Sei sulla pagina 1di 80

SHEET TOTAL

REG STATE FEDERAL AID PROJECT NO.


NO. SHEETS

3 D.C. DDOT - EASTERN AVENUE, N.E. 1 80

DISTRICT OF COLUMBIA
TRAFFIC DATA

DEPARTMENT OF TRANSPORTATION ROADWAY

ADT (2016)
EASTERN AVENUE N.E.

14,500

ADT (2036) 17,000

d.
DISTRIBUTION (NB/SB) 57%

TRUCKS 4%

CONTROL OF ACCESS NONE

POSTED SPEED 25 MPH

DESIGN SPEED 30 MPH

FUNCTIONAL CLASSIFICATION MINOR ARTERIAL

PLANS OF PROPOSED

REHABILITATION OF EASTERN AVENUE N.E.


FROM WHITTIER STREET N.W. TO
NEW HAMPSHIRE AVENUE N.E.
DCKA-2013-T-0067
FAP NO. STP-XXXX(XXX)

RESURFACING - 1070 FT = 0.20 MILES


RECONSTRUCTION - 1969 FT = 0.40 MILES
LENGTH OF PROJECT - 3040 FT = 0.60 MILES

LIMIT OF WORK

E
N
DCKA-2013-T-0067

a
s
te
EASTERN AVENUE NW VE.

rn
ELM A

A
v
STA. 100+65.00

e
,
$PENTBLS$

e
W

Av
W LIMIT OF WORK
dgn

,N
St

re
er

1st St, NW
i

hi
t
it
01Eastern Ave.NE - DDOT\CADD\pGN-T0001_Eastern.

Wh
DCKA-2013-T-0067

ps
am
EASTERN AVENUE NE

tol St

H
STA. 131+05.00

ew
30% PLAN SUBMISSION

N
Ka North Capi

NE
e,
NOVEMBER 3, 2016

Av
Bl
$PLTDRVS$

ai

as
r

ns
Rd
,
NW

NE

E
a
s
e,

te
rn
Av

A
re

v
DISTRICT OF COLUMBIA
50 AM

e
hi

,
N
ps
DEPARTMENT OF TRANSPORTATION

E
Thursday, Novem ber 03, 2016 AT 11:

m
Ha
on\121107.

w
Ne

RECOMMENDED FOR APPROVAL:


\2016\Transportati

LOCATION MAP PROGRAM MANAGER IPMA / TEAM 2 DATE

SCALE 1" = 800'

APPROVED:
CONSULTING ENGINEERS - PLANNERS
2820 DORR AVENUE, SUITE 230
FAIRFAX, VA 22031 DEPUTY DIRECTOR / DATE
CHIEF TRANSPORTATION ENGINEER
PHONE: (571) 282-4099
T:
SHEET TOTAL
STATE PROJECT
NO. SHEETS

D.C. DDOT - EASTERN AVENUE, N.E. 2 80

SHEET NO. DRAWING NO. SHEET TITLE SHEET NO. DRAWING NO. SHEET TITLE

STORMWATER MANAGEMENT
1 TI-01 TITLE SHEET

2 I-01 INDEX OF SHEETS 50-55 SW-01 THRU SW-06 STORMWATER MANAGEMENT MAP

3 GN-01 GENERAL NOTES

4 GN-02 STANDARD SYMBOLS AND ABBREVIATIONS

5-7 GS-01 thru GS-03 GEOMETRIC LAYOUT AND CONTROL POINTS STORM SEWER PLANS
56-61 DD-01 THRU DD-06 DRAINAGE DESIGN PLANS
8 TS-01 EXISTING TYPICAL SECTIONS

9-14 EC-01 THRU EC-06 EXISTING CONDITIONS PLAN

15-20 EU-01 THRU EU-06 EXISTING UTILITIES PLAN

21-22 TS-02 THRU TS-03 PROPOSED TYPICAL SECTIONS


EROSION AND SEDIMENT CONTROL
23 DE-01 PAVEMENT DETAILS 62 EN-01 EROSION AND SEDIMENT CONTROL NOTES

63 EN-02 EROSION AND SEDIMENT CONTROL DETAILS

ROADWAY PLANS
24-29 RP-01 THRU RP-06 ROADWAY PLANS

30-35 PR-01 THRU PR-06 ROADWAY PROFILES TRAFFIC SIGNALIZATION


64-66 SG-01 THRU SG-03 SIGNAL PLANS

MAINTENANCE OF TRAFFIC
SIGNING & PAVEMENT MARKING
36 TCN-01 TRAFFIC CONTROL PLAN GENERAL NOTES
67-72 SPM-01 THRU SPM-06 SIGNING AND PAVEMENT MARKING PLANS - EXISTING
37-49 TC-01 THRU TC-13 TRAFFIC CONTROL PLAN - PHASES
73-78 SPM-01 THRU SPM-12 SIGNING AND PAVEMENT MARKING PLANS - PROPOSED

STRUCTURES
79 RW-01 SAFETY FENCE ON STRUCTURE FENCING DETAIL

80 RW-02 RETAINING WALL REPAIR SCHEDULE


AND PROPOSED STAIRWAY DETAIL
dgn
001_Eastern.
01Eastern Ave.NE - DDOT\CADD\pGN-I

DATE: 11-2016 SCALE: N/A I-01


50 AM

D.C. DEPARTMENT OF TRANSPORTATION


Thursday, Novem ber 03, 2016 AT 11:

INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION


on\121107.

PROJECT MANAGEMENT DIVISION


HORIZONTAL DATUM: MARYLAND STATE PLANE COORDINATE SYSTEM NAD 83/91 PROJECT ENG.
REHABILITATION OF EASTERN AVENUE, N.E. DESIGNED BY
VERTICAL DATUM: D.C. ENGINEERS SURVEY DATUM
\2016\Transportati

FROM WHITTIER STREET N.W. TO CHECKED BY

DRAWN BY
NEW HAMPSHIRE AVENUE N.E. PROJECT MGR.

DIVISION CHIEF

CONSULTING ENGINEERS - PLANNERS


2820 DORR AVENUE, SUITE 230 INDEX OF SHEETS DATE -, 2016
FAIRFAX, VA 22031 NO. DESCRIPTION NAME DATE
FILE
PHONE: (571) 282-4099
T:

REVISIONS SHEET 1 OF 6
1
SHEET TOTAL
STATE PROJECT
NO. SHEETS

D.C. DDOT - EASTERN AVENUE, N.E. 3 80

GENERAL
UTILITIES

1. THIS PROJECT SHALL ADHERE TO THE CONTRACT PLANS, SPECIAL PROVISIONS,


1. DATE OF UTILITY DESIGNATION: SEPTEMBER 2016
DISTRICT DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR
UTILITY DESIGNATION
HIGHWAYS AND STRUCTURES 2009, SUPPLEMENTAL SPECIFICATIONS 2007 AND
PERFORMED BY: A. MORTON THOMAS, LLC (AMT, LLC)
STANDARD DRAWINGS 2009.
10 G NE, SUITE 430
WASHINGTON, DC 20002
IN CASE OF DISCREPANCY AMONG CONTRACT DOCUMENTS REFER TO STANDARD
PHONE: (202) 289-4545 FAX: (202) 289-5051
SPECIFICATIONS, SECTION 103.1, ARTICLE 2, ORDER OF PRECEDENCE.
costria@amtengineering.com

2. THIS PROJECT WILL TEMPORARILY IMPACT BUILDING ACCESS, PARKING, DELIVERY /


THE UTILITY DESIGNATION (QUALITY LEVEL B) WAS BASED ON RESEARCH OF UTILITY RECORDS AVAILABLE
LOADING ZONES AND REFUSE COLLECTION FOR ADJACENT PROPERTIES.
AT THE TIME THESE PLANS WERE PREPARED. UTILITY DESIGNATION WAS PERFORMED FOR NON-GRAVITY
THE CONTRACTOR SHALL COORDINATE WITH DDOT, DPW AND ADJACENT PROPERTY
UTILITIES ONLY.
OWNERS / TENANTS TO MAINTAIN ACCESS.

2. CONTRACTOR SHALL NOTIFY MISS UTILITY (1-800-257-7777) 48 HOURS PRIOR TO ANY EXCAVATION WORK.
3. THE CONTRACTOR SHALL COORDINATE WORK AND ACCESS WITH ADJACENT
CONSTRUCTION PROJECTS.
IT IS THE CONTRACTOR'S RESPONSIBILITY TO LOCATE ALL UTILITIES PRIOR TO BEGINNING EXCAVATION.

4. THE CONTRACTOR SHALL COORDINATE WITH WMATA REGARDING ANY IMPACT OF


3. NO MECHANIZED EQUIPMENT SHALL BE USED FOR EXCAVATION IN CLOSE PROXIMITY TO UTILITIES.
THIS CONSTRUCTION UPON METRO BUS STOPS OR ROUTES WITHIN THE PROJECT
CONTRACTOR SHALL HAND DIG ONLY.
AREA AND VICINITY. THE CONTRACTOR SHALL COORDINATE HIS ACTIVITIES WITH
THE WMATA OFFICE OF JOINT DEVELOPMENT AND ADJACENT CONSTRUCTION
4. THE CONTRACTOR IS RESPONSIBLE FOR SUPPORTING AND PROTECTING EXISTING UTILITIES AS
PHONE: 301-618-1015.
DIRECTED BY THE ENGINEER AND UTILITY OWNER. THE CONTRACTOR IS RESPONSIBLE FOR ANY
DAMAGES TO EXISTING UTILITIES DUE TO NEGLIGENCE.
5. CONTRACTOR IS RESPONSIBLE FOR OBTAINING PUBLIC SPACE PERMITS FROM
THE DISTRICT OF COLUMBIA DEPARTMENT OF CONSUMER AND REGULATORY
5. THE CONTRACTOR SHALL KEEP ALL UTILITIES IN SERVICE DURING CONSTRUCTION.
AFFAIRS (DCRA) LOCATED AT:
IF ANY UTILITY IS ACCIDENTALLY DISRUPTED DURING CONSTRUCTION, THE UTILITY
OWNER AND THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY. TEMPORARY AND / OR
1100 4TH STREET SW
PERMANENT RESTORATION OF SERVICE SHALL BE AT THE CONTRACTOR'S EXPENSE.
WASHINGTON, DC 20024
PLANNED DISRUPTIONS IN UTILITY SERVICE MUST BE COORDINATED THROUGH
THE ENGINEER.
PHONE: (202) 442-4400
WEB: dcra.dc.gov

6. PRIOR TO BEGINNING CONSTRUCTION, PUBLIC SPACE CONSTRUCTION PERMITS


GEOTECHNICAL INVESTIGATION
WILL BE REQUIRED. IF THE CONTRACTOR WISHES TO STORE MATERIALS OR
EQUIPMENT IN PUBLIC SPACE A SEPARATE OCCUPANCY PERMIT IS REQUIRED.
1. GEOTECHNICAL INVESTIGATION AND REPORT, DATED ______ __, ____, PREPARED BY:

APPLICATIONS FOR PUBLIC PERMITS CAN BE INITIATED ONLINE BUT THE PROCESS
GeoConcepts Engineering, Inc.
CAN BE EXPEDITED BY MAKING AN APPOINTMENT TO VISIT DCRA WITH THE ENGINEER.
19955 HIGHLAND VISTA DRIVE,
SUITE 170
7. EXISTING PARKING METERS SHALL BE REMOVED BY THE CONTRACTOR AND SHALL BE
ASHBURN, VIRGINIA 20147
RETURNED TO THE DEPARTMENT OF PUBLIC WORKS YARD AS DIRECTED BY THE ENGINEER.
PHONE: (703) 726-8030
www.geoconcepts-eng.com
8. REFER TO THE TRAFFIC CONTROL PLAN - GENERAL NOTES FOR PERMITTED WORK HOURS.

