2006-F-O I

(4) High humidity


The relative humidity is above 95% due to the continuous water spray cooling to the
wall of UV chamber
(5) Solar radiation simulation
The irradiation intensity of Xenon lamp is controlled between 0.85-0.95 kW /m2.
It is continuously measured with a radiometer.
(6) Pollution fog
Pollution fog is produced by a centrifugal fog generator from the mixture liquid of
NaCl and Kieselguhr. It contains 2 g NaCl and I g Kieselguhr in one liter
de-ionized water. The conductivity of fog liquid is about 3.6-3.8 mS/cm. The
actual generated fog is 0.34-0.42 L/h-m3 Continuous stirring of the liquid is
necessary in order to avoid the deposition of Kieselguhr.

-4-
High Voltage Laboratory. Tsinghua University Report No.: 2006-F-O I

Chapter2 Test Results

2.1 Pollution accumulation of AC specimens in test

NSDD and ESDD of the specimens at 500 h, 1870 h, 2500 h, 3500 hand 5000 hare
measured on a small area of 12 cm' on upper and lower surface of shed 3# for not
influencing on test process. Figure 2- l and Figure 2-2 show the change of average
NSDD and ESDD, respectively.

It could be found that the pollution accumulation is gradually increased. Pollution


fog brings NaCl and kieselguhr onto the upper surface and lower surface of the shed of
test insulator. The pollution accumulation process is very slow.

The ratio of NSDD/ESDD of AC insulator is located between 8.0 and I 0.0 (See
Figure 2-3).

Figure 2-4 and Figure 2-5 shows the pollution status of AC after 5000h test.

"> r
..:.)

oAC

,,.._,
2:: 1.0 >-
sr:
:L
0.5 .. o e Q

I
0.0
0 20CM) '~000 6COO
Time (h)

Figure 2-1 NSDDave of specimens

- 5-
High Voltage Laboratory, Tsinghua University Report No.: 2006-f-OI

0.3()

025 <>AC
r :
~
........ 0 . .10
u
~t'l
E O.t 5
c;
c:
:/".
;L
0.10

0.05
0

0 .00
0 2000 40{)0 6000
Time {h)
Figure 2-2 ESDDave of specimens
20.0
<>AC
o l6.0
C! e
v:
.:...t..: <>
d 12.0 .
::::::
/:.
z
-~~
<.,....
.....
-.;:::;
8.0
0
t'!!l
~ rl()

0.0
0 :woo 4000 6000
Time (It}

Figure 2-3 The ratio ofNSDD/ESDD

Figure 2-4 Pollutant status of AC specimen after 5000h test

- 6-
High Voltage Laboratory, Tsinghua University Report No.: 2006-F-OI

2.2 Hydrophobicity change of AC specimen

2.2.1 Hydrophobicity loss of AC specimen

Figure 2-5 to Figure 2-9 show the measurement results of hydrophobicity loss at
4th day, 34th day, 104th day, 158th day and 206th day of aging test.

(a) Upper surface of shed 5# (b) Upper surface of shed 1#

(c) Lower surface of shed 5# (d) Lower surface of shed 1#


Figure 2-5 Hydrophobicity loss status of AC specimen at 4th day

(a) Upper surface of shed 5#

-7-
High Voltage Laboratory, Tsinghua University Report No.: 2006-F-O I

(c) Lower surface of shed 5# (d) Lower surface of shed 1#


Figure 2-6 Hydrophobicity loss status of AC specimen at 34th day

(a) Upper surface of shed 5# (b) Upper surface of shed l #

(c) Lower surface of shed 5# ( d) Lower surface of shed l #


Figure 2-7 Hydrophobicity loss status of AC specimen at 104th day

-8-
High Voltage Laboratory, Tsinghua University Report No.: 2006-F-OI

(a) Upper surfaces of shed 4# and 5# (b) Upper surfaces of shed 1# and 2#

( c) Lower surfaces of shed 4# and 5# (b) Lower surfaces of shed l # and 2#


Figure 2-8 Hydrophobicity loss status of AC specimen at 158th day

(a) Upper surfaces of shed 4# and 5# (b) Upper surfaces of shed 1 # and 2#

-9-
High Voltage Laboratory, Tsinghua University Report No.: 2006-F-O I

(c) Lower surfaces of shed 4# and 5# (b) Lower surfaces of shed 1 # and 2#
Figure 2-9 Hydrophobicity loss status of AC specimen at 206th day

2.2.2 Hydrophobicity recovery of AC specimen

Figure 2-10 to Figure 2-14 show the hydrophobicity recovery results of AC


specimen.

(a) Upper surface of shed 5# (b) Upper surface of shed I#


Figure 2-10 Hydrophobicity recovery status of AC specimen at 6th day

(a) Upper surface of shed 5# (b) Upper surface of shed 1#


Figure 2-11 Hydrophobicity recovery status of AC specimen at 34th day

- 10-
High Voltage Laboratory, Tsinghua University
==,,,,,...,

(a) Upper surface of shed 5# (b) Upper surface of shed 1#


Figure 2-12 Hydrophobicity recovery status of AC specimen at 80th day

Upper surface of shed 5#


Figure 2-13 Hydrophobicity recovery status of AC specimen at l 581h day

(a) Upper surface of shed 5# (b) Upper surface of shed l #


Figure 2-14 Hydrophobicity recovery status of AC specimen at 2041h day

- 11-
High Voltage Laboratory, Tsinghua University Report No.: 2006-F-OI

2.3 Leakage current of AC specimens in ageing test

The Leakage Current (LC) varies with the change of hydrophobicity loss and
pollution accumulation in fog chamber. Figure 2-15 shows the typical change of
maximal LC in each ten minutes at 501h cycle. The maximal LC is about 20-30mA
during a day. The maximal current does not exceed I 00 mA, see Fig. 2-16. In most cycle,
the maximum current pulses is around 20-40 mA. There is no tlashover in whole test
period.

0,04
,-
<!'.
._,,,,:...
:t1
~::i 0.03
.Ec
c: 0.0.!
f;1
.c:
g
-
Ill

~ 0.01
-..."
0.00
0.0 6.0 12.0 rs.o 24.0
Time (h)

Figure 2-15 Change of maximal LC in each ten minutes during 24 h. (50th cycle, AC)

o.m
< 0

lJ.00
(1 2U 60 80 100 120
Cycle

Figure 2-16 Maximal current in each cycle (AC)

- 12-
High Voltage Laboratory, Tsinghua University Report No.: 2006-F-OJ

With the increase of test time, the maximal accumulated charges of single discharge
gradually increase. Figure 2-17 shows the curve of maximal accumulated charges of
single discharge in each cycle. The maximal accumulated charge of single discharge
directly influences the erosion of polymeric insulator [4]. The increasing of accumulate
charge explain that the erosion gradually increases.

020
,-. .
'-"
v:
<.;
~
1).16
.
~
-r_;
0.12
8
..
E e
., 9

uu 0.08
. e
...,"'
q

~,, . ee ....

z"'
(1.\11
q
.. ...
..
.......
.,..,"
Q ....

O.iJO "
0 ~o -10 60 JU() 1:::0
Cyd~

Figure 2-17 Maximal accumulated charges of single discharge in each cycle (AC)

When discharge start, the discharge current will increase rapidly, especially of
smaller discharge within the specified ranges of 5 mA and I 0 mA. The jump of number
of discharge pulse is almost accomplished within one cycle, see Figure 2-18. The
number of total current pulse, which greater than 5 mA, is around ten thousands and one
hundred thousands in most cycles.

I.OE-%~--------------~

J.OE-05
<.>
,;,
::i
;:;- l OE-04
~
"'
..c; . .
~ LOE
'-
<Jj
."
~ l.0[-02
0
!--
I.OE-OJ ~ ~
"
1.01 .: 00 '---~--~---'----'---'-----'
0 '.'..() 411 6(} 8() HlO 120
Cycre

Figure 2-18 Number of discharge pulse greater than SmA in each cycle (AC)

- 13-
High Voltage Laboratory, Tsinghua University Report No.: 2006-F-O I

2.4 Erosion status of AC specimen

Figure 2-19 shows the erosion on the trunk of AC specimen. All erosion depth are
less than O.Smm. All erosions do not reach the FRP rod.

(a) Hot end (b) Between shed I# and 2

( c) Between shed 2# and 3# ( d) Between shed 3# and 4#

-14-
High Voltage Laboratory, Tsinghua University Report No.: 2006-F-O I

( e) Between shed 4# and 5#

Figure 2-19 Erosion status on the trunk of AC specimen

- 15-
High Voltage Laboratory, Tsinghua University Report No.: 2006-F-Ol

Chapter 3 Conclusions

l. No flashover for AC specimens in the 5000h multi-stress aging test.


2. The maximum erosion depth on housing of AC specimen is less than 0.5 mm. All
erosion does not reach FRP core.
3. The AC specimens passed the 5000h multi-stress ageing test.

- 16-
High Voltage Laboratory, Tsinghua University Report No.: 2006-F-O I

References

[1] Department of Electrical Engineering, Tsinghua University. "5000 h multi-stress


ageing test procedure of silicone rubber polymeric insulator (draft)", Research
report. 2004.12 (in Chinese)
[2] Liang Xidong, Li Zhenyu, Yin Yu, Zhou Yuanxiang, Su Zhiyi, "Field ageing and
ageing test of SR composite insulator", 2005 world conference on Insulators,
Arresters and Bushings, HongKong, Nov 27-30, 2005
[3] Liang Xidong. "Basic research on ageing and brittle fracture of EHV polymeric
insulators". Final report of Natural Science Foundation of China (NSFC),
No.50025720, 2004.12 (in Chinese)
[4] IEC 62217 Ed. 1, "Polymeric insulators for indoor and outdoor use with a nominal
voltage greater than I OOOV - General definitions, test procedures and acceptance
criteria", 2005
[5] IEC 61109, "Composite insulators for a.c. overhead lines with a nominal voltage
greater than 1 OOOV - Definitions, test procedures and acceptance criteria", 1992

- 17-
High Voltage Laboratory, Tsinghua University Report No.: 2006-F-OI

Appendix

Test Chamber

- 18-
oe,
ce>
-0 t-r-r
<> >-
::;en
-I
'"-:r:1 :>--
= = = c:: c:::> = ::::cs-
'"' ,..--
=: ?'
:-
?'
=
::s::: ::::0
~ ~ ==
==
>-
'Z

:=: :=: :=:


r-'
= =
-cl
CZl
'""r:l
>< >-3
tTJ ;:!;:, er:
cr-: cr-.
= ~
=
'-"
cz:
,..--

"""
,..__, I
r-c>
'::;;;;::::
\:::)
1.. ==
=5
--! ~
:--
-I

= tTJ ,..-
~
-_;z

=
~ CZl
= =---
>----<
= ,..__,
e--'
::::0
c:::>
~
=
cr-.
=
;:!;:,
1..
-0
=
~ ~
_--1
,--,
en >- '::;;;;:::: ?
g (;;;
==
-3 e--'
>-<: t;
~
~ -
:::;
:;....-

~ ,---, ==
'.Z

=
c-o
=
~ >-

~
en :':':
"'
=
;;;::
cr-:

~ =
=
=
;:;....
8
.:s
=
co
oe,
ce>
-0 t-r-r
<> >-
en
_,__,
"'
>-r:J >-
~ ~ = C> 8 :=: r-r-
=- ~
=::s:::: ~
("""".)
>-
~ ~ =
?' ::::0 s::
:- g; ~
= ~ ~
r-'
=,..__. =~
-0
en
>< >-3
tTI
:z
~
~ czr-: = =
cr-;
c-
VO

_, ~ ~
>--
-Cl I L = -;
= r-c>
"--"
\::::!
tTI = ==
.........
= cl: ,-;- ;;;
_,,_

~ = -----
en ~ ::::0
~ _~
= ~ _, ~
-0

;,;,;,:::

= =
e-
>-
cr-;
= C>
:z
cs-,

~ 1. ?
c-e c-,,

g
<./>

== 6 ?:~ __,
-Cl
~ e--'
>-<:::
=
==
=
= g
~ =
>--
j

>--
'.:'.'.:
"'
"'
=
~ =
r--a
><
~
-es
"""""
-=
C>
Deccan Industrial Product
Pvt. Ltd
fJECOSIL DECCAN ENTERPRISES LIMITED

MANUFACTURER'S AUTHORIZATION

Date: 12th of January 2017


ICB No.: ICB-PMD-MCTLP-016/17-01

To:
Attention: Mr. Chirantan Bikram Rana
Marsyangdi Corridor 220 kV Transmission Line Project
Project Management Directorate
Street Address: Satungal - Bauthali Chowk Marga, Matatirtha Substation
Chandragiri Municipality, Ward No. 11
Floor/Room number: 2nd Floor
City: Kathmandu
ZIP Code: NA
Country: Nepal

WHEREAS

We Deccan Enterprises Limited, who are official manufacturers of Silicone Composite insulators , having
factories at 8/ 58 to 60, APIE, Balanagar, Hyderabad - 500037, Telangana, INDIA, do hereby authorize Mis
Larsen & Toubro Limited, India to submit a bid the purpose of which is to provide the following goods,
manufactured by us Silicone Composite insulators,and to subsequently negotiate and sign the Contract.

We hereby extend our full guarantee and warranty in accordance with Clause 27 of the General Conditions of
Contract, with respect to the goods offered by the above firm.

Signed:

Name: M. Narendra Rao

Title: General Manager - Sales

Duly authorized to sign this authorization on behalf of: Deccan Enterprises Limited.

Dated on 12th day of January, 2017

ClN: U52609TG1%&?LC001109
Regd Office:
058-60, APIE, Balanagar, Hyderabad- 500 0037, IND!A
fi + 91402387 0111 a+ 9140 2377 8699
2 info@deccan.in z!; www.deccan.in
Annexure 4 (i)
Manufacturing Experience

~ ------------
LIST OF PAST SUPPLIES FOR COMPOSITE LONG ROD INSULATORS

QTY SUPPLIED
SL.NO TRANSMISSION UTI_L__
IT_Y_N_A_M_E -+o_R_D_E_R_No
& DATE -----~~~-~~DERED (RATING W;SE NOS)
(RATING WISE NOS)

MAHARASTRA STATE ELECTRICITY NIL


I I 220KV-1No 1
BOARD DT:22.02.05 ..
132 KV -1 No 1

2
T-R--A-N_S_M-IS_S_I_O_N
__C_O_R_P_O_R_A_T_I_O_N_O_F
+C-P_T_8_1_1_/_F_.-In_s
__u.Misc/d.no.55 /2006 I 3
ANDHRA PRADESH LTD DT:Ol.03.06 220Kv/120KN - 3 Nos

3 P_uN_J_A_B
. _s_T
__A_T_E_EL_E_CT_~~TY-
__
-B-~~~-~- M_e_m_o_N-::~~~;~DT:0~06.2006 --1KV-45K~-~~=~--~-~-~-s-_
-_-_
-+-----2-5-