EROSION AND SEDIMENT CONTROL

SURVEY
1. THE CONTRACTOR SHALL INSTALL ALL SEDIMENT CONTROL PROTECTION MEASURES
PRIOR TO COMMENCEMENT OF CONSTRUCTION AS SHOWN IN PLANS.
1. HORIZONTAL DATUM: MARYLAND STATE PLANE COORDINATE SYSTEM
NAD 83 / 91
2. THE CONTRACTOR SHALL INSTALL SEDIMENT CONTROL PROTECTION FOR THE NEW
INLETS IMMEDIATELY AFTER THE INLETS ARE CONSTRUCTED.
VERTICAL DATUM: D.C. ENGINEERS SURVEY DATUM
SURVEY UNIT: SURVEY FEET
3. THE CONTRACTOR SHALL INSTALL SEDIMENT CONTROL PROTECTION FOR EXISTING NEARBY
INLETS OUTSIDE THE LIMIT OF WORK THAT ARE IMPACTED BY THE CONSTRUCTION.
2. DATE OF SURVEY: SEPTEMBER 2016
SURVEY PERFORMED BY: A. MORTON THOMAS, LLC - (AMT, LLC)
4. THE CONTRACTOR SHALL REMOVE SEDIMENT CONTROL PROTECTION UPON COMPLETION
10 G STREET NE, SUITE 430
OF EACH PHASE OF CONSTRUCTION AS DIRECTED BY THE ENGINEER.
WASHINGTON, DC 20002
PHONE: (202) 289-4545 FAX: (202) 289-5051
costria@amtengineering.com

TRAFFIC CONTROL PLAN


dgn

1. DURING ALL PHASES OF CONSTRUCTION AND THE DURATION OF THE CONTRACT


01Eastern Ave.NE - DDOT\CADD\pGN-N001_Eastern.

3. AMT, LLC HAS MADE EVERY ATTEMPT TO ACCURATELY PORTRAY EXISTING CONDITIONS
THE TRAFFIC SHALL BE MAINTAINED IN ACCORDANCE WITH THE CONTRACT DRAWINGS
WITHIN THE LIMITS OF SURVEY. HOWEVER, THE CONTRACTOR IS RESPONSIBLE FOR
AND SPECIAL PROVISIONS. PEDESTRIAN ACCESS SHALL BE MAINTAINED TO ADJACENT
VERIFYING EXISTING TOPOGRAPHIC FEATURES AND ELEVATIONS, ABOVE AND BELOW,
PROPERTIES AT ALL TIMES. IF EXISTING ACCESS IS ADA COMPLIANT, THEN CONTRACTOR
GROUND, PRIOR TO BEGINNING CONSTRUCTION IN THE FIELD.
IS REQUIRED TO MAINTAIN ADA COMPLIANT ACCESS.

THE CONTRACTOR SHALL BRING TO THE NOTICE OF THE ENGINEER ANY DISCREPANCY
2. IF THE CONTRACTOR DOES NOT PLAN TO USE THE TRAFFIC CONTROL PLANS IN THE CONTRACT
BETWEEN THE PLANS AND ACTUAL FIELD CONDITIONS.
DOCUMENTS, ALTERNATE TRAFFIC CONTROL PLANS SHALL BE SUBMITTED TO THE ENGINEER
FOR APPROVAL, AT LEAST 72 HOURS PRIOR TO THE START OF THAT PHASE OF WORK.
REFER TO THE EXISTING CONDITIONS PLANS FOR LIMITS OF SURVEY.

4. GIS PHOTOGRAMMETRIC DATA (I.E. CONTOURS, BUILDING FOOTPRINTS, EDGE OF ROAD, ETC.)
IS SHOWN BEYOND THE LIMIT OF SURVEY FOR INFORMATIONAL PURPOSES ONLY
AND SHOULD NOT BE USED FOR CONSTRUCTION. THE DATA WAS DOWNLOADED FROM
THE DISTRICT OF COLUMBIA - OFFICE OF THE CHIEF TECHNOLOGY OFFICER (OCTO).

5. A BOUNDARY SURVEY WAS NOT PERFORMED FOR THE DEVELOPMENT OF THESE PLANS.
IF ANY DISPUTE ARISES AS TO THE LOCATION OF RIGHT OF WAY LINES, PROPERTY LINES,
DATE: 11-2016 SCALE: N/A GN-01
50 AM

OWNERSHIP, ETC., A BOUNDARY SURVEY SHOULD BE PERFORMED BY A SURVEYOR LICENSED


IN THE DISTRICT OF COLUMBIA.
D.C. DEPARTMENT OF TRANSPORTATION
Thursday, Novem ber 03, 2016 AT 11:

RIGHT OF WAY LINES, PROPERTY LINES, OWNERS AND ADDRESSES SHOWN ON THE INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION
PLAN ARE SHOWN FOR INFORMATIONAL PURPOSES ONLY.
on\121107.

PROJECT MANAGEMENT DIVISION


HORIZONTAL DATUM: MARYLAND STATE PLANE COORDINATE SYSTEM NAD 83/91 PROJECT ENG.
REHABILITATION OF EASTERN AVENUE, N.E. DESIGNED BY
VERTICAL DATUM: D.C. ENGINEERS SURVEY DATUM
\2016\Transportati

FROM WHITTIER STREET N.W. TO CHECKED BY

DRAWN BY
NEW HAMPSHIRE AVENUE N.E. PROJECT MGR.

DIVISION CHIEF

CONSULTING ENGINEERS - PLANNERS


2820 DORR AVENUE, SUITE 230 GENERAL NOTES DATE -, 2016
FAIRFAX, VA 22031 NO. DESCRIPTION NAME DATE
FILE
PHONE: (571) 282-4099
T:

REVISIONS SHEET 1 OF 6
1
SHEET TOTAL
STATE PROJECT
NO. SHEETS

D.C. DDOT - EASTERN AVENUE, N.E. 4 80

ABBREVIATIONS SOILS LEGEND


AASHTO American Association of State Highway HDWL. Headwall RW or R/W Right of Way
Transportation Officials HERCP Horizontal Ellipitical Reinforced RCP Reinforced Concrete Pipe
ADT Average Daily Traffic Concrete Pipe RCPP Reinforced Concrete Pressure Pipe
AHD Ahead HP High Point R.Q.D. Rock Quality Designation
APPROX. Approximate IN Inch R.M. Rootmat
or B/L Baseline I.S.T Inlet Sediment Trap S South
BK Back / Book INV. Invert SAN. Sanitary Sewer
BIT. Bituminous J.B. Junction Box SB or S/B Southbound
B.C. Bituminous Concrete K K Inlet S.D. Storm Drain
B.M. Bench Mark L Length S.D.D. Surface Drain Ditch
BOT. Bottom LF Linear Feet S/E Super Elevation
C.C. Center of Curve L.L. Liquid Limit SF Silt Fence
CAP Corrugated Aluminum Pipe LP Low Point SF Square Feet
CAPA Corrugated Aluminum Pipe Arch L.P. Light Pole SHT. Sheet
CATV Cable Television LT. Left SPP Structural Steel Plate Pipe
C.B.R. California Bearing Ratio MAC. Macadam SPPA Structural Steel Plate Pipe Arch
or C/L Centerline M.C. Moisture Content S.P.T. Standard Penetration Testing
CL. Class MAX. Maximum SRP Steel Spiral Rib Pipe -
CLF Chainlink Fence M.D.D. Maximum Dry Content Aluminized Type 2
CMP Corrugated Metal Pipe MOD. Modified SRPA Steel Spiral Rib Pipe Arch -
C.O. Cleanout MIN. Minimum Aluminized Type 2
COMB. Combination N North SSD Stopping Sight Distance
CONC. Concrete NB Northbound SSF Super Silt Fence
CONSTR. Construction NE Northeast STD. Standard
COR. Corner N.P. Non-Plastic STA. Station
CORR. Correction O.C. On Center SO. Single Opening
CPP-S Corrugated Polyethylene Pipe - Type 'S' OHE Overhead Electric SY Square Yards
CSP Corrugated Steel Pipe - Aluminized Type 2 O.M. Optimum Moisture SWM Stormwater Management
CSPA Corrugated Steel Pipe Arch - PAV'T. Pavement T Tangent
Aluminized Type 2 PC Point of Curvature T Telephone
DC Degree of Curve PCC Point of Compound Curvature T.C. Top of Cover
D.H.V. Design Hourly Volume P/C Point of Crown T.G. Top of Grate
D.I. Drop Inlet P/GE Profile Grade Elevation T or TL Traverse Line
DIA. Diameter P.G.E. Profile Ground Elevation T.M. Top of Manhole
D.O. Double Opening P.G.L. Profile Grade Line TRAV. Traverse
E East P/GL Profile Ground Line TS Temporary Swale
E Electric P/R Point of Rotation T.S. Top of Slab
E
EA
External Distance
Each
P.I.
PI
Plasticity Index
Point of Intersection
T.S.
TYP.
Topsoil
Typical
SOIL BORING PROFILE
EB
ELEV
Eastbound
Elevation
POC
POT
Point On Curve
Point On Tangent
U.D.
U.G.
Under Drain
Underground
EXAMPLE
ES End Section PPWP Polyvinyl Chloride Profile Wall Pipe U.P. Utility Pole B-09
STA 123+45,20 RT
EX or EXIST Existing PROP Proposed USDA United States Department C/L CONST. MD 650

FT Feet PRC Point of Reverse Curve of Agriculture EX. GRD. ELEV. 125+/-
09-30-2002
F or FL Flowline PT Point VCL Vertical Clearance 0.0
BC
F.B.D. Flat Bottom Ditch PT Point of Tangency V.C.L. Vertical Curve Length DENOTES BORING NUMBER 0.8
SB
DENOTES REFERENCE LINE
1.8
F.H. Fire Hydrant PVC Point of Vertical Curve W Water DENOTES BORING LOCATION DENOTES EXISTING GROUND
FWD. Forward PVC Polyvinyl Chloride W West ELEVATION
N=13
G Gas PVI Point of Vertical Intersection WB Westbound DENOTES DATE BORING DENOTES STRATA
MC= 18
G.V. Gas Valve PVRC Point of Vertical Reverse Curve WB Wetland Buffer WAS DRILLED ABBREVIATION
H.B. Handbox PVT Point of Vertical Tangency W.M. Water Meter
DENOTES STANDARD PENETRATION (24) 8.0
DENOTES LAB MOISTURE
HDPE High Density Polyetheylene R Radius W.S. Wrapped Steel TEST N-VALUE IN BLOWS PER FOOT CONTENT (%)
R.F. Rock Fragments WUS Waters of the United States UNLESS OTHERWISE NOTED
RT Right W.V. Water Valve
MC= 16 DENOTES DEPTH TO TOP
OF STRATA FROM TOP OF
(0)
DENOTES WATER DEPTH BORING
14.0*
READING FROM TOP OF
CI(24)
BORING (TIME IN HOURS) DENOTES FIELD NOTED
dgn

MOISTURE CONTENT

CONVENTIONAL SIGNS
01Eastern Ave.NE - DDOT\CADD\pGN-N002_Eastern.

SAT
DENOTES CAVE-IN DEPTH DENOTES BORING DEPTH
(SAMPLES) FROM TOP OF BORING
(TIME IN HOURS)
CI(0)
N=10

N=50/3"
21.5
HCI
DENOTES HOLE WAS
PROPOSED MEDIAN BARRIER PROPOSED PIPE / CULVERT CLOSED IMMEDIATELY

ELECTRICAL HAND BOX - SIGNALS EXISTING PIPE / CULVERT


SOILS TEST DATA

FLOW LINE EXISTING DROP INLET E BORING SAMPLE LL PI USDA USC MDD OMC REMARKS
NUMBER DEPTH
STATE, COUNTY OR CITY LINES UTILITY POLE
B-09 1.8 - 8.0 18 NP Sandy Loam - - - with Gravel

PROPOSED TRAFFIC BARRIER WETLAND B-09 8.0 - 14.0 41 22 Silty Clay Loam CL 121 12 -

EXISTING TRAFFIC BARRIER


WETLAND BUFFER
PROPOSED FENCE LINE
EXISTING FENCE LINE WATERS OF THE U.S.

RIGHT OF WAY LINE


HEDGE / TREE LINE
EXISTING ROADWAY DATE: 11-2016 SCALE: N/A GN-02
50 AM

BUSH / TREE
RAILROAD
CONIFEROUS TREE D.C. DEPARTMENT OF TRANSPORTATION
Thursday, Novem ber 03, 2016 AT 11:

+50
32
BASE LINE OR SURVEY LINE 31
6
173.

FIRE HYDRANT DATUM LINE


INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION
GROUND ELEVATION
on\121107.

PROJECT MANAGEMENT DIVISION


22
2

HISTORIC BOUNDARY
210.

GRADE ELEVATION
DATUM LINE
HORIZONTAL DATUM: MARYLAND STATE PLANE COORDINATE SYSTEM NAD 83/91 PROJECT ENG.
WATERS OF THE U.S. REHABILITATION OF EASTERN AVENUE, N.E. DESIGNED BY
VERTICAL DATUM: D.C. ENGINEERS SURVEY DATUM
\2016\Transportati

FROM WHITTIER STREET N.W. TO CHECKED BY

DRAWN BY
NEW HAMPSHIRE AVENUE N.E. PROJECT MGR.

DIVISION CHIEF

CONSULTING ENGINEERS - PLANNERS


STANDARD SYMBOLS
2820 DORR AVENUE, SUITE 230
DATE -, 2016
FAIRFAX, VA 22031 NO. DESCRIPTION NAME DATE
AND ABBREVIATIONS FILE
PHONE: (571) 282-4099
T:

REVISIONS SHEET 1 OF 6
1
SHEET TOTAL
STATE PROJECT
NO. SHEETS

D.C. DDOT - EASTERN AVENUE, N.E. 5 80

N
5
2

0
0

0
0

3
1

5
3

7
1

4
E

N
00
LIMIT OF WORK 5

0
2

POT STA.100+00.

0
6

9
9

4
0

7
DCKA-2013-T-0067 3

4
1

N
E
EASTERN AVENUE N.W.

34

04
.
.103+18
STA. 100+65.00

PT STA.104+93.
PC STA
CURVE
EAST-1

1+ 50
09
TRAV PT 1
B
L CONSTRUCTION EASTERN AVE. N.E.
+50
1
01
TRAV PT 107
+50

1
1
02 CURVE EAST-2

NE STA.1
+50
1
03
+50 1
04 105 106 107 108 109 110 111
+50 +50 +50 +50 +50 +50 +50
W
.N
PC STA.100+36.

PT STA

EASTERN AVE. NW
ST

EASTERN AVE. NE
ER

MATCH LI
TI

TRAV PT 108
.100+58

IT

NO RTH
TRAV
H

PT 106
W
.
16

93

CAPI
TO L STREET NW

D
S
CONCRE

A
TE

PARK
TAKOM
APRON CONCRETE CURB

N
G

GH
797414-080650 & GUTTER

4'HI
N

G
G
5
2 EASTERN AVENUE, NE 17"

0
6

0
9

9
EASTERN AVENUE 0 7"

4
3

7
12"
1 DISTRICT OF COLUMBIA LIMITS

4
E

N
JERSEY WALL DISTRICT OF COLUMBIA LIMITS DISTRICT OF CONCRETE WALL 12"
STREET
BM TWIN NAME GRASS
NO PARKING 18" 10"
V
BM 503 SPE ED COLUMBIA LIMITS 7" 9"
A 109 LI
MIT
R

N
T T 4" 9"TWIN
1
5-MPH 5"
P 7"
12" GRASS GRASS
3'

' 12" 6"


4'

43
. 22 BRICK WALL
3
42.

4 5.3
'
34.

15"
.
4' TRAV
GRASS 12" GUARD RAIL
PT 107
STOP ROAD NARROWS/ CONCRETE CURB 797413-7780

D
S

S
S

STOP AHEAD NO PARKING


TE GUTTER CONCRETE CURB
TE CURB & CONCRE
GRANI

4'
S
S

E
EASTERN AVENUE, N.W.

15.
CONCRETE CURB
W

& GUTTER
S
S
W

EASTERN AVENUE, N.E.


79741
4-03 EASTERN AVENUE
50
G

.
.H
M
GRANI
TE CURB
& CONC
NO PARK RETE GUTT
ER

.
.
I
NG CONCRE

.H
.H

M
M
TE

59
DISTRICT OF COLUMBIA LIMITS

0'
NO PARK EASTERN AVENUE, N.W. EASTERN AVENUE, N.E.

3'
ING

.7

.
APRON
121+00

28.
58
G

'
CONCRE

W
TE WAL

0'
K NO PARKING

.
8" 124+00
.M.
W

4" 797413-7279

52
L

5"
RAI
CONCRETE

W
30" SHRUBS CONCRETE CURB TRAV PT 106 SIGNAL AHEAD

W
P

12"
O

GRASS 9" SHRUBS CONCRETE


ST

M.
W.

M.
GRANITE
CONCRETE
S

W.
S

GRASS 8" CONCRETE CURB APRON


9" 4
3.'
9
.

G
130+00 STOP
D

D
D
ET ER

S
S
.W

9" STONE
RE TTI

3728A/4H819DC 4' HIGH 5"


,N

L
GRANI
D

TE CURB &
S

STONE

RAI
CONCRE WALL

GH
GRASS TE GUTTE
ST HI

NO PARKING GRASS

.
R

.H
30"

M
L
WALL 5"

6'HI
D

RAI
D

L
S

RAI
COPING
GRASS 2'
W

M.
W.

STOP . GRASS 12"


8"
27

GH
E NO THRU

BLOCK WALL
6"

CLF 3'HI
TRUCKS
RA RAIL MULTI
IL
LOT 835 PORCH

D
S
CONCRETE
27"
4 LOT 45 LOT 30 LOT 31
83

LOT 831
RAIL

NG
D
S
EASTERN AVENUE, N.W.

COPI
TOL STREET
T WELCOME TO 1-STY

LOT 42
2-STY 1-STY
7'

LO
WASHINGTON CONCRETE
CONC
23.

0'

BRICK
S
S
12.
S

GRASS
S

Y
T 128+00
S K
- I C
2 127+00
R 5'
B
GRANI
TE CURB & C
5.
1 1-STY
ONCRETE GUTTER STOP AHEAD

NORTH CAPI
NO THRU BRICK

GRASS
TRAV PT 108
W

797413-2130
CONCRETE TRUCKS
STONE WAL
D

D
S

CONCRE
S

L APRON TE 3729M/
G
W

2
5 APRON 4H700DC
M.

.
W.

TRAVERSE 8
'
TRAVERSE
ASPHALT

GRASS STONE WALL


ASPHALT

POINT - 109
L

POINT - 106
RAI

STOP
dgn

4"
2" MULTI 5" AHEAD
SCALE: NTS
L

GRASS
SCALE: 1"=NTS
RAI

GRASS
01Eastern Ave.NE - DDOT\CADD\pGS-P001_Eastern.

TRAVERSE
GH
6'HI
LOT 818

4"
POINT - 107
LOT 59

2-STY
MASONRY SCALE: NTS
2-STY
PAR 1-STY
MASONRY
TRAVERSE POINTS
CONCRETE

PAR 116/34 116/47 POINT NO. NORTH EAST ELEVATION

106 474575.4271 1310117.8241 231.43

107 474821.8056 1309934.5020 248.88


TRAVERSE
POINT - 108
108 475041.4607 1309660.8187 264.12
SCALE: NTS
109 475269.1805 1309516.3748 266.43
B
L CONSTRUCTION EASTERN AVENUE N.E.

CURVE POINT NO. STATION NORTH EAST BEARING CURVE DATA

POINT POT 100+00.00 475,368.1662 1,309,403.4214 CURVE DELTA Dc RADIUS TANGENT LENGTH EXTERNAL DATE: 11-2016 SCALE: 1"=40' GS-01
50 AM

PC 100+36.16 475,342.6679 1,309,429.0600 EAST-1 250.00' 11.47' 22.77' 0.26'

D.C. DEPARTMENT OF TRANSPORTATION


Thursday, Novem ber 03, 2016 AT 11:

PI 100+47.63 475,334.5780 1,309,437.1943 EAST-2 1,975.00' 87.41' 174.70' 1.93'


EAST-1

PT 100+58.93 475,325.7771 1,309,444.5536


INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION
on\121107.

CC 475,165.4071 1,309,252.7687 PROJECT MANAGEMENT DIVISION


PC 103+18.34 475,126.7759 1,309,610.9580 HORIZONTAL DATUM: MARYLAND STATE PLANE COORDINATE SYSTEM NAD 83/91 PROJECT ENG.
REHABILITATION OF EASTERN AVENUE, N.E. DESIGNED BY
VERTICAL DATUM: D.C. ENGINEERS SURVEY DATUM
\2016\Transportati

PI 104+05.75 475,059.7168 1,309,667.0326


EAST-2 FROM WHITTIER STREET N.W. TO CHECKED BY

DRAWN BY
PT 104+93.04 474,997.8739 1,309,728.8126
NEW HAMPSHIRE AVENUE N.E. PROJECT MGR.

CC 476,393.6993 1,311,126.0587
DIVISION CHIEF

CONSULTING ENGINEERS - PLANNERS GEOMETRIC LAYOUT


2820 DORR AVENUE, SUITE 230
DATE -, 2016
80' 0 40' 80'
FAIRFAX, VA 22031 NO. DESCRIPTION NAME DATE AND CONTROL POINTS
FILE
PHONE: (571) 282-4099
T:

SCALE: 1"=40' REVISIONS SHEET 1 OF 3


6
SHEET TOTAL
STATE PROJECT
NO. SHEETS

0
5
5
4
D.C. DDOT - EASTERN AVENUE, N.E. 6 80

7
E

4
1

N
3
1
0
7
E 5
0
1
3
1
0
3
7

0
5

5
1
4
7
4
N
KANSAS LANE

AVENUE

MATCH LI
+ 50

B
L CONSTRUCTION EASTERN AVE. N.E.