4 KERELA STATE ELEC_T_R_I_c_I_T_Y_B_o_A_R_o


+g-~-~--~~?/i.~~~~06-0615630 - ---- ~v:-45KN (T &C)-862 Nos 862

!CE(P)/Proc/1098/RI/II/SILICON/ I
6 : :~:~:~E~=; ~~::~-
6KV /90KN(S)
---
- 2250 Nos
-- - ---------+------------1
2250

:::
1'
!CORPORATION LTD, VADODARA OT: 15.01.07 132KV/120KN - 250 Nos 250

I 220KV /90KN - 855 Nos


855

L_ _ _, 1 2_2o_K_v_1_1_2_o_K_N_-_4_7_o_N_o_s
__ -+-----4-70

I
6
TRANSMISSION CORPORATION OF Order/SRCI/Deccan/ RM- 1 220KV/70Klll_:_~_o_N_o~-----+------5o J
I AND_H_R_A_P_R_A._o_E_s_H_L_T_o_,_H
__
v_d_re
__a_b_a_d
__ ~T:20.06.07 L_____ 220KV/120KN - 50 Nos 50 I
7 Mangalore Electricity Supply Co.Ltd,
1;:~ 581o2'o'oT;ial

~~~;.:0~~;: llKV/45KN _ 5000 Nos 5000 I


,_~_8_-:_-:_:_:_;_:_:_:_1:_:_:_i_ru_p_a_t_i_ ---------t-~-~-~~~~;t~~~~~~~~!C: 84~~~:':.:~.o~:_-----+---3--;~K-.~V-~/.~7~0~K~N~-----3~0~0~0~0~N~-o~s~~~~~:~~~~~~~-3-0~0~0~-o-l

Discom/(W&P-EZ)/SE(P)-l/ORD/478
11KV/45KN - 3500 Nos 3500 ------i
9 M.P.P.K.V.V.Co.ltd - Jabalpur c--------- ---------+------------1
DT:14.12.07
33KV/45KN - 3250 Nos 3250 !

10 M.P.M.K.V.V.Co.ltd - Bhopal CMD/MK/04/P-ll/56/467 DT:29.04.08 33KV/45KN - 2500 Nos 2500 !


11 ABBlimited- Vadodara No. 3091003180 Dt: 03.05.2008 132kV /120KN - 6 Nos 6
,_ __ --------------------- ---+-----

MAHARASTRA STATE DISTRIBUTION Co. SP/L-26/T-1102/0108/005928 11KV-45KN (T _li~~5ooo_~-~-j_ s_o


__o_o_
12
LIMITED. OT: 02.07 .08
11KV-70KN (T &C)-2800Nos I 2800

13 M.P.M.K.V.V.Co.ltd - Bhopal 1g~,~~'.':i~~g;1P-II/S6/596' 33KV/45KN - 2500 Nos I 2500


1----1--------- . ------- ------+:--- --------f-----------------------1----------------1
CGM/P&MM/E2/CECT444/08/PM-
33KV /70KN - 1000 Nos 1000
,__1_4_-+A_P_C_P_D_C_L_-_H_y_d
__e_ra_b_a_d 42_6
__ 35108 OT: l 7 .10.08
----1'
15
UP Power Transmission Co. Ltd. Uttar PO No: 58/ETDC/5/T0-318/Decca~-:TJ ,_ _
220 KV, 70 kN -350 Nos 350 I

Pradesh. 12.01.09
400 KV, 120 kN-500 Nos 500 I
!

I
I
16
t.rmtted , Hyderabad.
. . .
A_nd_hra Pradesh Transm1ss1on Corporatmn
OM-0377 /2008/CE/400KV/P&MM
/Ell/ F.e.EHVT-22108
4/D.No.l1/08
/lot-
OT: 05.02.09
220 KV- 70 kN-lOOONos 1000

220 KV-70 kN - 646 Nos 646


1--~~----=VPN, RAJASTHAN RVPN/SE/TLPC/ A-I/TN-3672 /DE
/D.1736 OT: 06.02.09
220 KV-120KN 465 Nos 465
------------------+------------------- r------------ -------+---------------
1CE(P)/Proc/1310/II/Deccan/2062 10166
GUJARAT ENERGY TRANSMISSION OT: c---~=-~KV -90KN-lOl66
18
CORPORATION LTD, VADODARA
30.03.09 -----1---------------j
66KV-90KN-4320 4320
i----- ----------------------

400KV /120KN - 122 Nos 122


POWER GRID CORPORATION OF INDIA C-01807L179-3/ LOA/3034 OT:
19
14.05.09
l---+-LT_o_(_G_u_rg_a_o_n~)--- 400KV /160KN - 170 Nos 170

APSPDCL - Tirupati
NCC/ APSPDCL/TIRUPA TI( HVDS/ 6071/
20 (THROUGH EPC CONTRACTOR) 11KV/45KN (T &C)- 741 Nos 741
PUR/09-10 DT:22.06.09

GUJARAT ENERGY TRANSMISSION 220KV -90KN-80 Nos 80


G/JECPL/2009/GETCO/DEPL/LOI/11
21 CORPORATION LTD, VADODARA
Dt:23.07.09
>----------------<----------~
(THROUGH EPC CONTRACTOR) 220KV -120KN210 Nos 210
-------------- -+------------------ .. ------1-----,--------------+-----------1
APNPDCL - Warangal
22 VPL/202/09-10 Dt: 05.08.09 11KV-45KN (T &C)-500 Nos 500
(THROUGH EPC CONTRACTOR)

GUJARAT ENERGY TRANSMISSION

~. 23 lf~;:g~;~I~p~ ~~N_'
T_vR_AA_c_T_~_A_RR"),
A -+-lu_T_E_fo_~~-~~~~o~~-1~~~~
Dt: 07.09.09- 6_6_K_v_- __i __-_1_2_N_o
__ 9_o_K_N,_(_T __
s +---~~1-2 _

~~:_r_c~-~-~~~LG-HT~;i~~NT~~~!_____ loIST/Po/09~~~011ot:1~.-10_._0_9__ -+- 1_1_K_v__4_5_K_N


CT aq-1800 Nos 18 ,, ~c~2:?~_\
\ ,,....! ~

;01

~':--~{?
LIST OF PAST SUPPLIES FOR COMPOSITE LONG ROD INSULATORS
-+---------------------~-- ------------- ---~-------- . -----
SL.NO .TRANSMISSION UTILITY NAME loRDER NO & DATE QTY ORDERED (RATING j
WISE NOS)QTY SUPPLIED
(RATING WISE NOS)
----- ---------------+'---
APCPDCL- Hyderabad
25 VPL/303/09-10 Ot: 20.10.2009 11KV-45KN (T &C)-1000 Nos 1000
(THROUGH EPC CONTRACTOR)

I I
i--- 26
APSPDCL - Tirupati
DIST /P0/0910/0052 Dt: 28.10.09 11KV-45KN (T &C)-2700 Nos 2700

t '~
(THROUGH EPC CONTRACTOR)
------+----
APNPOCL - Warangal
I 27 (THROUGH EPC CONTRACTOR}
VPL/326/09-10 Dt: 02.11.2009 11KV-45KN (T &C)-500 Nos 500
>------- ------ ------------- I --
G/JEC/2008/P0/220Kv.SRI/V-M
I
220KV -90KN (S) - 5181
I
line/S/01 Ot: 04.12.2009, 5181
G/JEC/2008/P0/220Kv.SRI/S-O
!GUJARAT ENERGY TRANSMISSION
line/S/02 Dt: 04.12.2009,
28 1CORPORATION LTD, VADOOARA
G/JEC/2008/P0/220Kv.SRI/M-H
(THROUGH EPC CONTRACTOR)
l/S/03 Dt: 04.12.2009 &
I

i~
G/JEC/2008/P0/220Kv.SRI/M-H 220KV-120KN(T)-4086 4086
2/S/04 Dt: 04.12.2009
I
UTTAR HARYANA BIJLI VITRAN NIGAM
IA2Z/08-09/UHBVNL-HVDS/183
LIMITED. 11KV-45KN (T &C)- 10,000 Nos 10,000
Dt: 21.12.2009
!(THROUGH EPC CONTRACTOR}

West BengalState Electricity Memo No: CE/Tr(O&M}/11/Line/101


30 220kV - 70KN (S) - 720 Nos 720
TransmissionCo. Ltd., Kolkata. Dt:12.0l.10
--~-------- i
I
APNPDCL - Warangal
31 VPL/464/09-10 Dt: 21.01.2010 11KV-45KN (T &C)-500 Nos 500
(THROUGH EPC CONTRACTOR)
--- -- ------ ---------------~----- ---
400kV - 120Kn (S} - 30 Nos 30

H,
6--, .-,----------+-----
- , ."
--------------- ----
400kV - 120Kn (T) -72 Nos 72

II
I
32
I
IIHARYANA VIDYUT PRASARAN NIGAM
ILTD. (THROUGH EPC CONTRACTOR)
GET/09-001/09-101648 Dt:25.0l.2010
I 220kV - 120Kn
(sj- .. ~

(T) - 204 Nos


..

204
_,
132kV - 90Kn (S) - 72 Nos 72

I I

t.t.:. -~ "'"'~
132kV - 120Kn (T} - 162 Nos 162

220kV-90Kn-2348 Nos 2348

PO NO: 1655/P&D(TS)/PNT- 425


me~,-~ 220KV -120KN - 267 Nos 267
Chandigarh Dt: 02.02.2010

220kV - 160KN - 159 Nos 159

APNPDCL - Warangal
34 VPL/478/09-10 DT: 04.02.2010 11KV-45KN (T &C)-1000Nos 1000
(THROUGH EPC CONTRACTOR)

Andhra Pradesh TransmissionCorporation


35 Limited' Hyderabad STLRM/P0-09Y-00690 DT: 15.03.2010 220kV - 120Kn (T) - 374 Nos 374
(THROUGH EPC CONTRACTOR}

Andhra PradeshTransmissionCorporation
36 Limited, Hyderabad STLRM/P0-08Y-00569 OT: 15.03.2010 220kV - 120Kn (T} - 330 Nos 330
(THROUGH EPC CONTRACTOR} I ----------~~! _

37
~:::::is~~~~ ~1gT~T~~~c;!":~~~1;"

(THROUGH EPC CONTRACTOR)


VCSPL/AIPL/ORD/DECCAN/09-
1012635
DT:
16022010
L
J
220kV

220kV
- 70KN (S} - 186 Nos

- 120KN (T) - 486 Nos


186

486
--

38
LTD (APCPDCL) - Hyderabad 2991/09 DT: 25.03.2010 os
1-----+--- - ---------- --
39
APCPDCL- Hyderabad I
(THROUGH EPC CONTRACTOR) VPL/003/10-11 DT ., 03.04.2010 -- - llkV - 45K_n~T~~- ~-~~::s--t-----~~0------1

400kV - 120Kn (S) - 2 Nos I 2

400kV - 120Kn (T) -4 Nos I 4-------------<

220kV - 90Kn (S)-4 Nos 4


HARYANA VIDYUT PRASARAN NIGAM GET/09-001/09-10/ 1648 Dt:
40
LTD. (THROUGH EPC CONTRACTOR) 25.01.2010
r---------------+---------~
I 220kV - 120Kn (T) - 10 Nos 10

132kV - 90Kn (S) - 4 Nos 4

132kV - 120Kn (T) - 8

GUJARAT ENERGY TRANSMISSION P.O. 66kv-90kn-(S)- 215 215


41 CORPORATION LTD, VADOOARA INo:HTP /Deccan/MAT/ APRIL/2010-
(THROUGH EPC CONTRACTOR) 111/650 dt: 22.04.2010 35 66kv-90kn-(T)- 35 Nos
--------- 1----------------------'-----------------'--------..,,.~~c'-'-'
I
r----
i SL.NO TRANSMISSION UTILITY NAME ORDER NO -;:;;-~~----------~~-ORDERED (RATING WISE NOS)l~t"7N~u;~;~E~OS)
----------~------- - . --t---------j
GUJARAT ENERGY TRANSMISSION P.O. No: JAY AMBE/LlNE 66kv-90kn-(S)- 36 Nos 36
42 CORPORATION LTD, VADODARA INSULATORS/MATERIAL/2010-11
(THROUGH EPC CONTRACTOR) DT:27 .05.2010 66kv-120kn-(T)- 102 Nos 102

MAHARASHTRA STATE ELECTRICITY I 132kV - 70KN (S) - 35 Nos _l 3_5 -j

43 TRANSMISSION CO. LTD., Mumbai P.O. No: 5/10 dt: 03.06.2010


(THROUGH EPC CONTRACTOR) E.' 132kV - 120KN (T) - 80 Nos 80

-~!'MAHARASHTRA STATE ELECTRICITI p 0 N R/002/10-11 ~t: 17:-p;2010


132kV - 120KN (T) - 45 Nos 45
1 ,TRANSMISSION CO. LTD. , Mumbai ' ' o:
1---------r---~- ---~-~- ~- ----- - - ---------- --+-----------------------+-----------------!
GUJARAT ENERGY TRANSMISSION I 220kv-90kn-(S)-1905 Nos 1905
45 ! CORPORATIONLTD, VADODARA LOI NO: Nil dt: 10.05.10
(THROUGH EPC CONTRACTOR) 220kv-120kn-(T)-1716 Nos

66kv-90kn-(S)- 7523 Nos 7523


1-------------------+------------!
GUJARAT ENERGY TRANSMISSION LOI No: CE(P)/Proc/Il/E-
46 66kv-90kn-(T)- 6722 Nos 6722
CORPORATION LTD, VADODARA 2126/Deccan/5396 OT: 19.05.2010

66kv-120kn-(T)- 3328 Nos 3328

400kv-120kn-(S)-2079 Nos 2079

t
HARYANA VIDYUT PRASARAN NIGAM LTD LOI No: FLCL/HVPNL/REC-099/03
(THROUGH EPC CONTRACTOR) dt:l9.06.2010
400kv-160kn-(T)-3360 Nos 3360
----+---------------------r-----------------j
1_3_2_K_v_-_7_0_K_N_-_<S_)-32 32
luP Power Transmission Co. Ltd. IPCC/UPPCL/Railway/PT-010/10-11/09 f- __ Nos
(THROUGH EPC CONTRACTOR) DT:l0.06.2010
132KV-120KN-(T)-136 Nos 136
-+--------------------+------- ~---------------------- -
MSETCL, VCSPL/IBPL/ORD/DECCAN/10
49 220kv-90kn-(T)-175 Nos i 175 I
(THROUGH EPC CONTRACT~~-----

GUJARAT ENERGY TRANSMISSION


11/1034 DT:l7.08.2011!_ _

66KV /90KN(S) - 408 Nos


--+----- 408
UTT-09/GETCO/GFL/10-11/Aug/35
50 CORPORATION LTD, VADODARA
(THROUGH EPC CONTRACTOR)
DT:27 .08.2010 ~
66KV /120KN(T) - 528 Nos
1
528 I
51 RELIANCE INDUSTRIES LIMITED,Mumbai ME0/7274562 DT:09.09.2010 132KV-120KN-(T)-57 Nos 57 I
GUJARAT ENERGY TRANSMISSION 220kv-90kn-(S)-30 Nos 30
52 CORPORATION LTD, VADODARA
UTT-08/GA CL/GETCO/SRI/10- I
11/0ct/P0/13 DT:07.10.2010
(THROUGH EPC CONTRACTOR) 220kv-90kn-(T)-180 Nos 180
I
GUJARAT ENERGY TRANSMISSION
iHTP /Deccan/MAT /OCT /10-11/243
I 66KV /90KN(S) - 3 Nos
--------
3
53 CORPORATION LTD, VADODARA
iDT:07.10.2010
(THROUGH EPC CONTRACTOR) 66KV /90KN(T) - 42 Nos 42
I
400KV-120KN-192 Nos 192

I -
220KV-120KN-300 Nos 300

HARYANA VIDYUT PRASARAN NIGAM


54 LTD 105648/10-11/1021 DT: 09.10.2010 220KV-70KN- 66 Nos 66
(THROUGH EPC CONTRACTOR)

132KV-120KN- 168 Nos 168

132KV- 70KN- 54 Nos 54

400KV-120KN-198 Nos 198


-----------
220KV-120KN-312 Nos 312
--
HARYANA VIDYUT PRASARAN NIGAM LTD
55 05649/10-11/1022 OT: 09.10.2010 220KV-70KN-57 Nos 57
(THROUGH EPC CONTRACTOR)

132KV-120KN-144 Nos 144


-------- ---
132KV- 70KN-48 Nos 48
--------------.
GUJARAT ENERGY TRANSMISSION
56 CORPORATION LTD, VADODARA iIN/ENL/810001065 DT: 23.10.10 66KV-120KN-(T)-6 Nos 6
(THROUGH EPC CONTRACTOR) I
I
rO NO: CE(P)/Proc/II/E-2158/e- 66KV-90KN-(T)- 1785 Nos 1785
GUJARAT ENERGY TRANSMISSION I
57 51394/SRI/Deccan/1276
CORPORATION LTD, VADODARA

Tamilnadu State Electricity Board,


-c---
IDT 12.11.10

Al/T.1576/POTR.2127 /D.1
!
i
220KV-90KN-(S)-

230KV-90KN-(S)-900
2855 Nos

Nos
2855

900
58
Chennai
SE/TRI/EL/
1
151/10 OT: 03.11:2010 I -----------------
230KV-120KN-(T)-900 Nos
-
900
-
220KV-120KN-(T)-144 Nos 144
APTRANSCO (THROUGH EPC _,,_____
59 028/2010-11 OT: 12.11.10 -----------
CONTRACTOR)
LIST OF PAST SUPPLIES FOR COMPOSITE LONG ROD INSULATORS

SL.NO TRANSMISSION UTILITY~~--- ORDER NO & DATE ------------F;;-~~DERED (RATING WISE NO~) I QTY SUPPLIED
(RATING WISE NOS)

400KV-160KN-(T)-90Nos 90

400KV-120KN-(S)-1296Nos 1296

UP POWER TRANSMISSION
i 220KV-70KN-(S)-2172 Nos 2172
60 3399/ETDC/1/TD-339 OT: 20.11.10
CORPORATION LTD., LUCKNOW
464
cn;;;~60K~~T)-4:~_'l-~--
+---------------------4
. 132KV-120KN-(T)-384 Nos 384

I 132KV-70KN-(S)-307 Nos 307


----+------------------------+-------------1
61 A2Z MAINTENANCE & ENGINEERING A2Z/lO-ll/U/REA/004 OT: 08.11.10 33KV-70KN-1907 Nos 1907
SER_VIC~S, KAMPALA, UGANDA ------ _
--+--------------------f-----------J
GUJARAT ENERGY TRANSMISSION 220KV-120KN-(T)-500 Nos 500
62 CORPORATION LTD, VADODARA P.O. NO. 6200001521 OT: 23.12.10
(THROUGH EPC CONTRACTOR) 220KV-90KN-(S)-220 Nos 220

GUJARAT ENERGY TRANSMISSION 220KV-90KN-(S)-860 Nos 860


63 CORPORATION LTD, VADODARA OPEPL/10-11/686 OT: 29.12.10
(THROUGH EPC CONTRACTOR) 220KV-120KN-(T)-272 Nos 272

400KV-160KN-(T)-1104 Nos 1104


M/s.IND BHARATH ENERGY LTD., VCSPL/IBEUL/PO/DECCAN/1011/1023
64
(THROUGH EPC CONTRACTOR) Dt: 22.01.2011
400KV-120KN-(S)-132 Nos 132

GUJARAT ENERGY TRANSMISSION 166KV 120KN TENSION - 36 Nos 36


65 CORPORATION LTD, VADODARA UEC/NG/T-21/176 OT: 27.12.2010 r---
(THROUGH EPC CONTRACTOR) 6
-----------~~~_90K_N SUSPENSION - 6 N~~----

GUJARAT ENERGY TRANSMISSION HTP/DECCAN/MONO STEEL !66KV 90KN SUSPENSION - 48 Nos 48


66 CORPORATION LTD, VADODARA LINE/MAT /MARCH-11/642 [-----------------+-----------l
{THROUGH EPC CONTRACTOR) DT:09.03.2011 !66KV 90KN TENSION - 51 Nos 51

GUJARAT ENERGY TRANSMISSION 400KV-120KN-{S)- 4500 Nos


IGPL/T&D/TLC/GETCO 2314/2010-
67 ICORPORATION LTD, VADODARA Under Execution
I 11/104 OT: 15.03.2011
(THROUGH EPC CONTRACTOR) 400KV-160KN-{T)- 3060 Nos

[. - STERILITE ENERGY LIMITED


I 400KV-120KN-(S)- 20Nos 20
68 IP.O. NO. 3191357298 OT: 18.03.2011
(THROUGH EPC CONTRACTOR)
400KV-160KN-(T)- 150 Nos 150
'
'UP POWER TRANSMISSION 220KV-70KN-63NOS 1 63
I 69
!coRPORATION LTD., LUCKNOW
(THROUGH EPC
SEW /ELEC/UPPTCL/CHARLMODI/
AN S.R.INS/2010-11
DECC
OT: 24.03.11 ------------~------~
CONTRACTOR) 220KV -160KN-195 NOS 195
-+------------ . ------------------
CGM/P&MM/E-23/STN-220/10/PM-
70 APCPDCL - Hyderabad 11KV-45KN (T &C)- 20,000 Nos 20000
3323/11 OT: 11.05.2011

220KV - 90KN (S) - 33 NOS 33


APTRANSCO (THROUGH EPC
71 014/2011-12 DT: 24.05.11
CONTRACTOR)
220KV - 120KN (T) - 90 NOS 90

220KV -120KN - 263 NOS 263

RVPN /SE/TLPC/TLM/ A-I/TN 220KV - 70KN - 365 NOS 365


RAJASTHAN RAJYA VIDYUT PRASARAN
72 3726/DE/D.1970
NIGAM LTD., JAIPUR
OT: 25.05.2011 132KV - 120KN - 368 NOS 368

132KV - 45KN - 194 NOS 194

66KV - 90KN(S) - 846 NOS 846


GUJARAT ENERGY TRANSMISSION
G/JECPL/2011/GETCO/LOI/18
73 CORPORATION LTD, VADODARA 66KV - 90KN (T) - 300 Nos 300
OT: 04.06.2011
{THROUGH EPC CONTRACTOR)
66KV -120KN (T) - 874 NOS 874

66KV - 90KN(S) - 9685 NOS 968S

66KV - 90KN (T) - 3719 Nos ~------3_7_1_9 ----;


GUJARAT ENERGY TRANSMISSION jCE(P)/Proc/II/E-2201/e 66KV -120KN {T) - 6084 NOS I 6084
74
CORPORATION LTD, VADODARA 58683/Deccan/1772 OT: 10.06.2011 t., ------------~

1
________ _ l_;;;;--: 200:: {;:) ~
7::4

::~__ t - _;~; _
E
I
TRANSMIS~I~I~-~_-;;; f
LIST OF PAST SUPPLIES FOR COMPOSITE

;~~~_-;o & DATE-


LONG ROD INSULATORS

I
.
QTY ORDERED (RATING w-I-SE_N_o_s_)~
QTY SUPPLIED--
(RATING WISE NDSG
1

!GUJARAT ENERGY TRANSMISSION

zs , o .,o,mo i.ro,._ooo"
(THROUGH EPC CONTRACTOR) r
IAPL/GETCO

U 0, >OU
2134111_121001
I 400KV-120KN-(S)-

400KV-160KN-(T)-
1980 Nos

1750 Nos
1980

1750
11

r 76 POWER ~RID CO:PORATION OF INDI:.- MOU :T29 06 20~~----- --- 1200KV __ - 320KN (S) -6_N_o_s_--i--
6

lLTD, GURGAON. . 1200KV - 320KN (T) -8 NOS 8


I----+---------- .. _L._ ----------- ------------------t--
400KV-120KN-(S)- 120 Nos 120
STERILITE ENERGY LIMITED ..
77 (THROUGH EPC CONTRACTOR) -~~~:~~:112/33S ~T: 27.06.2=~ _400KV-160Kf11--0~ 1260 N~~----_+_-_-_-_- __ -_-_-~-2--~~0~~~~~~~:
1

78 lNTPC LIMITED, DA;~I, UP.. 14000068038-M8S-1011 DT: 04.07.11 220KV - 160KN - 85 Nos 8S

GUJARAT ENERGY TRANSMISSION APAR/TR-001/GETCO /66KV G-H/TVP02 ~-6_6_K_v_-_9_o_K_N_-_s_u_s_-_1_s_9_N_o_s_-+


1_s_9 -;
79 CORPORATION LTD, VADODARA ,

f-----+-(T_H_R_o_u_G --+-D-T_'_0_8_0_1__2_0_1_1
__H_E,,_P_c_c_o_N_T_R_A_CT_o_R_> f--_6_6_K_v_-_9_o_K_N_-_T_E_N_-_8_4_N_o_s_-+-----8-4 ___J
66KV - 90KN(S) - 19760 NOS 19760

I 66KV - 90KN (T) - S280 Nos I S280


I ----"-----------~~
66KV -120KN (T) - 3S10 NOS 3S10
80
GUJARAT ENERGY TRANSMISSION
CORPORATION LTD, VADODARA
CE(P )/Proc/II/E-2208/e
---- - . ----------- ---------
iS923 1/Deccan/2S3S DT: 08.07.2011
132KV - 90KN (S) - 2200 NOS 2200
i f-- ----

-:+..~ ~. ,. . :
132KV - 120KN (T) - 2200 NOS 2200
I
---
220kV - 90KN (S)-S900 Nos 5900
----
C_I_M_I_T_E_D------+NMT 400KV-120KN-(S)- 222 Nos 222
PL/GEN/636/11-12 OT: 14.07 .2011
!(THROUGH EPC CONTRACTOR)
400KV-160KN-(T)- 1176 Nos 1176
I
GUJARAT ENERGY TRANSMISSION 66KV - 90KN - SUS - 263 Nos 263
I 82 CORPORATION LTD, VADODARA
HTP PROC/DECCAN/ROTARYTECH/1091
DAT E: 03.08.11 I
66KV - 120KN - TEN - 85 Nos 8S
----- ------------------!
I
::::::::~::G::::::::~ION 66KV - 90KN - SUS - 416 Nos 416
M-9 S/LOI-II
CORPORATION LTD, VADODARA
! (THROUGH EPC CONTRACTOR)
OT: 08.09.11
66KV - 120KN - TEN - 202 Nos 202
----1
.
I
-
" l'o"'""''"
iGUJA;~~ENERGYTRANS~ISSI~---1---

i.ro, ~~,. "~""'~"'"''" er.oa.ro.rr


iI 66KV - 90KN - SUS - 142 Nos
I.. ::------]------------
142 j
..

(THROUGH EPC CONTRACTOR) ,________ ---~:~~K~~:::~N~~~;~~-6::6N::s 1363467 I


8S
GMR ENERGY LIMITED
!(THROUGH EPC CONTRACTOR) H03940 / EPR00019 OT: 29.10.11
I,___'------------~-----------<
I 400KV-160KN-(T)- 2928 Nos 2928

400KV-120KN-(S)- 56S Nos 283


GMR ENERGY LIMITED
86
(THROUGH EPC CONTRACTOR)
A02900 I EPROOOlO DT: 18.11.11
400KV-160KN-(T)- 333 Nos 167
------+-----------------------1------------------1-------------4
400KV-120KN-(S)- 1678 Nos 839

87 GMR ENERGY LIMITED 400KV-160KN-(T)- 552 Nos

---+-(-T-HROUGH
EPC CONTRACTO_R_) ['"" "'"~" ITT"""" - 22:::::200KK:~r::~4-:_:_1_:_o_:s_-_-_+- 2_2_1 __,

POWER GRID CORPORATION OF INDIA CC-CS/168-CC/INS-1052/3/G6/Sub- _ NOS


88 400KV 120KN-(S)-4564 4564
LTD (Gurgaon) Pkg-I3B/NOA/4006 Dtae: 25.11.2011 1

89
POWER GRID CORPORATION OF INDIA
LTD (Gurgaon)
CC-CS/168-CC/INS-1053/3/G6/Sub-
Pkg-I4B/NOA/4007 Dtae: 25.11.2011
4oOKV _ 160KN-(T)-4766 NOS I 4766
.,
I
t:~=-:~-::D CORPORATION_O_F_I_N_D-IA--+W--R-T---II-:_C_&_M_:_9_0_K_N_I~::----
400KV t'--- _ 90KN-(S)=~::-1--1~0 --
90
LTD (Vadodara) 1REP:2012/P0/65/1943 DT:19.03.2012 NOS I
>------+--- -----------+-------- ----------- -----
GUJARAT ENERGY TRANSMISSION I
91 CORPORATION LTD, VADODARA -~M- IAL DTD.O. 9 . 0
(THROUGH EPC CONTRACTOR)
. 4
. 12 _l __ 220KV-120KN-(T)- 750 Nos 750 I
~---~------ ' ------------
. SL.NO T~ANSMIS-;~~~ UTILITY NAME --~~~~~~TE -----r;.I .:v ORDERED (RATING WISE ~~S) l
' QTY SUPPLIED

re,.,=
I 1 (RATING WISE NOS)

92
m~"""~--L,'"'~'",._,,M,~ . ::::.::,:::=:: :: -+-; ~---4-:_:_: -'--!

I or.ra.oe.aorz

If--~ ' ~-- -- -- ,,,_, _ ~'"_(')_:_"'.""'_


jcoRPORATION LTD VADODAR_A__ ["""~"" ------

sso
. . . . ... __ 220kV - 90KN (S)-1475 Nos 1475
_____ __, -----------+--------------~
I 1

I 66KV -120KN (T) - 2240 NOS 2240

I 93
GUJARAT ENERGY TRANSMISSION CE(P)/Proc/II/E2252/II/Deccan/e6961132~~-~;0KN (S) --~~~-~~~-- ----1-4;;;---
; CORPORATION LTD, VADODARA 81/972 dt:12.04.2012 --------------- ----------------

I- --~2_(>KV-120KN-(T)- 1250 Nos 1250

66KV - 90KN(S) - 27480 NOS 27480

I
132KV - 120KN (T) - 720 NOS 720

GUJARAT ENERGY TRANSMISSION C5E1(2P4)d/tP:ro1c6t_0181/_2E0212280/e73804/Deccan/


94 CORPORATION LTD, VADODARA 220KV-120KN-(T)- 1750 Nos 1750

400KV-120KN-(S)- 225 Nos 225


I >--------------------------+--------------------;
400KV-160KN-(T)- 163 Nos 163
-t------------------+------------
E8889P03000033,E8889P02000019
220KV/l20KN-TEN770NOS 770
LALITPUR BIDCO BOOM PROJECT (THRU
95 AND E8889P03000117 DT:24.12.2012 ------ - -- . . . ~--f------------j
EPC CONTRACTOR)
765KV-120KN-SU5-520NOS 520
------- ----------+--- ----1-------- . ----
96 BGR ENERGY SYSTEMS LIMITED
13500004799 DT:09.01.2013 I 400KV~_120KN-SUS-120NOS !
120

~-160KN-TEN-24 Nos 24

97 BGR ENERGY SYSTEMS LIMITED 3500004765 DT:l9.01.2013 400KV-120KN-SUS-190NOS 190

POWER GRID CORPORATION OF INDIA WRTSII:C&M:90KN/INS/REP /2012/ PO


98 400KV - 90KN-{S)-445 NOS 445
(Vadodara) /65/1946 DT:19.03.2013
1LTD
r----+----------------__,-----------------------+-------------~---------+---------------f
IRAJASTHAN RAJYA VIDYUT VITARAN 400KV-120KN-SUS-1672NOS 1672
99 [NIGAM LIMITED.(THRU EPC [VIL/RRVPNL-316/13-14/14
!CONTRACTOR) IDT:26.04.2013 400KV-160KN-TEN-1164 Nos 1164

[KX/815/DECCAN/PS/B/031 66KV-132KN-EYE END FITTING-


100 240
I KPLCE (THRU EPC CONTRAC
__
T_O_R_) -+------------
DT:25.04.2013 240NOS

400KV/120KN -5US- 219 Nos 219


PRAYAGRAJ THERMAL POWER PROJECT E900SP03000007 DT28 01 2013
101 I(THRU
1 EPC CONTRACTO: __ , ~~ 765KV-120KN-SUS-416NOS 416

33KV-70KN -B&S-1902NOS

878 (BALANACE UNDER


132KV-90KN-SUS-984NOS
EXECUTION)
I
642 (BALANACE UNDER I
132KV-90KN-TEN-3633NOS
EXECUTION) I
MADHYA PRADESH POWER
E/44,E/379,E/380,E/381,E/382, 2361(BALANAc:e-i
102 TRANSMISSION COMPANY LIMITED
(THRU EPC CONTRACTOR)
E/383 AND E/384 DT:06.02.2013
220KV-90KN-SUS-357NOS
!--------------------
__ UNDER EXECUT_I_O."i_! __ j
220Kv-160KN-TEN-_1_4_1_o_N_o_s
__ 1--1~-'.~~~~:~~rDER I
400KV-120KN-SUS-9NOS
-----+----
UNDER EXECUTION 1
400KV-160KN-TEN-45NOS UNDER EXECUTION

400KV /120KN - 100 Nos UNDER EXECUTION


HIMACHAL PRADESH STATE ELECTRICITY UPTL/Mktg./2012-13/754
103
BOARD (THRU EPC CONTRACTOR) DT:02.03.2013 500 (BALANCE UNDER
400KV/160KN - 640 Nos
EXECUTION)

400KV-160KN-TEN-7260N05 7260

400KV-120KN-SUS-3591NOS 3591
CC-CS/359-CC/INS
POWER GRID CORPORATION OF INDIA
104 1907 /3/G6/NOA/4602 DT:23.02.2013 ~ 220KV-120KN-TEN-50_9_9_N_o_s_---if--- 5099
LTD (GURGAON)
AND ADDITIONAL QTY order
I 220KV-70KN-SUS-4289NOS 428~

1-~;-~KV-90KN-SUS-429NOS 429 I
------~~~----------- - ------------"'"'""-~-------
11 105
'MADHYA PRADESH POWER
TRANSMISSION COMPANY LIMITED
(THRU EPC CONTRACTOR)
I
IE9003P03000007 DT:20.03.2013 ;
132KV-90KN-SUS-1885

132KV-9_0K~--T
__
Nos
432 (BALANCE UNDER
EXECUTION)

__ ___E_N_-_1_17_o_N_o_s_-;_24_8_(_B_A_L_A_N_c_E_U~N-D_E_R__,
EXECUTION)
220KV-90KN-(S)- 879 Nos 390 (BALANCE UNDER
EXECUTION)
147 (BALANCE UNDER
220KV-160KN-(T)- 585 Nos
--~.XECUTION)
132KV-90KN-TEN- 1732 Nos 501 (BALANCE UNDER
~:!'~;~I;~:g~~~:~:~:-:I:I~d-D
UPTL/Mktg/2012-1:~~~:--- -------------+---EXECUTION)
106

'
(THRU EPC CONTRACTOR) DT:22.03.2013 291 (BALANCE UNDER
220KV-90KN-(S)- 1086 Nos
EXECUTION)
------- ' -------------t-------
360 (BALANCE UNDER
132KV-90KN-SUS-1745 Nos
EXECUTION)
I 1 302 (BALANCE UNDER
I ADHYA PRADESH POWER 132KV-90KN-TEN- 1314 Nos

U
luPTL/Mktg/2012-13/979 EXECUTION)
RANSMISSION COMPANY LIMITED
THRU EPC CONTRACTOR) IDT:22.03.2013 660 (BALANCE UNDER
220KV-90KN-(S)- 1575 Nos
EXECUTION)
550 (BALANCE UNDER
I I
220KV-160KN-(T)- 1518 Nos
EXECUTION)
--------------------!---------------- _,_!

KARNATAKA POWER TRANSMISSION 110KV-90KN-TEN-60NOS 60


108 COMPANY LIMITED (THRU EPC 4021/30 DT:30.04.2013 ----------
CONTRACTOR) 110KV-90KN-SUS-26NOS 26
-------- ----- ---~--- -- -------------
220KV-90KN-SUS84NOS 84 I
DGEI/ APTRANSCO / 240/12-13
109 APTRANSCO (THRU EPC CONTRACTOR) ------- -
!
..
DT:l0.05.2013
220KV-120KN-TEN-324NOS 324
-..... _,,,,, _____ --- ....~----------- I ~
110
POWER GRID CORPORATION OF INDIA
LTD.(THRU EPC CONTRACTOR)
PT12225-001 DT:25.02.2013 I
I
400KV/120KN - 336 Nos
I 336

I i ! 400KV/160KN - 1050 Nos


I 1050
I
I
! 111
'
ISPGCL (THRU EPC CONTRACTOR)
I
isEW/SPGCL/PROC-07/2013-14
I
I 400KV-120KN-(S)- 316 Nos 316 I
400KV-160KN-(T)- 1376 Nos 1376
i[__ ----- ~'-""" !
400KV /120KN -SUS- 216 Nos

~-
220KV /120KN-TEN723NOS
JHARKHAND STATE ELECTRICITY BOARD lcGE/JSEB/400/Jharkhand/AIS/13 -- -------------------
112 UNDER EXECUTION
(THRU EPC CONTRACTOR)
132KV / 120KN-TEN441NOS

I
------
rM''" 33KV-70KN-B&S-390

400KV /120KN
--
-SUS- 168 Nos
NOS

-
168

POWER GRID CORPORATION OF INDIA CGE/PGCIL/Sl-Package/ AIS / 13-1


I
I 113
LTD. (THRU EPC CONTRACTOR)
220KV /120KN-TEN-123NOS 123
1DT:09.05.2013
765KV /210KN-TEN-18NOS 18
!

--
33KV-70KN-B&S-576NOS
I UNDER EXECUTION

132KV-120KN-TEN-468NOS UNDER EXECUTION


--
96 (BALANCE UNDER
POWER GRID CORPORATION OF INDIA Various substation packinges & 220KV-120KN-TEN-442NOS
EXECUTION)
I 114 LTD (SUBSTATION PACKAGES) (THRU EPC transmission line orders during
CONTRACTORS 201314 May '2013
FY-
400KV-120KN-SUS-2001NOS UNDER EXECUTION
--- ------
1160 (BALANCE UNDER
400KV-160KN-TEN-1792NOS
EXECUTION)

765KV-210KN-TEN642NOS UNDER EXECUTION


------- ------
132KV-90KN-SUS-19NOS 19

132KV-120KN-TEN-132NOS 132
SPR/APTRANSC0/13-14/02 I
115 APTRANSCO (THRU EPC CONTRACTOR)

1~
DT:09.05.2013
220KV-90KN-SUS-7NOS 7

- _,,,, ____ ,, ____ . 220KV-120KN-TEN-29NOS 29

220KV-90KN-SUS-683NOS 683
BIHAR STATE ELECTRICITY BOARD (THRU LOI/BSEB/PTE/DECCAN/220KV
116
EPC CONTRACTOR) LINE/13-14/007 DT:20.07.2013
220KV-120KN-TEN-510NOS 510
- ~------------- ---- ---------
I
220KV-90KN-SUS-7NOS 48
I
-----------
I 117 BGR ENERGY SYSTEMS LIMITED 4100000884 DT:24.07.2013
~ --- . -~----j

'I
'-------'------- ----------~------
- -
r-+-----
SL.NO iTRANSMISSION

---r-----------

118
----------i---------------1-------
UTILITY

HARYANA VIDYUT VITARAN NIGAM


LIMITED (THRU EPC CONTRACTOR)
NAME

--------- ~~~~:~;~;~~~:~~=~~;=~;:~~',
IORDER NO & DATE

JSL/P-06/INSULATOR/13-14/759
~~t~~;~~'INSULATOR/13-14/760
AND
OT:
QTY ORDERED (RATING

-.- .~:::::::=.-~~:-._::~:~
rl, .
c-----
---~20KV-70~=(~-
WISE NOS)

72 Nos
~r ~. ~ ~-.~-
.
I

--
-Qn-SUPPLIED
(RATING

__
WISE NOS)

--
?!.__
I

I 220KV-120KN-(T)- 816 Nos 816 ~

GMR ENERGY LIMITED


I 400KV-120KN-(S)~-;~3 Nos- 243 I
119
(THR~UGH EPC c:T:~CTOR) ----- ~'C/GM~~25/P~/S966 :T~0-6.07.2013 ~OOKV-160KN-(Ti~~;~~-Nos -f--------
1700
I
L-- 33KV-70KN-B&S-248NOS 248
-
113
ZESCO (THRU EPC CONTRACTOR) 0113PROJ000012,33,93 AND 98 ~--- 132KV-90KN-SUSl~-3."'_~-- --------
120 -
DT:31.07.2013
I I 132KV-90KN-TEN- 345 Nos 345

361

4875
-~---
7375
121 ORPORATION LTD VADODARA 2327 /e83631/Deccan/2013- .
I
' 14/ATl/3675 DT:17.06.2013 . . 2-=~~~-~0KN_::~~-)- 14849 Nos 8320

400KV-160KN-(T)- 300 Nos 300

122 VEDANTA ~;~Ru EPC co~;R~~OR) 13191576251 DT:23.07.2013 -- I -~~oKv~~;~~~---s-u_s


2_4_0_N_o_s t----------;
f---l- ------- . --- . -- . --~-"----- . ----- . .!.- . . . . - . --------~------------- . -- . ---~ .
I
-+--
'
240
---------------------+----------'
iCE(P)/Proc/II/E- 132KV - 90KN - SUS - 9181 Nos
GUJARAT ENERGY TRANSMISSION
123 j2327 /e84590/Deccan/2013-
CORPORATION LTD, VADODARA
14/AT2/4646 DT:13.08.2013 400KV -120KN - SUS - 600 Nos 600

124
POWER GRID CORPORATION OF INDIA
LTD. (THRU EPC CONTRACTOR)

M/s.IND BHARATH ENERGY LTD.,


PT13924-001 DT:24.09.2013

VCSPL/IBEUL/PO/DECCAN/12-13/1130
-
400KV /120KN

.... 400KV /160KN


- 451 Nos

~-:56."'_o."_ 1----~~-~
j

-~---t--------
451

181
125
(THROUGH EPC CONTRACTOR)

1::~::::~::::0/LMW/AI5/13-:~-/-0-10--ti--:~~~~~-:~~:~:::.l:: ::: [-----3-3---


POWER GRID CORPORATION OF INDIA
r--------- ------+1 --------- 'oT:30.09.2013
!LTD. (THRU EPC CONTRACTOR)
220KV /120KN-TEN-431NOS 431
--t-1 -----------1-----------+----------+----------1
RAJASTHAN RAJYA VIDYUT VITARAN 400KV/120KN - 982 Nos
RSIPL/P0/13-14/RRVPNL/TN-326/12
NIGAM LIMITED.(THRU EPC
DT:28.ll.2013
CONTRACTOR) 400KV/160KN -1080 Nos

132KV-120KN-TEN-6NOS 6

4500126329 & 450012330


128 ZESCO (THRU EPC CONTRACTOR)
DT:23.10.2013
132KV-90KN-5U5-3NOS 3

12

400KV-120KNSUS-224NOS
HINDUJA GROUP (THRU EPC PVR/HNPCL/DEPL/2013-14/002 & 001
129
CONTRACTOR DT:29.10.2013
400KV-160KN-TEN-267 Nos 267

110KV-90KN-TEN-60NOS

..
131 KARNATAKA POWER TRANSMISSION
>----COMPANY LIMITED (THRU EPC 4021/30 DT:30.04.2013
CONTRACTOR) 26

132 220KV-90KN-SUS-84NOS 84
r--- APTRANSCO (THRU EPC CONTRACTOR)
220KV-120KN-TEN-324NOS 324

";,;;1n.v-,;;n.oy Arm

r-- Indian Railways !Various Railway Orders from 2006 25KV-Bracket Tube
25KV-9 Tonne
-------------.-~-------,---------------- -------

fJECOSIL Elei:trifying Future


DECCAN ENTERPRISES LIMITED

List of Performance certlncates Conforming the Insulators or slmllai'. / higher. rating In seritlce for a minimum period of 3 years

SI.No. Utility Name . Item Description Qty In No's lnstallatlon Date Certificate No. a. Date
. Slllcone Polymer Insulators
122
Power Grid Coi-poratlon of 400kV/120KN Ref.No.NR1/BLB/TL(08iM}/
1 May' 2010
India Ltd Siiicone Polymer Insulators DT:07.07.2011
170
400kV/160KN
Haryana Vldyut Prasaran Silicone Polymer Insulators
Nigam Limited, (Thru M/s. 2001
400kV/120KN
2 l'edders Lloyed Corporation June'2012 Raf. No. Ch77 /L-1 dt:D4.02.2015
Ltd Cobra Intalaclous y Siiicone Polymer Insulators
3360
Ser/Ices I JV\ ) 400kV/160KN
U.P. Power Transmission 400KV/120KN Slllcone Rubber 1418/l!TDIl/GZB
3 400 25.05.2009
Corpaiatlon Ltd, Composite Insulators OT: 24.09.2012
u.P. Power Transmission 400KV/ 120KN 5lllcone Rubber
4 100 May'2009 23/E.T.D.I(l<)/PC dl 23.02.2013_
Corpotatlon Ltd. Composite Insulators
U,P, P.ower Transmission qooKV/ 120KN Silicone Rubber
5 162 25.04.2011 962/ETD/M DT 10.07;2012
Corporatlpn Ltd. Composite lnsula~ors
U.P. PowerTransmfsslon 220KV/70KN Siiicone Rubber
6 Corporation Ltd, Composite Insulators
248 25.06.2009 962/ETD/M DT 10.07.2012

400KV/ 120KN Silicone Rubber .


830 Aprll'2011
U.P. Power Transmission CompoSlte Insulator5 " 1236/ETDl(K)/400K.V .: Pankl-
.' 7
Corporation Ltd. 132KV/70KN Slllcone Rubber
c~mposlte lnsvlators
50 Aprll'2011
UnnauLine dtJ0.06.2012

a) SSKV- 90KN SUS 2250


,
.. b} 66KV90KN TEN 900
- C!(TR)/ ACE(TR}/SE(TR)/EE
Gujarat Energy Transmission c} 132KV - 90KN SUS 370
8 2007 L/performance/1408
Corporation Ltd., d) 132KV120KN TEN 250 OT 14.09.2011
a) 220KV - 90KN SUS 855
;
I') 220KV1201<N 'TEN 470
1} 400KV - 120KN. T!N 72
- , 2} 400KV - 1201<N- SUS 30
..
Haryana Vldyut Prasaran 3) 245KV - 120KN "TEN 204 l!ndst No. Ch-79/STC99/GET/Vor,v
9 23.01,2012
Nlgam Umlted. 4) 245KV."" 120KN. sus 66 dt: 09.02.2013

5) 132KV - 120KN TEN 1&2


8) 132KV - 120KN SUS 72
1) 400KV- 120KN 198
..
Haryana Vldyut Prasaran 2) 220KV - 120KN 312
Nlgam Limited. (Thru M/s, Dipalpur /HVPN_.JKT-39/2013
10 3) 220KV- 70KN 57 12.03.2012
Techno Electric &. Engineering dt06.03.2013
Co. Ltd., as BOOM Project) 4) 132KV - 1201(N 144
5} 132KV - 70KN 48
Andhra Pradesh Lr No.
2.20KV 70KN Silicone Composite
11 Power Transmission 100 Jul-09 ADE/EHTL&SS/PDGL/F.Performance
..,.. Insulators tnw- ?n-:>111 ntn.,no.n
Andhra Pradesh
Power Transmission 22~KV 70KN Sllleon Composite
12 372 Jul-09 Even No. Date 06.09.2011
,.Mftft"'tlon ltd. Insulators
Andhra Pradesh Powr
220KV 70KN SMlcone Composite
13 Transmission 140 Jul-09 Even No, Date 07.09.2011
Insulators
td,
220KV/70 KN Slllcone Rubber
50 Lr. No. EE/TLC/VSP/Tech/F.1/ D. No.~
Andhra Pradesh Power Composite Insulators
14 ~S.09.2007 634(a)/09
Transmission Corporation Ltd.
220KVI 120 KN Silicone Rubber DT 29.09,2009
Composite Insulators
so
Andhra Pradesh Lr.No.C!/400KV /P&MM/I!
220KV/120 KN Silicone' Rubber
15 Power Transmission 3 03.06.2006 21/F.Insulators /D.No.282/09,
Composite Insulators
Corporation Ltd. DT20.10.2009
.. 220KV 70KN Slllcone Rubber
3 rate No 1998/ETD(II}I/
U.P. Power Transmission Composite Insulatorors
16 06.02.2008 ~ -/ 220 KV Lin
Corporation Ltd,, 132KV - 70KN Siiicone Rubber OT 25.09.2009

q~ . -,
3
Composite Insulators

<B'
PLACE: HYDERABAD ~~p~
A ~ ~;: . ~(jl

COM YSEA~ o
'o - .
Cl N:US2609TG1966PLC001109 -lr!fy\'.
',~:~~.,:
Regd Office: .
858-60, APIE, Balanaqar, Hyderabad-500 037, INDIA.
'S +91 40 2387 0111 +91 40 2377 8699
sa info@deccan.in www.deccan.iri
OVfRSEAS SIJPPl'I' STATEMENT OF SlllCONE COMPOSITE INSUlATORS

DESOUPTIONOf MATER1AtsiSIUCONECOMPOS.ITT
SL.No NAME Of THE PURCHASER ORDER NO. & DATE SUPPUEOQTY (No.s)
INSULATORS)

flfA-UGANOATHROUGH EPC COMPANY 33KV-70KN-STRAIN TYPE. 1907

66KV-l321(N GUY TYP asc asc

KPLC, KENYATHROUGHEPC C 66KVB2/(N STAY TYPE 36() sec

132KV-90KN-SUS-5TRJNG
TYPE
PHCN,NlGffUA THROUGHE.f>C COMPANY
B2KV-12:0KN-TEN-STRIN.G
iYPE 21

ll2KV-70XN-SUS-STR!NGTYPE 1500
ZESCO, ZAMBIA THROUGH EPC COMPANY
132KV-l2m<NTEH-SHl:INGTYPE 600 600

REA-UGANDATHROUGHEPC COMPANY 1.0<JS

200 200
PHCN,NIGEft!A THROVG.HfPC COMPANY
330KV-SUS-STIUN<>
TYPE 110 210

431
ZES.CO, ZAMBIA THROUGH fPC COMPANY
UZKV-llOKN-TEl'f-STRING TYPE 47' 476

33KV-~-STRAIN TYPf so so
PHCN,NIGERIATHROUGHE?CCOMPANY
OT: zs.oi.zere
m
-----r-----~-~~
:nrncV-UOKN-STRINGTY?f ess ,,,
PHCN, NIGER.IA THROUGH fPC COMPANY OT: 27 .08.2013
330KV-160KN-STRINGTYPE
"" 271

Mt:XICO RECTRiCITITYTHROUGH EPC COMPANY OT:l(U2.2013 230l<V-12otcN

12 MEXICO ElECTRICmTY TH!l:OUGH EPC COMPANY 230kVl2GtcN

400W-160kN 10< 106

13 ICETRACO, KENYA THROUGHEK COMPANY 400kV-120kN 442 .,


22(;V-l20kN 82 82

14 BENIN, THROUGHEPC COMPANY 33KV-14KN Pin lnwlatw 3210 2500

132KV-160KN 258

15 EAC,CYPRUSTHROUGHEPC COMPANY D-T;29-,10.lS

1l2KVl60KN

MlNJSTRYOF ENERGY,GHANA THROUGHec


16 No. 2015060001 OT: 06.06.15 1236 1236
COMPANY

17 SENIN, THROUGHEPC COMf'ANY 33KV- 1$N Pin imulator 1095 UNOEREXECUTION

fPC
18 400k'11-l60kN 931 UNDEREXfCUnoN
COMPANY

19 400kV-120kN 400

MEXICO ElECTRICITlTY THROU{>H PC COMPANY UNDER E:XClJTION

400W-160kN 100

21

MEXICOUECTR!OTITYTHROUGH EPC COMPANY UNDER EXEClff10N

22 llikY -120tl;n soc

Turlcish flectriaty Transmission co~v(TE!AS)


23 %kv-40kn 1931!) UNOER EXECUTION
THROUGH EPC COMPANY

24 PHCN, NIGERIA THROUGH EPC COMPANY 33QKV-ll:OKN-STRINGTYPE 16 UNDEREXECUTION

TOTALQTY {NO.s~; 3995-0


DECCAN ENTERPRISES LIMITED
Electrilying Future

EXPERIENCE FORM - COMPOSITE LONG ROD INSULATOR

-S.no.' __J_
Descrj~p_tio_n____ lnformation/Da!~~!~_~':_f~~~~~~~------------1
--+-G_e_n_eEligibili~
r_al -------- ---+- 1

Na_m_e_o_f_S_u~~~1~~~: g_~~~_i:i__.~!~_rprises Ltd, India


2 Date_of_c_o_ns_tit~~i_?_!:l__~_b_-
~f_t_h~
c_on_tr_a_ct_or_
!~-~r.!!J_9~6 _
,Description of contract/Supply record to
!substantiate that the manufacturer has a
lgeneral manufacturing experience of at least!
3 1 Q.1ears as per 2.5.4:_(iL____ 400kv D/D Dhanonda to Daultabad Transmission Line
INFORMATION TO SUBSTATIATE
EXPERl~~CE AS PER 2.5.4.(1) 160KN
M/s Cobra lnstalacious 'Y' services, SA in joint \ nture

2
I~:~:~; ~~::~~~~~r~tr~g_!9L -+1~-~-t~-ta~d~~~-~l~t:s
~~:oration Lt~~----------
- 3 I Name of the Employer Haryana Vidyut Prasaran Nigam Limited
4 Contract No. iHDP-1739-1740/REC-99/XEN
5 Contract Amount
6 Contract AgreementJ)ate ---------+----------0_7_/0_4/_1_0 ____,
_?___Q_o_[11missioning D~~--~f_!~~_L_in_e 04_/_06_/1_2 _
8 .Line: 12 months from the date <2!_g~!:!!r11_~sioni_!:l_g _
---- louantity (In Number) Designed, I
--~--- ~_anufactured, T~~-!~9--~~d Supplied. i 3_36_0_n
__
o~~---------------
Satisfactory Performance Certificate Issued
10 By. Haryana V1dyut Prasaran N1gam L1m1ted
ISO 9001 :2000 (including design in scope of
__ 1_1_r~_Qjstration) su_~~~!!.~ci.JYL~L ---+ Y -----1

12 Date of ls~ue of Type Test Certific_a_te__ --+------ 03/10/13


13 1Type Te~~ertificate lsuuing Age~_~y__ ~C_e_n __
tra_l_P_o_we_r_R_e_se_a_i:_c~J~_s_!it.~!~--------------

CIN.: IJ52609TG1%6?LC001109
Regd Office:
858-60, AP!E, Balanagar, Hyderabad- 5000037, INDIA.
il' + 9140 2387 0111~+9140 2377 8699
:.!::SJ info@deccan.in ! www.deccan..in
fJECOSIL DECCAN ENTERPRISES LIMITED

EXPERIENCE FORM - COMPOSITE LONG ROD INSULATOR

2 Date of constitution of the Sub-contractor 15th April 1966


----;-------~---
. ------ . --------------- - ~----~------------ ---~------i

Description of contract/Supply record to


substantiate that the manufacturer has a
general manufacturing experience of at least PGCIL- Replacement of insulators on transmission lines
3 10 years as per 2.5.~j!) -__ in north~rn region, southern region-~__\A'~~tel'll_~~~~:------
INFORMATION TO SUBSTATIATE
exPERIE~f~-~?-e-~-~-2.s.4.(I) I 1oo__K_N ___,
1 Name of the BJc:J_g~/gg~!~~tor: !Deccan Enterprises Ltd -----~-----'
2 Name of Subc~ntr~ctoi::__ - !Deccan Enterprises Ltd ---------------------------
3 Name of the Employer
---"""""-T------~-~------
Power
---+-------------~-
Grid Corporation of India Limited
-- . -~--------------------- . -
4 Contract No. CC-CS/ 168-CC/INS-1053/G6/Sub-P_~g~1~~j~O~'!_O_QZ_ _
5 Contract Amount INR 36602774.00
--+---------------------------0------------"---------------j
-- 6 Contract Agreement Date 25/11/11
7 Commissioning Date of the Line ------ " _
8 LiQe: ------ 12 months from the date of commissioning
Quantity (In Number) Designed,
~anufactured, Tested and Supplied. I 4766 nos.
ISatisfac"t"ory Performance Certificate Issued r---------"-------------------------'
10 By: 1 -------+I P_G_C_IL
__ "_""""""-----------------
llSO 9001 :2000 (including design in scope of I
11 l registration) submitted (Y/N) I Y
___12 !Date of Issue of Ty~ Test Certificat~ I -------- 03/10/13 -~------------------
--~-~- IType Test certificate lsuuing Agency -------L---------.Q~ntral Power Res~~I~h_l_ns_ti_tu_te ~

CIN: U5209TG1%6?LC001109
Regd Office:
858-60, APIE, Balanagar, Hyderabad- 500 0037, INDIA.
1i + 91 40 2387 0111 E + 9140 2377 8699
2 info@deccan.in ! www.deccan.in
DECOSIL Future
DECCAN ENTERPRISES LIMITED

EXPERIENCE FORM - COMPOSITE LONG ROD INSULATOR

. S.no.
'

i 1
General Eligibility
Description
-------------- . -~---

Name of Subcontractor:
----- ----------------------- ---
.
I
------------
Information/Data
, ___ ___
,,,, ______
to be Provided
----- -----------
.

De_~-~?~Enterprises Ltd, India, __


. ____
..
__ __J
!

II
I
2 Date of constitution of the Sub-contractor 151h April 1966
Description of contract/Supply record to
substantiate that the manufacturer has a
general manufacturing experience of at least PGCIL- Replacement of cornentional insulators in polluted
-.
3 10 years as per ?:.4.(i) stret_c::hes of transmission lines_in different region.
INFORMATION TO SUBSTATIATE
'
EXPERIENCE AS PER 2.5.4.(1) 160KN
1 Name of the Bidder/Contractor:
-----------
____ Q_eccan __Ent~rp~~~s Ltd____________ -
2 ,Name of Subcontractor:
.--i-------------------------------
Deccan Enterprises Ltd
3 !Name of the Emplox_~r I Power Grid Corporation of 1nciTaLimited-- -
4 'Contract No. 1ce-csi359-CC/INS-1907/3/G6/NOA/ 4602
5 leontract Amount 1INR 107764085.00
6 1Contract71:greement Date I 23/02/13
7 Commissioning Date of t~e Line
8 Line: 12 months from the d~t-~_~!_~_S:>mmis~_i_~0ing
----- --- - --
Quantity (In Number) Designed,
9 Manufactured, Tested _!_QQ Supplied. ____ --------- 7260 nos. --- -----~
Satisfactory Performance Certificate Issued
10 By: PGCIL
!
-----
ISO 9001 :2000 (including design in scope of
11 reoistration) submitted (Y/N) y I
12 1oate of Issue of Type Test Certificate 03/10/13
13 !Type Test certificate_Jsuuing Agency Central Power Research Institute

CIN: U52609TG1%6PLC00110'l
Regd Office:
B58-60, APIE, Balanagar, Hyderabad- 500 0037, INDIA
w + 91402337 0111 a
+ 9140 2377 8699
2 info@deccanJn ! www.oeccan.ln
fJECOSIL DECCAN ENTERPRISES LIMITED

EXPERIENCE FORM - COMPOSITE LONG ROD INSULATOR

..~~---~-----~-0e-sc-rii)ti0n-_-_
-~'.!_1~_~.J- __ ..-_~ .. ~nnauon/Data to be ProvidOd .:
-----+-G_e_ne_r~-~
Elig_i~i_lity~-- 1 .. .

Name of Subcontractor: ------


Deccan
-
Enterprises
.. ----
Ltd, Indi---
a -

2 Date
----" ~ ~ of constitution of the Sub-contractor--------------------
. . ~-,-------------------------- --
15th April 1966 - I
Description of contracVSupply record to
substantiate that the manufacturer has a
general manufacturing experience of at least PGCIL- Transmission system for connectivity of Essar
3 10 year~-~~J:>~!.?..:.5.4.(i) _" ____ power Gujarat Ltd. And WASS-XIII --"-----
INFORMATION TO SUBSTATIATE
EXPERIENCE AS PER 2.5.4.(1) i 160KN -------
1 I Name ofthe_B.ldder/Contractor:
-------------------~--
! D eccan Enterprises Ltd -----------
2 Name of Subcontractor:
1

..
!Deccan E~terprises Ltd
3 Name of _t~~~mployer Power Grid Corporation of India Limited
4 Contract No. lcc-CS/21 O-WR2/INS-1803/3/G6/NOA/4616-----
---------- ---------------------
5 Contract Amount ...... __ jNR 19744728.00 -----------------
__ _JQQ~tract Agreement Date ----------
21/03/13 __,,.

7 Commissioning Date of_t_~e Line --

8 Line: 12 mQ!lth~Jr_om t~~<:l~~~of commissio_Qi~


Quantity (In Number) Designed,
9 Manufa_clured, Tested and Supplied. ----
776 nos.
----
Satisfactory Performance Certificate Issued
10 ?L_ _______ PGCIL
ISO 9001 :2000 (including design in scope of
11 registration) submitted_fi'LNJ ___ -- y
12 Date of Issue of Type Test Certificate 03/10/13
13 Type Test certificate lsuuing Agency Central Power Research Institute

CIN1 U52609TG1%6PLC001109
Regd Office:
B58-60, APIE, Balanagar, Hyderabad- 500 0037, INDIA.
1i + 9140 2387 0111 ~ + 9140 2377 8699
2 info@deccan.in !:www.deccan.in
... -il
I

Annexure 4 (ii)
Supply evidence and
Performance Certificates
FROM rnx NO. : 15 Jul. 2013 5:4SPM Pi

HARYANA VIDYlJT PRASARAN NIGAM LIMITED


(Regd. office: ~ctor-6 Sha~ti.Bhawan, Panch/ocula)
0 0 0. 093504-54131

HV P N Office Oftbe
Executive
.
Engineerv'Transmissiorr
. . System Division, HVPNL, Manesar.

R;ef. No. Ch 57/L-l Date: 15.07.2013

To Whom it niay Concern

Subject: Operational Performance of 440 KV Silicone. . Polymer


.
. Long Rod lnsulators supplied in 400 KV D/C Dhanonda
to Daultabad Transmission
. . . line under Contract'No.. HDP-
..

'1739/RE~-99/XEN (Projects TL) dated. 07 /04/2010


. through Cobra ~nstalacious y Services; SA, in Joint
. Venture with. Fedders Lloyd Corporation Limited under .
jurisdictfon of this Division.

I '

With 'reference to the above subject we certify that 830 N~s.


. . .. .
of. 400 KV 120 KN and . 1248 . Nos. of 400KV . 160 KN. .Silicone composite
Long Rod Insulators supplied by M/ s pe~can Enterprises Ltd. Hyderabad
and installed/ commissioned during April-May-June, 2011 have been
found to be performing satisfactory till date ..

. ~L

X~n/T~ ~ivision,
HVPN, Manesar.

Executive Bngineet
Tr~s. System. Division
lIVPNL.. Manesar
. .
U.P. POWER TRANSMISSION CORPORATION LIMITED
. ~ ~ 1ff1N ~ i/llx41~~11 ~

-. ~.1tslllWco.tp..,, Oftlcs ot the Exooutlve Engineer


E1&91rl.clty"fr;jnsrrllS{llgn Plvlslorr-1,
f~\J~ .fl)
.. . . w.,..~
-.< . U .P.Power Tooi~mlsslonCo;porationLtd,
~
a..; "' ;_
.. :.::
.
'. : . - . -;:::
~ Vldy\.ot Col:my,Gnvincl 1-.lagar, ksnpur-2.0SOOS
Ema11-1o:~a8tdfr.np@up;itcl.orv
~--:- .. _, ... --- .. '.:.t:::;;J .. -'--
:. , ' --_ .._,,_., ..
. UPPlGl
... LTRNo:

-
.. ----
. ..,_ . . .-
. ..
-.
.

c:ft:
Ref: PONo:.58/ETDC/5/JD-318/PE:!CCan 12&+.zoos

M/s. b~ccan Enterprises PvT. qd~;(DECOSIL~l


#~/S8,59 &60,APIE,Balanagar,Hyderabad-37.
Andhra Pradesh, ind la.

Dear~ir,

. W(th ref~renc~:to
_:_,_ .-1;.
the above referred subject, it is to inform you that 100 Nos of .

400kV
_.
Compo~i,
.--,; te Silicone
;_,. . Rubber Insulators
.
were installed and commissioned on
. .

. , -vr- .
400kv Pankl-Kanpur line upto May 2009 and these Insulators have found
~prking'satisf?ctodly till date.

A)a~
{ Shekhar Agrawal) .
Executive Engineer
HARYANA
VIDYUTPRASARAN
NIGAMLIMITED
(Regd. office: Sector-G Shakti Bhauran, Panchkula}
PJ!-0!14 2764759 Mob: 09350454131

HVPN
Office Of the
Executive Engineer /Transmission System Division, HVPNL,Manesar.

Ref. No. Ch-77/L-1 Dated: 04-02-2015

Subject: Operational Performance of 400KV Silicone Polymer Long Rod


Insulators Supplied in 400 KV D/D Dhanonda to Daultabad
Transmission line under Contract No. HDP-1739-1740/REC-
99/XEN {Project TL) dated 07-04-2010 through M/s Cobra
Instalacious 'Y' Services, SA in Joint Venture with Fedders
Lloyd Corporation Limited.

With reference to the above subject, It is certified that 2001 Nos. of


400 KV 120 KN and 3360 Nos. of 400KV 160KN Silicone Composite Long Rod
Insulators Supplied M/s Deccan Enterprises Ltd. Hyderabad and installed
/ commissioned on 4th .June 2012, found to be performing satisfactory till date.
QIC:H fctrs Chl'lQ)~~rc:rJ:ftcF; ~B41 fti1~?;5
(~ ~ CfiT 3Udf)

POWER GRID CORPORATION OF INDIA LIMITED


(A Government of India Enterprise)
400 ~.cfr. 3tf-$?i, f!Ji'11'fl. lll<"<'lildlClJ, 4'1:flC\lli!IC\ -121 004
400KV Sub-Station, Samaypur, Ballabgarh, Faridabad - 121 004
~~ I Tele: 0129-2230071, 2230072, 2233808, ~ I Fax: 0129-2230071
~ar RefNo.: NR-1/BLB/TL(O&M)/. ~ Date:.07.07.2011

TO WHOM IT MAY CONCERN

This is to certify that M/s Deccan Enterprises Private Limited, Hyderabad


had supplied 170 nos of 160 KN & 122 nos of 120 KN polymer insulators
vide SRV no. 0084/09 to Power grid, Ballabgarh in the month of March
2010 and accordingly installed the said polymer insulators in the 400 KV
line under the jurisdiction ofBallabgarh group in the month of May 2010. It
is confirmed that no abnormality/ defect have been noticed till date.

~
(P.Chetri)
Manager (T/L)
/o~k~b~5B. 400 1{v
S/5 5,t1MAIPUR
6ALLABGARH 1210811
OFFICE OF THE
<vr&fa<J ;;irtmrr'tfi 31 ~ EXECUTIVE ENGINEER
'3"0 lJO 1ITiR S:i'flfll~l'i ~'U'l fsro U.P.POWER TRANS CORP. LTD
~ T/ltqlT[ ~ ELECTY T!l~~NSMISSION DlVJSION
220 <l>"m ~ ~ 220 KV SIS DELH1-MEERUT ROAD
~ 01232- 261004 MURADNAGAR
f.Tcrn:r 01232- 261069 E.l'rlail: eeetdmrd@upptcl.org
~- 09412749982

No ..... ?-b-,_.... ETD/M Date .. /.~.:-::-.)-.J L


Subject:- Operational Performance report of220 KV, 70 KN Composite silicone Insulator,
Ref. PO No-58/ETDC/5/TD-318/Deccan Dated 12-1-2009

Mis Deccan Enterprises Private Ltd.


B/58,59&60,Asst Private Industrial Estate
Balanagar, Hyderabad-500037(AP)India

Dear sir,
Kindly refer to your office Letter No-DEPL/iv1KTG/PERFOR1v1ANCE/
UPPTCL/GZB/12-13/004 dated 23-6-2012 on the above mention subject.
In this regard it is to inform you that 248 Nos. 220 KV,70 KN Polymer Insulator
were installed on 220 KV Modipuram- Muradngar line, 220 KV Muradnagar-Shamli
line, 220 KV Muradnagar-Khurja line during June-2009 ( before 25-6-2009) and
these insulators have found working satisfactorily till date.
. ~Sf:
~'1---
( Yogesb Kli.m'ar)
Executive ~E-~fa..c~r
F:~l!Fdi't'e -'i~:i~i~on
l'Taf!~Jr
Regd. Office: Sardar Patel Vidyut Bhavan,
J Race Course, YADODARA- 390 007.
GElf~CO
/1
Telephone No.(0265)2353089 (D)
Fax No.(0265) 2351218 (GETCO) I
(0265) 2337918/2338164 (GUVNL)
Web site: www.getcoqujarat.com
Email: cetr.getco@gebrnail.com

CE (TR)/ ACE (TR)/ SE (TR)/ EE-L/Performance_/ J 17 ~

To,
~Is DECCAN Enterprises Pvt Ltd,
V
1
~158, 59 & 60 Asstd. Pvt Ind. Estate,
Balanagar,
Hydrabad-500037
Andhrapradesh,

- ...
.Su~: Performance certificate in respect of DECCAN make silicon composite insulators 01 66KV,
132 KV, and 220 KV class Silicone Composite Insulator supplied to GETCO in 2007.

Ref: 1. Your letter no. DEPLIMKTG/1098/GETC0/11-12/002 Dt. 03.08.2011

Dear Sir,

On the above subject and reference the performance of DECCAN make silicon composite
insulators supplied to GETCO in 2007 of 66KV, 132KV and 220KV clas! as per9ifeld report is
as under.

rsr PO No. Dt. Item Qty. Remark

1 CE(P)/Proc/1098/Rl/ll/Silicon/ 90KN/66KV As per Order Generally found Satis


DECCAN/318 Dt. 15.01.2007 Suspension

2 CE(P)/Proc/1098/Rlfll/Silicon/ 90KN/66KV As per Order Generally found Satis factory


DECCAN/318 Dt. 15.01.2007 Tension
I
r-3rCE(P)/Proc/1098/Rl/ll/Silicon/ . 132KV/90KN As per Order Generally found Satis factory

i I DECCAN/318 Dt. 15.01.2007


Suspension
I
l.-----
I
. \.------~--- ---------
. 41 CE(P)/Proc/1098/Rl/ll/Silicon/ 132Kv/90KN As per Order Generally found Satisfactory
. DECCAN/$18 Dt. 15.01.2007 Tension

5 CE(P)/Proc/1098/Rl/11/Silicon/ 220KV/90KN As per Order Generally found satisfactory


DECCAN/318 Dt. 15.01.2007
Suspension

6 CE(P)/Proc/1098/Rl/ll/Silicon/ 220KV/90KN As per Order Generally found satisfactory


DECCAN/318 Dt. 15.01.2007
Tension

-~ --

This is issued as per your own request without prejudice to the Terms and Condition of A/T.

Thanking you,

Yours faithfully,

~
(R.90. Naii:j ..
Chief Engineer (TR)
GET CO
TECHNO ELECTRIC AND ENGINEERING CO. LTD.
Corporate Office, Power P1Bn1 & Electrical Division :
2F & :JF, Park Plaza, 71. Park Street, Kolkala-700 016 Toi. 3021-3000, 9831 B 56617-20, Fax : 033-2217-1167, Ema1I. lechno@cal.vsnl.netin
&KJlt-ffRS&
CONSTRUOOR5

Dipalpur/HVPN_JKT - 39 /2013 February 6, 2013

CERTIFICATE

This is to certify that M/s Techno Electric & Engg. Co. Ltd. had placed an order on M/S DECCAN
ENTERPRISES (P) LTD, B/58 - 60, APIE, Balanagar, Hydrabad - 500 037 for Design, Engineering,
Manufacture, Shop Testing, Inspection and Supply of Composite Insulators against P.O. No.05649/10-
11/1022 dated 09-10-2010 for 400/220/132 KV Sub-Stations at Kabulpur & Dipalpur under HARYANA
VIDYUTPRASARAN NIGAM LTD.

Qty. of Composite Insulators supplied against above P.O. are as follows:-


1. 400KV 120KN Composite Insulators -198 Nos.
2. 220KV 120KN Composite Insulators - 312 Nos.
3. 220KV 70KN Composite Insulators- 57 Nos.
4. 132KV 120KN Composite Insulators -144 Nos.
5. 132KV 70KN Composite Insulators - 48 Nos.

Kabulpur & Dipalpur Substations are in commercial operation since 12/03/2012 and performances of
above composite insulators are satisfactory up to now.

For Techno Electric & Engg. Co. Ltd.

/l}J.~-
Mahendra Mahawar
Sr. Resident Manager

CC forwarded for information to the V.P. Projects, Techno Electric & Engg. Co. Ltd., Kolkata

Registered Office : P-46A, Radha Bazar lane, Kolkata 700 001, T et 2225-4671 / 4472 J 3276, _;,178, E-~: techno@cnl.vsnl.net.ln
Mechanical Division : Ideal Plaza-South Block. Room S-307 & S-309. 1111, Sarai Bose Road, Ko.'kata-700 020, Tel. 1 , E-mail: techoo@cal.v.nl.net.in
Delhi Office: 508-5C9. Skipper Corner, 88, Nehru Place. New Delhi-110 019, Tel. : 011-2643-1602, 416174 E-mail . delhl@techoo.co.in
Hyderabad Office : 63-252/115 : Flot No. 301, oramanzil, HyoerabM . 500 082. TRI : 0405566 0523, . hydcrabad@techno.co.in
Visit tis al : http://www.lechno.co in
TRANSMISSION CORPORATION OF ANDHHA PRADESH LIMITED

CERTIFICATE Date: 06.09.2011

(TO WHOM SO EVER IT MAY CONCERN)

This is to certify that 220KV, 70KN S.~.C insulators of :tvVs Deccan


Enterprises (Pvt) Ltd, Hydearabad were drawn and utilized in the following works.

SI
-
..),.

No
- ReqNo Quantity TLC Stores Name of the Work

1
-. 091MR-tl60 61 Nos Guuadala
;

220KV LILI 220KV SS


Narasaraopet
'
2 - 091MR-l 159 150 Nos Gunadala 220KV VTS-Tallapally DC
line (LOT-I)
3 ,. 098MI"793 161 Nos Gajuwaka 220K Y VTS-Tallapally DC
line (LOT-II)

Total: r 372 Nos

The performance of the above material are found satisfactory. '

~ ~-
~.'\\rt.~~~
ob
\~~\~\\
Aast. Execttve Engln,er
T.L.C. Sub-Division-II
GUNTUR .
. : ...
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED

CERTIFICATE
(TO WHOM SO EVER IT MAY CONCERN)

This is to certify that Mis.Deccan Enterprises (P) Ltd., Hyderabad have supplied

SO nos 220 KV, 120 KN Silicon Rubber Composite insulators and 50 nos 220KV 70 KN

Silicon Rubber Composite insulators against P.O.No.CPT 01/Trailorder/SRCI/

Deccan/RM-3825/2007, dt 20.06.2007 for 'Performance Trials' received on 25.9.2007.

The same were utilized in 220KV LILO line from Loe. No 489 of VSS-GWK to 220/33KV

Ganagavaram port SS. The performance of the same till to date found to be satisfactory.

Lr. No EE/ TLC/ VSP/ Tech/ F.1 / D.nob.-H(<'.\)/09 Dt 29 .09.09


TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED
VIDYUT SOUDHA/HYDERABAD

CERTIFICATE
(TO WHOM SO EVERIT MAY CONCERN)

This is to certify that Mis. Deccan Enterprises (P) Ltd., Hyderabad


have supplied 3 Nos. 220 KV, 120 KN slncone Composite Insulators for
"Performance Trails". The same were erected on 220 KV Gachibowli-

c Yeddumailaram line Location No,23 on 03.06.2006. The performance of


the same till date found to be satisfactory.

Lr.No.CE/400 KV/P&MM/E 21/F.lnsulators/D.No.'2~/09, dt.20.10.09


c_
\'Mfll' : 0822-23tQ6.t

OFFICE OF THE EXECUTJVE ENGINEER


ELECTRICIJYlRANSM!SSlONOMSION (II}
,w.u~
.:it.ft)\
Ewmall : eoold21ko@gmall.com
tff l~fclt( al~~lltflt ~~
filyd1IN!f0r~-)
u.~ PowerTrans~rolon CorporatiQn Llml!Gd
S3'16,,Shakll Nagar, Joditu Nagur,
u ..
1 r r 1 cl
I \'iOH'O "'"" ~I"flfinrtf ?llN~~r la
\~-348 if'R', ifFr<m. 'if1ff.
lucknrtN .2.2M16: ~~0111
No. l-e~-a/ETO (II) LI ~3i:d (II) qr I Q..'lC~" Lw4 Oat~:<Sfetf-=- 200 ;:>

Sub-Perfonnance report ot'220 KV and 132 KV composite Slllcon rubber


Insulators.

MIS Deccan Enterprises Private Ltd.


B/58, 59 & 601 As~td. Private Industrial Estate,
Balanagar, Haderabad-500 037 (A.P) lndla.

Dear Sir,
Kindly refer to your office letter no.OEPUMKTGIUPTCll09--10/001 dated
21~09-09 on the above mentioned subject.
In this regard lt Is to. Inform that 3 nos 220 KV composite Silicon rubber
Insulators were lnslalfed on 220 KV Chlnhat-Hardol Road line at loo.atlon no. 4 on
date 30-01-08. Slmllarty 3 nos, 132 KV composite slllcon rubber Insulators were
Installed at loca!lon no. 20 A of 132 KV Khurramnagar-NKN Une on date oa-02-oa
since then both 220 KV & 132 KV Insulators have been found working
.satlsfactorlly.

Thanking You,
Yours faithfully
~
(Kavlndra Singh)
ExeouUve Engineer
CC-
1 SE,.ETC-1, Lucknow
2- SOO 11 J Ill, Lucknow.
GUJARAT ENERGY TRANS ISSION
- - -
CORPORATION
.. ---. - ~
LIMITED ~dRiD#'
. -~~- .,, ""'o<':"--~..-_,,. , . ,,:,;.;;.o.,.. _,,,

R&M ZONAL STORE


JETPUR ROAD, 220 KV S/S COMPOUND, GONDAL
PHONE: -(02825) 296772 I 220175

NO. R&M/Store/GDL/ 18"' Date:-28-08-14.

M/s. Deccan Enterprises limited,


B-58 to 60, APIE, Balanagar,
Hyderabad-500037,
Telangana State.

Subject: Performance certificate in respect of DECCAN make Silicone composite insulators of


220kV 90KN class silicone composite insulators supplied to GETCO during FY-2009-10.
Ref: GETCOPO No. CE(P)/PROC/1310/11/DECCAN/2062OT: 30.03.09

Dear Sir,

We reter to your office letter no. DEL/MKTG/2062/PERF-REQ-LTR/14-15/001 DT:21.08.2014 on


the above mentioned subject.
In this regard it is to inform that 5700Nos-of 220kV90-KN Class silicone composite-insl.Jfators
were supplied during FY 2009-10.

SI.No. Invoice Date Invoice No. ITEM-SRI Supplied Qty. in Nos


1 11-09~2009 Sl-INS-53 220kV-90Kn-S 750
2 26-09-2009 Sl-INS-58 220kV-90Kn-S 750
3 31-10-2009 Sl-INS-64 220kV-90Kn-S 840
4 04-11-2009 SHNS-65 220kV-90Kn-S 660
5 20-11-2009 Sl-INS-76 220kV-90Kn-S 504
6 20-11-2009. Sl-lNS-77 220kV~90Kn-S _ 496

- 7
8
15-12-2009
15-12-2009
Sl-INS-87
SHNS-88.
220kV-90Kn-S
220kV-90Kn-S
550
550
9 07:-01-2010 Sl-INS-92 22okv.:.90Kn-s 600
TOTAL QTY. 5700

The above supplied insulators were installed & commissioned before March'2010-and these
insulators are working satisfactorily till date.
"
lru~~T'.-\~-:~~:;~rl\~ ~ wh!4l~~rcrr 3Titt> ~f?J<:i1 f&tfd:tds ~,- 1~
(;:~~~:;.';6 ~ w
! . -

\ - I ,~!;: OWER GRID CORPORATION OF


0~;,~.,
L-~~~~~~~'J.'.;';':~~.'L~ _ (A Governmentof India Enterprise) 4 I Cl'l fcu s
ORIGINAL ~.~: "x:fl<;1fii--l)" ~ ~- 2. ~-29, ~-122001, ~
~ m:
: 2s1.1100 - 119, 2511160, 2s11161 \1R ~
Corporate Office: saudaminl" Plot No. 2, sector-zs, Gurgaon-122 001. Haryana
. Tel.: 2571700 - 719, fax: 2571760, 2571761 Gram: 'NATGRID'

m ,~f:efq~~:met-CS/168-CC/INS-1053/3/G6/Sub-Pkg-14B/NOA/4007 Date: 25.11.2011

Mfs DECCAN Enterprises Private Limited


B/58, 59 & 60, Asstd. Private Industrial Estate
Balanagar
Hyderabad-500 037

Kind Attention: Mr. Vikas J alan, Jt. Managing Director


SUB. :NOTIFICATION OF AWARD OF CONTRACT FOR INSULATOR
PACKAGE-14 (SUB PACKAGE - 14B) FOR 160KN COMPOSITE
LONGROD INSULATOR ASSOCIATED WITH 'REPLACEMENT OF
INSULATORS ON TRANSMISSION LINES IN NORTHERN REGION,
SOUTHERN REGION & WESTERN REGION
Specification No.: CC-CSJl68-CCflNS-1053/3/G6
Domestic Competitive Bidding. (Project Funding: Domestic}

Dear Sir,
1.0 REFERENCE
This has reference to the following:
1.1 Our Invitation for Bids (IFB) dated 17/09/2010.
1.2 Bidding documents for the subject package issued to you vide our letter Ref.
No. CC-CS/Ins-13 & 14/G6/BD dated 19.10.2010,Comprising the following:
a) Conditions of Contract Volume-I
(Document Code No. DC-1395-11088, September 2010)
b) Technical Specifications Volume-II
(Document C9de No. DC-1395-11089,September 2010)
c) Bid Form, Price Schedules Volume-III
(Document Code No. DC-1395-11090, September 2010)) alongwith
Integrity Pact (Document Code No. DC-9008-April-2009-Rev-O)in
Eight sets.

Pagel

~ ~:'4t-9, '[Q<t ~!'l~'J>~l'i<'l 1ffem,


4iect1R<i1 ~. ~ ~-110016~; 2656~21 t:lic:m:o11-2s5soo39 tiR ~
Registered Office: B-9, Outab Institutional Area, Kalwarla Sarai, New Oelhl-110016 Tel.: 26560121 Fax: 01126560039 Gram: 'NATGRID'

~ ~ 'll~~a if ~ ~
Save Energy for Benefit of Self and Nation
)'

, Power Grid Corporation of India Ltd.


NOA No.: CC-CS/168-CC/INS-1053/3/G6/Sub-Pkg-I4B/NOA/4007Dated: 25.11.2011
(Contract for Insulator Package-I4 (Sub Package - I4B) for 160kN Composite Longrod
Insulator associated with 'Replacement of Insulators on Transmission Lines in NR, SR &
WR).

1.2.1 Amendment NoA, Errata No.-I & Clarifications No.-I to the Bidding
Documents, issued to you along with Bidding Documents vide our letter Ref.
No. CC-CS/Ins-13 & I4/G6/BD dated 19.10.2010.
1.3 Your bid for the subject package consisting of First Envelope (Techno
Commercial Part) and Second Envelope (Price Part) 'submitted on
10/11/2010.
1.4 First envelope of your Bid submitted for the subject package under Proposal
reference no. DEPL/MKTG/PGCIL/TECHBID/10-11/002 dated 03/11/2010,
was opened on 10/11/2010.
1.5 Intimation for Opening of Second Envelope issued to you vide our letter no.
C-CS/Rep1acement/Ins-I3&I4 dated 28/04/2011.
1.6 Second Envelope of your Bid submitted for the subject package under
Proposal reference no. DEPL/MKTG/PGCIL/PRICE BID/10-11/002 dated
03/11/2010, was opened on 04/05/2011.
1.7 Your letters ref. no. DEPL/MKTG/PGCIL/11-12/002 dated 30/04/2011,
DEPL/MKTG/PGCIL/11-12/003 dated 06/07 /2011, DEPL/MKTG/
PGCIL/11-12/005 dated 27/08/2011 & DEPL/MKTG/PGCIL/11-12/006
dated 02/11/2011, extending the validity of your bid up to 10/07 /2011,
10/09/2011, 10/li/2011 & 10/01/2012 respectively.
1.8 Post bid discussions we had with you from 31/10/2011 to 15/11/2011
resulting into the Minutes of Meeting/ Record Notes of Post Bid Discussions
enclosed as APPENDIX (NOA)-1 with this Notification of Award.
2.0 AWARDOF CONTRACTAND ITS SCOPE
2.1 We confirm having accepted your Bid (referred to at para 1.3, 1.4 and 1.6
above) read in conjunction with all the specifications, terms & conditions of
the Bidding Documents (referred to at para 1.2 & 1.2.1 above) and specific
confirmations recorded in the Record Notes of Post Bid Discussions (referred
to at para 1.8 above), and award on you the Contract for Insulator Package-14
(Sub-Package - 14B) for 160kN Composite Longrod Insulators associated With
'Replacement of Insulators on Transmission Lines in Northern Region,
Southern Region & Western Region. The scope of work inter-alia includes
Design, manufacture, testing and supply on FOR destination including
unloading at site basis, as detailed in the documents referred hereinabove.
The scope of work under this Notification of Award (NOA) shall also include
all such items which are not specifically mentioned in the Bidding Documents

Page2
, Power Grid Corporation of India Ltd.
NOA No. : CC-CS/168-CC/INS-1053/3/G6/Sub-Pkg-I4B/NOA/4007 Dated: 25.11.2011
(Contract for Insulator Package-I4 (Sub Package - I4B) for 160kN Composite Longrod
Insulator associated with 'Replacement of Insulators on Transmission Lines in NR, SR &
WR).

and/ or your bid but are necessary for successful, efficient, safe and reliable
operation of the goods, as detailed in the Bidding Documents unless
otherwise specifically excluded in the Bidding Documents or in this
Notification of Award.

3.0 CONTRACT PRICE

3.1 The total Contract Price for the entire scope of work under this Contract shall
be '.". .I . :.~,' .J......- :_,,, .
1thfll
-- ~ ;.~.:r
. > - ! ~3~
- . ,. ~ . . asper e 0 owing bk
'
.
4 .. rea -up:
SI. Price Component Amount
No. (in Rs.)
1. Ex-Works Price component ':: ;

2. Local Transportation, Insurance and other I . ~ ': .!


'
'
Incidental Services
. .
3. Type Test Charges '
Total for Contract Price (1+2+3) ~ I

The above Contract Price is exclusive of all such taxes and duties that are
payable/ reimbursable by POWERGRID in line with the provisions of
Bidding Documents which shall be paid/reimbursed as follows:
Excise duty inclusive of education cess would be payable/reimbursable at
actual but limited to 10.3% (ten point three percent). Central Sales Tax would
be payable/ reimbursable at actual but limited to 2 % (two percent) against
issuance of Form "C" by POWERGRID as per the provisions of the Bidding
Documents. Any other applicable taxes and duties including Entry
Tax/Octroi Duty, if any, shall be paid/reimbursed as per the provisions of
the Bidding Documents.
3.2 Notwithstanding the break-up of the Contract Price, the Contract shall, at all
times, be construed as a single source responsibility Contract and any breach
in any part of the Contract shall be treated as a breach of the entire Contract.
4.0 You are required to furnish at the earliest a Performance Security(ies), as per
th~ ~idding Docu~ents, 1or an_ a~omr of - :
;__ . . .. ~ . ~ --- . . -~ \'. .:. : i.e. equal to 1s%
(Fifteen percent) of the Contract Price, and valid upto and including
31.08.2016 and any other securities as per the Bidding Documents.
5.0 For release of advance payment (admissible as per the Bidding Documents)
equal to 10% of the Ex-works Price component of the Contract Price, you are,
inter-alia, required to furnish a Bank Guarantee for the equivalent advance

~/
Page3
, Power Grid Corporation of India Ltd.
NOA No.: CC-CS/168-CC/INS-1053/3/G6/Sub-Pkg-I4B/NOA/4007 Dated: 25.11.2011
(Contract for Insulator Package-14 (Sub Package - I4B) for 160kN Composite Longrod
Insulator associated with 'Replacement of Insulators on Transmission Lines in NR, SR &
WR).

amount i.e. 1
. '. . . : ..
. : . . . . [ The validity of the Advance Barik
Guarantee shall be up to anu mclucdng 31/08/2012. Further, please note that
furnishing of the Contract Performance Security(ies) under the Contract shall
be one of the conditions precedent to release of advance under this Contract.
6.0 All the bank guarantees shall be furnished from an eligible bank as described
in the Bidding Documents.
7.0 The delivery schedule for the supply of goods under the contract shall be
construed from the date of issue of this Notification of Award for all
contractual purposes as per below:
Commencement of Completion of Approx. rate of supply
Delivery at site delivery at Site
4th months from the 6th months from the Total quantity equally
date of Notification date of Notification distributed in three lots over
of Award of Award the total delivery period.
8.0 This Notification of Award constitutes formation of the Contract and comes
into force with effect from the date of issuance of this Notification of Award.
9.0 You shall enter into a Contract Agreement with us within twenty-eight (28)
days from the date of this Notification of Award.
10.0 This Notification of Award is being issued to you in duplicate. We request
you to return its duplicate copy duly signed and stamped on each page
including the enclosed Appendix as a token of your acknowledgement.

Please take the necessary action to conunence the work and confirm action.
Yours faithfully,
For and on behalf of PO~RGRID
~~\\\\\
(Nrapendra Kumar)
Dy. Manager (CS)
Enclosures:
APPENDIX (NOA) -1- Record Notes of Post - Bid Discussions held from
31/10/2011 to 15/11/2011.

Page4
Power Grid Corporation of India Ltd.
CA No.: CC-CSj168-CCJINS-1053/3/G6/Sub-Pkg-I4B/CA/4007 dated 20.12.2011
(Contract for Insulator Package-I4 (Sub-Packqge - I4B) for 160kN Composite Longrod.
Insulators aseociaieduntn 'Replacement of Insulators on Transmission Lines in Northern
Region, Southern Region & Western Region).

Appendix-4
DELIVERY SCHEDULE

1. The Delivery Schedule shall be as follows:



SL Month & Year Lot Quantity in Nos. of Composite Date from which LD
No. Long Rod Insulators to be for Delay shall be
delivered at site leviable
160kN
1. March'12 1st Lot 1588 01/06/2012
2. April' 12 2na Lot 1589
3. May'l2 3ra Lot 1589
Total 4766

1.1 The activity(ies) under the Supplier's programme for Project Completion shall be in
the form of a master network (MNW) and shall identify the various activities like
design, engineering, manufacturing, supply, transportation to site and Taking Over
etc. of the Goods or specific part thereof (where specific parts are specified in SCC).
The network shall conform to the above Project Completion Schedule.
Liquidated damages for delay at rates specified in Clause 21 of GCC shall be
applicable beyond the date specified above.
1.2 The Contractor shall be required to prepare detailed Network(s) and project
implementation plans & programmes and finalise the same with the Purchaser as
per the requirement specified in Technical Specifications, which shall from a part of
the Contract,

End of Appendix - 4
QICli! fcns Cbli!lll~~rar aiit6 ~ fivtfJ12g ~~~
(atRO HlCf.>h~ Ct.>T 31l<ff) S=
POWER GRID CORPORATION OF INDIA LIMITED -::::-
(A Governmenfoflndia Enterprise) 4icR~Jg
~ ~ : "mc;rfli;fr" ~ xi-2. ~-29. ~-122 001. ~
1fi14 : 0124-2571700-719 tfi<m : 0124-2571760, 0124-2571761 \'JN : ~
Corporate Office: "Saudamini" Plot No-2, Sector-29, Gurgaon -122 001 Haryana
ORIGINAL Tel.: 0124-2571700 - 719 Fax: 0124-2571760, 0124-2571761 Gram: 'NATGRID'
*4~/Ref.No. ~ ~ I CORPORATE CENTRE

Ref. No.: CC-CS/359-CCfINS-1907/3/G6/NOA/4602 Date: 23.02.2013


Mf s. Deccan Enterprises Private Ltd.,
[Licensee of M/s.Hebei Xinhua High Voltage Electrical Equipment Co. Ltd., China (the Licensor)]
B-58,59 & 60, APIE, Balanagar,
Hyderabad - 500037,AP
Tel: 040-2387 0115, 23870111; Fax: 040-2377 8699;
I
Email : info@deccan.in

Attn: Mr. Vikas [alan, Joint Managing Director


Sub.: Notification of Award (NOA) for Insulator Package 1-1 under Procurement of
Polymer Insulators for replacement of conventional insulators in polluted
stretches of Transmission Lines in Different Regions.
Specification No.: CC-CS/359-CCfINS-1907/3/G6;
Global Competitive Bidding; Project Funding: Domestic
Dear Sir,

1.0 REFERENCE
This has reference to the following:
1.1 Our Invitation for Bids (IFB)dated 12.09.2012.

1.2 Bidding documents for the subject package downloaded by you from the portal
https:/!pgcileps.buyjunction.in, after authorization from POWERGRID vide letter
Ref. No. CC-CS/359-CC/INS-1907, 1908 & 1909/3/G6 dated 05,10.2012,
comprising the following:
a) Conditions of Contract, Volume-I
(Document Code No.: DC-1833-12345, September 2012)
b) Technical Specifications, Volume-II
(Document Code No.: DC-1833-12346, September 2012)

c) Bid Form & Price Schedules, Volume-III


(Document Code No.: DC-1833-12347, September 2012)

~\;/

Page 1of5

tj-v\)'IFf ~ : <l'r-9. <gW1 ~lc;<~1'ici ~. <J'icCJIRlll m. ~ ~-110016 ~: 011-26560121 $m: 011-26560039 CTR: ~
Registered Office: B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi -110016 Tel.: 011-26560121 Fax: 011 Gram: 'NATGRID'
~ ~ ~~ ~ \Ji\iff ~
Save Energy for Benefit of Self and Nation
Power Grid Corporation of India Ltd.
NOA Ref No.": CC-CS/359-CC/INS-1907/3/G6/NOA/4602 Dtd. 23.02.2013
[Supply Contract for Insulator Package-11 under 'Procurement of Polymer insulators for
replacement of Insulators on Transmission Lines in Different Regions]

1.3 Your Bid for the subject package comprising First envelope (Techno-Commercial
part) and Second envelope (Price part) submitted/uploaded by you on the portal
https:/!pgcileps.hnljunction.in. First envelope (Techno-Commercial part) of your
aforesaid bid submitted under Proposal Ref. No. DEPL/MKTG/PGCIL(PKGE-
11)/12-13/003 dated 10.10.2012, was opened electronically on the above portal on
17.10.2012.
1.4 Intimation for Opening of Second Envelope bids on 21.02.2013 was sent to all
the bidders through above portal on 21.02.2013.

1.5 Second Envelope of your Bid under proposal reference no.


DEPL/MKTG/PGCIL-PKGE-11/12-13/004 dated 10.10.2012, was opened
electronically on the above portal on 21.02.2013.

1.6 Post bid discussions we had with you on 22.02.2013resulting into the Minutes of
Meeting/ Record Notes of Post Bid Discussions.

2.0 AWARD OF CONTRACT AND ITS SCOPE

2.1 We confirm having accepted your Bid (referred to at para 1.3 & 1.5 above) read in
conjunction with all the specifications, terms & conditions of the Bidding
Documents (referred to at para 1.2) and specific confirmations recorded in the
Record Notes of Post Bid Discussions (referred to at para 1.6 above), and award
on you the Contract for supply of Composite Longrod Insulators on FOR
destination site basis for following transmission lines under Insulator Package I-1
associated with 'Procurement of Polymer Insulators for replacement of
Conventional Insulators in polluted stretches of Transmission Lines in Different
Regions', as detailed in the Bidding Documents referred hereinabove:
Package Insulators: Type & Qty.(Nos.) Transmission Lines
I-1 i) 132kV, 90kN Composite Longrod 132kV, 220kV & 400kV
Insulator: 429 Nos Transmission Lines in NR-I,
ii) 220kV, 70kN Composite Longrod NR-II, NER & SR-II.
Insulator: 3409 Nos
iii) 220kV, 120kN Composite Longrod
Insulator: 3499 Nos
iv) 400kV,120kN Composite Longrod
Insulator: 2809 Nos
v) 400kV,160kN Composite Longrod
Insulator: 7260Nos

Page 2of5
Power Grid Corporation of India Ltd.
_- =-11~
___ _,, ,_
=~:.::.::=:
NOA Ref No.: CC-CS/359-CC/INS-1907 /3/G6/NOA/4602 Dtd. 23.02.2013 --
[Supply Contract for Insulator Package-Tl under 'Procurement of Polymer insulators for ---==~
q1<i'B\tis
replacement ofinsulators on Transmission Lines in Different Regions]

The scope of work under this Notification of Award (NOA) shall also include
all such items which are not specifically mentioned in the Bidding Documents
and/ or your bid but are necessary for successful, efficient, safe and reliable
operation of the goods, as detailed in the Bidding Documents unless otherwise
specifically excluded in the Bidding Documents or in this Notification of
Award.

2.1.1 You (the Licensee),along with M/s. Hebei Kinhua High Voltage Electrical Equipment
Co. Ltd., China (the Licensor), shall be liable jointly and severally for the execution
of the Contract in accordance with terms and conditions of the Contract.

3.0 CONTRACT PRICE

3.1 The total Contract Price for the entire scope of work under this Contract shall
be
as per the following break-up:

SI. No. Price Component Amount


1. Ex-Works Price component
- - - - ---
2. Inland Transportation, Insurance Charges and
other incidental services
Total for Contract Price

The above award price is exclusive of Excise Duty, Entry Tax and other
applicable taxes and duties, which are reimbursable/ payable by
POWERGRID,in line with the provisions of the Bidding Documents.

3.2 Notwithstanding the break-up of the Contract Price, the Contract shall, at all
times, be construed as a single source responsibility Contract and any breach
in any part of the Contract shall be treated as a breach of the entire Contract.

4.0 You are required to furnish at the earliest a Performance Security(ies), as per
the Bidding Documents, for an amount of

i.e. equal to 10% (Ten percent) of the Contract Price, and valid upto and
including 31.10.2015 and any other securities as per the Bidding Documents.

Page 3of5
Power Grid Corporation of India Ltd.
NOA Ref No.: CC-CS/359-CC/INS-1907 /3/G6/NON4602 Dtd. 23.02.2013
[Supply Contract for Insulator Package-11 under 'Procurement of Polymer insulators for
replacement of Insulators on Transmission Lines in Different Regions]

4.1 In addition to above, You shall arrange to furnish an unconditional and


irrevocable bank guarantee(s) for an amount of
. -
equivalent to 5% (five percent) of value of the Contract from your Licensor i.e.
M/s. Hebei Xinhua High Voltage Electrical Equipment Co. Ltd., China, valid upto and
including 31.10.2015 in accordance with Clause GCC 9.3.1, Volume-I of the
Bidding Documents.

4.2 M/ s. Deccan Enterprises Pvt. Ltd., Hyderabad is the Manufacturer of


Composite Longrod Insulators to be supplied under the subject package.

5.0 For release of advance payment of

the Ex-works Price component of the Contract Price, you are, inter-alia, required
to furnish a Bank Guarantee for the equivalent advance amount. The validity of
the Advance Bank Guarantee shall be up to and including 31.10.2013. Further,
please note that furnishing of the Contract Performance Securities as per para 4.0
& 4.1 above under the Contract shall be one of the conditions precedent to
release of advance under this Contract.

6.0 All the bank guarantees shall be furnished from an eligible bank as described
in the Bidding Documents.

7.0 The delivery schedule for the supply of goods under the contract shall be
construed from the date of issue of this Notification of Award for all
contractual purposes as mentioned in the Bidding Documents read in
conjunction with the Minutes of Meeting/ Record Notes of Post Bid
Discussions.

8.0 This Notification of Award constitutes formation of the Contract and comes
into force with effect from the date of issuance of this Notification of Award.

9.0 You shall enter into a Contract Agreement with us within twenty-eight (28)
days from the date of this Notification of Award.

Page 4of5
Power Grid Corporation of India Ltd.
NOA Ref No. : CC-CS/359-CC/INS-1907/3/G6/NOA/4602 Dtd. 23.02.2013
[Supply Contract for Insulator Package-Ti under 'Procurement of Polymer insulators for
replacement of Insulators on Transmission Lines in Different Regions]

10.0 This Notification of Award is being issued to you in duplicate. We request you
to return its duplicate copy duly signed and stamped on each page including
the enclosed Appendix as a token of your acknowledgement.

Please take the necessary action to commence the work and confirm action.

Yours faithfully,
For and on behalf of
POWER GRID CORPORATION OF INDIA LTD.

Dl~\o>\\'>
(Nrapendra Kumar)
Dy. Manager (CS)

Page 5of5
trrcR' fa.Is Cbi"!cft~~rat 3fic5 ~
POWER GRID CORPORATION OF INDIA LIMITED
(<ITTl mcPTi
f6:tfCR2s
Q5T 3E.ldl)
Ei-= ~=~
=::
(A Government of India Enterprise) ~s
~~: "fl"IG!fTl;:\'l"ajjc"fi. 2, ~-29, ~-122001, ~
~: 0124-2571700-719, crn: 0124-2571760, 0124-2571761 (ITT,~,
Corporate Office: "Saudamini" Plot No. 2, Sector-29, Gurgaon-122 001. Haryana
Tel.: 0124-2571700-719, Fax: 0124-2571760, 0124-2571761 Gram: 'NATGRID'
~ 001I Ref. No.

0 k!.J VilIV fl L
Ref. No.: CC-CS/210-WR2fINS-1803/3/G6/NOA/4616 I)ate:21/03/2013

Mf s. Deccan Enterprises Private Ltd.,


B-58,59 & 60, APIE, Balanagar,
Hyderabad - 500037,AP
Tel: 040-2387 0115, 23870111; Fax: 040-2377 8699;
Email: info@deccan.in

Kind Attn: Mr. Vikas Jalan, Joint Managing Director


Sub.: NOTIFICATION OF AWARI) (NOA) FOR COMPOSITE INSULATOR
PACKAGE CIS-02 ASSOCIATE!) WITH TRANSMISSION .SYSTEM FOR
CONNECTIVITY OF ESSAR POWER GUJARAT LTI). ANI) WRSS-XIII
Specification No.: CC-CS/210-WR2fINS-1803/3/G6;
Domestic Competitive Bidding; Project Funding: Domestic
Dear Sir,
1.0 REFERENCE
This has reference to the following:
1.1 Our Invitation for Bids (IFB)dated 22.06.2012.
1.2 Bidding documents for the subject package issued to you vide our letter Ref: No.
CC-CS/210-WR2/INS-1803/3/G6/BD dated 18.07.2012, comprising the
following:
a) Conditions of Contract, Volume-I
(Document Code No.: DC-1792-12236,June 2012)

b) Technical Specifications, Volume-II


(Document Code No.: DC-1792-12237,June 2012)

c) Bid Form & Price Schedules & GTP, Volume-III


(Document Code No.: ~~;~~38,June 2012) _
1_.t.
! /. . .. . . .. . . \.'. ~,)
/-<, .~
[ ..... ._,~(G?J
\ \ .: ~
. !i '-:.) ,/ Page 1of4
> ... ,;~//
~ ~ : <l'T-9, ~ ~'i'ilc'i,~l'ki iffei:rr. ~ 'fRl<i, ~ ~-110016 ~ : 011-25550121 ~: 011-26560039 f!N ''lcftr.s
Registered Office : B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi-110016 Tel. : 011-26560121 Fax : 011-26560039 Gram : 'NATGRID'

~ ~ '<l~~a ii ~ ~
Save Energy for Benefit of Self and Nation
Power Grid Corporation of India Ltd.
NOA Ref No. : CC-CS/210-WR2/INS-1803/3/G6/NOA/4616 Dtd:21/03/2013
[Notification of Award (NOA) for Composite Insulator Package CISS-02 Associated with
transmission system for connectioiiu of Essar Power Gujarat ltd. and WRSS-XIII]

1.3 Your Bid for the subject package comprising First envelope (Techno-Commercial
part) and Second envelope (Price part) submitted by you. First envelope (Techno-
Commercial part) of your aforesaid bid submitted under Proposal Ref. No.
DEPL/MKTG/PGCIL/PRICE BID/12-13/001 dated 25.07.2012, was opened on
30.07.2012.
1.4 Intimation for Opening of Second Envelope bids on 07.02.2013 was sent to all
the bidders through our letter dated 05.02.2013.

1.5 Second Envelope of your Bid under proposal reference no.


DEPL/MKTG/PGCIL/PRICE BID/12-13/001 dated 25.07.2012, was opened
on 07.12.2012.

1.6 Post bid discussions we had with you from 06.03.2013 till 15.03.2013 resulting
into the Minutes of Meeting/ Record Notes of Post Bid Discussions.

2.0 AWARD OF CONTRACT AND ITS SCOPE

2.1 We confirm having accepted your Bid (referred to at Para 1.3 & 1.5 above) read in
conjunction with all the specifications, terms & conditions of the Bidding
Documents (referred to at Para 1.2) and specific confirmations recorded in the
Record Notes of Post Bid Discussions (referred to at Para 1.6 above), and award
on you the Contract for supply of Composite Long rod Insulators on FOR
destination site basis for following transmission lines under Insulator Package
CIS-02 associated with transmission system for connectivity of Essar Power
Gujarat Ltd. and WRSS-XIII as detailed in the Bidding Documents referred
hereinabove:
Package Insulators: Type & Transmission Lines
Qty.(Nos.)

CIS-02 120 KN Composite (i)400 KV D/C(Triple Bundle)Essar TPS-


Longrod Insulator:2,205 Bachau Transmission line
Nos.
And
160 KN Composite
(ii) 400 KV D/C Bachau(PG)-
Longrod Insulator:776 Nos. Varsana(GETCO)Transmissionline.

The scope of work under this Notification of Award (NOA) shall also include
all such items which are not sp~cifis:,ally mentioned in the Bidding Documents
/.'./
i
. , . ~~.: ~}\ t::;

,,~\Ev.~,
;r( ,
Pr:~:,:.~~.,_
. \\
\
~- '

\ ', , Page 2 of 4
'\, .
Power Grid Corporation of India Ltd.
NOA Ref No.: CC-CS/210-WR2/INS-1803/3/G6/NOA/4616 Dtd:21/03j2013
[Notification of Award (NOA) for Composite Insulator Package CISS-02 Associated with
transmission svstem for conneciioitq of Essar Power Gujarat ltd. and WRSS-XITI]

and/ or your bid but are necessary for successful, efficient, safe and reliable
operation of the goods, as detailed in the Bidding Documents unless otherwise
specifically excluded in the Bidding Documents or in this Notification of
Award.

3.0 CONTRACT PRICE


3.1 The total Contract Price for the entire scope of work under this Contract shall

SI. Price component Award Price (Rs.)


No. I
( 1 Ex-works price
2 Type test charges
3 Local Transportation, Insurance and
other Incidental Charges
Total Contract price (1 +2+3)

The above award prices are exclusive of Excise duty, Sales tax and other
applicable taxes and duties which are reimbursable/ payable in line with the
provisions of the Bidding Documents.

3.2 Notwithstanding the break-up of the Contract Price, the Contract shall, at all
times, be construed as a single source responsibility Contract and any breach
in any part of the Contract shall be treated as a breach of the entire Contract.

4.0 You are required to furnish at the earliest a Performance Security(ies), as per
(

only) i.e. equal to 10% (Ten percent) of the Contract Price, and valid up to and
including 31.12.2015.

5.0

the Ex-works Price component of the Contract Price, you are, inter-aha, required
to furnish a Bank Guarantee for the equivalent advance amount. The validity of
the Advance Bank Guarantee shall be up to and including 31.12.2014. Further,

Page 3 of 4
RECORD NOTES OF POST BID DISCUSSIONS HELD BETWEEN POWER GRID
CORPORATION OF INDIA LTD. (POWER GRID) AND MfS. DECCAN ENTERPRISES
PVT. LTD., HYDERABAD (DECCAN) FROM 06.03.2013 TO 15.03.2013 WITH RESPECT
TO COMPOSITE INSULATOR PACKAGE CIS-02 ASSOCIATED WITH
TRANSMISSION SYSTEM FOR CONNECTIVITY OF ESSAR POWER GUJARAT LTD.
AND WRSS-XIII [SPECIFICATION NO.: CC-CS/210-WR2/INS-1803/3/G6]
FUNDING : DOMESTIC

PARTICIPANTS

I
POWER GRID DECCAN
--
1. Shri Sujan Gupta, AGM (CS) 1 Shri vikas Ialan, Jt. Ma~aging ~i!::ector
2. Shri P.K.Gupta,AGM(CMG) 2 Shri A K. Jhunjhunwala
I
3. Shri Rajesh Wadhwa, DGM (QA&I)
----
4. Shri A. K. Vyas, DGM (Engg.) .. ---
5. Smt. Pratyaksha, Ch. Manager (Fin)
-
6. Slui Sanjay Sharma, Ch. Manager (CS)
--
7. Shri Kanchan Chaudhary,Ch.Mgr(CMG)
8. Shri Amit Garg, Ch. Manager (Fin)
9. Shri Brajesh Kumar, CDE (Engg-T /L)
-- - --
10. Shri Arvind Gupta, Manager (CS)
11. Shri Nrapendra Kumar, Dy. Manager (CS)
--
12. Shri Deepak Sahoo, Dy. Manager (QA&I)
-------

Based on the bid of DECCAN for the subject package, the specific agreements reached
between POWERGRID and DECCAN are as follows:

(
A. TECHNICAL ISSUES Refer Attachment - A (PBD)

B QUALITY & INSPECTION ISSUES Refer Attachment - B (PBD)

c WORK SCHEDULE ASPECTS Refer Attachment - C (PBD)

D. COMMERCIAL ISSUES

D.1 With reference to stipulations/ comments of DECCAN mentioned in their bids, the
resolutions/ tie-ups / clarifications are indicated in Attachment-D(PBD). Salient
points are brought out hereunder:

D.1.1 As stated in the bid, DECCAN confirmed that they are opting for "interest bearing
advance" under the subject package. PO~~(C?RID noted the sam~e_. ,,.~
-:rir b\ 1 .~ - l\,, \ r_-

R"''' Nol" ,)t BM Dim'~" b: '"::"' <if ;, i.:.: :,::i~;~fS-02 ~'~~t"i-~----~---'~,~--


with Transmission sijstetn for connectivity of Essar Power Gujrat ltd. and WRSS-Xlll Pagel of 3
[S ec. Nos.: CC-CS/210-WR2/INS-1803/3/G6]
D.1.2 During discussion, POWERGRID stated that the total prices quoted by DECCAN are
substantially higher (Aprox 38.44%)with respect to the prices quoted by global bidder,
for which the bids were opened on the same day. Deccan during discussions stated that
they are one of the indigenious manufacturere of composite long rod insulators
developed by POWERGRID having completed the necessary design & typetest as per
POWERGRID specifications. They have been supplying composite Long Rod insulator
to POWERGRID against the contract awarded to them under vendor development
programme.

Considering the current order booking position, installed capacity and avaliable
balance capacity DECCAN after review of their prices have offered to match their
prices with global bidders prices by giving a discount of Rs - on their total
bid price including taxes & duties. Considering the above discount, the total bid price
of DECCAN for the subject package shall be Rs as per following breakup:
( SL
No.
1
Price component

Ex-works price
--
___C Value (Rs.) 1

2 Type test charges


3 Local Transportation, Insurance and other Incidental
Charges
Total Contract price (1 +2+3)
----
4 Excise duty @12.36% incl. cess on Ex-works price
--
5 CST@ 2% on Ex-works and Excise duty ----~
Total contract price including taxes & duties (1 +2+3+4+5)
A letter dtd. 15.03.2013 from DECCAN in this regard is enclsoed herewith.

D.1.3 In view of above, the total Contract price for the purpose of award for subject
package in favour of M/ s Deccan Enterprises Private Limited, Hyderabad
(
(DECCAN), works out to INR
as per the following
break-up:
SI.No. Price com onent Award Price (Rs.)
1 Ex-works price
2 Type test charges
3 Local Transportation, Insurance and other
Incidental Charges
Total Contract price (1 +2+3)
The above award price is exclusive of Excise duty, Sales tax and other applicable taxes
and duties which are reimbursable/ payable in line with the provisions of the Bidding
Documents.
- - ),(
/1_-vv"" b{q.?, ., ( r )~1 r.: \ \'- ,-~--
~Ir~ (j \:Ji < - l /6 tC "}' }( (/ '{] , -1-
Record Notes of Po.,( BM Discussions in "'P"' of Insulator Package>CIS-02 aod~ted I
with Transmission system for connectiuitu of Essar Power Gujrat ltd. and WRSS-Xlll Page 2 of3
[S ec. Nos.: CC-CS/210-WR2/INS-1803/3/G6]
E. DECCAN have confirmed that signing of these record notes signify their unequivocal
acceptance of the same. They have also confirmed that except for the specific
agreements reached and recorded under Part-A, B, C & D of these Record
Notes/Minutes of Post Bid Discussions, all other deviations/ exceptions and/ or
additional conditions, implicit/ explicit contained in their offer, stand withdrawn
without any cost implication to POWER GRID and that the Contracts, in case of award,
shall be performed by them strictly in accordance with the Bidding Documents read in
conjunction with above specific agreements/ confirmations.

\ ~l:-"'
(POWER GRID)

,,s:1 f( r-r--,~
(DECCAN)l

j Record Notes of Post Bid Dismssi~;,,;~-l11 respect <~{ Insulator Packt~gesCIS-02 associated
with Transmission system for connectiuitsj of Essnr Power Gujrat ltd. and 1NRSS-XII1 Page 3 of3
[S ec. Nos.: CC-CS/210-WR2/INS-1803/3/G6]
t:ffCR fctr5" 4lH4)~~rc:r 3frtf; $Bll1 ~flt?;$
(~ mmR" CflT 3mi}
POWER GRID CORPORATION OF INDIA LIMITED
(A Government of India Enterprise)
400 $.<.fr. '3tf~~. ~. if("'('liila1a;, 'h:fla1@:; -121 004
400KV Sub-Station, sarnavpur, Ballabgarh, Farldabad -121 004
~:ITTi!f I Tele: 0129-2230071, 2230072, 2233808, ~ I Fax: 0129-2230071
~if RefNq.: NR-1/BLBTfL(O&t1)/ ~ Date: .07.07.2011

TO WHOM IT MAY CONCERN

This is to certify that M/s Deccan Enterprises Private Limited, Hyderabad


had supplied 170 nos of 160 KN & 122 nos of 120 KN polymer insulators
vide SRV no. 0084/09 to Power grid, Ballabgarh in the. month of March
20 l 0 and accordingly installed the said polymer insulators in the 400 xv
line under the jurisdiction of Ballabgarh group in the month of May 20 l 0. It
is confirmed that no abnormality/ defect have been noticed till date.

~
(P.Chetri)
Manager (TIL) .
Ballabzarh ,,00 icv
POWER 11fll!J. ~.
S/5 SAMAIPUR
&ALLABGARH f210ffll
~--- -~----

HARYANAVIDYUT PRASARAN NIGAM LIMITED


(Regd. office: Sector-6 Shakti Bhawan, Panchkula)
P.H-0114,2764759 Mob: 09350454131
e-mail ID- xems11111s(i]).frvp11.gov.
i11, :remsim/111a11esar\mrmail.ccom.

Office Of the
Executive Engineer /Tran_smission System Division, HVPNL,Manesar.

Ref. No. Ch-77 /L-1 _ / Dated; 04-02-2015


<z:. --- --. ,,./

To Whom so ever It May Concern

Subject: Operational Performance of 400KV Silicone Polymer Long Rod


Insulators Supplied in 400 KV D/D Dhanonda to Daultabad
Transmission line under Contract No. HDP-1739-1740/REC-
99/XEN (Project TL) dated 07-04-2010 through M/s Cobra
Instalacious 'Y' Services, SA in Joint Venture with Fedders
Lloyd Corporation Limited.

With reference to the above subject, It is certified that 2001 Nos. of


' -
400 KV 120 KN and 3360 Nos. of 400KV 160KN Silicone Composite Long Rod
Insulators Supplied by M/ s Deccan Enterprises Ltd. . Hyderabad and installed
/commissioned on 4th June 2012, found to be performing satisfactory till date.

(!k__
Ex2c~1tiv2 En~~~nt~flr
Di::don
Tr:J.:1~:. S:t,:;l~~;-i~
H'VF:~t., :-,{d;H:Stt.1
-------------
----------------

. U:P. POWER TRANSM~SSIONCORP-ORAttON_LIMIJgp _ .


\ffiR m TiITT ~it1filw1 ,ct11~q)h11 ~ . .

omce. ot lhe~e
~~"""'~.
Engln_eer
.; . ~t. l:ledJ1cltyTranamlAloilDMelon-1,
U.P.Powar l"'1&mlsslon C()rpofatlon Ltd,
.~ll.
.
-...,.
.:..
""'
-_ -
- . . ..
m
.
.
- ...

-
5
~
ii;
VldylJt Cok>nY.GOvfnd Hagar, kanpur-208006
Erilall-lD:eeet11knp@upptcl;org
UPPTCL
lTR No: 23/J:;T.D.-1(10/PC dt: 23.2.13

Sub: Operation Performance repo.rt of 400kV Composite Silicone Insulators - Reg.


Ref: PO No: 58/ETDC/S/TD-318/Deccan dt:: 12.01.2009

. M/s. Deccan Enterprises Pyt. _Ltd.,'(DECOSIL)


#s/ss;s9.&60,APIE,Balanagar,Hyderabad-37.
Andhra Pradesh, india.

pear Sir,

' . .
With
.
reference
-' .. .
to the above referred subject, itis toJnform you that 100 Nos of

4~kV Comp'~i.te Silicone Rubber Insulators were installed. and commissioned on


46okV Pankf-~~npur line upto May 2009 and these insulators have found

Working satisfactorllvtllldate.
,;: .

JA.,.~
( Shekhar Agrawal)
Executive Engineer
--- - ------------

OFFICE OF THE
~~a~ EXECUTIVE ENGlNEER
"B"O "!JO 1l'm ~it11'l11tM 'lil~<fthl'l fao U.P.POWER TRANS CORP~ LTD
~~~ ELECTY TRANSMISSION DIVISION
220 c6<ft ~ ~'!~~1,..<H.,.,.11~.
~ 220 KV SIS DELHl-MEERUT ROAD
~ 01232- 261004 MURADNAGAR .
f.r.mf . . 01232- 261069
E.Mail: eeetdmrd@upptcl.org
~- 09412749962

N~.... 9.~{,_.~- . - EID/M Date ... .[.9. ~ . )-/ j__.


Subject.- Operational Performance report of 400KV Composite silicone Insulator.
Ref. PO No-3399/ETDC/l/TD-339/Deccan Dated20-l 1-2010

Mis Deccan Enterprises Private Ltd.


B/58,59&60,Asst Private Industrlal' Estate
Balanagar, II.yderabad-500037(AP)In.dia

Dear sir,
. Kindly. tefer._tp_,yQl!r. office Letter .No-PEPLIMKTGIPEREORMANCE/
UPPTQVGiB/12-J.3/QQl datecl'.23-6-2012. on the ~b9ye f!l(:A4P!1Sl.lbject,.
In this regard it is to inform you that 162 Nos. 400 KV;.120 KN Polymer
Insulator were installed ()U Muradnagar- Mv.za.ffam~gar line during April-2011
( before 25-4-'2011) and these insulators have found working satisfactorily till date.
~--~

-~\~
( Yogesh Kumar)
E.xecutiv_e Engineer
Executive .tng1nee1
.EleLt:y. Trans, Division
G. r.
Ro:id, Mwad Nag;.i'
--- _,,,_,_,, __ ---- -----------

' ,o;!%i~==ll>
. . ~ ~-. .
~!;,;~:t~!~:;.:~u~~1i;i1Wl~i~{~S'cil\N'ill~
"1.J-l:)j<'. t~EttYi'l'A.NsM1ss)dND1~l~IoN
. ~ 22o)~:cft eq<fi~kl~'lit~ -~ .~ .. . . '-) ,ii_' . . 220KV s/sjI)~LHJ~M_ F,:E_ ROAD :RUT .
.. ~ 01232.-- 261004 :u fP l'~l:. , . ADN
.: . .. .. . _. -fr"_"OR_ _ AG:A_R ..

tj~if,f~'; j~?,'.,.;;'~Jt~OiiET?/]vf+
~- 012a2=:261c)e9 E.Mail:ecetdmrd@upp.tclorg

i: ii P:~. ;, ; . &~~:,@:21:) q~ ci'.C ~ i;;

I ~f;}($fiI ~l1,1~,t.1~1ti~f~~f~~tfrtlrfi,~~~!~~il[~dn.;~*!aro'r,
' ... ::b:-..--C.
--"---''CC

Mls:ne:~~~i~~;~i>riscs P~-i~~t;Ltd. ,, ~-
. ,B/58,59&60jA$stPtivatel1~dust.rfalJi:sfate_ .
~a:aliagal{Hyd~f~b~tl~soQQ37(AP)~ii~ii~
, - - .: . - - - :- : -
.; . :
. - ,_ . - - - -. , _._,_-_ t-: >L~-~~;!;.:
:-L::~~-~~-~-~~: -. -. -. -r,' --t- -~: ~.,;,_:
~ ". . 1. <;,1:.:5:'.;;--
~' :,.:t:,c

- _, . .;_'jfiese insulators liavefounchvorking satisfaptodfy tUi'date: " : . : __ , . : :<r- . _-._ ..

:;<;if~ii'i-''''~~' . ;, ,;,j;; 3 ' . . .. \~~1'''


Executh~ti':En~iucw -' - -
','f<'.secrutl.i>e.f~e;.1ne~ , :
.: - ;-> _, $.i , Di\!~1on~ -:. ..
- . ' -. ' 'J<1<"'' l. -~!$. - ..
7:---:~-~~-- ---.:-&_,_. :'r~ . .
1)

=- !~~ v~ -f,itir~d )>htf3!".-_--_


-:.
-- \J
. l .
\
1 . . ~ ! -~ ~ .
,.: ..