4TH
11

TRAV
PT 104
NE STA.1

NE STA.1
112 +50 113 +50 114 +50 115 +50 116 +50 117 +50 118 +50 119 +50 120 +50 121 +50 122 +50

EASTERN AVE. NE
MATCH LI

KAN
TRAV
TRAV
PT 103

SAS

23+ 00
PT 105

E
N
T.
AVE

S
N
.N E

A
M
R
E
K
C
TU
E

0
1

5
3

1
1

4
0

7
3

4
7

KANSAS LANE
5

GH
N

4'HI
N
5" 11"

h AVENUE

GUTTER
3" 7" GRASS

5"

CONCRETE
L
SPEED LIMIT

GUARDRAI

APRON
CONCRETE CURB
GRASS 25-MPH
GRAVEL

CONCRETE CURB &


8"

GUTTER

4t
SHRUBS

CONCRETE
DISTRICT OF COLUMBIA LIMITS

APRON
DISTRICT OF
6" 6" #798413-240400 6"
5' HIGH

&

N
TWIN COLUMBIA LIMITS

W
5' HIGH 7"
11" 9" 5" 15" DISTRICT OF
GRAVEL

S
S
15" 10" SHRUBS
MARYLAND
GRASS 12" COLUMBIA LIMITS GRASS
10" STOP GRASS
GRASS NO THRU
#797413 GRASS CONCRETE
CONCRETE TRUCKS
GRASS APRON 28"
-9563
APRON 9.4' STREET
115+00

1'
4" 8"
8" NAME

8.
9" #798413-430160
CONCRETE CURB 798413-0455/ 10"
111+00 CONCRETE CURB

E
#798413-500090/
NO PARKING

E
798413-190400 BUS
4P646DC

2'
STOP BENCH

.
S
TRAV

49
#798413-250340
EASTERN AVENUE, N.E. PT 104 114+00

4'
6
3.'
2

21.
EASTERN AVENUE, N.E.
1'
30.

'
.5 76

4'
88 68 .
4'

24.
.
5' 5.'
2
118+00 1 117+00

S
S
EASTERN AVENUE, N.E.
NO

.
.H
CONCRETE CURB

S
S
PARKING
M.
M.

W.
W.

TRAV PT 105
.M.

CONCRETE WALK
W

4" TRAV CONCRETE


CONCRETE GRASS
BRICK WALL 4" PT 103 15"
APRON

M.
W.
APRON
GH
L

BRICK WALL BRICK WALL


RAI

3'HI

GRASS GRASS 3
4.8
'

S
S

W
WATCH FOR

S
GRASS

CONCRETE
CONCRETE
STONE

RAI
GRASS RA PEDESTRIANS
BRICK

L
I

RAI
WALL L 2" GRASS
CK
WALL

L
3"

G
WALL

RAI
CONCRETE WALL
5"
BRI

S
S

S
S

CONCRETE
CONCRETE
LAMP
W

M.
GRASS

W.
GRASS

W
7" CONCRETE

M.
BRICK

W.
ROU
BI
LOT 24 WALL

KE
PAR 127/42 GRASS

TE
GRASS

E
E
1-STY
GRASS LOT 21

AVE

D
S
BRICK
LOT 19 LOT 20

KAN
2-STY

L
E
T
NUE
BRICK

SAS
2-STY

,N.

S
BRICK

S
2-STY BRICK

E.
dgn
01Eastern Ave.NE - DDOT\CADD\pGS-P002_Eastern.

TRAVERSE TRAVERSE
TRAVERSE
POINT - 104 POINT - 103
POINT - 105
SCALE: NTS SCALE: NTS
SCALE: NTS

TRAVERSE POINTS

POINT NO. NORTH EAST ELEVATION

103 473843.7369 1310850.9521 195.75

104 474153.4543 1310607.5377 180.86

105 474320.9000 1310368.3417 209.44

B
L CONSTRUCTION EASTERN AVENUE N.E.

CURVE POINT NO. STATION NORTH EAST BEARING

DATE: 11-2016 SCALE: 1"=40' GS-02


50 AM

POINT PT 104+93.04 474,997.8739 1,309,728.8126

POINT POT 133+20.53 472,997.5180 1,311,727.1345 D.C. DEPARTMENT OF TRANSPORTATION


Thursday, Novem ber 03, 2016 AT 11:

INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION


on\121107.

PROJECT MANAGEMENT DIVISION


HORIZONTAL DATUM: MARYLAND STATE PLANE COORDINATE SYSTEM NAD 83/91 PROJECT ENG.
REHABILITATION OF EASTERN AVENUE, N.E. DESIGNED BY
VERTICAL DATUM: D.C. ENGINEERS SURVEY DATUM
\2016\Transportati

FROM WHITTIER STREET N.W. TO CHECKED BY

DRAWN BY
NEW HAMPSHIRE AVENUE N.E. PROJECT MGR.

DIVISION CHIEF

CONSULTING ENGINEERS - PLANNERS


GEOMETRIC LAYOUT
2820 DORR AVENUE, SUITE 230
80' 0 40' 80' DATE -, 2016
FAIRFAX, VA 22031 NO. DESCRIPTION NAME DATE AND CONTROL POINTS
FILE
PHONE: (571) 282-4099
T:

SCALE: 1"=40' REVISIONS SHEET 2 OF 3


6
SHEET TOTAL
STATE PROJECT
NO. SHEETS

N
E D.C. DDOT - EASTERN AVENUE, N.E. 7 80

0
1

5
3

7
1

3
1

N EW
7
5

4
0
0

N
E

HA
0
0
1

4
3

M PS
1

53
1

4
1

POT STA.133+20.
5

N
0

HI
LL RD

RE
AVE
MI
23+ 00

AVE

NE
GO
B
L CONSTRUCTION EASTERN AVE. N.E.

5TH

SLI
TRAV
NE STA.1

TRAV PT 100
PT 102

+50 124 +50 125 +50 126 +50 127 +50 128 +50 129 +50 130 +50 131 +50 132 +50 133
MATCH LI

EASTERN AVE. NE

N EW
TRAV
PT 101

LIMIT OF WORK

HA
M PS
DCKA-2013-T-0067
EASTERN AVENUE N.E.

HI
RE
STA. 131+05.00

LL RD NE
E

AVE
E

N
0
1

T
0
3

S
4
1

3
1

NE
7
1

N
5
0

A
N

ID

MI
R
E
H
S

GO
SLI

LLS
#798412-710940

N
GO MI
CONCRETE CURB

ROAD
E
CONCRETE CURB

DISTRICT OF
h AVENUE

20"
GUTTER

4'
GUTTER

36.

CON
DC/MD
COLUMBIA LIMITS DC/MD

SLI

NE
CRE
STOP

W
AV
&

TE
&
5t

EN
#798412-910680/

HA
DISTRICT OF

WA
105+00 4P640DC

UE
LK

MP
19"
COLUMBIA LIMITS

,N
TRAV

SH
CONCRETE WALL PT 102
CONCRETE CURB

.E.
2 GRASS

IRE
7.9
' 104+00
21
STOP .1'

FIBER OPTIC
9" BUS STOP
DISTRICT OF
D

EASTERN AVENUE, N.E.


S

7'

#798412-720870 CONCRETE CURB


108+00 107+00
32.

0'

4'

JB
PEDESTRIAN
6. COLUMBIA LIMITS

S
S

IL
S

S
S

T
51.

0'
R

3.
U
C
R
4'

E
E
T
28.

T
T
100+00

& RE
EASTERN AVENUE, N.E. TRAFFIC CONTROL

U
G
C
CABINET

E
N
O

L
CONCRETE CURB

E
C

T
INTERSECTION CROSSWALK

B.STA.100+00
W
TRAV
TRAV
S
S

101+00 PT 100

9'
PT 101
DO NOT '

21.
4
.

.
M
9
W.
TURN LEFT STOP
9
.'
CONCRETE CURB 50
D
D

CONCRETE
S
S

32
7"
.

.M.

EASTERN AVENUE, N.E.


.M
W

APRON

.
2"

7'
CONCRETE

S
CONCRETE WALK

S
24"
L
RAI

CONCRETE CONCRETE
ASPHALT

PAR 115/146
L

L
I

RAI

D
GRASS 2"

S
RA

O.
#798412-8564
L

WINDOW GRASS
RAI
L

RAIL
RAI

LLS
WELL 3"

E.
PORCH

P.
ROAD,N.
dgn

GO MI
.
M
E.

T, N

.
E DA

D
D

D
.E

S
S
1-STY 1-STY

S
27" GRASS

N
BRICK BRICK

R
01Eastern Ave.NE - DDOT\CADD\pGS-P003_Eastern.

S
TR E

G
H
CONCRETE WALK

SLI
LOT 43 LOT 44

G
E

E
D MP

S
E HU

E
A D
A
E
"

GRASS
E
15

H
P
S

TRAVERSE TRAVERSE TRAVERSE


POINT - 102 POINT - 101 POINT - 100 TRAVERSE POINTS
SCALE: NTS SCALE: NTS SCALE: NTS
POINT NO. NORTH EAST ELEVATION

100 473144.8293 1311611.2660 203.96

101 473406.5785 1311280.1980 240.75

102 473671.3441 1311102.8342 220.97

B
L CONSTRUCTION EASTERN AVENUE N.E.

CURVE POINT NO. STATION NORTH EAST BEARING


DATE: 11-2016 SCALE: 1"=40' GS-03
51AM

POINT PT 104+93.04 474,997.8739 1,309,728.8126

D.C. DEPARTMENT OF TRANSPORTATION


Thursday, Novem ber 03, 2016 AT 11:

POINT POT 133+20.53 472,997.5180 1,311,727.1345

INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION


on\121107.

PROJECT MANAGEMENT DIVISION


HORIZONTAL DATUM: MARYLAND STATE PLANE COORDINATE SYSTEM NAD 83/91 PROJECT ENG.
REHABILITATION OF EASTERN AVENUE, N.E. DESIGNED BY
VERTICAL DATUM: D.C. ENGINEERS SURVEY DATUM
\2016\Transportati

FROM WHITTIER STREET N.W. TO CHECKED BY

DRAWN BY
NEW HAMPSHIRE AVENUE N.E. PROJECT MGR.

DIVISION CHIEF

CONSULTING ENGINEERS - PLANNERS GEOMETRIC LAYOUT


2820 DORR AVENUE, SUITE 230
80' 0 40' 80'
FAIRFAX, VA 22031 NO. DESCRIPTION NAME DATE AND CONTROL POINTS DATE -, 2016

FILE
PHONE: (571) 282-4099
T:

SCALE: 1"=40' REVISIONS SHEET 3 OF 3


6
SHEET TOTAL
STATE PROJECT
NO. SHEETS

D.C. DDOT - EASTERN AVENUE, N.E. 8 80

EX RW
TS
B
L CONSTR. EASTERN AVE. NE

MI
DC LI
90 EXISTING DDOT RIGHT-OF-WAY VARIES

20' 20'

6' BUFFER 10' 10' 10' 10' BUFFER 6'


SIDEWALK VAR. 3.5' VARIES SIDEWALK
EX. NORTHBOUND LANES EX. SOUTHBOUND LANES
TO 5' 0' TO 5'

VARIES EGE VARIES EXISTING GROUND


VARIES VARIES VARIES VARIES

RETAINING WALL HEIGHT


EXISTING GROUND AND WIDTH VARIES,
SEE PLAN FOR LOCATION
CONC. CURB AND GUTTER CONC. CURB AND GUTTER
EX. CONC.SIDEWALK FROM
STA. 127+82 TO STA. 131+21

TYPICAL SECTION
EXISTING CONDITION
STA. 127+75 TO STA. 131+50
SCALE: 1"=5'

B
L CONSTR. EASTERN AVE. NE

EX RW
MI
DC LI TS
90' EXISTING DDOT RIGHT-OF-WAY VARIES

BUFFER 20' 20' BUFFER 6'

VAR. 3.5' EX. NORTHBOUND LANE EX. SOUTHBOUND LANE VARIES SIDEWALK
TO 5' 13' 7' 0' TO 5'
PARKING

EGE VARIES EXISTING GROUND


VARIES VARIES VARIES VARIES

RETAINING WALL HEIGHT


EXISTING GROUND AND WIDTH VARIES,
SEE PLAN FOR LOCATION
CONC. CURB AND GUTTER CONC. CURB AND GUTTER
EX. GUIDERAIL STA. 108+00
TO STA. 111+37 TYPICAL SECTION
EXISTING CONDITION
STA. 107+94 TO STA. 127+75
SCALE: 1"=5'

B
LCONSTR. EASTERN AVE. NW

EX RW
* EX. STRIPPED BUFFER AREA
TS

STA. 100+77 TO STA. 107+49


MI
DC LI

EXISTING DDOT RIGHT-OF-WAY VARIES 75' TO 90'

VARIES 24' TO 35' 20'


dgn
01Eastern Ave.NE - DDOT\CADD\pHT-X001_Eastern.