- ,..;
- :! -
-------------------- - ---~---

U.P. POWER TRANSMISSION CORPORA'r!ON LIMlTED


~~Gm -~11 C/ll~l'.!R~11-~
{ilo!IO .'ffiliiR i'6I i3lll01!)
~1iiffii!iiJijiff\'iw'\'lf,
~~~'!ltFI. Oiilca ot the Executive Engineer __ -----
.---~-
. i!'m!OIJCR ~ ~ filo, . Eleclrlclty Transmbslon Ol1~1on-1;
U.P.fowerTransmlsslon Corpi>ration Ltd,
fqijil iiilt.fl.~ ;m,~ Vidyut Co!ony,Govlnd Naigar, kanpur.zoeooo
. WN<I : 'iiifil!l'{208006 Emall~O:eee\!;f1knp@upptcl.org
1'ro- uu;~2o4101, ~5i2-2283702(311D),22D310'2~) JJFPTCt

Ml~ Deccan Enterprises pvt. Ltd.,


B/58,59&60AsstdJ~Vt. Ind.Estate,
Balanagar, Hyderabad- 500037

Ref: Yourletter no- DEPL/lvII(TG/UPPTCL-PERP/12- 13/


902 &005 dt. 23.06.12 . - . ~-

eliAre Q~+ ~
With reference to your above letters it is to inform that performance of polycon
-- .... -~ ..
insulators supplied vide order
.
. no -. . 58/ETD.C/5nD-3
. . l .8/0e~can .d' t. . 1.2.01.2009
. .
& . '

3339/EIDC/1/TD-339 dt. 20.11.10 & installed .in~OO I~V Panki- Unnao & ~00 KV
Unnao-Agra & 132 KVPartl<l- Naubasta-were.found~fst~t~~ till date, .

r.x.~':1~.':he .E:::.gi ~e"r


Elect y. Tran!!:li!s{v::: f)J~i T .
t". p. ?\. ";re:- r ':! ~ ..1:a::::.-: LL~.
KA~~PUR
----------------------~----

-
./ " a
)
Regd. Ofllce: sarcar Patel Vldyut Bhavan. --1
.. ; Hace course, VADOOARA- 390 007. I
o E ~~,irlC 0
1 .
Telephono No.i020t:) 2363089 (0)
Fax No.(0266) 2361216 (GETCO) I
t

(0266) 2337918/2338164 (GUVNL)


Web site: wwwaetQ2gularat.com
Emafl: cetr.getco@gebipall.com

CE {TR)/ ACE (TR)/ SE (TR)/ EEL/Performanee/


. . . 1 lt' . ~ .... , .
' '

re..
~/s DECCAN Enterprise~ Pvt ltd, ..
v-
1
~/68, 59 & 60 Asstd. Pvt Ind. Estala,
Balanagar, < I~
Mydrabad-600037 ,.: I
Andhrapradesh.
\.
. l. .... ; ... ., . ~~
..yQ: Performance cart!tlcate in respect of DECCAN make slllcon composite Insulators ot 661\V,
132 l<V, and 220 l<V olasa SlllcoM Composite Insulator eupplled to GETCO Jn 2007.
e

Bfil: 1. Your letter no. DEPL/MKTG/1098/GETC0/11-12/002 Dt. 03.08.2011

Dear Sir,

On the above subject and reference the performance 'ot DECCAN make ~lllcon composite
Insulators auppllsdlo GETCO In 2007 of aeKV, 132KV and 220KV etas! as pe~iield report Is
as under.

$ j'.)Q No. Dt. Item Qly. Rem


->--
CE(P)/Proc/1098/R.1/ll/Sllloon/ 90KNJ66KV As per Order Generally found
DECCAN/318 Dt. 15.01.2007 Suspension

CE(P)/Proc/1098/Rl/ll/Slllcon/ 90KN/66KV As per Order Generally found Satisfactory


DECCAN/318 Dt. 15.01.2007 Tension

1-CE(P)tProc/1098/Rl/ll/Slllcon/ 132KV/OOKN As per order oeneraiiy-fouiici' sai18rii'ctorv


I . I .
.
: 01:ccANt318
I
ot. 1s.01.2001
Suspension I D
j ____ -------- ----- -- ... --~If-
4 CE(P)/ProcJ1098/Rl/Jl/Slllo~n/ 132Kv/90KN As ----I"""""----
per Order GaMrnlly -fovnc
. - mon.r.etr;;i" ]
DECCAN/31S Dt. 15.01,2007' '
Tehalon
,_
6 CE(P)/Proc/1098/Rl/Jl/SIUcon/ 220l<VJ90J<N As per Order Ganel'auy'ioL;nci - -- - ...... 1
f,:1'.li !;)f'.t ;,tV I
DECCAN/318 Dl. 15.01.2007
Suspension

6 CE{P)JProc/1098/Rl/ll/Slllcon/ 2201\VIS9KN As per Order Gen~rall fo'f


DECCAN/318 Dt. 15.0i.2007 12..okr-1
Tension

This ~ Issued as per your own request without prejudice to the Terms and Condltron of NT.

Thanking you,
Yeure faithMy,

..... .

,
:

,. .
. .....__._, __ --..,.---...., -. -.---~

1i

u
QI
Haryana Vidyut Prasaran Nigam Limited
(Regd, office, ShaktlBhawan, Sec,:;6, PanchkUla)
O/o XEH TS Div HVJ>Nl Sim MobR no 931S315621,T~lafa11.
01660-238426,emll ld-ir~trs4Phvpn.19v.ln

TO WHOM IT MAY CONCERN


Certified that 400 Kl/ Sub-Station HVPNL Nuhlyawali (Slrsa) has been constructed on turnkey
bases by M/s G.E.T. Power P11t. ltd against contract no WB-1/G 01/XEN/'NB d11ted 01/06/2009
underjurisdlctlon of XEN cum Project Manager Transmission System Division HVPNlSirsa under
Worid Banldundlog. Following long rod ccmposite po_lymer insulator procured from'M/5 Oec~an
Enterprises. Pvt. lt(:l. were supplied and Installed by the turnkey contractor afsald s!,!bstat1on

Sr. . Description
No
1 100 KV long Rod lnsulator ( tension)120 KN No
2 49() KV long .Rod lrisulator (suspension) 120 KN No 30

3 24S KV'loag Rod Insulator ( tension) 120 KN No


4 245KV long Rod Insulator ( suspensiort}12Q.KN

5 up<V long Rod Insulator ( tensionJ 12.PKN

6 132 Kv loiig Rod insulator (suspensio_n)).20 ~N

Endst No Ch~79/~F-99{Gf:T'/Vol.V

Issued to M/s Deccan E:nterprlses Pvt. Ud B~l~~~i~r~l:lyd_~tj~~~t~i)37 wJ,:t.,fif~lt> .:


letter dated 09/(t)./iOi.3 -: .
-------------------

TECHNO ELECTRIC AND ENGINEERING CO. LTD.


Corporate OHlce, Power Planl & Eleetrlcal Dlvllon :
2F & 3F, Pflrl< Ploza, 71, Purl< Street. Kulkata-700 016 Tel . 302\JOOO. 98318 56617-20. Fax: 033-2217-1167, E-mail; 1ec1tnoOca1.vsnt.n&l.ln
ENGINEERS&
~ONSIRUCTORS

Dipalpur/HVPN_JKT- 39 /2013 February 6, 2013

CERTIFICATE

This is to certify that M/s Techno Electric & Engg. Co. Ltd. had placed an order on M/S DECCAN
ENTERPRISES (P) LTD, B/58 - 60, APIE, Balanagar, Hydrabad - 500 037 for Design, Engineering,
Manufacture, Shop Testing, Inspection and Supply of Composite Insulators against P.O. No.05649/10-
11/1022 dated 09-10-2010 for 400/220/132 KV Sub-Stations at Kabulpur & Dipalpur under HARYANA
VIDYUTPRASARAN NIGAM LTD.

Qty. of Composite Insulators supplied against above P.O. are as follows:-


L 400KV 120KN Composite Insulators - 198 Nos.
2. 220KV 120KN Composite Insulators- 312 Nos.
3. 220KV 70KN Composite Insulators - 57 Nos.
4. 132KV 120KN Composite Insulators- 144 Nos.
S. 132KV 70KN Composite Insulators - 48 Nos.
.
Kabulpur & Dipalpur Substations are in commercial operation since 12/03/2012 and performances of
above composite insulators are satisfactory up to now.

For Techno Electric & Engg. Co. Ltd.

fifi}?~
Mahendra Mahawar
Sr. Resident Manager

CC forwarded for information to the V.P. Projects, Techno Electric & Engg. Co. Ltd., Kolkata

Rglslered Office : P-46A, Aadi1a Bazar Lane, ,Kolkala - 700 001, Tai. : 2225-4671 I 44721 :327G, Fax : 033222511'10. Emall : 1echnoOcal.vsnl.nol.in
Mec/lanlcal Olvltlon: ldoal PlazaSoulhBlocl<. Room S-307 & s-309, 1111, Sarai Bose Road, Koflultn-700020. Toi: 22!l0-164e, Fruc: 2'l03-IG65. E-mail: tedlnoOc.il.vsnl.nel.iJI
Deihl Olflce : 508::<>!1. SlOwor Comor, BB. Nehru Ploce, New Doi11110 019, Tel. : 011-2643\602, 4161-7438-40, Fax: 011-2$44-$098, E-mail; delltlOledlno.coJn
ttyderabod Office : 63-252!116 P.at No. 301. Ernmanli. Hyderaba<l - 500 062, Tel : 040-S566 05Z3, Fax ; E<ned hyderabodOtedVlO.oo.in
Vl~ll 115 "'; hllp://www.lechoo.co.in
APTRANSCO LlMITED

From: To:
As11fotant Divisional Engineer, The Divisional.Engineer.
EHTL&SS, TL & SS Division,
Plduguralln. Gunter,

;Lr No ADE /EHTL&SS' /PDGL I]. Pal'iorman~e / Dtfo. 202111. Dt: 06 09-11

Sub: EHTL&SS - PDOL - Perfonnaneeof SRC insulators submitted


-Reg.
Ref: 1. Memo No: CFJLlJ P&MM/F.2l/F.OM0031?/08/ D. No: .
202/2010 Dt:23/ll/2010
2. PO NO: OM-0377/08/CE/400KYIPB<:MMIE 21/Fe EHvt/22103/
Lot 4/ D. NO: 11/08, Dt: 05107/2009
3. Mis. DeccanEnterprises Private Limited Lr Dt: 06/091201t
* .. ,.
With refe1:ences to 1he above, it is to submit that HlO No's 70 KN, 220 KY
SRC insnlatora supplled by'M/a. Deccan Enterprlaes ( DECOSIL) were drawn from
TLC stoxes/ Gunadnlo/Y1jayawada on 1017/2009 v1de lss~ sllp noj 4 , (?o,l/'J rJ d \ ~6 6 '\ 1 - I'<.'

The above lnsul.ntors 'wero utilized In 220 KY VTS ~ Tallapalll-


r
Rentachintala DC line and the performance of th,e lnsulatora was found satisfactory.

Yours Mtbfully;

~
~---------~-------~------------------------- ------- ----------------------

. . -~,-~\Je\o
\...~ . .C>. ~ '-
L:--.
Page 1 - , /
BY REGISTERED POSIWmt AC!{ DUE ,11,~
, TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMlTED

From To
The Chief Engineer, . ./! M/ s.. Deccan Enterprises,
Construction/ 400KV, / B/58,59&60,
VIDYUT SOUDHA, Asatd, Private Industrial Estate,
API'RANSCO, Balanagar,
HYDERABAD-500 0082 Hyderabad-500 037(A.P.) India,
Fax No.040- 23323565

P,0. No.OM- O 3H/2008/CE/400 KV/P&MMIE 21/F.e.EHVT-22/08 /Lot-4/D.No. 11 /08, dt. IS" .1.09.

Sirs,
- L'.l.01

Sub: Tender Specification No: e-EHVT-22/2008 - Supply of 220 KV/70 KN


Silicon Rubber Composite Insulators -Detailed Purchase Order issued Reg.,

Ref: l.Bid.No.e-EHVT 22/2008


2.Your offer No.DEPUMKTG/APTRANSC0/03-09/002, dated: 11-08-08.
3.Your Lr No. DEPUMKTG/ APTR~SC0/08-09/12/20/001, dt.20-12-08.
4. LOI. Lr.No.CE/400KV/P&1vfM/E.2 l/F.e-EHVT-22i081L01/Lot-4/
D. No. 229 /08, Dt.30.12.2008.

I, acting for and on behalf of and by the order 'and direction of the Transmission
Corporation Of Andhra Pradesh Limited (hereinafter referred to as 'APTRANSCO') accept
your offer cited in reference (2) and your letter dt20.12.2008 towards Supply of 220 KV/
70 KN Silicon Rubber Composite Insulators as detailed in Clause-(2) below with the terms
& conditions set out in the Specification No;e-EHVT-2212008 and in this order. This detailed
order is in confirmation of the letter of Intent issued in the reference (4 ) cited.
1. SCOPE OF CONTRACT: This contract relates to the supply of 1000 Nos. of
220 KV/70 KN Silicon Rubber Composite Insulators as detailed in Clause (2) below and
covers its manufacture, testing before despatch and delivery FOR destination.
'I'RANSMTSSTON. CORPORATION OF ANDHHA PRADESH LIMITED

CERTIFICATE . Dnte: 06.09.2011

(TO WHOM SO EVER: IT MAY CON"C$.N)


.
This ls to certify thl\t 220KV, 70KN S.~.C lnsulatcrs of Mh Deccan
Enterprises (Pvt) Ltd, Hydenrnbnd were drawn and utlllzed in the following works,
..-
SI. ~
.... ReqNo Quantity Nnme of the Wot'l(
No TLC Stores ,
'
l 09HvlR-1160 61 Nos Gui\ndnla 220KV LILI 220KV SS
- Naraaernopet
2 ' 091MR-l l59 150 Nos Gunndnln 220KV V!S-Tnllnpnlly DC
line (LOT -I)
,. 093Ml793 220KV VTS-TnllnpnllyDC
.3 161 Nos Gajuwaka
. llue (LOT-II)

1
Tot11l: 312 Nos

The petfonnnnceof the above mntednl are fonud satlsfnotot'Y. '

I.

/
-- -- ----------- - ------------ . ----------------------

,1

TRANSMISSION CORPORAIION OF ANDHRA PRADESH LIMITED


.... CERTIFICATE
Date: 07.09.2011

(TO WHOM SO EVER IT MAY CONCERN) ,

This Is to certify that 2:20kV, 70KN S.R,C lnsulntors of M/s, Deccan ~nterprlses Pvt.Ltd,
Hyderabad were drawn In July 2009 and utlllzed In the following worl<s.

PO.No.OMOa7~/0S/Ce/400kV/P&MM/E.2l/F.eEHVT-22/08 Lot4/D,No.l1/08.dt.os.02.2009

--SI.No Req.No QuantlW Tt.C Stores Name of the works


'

1 091MR1232 140 Nos Gunadala 220kV Manubolu SBQ Line

The performance of the above Insulators are found satisfactory,

~
Dlvlslonal Engineer

O&M/400kV

(~!;.~EF E,\~fJH--~:E:;:_~ Nellora


~,... -, - ~~ ~-~ :: .\.- - ,_

A.;:. .~;-~-'-~:/ -, >:~:':.-:.,::,-.-


--- .. - ---------------- ------- ---

TRANSMISSION CORPOR<\TION OF ANDHRA PRADESH LllYllTED

Ctm.TI FICA TE
(TO WHOM SO EYER JT MAY CONCE;RN)
This is to certify thnt !\<f/s.Decc:111 Enterprises (P) Ltd., Hydernbnd have supplied

50 nos 220 KV, 120 KN Silicon Rubner Compcslre lnsulators nnd' 50 nos 220KV 70 KN

c Silicon Rubber Composite iusulntors agnlns] P.O.Nl).CPT OlfT1nilord~1(SRCI/

!)cccnn/RJVl-3325/2007,dt 20.06.2007 for '1'~1for111nncc Trlnls' received on 25.9.2007.

The same were utilized in 220KV LILO line from Loe. No 439 of VSS-GWK to 220(.>3KV

Ganagnvnram port SS. The performance ur the same till to date found to be sntis-factory.

.j\
J
r
,,"y , ~ ... "\,.

/ txECUllVEfo~m~~" 0
n'~C oMSIOH, li.P. TRANSC
IJlS>$liAP>.TNAM
~)

Lr. No EE/ TLC/ VSP/ Tech/ l'.l / D.noGH<<1l/09 Dt 29 .09.09


----------

TR4NSMJSS!ONCORPORATIONOFANPHR1 PRADESH Ll!rLTTED

From To:
The Chief ~;nglneer, Mis. l)eccan ~;nterpri,e!I Pvt. t.td.,
Cuuslrui;liuu, D/58, 59 & 60, A~LJ.
Vldyut &ludha, Prtvate Industrta! lt~tate
Hyd~:rabatl - llh Bt1lam1g1w, Hytle1ahll.d - 51lll o:n_
F:u Nu: 04G-l3317G.37 F.ax Nu. 040-23i7SG99

P.O. No. CPT :;011 Tl'ial Ord.;r/SRCl /Deccan I HM- '3,~ 2.-S 12ll07, J)t. 2.0 .OG. 21lUT

Sub: Supply of2201..v, iOKN and 220KV,120KN.Silicone RubOOI' Ccmposite Insulators required for
I~). KV & n1) K""V TmnRmii;.~ion linc.<i Detailed nrder iK~nci! R c~.,

Re~ L Yoor Lr.N). DEPU1\fKTOl.~L>\.NSC<Y06-07!00liA. D!: 06.01.2007


2. To Li-.No.CPT 301/SRI Tl'inV20071DtccawD.No.50/2007,Dt. 27.02.2007 .
.l Youd x, N0DF.T'T flvfKT(:tr"ri1mnco/06-07iS04!00I,111.0 t.o.:P.007-
4. LO!. Lt.No.CPI &%Trial Order-Deccan 1sRCI 1 D.NtJ. 61!2007, Dt 09.03.07.

J, acti:ng for and on behalf of and by the order and direction of th.; Traesmissicn Corporaaon Of Andhra
Pradesh Limited (hcrein:::fier referred to a.~ '1\PTR;~NSCO') ac~ept your offer, vide references In & 3rd cited,
towards Supply 22J.lKV,70KN and 220KV,UOK.N SUlcoue Rubber {;:1Jmposite Insulntors a.~ ck-tailoo in
Clause (2) below, subject to the tl}NlL~ & conditions set outin 11..!i~ order, This detailed order i"> in c.:iil.tinnatiO!l of
the letter nfTntcnt is.'llled in the reference 4"' cited.

I, SCOPE OF CONTRACT: Thi!! coutract relates to the supply of 220KV 70F..N & 220KV, 120 K:."i
Silicone Rubber C1)ml)f1filt.e Insulators as dctalkd i.u Clause (2) below and cover fheir manutactnre; l.>!'11ng
before di.'IJ)atd1 and d!ivery FOR d.;.mn11tion.

'-----------~-....--- ---- --~- - ---~----- --------- .. -- - -


Thie ($ to oerilry lhal M/$, Deccan E!nterp
havo iiuppllod 3 Nos, 220 KV, 120 KN 3111qone
~Perfonnanoo irauu, iho $amo wera ar6cled
Yeddum1lllar11m line LooaUon No.:23 011 03.0UO
the 1111mo Ull dale found to be 3eU11raotory.
"---------"-"~~

\Tllll I Gt!:ll-.2a!OGU
Emall : 8"1d21ko@gmall.com
OFFICE OF THE EXECUTIVE EN.GINEER ,~u~lt.. ~ at~ifn'fft G1flrw<11
l!ll!OTRICllTf TAANSMls:llON DMSION (10
U.Jl. PbWtrirans!lll"lon CorporaUon Llmltad
-:\JP.-.
j"
. ~m~~>
llORO 111qi '~Ml~llf ?!11'11'Wf Rio
8340,,Shhll llagar, lodira Nagar, J Pt I~ l 'ffl-340 .m.
111!1',
~~GOICI
-m
Luc!<na.v .226,010:
No. ieT)-aJ~TO (II) LI tU:d (II) l( / t).l'lCW~ ~ oat~~ofe>t~ 200;)
Subf'erformancereport 0(220 KV and 132 'f::ll composite Slllcan" n.tbber
lnsulatore.
MIS Decaen Enterprises Private Ltd.
B/581 69 & 60, A&~td. Prlv1tla lnduslflal Estate,
Salanagar, Hadarabad~aoo037 {A.P) India
. Dear Sir,
Klndly refer lo your office lelter no.OElPUMKTl311.JPTcLJOG-10/001dated
210$09 on the above menllonad subject.
In this regard ll fs to.Inform Iha! 3 nos 220 KV compoelta Silicon rubber
Insulators were Installed on ~20 KV Chlnhat-Hardol Roa(l llne at tooatlon no. 4 on ,.
- date 3001-06. Slmllarly 3 nos, 132 KV eompoelte slllcon rubber lnsulalor13 were
lnslalled at loo~llon no. 20 A of 132 KV KhurromnagarNKN Une on date oe-02-08
elnce then both 220 KV & 132 KV lnatJlators have been found working
,aallsfactorlly.

Thanking You,

---
Yours fallhrully

(Kavlnara Singh)
Exeoullve Engineer
CC
1 se,.erc-1, Lucknow
2~ SDO 111111, Lucknow.
-------------------------- -

APTRANSCO LlMITED

From: To:
As$istant Dlvisional Englneer, Tho Divisional Engineer.
EHTL& SS, . TL & SS Dlvlsion,
Plduguralla, Guntur.

Lr No ADE IEHTL&SS'/ l'DGIJF. Perform:1nce lDN0. 202 /11, Dt: 06- 09-11

Sub: EHTL&SS - PDOL - Performance of SRC lnsulatora submitted


= Reg.
Ref:- 1. Memo No: CE/LI/ P&MMIF.21/F,OM00377/0S/ D. No: .
202/2010 Dt:23/l l/2010
2. PO NO: OM-0377/03/CE/400K\'.IP~MMJE21/Fe EHvt/22108/
Lot 4/ D. NO: 11/08, Dt: 05/rt)./2009
3. W3. Deccan Ent.,rprises Private Limited Lr Dt: 06/09/2011
*iii*
Whh refeL:ence3 to tho above, it is to !ubmit that tOO No's 70 KN, 220 KV
SRC ins11Lato1'3 ~upplled by'Mls. Deccan Bnterprises ( DECOSlL) were drawn from
TLC stores/ Gunndolo/V1jnyawada on 1017/2009 vide lssu~ sllpna/e_, fc,})I) r' O\ 'D6 O ".1 -\?..(

The above insulators 'were utilized In 220 KV VTS ~ Tallapalll-


Reniachintela DC lino nnd the performance of tl\e Insulators was found satisfactory,

Thimklng you elr,


Yours fuithfully;
. . . .I~\
.
<!',\~l L
:V~. ~\.~
Page I ~~ f' :
BY REGISTERED POST WITH ACK DUE ~ ,11,'.');-
, TRANSMISSION CORPORATION OF ANDHRA PRADESH LII'4'1TED

From To
The Chief Engineer, . ./} M/ s.Deccan Enterprises,
Construction/400KV, / B/58,59&60,
VIDYUT SOUDHA, Asstd. Private Industrial Estate,
APTRANSCO, Balanagar,
HYDERABAD-500 0082 Hyderabad-500 037(A.P.) India,
Fax No.040- 23323565

P.O. No.OM- O 31-1-/2008/CE/400 KVIP&tvlM/E 21/F.e.EHVT-22/08 /Lot.4/D.No. 11 /08. dt. IS- .1 .09.

Sirs,
J."l.O'i -
Sub: Tender Specification No: e-EHVT-22/2008 Supply of 220 KVnO KN
Silicon Rubber Composite Insulators - Detailed Purchase Order issued - Reg.,

Ref: l.Bid.No.e-EHVT- 22/2008


2. Your offer No.DEPUMK.TG/APTRANSC0/08-09/002, dated: 11-08-08.
3.Your Lr No. DEPLJMKTG/APTR~SC0/08-09/12/20/001, dt.20-12-08.
4. LOI. Lr.No.CE/400KV/P&:MNIIE.2 l/F.e-EHVT-22/08/LOI/Lot-4/
D. No. 229 /08, Dt.30.12.2008.

I, acting for and on behalf of and by the order 'and direction of the Transmission
Corporation Of Andhra Pradesh Limited (hereinafter referred to as 'APTRA.NSCO') accept
your offer cited in reference (2) and your letter dt.20.12.2008 towards Supply of 220 KV/
70 KN Silicon Rubber Composite Insulators as detailed in Clause-(2) below with the terms
& conditions set out in the Specification No.e-EHYT-2212008 and in this order. This detailed
order is in confirmation of the letter of Intent issued in the reference (4 ) cited.
1. SCOPE OF CONTRACT: This contract relates to the supply of 1000 Nos. of
220 KV/70 KN Silicon Rubber Composite Insulators as detailed in Clause (2) below and
covers its manufacture, testing before despatch and delivery FOR destination.
----------------------

'
'I'RANSl\ITSSION. CORPORATION OF AND HUA PRt\DESH LllVITTED

CERTIFICATE .. Dnte: 06.09.2011


(TO WHOM SO EvER IT MAY CONCBltN)
This Is to certify tbnt 220KV, 70KN S.~.C lns11lntors of Mh Deccan
Et\t&rprises (Pvt) Ltd, Hydeambud were drawn nnd utilized In the following works
. ..
SI.
No -
~
~
ReqNo Quantity TLCStotes Nnme
, of the Wotk
1
.. 091iWR-1160 61 Nos Gut\ndala 220KV LILI 220KV SS
Narasarncpet
2 091MR-l 159 150 Nos Ounadala 220KV V'!STnllapn{ly DC
llne(LOT-I)
3 098Ml-793 161 Nos Gajuwnka 220KV VTS-Tallapally DC
' lit}e (LOT-II)

1
Totl\1: 37'.}. Nos

'Ihe performnnco of the abcve mntelial are found satiafaotory. '

. '!.!\~ .
;.
JY''
cr-nr:F E?~Gt~;.J~E:~~ .
(:~~- \~ :-:; T !:: ; . ;-~~--~; '-.~- :. :
l!. :) .., .. , . ~. ~-: . ' .. , .
J -> t ~ ':,; ...... _,,- .r.

.,. ,.:
,1

:rRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED

CERTIFICATE
Datel 07.09.2011

(TO WHOM SO EVER IT MAY CONCERN) ,

This 1$ to certify that 220kV, 70KN s.R,C Insulators of M/s. Deccan Enterprises Pvt.Ltd,
Hyderabad were drawn In July 2009 and utlllzed In the following works.

PO.No.OM0377/0S/CE/400kV/P&MM/E.2'1/F.eEHVT-22/08 Lot-4/0.No,11/08.dt.OS,O:Z.2009

Si.No Req.No O,uantlty TLC Stores J Name of 1he works

l 091MR1232 140 Nos Gunadala 22okv Manubolu- SBQ Une

The performance of the above Insulators are found satisfactory,

~
Dlvlslonal l!nglnaer

O&M/400kV

Nellora
------~--

.:.;-;:~,t~:
.... '.
"j,

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED

ClmTIFlCATE
(TO WHOM SO EYER IT MAY CONCE;RN)
This Is to certify that !\'!/s.Deccnu Enterprises (P) Ltd., Hytlefob11d have sup11lied

SO nos 220 KV, 120 KN Silicon Rubber Compesite lnsulnrors nnd' 50 nos 220KV 70 KN

c Silicon R11bb1:r Composite iusulnfnrs ngnlnst P.O.No.CPT Olffraiforde1/SRCI/

Dee.:nn!RM-3325/2007, dt 20.06.2007 for 'Pt:l'formnn'cc Trlals' reeeived 011.25.9.2007.

The same were utilized in 220KV LII,0 line from Loe. No 439 of VSS-GWK to 220/33KY

Ganngnvnrnm port SS. The perfurmnnce oC the same till to dnte found to be sntis.faehH'}'.

Lr. No EE/ TLC/ VSP/ Tech/ Ji'.I / D.nobH<~)/09 Dt 29 .09.09


RY U::c;J.'>TY.11/W l'OS?' Wffll AC:K nm:

TRANSMJ,Y,~JON CORPORAITON OFAN1WRA PRAJ)ESH LUrllTEJ)

.l<'rnm TO!
Tl1.e Chief ~;ngln"!er, M/s. l)ei:can l!:.nterpri~e;1 Pvt. Ltd.,
Cumslrui:liuu, Df53, 59 & ~. A:i:slJ.
Vldyut Soudha, Prtvate lndu~trlnl F..qtata
Hy!:ler.ahad - 1!2 Hnlanngnr, Hyderabad - SOU 037.
Fax Nu! 040-2331iG3i Fu. No. 040-23i78699

.\
... - P.O. No. CPT HOl /Trial 6n1,,.r1:-;1w1/ Dect'an I J.lM- 3 S 2.S.121.107 Ill 'i O .OC.. 20111 .
~:
Sui>: Supply of220KV, iOKN and 220KV,120KN.Silicon& Rubber Composite In1rolnto111 required for
1;;'1. KV & no f'--:V 1'r:1nRmis.inn linc.'. Dctailc'l order iAAucif. Ree;.,

Rel: 1. 'fonr Lr.No. DEPUMKTG/APTRAMSC()I06-n.7iOOli1\ Dt: 06.01.2007


2. To l.x.No.CPT 801JSRI TrinV2007iDeccoll!D-.No.50/2007, DI. 27.02.2007 .
.1. 'fonr T .r, NnDli.T'f il'vfTCfOi ..\p1ran.~coi06--07iS().4JOOl,Dt.Ol .O.l-W07.
4. LOI. Lr.No.C'PT 801/TrW. Order-Deccan 'SRCT ! D.N11. 61 .I 2007, Dt 09.03.07.

I, a~tit~ fur and on IJ~half 1)f and by th.; order and di.r.;cti011 cf the Transnussion Corperation Of Andhra
Pradesh Limited (hcreiaafter referred to as ';\PTR.-~NSCCT)nc::ept ynur offer, vid~ referencea I" & 3"' cited,
towml.'l' Supply 22'lKV,70KN and 220KY,UOK..l'f Sllkone Rubber .Cmnpusit.-; Insnletors as detslled in
Clause (2) below, sul>iecl t.o ilte ~filL'! & conditions set ontin lbi;i order. This detllied order i"I iu ~)i11il11U11fonof
the letter nf Intent ill.'!lled in the reference 4"' cited.

1. SCOPE OF CONTRACT: This contract relates to llw supply of 220KV 70K.'l-1 & 220KV,120 KN
Silicone Rubber Composlte Insulators ~-q d:!ailed in Clause (2} below and cover 1l1.;i.r manntacture, ~still~
before di11patch and tklivcry FOR (l.;sfiniltiiin.

o,...v~ !
C.E/C0?4S1'P.UCTJON

l\

(-------------;----- - .. ----- --~-- - ------- -- ----- ---

'.
---"--------------------------- -------

--,
.
f > :j}.
Thia Is to oettity lhat M/$, Osecan enteiprts .1, P) Lid., Hyderabad
have 11upplled 3 Nos. 220 KV, 120 KN Sll!Qona It lnull'tllll for
"Pelformanoe Tral111, The eamo we'" arooted o Kt/ GtohlboVdl
Yeddum1111orom llne LocaQon No,23 en 03.0(t.20
lho aame 1111 date round lo be aaU&raototY.
---------------

\'flllt I 0622-23106
Emall: "61d21ko@gmall.com
OFFICE OF THE EXECUTIVE ENGINEER ,\VU~IA ~'611i'ilfli'ffl Gi'~~'<li
ltU!OTfUCllYTJW{SMISSIONDMSION (If) s'l r 1
U.1!. Pbwor7nns(lllH1on CorporaUon Llntllcd V
ft) 'Yo . ~lllWr~~)
130lf0 'lit ~MlfillPf l!IN~U"tf ~o
S:WO,,Sh1kll Higat, Indira Na;ar, Ir 1 l ~I 1"!-m mita ;i1J1, lf.iro. m.
lucl<naw .228.010: ~~QIA

No. ie~8J~l0 (ll) LI ~~.d (ll)lt / Q..")()~"Lw4 bat~~.Sfetf-~ 200 ;:i


Sub-Perfonnance report 0(220 KV eind 132 KV composite SIUcon. rubber
Insulators.
MIS Deccan Enlet'J)rlaes Private Ltd.
13/68, 59 & 60, Aa~td, Prlvata lndustrlal Estate,
E!alanagar, Haderabad-500 037 (A.P) lndla
. Dear81r,
Kindly refer to your otRce. letter no.OE!PUMKTGIUPTCUOS-10/001dated
210909 on the aboVl!l l'J'lenlloned uubJect.
In this regard It rs to.Inform that 3 nos 220 KV composite SlllCQn rubber
lnsul!illora ware lnetalled on 220 KV Chh,hat-Hardol Roa~ Rml at location no. 4 on
.
c

- date 3001~06. S!mllarly 3 no$, 132 KV co'!lposlte slllcon rubber Insulators were
Installed at tocallon no, 20 A of 132 KV Khurramnagar-NKN Une on date oe-02-08
since then both 220 KV & 132 KV Insulators have been round working
,sallsfactorlly.

Thanking You,
Yours rallh(ully
&-'
(Kavlndra Singh)
E:>CeouUve Engineer
cc-
1 SE,.EiCI, Lucknow
2~ SOO 111111, Lucknow.
1J.ECOSIL Flr:clrifyint,~ Fu111re
E>ECCANENTERPRISES LIMITED

list of Performance certificates- PGOL

SI.No. ~iityName Item Desaiption Qty in No's Installation Date Certiflcate No. & Date

Siitone Potfrner Insulators


1 Power Grid Corporation of India Ltd 1068 OEC'2013 N2Ml./ll/PotYMER/2016/687 DT:06101016
400kV/160KN

Silkone Potjmer Insulators


2 Power Grid Corporation of India Ltd 804 Oct'2012 NRl!/TL/7265 DT:0410.2016
400kV/160KN

SHicone Po~mer Insulators . Det'2012


3 Power Grid Corporation of India Ltd 531 NZMG/TI./2016/527 Dtd:27.09.2016
400kV/160KN

Siicone Po~er lnsulators400kV/120KN 122


4 Power Grid Corporation of India ltd May'2010 Ref.No.NRl/BLB/TL!O&M)/ DT:07.071011
Siicone Pot{mer klsulators
170
400kV/160KN

Total Qty in Nos. 2,695

CIN: U52609TG19G6PlC001109
Regd Office:
B58-60, APlE, Balanagar, Hyderabad- 500 ooaz. INDIA.
1i + 9140 2387 0111~+914023718699
f2l info@deccan.in ~ www.deccan.in
4 I C1 x fu~ Cf> Ix q) ~ ~I rt 3ifll> ~ f'5 l:ll ft1 flJ e ~
(._TTl ~R CfJl ~)

POWER GRID CORPORATION OF INDIA LIMITED


(A Government of India Enterprise) qi<Hfll:S

400/200 cfi.m. \JC!"-~. ~ m. tJIN'<cnlccil 148023. ~ fiq'(i)'( (~). ~~ ITT-2


~ : (Cf)f.) 01675-263554, ~ : 263559. E-mail: rhqmalerkotla@yahoo.co.in
400 KV Sub Station, Ludhiana Road, Malerkotla-148 023, Distt. Sangrur (Pb.), NR-2
Phone: (0) 01675-263554, Fax: 263559, E-mail: rhqmalerkotla@yahoo.co.in

~ ~~/Ref. No.N?- .. t\J.,..\.J.h\ PtiL'fMER...\.2-cl <-j C&t- ~ "1 j(f)/Date ... O.f.: .!.O.:.:?..r:/.(, ......

TO WHOMSOEVER IT MAY CONCERN

It is to certify that M/s. Deccan Enterprises limited, Hyderabad have supplied 568 Nos.

of 400KV, 160KN Composite Long Rod Insulators to Powergrid, Malerkotla in the month of

July'2012 and 500 Nos. 400KV, 160KN Composite long Rod Insulators received through

Powergrid, Jalandhar in October'2013 supplied by M/s. Deccan Enterprises Ltd against

Contract Agreement No.CC-CS/168-CC/INS-105~G6/Sub-Pkg-14B/CA/4007 dated


20.12.2011.

The above 1068 Nos. of 400KV, 160KN Composite Long Rod Insulators supplied by M/s.

Deccan Enterprises Limited were installed I commissioned at 4001<V S/C Patiala -


Malerkotla & 400KV S/C Malerkotla - Ludhiana Transmission lines during

December'2013, and found to be performing satisfactory operation till date.

Fo~Power Grid Corporation of India Ltd,

(A.K. Dhawan) .fb.101


Dy. General Manager {
31'.':f: ~ A.K. Dhawan
1
~1. :c<fit\!W'lllJMll:l"W= (tji.,f~-)i~. Gen. Manager I ,J_)
400 1:'.cft.ro::,.;100 K. V.SJS:n
J:'.47-2 Qlll'WJs/NH-11 POWERGRID
lrr'i'" ~11Ylalerko1!;i ! 48023
Pw!r" ~ tilr:.i)lr .:. :).inIUJ' (Pb.
.J'
~ ~ : ilh:, ~ ~di"'{~ ~. ~ tr(ll:I, ;if ~-,'loo,f.., F!'!f : ""'JM~: U~OO~t,, il'ft: ~
Regd. Office: B-9, Kutab Institutional Area, Katwaria Sarai, New Delhi-110016, Tel. 6560121, Fax site: http://www,powergridindla.com
~1::::"'~~

----
.
.

- -~~~

q~
tf1{R m- Cfit-t.tffi~ror 3fftP r;Qln fftme~
PO\VER GRID CORPORATlON ()F INDIA LllVHTED
i.oA iJ;_t~1 M' i.J:H!L~ 1:-'..ulttfitt!I!;
~(HJrnu itr. '1\ . ""'~.cm di th\;r, mur;"F !;\.\iii.ii,;;:.,,," :;;m.~v1 rrhzroJ') ~ro:t~J~ IJl~h 17S 1;;00.'.tiSJSJJ
.il.101220 K\i Subst~tiQn, G.T.Road.. Km~rptir-14~301, Di$H Jalancfll11r (Punjab). TeVFax :.01&1*2781200, 2763613

Date: 04.10.1016

TO WHOMSOVER lT MAY CONCERN

This is to certify that M/s. Deccan Enterprises tlmlted, Hyderabad have supplted 968
Nos. of 400KV, 160KN Composite Long Rod Polymer Insulators at POWEHGHID,
Kartarpur (Jalandhar) on 19.0G.12 & 20.06.2012 against Contract Agreement No.CC-

CS/168-CC/IN5~1053/3/G6/Sub~Pkgl4B/CA/4007 dated 20.12:2011.

The 804 N9s. of 400KV, 160KN Composite LOf'l(:{. (tod lnsulatqrs. were installed I
commissioned at 400kV S/t J~landhar ~ Ludhian~ ! Transmission ~ine during

October ;2012, found to b@ performing satisfuc:fory, operation till date.

1\

For Pow~r Grld Corporatlon of India L\~,


\'

. ( M~!.~~::x;il~~~~*
~""'"''' \\ ,,P',::;.--

tp,,
r.t. M.
]SIHOH
1;~ (~~) l~.t,rm;f}''1 (TL I
~Rri~/f'0\ Vt:fiCR!D
1 .
. I
. ;r~;;:';;;w;r"('.J~:~;rk;:.ir) I
I
i

corlX)rare'omcs; sa~damtnr Plot no ~2. sector '- w, dorgalin -122001.Haryana. Tel-" 2571 roo-119
I
!

Fa:<:,25717601, 2571761- Wah slte: h!ill'fl~NW.QQWar9ridlndla.com I


l
I
I
I
j
.:'".i
~niwadi
s-a'ti&fcact_of.Ol2ftt-atipn_
:"- ,. -- -
till .
- ~-- . --------~----~"-----

Annexure 4 (iii)
ISO Certificates
DNVGL

MANAGEMENT SYSTEM
CERTIFICATE
Certlflcate No; Initial cettificatlon .date: V&lid:
1647-2007-AQ-IND-RvA 15, October, 2001 26, November, 201.5 - 15, September, 2018

This is to certify that the management system of

Deccan Enterprises Limited


Unit - I: Works: Plot No. B - 58, 59 & 60, APIE, Balanagar, Hyderabad - 500 037,
Telangana, India
and the sites as mentioned in the appendix accompanying this certificate

has been found to conform to the Quality Management System standard:


ISO 9001: 2008

This certificate is valid for the following scope:


Design and manufacture of polymer insulators for power applicationsand
Manufacture of rubber & rubber to metal bonded products for railways,
pipe industry and constructionindustry

Place and date: For the issuing office:


Chennal, 27, November, 2015 DNV GL - Business Assurance
ROMA, No. 10, GST Road, Alandur,
Chennal - 600 016, India

~~
MGML SYS.
RvA C 01 1 1

The RvA 1, a signatory to the IAF MLA

lack of fulfilment of conditions as set out in the Certiflcation Acreemenr may render this Certificate invatid,
UND Gl H V,1 l, ?9'.H t\AfH:'f'ff)fH:CHT,NFTHfRi./i.NGS. 'TEL~-Jl
acsutcoce .dr:vq! .ccm
DNVGL

Certificate No: 1647-2007-AQ-IND-RvA


Place and date: Chennai, 27, November, 2015

Appendix to Certificate
Deccan Enterprises Um!ted
Locations included in the certification are as follows:
Site Name Site Address Site Scope
Deccan Enterprises Limited Unit - I: Works: Plot No. B - 58, Design and manufacture of polymer
59 & 60, APIE, Balanagar, insulators for power applications and
Hyderabad - 500 037, Telangana, Manufacture of rubber & rubber to
India metal bonded products for railways,
pipe industry and construction industry
Deccan Enterprises Limited Unit - II: 393 - 396, GIDC, Sava Ii, Manufacture of polymer insulators for
Vadodara - 391 776, Gujarat, power applications
India

Lack of fu~ftlment of conditions as set out in the CertificationAgreement may render this Certificate.invalld.
\)NV Gt ?ViOLSE\\ifG i , '2994 f:l,;\FtE NURt?'CHT, NETHf?Lf<Nf.h i'tt; +3 I
r-
1 ----- -------------- --------------~-- . ------
]

Annexure 4 (iv)
Type Test Report
ELECTRICAL RESEARCH ANO DEVELOPMENT ASSOCIATION
(Accredited by the National Accreditation Board tori(fstlng and Calibration Laboratories, Govt. of tmlla)
ERDA Road, Makarpura Industrial Estate, Vadodara-390 010, India.
EPABX : +91 {0265) 2642942, 2642964, 2642377, 3043128 I 29 I 30 I 31/33
Fax
Certllfcate No. : T-0071
E-mail
Web

TEST REPORT
SHEET NO.: 1 OF 5
NAME & ADDRESS OF CUSTOMER TEST REPORT NO.: RP-1516-049325
DATE : 18/03/2016
M/s. Deccan Enterprises Ltd. CUSTOMER REF. NO.:
B/58,59 & 60, DEL/Design/JL/32
Assisted Private Industrial Estate, DATED : 09/03/2016
Balanagar, Hyderabad - 500 037.
DATE OF SAMPLE DATE OF
Telangana, India.
RECEIPT TESTING
!--------------------- 16/03/2016 18/03/2016
SAMPLE DESCRIPTION SAMPLE IDENTIFICATION
220 kV-120 kN Long Rod Silicon Composite
'\ Insulator Single Tension String with Type : Silicone Composite Insulator
Hardware Insulator Make
Rated Voltage : 220 kV M/s. Deccan Enterprises Ltd.
H.S.V. : 245 kV
Embossing Hardware Make
1) On Hardware : RU M/s. RUL
2) On Insulator
ERDA Sample Code No.:
DECOSIL INDIA 220KV/120KN-T
ERDA-00132782
Project Reference No.:
NIT No.02/PR/BSPTCL/2015
TEST DETAILS TEST SPECIFICATION
1) Dry lightning impulse withstand voltage test IEC: 61109-2008
2) Wet power-frequency test

ENCLOSURES: Drg. No.: 1) OT 340 REV.NO 00


(Hardware Drg. Prepared by: M/s. Deccan Enterprises Ltd.)
2) 1053 REV.NO 03 ,~
TEST WITNESSED BY: ------

NOTE : The above sample was received with RITES Hologram & selected by
Mr. E.Santhana Moorthy, Inspecting engineer, RITES/Southern Region.
REMARKS: As er SHEET NO.: 2 OF 5
\~///
\ '.. KHOPKAR
PREPARED BY CHECKED BY APPROVED BY
f--------------------------------------------1
Note : 1. This report relates only to the particular sample received in good condition for testing at ERDA.
2. This report cannot be reproduced in part under any circumstances.
3. Publication of this report requires prior permission in writing from Director, ERDA.
4. Only the tests asked for by the customer have been carried out
N 5. In case of any dispute, Vadodara will be the exclusive jurisdiction & shall be construed as where
Lf) the cause has arised.
C) icautio . " : ERDA is not responsible for the authenticity of photocopleo or reproduced test reports.
(D L. .---- . __E:._f3,QA rovides su ort to customers for verificatio o e authentici!}'_(_:lf test re orts issued b ERDA.
co
co
...;
w
I-
ELECTRICAL RESEARCH ANO DEVELOPMENT ASSOCIATION
{Accredited by the Nallonal Accredllal!on Board lorTesling and Calibration laboratories, Govt. of India)
ERDA Road, Makarpura lnduslr!a! Estate, vacooara-aso 01 O, India.
EPABX ; +91 (0265) 2642942, 2642964, 2642377, 3043128 J 29130 / 31I33
Cer!J!icate No. : l-0071 Fax : +91 (0265) 2638382
E-mail : erda@erda,org
Web : ht!p:!iwww.erda.org

TEST REPORT NO.: RP-1516-049325 SHEET NO.: 2 OF 5


DATE : 18/03/2016 -----!

Atmospher
ic condition : Dry bulb Temperature : 30.00C
Wet bulb Temperature : 26.00C
Atmospheric Pressure : 756.9 mm of Hg
,,

Sr. Test Conducted


Test Requirement Obtained Results Remarks
No. (Cl.No. & IEC)
>--~-+-~~~~~~~~~~~~~~~~~~~~-~~~~~~- ~~-+----~~~~
(1) Dry lightning Lightning impulse Withstood Conforms
impulse withstand withstand voltage
voltage test value requirement for ( +ve 1047.3 to
both polarity : 1049.7 kVp)
(As per Cl. No.11.1 of 1050 kVp (- ve 1050.2 to
IEC: 61109-2008) 1053.7 kVp)
(No. of shots
applied : (Wave forms
15 +ve polarity & recorded given in
15 -ve polarity) SHEET NO.:
3 OF 5 & 4 OF 5)
(2) Wet power-frequency The test voltage Withstood Conforms
test of 460 kV AC
corrected to ref.
(As per Cl.No.11.1 of atmospheric
IEC: 61109-2008) condition shall be
applied between the
H.V, terminal & earth
for one minute
duration under
artificial rainfall
condition.

PREPARED BY CHECKED BY

(Y)
to
0
(.0
co
co
rl
w
I-
ELECTRICAL RESEARCH AND DEVELOPMENT ASSOCIATION
(Accredited by the Nallonal Accredltetlon Board torTestlng and Calibrallon t.abcratones, Govt. of lndla}
ERDA Road, Makarpura Industrial Estate, Vadodara-390 010, India.
EPABX : +91 2642942, 2642964, 2642377, 3043128 I 29130 / 31I33
Fax : +91 (0265) 2638382
E-mail : erda@erda.org
Web : h!tp:l/www.erda.org

TEST REPORT NO.: RP-1516-049325 SHEET NO.: 3 OF 5


DATE : 18/03/2016

Dry lightning impulse withstand voltage test

Calibration Pulse

~VJr----..,r--~~--..,r--~~~~~~~~--.~--.~--,..~--.
se1< div ~~'Os1dr- -et?r~1-oq-Ms1s :- - - - -:- - - - -:- - - --;- - - - - Chl Chl: 1
I
I
t
t
I
l
t
t
I
I
I
I
l
1
I
I
Up = 643.61 kV
Tl = 1.1273 s
.
---~----~-----r----~-----r-----1 -----r----~-----
I .t t I I I I I

64
I I I
T2 = 49. 790 s
-- L----~-----L----J---- ~-----!-----
f

1 I I l I t
I I I j .I I
I I I I
! I I I

l48 -----r----,- --r----,-----r-----1-----r----~-----


I I l I

'
.
1 I I I
'' l I 1 I

I J
'I I
'I 1

-----~----~-----}-
1 I
-~-----~----~-----f----~-----
I I I
I I I I I
I l I t I

32
I

I
l
-----t------J-----.-
I I
----J-----
I

I
f

I
I I
-----1-----t------1-----
I
I

1
I I I I I o I I
I J I I I I I
I I I I I I I I

-----r----~----
I I I
r- --~-----T----~----
I I I
------,-----
I I

'' '
'
'
'I 'I
16
-----~----J-----L----~-----L
I
I

I
I I

!
J
'

<
_

I I .I I

-----r -- -- "'l--'* -- -,--I - -- -,-- I'

.
I I ~ I
- - -T- -- --1-- - - - - --- -,- -- --

' '
'' '' ''
0 ' '
-1-~-+--~-7-~-7-~-7-~-'-~--!-~~~-+~--'-~--'-~-l '

0 20 40 60 80 [ps]

Comment:
LI RW

(j rS-L_:, L
t- PREPARED BY CHECKED BY
L{)
0
(D
co
co
..-!
w
t-
ELECTRICAL RESEARCH AND DEVELOPMENT ASSOCIATION
{Accred!led by tile Nallonal Accreditation Board forTesling and Callbratlon Laboratories, Govt of India)
ERDA Road, Makarpura Industrial Estate, Vadodara-390 010, India.
EPABX : +91 (0265) 2642942, .2642964, 2642377, 3043128 J 29 I 30 I 31I33
Fax : +91 (0265) 2638382
CertH!cate NC>, : i-0071
E-mail : erda@erda.org
Web : http://www.erda.org

TEST REPORT NO.: RP-1516-049325 SHEET NO.: 4 OF 5


DATE : 18/03/2016

Dry lightning impulse withstand voltage test

[kV] FIRST SHOT


~~0~ ~~F~ --f-~~ ' -r -i-----1-- -- -~--- - 1 0 -~~t-- -[--- Ch1

Chl: 1
600 ---- -----!----~~~--' -!"---~ ----!-:,,--~ : --- Up = 1,0473 MV
-- --y~r--~
: : : : :_,__-+--_!
---- -----i--- - - -f- - - -;~- - --t----1-----~- Tl = 1.2341 s
0 T2 = 50.293 s
~--t---.---r---.----r-~--.--i-----t--i-
0 20 40 60 80 fps]

Comment:
100% LI FW
!----------------------------+--------
~
[kV] LAST SHOT
300k ~~s!piv ~H 1:1 (;)0 MS(s : : : : Chl

600 ~~~: : ::: -~~c~:J:~::r:::c::r:::T--- Chl: 1


Up = 1.0495 MV
---- ---~ ----r----~-----~- --~ :::-:-::-~---~~~
1 I j f~ I I I

Tl = 1.2344 s
0
. . ' T2 = 50.373 s
0 20 40 60 80 [us]

Comment:
100% LI FW
FIRST SHOT

Chl: 1
Up = - 1.0537 MV
Tl = 1.1021 s
T2 = 49.891 s
0 20 40 60 80

Comment:
100% LI FW
=[kcc-VJ-=-------,,,,,,,,,,,,,,,,, ,,, ~
LAST SHOT
0 -[2i~4#~+~~~~==~~-~~,,~~~==+===+:===i::::==:::f===lCh1 I ! ! I

-:- - - - -:- :-
< 0 t l I

-----;-- >
-- - --
t

- - -_-:- o
--~~~
I ' I
Chl: 1
Up= -1.0501 MV
-600
~rn~~:~:t~- ~1:~~:l: :: Tl = 1.0885 s
T2 = 49.968 s
'O 20 40 60 80 [ps]

Comment:
100% LI FW

PREPARED BY CHECKED BY
ELECTRICAL RESEARCH AND DEVELOPMENT ASSOCIATION
(Accredited bylhe National Accreditallon Board for Testing and Ca!lbrallon Laboratories, Govt. of India)
ERDA Road, Makarpura !nduslrial Estate, Vadodara-390 010, lndla.
EPABX : +91 (0265) 2642942, 2642964, 2642377, 3043128 / 29 f 30 ! 31I33
Fax : +91 (0265) 2638382
Certificate Mc. : T.0011
E-mail
Web : http://www.erda.org

TEST REPORT NO.: RP-1516-049325 SHEET NO.: 5 OF 5


DATE : 18/03/2016

PHOTOGRAPH OF TEST SAMPLE

PHOTOGRAPH OF HOLOGRAM

PREPAREDBY CHECKED BY

tj-
LO
0
(D
00
00
rl
w
......
=

I
~ E
5"
E
V) E
-
-" .,,
E
=' - ~."'-
V";
<:::: C-
.,., - ~ cc c.
'""l
~.
r-t
~
C V'
0-
O
~
-....: '.::]
-
"'; 0
0
0
0 6
U'')
c .,..,
e-
~ "
r<

5
,~
L1J
..J
IU
-'--~--

~\ !

_j
l

------------:l--~{-
CPRI

TEST REPORT

Central Power Research Institute


(A Govt. of India Society)
Medipally P.O., Warangal Road,
Hyderabad - 500 098 (INDIA)
CENTRAL POWER RESEARCH INSTITUTE

TEST REPORT
CPRI
Test report number UHV1591617 Dated: 17.08.2016
Name and address of the customer Mis. Deccan Enterprises Ltd.,
B 58, 59 & 60, APIE, Balanagar,
Hyderabad - 500 037, Telangana
Name and address of the manufacturer Insulator:
Mis. Deccan Enterprises Ltd.,
B 58, 59 & 60, APIE, Balanagar,
Hyderabad - 500 037, Telangana
Hardware: Mis. International Transmission Ltd., Mumbai
Particulars of sample tested
Condition of sample on receipt New, Insulators found with signature of
Mr.Nunavath Ravi, Engineer (QA & I), PGCIL
Type Long rod silicone composite insulator
Designation 400 kV Single suspension pilot insulator string consisting of
one number of 120 kN long rod silicone composite insulator
with hardware fittings suitable for triple ACSR snow bird
Conductor
Serial Number Nil
Number of samples tested One
Date(s) of test(s) 10.08.2016 to 12.08.2016
CPRI sample code no(s) UHV16S0277
Particulars of test{s) conducted Test 1: Lightning impulse withstand voltage derived from 50%
Dry lightning impulse flash-over voltage test
Test 2: Switching impulse voltage withstand test (Wet)
Test 3: Power frequency voltage withstand test (Wet)
Standard/ Specification As per IEC 61109: 2008
Sampling plan Not applicable
Customer's requirement Test voltages for tests 2 and 3 indicated by the customer
Deviations if any Nil

Name of the witnessing persons


Customer representatives Mr. P. Sreeram Sunil Varma, Engineer Design
Other than customer's representatives Nil

Test subcontracted with address of the


laboratory : None

Documents constituting this report


(in words)
Number of sheets Four
Number of oscillogram/s Nil
Number of graphs Nil
Number of photos Nil
Number of test circuit diagrams Two
Number of drawings Four

~01~
(D~P~fAJAMANI) (K. A ARAVIND)
'-*"' ~-A r- ~ v
r~d--
(Dr. PRADEEP M. NIRGUDE)
Test Engineers Joint Director

' .. ,. .... ----,.<--- --~----~-~------------------------,., ..... -------------~-------:-----~---~--~-~-~---..--~-------~~-----------~--- -----~-~------

UHV Research Laboratory


iv1i;d1pally P 0 .. iNdr;mqal H19ilway. Hyderabml 500 0%. (India)
Phones t91 (OJ 40-29ll03t:i/'2. 29()01724. 2DB03112. 2Df104fO1. Fax: 040 2011033 l(l
E-mail . t1l1yri@lc;mjjr_1
Sheet 01 of 04
CENTRAL POWER RESEARCH INSTITUTE

CPlll
Test report number : UHV1591617 Dated: 17.08.2016

MOUNTING ARRANGEMENT & TEST CONNECTIONS DURING TEST:


Mounting arrangement: Sample consists of the material as per the fol.lowing.
SI. No. Drawing No. Description Make Remarks

01 1054 400 kV- 120 kN long rod


Rev. No. 04 silicone composite insulator
G 01, M/s. Deccan Enterprises Ltd,
02 Grading ring Sample was
Rev. No. 05 Hyderabad
erected as
03 G 13 per the
Grading ring
Rev. No. 02 drawing
lTL / 400KV I 400 kV Single suspension M/. International
04 SSP /TRIPLE pilot for Triple ACSR Trasnmission Ltd.,
REVOO Snowbird Mumbai

The string was suspended from a cross-arm. Conductor of 6 m length was simulated at the line end of the string.
The clearance of the conductor was 8 m above the ground
Tests 1 & 2: Impulse voltage source connected to one end of the triple conductor simulated at the line end of
the string. Anchor shackle at tower end of the insulator string connected to earth.
Test 3: High voltage AC source connected to one end of the triple conductor simulated at the line end of the
string. Anchor shackle at tower end of the insulator string connected to earth.

AMBIENT CONDITIONS:
Temperature (C) Atmospheric Atmospheric
TEST
Drv Bulb Wet Bulb Pressure (kPa) Correction factor
-
1 31 25 95.86 1.008
2 31 25 96.26 0.962
3 28 24 96.13 0.986
-- ~---

TEST PROCEDURE: As per IEC 61109: 2008

RESULTS & OBSERVATIONS:


Lightning impulse withstand voltage derived from 50% Dry lightning impulse flash-over voltage test
Polarity No. of impulses applied 50% Dry Lightning impulse flashover
Voltage (Uso) kV (Peak)@
""--- --
Positive 20 1759
Negative 20 1913
--- ----

@ These are final values obtained after applying correction factor for atmospheric conditions

The 10% impulse disruptive-discharge voltage U10evaluated from the U50 value using the relationship
U10= Usn(1-1.3cr); the standard deviation'c' of the disruptive discharge considered as o 0.03 =
Thus: - U10= U50/ 1.04
~~ ~*V -} ).V
(or. F>. fAJAMANI) (K. A ARAv1
Test Engineers
-~-----~---------------- -----------------~------ --~--,-~------
--- ------------.------ --
UHV Research Laboratory
Meli1p;1liy PO. Vh1r:rnqal Hi~ihway, Hyrierabad 500 09H. (India)
Phones 191 (OJ 40-2980'.lG22. 29B01724. 2DB031l2. 29804101, Fax: 040 29HO:nln
E-rnail. ui1_1:.1l@~miill Sheet 02 of 04
CENTRAL POWER RESEARCH INSTITUTE

CPRI
Test report number : UHV1591617 Dated: 17.08.2016

Lightning impulse withstand voltage (U10) determined from (Uoo)

Polarity U10 kV {Peak) Remarks

Positive 1692 U10> 1550 kVp Specified


Negative 1840 U10 > 1650 kVp Specified

TEST 2: Switching impulse voltage withstand test (Wet)


Switching impulse voltage
Polarity No. of impulses Test voltaie Remarks
applied kV (peak)
Negative 15 1050 Withstood
Positive 15 1050 Withstood
-------
"
..
@Test voltage was corrected for atmosphenc conditions and corrected voltage was applied.
Resistivity of water used for wet tests: 104 Q-m

TEST 3: Power frequency voltage withstand test (Wet)

Test voltage, kV rms" Duration Remarks

680 One minute Withstood


#Test voltage was corrected for atmospheric conditions and corrected voltage was applied
Resistivity of water used for wet test: 104 Q-m

TEST CIRCUIT DIAGRAMS


Tests 1 & 2:
2

4
1

Legend:

3 1. Impulse voltage generator


2. Impulse voltage divider
3. Digital recorder for measurement
of voltage
4. Test object

UHV Research Laboratory


rvled1p;illy PO V\l;irn11~1al Hinhwny. Hyderabad 500 09H. (India)
Phones. 10! (0) 402~Jf)()'.lbL2. 2~J801724. 29803112. 29804701. Fax 04029B033/H
E mail t1i1\ltl@~QL1.in
Sheet 03 of 04
CENTRAL POWER RESEARCH INSTITUTE

CPU.I
Test report number UHV1591617 Dated: 17.08.2016

Test 3;

50Hz :,
.l : . 2
Legend:
AC
1: HV AC Source
2: Voltage Divider
3: RMS Voltmeter
4: Test Sample

NOTE

a) The test results relate only to the item(s) tested.


b) Publication or reproduction of the report in any form other than by complete set of the whole test report
and in the language written is not permitted without the written consent of CPRI.

c) Any corrections/erasure invalidates the test report.


d)
NABL has accredited this laboratory as per ISO 17025:2005 standard for the tests carried out.
NABL Certificate no T-0098
e) Any anomaly/discrepancy in the test report should be brought to the notice of CPRI within 45 days
from the date of issue

(~~MANI)(K~A~l~:i
Test Engineers

-------- - -----~-~-------- --------


Ul IV Research Laboratory
Med1pally P 0. \Naran9al H151lwmy, Hydmabnd - 500 09H. (India)
Piioncs . 1 9 \ {OJ 40-29B03b22 29801724. 29B03112. 2~JB01 /01. Fax: 040-291.\0:nrn
E-rnail t1hv1J@cprlj11
Sheet 04 of 04
,< v 0 u:-
. I

.,,. r- o-
v,, 00 00
0 +l
'D ;!t ;.!i
0
(')
N r-, '"
,..r,
,...,
,,., '"
N
t') '"

"!Jl'i.LH{l!Jl!{! ~;Y,:-t)::':O.ifl:;'H.'\(.(i.i~?t11! J.iN~W~-.


< (J.i::i :.h 1f;tffF!':i> ~- wux m:1~;~,~~11~:.i~;:.11:e1 ~'HI :;1 n1:JxL:<:(G ~~avr;,: .. 11->.: 11\'
o

~ ~)--
"'
~ \
l ~'~L_
~1 _
~ I I I \

_L i
-I --
I 1\\
~
11
/ )/

0'6TCOZ0 __ J I
I 0'Fi'000-------1
I
~1
. I I

C-" :!~ :c;t ~~~.~ "i ~ 7~.::I~~~ -~t:.;;:r_~~ ~;~~~,.;?,2?;.:,c;= ~~~~~~;]~~: 1 >

~-----
<

.----II--__,

..---ff 98-

r----0'9+0ZI 0----t-1
'----...,,,,.--:::-+--0' 6=FOOZ0------+-'~-u..

' 'G.l1S"35r-l!J'tl3..L'G :...Y.:l:na~OL'\::.:S:.OOJ!IliO!f! 1I:


~m <!CJ: lOX a1r.1'::-Hs "!'/ 1YU~"'3CI!f'OO n L~~!Vi{~.:oo S'l:-0. N! ITT.'-.WWot !\CU Yh.COJ..:
co
l{) {i)

l{) @
,.....
------

I
@
I-
o
z 50 SPHERE
w
_JI!)

a::: I') z
on
1-n :::;:
5
:::)
0
l{)
(I) 0
z t')

Cl
-e-
')
;t; I 0
Woll THK
0
co

(!)
r-,
l{)
co

457

N01E:-
1. ALL DIMENSION IN mm.
2. SPRING WASHER ELECTRO-GALVANISED.
3. ALL FERROUS PARTS HOT-DIP GALVANISED. 7
4. BALL SOCKET SIZE 20mm AS
PER IS-2486 (PART-II). 5
5. UTS OF THE STRlNG 120KN. 4
6. THE VARIOUS FITIINGS AND MODES OF 3
ATIACHMENT SHOWN ARE INDICATIVE
ONLY, AND NOT MANDATORY.
7. STAINLESS STEEL R-CUPS
NO.

DRG. NO. :- ITL/ 400KV /SSP /TRIPLE D TE


,__----~----~------ _11.06.16
DRAWN CHECKED APPROVED REV.
01
RU PESH 19.08. 16
TTTLE:- SCALE
400KV SINGLE SUSPENSION PILOT
N.T.S.
FOR TRIPLE ACSR SNOWBIRD
CENTRAL POWER RESEARCH INSTITUTE

CPRI
TEST REPORT
Test Report Number UHV IT/ 242 Date: 31.10.2012
Name & Address of the Customer M/s. Deccan Enterprises (P) Ltd.,
B- 58, 59 & 60, APIE,
Balanagar, Hyderabad-500 037, India

Name & Address of the Manufacturer 1) Insulators: M/s. Deccan Enterprises (P) Ltd.,
Balanagar, Hyderabad-500 037
2) Hardware: Mis. Krishna Transmissions, Baroda

Particulars of sample tested


Condition of the sample on receipt New
Type Nil
Designation 220 kV, 120 kN, Long Rod Silicone Composite insulator ,Double
tension string with hardware
Serial number Nil
Number of samples tested One
Date(s) of test(s) 26-10-2012 & 29-10-2012
CPRI sample code No(s) UHV12S0297
Particulars of test(s) conducted
1) Dry Lightning impulse withstand voltage from 50% Lightning
impulse flashover voltage test
2) Wet power-frequency voltage withstand test
Standard/specification As per IEC: 61109-2008 & customer's request
Sampling plan Not applicable
Customer's requirement Test voltage for test 2 indicated by the customer
Deviations if any Nil

Name of the witnessing persons


Customer representatives 1) Mr. V. S. N. K Chaitanya
2) Mr. M. V Durga Rao. S
Other than customer's representatives Nil

Test subcontracted with address of


the laboratory None
Documents constituting this report
(in words)
Number of sheets Four
Number of oscillogram/s Nil
Number of graphs Nil
Number of photos Nil
Number of test circuit diagrams Two
Number of drawings One

(Dr. P~E~"~uoE)(i<''~' A~~~~~) (Dr. D. DEVENDRANATH)


Test Engineers Joint Director

UHV Research Laboratory


P.O. Box No.9, Medipally P.O.
Warangal Highway, Hyderabad - 500 098. (India)
Phones: +91 (0) 40-27203622, 27201724, 27203112. 27204701. Fax: 040-27203378
E-mail : uhvr!@cpri.in
CENTRAL POWER RESEARCH INSTITUTE

CPRI

Test Report Number : UHV IT 1242 Date: 31.10.2012

MOUNTING ARRANGEMENT & TEST CONNECTIONS DURING TEST:

Mounting arrangement: The sample was strung in tension mode at outdoor


Reference drawing no. DEPL/220kV/25MM/T/HF/S004

Test connections: HV lead connected to one end of the conductor simulated at the line end of the insulator
string. Ball hook at the tower end of the string connected to earth. The height of the insulator string was 4 m
above the ground.

AMBIENT CONDITIONS:

TEST I Temperature (Degree Celsius) Atmospheric Correction factor applied


Dry Bulb Wet Bulb Pressure in kPa

1 31 25 95.99 1.009
2 29 24 95.73 0.978

TEST PROCEDURE: As per IEC: 61109-2008 & customer's request

RESULTS & OBSERVATIONS:

TEST 1: Dry Lightning impulse withstand voltage from 50% Lightning impulse flashover voltage test

Polarity No. of impulses 50% Dry Lightning impulse flashover voltage


applied
( U so% ) kV (Peak) @

Negative 20 1185

Positive 20 1170
@ These are final values after applying corrections for atmospheric conditions.

U so;,= U 10% I (1-1.3cr); o = 0.03, U 10%= U so%/ 1.04

Lightning impulse withstand voltage (U 10%) determined from (U 50%)

Polarity Lightning impulse withstand voltage, kV (Peak)

Negative
1138
Positive 1124

UHV Research Laboratory


PO. Box No.9, Medipally P.O.
Warangal Highway, Hyderabad - 500 098. (India)
Phones: +91 (0) 40-27203622. 27201724, 27203112. 27204701. Fax: 040-27203378
E-mail : uhvrl(a)cpri.in
CENTRAL POWER RESEARCH INSTITUTE

CPRI

Test Report Number UHV IT/ 242 Date: 31.10.2012

TEST 2: Wet power frequency voltage withstand test

Test voltage, kV rms" Duration Remarks

520 One minute Withstood


@Test voltage was corrected for atmospheric conditions and corrected voltage was applied
Resistivity of water used for wet test: 104 Q-m

NOTE

a) The test results relate only to the item(s) tested.

Publication or reproduction of the test report in any form other than by complete set of the whole test
b)
report and in the language written is not permitted without the written consent of CPRI.

c) Any corrections/ erasure invalidates the test Report


d) NABL has Accredited this laboratory as per ISO 17025:2005 standard for the tests carried out.
Any anomaly/discrepancy in the test report should be brought to the notice of CPRI within 45 days
e)
from the date of issue.

UHV Research Laboratory Sheet 03 of 04


PO. Box No.9, Medipally P.O.
Warangal Highway, Hyderabad - 500 098. (India)
Phones: +91(0)40-27203622. 27201724, 27203112. 27204701. Fax: 040-27203378
E-mail : uhvrl@cori.in
CENTRAL POWER RESEARCH INSTITUTE

CPRI

Test Report Number : UHV IT/ 242 Dated: 31.10.2012

TEST CIRCUIT DIAGRAMS

Test1:, ,

Legend:
1. Impulse voltage generator
2. Impulse voltage divider
3. Digital recorder for measurement of voltage
4. Test object
V. Voltage

Test 2:
Legend:

SO Hz
AC 1: AC Transformer

2: Voltage Divider

3: Test Sample

4 4: RMS Voltmeter

~~~ \--*v
Test Errgtleers

UHV Research Laboratory


P.O. Box No.9, Medipally P.O.
Warangal Highway, Hyderabad - 500 098. (India)
Sheet 04 of 04
Phones: +91(0)40-27203622. 27201724, 27203112. 27204701. Fax: 040-27203378
E-mail : uhvrl@cpri.in
>(' I(
ec. !!II.
I>. I>.
~e
E E E 21; (I;
E E E - -
Ill 0 0
,.. 0 Ill
~ ~ ::! ~
..
0
IOOINN
0 ID

II II II II II II II II

.....
.
"'E
~
0
~ ~ 0 N
N N 111 111'
II II II II

E E E E E
E E E E E E
111 E
" 0 Ill CIO Ill Ill

.
"N

....
"
.. "0 N
..
Q
& & &
~ ~
NI'!
Q Q
TEST REPORT

STRI Project no.


84922

Title of the report 5000 h multiple stress test in accordance with IEC 61109 with test procedure in
accordance with IEC 62217 and IEC/TR 62730 on two polymer insulators

Customer Deccan Enterprises Limited


Balanagar, Hyderabad, India

Test object Two polymer insulators

Test period 14 March 2013- 28 October 2013

Tests 5000 h Tracking and erosion test at 15.0 kV, 50 Hz, with humidification,
heating to 50C, rain, simulated solar radiation and salt fog.

Standards/ IEC 62217 Annex B (2012-09), IEC 61109 (2008-05), IEC/TR 62730 (2012-03)
Specifications

Test result The test object fulfilled the requirements in accordance with the standards.

Ludvika 10 December 2013

STRIAB

Dan Windmar
Laboratory Manager
This report may not be reproduced other than in full, except with the prior written approval of STRI AB.

STRIAB Business address: Vat No. 556 01


Box 707 l.yviksvaqen 8 Phone +46 240 - 795 00
SE-771 80 LUDVIKA. Sweden 771 31 LUDVIKA Fax +46 240-150 29
vmw.stri.se info@stri.se
T13-2204
Rev. I
Page2(10)

Table of Contents
Front Page 1
Table of Contents 2
1 Test object 3
2 Test. 3
2.1 Test conditions 3
2.2 Test cycle 3
2.3 Set-up in the test chamber .4
3 Test results 5
4 Dimension drawing 6
5 Photographs of the test objects before the tracking and erosion test.. 7
5.1 Test object A 7
5.2 Test object 8 8
6 Photographs of the test objects after the tracking and erosion test.. 9
6.1 Test object A 9
6.2 Test object B 10

Revision 1:
Page 1: Customer name corrected.

Previous test report distributed 2013-11-20.


fJECOSIL Elenrifying Futur
DECCAN ENTERPRISES LIMITED

Guaranteed Technical Particulars -220kv-120kn/160kn Long Rod Composite Insulator


120 kN COO'C)OSite 160 kN Colll)OSlte 120kH~ile 160 ktt Coflll0$i!e
SI. Description Unit ong Rod Insulator (As ong Rod Insulator ong Rod rnsulator ong Rod Insulator
per Tech. Spec.) As per Tech. SJ)e(.) ~ffered Offered
)lerua Enteip(6es liTited, Oeo:3n Enterpttes
I tlame & Mlress of Manufacturer 1000 inlf'fiInda
2 1Veght cf si1Qi'! unl Kg 7.5 13.2
20 mm as per !EC 20 mm as per IEC 20 mm as per !EC 20 mm as per !EC
3 Slze art! Desi;)rati)n Qf Bal & 5octet a~~ mm
60120/1$:2486 (Partll) 60120/15:2486 (Partll) 60120/15:2486 (Pa1H!) 60120/15:2486 (Part-If)
4 ore dilmeter nm 2Srrm 32mm
5 Tcmoc.e oo cae Di31n tter +mm As per IEC-61109 As !)?( IEC..51109
6 r1oo11ia1 mJh (lnsooron Spacng) nYll 2320 2890
7 T cmncc oo Nomnal l?l>;Jth +mm As per IEC-61109 As ~r IEC..51109
B Dry Altfl'J d&aoce nm 1990 2506
9 Number of~ tlos. -
"O~ AerufynarntFl'!fi! 'Opffi Ae!trlynami: ProtE
10 SIX)(Js profu (l)lJe)
llthoot air,' ~ rbi' lltint any imer rtJs'
Aenxfyoamt Aer<Xlynamt

11 Shed sp3Ch,J mm As per IEC-60815 As per IEC-0015 IEC-60615 JEC-0015


12 Sheds profiJ (~ilr{Atematn;J) Al:emate Shed l)dl! Alemate SOOd ~ Alemate At111ate
13 Shed d8meter mm
14 r<nanre 00 sled dilmeter +mm As i:er IEC-61109 As per IEC-61109
15 ~1ilinurn Cieej:I]~ dttanre mm 5040 5355 5040 5355
16 rrrerance 00 Qa;page dttaoce mm As per IEC-61109 As~ IEC-61109
17 IG1.11ra<tml me:tllni:ai strength m 120 160 120 160
18 Jtootiie 111Erll<lnt:al bed '1i ro 80

19 "'atalll

GJSS Ftre Rcilfmed (FRP Gl3ss Fm Reilfoo:C'd (fRP


0)FRPRcd rm) efXll.Y resn r00 of hiji Resh lloo:led
rOO) ep:ixy resi'I red cl ~gh
ROO
fllre ~ Resh &002d Flxe Gess
ROO
s\refqtl1 ~
b) We.ather S11 dds11th% cootelrtS of st:oo Mi1. 30% Mil.JO% Mil.30% Mi1.30%

Sl::ooe Rutre (v.tll tfgh sti:ne Rllltier (11th liyh


) Housi'g KTV stone Rti:iber HTV stooe Rutre
tffilperature Vllti!nE.llbn) t~e Yul:aoizatm)

ii) fnd Fltiigs


Ma~~Castron
sphen)Cat gra~te or
Mal?.abe Cast ron spherooal
gra,:ilte QI' Fa9!(I Seel
fQ(gOO steel Hot op
Galiarizcd
f<XgOO Slee!
Gal.ianlled
'*'* op
Forge!~
~) Grad'Jr,J RiJ,JS Allrnili.Jm Ab( Allmhirn~
20 Mnirun thtl:ness cf shealll 001erh;i (]let tre are mm Mil. 3 rrm Mit3mm Mi1.3mm Mi1.3mm
21 PirtY of zoc used for g.}l{an~m am ftthgs % 9'3.95% 99.95% 99.95% 9'3.95%
11mh!r of dts Yili:h the ID! fttilgS ran v.thstaro i1 6 su:cess!le dili each llsti1g 6 soxessi{e dts ea:ll 6 sooessile er~ eacti
22
istartlard preece test ~. 6 sucteSSile <ff,; eadl
astm rcnioe ( 1) Miltte foc one (1) Milute llsthg foc one(!) Mnute estilg (!)'one (1) Mhule
~ test refX)rt of aa;eB<lted ageiYJ test cf 5000 Yes{No Yes
23 Yes/l'J.J Yi!S
'100fS (encbsed) (AwzrdH of JEC-61109)
2~ llravklg eri:twJ Yes/M-0 YesjNo Yes Yes

CIN: U52609TG19661'1.C001109
Regd Office:
B58-00, APIE, Balanagar, Hyderabad- 5000037, INOlA.
!i' t 9140 23870111~+9140 2377 8699
B info@deccan.in fl) www.deccan.in
J\Ll l'-Jft.~MAT{O~J CDN'TAC'IWlN nus DvCU.\.IF}ffIS CO.'lflUtNTIAt. .t SltoULDNOf usrn
WlfH(JtiT PiWrfRCO;o.'Sc-ITOf D[((,\N f~TF-RPltlSE.S Lrn_
BE
>

,_ r ------
w 1-------r;-------l

0 0

:::: rn (/l
::: ::r:0 0 Q r 0 :r: mr
v.i

" 0i:i." nm ~.c -< "O.," ~g ...3 o'O':T m


"O
"g 0."':! s
:.:i
(~ ('I 0
o
g. 2.. ~ ::i:> "' ci5(l"'e- ~ 5 sc Ul~ ;:r::I-I
G
(IQ
,...,
0 (JO
zn
z 0 ....
I~
rr
~
'<
s-0 ~ .... :::>
0 3
;;; !a. 't:I
0. <>
-e "'c; o
" n >r
" g ~ ;;; t: 0
3
~ ~ ~ > "
o:i :!'
:::> r !! " 0 ...," <
" ga. ::. n 0 O"" :!'
;;;- ;:; "
0
0
n
" .ns ::i::> m
:::;>
Q r! ::i: 0 ~ ~ V>
.0 (JO -I
):> -:::: ! ~
(/)
0
0
0
~
r. 'ii) g
s:::> "s c ~ o
C) ;:;
!t ~ C)
0.
-e '< 3 n :i::
~ n
1l 0 [:: -I
m a 0
s
:!' -i
m ....2
2m r:
...
;:r::I ..,"'"'
(JQ
f'
~
i'
:.:i
... ol=>
;:r::I

~
~ (/)
-I
....
n
(/)
ci5
"'
iv
0
"O
c,
;:;; o<
~
QO
~ r-
n
(/)
,,
l=>
<.>

0
"' "0
.;:;: u.
~
:3, :r:
N
....
::::
~
gl
olg
-1>-.>i- N w .j>. N > ""
"'!"'
w N "'w CJ c- .j>.
t..> ~I
Q
0
Q
0
0 rw r
N
r
- o 0"'
' v. "'
0
0 '.J>
~
w N ~
~ 3 3 r. I" "'<"
...- -
3 3
-.... 0-
0
..,.,
"'3 v.
v.
N
cc
<o
z 13 3 ~. ~ ~i~
"'3 0 "O 3
3 3 3 3 'O
2 ~
3 3 3 3
"'3 0
-.'.'.'..
J
:.r: I o "'1 m > ~
"
()
Al.L INFORMATION CONTAINRO IN nns DOCUMENT lS COttf'lDBNTlAL&.SHOULD NOT DBUSED IF IN DOUBT ASK
WllllOUf PROPER C{)Njf!NT OP DECCAN EN'reRPR.lSBS cm.

i------ c ---~- r------- ~ ------1

~
__,
~
-~
~
00

00
~
~r z~
a. a ~l ~i.
~....,
()
z"' - "' .... .j>.
u.
RI>
'
!Hi lta: S' 9
"' o-g
-
t:l
!!
()
iqi
t:l
.z ~
p
tr1
"' l;'
o
8'
~ ~g; ~ "'
RI> "'
'd
~ $:;.
ti)

.f.
e.Et Elg: g_ !1ft
0

. .
~ c.
t::h
C'.1 0 ii g. t::h ~
t:i ~ Ir er
C.l)Q
0
"'"' "'
t:l g' [ f.ilf;l
3: ~ c ~ m ,..m
~
8
(/} Ul
[
~ !~
l !!
"'() 'O
.j>."' Cl>
g a. m 0fjl ~ ~
o
~ .~
Cl t11
"o
"'- N
~ ~ 'T1
g: 5i
... 0
l:l
n
:c 6' ~ ~ l n
...
I~
OQ
0
..... p.. !'!!. )lo 6' OQ

... i ,..
t"" z !2 $.
e: !2 ff ... ~
OQ
..., !@ s-n ~ ~ g
I i I i-
n
""
r n
)I:> 'tc ~
5
"'
~ ~ ~-~ t=:
~;; s gn
::t:"'1
0 0
-.;;:
.a-!!.
,.., !"' ; [ ~ ~ >[ ,..
... ~ <
f.
~--- Si [ g;; g [ g.' n O"
"
lff > n

l
!!l.
5 " '!"' ~ ~fl- fl-
~ :c -I
~ [[ ~ -c w [ ~ " 0 0 ~ r- :c ~ .g m
;:; :a 0
0
"' ~@) ~
!"
p
"'ill
:>'"
0
c.
c.
!f 1- ~
fis~gsft
~th>C~'"'t~
(/l>Cp..
g
'O;
a
Ul 0
0
~ fe:
~ (/l
>
~
'-'
"l:l ~
0

0
~ n :c
... z....
n
;:;
"'
s ll
0
""+ !:l a
c
~1
,...0 ~ m
::0 ~~
"O
;o
iii
0-!
a ~cl:,;
'-' v. !:!!~
...
~ "'
m e ~ n
:i:~
I""
m
0
c,
z
(1) ~
~m '-' ~ s ...... r-
(I) )>
;;;
G)
z
o_
"' 11o1
llJ
0
c
m
n
n
)lo
m
0
:-:!
-! zp fla l>;J;l
tTl g g
(') p. p..
~VIA
!):
til
(') .
...!!I
n
(I)
ell
~
0
'O
0
<
0
i;t"
OQ
n ,,
(I)
)>
-
w

n~ z :;~~ ;;_Ei' "' v,"

:;
~
w
~ ~~
u o ...
.,,o
3: llJ
0;11; ljl
Ill
~6 ~
z l"i ~~
m
z
...
\000

. ~ ~
OIJQ

~~

.....,
~ ~
~
~
....~
n
c:
~
:;

:!z;:: s: ~ :;:; v.
v.
N
0 N N
w
N
00 :; ~ N
~
0 N ~ v. 0 "'"
v.
z G) Ill
m !Si !Si t"'
t:1 w t"'
N t: 0 '
0 o 0 (I)
Ill ;Ill Ill w 8
--
N
c:o c:;
-- I ""~ ~
i
?'
o.,,~ !j;o N N ~ ~
...... ..,. ~ w w

l I
3: w
~ 00

i cil!l
0 N

u.

~
;Ill i:;
n
0
m
c ~ ~ ~ ~ ~i ~
zm
Cl () ti)
MACLEAN POWER
SYSTEMS
MACLEAN POWER, L.L.C.
A Maclean-Fogg Company

Manufacturer'sAuthorization

Date: 05'1' January 2017

ICB No.: ICB-PMD-MCTLP-016/17-01

To:
Attention: Mr. Chirantan Bikram Rana
Marsyangdi Corridor 220 kV Transmission Line Project
Project Management Directorate
Street Address: Satungal - Bauthali Chowk Marga, Matatirtha Substation
Chandragiri Municipality, Ward No. 11
Floor/Room number: 2nd Floor
City: Kathmandu
ZIP Code: NA
Country: Nepal

WHEREAS

We Maclean Power LLC, who are official manufacturers or agent authorized by the manufacturer of
Composite Long t>d Insulator having factories at Guangzhou, China, do hereby authorize M/s Larsen &
Toubro Limited, lri'dia to submit a bid the purpose of which is to provide the following goods, manufactured
by us fomposite Long Rod Insulator, and to subsequently negotiate and sign the Contract.

We hereby extend o r full guarantee warranty in accordance with Clause 27 of the General Conditions
of Contract, with r e to th good o ered by tJ1e above firm.

Na me: Alan Beckman

Tit I e: Contract AdministrationSpecialist

Duly authorized to sign this Authorization on behalf of: Maclean Power LLC

Dated on 2nd day of December, 2016

481 MUNN RD SUITE 300 FORT MILL, SC 29715 U.SA TELEPHONE 803-628-4300 FAX 803-396-8601
.. I

Annexure 4 (i)
Manufacturing Experience
.....
N
....
co ;;; .....
;;; <'>
u
<') <')

~ N ~ N
ll)
N
IO
N
IO
N
IO
l'!
c:
0
l8
i-..
co
-e--
0)
"f'
0
0
;;;
s..... 0
0
;x;
s..... 0
0
;x;
0 6 ;,; ,;, "? "?
N C) N
C)
N
d>
N
0)
N
0,
N
0 0 0 0 0 0 0

uc: g c: uc: c:: ti fi ti


c: c: c: c: tic: -5c
E E E e
CJ
e
co
E
co
!.'!
CD
E
co rD"' E [I)E
[I)
OJ co OJ
c: c: c: c: ~ >. >.
c::
c:: c: (ii
c: c:
s 0 0
u_g ""'2
0 0 0
~u "' l'D

t~
0 0 c.
di ;;; ;;; ts ~ 'fl u E
0.
E
0.
E
.E"' th
.E .E VJ 2 ..,
2 2
-;;; ..,c:
~
~c: ~c:
0
(.) 8 0
(..)
c
$
!/) <I)
c
s "' c:0
c::
$ o:g
"' s
o o"'
c::
0 "'c:
0
(.)
c:
0
(,)
0
o 8 0
(.)
0
(.)
s:
u
c:
s:
u
c:
s:
o
c:
s:
u
c:
c: .r:
u
c:
-0
'C
CJ
"O
c:
<.?
"O
c:
C)
:g "O "O "O :g s 5 -0 :g E E !.'! E E
>
:c
w ~ >
UJ
:c o
w
C) ~
c:
(!) l'5 CD C) (!)
OJ co
a; :!!!
CD
iii
co
iii
~
iii
co
(ij ~ a..~ !
a.
I ! c: ;::: ;::: c: c: 0.
~ 0..~0 0..~0 ~
>.
:' c: ~ a..~ !!! ,Si $ J!l .2! i:i:5::8:9
*
"O
"'
0.
<O
.o.
E >.
0..
,.., CL n, ll. "'
~ :::;:"' :::;: ~"' "'
:::;: ~"',.., w w w -' ,..,c: ci -'ci ::::;ci
o
o ~ 0 c ~ :' c: c:>. >.
c:
>.
c:
>.
c: >.
c:
c-,
c: ~ >.
c: ~ c:
"O
0
:g
0
:g
"'E "'E "'c.E "'E "'c.E
o, o, 0. "'
c.
E
"'E "'E
0. 0.
"'0. "'a. "'c, ~ "'Ec. "'a.E "'E' u:g u:g u:g
8 C) o 8 8 0
(.)
0
u 8 8 0
(,) 8
E
0 0
E
0
E E
0 0 0 8 C) (!) (!)
o o o u u u a;
~
~
0
0..
ee
~0
CL
~
0.. J ~0
0..
!
a.. ~
~0
0..
! ! !
0.. ll. a. !
n,
i0
a..
! ! !
a.. a, a..
!
a.
~0 ~0
ll.
a.
!
0..
3::
0
a.
c:
:;:: E E o
c .g <.)
;:::
<.) o
'C
o
c:
u
;::: 0
;::: <.) u 0 0 u .g "' :;:"'c: :;:"'c:
.5
o
(I)
1! 0Q) 0Q) 13 i t) u u tl
c: ;:::
u ts '.tl u
c .c:
~ :5 w m _gi _gi
w
Q) Q)
.!E Q)
.!E ~
tl (.) (.) (.)
w w w w w Q)
"' ITi"' w
iiJ w .!E
j cJ5
"'
0
U)
"' ;;:"' ;;:"' .!.!!x ;"';:
;;: ;c ;;:
w
~ ;;: -~
w
~
t:: .5 "'
c: 0) 0) 0) c: c: c:
z
0 s:
u
:;:
0 z' z'c: zc: zc zc::
c:
"' so"'
s:
V)
.r: "'
s:
V)
"'
.r:
(/)
"'
.r:
V) "'
.c:
Cl)

5
~ co co co co co co co co
... 0
C:
0
C:
0
c::J 9c: 0
t; t;
0 0
co
0
co
0 0 co
0
co
0
co
0
gc: ::>
7 ...,
::>
7 -,::> 0 0
t; t;
0 0
t;
0 0
b
Q) 0.
<I)
'1
.(1
<1)
a.
Q)

0
0
-e-
6
..... 0..... 6..... 6
..... 6
..... 6
..... 6
..... 6
..... 6
..... ...............U( er;
0

N N
C)
..... "'
IO
N
i-.. 0
.....
0
"'

<(

0
0 ~
0
0
.....
0
..... 0
0
0
0
0
0
0
g 0
0
.....
0
N
0
0
0
0
0 0 0
0
0
~ .....
a
N 0
0
0
co
ll) +1
0
ll)
23
ll)
<'>
0
ll)
~
ll)
g 25 IO
0
ll)
0
ll)
a
ll)
0
ll)
~
ll)
::t
0
ll)
..... ll)
0
ll)
0
ll)
!';-
.....
~
ro ~
s:ro s:ro
i-.. i-.. i-..

~
i-..

~
i-.. i-..
?:CD ?:CD
i-..

~ ~
i-.. i-..

~
i-..
?:CD
i-..
?:co ?:ID
i-..

x x
u.. u..
x x x
u.. u.. u..
x
u..
x
u..
x
u..
x x
u.. u..
x ~
tL
x tLx ~
tL
x
lL
~
x ~
tL tL

~ > > ~ >


g g""' ""
0 0
co co g
0
co
.>
0
IO
~
.,.,
0
>
-"'
0
ll)
>
.><
0
IO
>
""'
0
ll)
...
>
0
ll)
>
.><
0
+I +I + +! i-.. i-.. i-.. i-.. ..... ..... "'.....
....
"'
>-"'
"'0
0
N
ll)
0
0
N
co
0
0
N
c:o
8
N
co
0
0
N
co
8
N
8
N
8
N
co co
g
N
~
0
N
co
0
0
N
co
8
N
8
N
8
N
co co co
0
0
N
co
0
0
N
co
0
0
N
co
8 8
co co
0
0
co
8 g
co co
0
0
co
8
co
0
0
co
0
0
co
0
0
co
0
0
co
0
0
N N N N N N N N N N N N
O> 0) O> O> O> O> O> O> 0)
<D
0
t-
8
.....
ID
0
..... ....0 8
8 ....0
<D
0
r-,
<O
0
.....
<D
0
r-,
tO
,__
0 "'r-,
8
O>
<O
0
O>
<D
0
O>

8
..... 8
,__
0) 0)

8
.....
0)
tO
R
0)
<D
0
.....
O>
8
o l'- r-, .....
~0 l'-"' "'
0 0
"'t? ...."' u
0 0
.... "'~
ll')
0 0
u
0 0 0 .,.,
0
~ 0 .,.,.....
0 0 0

o <O
a, "i'
.....
"'a,
r-,
<O
"'
r-,
' GO
,__
<O "'.....eo ll')
!'-
co
ll')
.....
ec
,__
co
!'-
ec
ll')
.....
co
ll')
.....
co
:e
a, %
CX)
O> cD 0, d, d, d> a, d> a, a,
N N
O>
N N N N N N N N N N N N
d> cD ch
0 0 0 0 0 0 0 0 N N N N
0 0 0 0 0 0 0 0 0 0

co eo eo
0 0 9
6.
(I)
a.
(I)
a.
a;
..... "1
CJ(
~ "1
~

0
co
0
N
N
-e--
0
O>
eo
~
0 .,.,
N <D
.....
N N

0 0 0 0 0 0 0
0 0 0 0
..... 0 0 0 0 ..... e--
;;:;
0
;;:;
0 0 0 0

g
.....
0
IC)
.....
0
N N
.,., ~.,., ~.,.,
N

~
N

~ s.....
l()
N
0 0
ll')
0
0
~
0
0

a.....
0
!:?
0
0
(')

0
";- r-, .....
l() l()
..... '";-
(')
r-,
c?
l()
r-,
ll')
.....
l()
'
.....
l()
j-,

~
m ~ ~ ~ ~ ~ ~ ~ $ :;; ~ ~ ~ ~
x
CD
x
CD CD CD
x x x
CD
x CD
x x
(D (D
x
CD
x
(D
x CD
x ~ CD CD
LL LL LL LL LL LL LL LL u, u, LL u,
x
LL
x LL
u,
x
> > > > > >
-"' -"'
0
IC) .,.,
0
.....
-"'
0
l()
-"a 0
l()
g
r-, ..... '..... ..... .....
"' N"'"' """" "" "' "' "' "'
IO ,.._ ,.._ <D <D <D N N
-
i-~.
<O N N N N N N I() I() co
I()
N
:?l N0 N0 N0 N"' "'
1() 10 M 0 0 <O <O <O 0) O> O> O> O> O> O> 0)
"'0 -e-
;; "';; "'
0 0"' 0<D c:::; <D
<D
<D
~
<D
<D

-
N l.O 0 0
t;
sc "' Ir)
"' 0 0 0 0 0"' .....00"' 00"'
Ir) M
<O "'
<O N N
0
N
N
N
N
N
N N N N N
"'"' 0 0 ,.._
0

-
0 0 <O 0) 0)
N N N N N <D <O <P <D
<O <D r-,
0 0)

...co
0) 0) 0
c;; ..... ....
0 0 0
0 ;b <D
0 0 0 0 N N NN N N N 0 0
0 a; ;o co :;; c;; ;;;
"? "?
O> N
r-!-
<D
N
r-!-
"'c:b c:b"'
<O <O
(')
co
c:b
0 0 0
a; c;; .....
0 0
.,... c;; 0-e-
"i' co
0 0
<O <O a; a; <O a; ,...co"'
0 a, a, ch 0, a, d,
0 <O <O
a, a, .;, 0"" 0
(') (') (") (") (') (")
' )- ~
d,
"' d,

l~ '
<D (') (')
O> (')
6 0 6
N
0
N
C)
N N N N
O>
N N (')
..... 0) 0)
"" "'
0) 0) O> N N
"' '
N
O>
N N N N N
"' N N N
6
N
6
N [/
0)
N
lpITr"'
0 C) 0 0 0 C) 0 C) 0 0 0 0 0 0 0 0 C) 0 0 0 0 0 0 0 0 0 0

{ ~~
\.l g ~

c:
>.
c:"" c: c
c:
>. >. 1~.i, 1;l!
: !;: '
""E "'E ""E "'E E"'
Q. Q. 0.

0
0.

0
0.

0 .......
0
o
0
o (.) o 0
c: c c c: c: f! ~
0
;;;
0
q; .,
0
;;; .2 0
;;; CD
c: c:
.E"' .!'IE .E"' E"' .E.,"' ~ 0
'iii
"' c"' "'ce c"'e c:e!
fJ)
.!'I
>.
c c: .E E
.s:
o
c:
{i
c
s:
0
c:
c: s:
0
t:
s:
0
c:
sc: s:
0
c "'E ~>"' >~"' f-> f- f->
0.
33..J ~ :E..J
"' "'c:e!
c

e
>.
c: 05"' co
e f!
[Q
~
al m
f!
05"' 05"' m
aJ 0
o ::i:
1.U
J:
UJ
::i:
UJ
~
UJ
::i:
UJ
-0
:::i :E
..J
'O
:::i
-0
::i f!. f-
"'a. 'iii a; (ii a; 'iii "iii co e c c 5 5 's 0 0 0 0 0 0
> >
:r::
J3l'O ~ 0 ::i:
"'er "' "' .,c
E "C "C c: c: c: 1:: 0 <II .c .c s: o 0 0 o o 0 0 UJw
0
2 saJ $ (I) (I)
~aJ 'iii :l :l

*
:; $
fl)
o
Ol ::? ~"' "' >."' :: ::
:::'! :ii ::;:
<O Oi "'E s ;:;,
;=;
c
"'
c:
.l'2
.!J!
'iii
~
'iii 'iii
c
a;
c:
'iii
c: 'iii
2
co
c:
>.
c:
>.
c !i 'O
:::; J:i
.E c:
-~ >. >.
>.
c: >-
>.
>-
:!
>.
"'
c:
=;
>. >.
i= f- f-
>- >- >. >- 'iii ~ 2111 (I)
'iii
2 2 "'E "'E
Q. Q.
...J
. ...J

l!
c c: c c: c:
c: c: c: c:
>.
c:
>.
c:
>.
c: c: c: c: c:
>.
""a. "'c:c. c:
c: c:
>. >.
~ "'
:!: ::;< ~
111
::1:
aJ
""
:: :: 0 0 0 0 0
<I)
.5 "'E "'E "'E E "'E "'E "'E
a. a.
0. "' a. 0. 0.. 0.
aJ
c. ~ aJ
a. "'a. "'E "'c.E
Q. "'a. "'0. "' a.
111
a. "'E E "' a."'E Ea."'
a. 0 (.)
" 0 0 0 .g (.) (.)
(.) (.)
:g :g
0

.
fl) c:
E E E E E E E E
i::; c: c: c: 'O
Ol Cii ~ 'O 'O c:
0
w
c: 0
(.)
0
(.)
0
(.) u
0
0
0 0
(.)
0
(.) 0
0
~
0
u 0
0 0
(.)
0
(.)
0
(.)
0
(.)
0
(.)
0
(.)
0
(.) u
0 0
(.)
0 0 (l)
t)
<I)
t) t)
(l)
t)
(I) ., ti.,
t) c
C)
c:
C)
C) C) C)
0 ()
w w w w w w w a; a;
'fd' ~0 ~
Q;
;~ I li;
~ 0~ ~ 0~
li; a.
0 ~0 ~0
'-
(I)
3: ~ ~ ~ 0~ ~
li;
~0 ~0
Q;
3:
c: c: c: c: c: c: c: 3: ~ ~
Cii
3:
QI
>
0..fl..
0
fl..
0
!l.. fl.. fl.. a. fl.. fl..
c:
.,
t) (L 0..
0
a. a. a.
0 0 ~
a. fl.. fl..
0
0..
~
Cl.. 0.. a.
0
Cl..
"'c '5c:"' '5"'c .!J!'Oc :0"'c: :0"'c: :0"'c fl..~ D..0 0.1110 fl..0111
:0
0
fl..
aJ
0 0 0 0 c c
0
.a 1::
~Cl "
1::
0
c:
i'i ~t5
c: 0
1::
0
fl
0
c: w 0
c:
0
" c:tl0 c:t;0 ctl0 0 ei30 c:t) .2u .213 (.) 0
c:
0
_c: z"' z"' z"" z"' z"' z' z"' .ca; Q; :cc .E .5
l'O i3
Cl
t)
El
t>
(I) (l)
i3
El ~
t)
El c
u
O> ~ ~ ., ~ w
.!:;;
tl<!) t) Ol O> O> O> Ol Ol .c
g> '5 '5 -:;;
.c
(.)
.., ..,
(.)
.c:
(.)

-
(I) (l) (I) (I) <!) <!)
(I) Ql (I) c: c
::: [jj w w iii w w w UJ w 'O0 iii w w w iii w iii iii w w
Ql
iii [jj
c:
0
c
0 0 0
c
0
c:
0 0 0 0
xc xc xc xc: xc: ;c xc ;c ;c x x x x x 'C "O 'O 'C (I)

!
'O 'O (/)
0) ;:;, :l :> :> xc: 'C U)
~
,..
0
Ill c
.9!
c:
::. c c c
Ol
c"' c: "' c "'
Cl)
c
:l
c"' c: c: c: c: c c:
"' C)"':> C)' C)"' C)"' C)"' C)"' Cl).c ..c .c"' ..c' .c' .c""
~ O>
c:
0)
c:
0)
c:
0)
c
Ol
c:
O>
c
0)
c c' c'
3:
..c .c
(3
(I)
"' .c"'
.c "'
.c ..c "'
"' Cl)
.c '
..c "'
.c .c Ill 111 II!
.c: "' "' "' "'
.c :l :::J :l
Ill
:l
"' "' "'
:l :l :l :E :c t:: t::

-.
0 0
...
QI
.c CD (/) (/) (/) (/) (/) (/) (/) (/) (/) (J) (/) (/) (/) (/) C) C) C) C) C) C) C) (.) 0 z z z
0

0 'E
(I)
'E
<!)
'E
(I)
'E
ID
cID E
(I)
c., c Ql
"O
E E E E E E E E
0
(,)
.!!!
0.
(I)
Q. ~a. Ql
Q.
.!!!
Q.
(I)
Q.
(I)
Q.
(I)
Q.
a. 0. 0. a. a. 0. a. a.
~ :::i
(/)
:::i
(/)
::l
{/)
:l
(/)
:::J
(/)
;:;,
{/)
:l
(})
:l
(/)
:i!:- .....
a. 8 8 ~ {{)
0 0 0 0 ;; N N N
CL 0
9 0 0 ..... .....
::i N N
0 9 0
a, ~ 9O>
tO
(!;
tO
... 9
tO ID <D
~
<O <O
~ ...
<D
"'..... "'..........
..... M
,...
,....
II)
~ ~ ~ 5: ~ ~ ~ ~
co <O $' ii) ii) ii) co $'
(')
0 0
(') 0
0
0
0
0
0 ...., ~
ch ....,
0
ch
...., ....,
{/) ch
....,
~
ch
...., di
....,
9
(/)
... ~
..... ..... .....
~ g 00 00 00 00 00 00 00 ..... ..... 0 0
c;; ;;; ~Ol ~ ,,.,co
<'I N co 0

.., ~7 ~
N N
~ ~ ~ !:::!. ~ ~ ~ N c: c
O> &. ...; ...; ....,
c:
1-:J
...., ...., 1-:J
....,
...., ..,1-:J ...;
....,
l()
0 0
N
0'
~ N
Cl
ci 0 r-!- r-!- r-!- r-!- N N N ~ 0 0
.!!! .!!! .!!! 7 7 -, 7 C)
0 0) 0)
co rh
;:;, a, {/) {/) CD m tO tO tO ~ ~ 8 (.) (.)
.... zt) ,... 000 00 00 000 000 0g 000 000 .,. ~ ~ ;:;,
Ill
(/) {/) Cl 0
c c: c: ti{ (/)
'1 {/)
M (")
....0
(') (') 0 0
..,>= >=7..., > a:> .>a: 6;; 06 06
a: ;; "'
M
Ql

~ ~ <D "' x ~ ~ x x x x @ ..... 0


0
6
0
6
0
0
0
6
,... "'
0 0 0 0 0 0 0 ~ ~ ~
z $u ~u u~ ~u u~
Cl) Cf) U) U) (/)
a.. 0c 0 <D N
<O
N
(J)

N N
(J)
<O
N N
{{)
<O <O
N
<D
N
<D
0
{{) ...; ...,
...., "" .x0 .><,...0 (/)N ~(J) N
0
z z z z zN N N ")'
z(/)
0
N
N
(3 u N N
0 0
3: 3: ~
('.) (!)
c 0
(.)
N
0
N
.... ....
N N N N N
..... N 0
..... ..... ..... ..... ..... 0 ...., (.)
()
...., It)..... tO
..... "' (/) U) (/) {/) {f) ~ ~ :t:
w
J:
w z z z
"'
~
"'0 0"'c!: 9 9 "'0 g; 0 9 0 O>
O> O>
:!il 0 "' O'> 0) O> O> 0) O'> O> 0) 0)
O> 0)
O> O> O>
O> 0 0
..... ..... ,... 0..... 0..... 0..... 0 0 0
0 .....
>. 9>-
>. :l :l :l t; t5 t; c: c 0C: 9c 0C: 0C: 0C: 0C: t; t; t5 t; 0 t; i5 .....' 0' .....
0 0 0
::;i t) '.% 9>. >.
0
>.
0
>. >. 0) 0) ..... .....
(I) .!. .!.
iU 0

,:.."" ,.:. ...,:. ~


0 f! "' :: "' "' ~"' ::;<"' ::;<"' ~"' 70 <f ,... <f 9 0 0 ...., ...., ...., ...., ...., ...., ...,
... ,....tb ,:.."' ,:.."' ,.:..' ,...7"' ,.:.."' ,.:.."' ,:.."' ,:.."' 9N,... N..... N..... c\i..... N..... .....N 9N.... 9..... .....9 ~..... "' '
Ii. ::;< ::;< 0 0 0 0 0 Ql
.c
N
C)
c0 ,:..
,... ,... ..... ,:.. r-!- ,:.. ..... ,... ..... tb
<D
(') ....~ ~.....
c (.)

"'
::;i
C)
.
t)
.!!!
... ..... ,.._ N
,.._
!;.
tO
.....
N ~
(0
co
C')
r::..- NO>..... <O
0)
(")
co
tO
0

"'..... ..... 0
0
..... ,.._
0 <O
I()
0
<O
0
"'
O>
<D
(")
(')
tO

"'
.....
N
(")
tO c:::; ;;::: ... co co co co <O ... ... ... I()

N
co
N
"' N C?
~
a

co (0
CD (.) co co (0 (.)

..... ... 0 ~
0 0
....0 0 0 0 0 0 0 0 0 ~ ~ ~ 0 0 0
0
...
0 0 N C) ..... 0 N 0
0
,...
a
0
0

)3 0.... ;;;
0
0 0
C) 0
0 0 0
N 0
0 0
,... 0 0 0 0 0
0
0

a
0
0
0

a
0
0
0
0
0
... 00 ~0
0
0 0 0
,...
.....
a
N N
~ v
a
(')
2
0 0 ~ g
!'.? N
0 ~
250 :::t (') (')
2 (')
:::t (")
0 0 0 0 0 0 0 "' 25 0 ~ 0 0 0
,... ..... ,..."' ....."' ,.._"' ,.._ ..... ,...tO ,... ,.._"' ..... 0,... ,...l.O
0 0 0 0

"' ,... ,..."' ,...


0 0 C)
co tO
..... tO ,... ....."' co
..... ID 0
l.O tO l.O tO 0 0 0 0 0 l.O0 tO
,.._ ,.._ "'
LO I() LO 0 0 0 .....
11
~ ~ ~
11 ...
co co
+1
co co
+I i;'
co co co co co tO
.... 11 +I +I M
co ~ ~ ~ ~ ~ N ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ N N
Q;
~ Nco ~ ~ ~ 3:
N N N N
m co m co D CD co co co N
x co co co co co co co
"O
x Ii.x xm
D CD al
(0
co co aJ (0
0 x x x x LL.
x x ~ xu. LL. x ~ x x x x x x x x x x x x x x
tD aJ CD tD
x x x CD
x
(0
::lE LL. LL. LL. l.L u.. LL. LL. LL. LL. LL. 11: LL LL. Ii. LL Ii. Ii. Ii. Ii. Ii. lL G'.: Ii. LL (:: LL. LL LL. LL.
Ql
>
-"' > ~ .x; > >
> > .x; > > > > > > > > > > > > > > > > > > > ~> ~ > > >
0)
s0 x .x
""'0 -"'0tO .x0LO .x0I.(') 0"" .x0 .x0 .xI.(') .x -"' ~ ~ ~ ~ ~ ~ !:<: > > >
0
"',.._ ,.._
0 0 "' 0 0"'
0 0 0 0 0
,.._ ,.._ co ,... ,._ ,.._ ,...
0 0 0 ""
0 ""
0,,., "" .>!
0 0 0 0 C) 0 0 0 C)
"" .:I.(') ""I.(')
"' ,..."' ,._"' ,..."'
0

>
0
co I.(')
+1
I.(')
.....
tO
"' +I "' ,...
"' "'I'- ,... I()
..... ,._ ,...
"' "' ,._ ,.._
0
,... 0
co
0
co
0
co
0
co
0
co 0
co
0
co
0
co
0
"' "' +I +< +I .... +I +I +1 +I co+I "'
0
,...
0
,._
0
.....

...., m 0) O> (J) (J) O> (J) O> O> O> O> O> O') O') O> O> 0) O> (J) 0) O> O> O> 0 0 0 0
ll>
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 .,..
0 0
>-
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
"' N N N N N N N N N N N N N N N N N N N N N N N N N N
"' N N N
1; I
"'
:::i
0
".p ;;;.;'

- ~
so so <O
"'-e- "' CD CD

..s
0
<O
CD
0
I'-
I{) I{) ..... .....
I{)

0 ;; 0 N~ Nv0 0N .;-
;j ;:;; N NO> O>
v
z
N
-e- -e -e
"'()! ()!a; a; ..... ,.... :g ..... ,.... N
(")
"' 0 ..-
<O
O>
a) <X) co
N
O>
-e-
a)
N
O>
,...
-e-
a)
N
...
O>
co
N
O>
v ...v
co
N
O>
co
N
"'.....v
co
N
O>
-e-
co

....N...
N
O>
<O
N
a>
;!
<O
N
O>
v
..-
<O
N
O>
v
<X)
N
O>
v
.....
r-,
t-,
.....
.....
r-
I'-
.....
0

'1'
N
0
v
~
0
.;-
<'!-
0
-e-
0
.;-
0
v
":'
0
-e-
N
c\i
c
0
'"i',.._
a;
~
co <O
I{) U')
-e-
<X)
N
"' "? "?"' "?e-
r-,
I{)
<O
... ... c:i
..... "';;:; N ..."? ...."?
-e--
N N N
..-
c::;
,... ..- N N c::i
-e-
-e-
N
<')

~ "'
C5 C5 ~
(") (") N
N
(")
N
N
<") o
N
N

0
0

"'"'
a; .....
O> a; 6
<O
"i' <O
6 0 6 6 ;::. t: t:
<O <O "?
.....
,.._ ,.._
-e-
~
r::: ....... "? ...."? '? ~
~
t: ;:: .... t: ,._ t: t: ;::
U? '? <')
(")
<')
<')
<') <O

"' "'"' ~"' "'...;.


<O
<O
<O
<O
.,..,
<O
O> a> O> N N N N N io I{) I{) I{) co I{)
<O <O <O <O
"' ...;.
0 0 0 0 0 0 0 0 0 l.O
0 0 0 "'
0 0 0 0 0
I{)
0
I{)
0
I{)
0 "'
0
I{)
0 "'
0
It)
0
r-, .....
,..._
0 0
,___
::> ::>
2"'
::>
2:
::>
"'
co (II co
::> ::> ::i
0 0 0
s: x: f
N N
::> ::> :;;>
s: .c: s: :l: ~
0
c
0
c
0
c
tic
e Ille coe ellc"' coe s:
0
c
s:
0
c c c::
OJ
c c c c c
~
co
e
Ill
!!!
ro CD
!!!
co
0 0 0 0 0
;;;
(/)

E .E
;;;
(/)
'iii
"'E .E ,!ilE
'iii
(/)
;;;
fic s:
0
s:
13c 'iZ
c
0
c
0
'_ii)
c
.Q
c
.Q
c
0
'iii
s c
.Q

~ e e e e "'Ern E"' Ern"' E"'"' .E"'"'


0
c c .!il so II)

"'c c c:"' c"' c"'


U)
l!!
s:
0
c:
s:
0
c:
.r:
0
c:
s> ~ i=."' I-E I-!!!
> >
Ill OJ
8c: 8c 8
co en c: c c c: c: c: c
8 "'e I-e ~ I-"'e I-e I-"'e I-l!!"'
"'
~ e :r >
:r >
E E c: c: I-
:r :r :r: c"' c:
.a Ill Ill en w w w UJ w "' .,c:"' ~ > > > > > >
:t: :t: :t: :t: >
:;"'
en
-0
:i
::r: >
>
w w w
:r: s: >,
c
Ill
>,
c:
Ill
>.
c:
Ill
>.
c:
"' "'
>,
c:
{; c c ~ w:r: :t:
a a
Q)

; ;;; ;;;
w w w w w :t:
>.>,
c:
>, >. >.
c""
w
>.
c: c: c: c: c:
- >. >, >. a. a. .a. Q. Q. >. >. >. >. >, >. >, >, >, >. >. >. >. >. >. :a= :a= :a= :a=
"' "' 8. l1 ~ "'a.
.E 0 c: c:
(\)
c: E
0
E
0
E E
0
E
0
c:
Ill
c:
!Tl
c: c: c: c: c: c c: c: c: c:
"'E0.. 0..E"' "'0..E 0.."'E "'0..E E"'0.. 0.."'E "'0..E "'E0.. Q."'E 0.."'E "'E0.. a.
c: c:
"'E c"'a. c:a."' ca.
c >. >. >. >. a.
E
Q.
E E E E "'
a.
!en (.)
"'
a. 0.
"'E
a. (.) u
0
(.) (.) 0 0.. 0.. c
Ill 0 ~ 0 0
8'O 0 0
E

8 0 0 0... 0 0 0 (.) ()... 00 E ()E0 (.)"'E0


'O E E 'O 'O "O
E E a. () 0 0 () (.) (.)
0 ~ u0 u
0
u
0 c: c: "'c c(!)"' 't: u
0
u
0 0
(.)
0
0 0
0 0 0 0 0 0 0 0 0 E 1:1
c "'c: 1:1 1:1
c: 'O 'O
... (!)
...
(!) (!) (!)
Q; :;; <ii 8... 0
(!) (!)
't:
C'5
c '<:

"' l !
0 (!) (!)

!
(!)
~ 3: Q) Q;
~ ~ ~0
Q)
~ ! ~ 3: ~ 3: ~0 0~ ~0 ~0 3: ~0
Q)
i Q; :;;
(!)
....
! l
3: G;
'K? 0
0.. 0
0.. 0..
0.. a.
3:
0
0..
0
a. 0.. a.. n..
0
0 0
n.. n.. n.. n.. a..
0
0..
0
a..
0
0.. a..
0
0.. 0.. a.
~ a.0
0.. ~ ~0
0
3:
0
~ ~0 ~
0
3:
0 ~ ~"'
11)

"' 0 0 0 0 0 0 0 .g 0 0 0 0 0 0 0 <.> 0 0.. 0.. 0.. a.. 0.. a. 0.. 0.. a.. a. a..
u.,
> 0 c c: c r: r:
.5 c E E E E 'C: c: c c::
0
.c .r:
u ~ t)
"I:
0 "'
.c
Qi
.c
Q)
.c
Q)
.c
Q)
.I::.
0Q) 0
~
u ~
Q) Q)
0Q) t5
Q)
"I:
0 t)
Ill
~ ~ u
Q) Q) Q) .,
t)
't:
t)
Q)
t) 0
c:
0
c:
u
0
c:
0
c: EQ) .,
E
~ EQ) E
Q)
E
Q)
E
Q)
w w w w"' w
Q) t)
.91 <D tS 0I))
"' u; w iii
.!!! 5 5 5 :5 :>0 iii w iii iii ill w w ill w w ::> ::i 5::> ::> .r:

.. w Q) I)) Q)
> 0 0 0
rn
0 O> O> O> O> Cl O> C> co iii ill w w "0 0 0 "
0
5
-"'
0
c
~
.c:
O>
<:
Cl)
c:
C>
c
(/) Cl) Cl) (/)
c
.!!!
c c: c:
.!!! .!!!"' c: c: c
O>
c c:
O>
c:;
Cl
c: c
O>
c
Cl
c:;
O>
c 'i( xc: -~ "i(
I/) (/) (/) (/) ~ 0
(/)
0
(/)
It)
j! r "' 'E'"' c; E"'
'E'
.!!! c:;
"' E"' E"'c
.5 c: "'
c: "Qi' "'
'W 'Qi' ;p ~"' "' :~.c"' :~.c:"' .c:"' :iB'.c:"'"
:~ :~
.S1
'Qi' '.cS"'' ~
"' "' .c:'a"'r
:~ c c
"'
c:
!Tl
c
Ill
c: "'c: !Tl
c: "'
c: "' c:
"'"
CD () z
0
x x x (.)
.c
0 u 0
E
u
.r:
N
.I::.
N
;::,
N
.r:
N
.r::
N
.r::
N N N N N f;j N ;6 .r:
N "' .c"' .c"'
.c
!/) !/)
!Tl
.c :2 :E :2 :E :E :c :c
-...
N (/) Cl) () 0 0 (.) (.) (.) (.)
j
0
'C
0
(.)

~
~
0.
0.
"'......,..
:I
fl)
...-
~ 0
N N N N N
....N N
....N N.... N .....
.... ..... .... ..-.... .,......
.....-
.,.. ..- ..- ........ ..- .....,.. 0..-.... 0......- ..-0.... ,._ ,._ ..... ,._ ..... ,._
"
N 0
0) O> 0) 0) O> ..- ..- .- ..-
0 N N N
;; ..-
;; .... .... ..... .....
0
0 0 ;;
N N
0 0 0 0 0 0 (X) (X) tO <O (X)
0
... z
u
0 0

...
0
N
0
0
....
N
0
0
N
0
0
N
0
0
N >-
(!)
0
>-
(!)
>-
(!)
~ >- .~ ~ >- >- ~
>- (!) >- >- >- >- N N N N 0N 00N "'
0 0
0
0
0 8 00
<O
0
0
QI
u..J u..J u_, I-(!) b I-(!) I-C)
(!) (!) (!) (!) (!) C) (!) 0 0 0 0 .... "'u t) "'t) "'
bN ~C)
N N
g ~ ~ ~
~ ~ b ;;; Nrh (/)()! ~(/) u
(.) I- I- I- I- I-
0 !:g (!) ..J
N N N
(!)
....0 0N ;;
(!) CJ (!) (!) CJ (!) Cl
8 (.)
0 0 0 8.....
---
N N N N 0 0
tl.
3: 3:
.,.. ..- 3: ~ 3: 0
N
;; 0
N N N N N
(!) (!) (!) (!)
,._
!/) (/) Cl)
,._ (/)..... (/).....
0 0 ;; 0 0 0 (J)
c: 0 0 0 N N N N N N N
0
N
0
N
0
N N
0 0
N
0 x
-, x
-, x
-, x
-, 0 r-- I'-
(/)

N
111
Cl>
"' "' 0 0 0 0 0 0

!ii .,..
.... ..... .....
.... N N N
.... N..... N N
..N... N... N.... N
.... .... .,..N N N.... N N N.,.. N.... N..... N..... N.... N "' N....(, N..... N....
:E ...
Cl
> >0 LL LL<D LL u..,
.b
..-
.b j, j,
..-
j,
..- N

u
N N N N
..-
N

i> i> i> 0 i5 0> 0> ~ >0 u u u u


e...." ::i:"' ~>0 i> i> i> i> ~ ~ i> i>
::J o!.
Q) Q) 0 0 0
0
~
0
"' LL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 z z z z
9 "' "' "' "' 9
Q)
.r:
N c .... .... .... ~.... N,:., ,:.,N ,:.,N ,:., ,.;
...
.;,
.....;, .,...;, ... ...
.;, .;, .;, .,..
.....
.;, ,;, .;,
.,.. ... .;, ,;, ,;,
.... ..- .,.. .;,..- .;,...- ,;,
....
9 9 9 9
J:, M ..... ;;; ;;:; .... M M
9
ti)
c
"' ::J
8
N N

' ' ' "'


<')

(!)
<D
.,
0

~ (") N
<O
t..')
0)
N
v v
v It) N
.... 'NN
0)
<O
co ~ ~ 0
v 0
l!l <D 0 <O N N ,._<D N
"' "' 'V N
N
It') I'- 'V N N N N
' O> N
..... <O
N ....
a> (')
N N ...."' It) It) It') It')
"' "' "' "' 'V N v
~
a

O'.l co co Ill co <( m (.)