BUFFER *6' STRIPPED 12' 12'- 0" 7' 6'


VARIES BUFFER AREA EX. NORTHBOUND LANE EX. SOUTHBOUND LANE THRU / PARKING SIDEWALK
3.5' TO 12'
1'
1'
EXISTING GROUND

RETAINING WALL
EGE VARIES
VARIES VARIES VARIES VARIES
RETAINING WALL HEIGHT
C
LEASTERN AVE. AND WIDTH VARIES,
SEE PLAN FOR LOCATION

GRANITE CURB & CONC. GUTTER GRANITE CURB & CONC. GUTTER
STA. 101+84 TO STA. 107+94 STA. 100+00 TO STA. 107+41
CONC. CURB AND GUTTER CONC. CURB AND GUTTER
STA. 107+94 TO STA. 111+00 STA. 108+09 TO STA. 111+00

EXISTING GROUND,
(EX. BUFFER, STA. 101+84 TO STA. 111+00)
DATE: 11-2016 SCALE: 1"=5' TS-01
TYPICAL SECTION
51AM

EXISTING CONDITION
STA. 101+84 TO STA. 107+94 D.C. DEPARTMENT OF TRANSPORTATION
Thursday, Novem ber 03, 2016 AT 11:

SCALE: 1"=5'
INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION
on\121107.

PROJECT MANAGEMENT DIVISION


HORIZONTAL DATUM: MARYLAND STATE PLANE COORDINATE SYSTEM NAD 83/91 PROJECT ENG.
REHABILITATION OF EASTERN AVENUE, N.E. DESIGNED BY
VERTICAL DATUM: D.C. ENGINEERS SURVEY DATUM
\2016\Transportati

FROM WHITTIER STREET N.W. TO CHECKED BY

DRAWN BY
NEW HAMPSHIRE AVENUE N.E. PROJECT MGR.

DIVISION CHIEF

CONSULTING ENGINEERS - PLANNERS


2820 DORR AVENUE, SUITE 230 EXISTING TYPICAL SECTIONS DATE -, 2016
10' 0 5' 10'
FAIRFAX, VA 22031 NO. DESCRIPTION NAME DATE
FILE
PHONE: (571) 282-4099
T:

SCALE: 1"=5' REVISIONS SHEET 1 OF 6


1
SHEET TOTAL
STATE PROJECT
NO. SHEETS

N
D.C. DDOT - EASTERN AVENUE, N.E. 9 80

00
POT STA.100+00.
SPEED
HUMP
CONCRETE CONCRETE CONCRETE WALK
CONCRETE WALK 5-MPH CONCRETE CONCRETE CONCRETE WALK CONCRETE CONCRETE
APRON APRON APRON APRON APRON APRON

G
797414-080650
CONCRETE CURB 797414-140490 RESERVED PARKING CONCRETE CURB 797414-300340 CONCRETE CURB
& GUTTER 797414-230400 & GUTTER & GUTTER

EASTERN AVENUE, NE
EASTERN AVENUE, NE EASTERN AVENUE, NE

34
ASPHALT
ASPHALT ASPHALT

.
.103+18
CONCRETE CURB & GUTTER NO PARKING CONCRETE CURB & GUTTER
JERSEY WALL BM 503 CONCRETE WALL CONCRETE WALL
BM 2
6 2
JERSEY WALL V SPE ED 0
NO PARKING 6 8"
A 2 12"MULTI 4"
T
R 09 LI
MIT
SHRUBS 6
5
8" 5"0 2
6
1 0
SHRUBS
EASTERN A V T 1

PC STA
ENU E,N.
W. P 5-MPH 2 6"
9"
+50 6
SP5EED
SHRUBS
ASPHALT
2 9" 8"
1
01 EASTERN A L I
MIT GRANI
TE CURB 6
VENUE,N. & 5
W. 25- MPH CONCRETE GUTT 9"

E
(
40'WI
DE PUBLI
C STREET) 2 E2R
6 +5
5 0 6
5
ASPHALT ABANDON

D
1

D
02

S
CONDUI

S
S
T
(
75'WI
DE PUBL
I
C STREET) +50

D
GRANITE CURB &

E
PC STA.100+36.

PT STA
CONCRET GUTTER 1
03
2
EAST

W
6 ERN A

S
VE

S
+5 5 NUE
CONCRETE WALK 0 ,N.
W.

NE - SEE SHEET 2
ASPH 104
79 AL T
2
741
4-0350 GRANI
TE CURB
+50

G
6 &
5 CONCRE (

.100+58
TE GUTT 97414 75'WI
DE PUBL
ER -1
043 I
C STRE
NO PARKI
NG CONCRE ET)
4H

D
TE 679

S
NO PARK DC
APRON I
NG ME

S
TRO BUS

S
G
CONCRETE ROAD
WALK
79741 2
NARROW CONCRE 4-1 6

.
43

.M
TE 8/4

W
S H8 2
54DC

.
L

.M
S
STOP

W
RAI
CONCRETE
2- APRON GRANI
TE CURB & C
ONCRE

P
.
S 2 TE GUTTE

16
T 2 R AHEAD

93
6

O
7

D
O GRASS 2 TRAV PT 108

W
B

S
0 2 5

ST
R R 7 797413-2130

CONCRETE
I Y 2 7 CONCRE

S
C 0 8"

L
7 0 3" TE WAL

.
K 30"

RAI

.M
CONCRETE

W
0 L CONCRETE

D
STONE WAL

D
GRASS

S
CONCRE

S
L TE

D
S
2 APRON

W
3" 7 GRASS APRON

.
GRASS

.M
RAI

W
GRASS 0

D
S

ASPHALT
2
7 GRASS STONE STONE
0

ASPHALT
ER

L
CO

RAI
WALL WALL
NC

.
.M
W
T
AP RE 2" MULTI

GU
RO TE

L
RAI
N 5"

&
2

ER RB
RA

W
7

MATCH LI
0 IL

RB
CU

,N
LK

)
GRASS GRASS GRASS

CU
27"

ET
ET
A

GU E
T

GH
W
40" GRASS

RE
T
T

E
RE

RE
.
.M

6'HI
W

T
E

ST

RE
ET

NC

ST
LT
2-STY

NC
R

&
CO

IC
C

MASONRY

MASONRY
HA
BRICK

BL

LK
CO
N
PORCH

2-STY

2-STY
ER
O

SP

PU

A
C
Y

I
T

W
A
/

TT
S K

SS
25 D L 53
- I

DE
C

E
T
2

HI
PH I
R

ET
I
6

A
B

M
I
EE -9

GR

R
5'
W

C
2-STY 2-STY

SP 414

N
-M

(7

O
BRICK CONCRETE

C
79

47
94
4-
2
7

41
5

GH
96

HI
4'
DC 7
8"

4
68 94
4H 14-
0
64
79

H
A
R
LA
(4 N
0
'
W P
ID A
S
LA
E C
dgn

P
H
P A E
U
B
L
T
,N
01Eastern Ave.NE - DDOT\CADD\pEC-0001_Eastern.

L
IC .W
S .
T
R
E
E
T
)

DATE: 11-2016 SCALE: 1"=20' EC-01


51AM

D.C. DEPARTMENT OF TRANSPORTATION


Thursday, Novem ber 03, 2016 AT 11:

INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION


on\121107.

PROJECT MANAGEMENT DIVISION


HORIZONTAL DATUM: MARYLAND STATE PLANE COORDINATE SYSTEM NAD 83/91 PROJECT ENG.
REHABILITATION OF EASTERN AVENUE, N.E. DESIGNED BY
VERTICAL DATUM: D.C. ENGINEERS SURVEY DATUM
\2016\Transportati

FROM WHITTIER STREET N.W. TO CHECKED BY

DRAWN BY
NEW HAMPSHIRE AVENUE N.E. PROJECT MGR.

DIVISION CHIEF

CONSULTING ENGINEERS - PLANNERS


EXISTING CONDITIONS PLAN
2820 DORR AVENUE, SUITE 230
20' 0 20' 40' DATE -, 2016
FAIRFAX, VA 22031 NO. DESCRIPTION NAME DATE
STA. 100+00 TO STA. 104+50 FILE
PHONE: (571) 282-4099
T:

SCALE: 1"=20' REVISIONS SHEET 1 OF 6


SHEET TOTAL
STATE PROJECT
NO. SHEETS

N
D.C. DDOT - EASTERN AVENUE, N.E. 10 80

BRICK WALL
CONCRETE
CONCRETE WALK CONCRE CONCRE CONCRETE CONCRETE WALK CONCRE CONCRETE WALK CONCRETE CONCRETE CONCRETE CONCRETE WALK APRON
TE TE TE PAVERS BRICK CONCRETE WALK
APRON APRON APRON APRON APRON APRON APRON PAVERS

G
2
5 SPEED 2
5 5 797413
CONCRETE CURB 797414-380250 HUMP 0 797414-450180 797414-500140 797414-550040 CONCRETE CURB 797413-640990 CONCRETE CURB
& GUTTER 5-MPH & GUTTER -700970 & GUTTER

G
2
EASTERN AVENUE, NE

G
4
5
ASPHALT 2 EASTERN22AVENUE, NE EASTERN AVENUE, NE
2 3 2 0
4 5 3 ASPHALT ASPHALT
0 0
04

CONCRETE CURB & GUTTER CONCRETE CURB & GUTTER CONCRETE CURB & GUTTER
PT STA.104+93.