0 :i: 0
co
0 0 0 0 0 0 0
.... 0....
0 0
....
0 0 0
..... 0 0 0
....0 0 0 <( en 0
..-- ....
0 <( ID 0
0
g .., a
0 0 0 0 0 0 N 0
25 .,..0 N
N .- v
(')
' l.O
~ ~ (')
a
0
g ~
N

a
0 N
~
N 0 0
..-
0 0 0
...
0 0 !:':! 0 0
g
8 g 0
!:'." 0
0 ~ 0 ~ 0 0 0 0
::<!:
0 0 "'
0 0
!::'
0
::<!:
0 0 :'
0
g
N
v .,..
0 U) <O
0
0
0
25 "'0
0
0
...."' ..... It')
0 0 0
<O
0 0 0 0 0 0 0 0 0
,._ ,._ ,..._ ..... 0co 0 ";l +I c:o
0 0 0 0 0 0 0 0 0 0 0 0 tO tO <O
"',.._
I() tO <O tO 0 0 0
I'- +I ";l '+I +I +I
0 0 0 0 0 0 +I 0 0 0 0 0 0 It) I() I{) It')
<O
0 0
<O
'a; ~ ~ ~ ~ ~ :s: ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ :f: +I
't'l Ill co ID in co co ro co co m co co co Ill co Ill co ID co co co OJ
N
co Ill ~ Ill Ill co Ill en co co N ~ (0
0
:E
~
LL
xLL x LL
x
LL
x x x x x x LL ><
u.. (:: LL u.. LL LL LL >< LL
><
LL
x
LL
xLL x
LL
x xLL x x x xLL xLL Ill~ LL x LLx LL >< LL x x >< >< >< x xLL
LL LL LL LL LL LL LL LL LL

Cl>
C> >
..:.:: > ~ > > > > > > > > > > > > ::;; ::;; > > > > > > > > > > > > > > > ::;; > >
-"' 0..:.:: ""' ..:.:: 0""' .><0 .x0 ""'0 0""' .x0 0""' 0 0 -"'0 ..::
.>< .x ..:.::
..:: -""
~0 ,._ ,._
0 0 0 0 0 0
0 0 0
C)
0 0 0 0
0 0 0
0
0
0""' 0 -""
0 0
-"'
0 0 0 0 g ""'0 0 "' "'0,.._
0 0 "'00 ""00 ""00 ""00 0 ""' ""'00
0
>
I{)
"" '..... "'I'- co
+I
<O
+1
<O
+I '+I <O
+ ,
0 0
..- ,0 0
..... ,
0
....0 ,
0 0
, ,
0 8
, ,0
0
,
0
0
0
..... ,
0
,
0
It)
..... ....
l.O It') ll)
I'- <O <O <O tO
0
<O
0
co co

."' , ,
0
,
0
,
0
N N N
;; ;; 0 0 ;; 0 0 0 "'
0 0
N
0 0 0
N N N N N N N N N N N N N
;; 0 0 ;; 0 0 0 0 0
N N N N N N N N N N N N ,
Cl> 0 0 0 0 0
>- N N N N N N N N N N N N
N N N N N N N N N N N N N NNN
0
N N N l~
~. , r ,,
0

'~
1<
l~i
c
.Q
0
?i!
'<

1-
<O
..,.
0

- CIO <X) CIO N N N N N N


N N N N N
a; a; a; a; o; .... o; a; 0o;
CIO <X) co 0 0 0 0 0 0 0 0 0.,...
u N
N
N
N
N
N
N
.l!l N 0
0
~
0
N
Ol
0
0
N
Ol
N N N
c N N N
Ol

c CIO
""
(') Ol
0 CIO 00 00 .....
co "l' "l' t')' "'
"l'
.... a; a; a; a; a; a;
t')' "'
"l' t')'
o
"' d,N0 a,0 d,N0 O>
.,j. O> N Ol m m Ol Ol
~'
,.__
....0 0 0 0 0 0 0 0 "' .t?
:::J

~"':>
-~#

~ ~. l::1
,_,, l b.
co ~
:>
0 '~
~ ~
.c
N
::>
;: IL-..
s:
0
c x ~
!:!
co
c
0
"iii
E"' c: .c0c: c: s:0c: c: s:
0
.c
0
.c:
0 c: -5c:
c"' c: c: c:
e ID~ e e ~ -~ e OJ~ IDe ID
~
f
~ Ill Ill ID Ill CD Ill
> ;;; ;;; ti ;;; a; <ii a; a; <ii a;
.s I c: 1:: c: c: c: c ~ c: c: c:
Ill
'5
w
>. "'
'iii
2 .!!!
"' "'
.!!! a;"' .!!!
<II o; .,
.!!! 2 .!!!
~"'
<II
II)
c: :!! ::iE ::E ;:;.e ::?: ~ ::E ~ "'
::E
.5 "'E
a. >.
c:
>.
c:
>.
c
>.
c:
>.
c: >.
c:
>.
c: >.
c: >.
c: >.
c:
>.
c:
>.
c:
ee
>.
c:
"'E "'E "'E E"' "'E E"' E"' "'E
nl nl
!!
II)
o
0
0. 0. 0.
0. 0. 0. 0. 0. 0.
E E
0. "'
0.
E
0.
E
"'E
0.

0 "U 0 0 0 0 0 0 0
c:
(!)
0
o.... o o
0 0 0 0 0 o 8 o 0 (.)
0
o (.)
0

a; a;
1.J ~ ~0 0~ 0 1 ~ 0~
0 0
-~
~0 0
ii ii ii
0 0
;!:
0
s 0~
0
Q)
0
a. a. a. a.. a. a. a. 0.. a. a. 0.. 0.. a. 0..
> 0 0 0 0 0 0 0 0 o o
0
.c
(II
E
(I)
:E
0

~ u
<l)
0
c:
o
c:
t)
Q)
c:
t)
.!
~
.9!
c:
t)
.!ll
u.!ll c:
t>
.l!!
ii rs
't:

.!ll .l!!
c:
ts
.!ll
c:
u
.!!l
c:
t>
.!!1
~
:J
0
ff}
m &) m w
0)
w
Ol
w
0)
w
0)
w
0)
w w w w w
0
c x xc: xc: c: c: c: c: c:
Cl
c:
0)
c:
Cl
c:
Cl)
c:
O>
c:
~ :z:c"'
c
"' .c"' .c:"' x"' 'E'
nl
II)

"" "' c
:~
.!l! "' .!l!
!2' "' 'E-"' :~"'
c: 'E' !2' "'
=e--
u (.) ..c::
x x x x x x x x x
-=...
(I) ff} ff} Cf)

0
"O
0
(.)
(I)
a:
>,
Q.
Q.
:::i
II)

~ 0 0 0 0
ci ....co co
<O
co
co
<D
tO N N N N
0
N
0
N
0
N
0
N
0
N
0
N
(.) 0 0 0 0
< 8
.... ....0
0 0 0
..... .... 0....
0 0
....
0 0
..... 0.....
.... z
0
0 8 8 8 8 8 8 8 -c;, 8
(I) t) N
~ ;; ;; ;; ;; ;; 0
~0 !: () ~ Ci ~ 0 N 0 N
N
0 0
N N N N N N N
).. .;.. >- 6 (5 (5 (5 (5
Q. c 0
....0
ff} ..., ;;s ...., (.) () () 0 (5 (5 (5 (5 (5
0 (.) 0 (.) (.)
c
~
(.)
(') (")
.... ..... ..... Cl o o Cl o Cl o 8
.
.!
:E c"' .... ...."" .... .... ....
N (') (")
"' ..... .... .... .... ..... ....
.... .....
(') C') (') C') (') (") C') C')

:::i t) t'.i .!.


0. <5. 0. .!. >. >. >. >. "'>. >. >. >. >.
.
>,
0
~c: 9 ~ < ~ :E"' :E "' :E"' :E"' :E"' :!"' :E"' :!!"' ~"'
:E
;;:; N"" N,;, N cb
..c
N
O> 0 .... ,;,.... a,.... a,..... cb.... cb.... >..... cb.... ....cb
.... ,;,
(")

c: (.)
Ill
:::i
<.!)
~
<.>
CD
~ ..,.
O>
N I{) 0 N N ;g ~ 0v 0 0v 0 ~ 0
.?;-
..... 'I" ""
.....
' ~ ..,. N N ..... ' ..,. """v .... ....
N (')
It>

ID
0 C) Cl C) C) C)
c, c, '-?
C) {!)
c, <?
C)
0
0 0 0 0 0 c, 6 6 c, 6
~ ....N ....
"" 2i 0"" ;3 !:::!0 0 a 0 0M ~ ~0 a....
0 N 0 0 0 N 0 N
(') (')
0

.... .... ,._ "' ,._ ,._"' "',._ "',._ ,._"' .,.,,._ "',._ IO,._ r-"'
co 0 0 I{)
+l I{) I{)
"'
.,;.
Q;
't)
5 ?:
co
(I)
?: ~ID ~ID ~CD ?:tll ?:CD ~CD ID
(I)
?: ~ID ID ~ ~ ~
ID ID
:e xIL ~ xu.. x x >< x
0 xIL ><
IL IL IL IL IL
><
u. ><
IL
><
IL
x
IL
><
IL

GI
Cl > > > > ..x: > > > > > > > > > >
.i!!
g
-"'
0
0 .,,r- .,,r--
-"' .:.<
0 0 0
l.t)
"" ""
0
\()
0 ""0 ""'0IO 0""
\()
-"' -"'
\()
-"'
l.O
-"' 0
IO
0 ""
0
,...
l.O
0
\()
0
IO
co r- r- r-- r- r- r- r- "'
r-- r- r-

... N <')
;; 0.... ""
(")
..... "" ;; M;;
<") (') <')

0 "' ""0
<")

"'
GI 0 0 0 "';; ;; ;; "'
0 0
E
:l
> N N N N N N N N N NN N N N (/)
Guangzhou Maclean Power Co., Ltd. GENERAL CONTRACT LIST OF 500KV (2000-2005)
Client Product Qty Date of contracting
Liuzjou power supply bureau FXBW4-500/160-CB 18 2000-3-7
Shanxi transmission project company FXBW-500/160 117 2000-12-6
Foshan weiheng power company FXBW4-500/180 80 2000-12-12
Shanxi transmission project company FXBW-500/180 10 2001-9-1
Henan transmission project company logistics branch FXBW-500/180 I 80 2001-3-26
Zhejiang transmission project company FXBW-500/100 49 2001-5-2
Zhejiang transmission project company FXBW-500/100 18 2001-5-2
Guangxi power equipment company FXBW-5001160 80 2001-5-18
Foshan power company FXBW4-500/180 78 2001-9-24
Guangzhou power company FXBW4-550/210 120 2001-10-24
Shenyang Sanbei power company limited 500kV 153 2001-8-30
Anshan power company 500kV 150 2001-9-3
Yunnan Simao power supply bureau FXBW4-500/300 4 2001-11-28
Shantou power bureau FXBW-500/160 567 2001-12-1
Hangzhou power equipment company FXBW-500/210 73 2002-3-6
Hangzhou power equipment company FXBW-500/160 126 2002-3-6
Hangzhou power equipment company FXBW-500/100 11 2002-3-6
Guangdian Shantou branch FXBW4-500/160 89 2002-10-30
Guangdian Maoming branch FXBW4-500/160 139 2002-4-19
Guangdian Maoming branch FXBW4-500/210 42 2002-4-19
Gansu power company FXBW4-500/160 10 2002-5-4
Foshan power company FXBW-500/180 240 2002-3-28
Hangzhou power equipment company FXBW-500/210 3 2002-6-20
Hangzhou power equipment company FXBW-500/160 239 2002-4-9
Hangzhou power equipment company FXBW-500/160 373 2002-3-14
Hangzhou power equipment company FXBW-500/100 42 2002-3-14
Hangzhou power equipment company FXBW-500/210 72 2002-3-6
Hangzhou power equipment company FXBW-500/160 126 2002-3-6
Hangzhou power equipment company FXBW-500/100 11 2002-3-6
Changsha transmission project company FXBW3-500/160 210 2002-9-29
Maoming power supply branch company logistics center FXBW4-500/160 101 2002-10-28
Suyuan group Jiangsu power material company limited FXBW-500/160 377 2002-11-18
Guangdian Foshan branch FXBW4-500/180 24 2003-2-3
Guangdian Foshan branch FXBW4-500/180 203 2003-2-3
Tianjin Guangda power equipment company FXBW-500/180 120 2003-3-12
Tianjin Guangda power equipment company FXBW-500/100 40 2003-3-12
Suyuan group Jiangsu power material company limited FXBW-500/160 60 2003-4-21
Shanxi power equipment company FXBW2-500/180 223 2003-6-30
Suyuan group Jiangsu power material company limited FXBW-500/160 42 2003-9-8
Suyuan group Jiangsu power material company limited FXBW-5001100 27 2003-9-8
Suyuan group Jiangsu power material company limited BW-500/100 9 2003-9-8
Suyuan group Jiangsu power material company Ii /100 15 2003-9-8
/

Suyuan group Jiangsu power material company JH -; :;~}1 100 3 2003-9-8


, .,
Suyuan group Jiangsu power material company d / ;fj EE\ f;\Fp'.f3W;:.5, 100 9 2003-9-8
Suyuan group Jiangsu power material company _,_, _FJ<B\i'V:S00/ 100 9 '~-8
Zhejiang transmission project company FXBW-500/210 286 I
Guangzhou Maclean Power Co., Ltd. GENERAL CONTRACT LIST OF 500KV (2000-2005)
Client Product Qty Date of contracting
Zhejiang transmission project company FXBW-500/210 132 2004-2-1
Zhejiang transmission project company FXBW-500/100 74 2004-2-1
Shanxi transmission project company FXBW-500/180 73 2004-2-12
Shanxi transmission project company FXBW-500/100 151 2004-2-12
Sichuan power material company FXBW-500/180 156 2004-2-1
Sichuan power material company FXBW-500/210 48 2004-2-1
Shanxi power equipment company FXBW2-500/100 127 2004-2-12
Suyuan group Jiangsu power material company limited FXBW-500/100 122 2004-3-31
Suyuan group Jiangsu power material company limited FXBW-500/100 18 2004-3-31
Suyuan group Jiangsu power material company limited FXBW-500/100 62 2004-4-27
Suyuan group Jiangsu power material company limited FXBW-500/100 88 2004-4-27
Zhejiang Dayou industry company FXBW-500/160 152 2004-5-11
Shanxi power company power supply engineering company FXBW3-500/180 150 2004-7-7
Shanxi transmission project company FXBW3-500/180 15 2004-7-12
Shanxi transmission project company FXBW-500/100 13 2004-7-12

- Zhejiang Oayou industry company FXBW-500/160 = 20 2004-8-1


Zhejiang Dayou industry company FXBW-500/160 16 2004-8-1
Zhejiang Dayou industry company FXBW-500/160 60 2004-8-1
Heilongjiang transmission project company FXBW-500/100 12 2004-10-11
Heilongjiang transmission project company FXBW-500/210 59 2004-10-11
Guangdian Foshan branch FXBW4-500/180 21 2004-10-25
Sichuan power material company FXBW-500/160 24 2004-11-1
Southern China power grid company limited UHV
FXBW4-500/240A 292 2004-11-23
transimission company
Southern China power grid company limited UHV
FXBW4-500/240B 106 2004-11-23
transimission company
Southern China power grid company limited UHV
FXBW4-500/300B 96 2004-11-23
transimission company
Southern China power grid company limited UHV
FXBW4-500/300E 150 2004-11-23
transimission company
Southern China power grid company limited UHV
FXBW4-500/300F 68 2004-11-23
transimission company
~
Guangdian Jianmen Branch FXBW4-500/160 700 2004-12-1
Guangdian Jianmen Branch FXBW4-500/100 50 2004-12-1
Inner Mongolia UHV power supply bureau FXBW-500/180 342 2004-12-20
Inner Mongolia UHV power supply bureau FXBW-500/100 32 2004-12-20
Zhejiang transmission project company FXBW-500/240 660 2004-12-27
Zhejiang transmission project company FXBW-500/100 280 2004-12-27
Anshan power company FXBW4-500/160 645 2005-1-5
Guangdian Jianmen Branch FXBW4-500/300 728 2005-1-1
Guangdian Jianmen Branch FXBW-500/300 255 2005-1-1
Shanxi transmission project company FXBW-500/180 700 2005-1-22
Suyuan group Jiangsu power material company limited FXBW-500/100 218 2005-2-4

Hunanelectricpowerinstallationcompa~ ~00/210 52 2005-3-1


Guangdian Jianmen Branch 00/160 520 2005-3-1
Guangdian Jianmen Branch ( [i }t4'\i=~V\i4'.:"500/160
!'. -, ~-->
24 2005-3-1
Guangdian Jianmen Branch 11 ['~ I(: FXBW4-500/100 80 -,
2005-3-1
Guangdian Jianmen Branch +<:,;~ ""-,,,, .. ~-' "'"
FXBW4-500/210 2 - -1
'" ...
Guangzhou Maclean Power Co., Ltd. GENERAL CONTRACT LIST OF 500KV (2000-2005)
Client Product Qty Date of contracting
Guangdian Jianmen Branch FXBW4-500/210 12 2005-3-1
Inner Mongolia UHV power supply bureau FXBW-500/180 350 2005-3-4
Inner Mongolia UHV power supply bureau FXBW-500/100 33 2005-3-4
Nanning Jianning power supply project company limited FXBW4-500/160 27 2005-3-11
Guangdian Guangzhou branch FXBW4-500/160 15 2005-3-19
Guangdian Guangzhou branch FXBW4-500/210 15 2005-3-19
North China grid company limited FXBW4-5001180 7 2005-12-23
North China grid company limited FXBW4-500/180 7 2005-12-23
North China grid company limited FXBW4-500/180 80 2005-12-23
North China grid company limited FXBW4-500/100 19 2005-12-23
North China grid company limited FXBW4-500/180 4 2005-12-23
Guangdian Guangzhou branch FXBW4-500/160 375 2005-5-1
Guangdian Guangzhou branch FXBW4-500/210 51 2005-5-1
Huangzhong power material company limited FXBW-500/160 133 2005-5-1
Huangzhong power material company limited FXBW-500/160 62 2005-5-1
~
<':- --~-
Huangzhong power material company limited FXBW-500/160 3 2005-5-1
Guangdian Guangzhou branch FXBW4-500/160 300 2005-5-1
Guangdian Guangzhou branch FXBW4-500/210 9 2005-5-1
Hunan transmission project company FXBW4-500/160G 274 2005-5-9
Hunan transmission project company FXBW4-500/21 OG 18 2005-5-9
North China grid company limited FXBW4-500/180 4 2005-12-23
Anhui power UHV company FXBW-500/160 350 2005-5-21
Anhui power UHV company FXBW-500/160 20 2005-5-21
Anhui power UHV company FXBW-500/210 63 2005-5-21
Southern China power grid company limited UHV
FXBW4-500/160 6 2005-6-3
transimission company Wuzhou bureau
Southern China power grid company limited UHV
FXBW4-500/160 87 2005-6-3
transirnission company Wuzhou bureau
Southern China power grid company limited UHV
FXBW4-500/100 18 2005-6-3
transimission company Wuzhou bureau
Guangdong power equipment company FXBW-500/1 OOA 43 2005-7-1
Guangdong power equipment company FXBW-500/1 SOA 265 2005-7-1
Guangdong power equipment company FXBW-500/240A 73 2005-7-1
Kingwood group material branch FXBW-500/210 78 2005-7-10
Guangdong power gridShantou branch FXBW4-500/210 370 2005-7-12
Guangdong power gridShantou branch FXBW4-500/160 665 2005-7-12
Southern China power grid company limited UHV
FXBW4-500/240A 447 2005-7-18
transimission company
Southern China power grid company limited UHV
FXBW4-500/2408 9 2005-7-18
transimission company
Southern China power grid company limited UHV
FXBW4-500/240C 39 2005-7-18
transimission company
Southern China power grid company limited UHV
BW4-500/300A 231 2005-7-18
transimission company
Guangdong power gridGuangzhou b
-~ . -
d+ +1*:tJW~-500/160 415 2005-8-1
.Ui:!:::";:;;;
) ;i '1' "-'- ' \..J'( ,.,,, c:. . /.) ''-. ' t-
Guangdong power gridGuangzhou H :~ ',\ ;=;1 FX!3.\/V4-500/210 _r.Q5_ 2005-8-1
,, xU,,._
Guangdong power gridGuangzhou br ,
' ......--- ~:BXBW4-soo1150
'. (3~ ~005-8-1
Guangdong power gridGuangzhou branc'fr~- . .. _ . FXBW4-500/160
L]~~ 2005-8-1

~~_,;;;;;:c~:/
Guangzhou Maclean Power Co., Ltd. GENERAL CONTRACT LIST OF SOOKV (2000-2005)
Client Product Qty Date of contracting
Guangdong power gridShaoguan branch FXBW4-500/160 1,335 2005-8-15
Southern China power grid company limited UHV
FXBW4-500/160 186 2005-9-8
transirnission company Guiyang bureau
Southern China power grid company limited UHV
FXBW4-500/210 57 2005-9-8
transimission company Guiyang bureau
Northeastern transmission project company FXBW-500/100 268 2005-9-13
Northeastern transmission project company FXBW-5001100 4 2005-9-13
Northeastern transmission project company FXBW-500/210 1,066 2005-9-13
Northeastern transmission project company FXBW-5001210 16 2005-9-13
Northeastern transmission project company FXBW-5001300 496 2005-9-13
Northeastern transmission project company FXBW-5001300 8 2005-9-13
Northeastern transmission project company FXBW-500/300A 26 2005-9-13
Northeastern transmission project company FXBW-500/300A 1 2005-9-13
Shandong transmission project company FXBW-500/100 182 2005-9-13
Shandong transmission project company FXBW-500/100 3 2005-9-13
Shandong transmission project company FXBW-500/210 402 2005-9-13
~ Shandong transmission project company FXBW-500/210 6 2005-9-13
Shandong transmission project company FXBW-500/300 262 2005-9-13
Shandong transmission project company FXBW-500/300 4 2005-9-13
Shandong transmission project company FXBW-500/300A 43 2005-9-13
Hunan transmission project company FXBW4-500/210 167 2005-9-19
Guizhou hongdian industries FXBW-500/300 2 2005-9-21
Inner Mongolia UHV power supply bureau FXBW-500/180 109 2005-9-26
Guangdong power grid Jiangmen branch FXBW4-5001160 291 2005~10-1
Guangdong power grid Jiangmen branch FXBW4-500/160 146 2005-10-1
Guangdong power grid Jiangmen branch FXBW4-500/100 81 2005-10-1
State Grid Construction branch FXBW4-500/100 1,424 2005-10-10
State Grid Construction branch FXBW4-500/100 1,492 2005-10-10
State Grid Construction branch FXBW4-500/100 1,777 2005-10-10
....Southern China power grid company limited Uuzhou UHV
FXBW-500/160 292 2005-10-12
transmission bureau
...
Hunan electric power installation company FXBW-500/210 14 2005-10-12
Guihou power branch FXBW-500/240 162 2005-11-2
Guangdong power gridFoshan branch FXBW4-500/180 98 2005-11-8
Guangdong power gridFoshan branch FXBW-500/100 30 2005-11-8
Guangdong power gridFoshan branch FXBW-500/100 45 2005-11-8
Guangdong power gridFoshan branch FXBW-500/180 240 2005-11-8
Guangdong power gridFoshan branch FXBW-500/210 8 2005-11-8
Guangdong power gridFoshan branch FXBW-500/300 6 2005-11-8
Guangdong power gridFoshan branch FXBW-500/210 140 2005-11-8
Guangdong power gridFoshan branch FXBW-500/300 75 2005-11-8
Guangdong power gridFoshan branch FXBW-500/210 110 2005-11-8
Guangdong power gridFoshan branch I'll 00/300 61 2005-11-8
Guangdong power gridFoshan branch -:;-~i\s1r\fi, /100 18 2005-11-8

2(--1 -8
,;..u\-;;f!
j )'1' .~
Zhejiang transmission project compa ;ti"\ .~' ;;-.,_
.. t~;,:...
81Q_
- 2005-11-8
Zhejiang transmission project compan ~
"-500/100
Guangdong power gridZhanjiang branch ~,"""'~==' =--"PXBW4-500/1 oo 4~ ; ,05-11-9
~ h~;
~
Guangzhou Maclean Power ce., Ltd. GENERAL CONTRACT LIST OF 500KV (2000-2005)
Client Product Qty Date of contracting
Guangdong power gridZhanjiang branch FXBW4-500/180 894 2005-11-9
Guangdong power gridZhanjiang branch FXBW4-500/180 12 2005-11-9
Guangdong power gridShantou branch FXBW4-500/160 25 2005-11-16
Guangdong power gridShantou branch FXBW4-500/210 30 2005-11-16
Guangdong power gridFoshan branch FXBW-500/180 7 2005-11-22
Guangdong power gridFoshan branch FXBW-500/180 9 2005-11-30
Guangdong power gridFoshan branch FXBW-500/180 18 2005-11-30
Guangdong power gridFoshan branch FXBW-500/180 18 2005-11-30
Guangdong power gridZhuhai branch FXBW4-500/100 34 2005-12-1
Guangdong power gridZhuhai branch FXBW4-500/240 190 2005-12-1
Guangdong power gridZhuhai branch FXBW4-500/100 6 2005-12-1
Guangdong power gridZhuhai branch FXBW4-500/100 31 2005-12-1
Guangdong power gridZhuhai branch FXBW4-500/300 12 2005-12-1
Guangdong power gridZhuhai branch FXBW4-500/100 6 2005-12-1
Guangdong power gridZhuhai branch FXBW4-500/240 135 2005-12-1
Anhui power Hefei branch FXBW-500/100 35 2005-12-19
Shandong transmission project company FXBW-500/300A 1 2005-9-13
North China grid company limited FXBW4-500/180 126 2005-12-23
Guangdong power gridShaoguan branch FXBW4-500/1 OOC 42 2005-12-23
Guangdong power gridShaoguan branch FXBW4-500/210A 19 2005-12-23
Guangdong power gridShaoguan branch FXBW4-500/21 QC 17 2005-12-23
Hunan electric power installation company FXBW3-500/160 4 2005-12-23
Guangdong power gridShanwei branch FXBW4-500/1 OOA 61 2005-12-27
Guangdong power gridShanwei branch ~rr~OA
288 2005-12-27
Guangdong power gridShanwei branch
Guangdong power gridShanwei branch / >1~
J
-~~
-Y ~
12
153
2005-12-27
2005-12-27
SUM ,ff ~M 0 RJ 32,717
~JE'.1r~
fx::fl
;l;li!~m~ (~)
tfJR'JfBJ :rjj!~!)t{il :rjj!~~$\ ~~A.2*.E!!l;5
Type Contract Utinity ' Project i Contact and Tel
Qty
ing date

iI :j); 14' rg }J :L~ .;J #./ ~ {J~


Pitr.!fr(ITJl'Jf*):Jtil!.jci 500 r
FXBW-500/120-3 90 2015-1-6 lit lil~1Jll~T;fJ1 025-81022222
J1\'.01iJ Jiangsu
Luqiao Line

ITgj;ti1!!.J10 ,;J '.j?.J'i?i fJt 500 l{kfilt:l::'.11:'.JJJf~:k


FXBW-500/160-3 14 2015-1-6 025-81022222
1 J,f. z.- , ,j Jiangsu 220 l1* Ifl Qijie line

iI ;tj: ti it!_)) 0 rij !Im ~"i {!1: i 500 HkiI?lf.\'.11:'.?iH:r?.~~


FXBW-500/160-3 25 2015-1-6 025-81022222
f;i. i~ ;;J Jiangsu gfti&iZJ::U~ Jiangdu-Jinling
[
I
ff ;}j: ~ 1t!_ )J :C j:ftJ1i?f9t 500 T-ikiitff'.~-Jlf~'.!t~
FXBW-500/120-1 210 2015-1-6 025-81022222
J0:0i1J Jiangsu ~ CX~ I ill Jiangdu-Jinling

tn:J;1fr.t,i.JJ0 CiJ1PJ'r~HJ~ 500 T-1*ITi1\lV.Jt3i~~'.ll::tli.


FXBW-5001160-2 1134 2015-H 025-81022222
1-'Y.0 di Jiangsu ~i&:@Ifl Jiang_du-Jinling

tr&~m~or-1*:.tl!t~ i5!:~1
2015-1-1 ~ [<4 HliIT :fi' Ft!.)) 0 i1J :ttJ! 1i:J.tXtHE~lliti~i~:\1'( fJvHI Sun
FXBW-500/210-2 302
s :?t0-0nJ Zhejiang Additional project to resist 0571-51214928
I
I frost disaster
!
~ 1/f!lf;N lff 1*(!j; 1<: ~ :lt'I i9: ~
2015-1-1 [}11MilfiIT1ki!.!.}10i1J'.lt!J rl!~~~1:ff~ llli31Y~'ft 1
t1d'IT Sun
F XBW-500/160-2 49
9 ~'Hr0.1J Zhejiang Additional project to resist 0571-51214928
frost disaster

ME 500kV M" 1X. 5491 , P[lf:i(


I 2015-1-1 III ~'~i!JiITl'i'iti.)10 iJ'.lt!J f1JvJ'i:I Sun
FXBW-500/300-2 l 96 5492!xlfiS~>':~I:@
9 ~-0-0 nJ Zhejiang 0571-51214928
Fuyi,Yangyi Line
I
500kV TfiJUH1l'T3t-il:
2015-1-1 !flfi1HfiIT1'Jft!. JJ 0 f.>J '.lt!J 1'HIT Sun
FXBW-500/210-3 132 m 500kV :i~il:ll I'fjl
9 35H}0i'JJ Zhejiang 0571-51214928
Ningdong Line
500kV Ifilli! ~ ill7 .3t-11:
I
~MiJJiff!fl11!1J0iiJW
I FXBW-500/300-2 72
2015-1-1
9 ~ :/H~ ~ Zhejiang
W. 500kV J!tllI'f
fl.Hil Sun
0571-51214928
Ningdong Line
500kV Tf!~EHIJ.?:iJ:d~i.
2015-1-1 liil fi;Jilfiil11i'it!.7J 0f.JW 1il'Nl Sun
FXBW-500/ 120-3 98 ~ SOOkV :iSll\If~
9 1.10- 0 riJ Zhejiang N~~9,f.B
Ningdong Line 't-y,._-,"\
2015-1-1 J1,f lijjilfiu*i'1!!.}J 0 frJ #./
SOOkVTf.Vm J~iflft .X'iij,,;~fl
. . '5r;;-m~,
I . tJ 0
mt 500kV i!' tt/\!1k
FXBW-500/160-3

I
84
9 ~:fri~i'>J Zhejiang
Ningdong Une v
1
ri
, 5~-~/ ~
~
I
I F XBW-5001120-3 321
2015-1-1 I III i..Y }11J ;Jt fr~ )J L~ ii]
1[!. Jj t~Bl'H ;ltfilf'it:&P4#l
J.lt-{ij]tj 500 l{i\:!~~ TUl ' lJ.J{iffj Ma
4 I Hebei 0311-87934594
Baipo-Shixi Line
J
rt}.jjf,;if,~;ltlifl)l~VG#l
2015-1-1 ;JMM~tfi' rtJ;0 ,;J ~-ii!P Ma
FXBW-500/160-3 1168 ;lJ;:-filljj 500 TtU~~ TflE
4 Hebei 0311-87934594
Baipo-Shixi Une
l'${1iYt0 i:iJ l11f.iitiUtf.~fii:
2015-1-1 PilMiif :ltfi' 1l!.111~ riJ ~:lit# Ma
FXBW-500/160-2 45 i~H] 500kV "Ji.')("
4 Hebei 0311-87934594
Pengguan line

FXBW-500/160-2 18
I
J

~015-1-i p;jjklj}liJ;jtfiit!..}J0
Hebei
n'J sooiv rrtnHtili~~~:IJu~x
$ Qingcang Line
-bliiift;Ma
0311-87934594
I I 2015-1-1 L'ii1MinJ;Jt1i"i'rtJJJ ~ti) 500kV :It~ I !1{ frt@tl: I- ~?.HtiMa
FXBW-500/160-2 289
4 Hebei kii$ Beiqing Line 0311-87934594
2015-1-1 !JM?nJ~l:.f'.iit!}J~ nj 500kV :lt:il) I~~ {7g@~ T- !bii'ft. Ma
FXBW-500/120-2 18
4 Hebei A:ft Beiqing Line 0311-87934594
2015-1-1 lllM~uJ itti 1l!_f.J 0 ,rj 500kV $tfill I r~~ frg@~ T ~ii'fh Ma
FXBW-500/120-2 59
4 Hebei f!H?i: Xinliao Line 0311-87934594
2015-1-1 1!MM:lt ti il.!,)] 0 ii1 500kV $~) I!';\},'!!frte~ J' ll> :ff ft; Ma
FXBW-500/210-2 451
4 Hebei gjj:,f} Xinliao Line ' 0311-87934594
2015-1-1 fflMM~t!flfl!.JJ0 nJ 500kV ;li,;r I tlY. f;-g@~ :Y. lf>:{fft; Ma
FXBW-500/120-2 25
4 Hebei kft Pengguang Line 0311-87934594

I FXBW-500/160-2 262
2015-1-1
4
it) 1~~J~t.fd'
Hebei
1g )J z; ii] 500kV ~~I I ~][
1-.:m Pengguang Line
t'.H~~ 7- -!3t'if,
0311-87934594
Ma

2015-1-1 fjjflljffi/!l~rt!,;/J~~riJ 500kV *-i'M~f"txii!ftf@t~


FXBW-5001160-3 36 0791-88683196
3 Shanxi T-if!.e&~ktt Overhaul
2015-1-1 ! J MIT!)]' ti it! :1J0 JJ 500kV 1km I @1-frjjx~~T
FXBW-500/160-2 54 0791-88683196
3 Shanxi .t:~ Yongnan Line

FXBW-500/300-1
'
' 275 2015-1-7
Pi1Miimi1li E!:!.}J 0 ri1 ~i4! 1lll!Ttfli rer
~ttffl soo M:~ Chen
Shanxi f-{;\!X!flt:I.~ Fuzhou Line 13576142625 I

2015-1-1 l1'l !1 ?M Tl ti <ti. jJ 0 JJ rr ~i*J]il 500kV ~U~ T~ 1


#!@*Jiang
FXBW-500/160-3 56
i 4 Hunan Chang de 0731-85337575

FXBW-500/300-2 7
2015-1-1 ;J ~;it;f]WJ ~ 4!.t.J 0iiJ TT*~~ 500kV ~~T'f'. ~Af!*Jiang
4 Hunan Changde 0731-85337575
500kV {(:~H I @~PJJ~, PJj
i~r.:t;-3-r&iti
2015-1-1 lJM~ii~tl:J.7J0iil #Jil!*Jiang
FXBW-500/210-3 50 Changchuan Line
4 Hunan
conprehensiv:~?~r
l '"M'i
"'" f:: ~75
constructi y,"
- '11/,
. ~-0
I 500kV K ;.. r_;~
' -.-,,A-' ,, t;, H ~11~
Pbt , l.\'!*,fM,r,
... - 7,-
0!
\>
2015-1-1 !fl i~ i~ ffi 13 t li)J 0 f,J ,ilng
FXBW-5001120-2 14 '""'""' u r:-x: ""' ,,::,; j''\ <'~
5 Hunan Changchuan 07311-85337575
conprehensive
i construction
I

2015-1-1 JilMiml3ti1t!.JJ0'1J ~~fr&~ ~~U*j


4111t!J'J' iang
FXBW-500/210-3 18
5 Hunan Changchuan Line 0731-85337575
conprehensive
construction
500kV Kfl'ri I l0lt~!l/i~, llf1

201s-1-1 f:illllMftifi'rl!.)]0,;J ~"'5t;Jiii&~ . ., "L: Ji


):,l!J.:;.r: ang
FXBW-500/210-2 148
5 Hunan Changchuan Line 0731-85337575
conprehensive
construction

Mr..t0~j'-'i:
2015-1-1 [t]Mltv'J~i'lrti.JJiH f.}~J:!* Jiang
FXBW-500/300-2 10 Changchuan line
5
I Hunan
conprehensive
0731-85337575

l !;J;FlrJii.11rr~'liit.f:0r1J
construction

FXBW4-500/100- 'il\'llB~ Zeng


42 2015-2-5 :tmbitnfi 95-9' -i:.'
D Zhuhai 85124178
I Guangdong

FXBW4-500/100-
12 2015-3-3
c 85124178
Guangdong
IJ'j;11!~1Hlt.:lf<if~>;J
! FXBW4-500/180- ffirI1JtEt!.f.JllSITHl-W~rH: :xjifi.U:M Deng
IB
25 2015-3-3 1PJmtll!l.:%-ifC.'
, u~'{ ir;17Jq~ 1t: Fl! Yangjiang 85125263
Guangdong
r-n; LU.M:ff PR!ir t.f:0 ti]
FXBW 4-500/180- P.:J iI g~ ; I!. fili ITT IT PD {f fi!U!.Z Xf;JQ:fjj" Deng
21 2015-3-3 qt,31f,t1J!i~i:p,c.,
B at(f,;l.*J~:!l:Li!. Yangjiang 85125263
Guangdong
J~*r'i],Vi!ftf~:lllt.f:0i5J
FXBW4-500/180- 2015-1-2 fli,\'~~ Liao
61 !IP.J?,it)JajS-cp.e,, *tJ-,%~-?.i!tli~{~ Ifil
D 65125039
Guangdong Zhanjiang

!*rt!Mfi~'ifit.f:i:-i'il iill:~Itll<f!!.J.TI 500kV ~:liii3':


FXBW4-500/100- 2015-1-2 ~~:W: Liao
48 ttiiiif.JM ~ <P .c,, ;J;~w.%~"i'~itr.t~ll&I;f
D 85125039
Guangdong Zhanjiang
!*Ft~ tI!lN:Vfff0~]
FXBIJl/4-500/100- 2015-1-2
12 ~J.l~i.flfl*'T't
D
Guangdong
!* rl!.li~ ff jlll[-Jjlff0 fi"J
FXBW4-500/100- 2015-2-1
18 imfl~ ~ <P ,e,,
47J.J
D 3
Guangdong
FXBW4500/100- 2015-3-1
12 WiilEM!i%-r.J:iC.' t:ll~hD.1.~x:.ii:i:Tf~ Rongmao
c 8 85127370
Guangdong Line
ltr;tl!.l#Jffllf,! D'I1f0iJ
FXBW4-500/100- 2015-3-1 iIIJJf;~ 1U,R.j 500kV m~ Z.
49 W?ALijfi *"PC.'
D fXi:Jj/XlCl1.iZ:}:ffi'. Shanwei 85127370
Guangdong
/:tf.iltJJH!>!l~ff:-0 ,;J
FXBW4-500/100- 2015-3-1 iih~ {Jt it!, f.iJ 500kV ftt?f: Z.. WlldF-Cui
36 4miiit!Jlt;}).9='L.'
c 8 t~flfj/Xli',k~T'E Shanwei 85127370
Guangdong
r*1t1JJ11~m1f0.;J
FXBW 4-500/100- 2015-3-1 iJIJ~ {Jt tll.JiiJ 500kV ffi~ L. t!U't:iW Cui
49 ~Jmfll:l%-9'L.'
D 8 r:QWJ JXl.i'.k:ili I~ hanwei 85127370
Guangdong
i3M!.!1:fH&~H0iJ
FXBW4-500/300- 2015-3-3 ~i!!l!!.R Lai
48 Wmi'lH<PC.'
E Huizhou 85124183
""---->'
Guangdong
iJJ;rJ!M1'f~vHf0 iJJ
FXBW 4-500/100- 2015-3-3 ~.7-::ti Yi
/I 73 !lftli,fi.nt~*<P't'
D :f,iT.~ Shantou 85125294
Guangdong
1*1l!.f~ti~.9HH}hJ 500kV ift\i;~fjl l./!{#9-#71
FXBW 4-500/100-
36
2015--3-3
Wmft~ .%- 'P -t, ~1fil* Liao
D 85125039
Guangdong Zhanjiang
i-*rt!.Mtf~J){ ff 0 ill
FXBW4-500!180- 2015-4~ 500kv &~Z.r:lt{fr.lli)iet~ XflfrUJl Deng
270 W wUi!HS- 't1 'G'
B 0 y 1J~Jt}:.:-P$~ Yangjiang 85125263
Guangdong

FXBW4-500/180- 2015-4-1
260 WMttlfHSct:''t'
B 0 85125263
Guangdong

FXBW 4-500/180- 2015-4-1


j r * ffi M 1ntHHf:0 I;J
500kV IJ:;~Z.~(;f!:fil)~~ x!Slixk~ Deng
220 4ii11''iiJlfl 95-9 L'
B 0 r t%)::f!:J.:~:\ Yangjiang 85125263
Guangdong

)JJ;rhlijj1f~1i1f'.L}T:JJ
FXBW 4-500/240- 2015-4-2 M~'t' 220 f-{kt~~ Xlifrkfll Deng
24 Wi.iiEn*t:f'C.
D 3 -220kV )S~-Jg!~~Efl L 85125263
Guangdong
~~I~ Yangjiang
!-*Eti.!'Xif3Jlff11iif0fil
FXBW4-500/160- 2015-4-2 ifiz{J~Ff!.f.lj c ~~Jl.?ii-1tJo
20 !ltain'inf;l %-9 {,>
B 3 fit~(1::r)Qin
Guangdong
'*lh~~1i~~:fiiff0i>'J
FXBW4-500/100- 2015-4-1
9 ~Mt~!i%-r.J:i,l.'
0 I 6
Guangdong

FXBW4-500/240- 2015-4-1
r -*rt!!'X11f!i!'!.tiH:0fll
230 !!PJmR~%-r.J:i,c.,
D 6
Guangdong ~)Hailu Line
r*1u1~~Hi'.ftrt f.11;,;J
FXBW4-500/180- 2015-4-1 i1!1:UJ~11lf.ij c ~flr.Ri fitH ~A:f.@Yi
6 tJifdit ttii 0-41 L.
A 6 M ~(iii f.i1 )Shantou 85125294
Guangdong
rtf<rt!li.<Jfi~ !Ji: fH~ i;J
' FXBW4-500/300- 2015-4-1 ~!l1:kf}t1l!.PJ c ~~~ &{!f ~:AJ~ Yi
6 ~mt.ill!. %-<f' 'L'
D 6 fi{l~(l1ifr5)Shantou 85125294
Guangdong
rtf;1u1~HH~~{H;1i]
FXBW4-500/100- 2015-4-1 ~!1;1-{}tttJ.ff,j C ~fitJ"u*f4 ~X&Yi
6 t!JJiii'tnI0591t:,.
A 6 fitl 11\-(rn f.U )Shantou 85125294
Guangdong
r;);rl!.Mfi~!EH:~,;J
FXBW4-500/210- 2015-4-1 1ilJJ-fjt1l!.f.i.i c ~flr&.11\-14 ~k~Yi
6 ~1mt1M'15-'PL.
A 6 fi.li ~(in fr,j )Shantou 85125294
Guangdong
r *rt!lajf!i;f! 9lff~i1J 500kV It~IT. ff! l.f'l.2~3'~~
FXBW4-500/240- 2015-4-1 ~flHPi Zeng
96 #.lmH!i91-<P-C.' ;i!:.llf&/t!li'$:T-$),$$ Shigui
D 6 85124178
Guangdong Line Overhaul

FXBW4-500/240 2015-4-1 1
ltf<it!.M:f.fW.:!iiff0,1J l soosv mtt Efl z..tx~~~
'/@!:lil'iQ Zeng
84 'tMtJJR9J-it',G llit '':~Cf$ kf.? Shigui
B 6 85124178
Guangdong Line Overhaul
13); rlJ.1(<) 1'fi:~:IlHf ~ iiJ ;);Ai~it!.Ji\ltiliPlllilillWT
FXBW4-500/180- 2015-4-1 i.Uft\f!i! Wang
204 ![tl}ifirna%-<P L. 2015 ~1:rtt1'J 1'4 m.
A 16 85127372
' Guangdong Dongguan

FXBW4-500/180- 2015-4-1
l;);rt!Mff P~tli if~ il * S';i~'J;t!!fwl$!! rJ.i 'm'lfilPJT
IT!#~Wang
201 4o/JV!f.Hii %- it'{, 2015 fj01:f"tHH't'#t
A 6 85127372
Guangdong Dongguan

2015-3-1
c:p [FJm jj 11!. l'Hi ffi. :~Hf t:~ W-.i 3 t Vi:Iqo lrf rg ~~* 1-{i, tj:f&:f! Niu
FXBZ-500/180-B 59 '.0 ilj ~ j;'ij If~) If! t- nJ J~jilj]im~Fl!I:f-% 3 .
2 38126017
China South Guangxi DC
9 Pl r\<ijj <tJJlffllt!'PHf ~m!i7'. ViI9'ifft1pJbJZi!l:!.
FXBZ-5001240-E 2015-3-1 4ti~Niu
E-B
206 1.;. ;;1~1-ti FEm-1 r I!. 0 iJJ r illi 11 mt ti! rt! ::r mi~ 3 -.
i 2 38126017
China South Guangxi DC
i:p ~ ~ 1/ll! fi1 fl ll&t :f]j ff -;2 m~i:hI 'Pih'i iJ:!~ iS ~
FXBZ-500/300-E 2015-3-1 !j:f;(lli Niu
117 ~ ri] Re 1i'~ Jf.~i!Jtt 0 ii] ri&Miiit~-Wi'tfftj!~ 3 t!1
i E-B 2 38126017
China South Guangxi DC
cp ;i $.1i tli r~ ff iiR Jir if ~!W~1YiI9ib'frlJ.!f6~~
FXBZ-500/400-E 2015-3-1 4-f!ZfliNiu
145 0 i\J~1:'lif:HWire 0 fD lillil!i.~ft.~lf.Pt.1. Tfllm 3 t!l,
E-B 2 38126017
China South Guangxi DC
9 Pl ~1J i[iJi;HH~~ff .ZC!W~;:J;ITrp~ig
FXBZ-500/550-E 2015-3-1
73 ~ iiJ~Igliit:!B~Ft-~ <>J liTrlit
E-B 2
China South G
9=1lillm1J rt! I~ fHl'UHf
20i5-3-1
FXBZ-500/ 180-B 78 i~ iiJ ~ lfli I 1fil MJ ~ flJ
2
China South
FXBZ-500/240-E 2015-3--1
4'1ilm1Jll!.Mfiilll!ffi1f j ~iJ~iYIT'P~Pt!:.4'ii5rl!.
'lft.l{i Niu
226 0.;J~,?.11-t..i.Wl.!.z~,;J I liro:.f.i!ii$J'tr1l:!n'.fr.t; 3 8
E-B 2
China South I Guangxi DC 38126017

<?film1.ntlt4H~:ltif I ~ri'hi~i.Pu.cpW1u?'t;.t51l!.
FXBZ-500/300-E 2015-3-1
E-B
145
2
z:.uJ~,\'\irH1r.tt0rct I liJll11ml~i!>i~T1J1~ 3 B
LJ:f&:i'f Niu
38126017
China South 1
Guangxi DC
9Plffl1J!l!.!~ff Pfl!. Jtif t..d\iJ *:&IT i:j:Tiffi Ill~ i! '4!
FXBZ-5001400-E 2015-3--1 'HQaNiu
177 0 il}M!r,';j ftdlfiiti.l. 0 ,;] lifti1fi.i(~1l!. T~~ 3 El,.
E-B 2 38126017
China South Guangxi DC

FXBZ-500/550-E 2015-3-1
i:p !1!1m1J rl!.~.<JfHR!k'ff .i m ~iJ; IT 'i" W'r- rt!.~t;i! ~
'HN~Niu
25 0 ITJ {R rl':i HdwJ 1 [! z~ [1J /[JlJ]Iifif.tiW-rl!. T:f1~3-@
E-B 2
China South - . Guangxi DC
38126017

4' ~ffi1.l1trMfl~ Jli{f "!.> m-~iJ;IT<P7Hf r[!.fti!iiIM!.


2015-3-1 'H!z~Niu
FXBZ-500/180-B 77 01iJ~1Di&~~rttZ~ r1J /i.lij}[Vft$DJi.!!. Tf1.:m 3 "@.
2 38126017
China South Guangxi DC
cj:> li1 ~J1J ftI. li;iJ f;f~
:!ii if .z: m<t?J:ITrJ:il,)f 'l!.~.BS.il!
FXBZ-500/240-E 2015-3-1 4'f!d~ Niu
E-8
141
2
0 7iJti:!iniJf.:~1g0i1] nm:i1J:iM~'ilf!T~ffi 3 m. 38126017
China South Guangxi DC I
*
I :'~3-1
wiw1.11t11'1 ffi:f! ~if z;- Hli ;;J)::rJ;IT 4' iYfrt!.16 i2i rf!.
FXBZ-500/300-E 'H~~ Niu
202 0Ultlif'~ff~1!i'l!. 0 cij rjl!:jll:7'1f~i:tn.nm 3 ~
EB 38126017
China South Guangxi DC

I FXBZ-500/400-E
121
12015-3-1
cp f:iil Tw7)"rt!.M :fOf!"!Jl ff
~ -fj'J tli?:i It.'\;%]!{!, i~ i'IJ
;:;, jf;j::1..l:i:I9=Wt- t!!.~.1;511_1.
rvli1Mf4fl,illn~~;g 3 ~
4ffr:ik Niu
E-B 12 Guangxi DC
38126017
I
; China South

I -z; m ~rJ! rr? Wtrl!.Mi2i rn


;
9=i pi'! TW1i itr llHHIU1 if
FXBZ-500/550-E 2015-3-1 ti~~Niu
69 0riJl$~~:~1tJ.i;'JJ li1Jl]:i:m!rii'Ufl:!Tf'.El+13 -E!.
E-8 2 38126017
China South Guangxi DC
4'l'.i:!Wi1JrUt'JffW. il'iff: ~ Wi :@:7'.J.'IT"l'it'f ll:!.5!.!ii1dJ.
2015-3-1 4-f~~ Niu
FXBZ-500/180-B 117 i~~t!Itlil.t.'ifi]rhz:. l;j rilli1:iiJ'K$fi.l1[1.I~~ 31!1,
2 38126017
China South Guangxi DC
.:P ~ rn1J rt.M i'i ~%'.ff ~rn~?J;U'Pi&ri!.M~rt!.
FXBZ-500/2 40-E 2015-3-1 !f:&~Niu
226 0-ii]~!\';jlli~tt!.0 ilJ lillimiff.~J~I~~ 31!1,
E-B 2 38126017
China South Guangxi DC

FXBZ-500/300-E 2015-3-1
i:p ~ffi1Jrt.~-ti w
!fl 1 rn
Z:-: ~WIT 't'itf tll ~~rt!.
!j:f~~ Niu
133 0 ~;liij\';j lli ~Ft!.~ ?iJ rilli1im~E.I~m 3 -m
E-B 2 38126017
China South Guangxi DC
4' m1J fl\~ 1Htt!lNf i:ii~W filAi\
FXBZ~500/400-E 2015-3--1
i~ f.1 illiit'ti f:Hwfli! 0 ;:;J )l!](' ;o;yp'E!
I E-B
61
2 } rlij-i-rn ',,,,_ ~l'- l 1I
China South Gua
_,_,
6 ;.:.J_};
,,,, ~~ ()\

<P !il WJ7J cg ~HH!U~f:f -z;JJi: ,1t


1~uz.: >'; , ~
~~/
FXBZ-500/550-E 2015-3-1
rjllj:!i)f.E
, '~J'llu
25 0TIJ lffi1l'li JfWJi\! i~ ri1 ~f$ .j li ... i,,,4
i
E~B 2 ':lR,'J'26017
China South Guangxi DC
I
I
I

2015-3-1
4'ffliJ1J1[.(Mfi ~-~{1 t-:-m %. i".JIIT .:Pihf 1[l,J;)Z; 11_1_
1H~fiNiul
FX8Z-500/180-B 136 ~ 1iJtl1:'1iJ:Eti'"tit!:L~ ii) r-i!Tii.1.iit'ltl11u n'.fm 3 -G.
2 38126017 !
China South Guangxi DC
4' ff! M" 1J 11!. 1'J fi f>Ui ff C. m ~l'.ViI .:P Wt 1tl:!i~; i! 11.!.
FXBZ-.::500/240-E 2015-3-1 'H~fiNiu
109 0 ;,j~,?:irr-.~iui~ 1iJ riJ!j~i;fE1iltf1{!.T~w; 3 i!:J,
E-B 2 38126017
I China South Guangxi DC
4' lil ii h 1J_1JJ H il~ !A If Z-WJ~tViitf:'ifffl[!;)'Jj_i!; th
FX8Z-500/300-E 2015-3-1 "H~nNiu
153 01iJ ifji,;'ljJ-j{~j!{!. 0 ,';) /".j)!j:gfti{~1l!.:n.f5f; 3 -8.
E-8 2 38126017
China South Guangxi DC

2015-3-1
i:p !II m 1J 1[!. 1.t.Hf Iii{ vHf ~ iij ~tViI 4'wt FUJi'li~ <!!.
FXBZ-5001400-E 'H~~Niu
117 :L~ 1ij{Rii"ii It< 1$ l!. :L~ ,;j /jlij]ijj;f[~rt!, Tflt>;; 3 '@.
E-8 38126017
12 China South Guangxi DC
<P Iii! ffi1J <h l'-'1'fr flUHf ii m 'ltr.1'.9rr i:p Wi 1Mi:; .i!; 1 l!.
FXB_Z-500/550-E 2015-3-1 '1-#tl!t Niu
41 01Jifli,f:iff$.01lJ. ~ nJ nm.RwJi!~kfl T.:t~m 3 -m.
E-B 2 38126017
China South Guangxi DC I

4lilfiiI1J1{!.ls:-J N~!tai' ff L"M~i'YiI<t'ih'i t\.!.li~i~ rti.


2015-3-1 'Ht1~ Niu
FXBZ-500/180-B 75 ~ uJUii*i&t~rt!. ~}if] )il.!l!iiirrJifi1l!T~~ 3 -E_J,
2 38126017
China South Guangxi DC
q-i JJ ffl 1i l4:J. fiJJ fil~ 95' {f :,:;.-oo ~tYiI tf' iJfr rt!M ~ 1 t!
FXBZ-500/240-E 2015-3-1 tj:f!r'.!f Niu
189 0 iiJ Ml itii ff.: $!!PU 0 frj /j)lj.fivitlf,-Jrt!If~m; 3 '@.
E-8 2 38126017
China South Guangxi DC
4' Ji.1 ffi1.:il-U M 11 !;& 9l ff ;
'z; m ]1.J:rr l:f iij't 1utr1~ ~ tl!.
FXBZ-500/300-E 2015-3-1 'Hi-'.tll Niu
173 0 iiJt\l.il'<i!:t:lii'rit!.i~ rlJ iil!iM:iliirii~T.F~ 3 1'1.
E-B 2 38126017
China South Guangxi DC
i:f ~1W1J Fi! M tH!Hiff ; ffi~i'. ViI <i1 iJff rl:!,MJ.3: LlJ
FXBZ-500/400-E 2015-3-1 1l1Qti Niu
109 ~ 1i]~i:':iJf..:hTufl!.01i) lil:!iilMi!iiJ)il!.Ifl\~ 3 {Q.
E-B 2 38126017
China South Guangxi DC

FXBZ-500/550-E 2015-3-1
iF lilm1J rl!. M :fiP::! :!fNf *
2-{ffi ~l".J.'iI t\'f it!.t.'iiS rg
1 H3l~ Niu
49 ~ ii] !l1l1f:i 1:t Wi qi. 0 ri] liJ!i1~j;E~tlJTf:i1% 3 -El.
E-B 2 38126017
China South Guangxi DC
i:p Jtlffi1J ri!;l(Ajfl ~ Jli {f lim<6:i' . Jiiicpijff htci~rh
2015-3-1 'H3i'.~ Niu
FXBZ-S00/180-B 95 i:nJtll~Jf~il4:J.0 ill iiiiliiiffi.~i!l!.I~jt;fl 3 .
2 38126017
China South Guangxi DC
9 l"flm1Jt@.VHfllfl~ {f "A lW ~i:'.ViI tp iifr il!,tr~i,S rt!,

~M~m
FXBZ-5001240-E 2015-3-1 'l:fJ.l~ Niu
189 0 i-i'JM!l~:Jlli~Jti!.0 l'lJ iilli1l:iilt~lf.I~ffi 3 '.
E-8 2 38126017
1 China South Guangxi DC

! 9=1 Di! ffi1J t@.M fi-PR :ot {f


FXBZ-500/300-E 2015-3-1 ~~~,Niu
149 0f>Jitliirii&$irt. 0 ti] ll!'iJ;i.. i!!
E-B 2
China South Guan9' J) 1tl fTJ ;.!i Jr.,P ''
-~?-."_:~ _t.
~J.~~7 1CJ
I
I
4'I1'lm1Jin1~f!1*1-mff z(Wi":i7J 7.ifftll-IJ;W' }
FXBZ-500/400-E
93
I 2015-3-1
0-r>i~f.liFE!m~'i.!.0n-1 /iJTj}!tj,ff ~3-1:-
~v
Niu
E-B ,,,~a11'5011
j2 China South Guangxi DC - --~'"'"'"',
41flm1J11!. l'-<J fi. m 71. n: c: Wi ;t;:rJrr 9iJ/r1u~-b~1g
FXBZ-500/550-E 2015-3-1
i'; 1i);ti[i~H:.~'tr11!.0 ;;j
'Hizi; Niu
69 I fffiM_Vi[$rPl"lt!. Tl~~ 3 .
E-B 2 38126017
China South Guangxi DC

FXBW4-500/300- 2015-1-1 ,.. ., m ~Ni11'.JJi'JxW.i<.iX.)'lifi""111 ~lw.:f;t Lai


12 1'.lJmfdl*-rL :><:. t.:.
H 5 Guangdong Tfil Huizhou Longmen 85124183

FXBW+500!300- #!~~Lai
3 2015-5-6
E 85124183

FXBW4-500/180-
r * lLI~ ff
1 f!:;i:i{f[~ ;;J 500kV !J;t.~z:.~~t:ltli!H!l'.g
-#HJ~!E Lai
2 2015-5-6 :V.tYortlfbf!h-cf:iL. rtt:7-LJ~Jt)~~$ Huirnao
A 85124183
Guangdong Line
)$l(!l<Jffl'.{t~{H:H 500kV ~if:Z.t~~~xltti-fe
FXBW4-500/240-
8 2015-5-6 1nif.f.lJ&1)-rp.f,. rtT-11-~J!Jd~ Huimao ~Wl!~ Lai
D
Guangdong Line 85124183

FXBW4-500/240- ~Wl!~ Lai


2 2015-5-6 fd.lif.fHR*"P'L' ~ T-"-J :@:ft ,kflj' Huimao
D 85124183
Guangdong Line
r $ 1l1J{'l ti~ -JJHf 2-} nJ 500kV ~-~-z:.~~tt~~ I
FXBW4-500/180-
115 2015-5-6 ~ii!tnlt~it=L r&=f 11~J1..:;)d~ Huimao ~il!l:it Lal
A Line 85124183
I Guangdong
I~-* it f<ffi JiR ~ff-~ BJ soosv -*J!i EJ1 rx&tir~ T- ~
FXBW4-500/180- 2015-5-2 ff#f.~Wang
28 ~Jif.U!!i%-9C: ~;ldii-~
A 6 85127372
Guangdong Dongguan-Huizhou Line

i-*1l!Y-HHlt-'.!nff ~HJ 500kV 1,f-)..fflf~~~:N:T-~


FXBW4-500/160- 2015-5-2 i..U~~Wang
6 #J~~LJfHJ-tf1L 1*).:~}~
A 6 I 85127372
' Guangdong Dongguan-Huizhou Une
t3.tirti.l-lrnm:J:li1H.;- m f.t!fIHJt1ufnJ:4i:fr~ 201s "-~nu
FXBW4-500/240- 2015-5-2 ~iif.;JRLai
16 !WJ~fl.ijl.!!,{.J
i<:rrT _m,[;' 11!1~
J, -iP:lf't't'!i!!:l
dl Hulzhou power
D 6 85124183
I Guangdong transmission purchasing
1-*i4!.V':!'FHi1J:i'.1H;iJJ :lt\1-f!Bt1l!.f.1J4'f1C 2015 ~!fflii
FXBW 4-500/ 100- 2015-5-2 ~~.j(Lai
78 !lillW.Jlf!.%-'-PL' 'hf.ffi "llW:l Huizhou power
A 6 85124183
1------j----t----f-G'.:'.u~a~n~g~do:'.'..n~g J_:itr~a~ns~missio~ purchasing
I-* <il fl.i11f l~ !f.i{H';- tiJ ii!! Tli Bt itl?U;;f>.flll 2-::01-:--::5:--:iF-=-
~-Wi+----__J
FXBW4-500/180- 2015-5-2
'#i!mnfi.-m,L' 1t:.f.t'l"~$~
~~3R: Lai
694 :ri-1 ;, Huizhou power
A 6 85124183
Guangdong
! .-* ll!.Mfi P& !iH.f:i';-HJ
i FXBW4-500/100- 2015-5-2
61 !f!JJ~Ti.Mli %-1' ,c,, 7-E:i
A 6
Guangdong
I.-* F"t!.l''fff F~:; if-~ 'JJ
FXBW 4-500/210- 2015-5-2
58 WMUJa15--'i' {,.
A 6
Guangdong
lmttil:<l:l fl~~ !ti ifi~ riJ 500kV jfi~l,~~t{~.@:
FXBW4-500/210- 2015-5-2 Wr~'if. Cui
45 !fP.lihtnfl %-rfi ,(., l]i;ffi~&7$)..:fi'.t
B 6 85127370
Guangdong Rongmao Line
IJi<1t!.Mff P!l..ITTff~ ,;J 500kV ft'l'TZ.tx~~~;@:
FXBW4-500/210- 2015-5-2 W.~$ Cui
33 4mitii.Nfi*9='C' :!lH'~~ 7 $ }.J;t I

c 6 185127370
Guangdong Rongmao Line
IJJ<<l!it411i:r!~lf:z~ nJ 500kV t;:i~l.~~~:UUk I1
FXBW4-500/160- 2015-5-2 W&':if1' Cui
164 4P./;lf11'.Ufi~1',L. 'liHt~r~Jd$
A 6 85127370
, Guangdong Rongmao Line
~
2015-6-1 !i.11-'1ilfrITfii'!{l.JJ ~ J;'t!J sookv~'.5t1u Tf1mn 11' 'J IT
1 Sun
FXBW-500i210-3 -19
'o '91'l}.2- nJ Zhejiang Taizhou supplement 0571-51214928

2015-6-1 !l 1'4HITIT -1N.1.J10 ;iJ1m 500kV tm~it!. TJ:!~H~ {1J>1MI Sun


FXBW-500/420-2 20
0 ~0-~n] Zhejiang Taizhou supplement 0571-51214928

' fl ffl ~..:...::&Ft!) :i.Sr':tl


2015-6-1 liif fi.frfrIT ~rt!. :JJ 0 r:J ~ M NI
1 Sun
FXBW-500/120-2 23 500kV $Wj-Jtlf.l.I@~:f~
0 l?f5}0i'fl Zhejiang 0571-51214928
Taizhou supplement

1 2015-6-1 rn ~ iirrIT 111' rh fJ 0 ,;J !VJ,J f11tl ~=:&Et!.! l! ill ftJ11NI Sun
fXBW-500/420-2 8
0 ~)}0ir] Zhejiang 500kV ~j~IE,I:F:!'\'!:ti 0571-51214928

500kV ~~-tfl!Jt HI fO!~i~


2015-6-1 Pll ~~ilfriI*i' tl!JJ 0El 11.H' IT Sun
FXBW-500/210-2 -14 11..!:T~i~Hf.
0 Zhejiang 0571-51214928
Chunxiao Ill Line
I ' 500kV ~--0~fftt Ill [01.411~
. 2015-6-1 b1i1 MWrIT ti rl!:jJ 0nJ :fl11NISun
FXBW-500/120-2 8 ttitMHr
0 Zhejiang 0571-51214928
Chunxiao Ill Line
500kV 7(--~lf)t Ill 1~1~61":~'.
2015-6-1 l'l'Jji~ilfrll.~'rg)J 0 liJ 1']1t}-t( Sun
FXBW-500/300-1 1 1f:!.If~:~H~
0 Zhejiang 0571-51214928
Chunxiao Ill Line
irrm*t;i in~ rti,~i'i-MHm
2015-7-1 J:lilMili*in =if.:JJ 0 6J:lP.J ~J\Zhao
FXBW-500/210-3 540
5 '.?0iiJ Shandong
500kV ~ga n-'
0531-80126969
Jinan UHV
ir.=lItlf 1~ lli1!: 1t:!.Y-i1i-flil Ml
2015-7-1 P'lli:<.lill*:f!it!.h0i1J~ ~if~ Zhao
FXBW-500/300-2 462 500kV tt~nI.
5 ~0<tJ Shandong 0531-80126969
Jinan UHV
~m~,~EE~fhtp-fill1fll
FXBW-500/420-2 72
2015-7-1
5
!illM w*W<t!h~ iiJW
li'.f0fiJ Shandong
500kV
~il:Zhao
I
'
I
Ji :O::Q~' ~1-80126969
~

.
2015-7-1 ftl M ili *~ Eb.)J 0 ri"J!IPJ s l!IJ~!B~~~
':- d'i'i!.1 hao
FXBW-500/120-3 186 f~~~1 "

15
, 1ti i~ ii] Shandong
Jin
~ - x__ nj -80126969
I
~ ' ""'-- - -_ ..l.. 'iUJ
1)1:ffitff 1\7.t -~~;811
2015-7-1 !4i'll~~ wJt-*1'4!.J10 i;JW ~it Zhao
FXBW-500/210-3 998 500kV ti(~ Iffi
5 ~0i1J Shandong 0531-80126969
1
Jinan UHV
Hr:rn~1~ii:t-.;t:1f!.%-~ffil
2015-7-1 ill"'! LL 3J'; fith )j :'.C ,;J #'.] ~i\ Zhao
FXBW-500/120-3 130 500kV~~Tf'.f
5 !ti~ .,3 Shandong 0531-80126969
Jinan UHV
w~dil 1~'1.fJ'ttl!.!-# :7t
2015-7-1 !ElJ tl.J ~;: \i:j'lf!.)J 2:- iJ:\m ~J-\Zhao
FXBW-500/120-3 91 500kV 1!:: 1ll.tM:lU~ T..f:f
5 ~~1 Shandong 0531-80126969
Chouguang
i
tl.J 3)';Jll~f<%:)1:;Il!,)-*fJ't
2015-7-1 rtlfi<JtiJ3)';f;'~)j0riJ:\m I ~if~ Zhao
FXBW-500/160-3 791 500kV ~1g)I.';;~~ T f]j_
5 tit-;) Shandong 0531-80126969
Chouguang
?filtt!Jr:':;/pi' 500 =f("k'.ll:: rl.!.~/i
2015-7-1 lJM w *ft' tlJ. h 0 nWJ.1 kiit Zhao
FXBW-500/210-2 13 220 H1tili21':12iH\ Tl~
5 ~ 0 ,;J Shandong i 0531-80126969
Zibo Gaoqing
500KV lfrllllfll~&JlJtM
FBS-500/120 11
2015-9-1 1*11HJ1tr~1t!. n~rn ,jJ ti<fr~~Tt~
'fr.:!Fi~ Yi
0 Guangdong 020-81255833
Qiaoqu Line
500KV HFJl!Jrfi!x&JIJftli'.i
2015-9-1 : r**-i'~~iogn1~iiJ i}t;ljijfl YJ
FBS-500/210 30 I ti:fre:<lifi:I~
0 ' Guangdong 020-81255833
Qiaoqli Line
500KV #f [fl! ~ t:t:.& JI- ffiM
2015-9-1 IJJ;-'#~1~'ll n~~~r'iJ {jt;ljijfi Yi
FBS-500/300 ,6 ~ft~~T~
I 0 Guangdong 020-81255833
I Qiaoqu Line
SOOKV mrtilrrt~&JtJt;'ib
1 FGSP-500/300
I 2015-9-1 IJ1;13tm3tlJ:l..If0~iJ fp;ljijf! YJ
12 tifre1i:@T~
0 Guangdong 020-81255833
~ Oiaoqu Line

-- FXBW4-500/210-
6
2015-7-2 ...; iJ Li! ftil ff Jlli!. :91 ff i~ Jij 500kV },,:ff! I ii:Jl~~!lJi7'J ),:f~ i:':ifil Gao
!"
G 0 )...:.flll.f!~t\:11i'Q Yunnan Dahe Line 0872-3188448

FXBW4-500/160- 2015-7-2 i.{ ffi rt!J<.91f l!!Ul'if 0 i>J 500kV };:;ff! I @txl>}ifJ ki!i itd!J: Gao
.., G
42
0 J,,:l:filmtl:!.m Yunnan Dahe Line 0872-3188448

2015-6-2 illi'iH'1iti~1h U1!.i~riJ 500 -[-~E;TW~~~I~ i'i.fl:1JC.'( Hu


FXBZ-500/210-2 26
3 Zhejiang Genan Line 0571-51215184
500kV ;)j:-Ej/~:;!jj~r.~t"'
2015-9-1 rr~:ri;~jtr[l.1} riJ ~ffifi:itYang
FXBW-500/120-3 12 )ffi.~~If~
5 Jiangsu 025-86817560
Sushi/Sufang Line
500kV :ki*l:ktJti~if:!?f'
2015-9-1 lI~:Hii.5:Jt1M~nl ~nb!i;Yang
FXBW-500/120-3 12 :tU!If.
5 Jiangsu 025-86817560

2015-11- ffl~J~JZff 1/'.i' ;U:iJ:ff i;!i


FXBW-500/120-1 64
4 0 riJ Heilongjiang

2015-11- ml M ~ }tiI ti rt!. JJ 1f ~~


FXBW-500/210-2 : 219
: 4 0 BJ Heilongjiang
Hegang Line
0451-53684194
~JE*F18'!1
fi:jit
~~~~ lltfii'J :(9iij~{!L Jjli~~~ ~~A&rti,~
(j:)
Type Contractin Utinity Project Contact and Tel
Qty
g date
!iilMl!frIT1'Jrl:J.Jj2- 500kV Fi.t; 5832 !::Ii_~
{1j,,J.lI Sun
FXBW-500/210-3 150 2016-1-26 1iJ~lJf 7}01tl ~"i'tx~J . J~
0571-51214928
Zhejiang Fengyan Line
lfi !c;iJ il.1 rr f'i' il!, M} 500kV PJ.ti 5832 !'.&~
-I1JvJ'IT Sun
FXBW-500/160-3 150 2016-1-26 ri)'.!tJ~j},Z.iij ~"i't\:~Aj}
0571-51214928
Zhejiang Fengyan Line
If! M ii.Jiff fi' rt }] i~ 500kV x'J' 5455 H~~
fljlNISun
FXBW-500/160-2 400 2016-1-26 1i] 1ta ~ 7}0 ri] ~>;~~lt'Ji},:f-~
0571-51214928
Zhejiang Tianning Line
rt! f\iJ ilffIT fi' !\!) J ~~ 500kV J('J' 5455 ~~
t'H'ff Sun
FXBW-500/300-1 40 2016-1-26 J :JP.itfr'lt ~H ~~~ii~}.:~
0571-51214928
Zhejiang Tianning.Line
ffilJ:WitifJ0{iJ1t #f+!5c*(1:':it.lJ)220 f
f,'Ltt.U Zhang
FXBW-500/210-3 24 2016-1-8 ~{!tIY.0 i] {:J\~~tl!.T~
025-81022222
Jiangsu Taizhou
rr;)J;fi rt!. JJ 0 ;iJW 500kV #oi-;~11-t::li.~~
i ~;ft fi Zhang
I FXBW-500/120-2 70 2016-1-8 ~HJlJ2Y. 0 ti] a't.m
025-81022222
Jiangsu Taidou Xingdou line
ir~H'P~ J12- iiJ ~!IJ 500kV Z,:-'l ;'Uf-tL:C:ir.'J
~~.f*Zhang
FXBW-500/210-3 200 2016-1-8 'tttftJ \j 0ii]
1 i i&lZi
Jiangsu I Taidou Xingdou Line
025-81022222

rr;n: t1i 1t!.fl 0 iJ ra


500kV ).!(',;&tx.:=.:Yic&i1i J{i:.tHi-Zhang
FXBW-500/120-3 19 201.6-1-8 jj'ff;i~l'Y.0 tiJ
Fengtai Line 025-81022222
Jiangsu

1n.i:ft' Ft!J; i~ ,TJ :im


500kV plj;t::~.:::.~C'.:liii: i?::fi:U Zhang
FXBW-500/210-3 258 2016-1-8 ~ ilt!!Y. 0 rij
Fengtai Line 025-81022222
Jiangsu

f!!!$:fi'~;"il;;t!T -~4'
r;tJ f<4~it i!Pt!. )J *1. 500 f{k~~In H)tgjtWang
FXBW-500/300-2 90 2016-1-12
i ~ 0 i'IJ Fujian L uoyuanwan-Yangzho 0591-87024296

11J li;iJ .@.1 :ft r{! fJ ff


FXBW-500/160-3 206 2015-1-12
ifi!~ril Fujian

iii! iUJ mi~ ii' rl!, fJ ff


FXBW-500/210-3 96 2016-1-12
~i~ ;ij Fujian Luoyuanwan-Yangzho
ng
Annexure 4 (ii)
Supply evidence and
Performance Certificates
Client Satisfaction questionnaire MPC-S3-03
;~ f-1 17.1 M~ G~A&~-~ili ~M~qm #~BM nm 'l,i; #i {'_)_; Jlj Ji!l 1.'i,
Client I Linkman and Tel Product Type First Dato of Running Amount Use Place
I
* .lt 'tl.!~:J,~c~:, ~~
,t:;! ff_ ?-1
ll'.
_TIJ n;',- !i; I
~ ijj /045 J -5:!922082
FXBW-500/210
FXBW-500/100
2006-8-25
I I as Sr_
lll x
500kV /I\-:k-jc~-nfi
'iiw~
r{J, T-f!
500kV Feng-Da-Song-HaProject
,__N_orlh_~~
G~~id~E-,,HV~H=a~.,,,rbincc-
~D_lv~isio...,n~--Zhao--y-on_g1_04_s_1-_s3_9_zz_oa_z
__ -l *
HJ f' J-ii. \Jll ~: !Al, .& ~ is.( :
* Content of client Satisfaction
HJ J'' ii\li Xii: fl[ i~~ 1'i' Jig 'fi-:
investigate
Feedback and Suggestion of Clients

1, :<.!' J"~= 1W1 l:Q. ~~ :M: --l!f 1~ 11 1 ltl:i?J nD


Be satisfied with Packaging Yes No
or not?
2 , X>J ,u; i1l1 ?I . ;<!R. )ik ?:f iNJ :Zi;. ? biiZf fi 0
Be satisfied with product Yes No
appearance or not? The Products have been in good service since operation.
3 , ;it;J ;~: M, fJ: fi~ J~ N i~ :id '? ->tvi 'ili'D
Be satisfied with product Yes No
function or not?
4 ' i" 1\h ;;;_ fi i}: (JI. hl i'T tC! ft[ '? ltd Jli'O
Product running status is well Yes No
or not? HJ f' f('- Ft: 0 T;i ,
5 , A'J /" ,W, {1)- ;!i'r kk i'T iii!J ,\;! ? Jt4J f!iO Cachet of Client 2i
No
Be satisfied with product Yes
El !!IL _;v .i//9 1,, H;2..2/J!,
price or not? Date n 'Jj,
6, X>t 3C: :f,UH5- Ji!: N i'iij '.": '? M'fi:J i'T 0
Be satisfied with delivery Yes No
service or not?
7, Rti~IFiJJEl3}-b2NiJJlfi:'I 12-ci ;lfO
Be satisfied with delivery Yes No
service or not?
s. x1fl~9}-liJ!!ll:lt'61iliik'i:? :ilk );I ~~ 0
Be satisfied with service Yes No
quality or not?
9 .. ~.t fJ:. 1ih ~~ -1* Jm: -rn: _lt: ~ i'iiil :\ti: '? J-loq ~o
Be satisfied with product Yes No
holistic aualitv or not?
~ !" il'i ,\i!, 51-ifr :
Analysis of client's information

7l- ffi A analyst, -\f~


NORTHEAST CHINA GRID COMPANYHARBIN EHV BUREAU

iE1fiiEBJ1
Operation Certificate
x-t JJt~it Et! If1 {,J:
3&:
rfflm~~#~h~~0~~~~soo~~~f7m~~~~tt~~
~~~m~~~~R~~~~-~trM~~~,*~~MR8~--$.BBM3~
iEiT~~!Ar:iT:
To whom it may concern,

The 500kV composite insulators produced by Guangzhou Maclean Power Co., Ltd. have good quality with

specifications complying with international standards. For many lines operating in our bureau have good

performance of these insulators and no pollution flashover happened . For lines have been operating more than

three years are as following.

1-IS- J!\!~~5 ~,,~~~-


!I!
,J)_ )E trll't fB]
Item Type Quantity Commissioning Date Project

FXBW-500/100 12 500kV f11f-1f 1C.,.-.:.lrJ]~~Ji


1 2005-2
~Ti'F. Hanan-Hex in II Line
FXBW-500/210 59
FXBW-500/100 272 500kV JJ-4-~t!l.!ifi.ill!,!i~
FXBW-500/210 1082 T:ffil III ;f]Ffi
FXBW-500/300 531 Fan-Mu-Dun-Bao Line III
2 2006-1
BJH--500/300 25 section

FXBW-500/210 1139
3 2006-12
FXBW-500/100 111
.------------
!!
i::i

-u
C)

~ ......
0
s::
0

()..-:>
r-; 0 0 D D no n 0
~...._ ~z Ka z0 ~o
:z
Do
!({I z Kn z0 Ku z ~~
Dv
Knz Kaz
~
.L.,._ i~ b~:e U> <A ~qi p<A ~<A b~ 'g '2i U> U) b U)

;:: ~ ~ ml!i ~ ~~ ~~ ~~ nij!l~ ~~ ~~


""" "'
u
:>
r'Y1 .e I:-

Iii~
"e.i
1~
lia'
<4

-g1~~-
~
r::~-
IP~
~ $
ii:ll
2
.t:\l c
qJ
Gr
11?
IX:::11J.
11.. u Iii
<...i
!:; ~ -R
Ls -ei
~

.1I Ii *"
..
-
0
v
ro

~
III
$
;:,R

o
4...
0
I::
.2
+-'

~
, ;t;b.O
~bl)

~~
~ -g
~ tll

-U)

~
<l)

~
.:,,:.
u $~
~] ;;t: ':;
-0
u, ~ ...
.!!!'J' i "'
Ef (.i;..

iC
I
~
. -: I
o;j
c
""~
.
-<
$.~ I

0 0 0 r1
0 [J 0 0 e 0
l(tz Kt ze ~ 0
z
w 0
~ z ~p 0
z !I z
0
/IG
9
z Ka ;z
~., 0
,,...... z
Operation Certificate

To: Guangzhou Maclean Power Co., Ltd.

Our company has used 500KV AC poly insulators made by


Guangzhou Maclean Power Co. , as following:

Type Quantity Contract No. Project


FXBW4-500/160 15 0000052 I
FXBW4-500/210 15
FXBW4-500/160 309 0126HC050089 Zen Hen A line
FXBW4-500/160 348 0126HC050090 Zen Hen B line
FXBW4-500/160 375 0126HC050008 Zen Guan B line
FXBW4-500/210 51
FXBW4-500/160 300 0126HC050016 Bei Zen B line
FXBW4-500/210 9
FXBW4-500/160 415 0126HC050093 Zen Guan A line
FXBW4-500/210 105

The above insulators have been in service since 2006s with no


quality issues and the operation meets our requirement.

Guangzhou Power Transmission dept, Guangdong Grid

19.01.2010
Operation Certificate

To: Guangzhou Maclean Power Co., Ltd.

Our company has used 500KV AC poly insulators made by


Guangzhou Maclean Power Co. , as following:

Type Quantity Contract No. Project


FXBW4-500/160 15 0000052 I
FXBW4-500/210 15
FXBW4-500/160 309 0126HC050089 Zen Hen A line
FXBW4-500/160 348 0126HC050090 Zen Hen B line
FXBW4-500/160 375 0126HC050008 Zen Guan B line
FXBW4-500/210 51
FXBW4-500/160 300 0126HC050016 Bei Zen B line
FXBW4-500/210 9
FXBW4-500/160 415 0126HC050093 Zen Guan A line
FXBW4-500/210 105

The above insulators have been in service since 2006s with no


quality issues and the operation meets our requirement.

Guangzhou Power Transmission dept, Guangdong Grid

19.01.2010
IUCHAIU) J. lllORDo\N ~
MC)'Gf Dl!NNIS A. nm ~
JCISt t:Jl' I AAtl~ U!GA.$1'1.
CA~ L 011.J!.EH
""' l'hlri*n1
ltJOY M. Mii.i.tiii.
MAii.CU. f-'. ~JrBRT
l~f;>/ N. l'.1SHI. &,"',,,,.

December 9, 1996

Mr. Rick Oruendel


Manager, International Markating
Maclean Power Systems
11411 Addison Street
Franklin Park. Illinois 60131

Dear Mr. Gruendsl:

This letter Is in response to your request conoeming the Los Angeles Department of
Water and Power's (LAOWP) use of +J-500 kV DC polymer insulators manufactured
by R911able Power Products (Reliable)

The LADWP installed 495 Reliable insulators in 1983. These insulators were placed
In areas subjected to high contamination. To date, we have experienced satisfactory
performance wJth the Reliable insulators Installed 13 years ago.

In addiUon, LADWP, acting as Project Manager; Installed approximately 6500 of the


7087 polymer Insulators purchased for the Maad9Adelanto Project Transmission Lina.
Although operated as 500 kV AC since their lnst~llQtlon in 1995, these insulators are
also d9stgned for possible future use at +/..000 kV'OC.

You may provide this letter to the Maharashtra State Electricity Board In Bombay,
India In response to their inquiry on customer use of Reliable polymer insulators.

ff any addltlonal Information Is needed, please eontact me at (213) 367-2580.

S.!ncere~,
4~~ . ~
GAR~.SWYTE
Supervisor
of
Transmission Engineering

Water and Po" er ConseTrvatio1~ ... a way of life 1

f 1 f "..:trfti 1-t..:- (:, r--:r I c A.nr:r:Vc. c~:i(i..-n: ... ~~ M,,_,._,V: ~(f f\-,i. J ! ! :;.. ._ l'\.-r1f::':~ ,.,_,,,.I' l-0~(.t,
- ( I ,,
11-10-2011 11 :23 t'E- ONE /DAIA +212522668079 A-433 P.001/002 D-463

.$~~_)1~1 De : II. Abdellah AHNACH


Office National de l'Electricite Entit6 : Division Normalisation et Eludes
service Agr6ntents
Reftrence '. DAM/NEIAG/674/2011
Te1ecopie
A:
Objet : Agmnent des isolaU!Urs en oompositai 400kV ck: Jll8Jq\le MACLEAN POWER.
Org.: ATLANTIC ENERGY

,,
RM T~ : OS.22.39.35.97 T81:

Nous avons le plaisir de vous transmettre ci-jeint, copie de I'agrement n 1403-2690/1 ~ des
isolateurs en composites 400kV, de marque MACLEAN POWER (Chine) ct de reference
S878161VG01.

L'original de ce document sera adresse par courrier recommande.

~ Salutations distinguees,

Division No

Copie A: MACLEAN POWER (fax n +86.10.62913139)

Direction Appnwislonnements et March~ Division Normaftsation et Etudes ~T818c.05.22.43.31.14-T91:05.22.66.81.52


11-10-ZOl 1 JI :23 DE- ONE/DAM +212522668079 A-433 P.OOZ/002 0-463

OFFICE NATIONAL DE l'ELECTRICITE


LE DlftECTEUI\GENERAL
- 3 OCT. 2011

AGREMENT
N 1403-2690 /17

Vu les elements du dossier d'identification et les resultats d'examen technique, I'Office National
de l'Electricite (ONE) prononce par la presente, l'agrement des isolateurs en composites 400kV, de
marque MACLEAN POWER (Chine) et de reference S878161VGO I.

Le fabricant est tenu d'aviser l'ONE de toute modification de conception on de fabrication qu'il
serait eveatuellement appele a apporter sur Iesdits isolateurs, meme dans le sens de I'amelioration
de la qualite,

a
Le present agrttnent accorde titre precaire, est valable pour une periode dtune annee, compter a
de la date de son emission. TI poerra ette suspendu OU annll1.e si lesdits isolateurs venaient a
l presenter un mauvais comportement en exploitation. un vice de fabrication ou un defaut de matiere.
J

65, Rue Othman Ben Affanc 20000 CASA MAROC - 8.P. : 13498 - CA~LANCA 20001 - TCL : 05.2:?.6'i.80.80
. tiOll. :,,~~J!,,~ueion : 6S - 61
Teloit : OFELOC 22780 M I 22603 M - 'l'Cleiiix : (212) M.22.22.00.38 - C.C.P. Rabat~-
, - . I,~v,~:0:\
'~. ,-\,,
;~/
l .-
'~'
~I

'-~~G"'p<!'
"''
.,,,,.,
-......;:_'C"!;(;tJ"
;;-.
,...,,,....
\;~,,
!'..!
Operation Certificate

T!) whom it may concern

J.i'"J
1 '. ~ii 1-
! -: 800kV 800kV

iu. 1: .(} - j 11.-, }j' 4, I,

The worldwide first 800kV DC line built by our company:

transmission, applies composite insulators from Guangzhou

Ltd. been formal operating since June 2009, with

quantity as Iollowina:.._~

satisiified our requirements on composite insulators,

ns 1n areas, and
Operation Certificate

To Whomsoever It May Concern

We, Foshan Electric Power Supply Bureau of Guangdong Power Grid have used

silicone rubber insulators supplied by Guangzhou MacLean Power Co., Ltd. for our

SOOkV AC and 220kV AC transmission lines. The installed lines for more than 15

years are as follows:


Delivery
Item Project Model Qty Client
time
1 02/03 Line Upgrading FXBW-500/180 78 1999. 09
2 Projects FXBW-220/100 300 1999.09 Foshan Electric Power
500kV Guangdong Supply Bureau of
3 Upgrading Transmission FXBW-500/210 120 1999. 07 Guangdong Power Grid
~-
Line

The insulators have been working on line to our satisfaction, and no accident or

flashover happened.

Contact person: Luo Yongquan

Phone: 86-757-83389525

Date: August 25, 2014


POWER GRID
~ ~: "~' ~ti. 2, ~-29, ~122 001, ~j ~; 0124-2571700-719, : 0124-2571762,
saudamlni' Plot No. 2, Sector-29, 001, : 01242571iG'0-719, Fax: 0124-2571 ni2, Web.: 'fNIW.powergridimtia.corn

Regd. Post

Ref No. CC/P&S/MPS/Performance Report-16/12 Dt. 28.03.2016

1\1/s Maclean Power Systems,


11411 Addison Street,
Franklin Park, Illinois, 60131(USA)

Sub : Performance Report of Insulator Package-C? for 400KV transmission lines


associated with 765KV system for central part of Northern Grid-Part-III
executed by M/s Maclean Power Systems (NOA Nos. C-14910-L179-3/NOA-
I/3412 dated 21.07.2010 and C-14910-l,179-3/NOA-II/3413 dated 21.07.2010)

Dear Sir,

Please find enclosed herewith the performance report Insulator Package-C7 for 400KV
transmission lines associated with 765KV system for central part of Northern Grid-
Parl-III executed by M/ s Maclean Power Systems, USA (Authorized Representative of the
manufacturer - M/s Guangzhou Maclean Power Co. Limited, China ) vide LOA Nos. C-
14910-L179-3/NOA-I/3412 <lated 21.07.2010 (Off-Shore-Supply Contract) and C-
14910-L179-3/NOA-II/3413 dated 21.07.2010 (On-Shore-Services Contract) issued by
PO\\TERGRID.

The required Performance Report is attached herewith at Annexure-A.

Thanking you,

For & on behalf of


Power Grid Corporation of India Limited

'"'0,.---
(S.K. Singh)
Chief Manager (CS-P&S)
End: a/ a ( 1 page)

~~:#1-9. f<;'A\-110016 011-26560112, 265{50)21 25564812, 26554892., T~: 011-2501031


Regd. Office: B-9, Outab Saral, \fow Tel. 011-26560112. 265G4iJ12, 265S4BB2, fax: 01i-266D10Sl, Web.,: lVVi-Yt.pO't-1ergridlndia.oom

f[{i ~ii
c ..... ..,~ . . . . 'i:'- ...... -- ... ~ ,......,. D .............. &.~4 _.r; C,,..,.1$. ,,.,._..,,;:! i\.J..,.,.4-:;"""'
Annexurc-A

I~ef No. CC/P&S/MPS/PR-16/12 Dt. - 28.03.2016.

PERFORMANCE REPORT IN RESPECT or


Insulator Package-C7 for 400KV transmission lines associated with 765KV systf>m for central
part of Northern Grid-Part-III.

EXECUTED RY : M/ s Maclean Power Systems, USA (Authorized Representative of the


manufacturer - M/ s Guangzhou Maclean Power Co. Limited, China )

01 I CONTRACTNO.&DATE C-14910-L179-3/NOA-I/3412 dated


21.07.2010 (OH-Shore-Supply Contract)
and
C-14910-L179-3/NOA-II/3413 dated
----~----
21.07.2010 (On-Shore-Services Contract)
02 TOTAL VALUE OF THE CONTRACT USD 698,632 Plus INR 18,85,000/-
03 MATblUAL/ EQUlPMENT SUPPLIED NR-I Portion NR-H Portion
Composite Long Composite Long
Rod Insulators: Rod Insulators:
120 kl"J-1346 nos." 120 kN-355 nos.
160 kN-1415 nos. 160 kN-654 nos.
04 LINE(S) /SUBSTATION(S) where the 'LILO of 400KV 400KV D/C
material under reference was utilised Bare illy Mandala Bhiwani - [ind T / L
TL, 400KV Manesar-
Bhiwadi - Neemrana
TL package A1 and
400 kV Gurgaon-
Manesar TL package
I
Al. I
I

05 SCHEDULED DATE OF 20.11.2010 20.01.2011 i


COMMENCEMENT OF SUPPT JES

06 ACTUAL DATE OF COMMENCEMENT 18.09.2011 04.12.2012


OF SUPPLIES .....................

07 SCHEDULED DATE OF COMPLETION 20.01.2011 20.03.2011


l
l OF SUPPLIES
I os ACTUAL DATE OP COMPLETION Of
SUPPTJRS
22.11.2011 26.04.2012

I 09 PERFORMANCE OF THE CONTRACT SATISFACTORY


.". PFRFORMANCEOF MATERIAL/ SATISFACTORY
EQUIPMENT

* Out of the supplied quantity of 1346 nos. of 120 kN insulator in NR-1, 2 nos. of
insulators were found damaged and recovery of cost towards the same was made by
the site.
11- --------------
!

Annexure 4 (iii)
ISO Certificates

----- . ----------
Ce ificate of Registration

is to certify the management system of

Guangzhou adean Power Co., Ltd .


339, Conqhua, Guangzhou City,
Guangdong Province, P. R. China

has been assessed and registered by lntertek as conforming to the requirements of

quality management system is applicable to:

Design manufacture of 1 OkV- JOOOkV AC composite insulator and series products, design and
manufacture oi s: l 60k'v~ 11 OOkV DC composite insulator and series products.

Organization Code: 75346337-6


Certificate Number
Original Date: 18 13
Certificate tssue 07 November 2014
Certificate Expiry Date: 19 January 2018

lntertek Ceniiicsticn lirnite::{ 1 OA VfctG(V Perk, viacrv Rcoci1 Derby DE24 8Z..~ United Kingct'oJT;
!ntertek C2rtifr::2tion L:rni10ij '$a UKP. . 5 J<:(fed-ited bcdy i_Fidi:-~r sc1edu~e Gf accred:--izti-on no. oi4

to the rgl'r. with a sm.ar"Iphone.


through thl? ~vr::bsite httr,:=J/-.\\\:v.:.c-:c.1.cc'f.Cr. cf CNC,4 !f"l Ch'.;,,:;;
Certificate of Registration

lntertek
This is to certify that the environmental management system of

Guangzhou Maclean Power Co., Ltd.

#339, Pingzhong Rd, Taiping Town, Conghua, Guangzhou City,


GuangdongProvince, P. R. China

has been assessed and registered by lntertek as conforming to the requirements of

ISO 14001: 2004


The environmental management system is applicable to the management
of the environmental aspects related to:

qf)Ufacture of 1 Okv-1 OOOkv AC composite insulator and series products;


''" ot s: 160kv- 11 OOkv DC composite insulator and series products.

Certificate Number: 121307008


Certificate Issue Date:
Certificate Expiry Date:

Of\---'-l v_.._
Authorised Signature: Calm Moldovean - President, Business Assurance
_ 014

lntertek Ceniticetioo Limited, 10A Victory Park, Victor; Road Derby DE24 8ZF. United Kingdom
lntcrtek Certification Limited rs a UKAS accre<J;ted body under schedule of accreditation no 014

In 111e 1S>uance of this cert1fl(<Jte. lntertek assumes no 1,.;b1h1y to any party other th-Jn to the client. and then only 1.
with the agreed upon Cernhcatron Agreement. This cert1hcdtc's validity >s <ubjert to the orqaruzauon ma1nia1n1ng
~rcordance w:ti' lntertek's requirement> for sy>tPfns cenif1cat1on Validity may be ronnrrned via Pma1I at _
1 :;i;. ,:re v,;hct=n1(t1)/i.'.i:1nt.~1 ~1.:k l 0rn or by scanning the code to the right with a s.nartptione * 0 ..
The annud! validity of the cert1hcate u1ri aiso be checked throuqh the vveb)1te 1-.i1p fN v~~,,.v: lice-, gov en of CN(ti. in ,,_ ~.;, _,...X\e"'r::
.1/ctfon-v

1:112 CPrtdic;He remarns Ille property at lntertek to whorn 1T mus: he returned upon request
Annexure 4 (iv)
Type Test Report
q1<1:z .~ mr:zq):lflrar 3b $~ll1 ~Ptas
('11"R1'r ~ ~ ~)
POWER G.RID CORPORATION OF INDIA LIMITED
(A Gowmment <>f ~Enterprise)
~~c;rn; '~Glf'14)" i:;ffic ~t 2, ~-29. ~-122001, ~i
m : 2511100 - nG, ~ : 2s71100. 25111s1 {l'R ~
Corporate Office: sa.udamlnl" Plot N<L 2, Secto1-.29, Gurgaon-122 001. Ha.ryaoa
TeL: 2571700 719, Fax: 2571760, .:?.5717$i Gram: 'NATGRIO'

~ ~/Rf!. NumooY
CC:ENGG:TL:NR-1:765kV NCR:l'vfACLEAN Date: 08/04i2011

Ivt/s Maclean Power Systems


11411 Addison Street,
Franklin Park, Illinois 60131 (USA)

Kind attn : Mr. Sharat Mathur, Country Manager

Sub. : Composite Insulator Package C7 associated with 765KV system for


Central part of Northern Grid Part-I
CA NO: C-14910-L1793/G2JCA-I/3412 dated 03.08.2010

Regarding Approval of Type test Reports

This has reference to your letters ref: .MPSiPGCIL/L179-3/Type test Reports dtd. 27.01.2011,
09.02.2011 & 22.03.2010 vide which you have submitted the following type test reports
pertaining to individual 120 kN & :160KN composite long rod insulator and complete
strings with hardware fittings from M/s Tag Corporation, Chennai & M/s Asbesco
Ltd., Kolkata for the subject mentioned line :
Q:p~m~Mc ln~ulator Strings with Hardware Fittings of MIS IAG CQRPQ:(lA TlQN, CHENNAI

SI.No I
'
DESCRiPTM. n1o~N~f4o0:FF
11wrnRRJ ..E~p[)(o)]R~Tf.NN:Colf''
- Ti.~ TITEST~REPORT NO I;
TrEE:s~TrRREE.PPOORRTT~N~'o)
,_____ __,1 _!.!S!~~---- & DATE & DATE --- I & DA_ _T_E_.
-~---i
On Insulator Strings Single r Single 'I' I Double Tension
Suspension Suspension Pilot !I

Power frequency
Voltage Withstand
Test(\Vet)
Impulse Voltage
Withstand Test(Dry) ,
---------~;.... "--~----~;-.q
3. Impulse Voltage ,
Fla shover T est(Dry) I (2011) QlTC
!-------------------;;( " . ' "" " . (20l l)QlTC (201 !) QITC
'l. Switching Surge
---1
N<dDC031.
NoJDC032, No.JDC{J29,
Voltage \:Vithstand
Test(W' et Dated.I LO:L201 l
--- -~_ ..__
,,,......._~"""'----j Dated.I 1.03.201 l Dated: l l .ClJ.20 ! 1
5. Corona & RIV Test

Not
B. On Complete lnsulatgr :2trings with Hardware Fittings of MIS ASBJ:l?kO LTD, ~QLKATA

, , s1:"N- 0~~-D-E_S_C_I~-IP~Tfr-JN-0~:;1~TE-.S-,1-'
1 -REPORT NO & TEST REPORT NO &
.._~_,_T__I_:S~'T_ JDATE JJATE
On Insulator Strings I Single 'P Suspension Double Tension
I
Power frequency
-~---f-----
1 Voltage Withstand
I Test(~\_1e_t~>-----4
I lmpu lse Voltage
\Vithstand Test(Dry)
Impulse Voltage
I Flashover Test/Dry)
[T-1 Switching Surge
(201 i) QITC No)DCOJO, (20i l) QlTC No.JDC028,
! j1 Voltage \<Vithstand
Dated: l l .03 .2(Jl l Dared.I U)'.t20l I
~ Test(Wet _
; 5. Corona & RIV Test
6. Mechanical strength
test

withstand test

C Qn Individual Disc Il)sulators

r-:~L.NO-rDESCRIPTION OF I TEST REPORT NO & TEST REPORT NO &


: ! TEST i DATE DATE
l '1 t
( 160 Kl"\')
On lndividu;l Disc-. . . . ----- (l20KN)
----+-~---l1_1s_u_l_at_o_.r_s~. _ ~~---~---l---~----~----4
I on interfaces and
I connections of metal
1

I
,__-----~----- l fittinzs
...........,
I
(i) Dry power
frequency 1
voltage test ~
l (_ii_)......._,_s_
. u.dden load release test _J
~;;) Thermal mechanical test
(201 l) QlTC NoJDC026, (20 l l) QITC NoJDC027,
! (iv) . Water imm:ion tCs_t_
. -- ...-.. --j

1: Dated.I l J)3.201 I Dared.I 1.03.2011


r ( v) power frequencYi Dry
test
1-----il~"-'oltage l
II i Test of housing, Tracking I
:
" Ill---t!. and erosion test
Fl~il-it-v-te_s_t__~~...---JI
[~~1v_ _I-.ii~.f.. )r.e.s.su~e~~~~!!~~ tcs'J
1
!, V I Recovery
. . of
L__ . . Hv<:!E?J:?hobicitv tesL
I VII I Tests for the core material ! 101 lOI-2dated:06.l1.20!0 l 0 l l 0 l-2 dated:06. l l .2-010

I (a)Dye penetration test


I
L ~--'--'-(~-~~ ~.!erdiffusion t~~.!~--'--- 1 ---- "- ..-~---~----- .. -__,,.~~~
2
k'Sl

(2) Determination of
average failing load of the
core of the assembled uni:

(b) Connel of the of


the strength time rut vc of

l ime test HJ 1 IO l-S (lated 06.112010 l 0 i 101-5 dated:06. l 1.20 !O


tightness
and

Dated:22.11.20JO
--------'

The above type test reports have been examined and the results are found to be generally
meeting the specifications requirements. TI1c above reports are, hereby, approved and a
copy of the same is enclosed for your record.

Kindly note that clearance for commercial production uf insulators have been
accorded vide our letter dated.I 4 .02.2011.