2 2 CONCRETE WALL 2 CONCRETE WALL CONCRETE WALL


5 2 2 2 2 2
5 5 5 2 0 2
0 2 18" 5 0
NO PARKING NO PARKING 4 NO PARKING
SPEED 7" 2 12"
5 4 2 2 2
2 2 0 3 3 8" 9" 2 8" TWIN
2 5HUMP 5 5 0 5
6 5 5" 0 4"2 10" 2
012" 5-MPH 2 4 5" 10" 5" 8" 2 2
5 SHRUBS 5 6" 3 5
20" 5 14" 2 12" 8" 0 6" GRASS
2 12"
5 SHRUBS 4 2 6" 2
2 12" 2 0
GRASS 12" 6" 2 MULTI 0 3 SHRUBS 6" 3
6 5 4 5 0
5 6"
0 2 10" 5 15" 2 GRASS
6" 8"
6 12" 13" 2 3
0 10" 3 6" 3" 0
7"MULTI 5 7"
NO PARKING RIGHT LANE TE CURB &
GRANI METRO BUS
NO PARKING STOP
CONCRETE GUTTER 2 TRAV PT 107 2 GUARD RAIL

D
NARROWS AHEAD

S
5 4
0 0
CONCRETE CURB BROKEN CONCRETE CURB ROAD NARROWS/
TE CURB &
GRANI

E
E
CONCRETE GUTTER STOP AHEAD

NE - SEE SHEET 3
NE - SEE SHEET 1

2
6 2
0 3
5
2
EASTERN AVENUE, N.W. 5
5 EASTERN AVENUE, N.E.
+50 105 +50 106 +50 107 +50 108 +50 109 +50 110 +50
ASPHALT ASPHALT

2 (90' WIDE PUBLIC STREET)

D
D

S
S
(90' WIDE PUBLIC STREET) 4
5

S
S

S
W
S

W
797414-4011 GRANI
TE CURB & 797414-4407
GRANI 797414-5992
TE CURB & CONCRE GRANITE 25

W
TE GUTTER /4H821DCA CONCRETE GUTTER /4H820DC 3728A/4H819DC
0 CONCRETE CURB 2
/4H818DC CONCRETE CURB
4
CONCRETE CONCRETE 2 STOP 0

D
D

S
S

.
.
6

.M

.M
.M
.
W
G

W
W
.M
W

W
NO PARKING
W

STONE 0 797413-6685

W
APRON
.

W
APRON METRO BUS
.M

6"
.
.M
W

.
W

.
CONCRETE

.M

.M
CONCRETE WALK

W
.

W
.M
W
STONE WALL WALL RAIL 4' HIGH RAIL STONE WALL STONE WALL /4H817DC
APRON

D
S
L

L
ASPHALT

RAI

RAI
STONE WALL STONE WALL 3' HIGH CLF STONE WALL 4' HIGH 4' HIGH

PAVERS
7" COPING 2" GRASS GRASS 2

STONE
4" GRASS GRASS 3
CONCRETE

STONE WALL

GH
STOP
CLF

8" 5
GH

GH
GRASS GRASS 3' HIGH
GH

MATCH LI
GRASS 13"
MATCH LI

6'HI
6"
4'HI

GRASS

GH
3'HI
MULTI 7" NO THRU GRAVEL
4'HI

CLF

GH
GRASS

BLOCK WALL
6"

CLF

CLF 3'HI
3" TRUCKS

4'HI
GRASS GRASS RAIL RAIL MULTI 2" 30"
5" 6' HIGH
PORCH PORCH PORCH

D
4' HIGH

S
CONCRETE

PORCH PORCH RAIL

NG
D
S
PORCH

COPI
4" PORCH PORCH WELCOME TO
PORCH 1-STY
2 1-STY
5 WASHINGTON CONCRETE
0 CONCRETE
1-STY 1-STY 1-STY 1-STY

GRASS
TE CONCRETE
1-STY MASONRY MASONRY CONCRE
1-STY 1-STY
WOOD/MASONRY
BRICK MASONRY

TOL STREET
NO THRU

GRASS

GUTTER
C STREET)
TRUCKS

CONCRETE WALK
3729M/

CONCRETE WALK
4H700DC

CONCRETE CURB &


ASPHALT

DE PUBLI
STOP

NORTH CAPI
AHEAD
RAIL
2
2 5
5 0
0

CONCRETE CURB

90'WI
GUTTER
BLOCK WALL

(
2
6
0

&
METRO BUS

ASPHALT
CONCRETE
APRON
dgn
01Eastern Ave.NE - DDOT\CADD\pEC-0002_Eastern.

DATE: 11-2016 SCALE: 1"=20' EC-02


51AM

D.C. DEPARTMENT OF TRANSPORTATION


Thursday, Novem ber 03, 2016 AT 11:

INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION


on\121107.

PROJECT MANAGEMENT DIVISION


HORIZONTAL DATUM: MARYLAND STATE PLANE COORDINATE SYSTEM NAD 83/91 PROJECT ENG.
REHABILITATION OF EASTERN AVENUE, N.E. DESIGNED BY
VERTICAL DATUM: D.C. ENGINEERS SURVEY DATUM
\2016\Transportati

FROM WHITTIER STREET N.W. TO CHECKED BY

DRAWN BY
NEW HAMPSHIRE AVENUE N.E. PROJECT MGR.

DIVISION CHIEF

CONSULTING ENGINEERS - PLANNERS


EXISTING CONDITIONS PLAN
2820 DORR AVENUE, SUITE 230
20' 0 20' 40' DATE -, 2016
FAIRFAX, VA 22031 NO. DESCRIPTION NAME DATE
STA. 104+50 TO STA. 110+50 FILE
PHONE: (571) 282-4099
T:

SCALE: 1"=20' REVISIONS SHEET 2 OF 6


SHEET TOTAL
STATE PROJECT
NO. SHEETS

N
D.C. DDOT - EASTERN AVENUE, N.E. 11 80

CONCRETE CURB

797413-780850
GUTTER

CONCRETE WALL
NG
PI
10"
34"

CO
&
7" 19
6" 6" 5
10"

W
5"

GH
4"

W
CONCRETE WALK

4'HI
8" 6" 20" 14"
D
S

34" 2 7"
2 19

GH CLF

CONCRETE WALL
5 5"

A
GRASS 2

CONCRETE WALL
0

CK WALL
2

PARK
2

CONCRETE WALL
TAKOM
CONCRETE CURB 17" 14" 0 2 2 6"
GRASS 0 15

GH
& GUTTER 16" 3" 7"

CLF
4'HI

TE
4'HI

ASPHALT

ASPHALT
GRASS 5" 2 2 8"
7" 10 0

G
G
11" 0

CRE
8" GRASS

TE
EASTERN AVENUE, NE 17"

BRI
GRASS 6"
GRASS

CRE

GH
CON
ASPHALT GRASS 16"
TWIN 8"

4'HI
CONCRETE WALK
7" GRASS
2 5"

CON
12" 2
12" 5
CONCRETE WALL 2
2 2
2 5 2

CK WALL
0 STREET 2 15
2 6" 6" 2
0 10

CONCRETE
NAME GRASS 5' HIGH 4' HIGH
14" 3" 5' HIGH 7" 8"

ASPHALT
GRASS GRASS 11" 5" 15" BRICK WALL GRASS GRASS
9" 9"

ASPHALT

ASPHALT
2 GRASS 14" 2 19

BRI
2 SHRUBS 15" SHRUBS 0
5 9"TWIN 2 10" 0 5
15 12"
7" GRASS
GRASS 2 10" BRICK WALL
2
NE - SEE SHEET 2

NE - SEE SHEET 4
#797413-8572/ 0 2
10 30"
BRICK WALL 20" GRASS HIDDEN DRIVEWAY/
2 NO PARKING CONCRETE
3 CONCRETE #797413-9563 GRASS
0 APRON 2 NO PARKING
GUARD RAIL 0 19

D
2 CONCRETE APRON

S
2 5 0
CONCRETE CURB 5 798413-1148
797413-7780 APRON CONCRETE CURB 798413-0455/ CONCRETE CURB
NO PARKING NO PARKING

113 114 115 116 EASTERN AVENUE, N.E.


+50 111 +50 112 +50 +50 +50 +50 +50
ASPHALT

D
S
D
S

(90' WIDE PUBLIC STREET)


2
2 0 19
0

S
2

S
0 5
2
15
2
3

W
0 2
2 2
5 10 WATCH FOR
797413-7279

G
CONCRETE CURB CONCRETE CURB PEDESTRIANS CONCRETE CURB CONCRETE CURB
SIGNAL AHEAD 2
MATCH LI

MATCH LI
0 19
5

D
TRAV

.
.

.
0

.M
.M
S

.M

.
.
.
.

.M
.M

W
.M
.M

.M

.
.
BM 502

.M
.

.M

W
W
W

W
.M

CONCRETE WALK

W
W

.
W

.M
CONCRETE WALK

W
G
TRAV

W
CONCRETE PT 105 CONCRETE WALK

M
G
STONE WALL STONE WALL

B
G

STONE WALL BRICK WALL BRICK WALL 2' HIGH BRICK WALL
G

PT 106 RAIL BRICK WALL


APRON 2
C

GH
3 CONCRTE

L
STONE WALL 5" BRICK WALL 2' HIGH C

RAI
0 6' HIGH 2' HIGH 2' HIGH O

L
C O

RAI

3'HI
L

O N N
RAI

GH
WALL C

GH
GRASS GRASS 3 GRASS GRASS C 2 N GRASS C GRASS GRASS
O 0 C R 19 R

CLF
5" 0

4'HI
RAIL

GH
GRASS GRASS N E E

4'HI
5 R
L

5
L

RAIL STONE C T
RAI

T
RAI

L
RA R E

6'HI
RAI
E T E
WALL IL T E
GRASS 12"

CK
GRASS

WALL
E

L
3"

RAI
RAI
5"

BRI
21" 28" RAIL "39
GRASS BRICK BRICK

W
2

W
3 7"
5

1-STY 1-STY
1-STY 1-STY
2-STY 1-STY BRICK
2-STY 2-STY 1-STY BRICK
BRICK BRICK
BRICK BRICK
BRICK BRICK BRICK

1-STY
1-STY 1-STY
BRICK
BRICK 1-STY BRICK
BRICK
dgn
01Eastern Ave.NE - DDOT\CADD\pEC-0003_Eastern.

DATE: 11-2016 SCALE: 1"=20' EC-03


51AM

D.C. DEPARTMENT OF TRANSPORTATION


Thursday, Novem ber 03, 2016 AT 11:

INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION


on\121107.

PROJECT MANAGEMENT DIVISION


HORIZONTAL DATUM: MARYLAND STATE PLANE COORDINATE SYSTEM NAD 83/91 PROJECT ENG.
REHABILITATION OF EASTERN AVENUE, N.E. DESIGNED BY
VERTICAL DATUM: D.C. ENGINEERS SURVEY DATUM
\2016\Transportati

FROM WHITTIER STREET N.W. TO CHECKED BY

DRAWN BY
NEW HAMPSHIRE AVENUE N.E. PROJECT MGR.