Thanking you,

Yours faithl:ui~~

\ -,
I
\.''\ ~
\\"-kAJESH
<->GUPTA
Chief Design Fngr. (ENGG:TU
c
./':

'h

i~~ ;~

(_;;
~-- ;::. ;...,
0 I~
;;; p
rj
0 ~-
:0t 1:)
;:::<.
~= , :;
';"]

+: -~~
~~ ;;:
-o
g
~ Q
*"'v>'""' c;~
t)

".;/
a: ;f;
i~: X1 it\::,:k ff B'>J -Ql{fr
~fflmm~#~h~~*~~~~~~~-~.~~~-l~.~~ttft~ft~~
oo~ffft~~~*~~~~~~~~ff~~~D~~~m~#~~~n~~~

~:Ji
:rm 01?iiffi\ *l~Jl'l~ f*:&!IPJ fffJ ftfql~-}
()t)

::Rt]~jfif.~~500kV ~rt!~~ FXBWZ- 500/180 120 2002 ~ 3 Jl WZ01186


ffl:fM-rJf-500kV J[yfif.~rl!I FXBZ-500/160 866
2003 4= 10 A SPSC [2003] WZ082
~~ FXBZ-500/210 166
ffl:J-1'1 ~t fK~ @l
J[fif.~"tr rl!I{~
= FXBZ- 500/ 180
FXBZ- 500/240
1155
2006 4= 12 A EHV[2006]WZ126
3739
FXBZ-800/400A 245
EHD (2010) WZ058
FXBZ- 800/ 400C 28
~1J-f.*800kV FXBW4-800/400A 531
2009 ~ 12 .!3 EHV [2008] WZ273
J[fif.~rl!.Il~ FXBW4-800/400C 114
FXBW4- 800/300B 3025 EHV[2008]WZ274
FXBW4-800/300B 2446 EHV[2008]WZ275
FXBW- 800/ 160B 458
FXBW-800/210B 229
~:fi.~lt rl!M~ rl!t ft- 800kV
FXBW- 800/3008 524 2012 ~ 10 J3 01WLC120029
J[yfif.~rl!Iffil
FXBW-800/4008 744
FXBW~ 800/5508 45
r~1*~J5Jrl!M~rl!r*:xx@l FXBW- 500/240-EE-B 2977
2012 ~ 12 J3 01WLC120360
500 =f{l\J[fit~rl!Iffil FXBW-500/240-EE-C 41
500kV xt-m:mt~~~~r FXBZ-500/210 180
2013 ~ 3 J3 08SDS120032
~r5 ::1J..lf~ <x1:*1fWi) FXBZ- 500/240 50
FXBZ-500/160 88
2013 ~ 6 fl 06SDC120112
FXBZ- 500/210 28
500kV :::Rlfilmt~~~~r FXBW4- 500/160 117
CGY055J0401130196
~}j ff; ::!l!lt :i:m ( 138Wi) FXBW4-500/210 2
2013 ~ 12 J3
FXBZ-500/160 384
CGY06SD0401130075
FXBZ-500/210 138
3& : xr i1:t * r tt:J ,rf!-1:V:
rfflmm:~#~h~~~~~~~~~-~.F~alw.~~tt~~~~~
~:f; J\*Dh~11Fli~)}(. tEf.lt~$~:t~tilihtf!15l l:ff o ~ ~Ji!:Jil~~*F~tE3tHf.tilu~J)'A
J:Ef.JE\Zf!HI:
~:I:
rm EJ ;g:y~ t!X!~JJM~ 1A~Mfsl #jjIJ~~
(~)
FXBW4-500/240 398
x1~imilll sooiv xr!it!ttli13t~:n~ 2004 .l,f IO A SPSC[2004]WZ136
FXBW4-500/300 314
500k v ~1*-1fAffHW ~ xVft!ttliJ it FXBW4-500/240 495
2005.if- 6 A EfN [2005] WZ065
I*fE FXBW4-500/300 231
FXBW-500/100 90
500kV ft)Xfbkftv}i~tl]~ifiJftI;f~ FXBW-500/160 282 2006 :?f: 7 A EHV[2006]WZ119
FXBW4-500/210 12
500kV ~ B =@ XJii!ttli] ltI*Il FXBW4-500/300 1632 2006 l,f 12 J3 EHV [2006] WZ343
500kV ftJXibkft5fili~tl]~ftilfil FXBW4-500/160 790
2007 l,f 10 J3 EVH[2007]WZ021
CTYP*-t=E.tH&) FXBW4-500/210 31
FXBW4-500/100 3836
"+---li" l!l~~t!~J~ 500kV 5(Vf[ FXBW4-500/240 3093 2001l,f12 A EHV[2007]WZ299
FXBW4~500/400 363
fiili*3i'b'J:~w!ttliJ3trf:!,Ifft1
*~raJrSJ11w 334 2008 if 11 J3 EHV[2008]WZ106
BJH-500/100
FXBW4-500/180 327
F'XBW4-500/210 47
FXBW4-500/240 731 2007 l,f 12 J3 EHV[2007]WZ351
t~'fifjjf-j~di!lm 500kV !ttli13t~Il[g FXBW4-500/300 279
FXBW4-500/400 425
~rmraJliw 136 2008 if- 12 J3 EHV[2008]WZ107
BJH-500/100
500kV #ftfJf,H~Itf FXBW4-500/180A 1249 2008 if- 8 J3 EHV[2008]WZ157
r:lm~:ti J itM~ ~r- *xx@ FXBW4-500/100-C 42
500 'f~JIVJii!ttli!Ftifft1h>dt~mt FXBW4-500/240-C 84 2013 l,f 12 J3 CGY01WLC0401130201
Mtrc~ soorv xVft~~It.'iI FXBW4-500/3QO-C 6
z--7

<O
..... 0 0 E E ti)E E E E E E E E E > > > > > > >
"""E 0 N N
E It)E 0
0)
.II: E E E E E E E E
.II: .II: .II: .II: .II: .II: .II:
0 It) 0 0 "it "it 0
..,.....
-
N 0 0 co "it N co "it "it
Cl) a; 0
It)
..,
0 "it N 0
.., t-- <O ll'? It)
ll'? It) 0 <O It) t-- It) N N
N

N
N ...
~ ~
CD
'CV
.II:
N

"C
co
~
N
N
N
"' .....
It) ..,
~ .....
N .....
N
0
t--
csi
o al E
0
(/) 0
N

0) ti)
- .c .5 .5 .5 .5 .5 .5 .5 .5
..... ...J
N
0 ..... <O co .., "it It)
co
.., co
Iii "' '=! t--
,.;
0 ~ ,.; ,.;
..... ..... c-i 0 co <O
N

"
0
...J
s (/) !/)
0
J, a:: w w
LO w
.....
:;) :;)
...J
Cl) "
~ <t
:E
<t
>
...J
<t
~ e" ...J
>
...J
(/) <t <t
~
<(
Cf) N C) z 0
Cl) ::i 0 z 0
a:.....
C)
j: u;
>- ;;:;
> z
Cl)
(/) co
0 ....
en
u:: w
:E
0
w
a:: t) :::! 0
co
0
z E
...J
w
~ -5e ifot ..... w
co
Cl)
00...2
Q '-"""'
(I) ffi
<: ~ u:
<:( 0 c "C "C u) en
0... c:
LU <D ~
0 c:
JSti) ...
CV
0
;.: "C z
c...
CD

-.J - -0
0 .0ro <(~
<:( = ~
~ (I)"
0::: ;: ;.:
0)
...
CD
3: QI ti)
j ~
:
..... ...,
CD
-
.c: .c:

c
:!:
;: ~c
ti) ;.:
~
0
ti)
CD
> c: c: 0
ti)
ti)
"C u)
0 JS .!!! c...
.c: .c:
--
ti)
.c: .c:
...
CD
...ns N' CD ns
-
c: ~ M" ~ >
u:: ~ ;:
= =u:::
"C .c:

.
CD 0) 0 .c:
(.)
c: ~ ~ LL.
~ ~
- c: 0
.c c: CD
.c: CV 0)
...
~ ~ ~ ... .!!! .c:
u:::
- E c: .!!!ti) Q; c c
0)
E 0)
c: c:
0) (/)
c: CD
.c: t; .c: .c: .c:
ti) 1=' 'lii 1=' ti)
ns
::I "C CD i5 0 ~ 0 ~ :ill :ill u::
z c: oc oc ... 0 ti)
...
!/)
ns 0) 0) 0)
i5
... w
. a; a; a;
...J
w "C c..
... c: c: ...
o CD N N N N

*
0) ns CV CD .c: CD !/) ::c: ::c: ::c: 0) ::c: ::c: ::c: ::c: CD CD CD

-- w > ti) ti)


0 c: c: .c 0) 0 CV
:; :; .!!1.
cv CD
CD
3: CDc: ... ...
0 0
E a; ..., 0 "C "C "C "C <t .II: 0 0 0 0 ::I
CV
0 0
CV
.....0 :i 0
0
0
0 ::I
z ~
CD
!/) s
rO CD
.c:
(/)
CD
.c:
!/)
CD
.c:
(/)
CD
.c:
(/) 0
1=' CV
CD
...J
<O
0
It)
0
It)
<O
"'
Q
It)
<O
0
It)
e, e, c..
.5 .5 .5
~ z~ z~
0 0 0
..,....
N N CO

::J
:e
Ci ~ ::J
z
QI
.,,0 I-~
"O
...
QI ....I .,,
"O
> .s= 0

-
0 ....I
.r:: (.)

.,,
VI QI
:e VI
QI
u: "O I-
QI QI
VI ~
'3 ~QI +::
:::s
c. c. 0
.. Cl) 0:::
N c.o
..... so
N N
E E E Cl E E E E E E E E ~ > > > > > >
.IC: .IC: .IC: .IC: .IC: .IC:
0 E E II) .IC: E E E E E E E E 0
co ~ N co ~ ~ N..,
&t)
0 0 ~ ~ 0
E N 0 0 N
..,
.., ..,c.o
0 &t)
Cl) a; .., c.o c.o .....
&t) 0 &t) 0 &t) &t) &t) &t) &t) 0 &t) N N
&t)
..... .....
~ c;;;N
...
~~
(I)
Ri
N f'i
.....
O')
co
N
O')
f'i
&t) ..,
....: f'i
N N
0
co
cO
.IC:
0 co "O
E
0
en c.o
N

Cl II)
- ..0 .5 .5 .5 .5 .5 .5 .5 .5
.....
N
...J
..... ~
.... co co
.....
..... co O')
co
..... &t)
....: .... "? 0 ~ ...; cD
N ...; N c:) 0 ..,
~

...;; ...J

9
s
0::
en
w en
U)
w ::::> w
(/)
...;:::--
U)

!:i:e ...J
<(
::::>
...J

~
...~ >
...J
<(
>
...J
en <(
~
<(
U)
::)
....
0
(!)
z
z
0
<(
0
(/) C2
;;:; (!) u;
>- > ~ z I-
0
(/) w
a::
0
(/) so
t) :::::!
........
"<f' u,
c :e w
...J
w
00 z Ci
~ .g~
e~
.....
00
w
Cl)
0 o, Jii
Q .._..>::
Q) ai
~ ~ U:
<::( 0 c: "O "O ii O>
a.. c: enl
LU a>
0
'6 .l!! ... 0
ll.
(I)
z
... ...
II) i.: i.:
c: c: ii
-' - -0 II) "O "O
0 ..c:
-...~
(I)
..a<( ..c: (I)
> > 0 .l!! .l!! ll.
0
<::( ~ ;::: 0
...
~ Q) ...
0:::;::: i.:
Cl
c: Cl
(I)

0
QI
.5
II)
"O .! <... !E....
..c: ~ .... N' ;:::;- (I)
0
0
(I)

c:
~
c
~c: ..c:II) ..c:II) ..c: ..c:II) (I)
~ ..!!!
nl
u, u:: ~ ~ 0
... ...
II)

>
(I)
..0
= u::=
u::
c: .::.. (I)
:::.. ..c: nl
E
..c:
Cl
nl Cl e:.... e:.... e:.... c:
.l!!II) .l!! ~
~~ ~ 'Z c
..c:
E Cl
-~ e... c:
(I)
..c: .5 ..c: ..c: ..c: II) c II)

z
::I "O
c:
c:
ii:
+::
II) (I)
en
...
0 Cl Cl Cl s s c s: c s: ~ s u:: nl

Cl
0
w
...
"O
e
w nl
c: c:
0::
nl
0
(I) ...
w
..c:
...J
e (I)
>
nl
Q.
en
a;
:c
a;
:c
a;
:c ...
0
(I)
Cl
N N N N
:c :c :c :c (I)
II)
(I)
..!!}.
(I)
II)

~nl s ~0 (I)
c: ... ...
0 0
..0
E
::I
Cl
a;
0
+::
0
0
.,;
"O
(I)
..c:
"O
(I)
..c:
"O
..c:
(I)
"O
(I)
..c:
<(
e-
nl
.IC:
nl
0
!e
0 0
c.o c.o !e Q. Q.
0 &t)
0 '!:i ::I '!:i
Q.

0 c
nl
I- :J 0
0 0
0 z s:
(I)
en s en en en en c
(I)
...J
0
&t)
0 &t)
&t)
0 . . .
u)
...
"O
Ill
"O
c:
.I!IJ)
0
!!:!
"O
IJ)
c:
Ill
"O
Cl) (i)
.c
IJ)
z<(
o6 Cl)

....
.c ::c
Ill
Ill
Cl) .~
.c c.
...
IJ)

Cl)
Q.
Ill
..c ....
.c
..c
::I
0:::
~
IJ)
Cl)
c: .!!!
0 c.
~ 0E
u; ..,

>
.:.:
z.:.: .:.:
z
..,
0
N
0

"'
......
0
co

:::r
:E
Ci !!?. :::r
.....
Cl) "O
z Ill ~
...
Cl)
0
..J "O
Ill
> ~o 0

-
0 ..J
.c Cl)
IJ)
II)
Ill :E "'O
u:: "O
Cl)
..... <l.)
Cl) Cl)
;;::: Cl) >
0
IJ) c:
"5 '<:) ;i !-<
Q. Cl) ::I c,
Q. 0 c,
.. en 0::: <
Dallian Insulators

~~ -----------
(5) Earthwire
I

Geekay Wires Pvt Ltd

.~ -- . -~--~----~-----~-~--------
GEEKAY WIRES PRIVATE LIMITED
(Mfrs: Galvanized Steel Wire & Wire Products)
Regd.Office: H.No.11-70/5, 2nd Floor,
G.P.Complex, Shivalayam Road, Fathenagar,
Hyderabad - 500018,Telangana, India.
Tel: +91-40-23778090
Fax: +91-40-23778091
An ISO 9001 :2008 Company e-mail : geekaywires@yahoo.co.in

ICBNo.:ICB-PMD-MCTLP-016/17-01

To:
Attention: Mr. Chirantan Bikram Rana
Marsyangdi Corridor 220 kV Transmission Line Project
Project Management Directorate
Street Address: Satungal- Bauthali Chowk Marga, Matatirtha Substation
Chandragiri Municipality, Ward No. 11
Floor/Room number: 2nd Floor
City: Kathmandu
ZIP Code: NA
Country: Nepal

WHEREAS

We M/s. Geekay Wires Private Limited, ,whoareofficial


man ufacturersoragenta uthorized bytheman ufacturerofEarthwirehavingfactoriesat 300/ A, lsnapu r
Village, Medak Dist, Telangana, doherebyauthorizeM/s Larsen & Toubro Limited, India to
submitabidthepurposeofwhichistoprovidethefollowinggoods,manufacturedbyusEarthwire,andtosubsequ
entlynegotiateandsigntheContract.

WeherebyextendourfullguaranteeandwarrantyinaccordancewithClause27oftheGeneral
Condit io nsofContract, with resp ectto theg oodsoffe red bythe abovefi rm.

Signature Signaturure

Date:02 .12.2016.
Ch. Pratap.
Place: Hyderabad Geekay Wires Private Limited.
Annexure 5 (i)
Manufacturing Experience
l "'
9

f'.1.Q''
zi

~I
0
z ?
~I
01
.w> " N

-..,
~"
~;
0

1a. ~,~ ii
.,
t:'.'
"
"'"'~ I
;i
s,_ e
~ "'"' e a g !ii<>
~I
0
0 0
0
Ci ~
e ~ ~ ~ ,;: 6 t.~
l:i">
if; e,
a,
q
o
,,ii; "'~ ~ "'"'t:, ~ g'" ~ ~ ~ \\:"' '4,')

"'~I:; ,.:~ 3 ~l~l ~91 :2"' ~ n~ ~ ~0


<...? 'ii t:
Q
("~
p
e,
o..i:
uJ
c,
~ ~ @
o 0 :.ill 31 "'
"'"'
0 (;) 0 0

s "'
~ "'z "2e 2"
~

I ~l A " e
~. " -c~ s
o I ~

l:
e;
l:

-P
:; .~

ii ':f
~" g
n
.'li'

a:
(:':'

~ f!i
.~1
"
:;
>
c.
~I ~
~!! ~~
t;;'.;'
0

~ ~
Z:t jj' !!I
a: ~ ::i"
;: ~l
O'
c, "'I
1
05~
~j

~
-:
~I"'
0
"
a "
;.;" St" 0:
Q
-;m
so ~w
<>
?. 9. z
:i
tJj

i-" ." "


""a ~
M

3 M
~ c
t Ji l: .z -
>'.'..)I
8 -I
~ ~
"'
0
z 0
z I I
~
~ ~
0
cs
I
~ ~
~_, ~_,
<.
14,

~"'"
~ s
0

.," ~ w
'
~o ~I
<O

filf ;;
6i
~
l
"
"
.,
:;
0.
"
a. I
."'~ .~~ "". J
"O
:; J
"' ~ ""
:1
! Ti
e
F
8
:
<(

"'
Q

~
.,"'
0
1
I ~l '
't'ij
21 ~
~
~~
!!

I "
;,j

"
:'.':j

u
::l
~.., l!
:SJ
~
u

1 ~i ~
l!!
s
0
.~
j
,,I
:3
~I
"
a,

ii-e
" ~
_::f

.
a
.t
!!
3 ;;: .
0.
6S

ul
:1
;;
c, ~J
u.,
fl TI!
l 1l'l)i
d
"'
;;;,_;

~I
ii
l
I
I
I

z
~ t:
Q
~I
Q
A
g 8 0..

~1
<
o
~-c
;,?
n.
::>
()
::)

.,"'
J
"I
;;,
~

~IiiJ ;
"'I
< ,:'.)
8
~I ~
~1
;2~ ~I ~
w 5
~
\?I "'
\'! ~I i:D
~~ '::. si Cl

! l "
1~ I
ii i
l".~i:
z~gj z"g z~
'11

g1 ~I 'Z_
ii
D
~ ~
G
~
>
a,
~
s

3!
e. .ti
~ JI
~"'
5i
I
n,

1?
~c
0
~
l
5
~ lll"'
~
~
41 i
c;
~ I ~
:e<

o.e
s ~
::i
j
"
~I
.;n
~I
N

::? s a,
;.
0 "'~: g
"''
('.'.)
\)

"'~i::z ~ s
N

e; e,
~ > 0

l'l
li: "'
C>
~
N

~
CJ

o
0
e, "' 0 0

~ 6c.: ~ ~
::t c.
z
~ ~:3
'n
8 ~ ~-

~~ ro ?I31 "{;, t'


iii :::)
" "'0::;
_,
~j
s
,,, \); "'
.,_j 0.
g
M
<I)

"' ~

~I5~ -~

~r 0 : !2
Q <!)
N
w :;, o :
o w
~ ur
<(
'""' ~
,_ s I>'.
.o
ill
:? "'> "'.> ~
l
!

z~
"'i "
J! z" ~I~
::;
~
"
f; -
~:

g
~ ~
_E~~"
!?,i
~:J
1
n
~ ::;
~- :3 ::;,,"
ii:
0. ~
~1 I
~-
e a
z; s a>
o
::;
~ ;f
~ ~- ~I"'!
0 s,,
~
!)
c,
~I ~
j!
-VJ
-
UJ
~
Annexure 5 (ii)
Supply evidence
o; ~ o; ~ o; 0)
~ 0)
~ 3 ~ ~ (/) ~ ~ ~ 3
I/) (/) rn 0 w
-- -- .....-- ,....--
(f) II) (f) {/)

--
0)

t:, I'-
0) 0) 0)

t:, !::, t:, ,....


.._,
Cl)

. ........,..,.
0)

-- --
0)

t:, ,.... t:,


<-,
Cl)

E E E E E
E (0E E E E
(0 co t.O (0
~ ..-
-- - -- --
~ ~ (")
~
co (') (') (")
,.... ,.... ,.__ I'-

'<t '<t '<t


e-' ..- .- -e--
0 0 0 0
"l N N N
io cri (") (")
~ 0 0 0
......
(")
..:t
0 .... lri lri
0 0

I'- >.
..... ro
'
;::J
0) i:o sc N
(")
(0
;::J ..- (I) (I)
(0
(0 (0
"O '
ro
E
ro
ro
....
'<t
I

,.....
--
co
0)
""";;::
..-
...J
e, !-
0) l.O
::::i
0
0
I'-
.......
I - :z
~ ~
I
..)('.
0 0
.;,(.

E
E
,
ro
io
l.O
0)
NI
o
-e
0
0
'<t Cl)
..... '
0
0... 0...
:::i 0...

n, c ~'
~
.._
_J

.._ l.O
cu
,...
I!! ~
:f..!.. :f
;::J
..!.
~>
:;!
.....
0
0 co
(") 0..
0 ::)
-- c:
n, (I) 0
0..
......
ro ~
.....0.

-- s cx --;:....
c;(
o (I) N
~
0 ~
Q/j
,_
N
--v
(0
0
~
a,
z(j)
0:::' 0) ll)
-- --
-'
0 0
Q/j Q/j
r;- 0
0 mw 0...
:::I ..!:
I- r;-
::) c:
.... I
0::: 2 ::::s 0 t::
'
:::i :)
en ro 5
(j) z ...J s: 0:::
I-
(j)
(II (/) ro
(I)
co rn
(I) (I)

0 0 0 0 0
o
(I)
0
Cf)
0 0
(I) Cf)
zc;( z z z ...J

0:::
-c
0:::
c;( c;(
0::: 0:::
0
I-
I- I- I- I- 0...
a, u, n, a, c,
c;( c;( -c < 2

II)
c
.Q
::;
0 :E
...J
(/)
c;( ... t5
(jj
~ (I)
E
.....! ~
0
0..
~.e' -0
:J
:E
.....!
11) 0.. ......
t5a; 0(I)
(f)
;::J
(f)

o o
(l.)
19
<Ii
~ .e' e -~
c, o, a, o,

,... .....I ..- ..- ..- ..- ,..... I


'<t' '<t <r' '<t
..... ..... ......' '<t
I I
'<t '<t
..- ..-
0
N
't"""'
"""
0
N
0
N
0
N
0
N
0
N
0
N
ssss
w w UJ w

so I.() io IO l.O t0 IO
-e- -e- ....... ~""'"" 'T'- ~
00 0 0 0 0 0
N N N C\! N N N
Cf) o..; d 0 d d ..-
0
i.ri
0

f!'0).
....
100
~o 0o
...., 0
=oo
(I) 0 0
..J I.() lO
ooo
~ a. a.
I- (.0 J'-.
'
:::> 0
(") (")
0
co o o
(/) w w

(0 (.0
e-'
I
.....
....... -e-- ....... ..- .......
..... .....'
I J I

..- ....-' ' l.O


"<:t lO I() I() I() ,I()
-e-- 'e-- -e--' ,,.... ..... ..- e-
0 0 0 0 0 0 0 0 0 0 0
N N N N N N N N N N N
.b.b c?>
2 2 2 2 2 2 2
~ ~ ~ ~ ::..::: ~ ~ ~ ~
C) C) 0 0 C) C) 0 0 0
0 0 0 0 0 0 0 C) 0
0 ~ 0 0 (") 0 0 0 0 -0
.-.: N
t-
<'i i.ri i.ri o)
.....cci tri 0)
ci Q)
:!:::!
.- ,....
U') 0 0 0 0) (D
N ,.- N
-e-'
E
sw ws ws ssss
w w w w
'.:i
(l)
......
ro
>
- OJ - -3: -3: -~ -3:: e
;::
c,
0) Oi 0) Ol OJ 0
V' ......
3: ~ 3:: ~ ro
~ c
- - --- --- ---
If) If) ti) {// {// If) ti)
0)
-.
--
---- -
t-
0)
t-
O>
-.
t- t-
.,_,,,
0)

'-'
~
t-
0)
-. 0)
t- t-
,__
0)
t-
0)
t- $
> ~
It!
v;tio
-0
E E E E E E E E E ,.;
Q)
V)
E (0E E E E E E (DE E Q) c
(D (,0 (0 (D (0 co <D (l)
~

-
(.!)
(0
~ CD (0 (0 CD ~ (0 (0
.....
-- -- 2 2 -- -- --
eo ('I) (")
('() (") (")
(')
0 ::i
t- t- t- t- t- t- t- t- t::: u.. -c
<D
..- ..-
0 0
("! N
(0

'
N
(D
..- .,,,.. ..-
0 0
N
(D

0
N
(0
-e-
0
N
(0
.-
0
N
(D
-e--'
0
N
CD
..-
0
N
..... N <'i N C'i <'i <'i N N
0 0 0 0 0 0 0 0 0
o)
N
.-.:....- co ci - ..q: ..q: ..q: tri
..- N N N N N N

:J
I...
:J
0)
:J
c:
m
2
:J
-0
'
m
a.
E
m
I?
(0

I.()
..-
.._
.
.....
0
I
:J
en ..... (0

~
0
0
'<t
-
0
0

6
..J
0

0
.._
(0
l

....I
IO l.O
..... Nco (')0) 0)'<t l.O
..- N '<t
t-
l.O
.....
ao6 (') ~ l.O
..- l.O U') l.O t.O
0)

..- ..- ..... .-


0)
U')
0
(D
.,....
o ,,.-
I-l
:)
co ~ 2
0
0)
--
o ::i
I-
(/)
N
0
0
l.O
81 81
0
IO
0
IO
N
0
0
I.()
N
0
0
IO
N
0
0
l.O
U) I-w ::> '<t '<t '<t "If' '<t "'1"

0 0
o o
so (/)
z z<(
~
I- I-
0::: cm: '2
(1l
cro: c: c:m
(1l
2
m
so a. -0 "O "O
I- <( <( <( ~ "
<( ~

(/}
.....
<l)

~
o6

-
If)
"O
.....J
~
::J
t) ....(!} <l)..... ....(!} ..... .....

-
'-
,_
::I O}
3::
0 ~
3:: ~ ~
0 0 0
s0
a. a. a. 0... 0.. a.

.- .-- ....- ....- .,.... .... .....


(0 (D (0 (0 (D (0 (0 (0 (D
.-- ..- I I I
' l.O'
l.O
..... .....
0 0
.....' l.O
t.O
0 0
' l()

0
....' LO
..- LO
...... ..- l.O
0
l.O'
.- .....
0 0 0
/
N N N N N N N N N
NEA- 7/3.66MM EARTH WIRE DRUM DRAWING

'o/727?2722?'42?'7?7~ ZZ:ZZ.2&::::::::
8
SECTION AA

S.. NO ORUM COMPONENT MARK SIZE/QTY


FLANGE DIAMETER 1195
LL DIMENSIONS ARE IN MM
BARREL DIAMETER .2 600
TRAVERSE 3 710
DRUMS CONFORM TO IS
177811980 SPECIFICATION

ONE LENGTH OF THE CONDUCTOR


WOUND ON EVERY DRUM

10 STRANDED LENGTH OF THEEARHT WIRE IS


3000METERS,Tolerance +/- 5%

15
16 THE MINIMUM OtSTANCE BETWEEN
\OUTER SURFACEOF
17 LAGGINGS
18 LAGGINGS THE OUTER LA YER OF EARTH WIRE
19 NAILCIRCLE AND INNER SURFACE OF
20 NAIL LENGTH
EXTERNAL LAGGING SHALL BE 50 MM

Name of
Purchaser MIS. Nepal Electricity Authority
Title Drum Drawing of GS EarthWire 7/3.66mm
Name of Contractor M/S.Larsan & Toubro Ltd
'le of
Vendor MIS GEE KAY WIRES PRIVATE LIMITED.
Drg.No
Project ICB-PMD-KGTCP-0721073-04 Design, Supply, Installation and NEA/GWPUL& T/7-3.66mm EW-/2016-17 &
Details Commissioning of Kusma-New Butwa! 220 kV Transmission Line
&. 06.09.2016
Date
Prepared by Checked By Approved By GEEKA Y WIRES PRIVATE LIMITED
REGO Off: H.No. 11-70/5,
2nd FloorG.P.Complex,
Shivalayam Road, Fathenagar,
Hyderabad - 500 018,
Works :300/A, lsnapur Villag
Medak District,
Telangana - 502307, India.
Annexure 5 (iii)
ISO Certificates

~~---------------
Tliis is to Certify tliat
Quafity Management System ef

GEEKAY WIRES PVT LIMITED


REGD OFFICE: H.NO: l 1-70/5, 2NO FLOOR, G.P.COMPLEX, SHIV ALA YAM ROAD,
FATHE NACAR, HYDERABAD- 500018, TE LANGAN A, INDIA
WORKS: 300/A, lSNAPUR(V), PAT ANCHERU(M), MEDAK(DT), TELANGANA, INDIA

has heen assessed andjound to coniorm to the requirements ef

ISO9001:2008
jor thejo{fowing sa.?J'e :

MANUFACTURE AND SUPPLY OF ST AND ARD STEEl, WIRES,


GALVANIZED STEEL WIRES AND GALVANIZED STEEL STRANDS

Certification No 1015QB113
Initial Registration Date : 30/01/2015 Issuance Date : 30/01/2015
Date of Expiry : 29/01/2018
1st Surve. Due : 30/12/20] 5 2nd Surve. Due : 30112/2016

~
Managing Director

:6':
JAS~ANZ
r------+------,
I I
I I
I I I
--! _I I
I I I
I I I
I I
I I
I I

L------t
I I I
J
I

OIN

~6sofute Quafity Certjfication Pvt. Ltd.


AccreditelB!r Joint Accreditation System ef Austmlla & New Zeafo111{(JAS-A~~).1
401. t\shok lihmvmi, 93. Neliru Pfoce, New Ddlii -110 019, I +91. 11. 410511391 e-mai(,info@aGscfoernficarion.com,www.a6so{utecertjficaricm.com

Tlir Rt9inmrfrm is""' 11 P1lJdi1rt (-01rdiry c~rr!fit.ttt Sn(;_;ect to su~wifi1( ef


'"9'ftrio11 mrvtill(mu awfit1
Ctrt!Jlrntt is tfitym_pcrt9 ef AQC mu( return 1vlim rfrmmuft,f
Annexure 5 (iv)
Type Test Report
CPRI

TEST REPORT

CENTRAL POWER RESEARCH INSTITUTE


(A Govt. of India Society)
P .B. No. 8066, Sadashivanagar Post Office
Prof. Sir.C.V.Raman Road,
Ban-galore- 560 080 (INDIA)
CENTRAL POWER RESEARCH INSTITUTE

TEST REPORT

CPRI
Sheet 01 of 04

Test Report Number VB.2126.T264.1213 Dated 19.03.2013

Name & Address of the Customer Mis. Geekey Wires Private Limited,
1-609, Divya Shaki Complex. Ameerpet,
Hyderabad -500 016 (AP.)
E-mail Dated: 15.03.2013

Name & Address of the Mis. Geekey Wires Private Limited,


Manufacturer 1-609, Divya Shakti Complex, Ameerpet,
Hyderabad -500 016 (AP.)

Particulars of sample tested 7/3.66 mm GSS Earth Wire Grade-B

Condition of the sample on receipt New


Type
Designation
Serial Number
Number of Samples tested One
CPRI Sample Code no(s) VB1213S0340
Date( s) of test( s) 18.03.2013

Particulars of test conducted Test on complete Earth Strand & Individual Wires of
Standard /Specification Test procedure is in general accordance with IS: 12776/2002
and Customer requirement

Sampling plan
Customer's requirement
Deviation if any

Name of the witnessing persons


Customer representatives Mr. K. Devender, Assistant Marketing
Other than customer's representatives
Test sub contracted with address of the
Laboratory
,
Documents constituting this report
Number of sheets FOUR
Number of oscillogram/s
Number of graphs
Number of photos
Number of test circuit diagrams ONE
Number of drawings

~ ~J!)SOJ1
(M.D. ANANTHA BABU) (0. REVANNA
TEST ENGINEER JOINT DIRECTOR

MECHANICAL ENGINEERING DIVISION


P.B. No.8066, SADASHIVANAGAR P.O.
PROF.SIR CV.RAMAN ROAD. BANGALORE - 560 080, INDIA.
Tele-Fax : +91 (0) 80-23604664,
CENTRAL POWER RESEARCH INSTITUTE

TEST REPORT

CPRI
Sheet 02 of 04

Test Report No.: VB.2126.T264.1213 Dated 19.03.2013

Test Results:
SI. Type of test Unit Specified Value Measured/
No. I Computed/
Observed Value
1 Number of Steel Wire -- 7 7
2 Lay & Lay length of mm RH Min: 143 RH 165
Galvanized Steel earth Max: 307
strand
3 DC Resistance of D/Km 2.51 ( 2.32
Galvanized Steel Earth
Strand at 20 C I
4 Wire Diameter mm 3.58- 3.74 3.58 to 3.68
5 Wrapping Test on Wires -- The wire shall be wrapped around a
mandrel equal to four times the wire
diameter to form a close helix of 8 turns. 6 No breakage of
turns then be unwrapped & finally closely wire observed
wrapped again in the same direction as
I before. The wire shall not break during
I
I I the test (for wires after strandino).
6 Tensile strength of Wire N/mmL 1050 (Min.) 1169.2-1179.9
7 Elongationof Wire (200 mm % 3.5 (Min.) 6.5- 7.5
qauge length)
8 Torsion of Wire (100 X D) No. of 18 (Min.)
I Twist I
9 Zinc Coatino on Wires I
a) Amount of Coatinq q/m' 238 (Min) 302.75
b) Uniformity of Zinc Coating --- I Shall not have red deposit . of Copper No Red I
deposit
upon base metal (2 dips of 1 Minute & 1 I of Copper was
I dip of Yz Minute} . observed
10 Breaking Force Galvanized Test procedure : A circle perpendicular to the axis of the strand shall be
Earth Strand marked at two places on a sample of galvanized steel earth of strand min.
(Ref. fig. 1 at Sheet No. 3) 5 m length suitably compressed on the dead end clamps at either end.
The force shall be increased at a steady rate upto 50% of Min. breaking
' force. The circle drawn shall not be distorted due to relative movement of
the component wires. The applied force then be increased until the
breakingforce is reached.
Specified Min. breaking force = 72.9 kN

Test Result : A sample of galvanized steel earth strand of 6 m length


suitably crimped with compression dead end clamp was loaded upto 36.45
kN i.e. 50 % of Min. breaking force. The circles drawn perpendicular to the
axis were not distorted at this load. Further the load was increased upto
72.9 kN. The sample withstood the load of 72.9 kN without any sign of
any visible damage or failure. Again the load was increased till breaking.
On increasing the load, the strand of galvanized steel earth wire was
I broken at a load of 75.69 kN
JJJ I
" ENGINEER
TEST

MECHANICAL ENGINEERING DIVISION


P.B. No.8066, SADASHIVANAGAR P.O.
PROF.SIR C.V.RAMAN ROAD, BANGALORE - 560 080, !NOIA.
Tele-Fax: +91 (0) 80-23604664,
CENTRAL POWER RESEARCH INSTITUTE

TEST REPORT
CPRI
Sheet 03 of 04

Test Report No.: VB.2126.T264.1213 Dated 19.03.2013

TS

LC HLD

\ LI
J '

D
I .

PAC

FE - FIXED END
TS - TEST SAMPLE
LC - LOAD CELL
LI - LOAD INDICATOR
HLD - HYDRAULIC LOADING DEVICE
PAC - POWER PACK AND CONTROL SYSTEM

FIG. 1. TEST SET UP

~
TEST ENGINEER

MECHANICAL ENGINEERING DIVISION


P.B. No.8066, SADASHIVANAGAR P.O.
PROF.SIR CVRAMAN ROAD , BANGALORE - 560 080, !NOIA.
Tele-Fax : +91 (0) 80-23604664,
CENTRAL POWER RESEARCH INSTITUTE

TEST REPORT
CPRI

Sheet 04 of 04

Test Report No.: VB.2126J264.1213 Dated 19.03.2013

NOTE

a) The Test results relate only to the item(s) tested.

b) Publication or reproduction of the test report /Certificate in any form other than by complete set of the
whole test report /Certificate and in the language written is not permitted without the written consent of
CPRI.

c) Any Corrections/erasure invalidates the test Report/Certificate

d) Any anomaly/discrepancy in the test report /Certificate should be brought to the notice of CPRI within
45 days from the date of issue.

TEST ENGINEER

MECHANICAL ENGINEERING DIVISION


P.B. No.8066, SADASHIVANAGAR P.O.
PROF.SIR CV.RAMAN ROAD, BANGALORE - 560 080, INDIA.
Tele-Fax: +91 (0) 80-23604664,
Sterlite Industries
St rl it
Manufacturer's Authorization

[The Bidder shall require the Manufacturer to fill in this Form in accordancewith the instructions indicated. Thisletter of
authorization should be signed by a person with the proper authority to sign documents that are binding on the
Manufacturer. TheBiddershall include it in its bid, if so indicated in the BOS.]

Date: o!f1' January 2017


ICB No.: ICB-PMD-MCTLP-016/17-01

To:
Attention: Mr. Chirantan Bikram Rana
Marsyangdi Corridor 220 kV Transmission Line Project
Project Management Directorate
Street Address: Satungal - Bauthali Chowk Marga, Matatirtha Substation
Chandragiri Municipality, Ward No. 11
Floor/Room number: 2nd Floor
City: Kathmandu
ZIP Code: NA, Country: Nepal

WHEREAS

We Sterlite Power Transmission Ltd., who are official manufacturers or agent authorized by the
manufacturer of HTLS Conductor, ACSR Conductor & Earthwire having factories at Survey No. 99/2/P,
Rakholi village, Madhuban Dam rd, Silvassa - 396230 and Survey no. 209, Phase 2, Piparia
Industrial Estate, Silvassa- 396230, do hereby authorize M/s Larsen & Toubro Limited, India to
submit a bid the purpose of which is to provide the following goods, manufactured by us HTLS
and to subsequently negotiate and sign the Contract.
Conductor, ACSR Conductor & Earthwire,

We hereby extend our full guarantee and warranty in accordance with Clause 27 of the General
Conditions of Contract, with respect to the goods offered by the above firm.

Signed: [insert signature(s) of authorized representative(s) of the Manufacturer]


Name: Hitesh Singh
Title: Deputy Manager- Sales and marketing
Duly authorized to sign this Authorization on behalf of: Sterlite Power Transmission Ltd.
Dated on 5 day of January, 2017
Annexure 5 (i)
Manufacturing Experience
Kalparatu Power Transmission Ltd GSW Earth wire (19/2.30mm) GSW 121 Algeria 2006-07

Paymabargh GSW Earth wire (7 /3.25mm) GSW 70 Nigeria 2007

Kalparatu Power Transmission Ltd GSW Earth wire (7 /2.6mm) GSW 73 Algeria 2010-12

National Contracting Co. Ltd GSW Earth wire (19/2.36mm) GSW 82 Kuwait 2010-11

National Contracting Co. Ltd GSW Earth wire (19/2.30mm) GSW 8 Algeria 2010-11

Rebaioli GSW Earth wire (713.00mm) GSW 61 Ethiopia 2010-11

Babcock GSW Earth wire (19/3.20mm) GSW 9 South Africa 2010-11

zbcock GSW Earth wire (19X4.4mm) GSW 64 South Africa 2010-11

Viscas GSW Earth wire (19/3.20mm) GSW 6 South Africa 2010-11

Viscas GSW Earth wire 19X4.4mm GSW 45 South Africa 2010-11

Energoprojekt GSW Earth wire (7/3.25mm) GSW 35 Nigeria 2010-11

EJP GSW Earth wire (7/3.25mm) GSW 17 South Africa 2010-11

Energoprojekt GSW Earth wire (7/3.25mm) GSW 18 Nigeria 2012-13

Energoprojekt GSW Earth wire (7/3.25mm) GSW 20 Nigeria 2013-14


Annexure 5 (ii)
Supply evidence
PERFORMANCE CERTIFICATE

This is to certify that Mis. Sterlite Industries (India) l.td., India have successfully supplied 1200

kms of ACSR "Hawk" Conductor (26/ 3.44 Aluminium + 7/2.67 steel) against our

order No. PO/KBS/04-05/038 dated 10.09.04 for export to Electricite Du Laos (EDL)

The supplies were. made during November 2004 to March 2005 and uctor rs

performing satisfactorily on the transmission line so far.

Thanking you,
Annexure 5 (iii)
ISO Certificates
QR-2.5.2.6

This is to certify that:

Sterlite Power TransmissionLimited


Survey No. 99/2/P, Madhuban Dam Road, Rakholi, Silvassa, Dadra and Nagar
Haveli- 396230, INDIA.

operates a

QUALITY MANAGEMENT SYSTEM

Which complies with the requirements of

ISO 9001:2008

For the following scope:

Design, Development, Manufacture and supply of Aluminium & Aluminium alloy


wire rods and all types of overhead conductor including conventional, HPC and
HTLS Conductors with and without non specular finishing for power transmission
and distribution lines.

Certificate No: QEC12376

Issued: 24 August 2016 Originally Certified: 18 June 2002


Expires: 17 June 2017 Current Certification: 19 August 2016

Paul Simpson
Global Policy Risk and Certification Manager

JAS-~NZ
:-G-----;------:
.
;
'
I t

c-~.:-''"--~
'
;
i
'! '''
'' '
;

~------+------~-i>
W#W,JAS-ANZ.ORG/REGlSIER
ISO 9001
Registered by:
SAi Global Certification Services Ply Ltd (ACN 108 716 669) 680 George Street Sydney NSW 2000 Australia with SAi Global Limited
680 George Street Sydney NSW 2000 Australia ("SAi Global") and subject to the SAi Global Terms and Conditions for Certification
While all due care and skill was exercised in carrying out this assessment, SAi Global accepts responsibility only for proven
negligence This certificate remains the property of SAi Global and must be returned to SAi Global upon its request To venfy that this
certificate is current please refer to SAi Global On-Line Certification register at http://www.saiglobal.com
SAi GLOBAL
QR-2.5.2.6

This is to certify that:

Sterlite Power TransmissionLimited


Survey No. 209, Phase 11, Piparia Industrial Estate, Silvassa, Union Territory of
Dadra & Nagar Haveli - 396230, INDIA

operates a

QUALITY MANAGEMENT SYSTEM

Which complies with the requirements of

ISO 9001 :2008

For the following scope:

Design, Development, Manufacture and Supply of all type of overhead conductor


including conventional, HPC and HTLS conductor with and without Non specular
finshing for Power transmission and distribution lines. Manufacture and Supply
optical Ground wire (OPGW), Supply of Associated Accessories.

Certificate No: QMS40586

Issued: 24 August 2016 Originally Certified: 29 January 2014


Expires: 28 January 2017 Current Certification: 19 August 2016

Paul Simpson
Global Policy Risk and Certification Manager

JAS~ANZ
~-e---------~
-.
; l '

., .!. ;
..

; '
; :
'1-------r------
' -'-z- '
WWW.JAS-ANZ.ORG/REGtSTER
ISO 9001
Registered by:
SAi Global Certification Services Pty Ltd (ACN 108 716 669) 680 George Street Sydney NSW 2000 Australia with SAi Global Limited
680 George Street Sydney NSW 2000 Australia ("SAi Global") and subject to the SAi Global Terms and Conditions for Certification
While all due care and skill was exercised in carrying out this assessment, SAl Global accepts responsibility only for proven
negligence. This certificate remains the property of SAi Global and must be returned to SAi Global upon its request To venfy that this
certificate is current please refer to SAi Global on-une Certification register at http:l/www_saialoba!.com
SAi GLOBAL
Annexure 5 (iv)
Type Test Report
Test Report No.: CT I 175 I 10 - 11 16 I 11 I 2010

1, COMMODITY GS Earth Wire


Size- 7 ! 315 mm

2. MANUFACTURER Stertite Technologies Ltd., Silvassa, India

3. CUSTOMER . Niger Delta Power Holding Company of Nigeria {NIPP)

4. WITNESSED BY For Sterlite Technologies Ltd.,


a) Mc Nilesh Padwat

for NDPHC{NlPP)
a) Engr. A.O. Thomas, Vice Chairman, PDT 6
b) Engr. C.A. Ogunrinde. Princtpal Manager, PDT 5

5. DATE Of TEST 16 I 11 I 2010

6. TEST PERFORMED AT TAG LABORATORIES . Chennai.

7. NATURE OF TEST Breaking load test

8. SPECIFICATION APPLIED !EC 61089

9.. DETAILS a RESULTS AS GIVEN !M PAGE TWO


No.: /175/10-11 E

1. ng load
The test ls as per clause 6.5.3 of !EC 61089.

of the conductor ls fitted with suitable dead ends and the is mounted on
a tensile a load of about

The load ls on the conductor and the rate of increase of toad ls maintained at 0.3 kN/s as
per dause B.6.8 of Annex. B.

The load is increased tilt

Results:

GS Earth Wire
7/3.25 mm
Drum ~lumber BG-013

9.78 mm
96.B kN
66.8 kN
Al! strands of the conductor broke at the
center of the span
STERLITE POWER TRANSMISSION LIMITED
Power Transmission Business, Silvassa -INDIA
.

ITEM CODE & SIZE GSW (7/3.25mm)


Project Details Kusma - New Butwal 220KV Transmission Line
End User / Utility Nepal ElectricityAuthority

Contractor
QAPNO QAP/EX/GSW /001

SECTION: RAW~IATERIAL INSPECTION


S.NO. Component/Operation & Sampling Ref. Document & acceptance Testing Remarks
Description of Test Plan with norm Agency
basis
1.00 GALVANISED STEEL Customer Specification
WIRE Three C-0.50to 0.85% Supplier of Review of
1.01 Chemical Analysis samples per Mn-0.5to 1.1% Steel wire Suppliers TCs
heat Si-0.1 Oto 0.35% at the time
P-0.035% Max Inspection
S-0.045% Max

1.02 Diameter of the 10%ofLot !EC 888 Spec. ------do ---- ------do -----
Galvanized Steel wire Min: 3.20. Max: 3.30 mm -
Norn: 3.25 mm

1.03 Breaking load/Tensile test 10%ofLot BS 183 Spec


Min: 9.54 KN (1150 Mpa) ----do ----- ------do -----

1.04 Elongation 10%ofLot !EC 888 Spec


Min. 3.0% on 250 mm gauge ----do ----- ------do -----
length.

1.05 Torsion 10%ofLot !EC 888 Spec. ----do ----- ------do -----
Min 14 turn min on GL of 100
Xdia

1.06 Wrapping Test 10% of Lot !EC 888 Spec. ----do ----- ------do -----
Wrap-S, on a mandrel having dia
=4 X dia of the wire. The wire
shall not break.

IO%ofLot BS: EN 50189 Spec.


1.07 Preece Test ----do----- ------do -----
3 1/2 dips- !Min.

----do ----- ------do-----


IO%ofLot !EC 888 & customer
1.09 Mass of Zinc
Specification.
Min:245 gms/m2
Review of
QC Dep't. of Records of the
All routine tests as per BS:EN 50189 & BS 183 Manufacture Manufacturer at
10% of Lot Customer Specification r the time of final
clause 3.0 to 3.10
insp.
STERLITE POWER TRANSMISSION LIMITED
Power TransmissionBusiness, Silvassa -INDIA

ITEM CODE & SIZE GSW (7/3.25mm)

Project Details Kusma - New Butwal 220KV Transmission Line


End User I Utility Nepal ElectricityAuthority

Contractor
QAPNO QAP/EX/GSW/001

SECTION: INPROCESS INSPECTION

S.NO. Component/Operation& Sampling Ref. Document & Testing Remarks


Description of Test Plan with acceptance norm Agency
basis
2.00 STEEL STRANDING

2.01 Lay ratio Once in each BS 183 Spec. QC-Dept of Review of Records of
set-up Layer Min Max Manufacturer the Manufacturerat the
6+1 12 18 RH time of final insp.

3.00 ACCEPTANCE TEST ON


FINISHED EARTH WIRE One sample ------do------ Inspection at Works
3.01 Lay Ratio from every BS: 183 Spec.
20 drums or Layer Min Max Review of Records of
part thereof 6+1 12 18 RH the Manufacturer at the
time of final insp.
3.02 Diameter ------do------ !EC 888 Spec. QC-Dept of
Min: 3.20. Max: 3.30 Manufacturer -----do -------
mm. Norn: 3.25 mm

3.03 Tensile Breaking Stress ------do------ BS 183 Spec ------do ----


Min: 9.54 KN (1150 -----do -------
Mpa)
------do -----
3.04 Elongation ------do------ IEC 888 Spec -----do -------
Min. 3.0% on 250 mm
gauge length. ------do -----
-----do -------

3.05 Torsion Test. ------do------ IEC 888 Spec. -----do -----


14 tum min on GL of -----do -------
100 X dia

IEC 888 Spec -----do -----


3.06 Wrapping Test ------do------ Wrap-S, on a mandrel -----do -------
having dia =4 X dia of the
wire. The wire shall not
break.

BS: EN 50189 Spec. -----do -----


3.07 Preece Test ------do------ -----do -------
3.1/2 dips I-min the
specimen shall not
show any red deposit of
Copper upon base
metal.
STERLITE POWER TRANSMISSION LIMITED
Power Transmission Business, Silvassa -INDIA

ITEM CODE & SIZE GSW (7/3.25mm)


Project Details Kusma - New Butwal 220KV Transmission Line
End User/ Utility Nepal ElectricityAuthority

Contractor
QAPNO QAP/EX/GSW /001

Mass of Zinc Coating ------do------ IEC 888 Spec. QC-Dept of -----do -------
Min:245 gms/ m2 Manufacturer

Adhesion Test ------do------ !EC 888 Spec.


Specification. -----do ----- -----do -------
The Zinc coating shall
remain adherent to the
steel wire when wound 8
turns on a mandrel
having dia equal to 4
times the dia of
the wire.
Surface finish of GS steel
wire coils ------do------ BS EN-50189 &
Customer
Specification. -----do ----- -----do -------
The wire shall be
smooth. uniform & free
from imperfections
such as cracks, holes,
impurities, blow holes.
etc.
STERLITE POWER TRANSMISSION LIMITED
Power Transmission Business, Silvassa -INDIA

ITEM CODE& SIZE GSW (7/3.25mm)


Project Details Kusma - New Butwal 220KV Transmission Line
End User I Utility Nepal Electricity Authority

Contractor
QAPNO QAP/EX/GSW/001

3.09

3.10

3.11
STERLITE POWER TRANSMISSION LIMITED
Power TransmissionBusiness, Silvassa -INDIA

ITEM CODE & SIZE GSW (7 /3.25mm)


Project Details Kusma - New Butwal 220KV Transmission Line
End User / Utility Nepal ElectricityAuthority

Contractor
QAPNO QAP/EX/GSW /001

SECTION: FINAL INSPECTION AND TESTING

S.NO. Component/Operation & Sampling Plan Ref. Document & Testing Remarks
Description of Test with basis acceptance norm Agency
D. PACKING & DESPATCH
4.00 CHECK FOR IDENTIFICA-
TION &PACKING

..... \
4.01 Name & Address of consignee

4.02 Manufacturers name & Address

4.03 Drum Number

Visual
4.04 Size of conductor QC check at the
As Per Customer department time of
specification. of dispatch by
4.05 Length of conductor manufacturer Manufactur
er
100%
4.06 Gross weight of Drum after
putting lagging.

4.07 Tare weight with lagging

4.08 Net weight of conductor

4.09 Arrow marking for unwinding

4.10 Position of conductor end.