DIVISION CHIEF

CONSULTING ENGINEERS - PLANNERS


EXISTING CONDITIONS PLAN
2820 DORR AVENUE, SUITE 230
20' 0 20' 40' DATE -, 2016
FAIRFAX, VA 22031 NO. DESCRIPTION NAME DATE
STA. 110+50 TO 116+50 FILE
PHONE: (571) 282-4099
T:

SCALE: 1"=20' REVISIONS SHEET 3 OF 6


SHEET TOTAL
STATE PROJECT
NO. SHEETS

N
D.C. DDOT - EASTERN AVENUE, N.E. 12 80

KANSAS LANE
GH
6"

4'HI
11" 19

ASPHALT
11"

CONCRTE WALL

CONCRETE WALL
5
18 10"

GUTTER
5
10"

GUTTER
GH CLF
CK

WALL 27"

CONCRETE WALL
BRI

CONCRETE

GH
CONCRETE WALL

L
GUARDRAI
4"

h AVENUE
CLF
4'HI
APRON
2" CONCRETE 9" GRASS

CONCRETE CURB
GRASS CONCRETE MULTI
WALL

3'HI

CONCRETE CURB &

ASPHALT
GUTTER
8"
18

CONCRETE CURB &


0 SPEED LIMIT
18 18 25-MPH
5 6"
0

G
CONCRETE 3"

SHRUBS
#798413-240400 19

4t
0 SHRUBS

CONCRETE
MULTI

&
W

APRON
CONCRETE
6"

S
S
TWIN
MARYLAND
GRAVEL
CONCRETE

18

CONCRETE

ASPHALT
GRASS NO THRU GRASS 5
6"
GRASS
TRUCKS 5" GRASS 18 GRASS
TWIN GRASS GRASS GRASS GRASS
TRAV 0
4" STOP GRASS 2 7"
8" 8" 19 0
PT 104 9" 0
10" 8" 5 CONCRETE CONCRETE
7" 8" #798413-500090/

E
APRON 28" APRON

E
18 4' HIGH 15" STREET 4P646DC
8"
NE - SEE SHEET 3

NE - SEE SHEET 5
0 BENCH 2
NAME

D
D

S
S

#798413-430160 0
#798413-250340 5
18 798413-190400 CONCRETE CURB #798513-310280 #798413-370220 CONCRETE CURB CONCRETE CURB CONCRETE CURB
BUS
5
STOP

19
0
EASTERN AVENUE, N.E.
+50 117 +50 118 +50 119 +50 120 +50 ASPHALT 121 +50 122
18
5
18
0
D

(90' WIDE PUBLIC STREET)


S

2
0
0
.
.H
M

D
D
S

S
S
S
19
5
TRAV NO
WATCH FOR #798413-380120
CONCRETE CURB CONCRETE CURB CONCRETE CURB PARKING CONCRETE CURB
PEDESTRIANS PT 103 2
0
18 5

D
D

S
S

18 CONCRETE
W

0 NO PARKING BUS STOP CONCRETE 4" 2" CONCRETE 4"


GRASS 13" GRASS GRASS 15" GRASS GRASS GRASS 8"
MATCH LI

MATCH LI
5 4" 15"

.
.M
APRON

W
CONCRETE

.M
W
APRON APRON
APRON

G
CONCRETE WALK CONCRETE WALK
G

S
S

S
S

19

S
S

L
CONCRETE
GRASS

L
RAI

CONCRETE
CONCRETE
0

RAI
W

ASPHALT
18 2

CK WALL

CONCRETE

CONCRETE

CONCRETE

CONCRETE WALL

L
BRICK

L
GH

CONCRETE
0 GRASS

RAI
RAI
0 2"

CONCRETE
CLF
GRASS

CONC
GRASS 0

.
.M
W
GRASS

3'HI

CK

L
WALL

RAI
GRASS

CONCRETE WALL
ROU

W
.
18

.M

.
.M
GRASS

W
BI

GRASS

.
GRASS GRASS

.M
BRI
GRASS

W
5 GRASS

CONCRETE
GRASS

.M
GRASS

CONCRETE
KE

LAMP

.
GRASS

.M
W
LAMP GRASS
E

CONCRETE
E

RETE
TE

CONCRETE 3"

.
BRICK

BRI

.M
W
L
RAI
WALL
D

L
S

4"

RAI
RAIL

L
GRASS

L
GRASS

RAI

RAI
L
L

L
GRASS

RAI
GRASS

RAI
L

RAI
L

RAI
E
T

RAIL
GRASS GRASS GRASS

CONCRETE

.
GRASS

.M

.M
G

G
1-STY
D
S

.
.M
E
BRICK 2-STY 10

PORCH
2-SRY
D

2-STY
S

9" 2-STY
BRICK 2-STY 2-STY
11"

BRICK BRICK BRICK


BRICK BRICK 2-STY 2-STY
18 24" 2-STY 2-STY
BRICK
0 BRICK BRICK
RAIL BRICK

.
.M
D

G
D
S

S
KAN
(12

GRA
SAS SPHALT
0'

.
.M
W
NI

GRASS
WI

TE

18
DE

0
AVE

CUR

GRA
PU
BLI

NUE

18
SS

0
C

.
ST

,N.

.E
ASPHALT

N
R

T,
EET

E.

BUS

E
E

)
)

TR

T
L
E

E
T
STO

E
GRA

R
T

T
L
N

S
CO

#79

A
P
5"

A
NI

IC
#79

P
M
NC
TE

L
S
R

B
841

A
E

U
RET

841

P
K
CUR

3-1

E
ID
3-1

TU
E

W
402
B

'
427

0
(6
70
dgn

S
S
01Eastern Ave.NE - DDOT\CADD\pEC-0004_Eastern.

DATE: 11-2016 SCALE: 1"=20' EC-04


51AM

D.C. DEPARTMENT OF TRANSPORTATION


Thursday, Novem ber 03, 2016 AT 11:

INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION


on\121107.

PROJECT MANAGEMENT DIVISION


HORIZONTAL DATUM: MARYLAND STATE PLANE COORDINATE SYSTEM NAD 83/91 PROJECT ENG.
REHABILITATION OF EASTERN AVENUE, N.E. DESIGNED BY
VERTICAL DATUM: D.C. ENGINEERS SURVEY DATUM
\2016\Transportati

FROM WHITTIER STREET N.W. TO CHECKED BY

DRAWN BY
NEW HAMPSHIRE AVENUE N.E. PROJECT MGR.

DIVISION CHIEF

CONSULTING ENGINEERS - PLANNERS


EXISTING CONDITIONS PLAN
2820 DORR AVENUE, SUITE 230
20' 0 20' 40' DATE -, 2016
FAIRFAX, VA 22031 NO. DESCRIPTION NAME DATE
STA. 116+50 TO STA. 122+25 FILE
PHONE: (571) 282-4099
T:

SCALE: 1"=20' REVISIONS SHEET 4 OF 6


SHEET TOTAL
STATE PROJECT
NO. SHEETS

D.C. DDOT - EASTERN AVENUE, N.E. 13 80

N LLS ROAD
CONCRETE WALL

GUTTER

GUTTER
2

h AVENUE
2
0 12"
2 7" 2

ASPHALT
ASPHALT
CONCRETE CURB
GRAVEL 15

CONCRETE WALK
#798412-710940 C 4

GO MI
CONCRETE CURB
20" O 0
4" N

GUTTER
C

CONCRETE CURB &

CONCRETE CURB &


GUTTER
R
E
5" T
E
3"
7"

5t

SLI
&
4" GRASS

&
4" 20" 2
3 2
GRASS 2 0 3 6"
5 4' HIGH CLF 5' HIGH CLF

E
2
5
2 2
4 3
8" 0 0
CONCRETE DC/MD

CONCRETE
CONCRETE WALL DC/MD
2 7" CONCRETE
19" 15 2 GRASS
3
2 GRASS GRASS GRASS STOP 5
8" 10 GRASS
CONCRETE
STOP TRAV
APRON
NE - SEE SHEET 4

NE - SEE SHEET 6
GRASS PT 102
2
3 HIDDEN CONCRETE WALK #799412-980610/
SPEED LIMIT 25/ 0
#798412-640950 18" DRIVEWAY 12" 19" 4P639DC
9" 19" 2
#798413-570020 BUS STOP 4
2 0

D
S
2 #798412-910680/
5
NO LEFT #798412-720870 CONCRETE CURB #798412-770820/ #798412-840750 CONCRETE CURB NO PARKING CONCRETE CURB
CONCRETE CURB 2 2 4P640DC
TURN 15 2 4P642DC 2 CROSSWALK
0 3
5 2
3
5

2
10
EASTERN AVENUE, N.E. 123 124 125 126 EASTERN AVENUE, N.E. 127 2 128
+50 +50 +50 +50 +50 4 +50 PEDESTRIAN
+50
ASPHALT ASPHALT PEDESTRIAN 0

S
S

S
S

S
(90' WIDE PUBLIC STREET) (90' WIDE PUBLIC STREET)

D
4

D
2

S
3 0
0
DO NOT
TURN LEFT
MATCH LI

MATCH LI
CONCRETE CURB 10
CONCRETE CURB 09 CONCRETE CURB CONCRETE CURB
59 2
2- 2

D
D
1 CONCRETE CONCRETE

S
INTERSECTION

S
4 7" 5 2" CONCRETE 9" CROSSWALK GRASS
98

.
.M

.M
W

W
#7

.
.M
BUS DO NOT APRON APRON

W
W

APRON

G
STOP TURN LEFT 2 CONCRETE 2
CONCRETE WALK CONCRETE WALK2 3 CONCRETE WALK
G

2 0 5 TRAV PT 101
15

S
S

S
2
S

L
2 4 3

RAI

.
.M
G

W
0

CK W ALL
5
K D/

10 CONCRETE STOP
CONCRETE

ASPHALT

CONCRETE
BLOCK WALL 20"
U EA

L
L

I
RAI 4
NG 2
S

GRASS COPI

L
5" GRASS 2" 4

L
T AH

RA

RAI

RAI
GRASS 0
C

L
WINDOW

.
GRASS

RAI

.M

P
L
RAIL

W
GRASS

RAI
GRASS

O
R MP

3" C
R

CONCRETE
NCE 7' HIGH

T
WELL 3" WOOD FE O GRASS

BRI
PORCH

S
T HU

K N 2"
1

WINDOW
P

C
U

L
0

R
O

A
5

.
D

.M
E
H

E
S W WELL
E

' T
S

2
A
M

.
.M
E

G
E H E

'
R
B

24"
P

I B
O

T G

H
G

.
.M
S

E
M

E H W

L
I
B

G
R A IC

L
1-STY

H
.E

R RB

C C

G
1-STY L K

A
N C L

IN
O 1-STY L GRASS

W
GRASS BRICK GRASS GRASS
N

F
G

B
T CU

O N
A NO

K
BRICK
S
IN

T,

C C R

E
BRICK
"

W I #798412-8564
K

R A CK GRASS

N
A
12
G TE

E
R

P
8"

O
T L
E

T
W

L
T
P

S
T
R

N
E

C
T

.
.M
S

W
R

O
"

&
T
18

C
S
A
N

S 2

2 RIC
H

S 4 TE
A

-
IC
P

A 0 RE

S
C

B
S

L
M

R NC

T
R

G 5"
A

CO

D
G
R

Y
O

S
IN
U

S
E

K
P

S R 2
K

A A 4
E

R 0
C

P
ID

G
TU

.
.M
W
W

1/

P
O
'

D M
N
9
0

E HU
8
(6

L
C
-

L
D

A D
2

A
"
4 41

A
5

E
"
2

IC Y
W
6

E
15

H
"

B ST
8

P
K
4

K
P

S
1-
7

IC

2-STY
#

B
R

R
B

S BRICK

U
2
O TE

C
A 4
0
P RE

R CONCRETE

E
.

G 2
A
N

T
4

S
C

D
.E

S
S
L

0
N

R
R

.
O
N

.E
C
T,

N
A

D
A

,N

S
C
E

N
IL

C
E

T
R
)
TR

10"

E
E
T

E
T
E

)
S

E
E

T
B
"
R

E
7

R
T

K
T

E
IC

S
L
N

T
R

L
S

R
A

L
A

A
A

T
H

A
IL
IC

S
O

N
W
P
M

E.
S
L

P
S

A
A

P
E S
R

IC
A

S
R

A
IC Y

ID
E

LLS ROAD,N.
L
L

A
E
A

R
B ST

C STREET)

CONCRETE CURB
P

B
K

R G
IL

R
N

GH CLF
C
1-
C

E
C

P
N
R
ID

R
TU

H
O E

E
W

S
T

ID
'

GRASS
E
0

W
S
(6

'
S
C

5'HI
0
A I

(9
R / FF P

GH
G

ASPHALT
P O

DE PUBLI
O RA T

CLF
4'HI
T T S

D
S

S
S T
S NO
O

GO MI
R S
C E
O
D

90'WI
dgn

SLI

(
PUBLIC ALLEY
01Eastern Ave.NE - DDOT\CADD\pEC-0005_Eastern.

(16' WIDE)

DATE: 11-2016 SCALE: 1"=20' EC-05


51AM

D.C. DEPARTMENT OF TRANSPORTATION


Thursday, Novem ber 03, 2016 AT 11:

INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION


on\121107.

PROJECT MANAGEMENT DIVISION


HORIZONTAL DATUM: MARYLAND STATE PLANE COORDINATE SYSTEM NAD 83/91 PROJECT ENG.
REHABILITATION OF EASTERN AVENUE, N.E. DESIGNED BY
VERTICAL DATUM: D.C. ENGINEERS SURVEY DATUM
\2016\Transportati

FROM WHITTIER STREET N.W. TO CHECKED BY

DRAWN BY
NEW HAMPSHIRE AVENUE N.E. PROJECT MGR.

DIVISION CHIEF

CONSULTING ENGINEERS - PLANNERS


EXISTING CONDITIONS PLAN
2820 DORR AVENUE, SUITE 230
20' 0 20' 40' DATE -, 2016
FAIRFAX, VA 22031 NO. DESCRIPTION NAME DATE
STA. 122+25 TO STA. 128+50 FILE
PHONE: (571) 282-4099
T:

SCALE: 1"=20' REVISIONS SHEET 5 OF 6


SHEET TOTAL
STATE PROJECT
NO. SHEETS

D.C. DDOT - EASTERN AVENUE, N.E. 14 80

CON

N
CRE

NEW
TE
CUR

HA
B &
CON

(12

M P SPHAL
0'
CRE

GUT

WI

SHI
DE
TE

A
TER

RE
PU
WA

BL
LK

AVE
T
IC
ST

NU
2
TRAFFIC CONTROL
0

R
5

EE
CABINET

E,N
T)
COMUNICATION

.
E.
FIBER OPTIC

53
POT STA.133+20.
5' HIGH CLF 15"
2
2
5

CONCRETE

D
B
J

L
WALL
GH

IL
2

E
U

I
L
10

RAI
3'HI

B
Y

R
GRASS
GRASS K

U
F
O AR

C
R
P

E
U E
2 2 Y

T
2

T
3 2 2 IT A

T
E
0 5 0 C M

R
O

G
C
K

E
CONCRETE WALK 2 A NO LEFT TURN

&
T

L
C
2

E
15

T
24" 24" 0
6" 5 #799412-1841
GRASS GRASS
NE - SEE SHEET 5

CONCRETE CURB #799412-1841/ CONCRETE CURB


#799412-0554/ TRAV
4P638DC 4P637DC
PT 100

PAVEMENT
CONCRETE
EASTERN AVENUE, N.E. EASTERN AVENUE, N.E.
+50 129 +50 130 +50 131 +50 132 +50 133
ASPHALT CONCRETE PAVEMENT

S
10

S
(90' WIDE PUBLIC STREET) (90' WIDE PUBLIC STREET)

2 2 2
2

D
3

S
0 2 0
5

NO PARKING/ 2
2 CONCRETE CURB 0
NEIGHBORHOOD WATCH CONCRETE CURB 15 5

D
D

D
S
S
GRASS GRASS GRASS GRASS

S
GRASS 4"

.
2" 27" 2"

.M
.

GRASS
.M

W
27"
W

.
.M
.
.M

.
W

.M
W
MATCH LI

NO LEFT

G
CONCRETE WALK CONCRETE WALK
TURN

G
STONE

WE
E
STONE STONE

WA
WALL CONCRETE BRICK 2

GH
CONCRETE

LC
CONCRETE
WALL WALL

CONCRETE
CONCRETE

WALL WALL 5" 5

3'H
CONCRETE

SH
E
3'HI

CLF

OM
ING
GRASS GRASS GRASS GRASS GRASS GRASS

I
GRASS GRASS GRASS GRASS

GH

GRA

E T
GRASS 2
10

TO

NEW
CLF

O
SS
ASPHALT

N
GRASS

CON
RA
L

4"
RAI

L
RAI

L
L

L
RAI

(12
L

RAI
L
RAI

RAI
2"

I
RAI

RAI

CRE

HA
0'
GRASS
CK WALL

A/C

MP
WI
CONCRETE

TE
2"

B
CONCRETE

DE

AS
PO
CLF

SHI
PORCH

CON
PORCH PORCH PORCH L LK

WA

GRA
GH
HI RAI WA

PH
BM
CLF

RCH
6' ETE

PU
R

LK
3' HIGH C

AL
CON
BRI

CRE

RE
NI
BM
3' HIGH

BL
500
2-STY STY

TE

T
2-

I
2-STY

C
2-STY CK

TE
BRICK
2-STY 2-STY B I
R L
RAI

AVE
27"

M US

CUR
BRICK BRICK

ST
BRICK BRICK

GUT
LEF
GRA

RE
T T

B &

NU
GRASS

ET
TER
T L
SS

E,N
URN

)
GRASS

ANE

.
LEF

E.
T
dgn
01Eastern Ave.NE - DDOT\CADD\pEC-0006_Eastern.

DATE: 11-2016 SCALE: 1"=20' EC-06


51AM

D.C. DEPARTMENT OF TRANSPORTATION


Thursday, Novem ber 03, 2016 AT 11:

INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION


on\121107.

PROJECT MANAGEMENT DIVISION


HORIZONTAL DATUM: MARYLAND STATE PLANE COORDINATE SYSTEM NAD 83/91 PROJECT ENG.
REHABILITATION OF EASTERN AVENUE, N.E. DESIGNED BY
VERTICAL DATUM: D.C. ENGINEERS SURVEY DATUM
\2016\Transportati

FROM WHITTIER STREET N.W. TO CHECKED BY

DRAWN BY
NEW HAMPSHIRE AVENUE N.E. PROJECT MGR.

DIVISION CHIEF

CONSULTING ENGINEERS - PLANNERS


EXISTING CONDITIONS PLAN
2820 DORR AVENUE, SUITE 230
20' 0 20' 40' DATE -, 2016
FAIRFAX, VA 22031 NO. DESCRIPTION NAME DATE
STA. 128+50 TO STA. 133+20.53 FILE
PHONE: (571) 282-4099
T:

SCALE: 1"=20' REVISIONS SHEET 6 OF 6


SHEET TOTAL
STATE PROJECT
NO. SHEETS

N
D.C. DDOT - EASTERN AVENUE, N.E. 15 80

DATR)

DATR)
DATR)

DATR)

DATR)

DATR)

DATR)

DATR)
DATR)
DATR)
DATR)
00

G(

G(
G(
DATR)
POT STA.100+00.

G(

G(

G(

G(

G(
G(
G(
G(
SPEED

G(
HUMP
CONCRETE CONCRETE CONCRETE WALK
CONCRETE WALK 5-MPH CONCRETE CONCRETE CONCRETE WALK CONCRETE CONCRETE
APRON APRON G(DATR)
APRON APRON APRON APRON

G
G(DATR) G(DATR)
797414-080650
CONCRETE CURB 797414-140490 RESERVED PARKING CONCRETE CURB 797414-300340 CONCRETE CURB
& GUTTER 797414-230400 & GUTTER & GUTTER

DATR)
EASTERN AVENUE, NE
EASTERN AVENUE, NE EASTERN AVENUE, NE

34
ASPHALT

G(
ASPHALT ASPHALT

.
.103+18
CONCRETE CURB & GUTTER NO PARKING CONCRETE CURB & GUTTER
JERSEY WALL BM 503 CONCRETE WALL CONCRETE WALL
BM

JERSEY WALL V SPE ED NO PARKING 8"


A SHRUBS 12"MULTI 4"
R 09 LI
MIT
8" 5"
T 1
SHRUBS
EASTERN A V T 1

PC STA
G(DATR)
ENU E,N.
W. P G(DATR) 5-MPH 6"
9"
+50 G(DATR) SPEED
SHRUBS
ASPHALT
9" 8"
1
01 EASTERN A LIMI
T GRANI
TE CURB
VENUE,N. &
W. 25-MPH CONCRETE GUTT 9"

E
(
40'WI
DE PUBLI
C STREET) ER 24
+5

R)
0
ASPH ABANDON

T
G-ABND(DATR) ALT

D
DA
1

D
02

S
60 CONDUI

S
G-ABND(DATR)

S
T

D(
10"(DATR) 10"(DATR) 61 (
75'WI
DE PUBL

BN
I
C STREET) +50

D
GRANITE CURB &

E
A
18"(DATR) 18"(DATR)

PC STA.100+36.

G-
PT STA
CONCRET GUTTER 1
03

DATR)
12"W(DATR) 59
1
2 EAS

R)
"W( T

W
DATR) ERN A

S
VE

S
R)
12"W(DATR) CONCRETE WALK
12"W(DATR) +50 NUE,N.
W.

W
T
1
0"(
DATR)

NE - SEE SHEET 2
T
DA
104

DA
ASPH

(
AL

G(
797 T +5
4 0

R)
1
4-0350

"(
GRANI
TE CURB

G
& 1
0"

AT

10
CONCRE (
DATR)
(

.100+58
TE GUTT 97414 75'WI
DE PUBL
ER -1
04

(D
3 I
C STRE

DATR)
NO PARK 1
2"W(
DATR) ET) 58
57 18"(DATR)
I
NG CONCRE 4H

D
67

W
TE 9

S
G(
DATR) DC

8"
NO PARK

G
APRON I
NG ME

S
TRO BUS

(D
1

S
0"(
DATR)

G
CONCRE

A
ROAD

)
TE WAL

(
K G(
DATR) 10"(DATR)

15"

DATR
G(
DATR) 797 1
2 "
W(

R
NARROW CONCRE 41
4-1 DATR)

.
26 43

.M
TE 8/4

W
S H

)
824DC

.
L

.M
S
( G(DATR) STOP

W
DAT

RAI
CONCRETE
2- R) APRON GRANI
TE CURB & C
ONCRE

P
.
S 62 TE GUTTE

(
16
T G( R AHEAD

93

R)

O
DATR)

D
O GRASS TRAV PT 108

W
B

ST
R R 797413-2130

CONCRETE
I Y CONCRE

S
T
C 8"

L
3" TE WAL

.
K 30"

RAI

.M
CONCRETE

W
DA
( L

R)
D CONCRETE

D
STONE WAL

D
GRASS

S
CONCRE

S
A L TE

G(

D
S
T

AT
R 25 APRON

W
) 3" GRASS 23 APRON

.
GRASS

.M
RAI

W
GRASS

"(D

D
S

ASPHALT
R)
STONE

15
GRASS STONE

ASPHALT
ER

L
CO

RAI
AT
WALL WALL
NC

.
.M
W
T
AP RE

(D
2" MULTI

GU

G
RO TE

DATR)
RAI
W

DATR)
(D
8"
N 5"

A
T
&
ER RB
RA

R
N.

MATCH LI
IL

)
RB
CU

G(
G(
LK
G(

)
GRASS

,
GRASS GRASS

CU
DA 27"

ET
T
A
TR

GU E
T

DATR)
GH
E
)

W
40" GRASS

RE
T
T

E
RE

RE
.
.M

6'HI
W

T
E

ST

RE
ET

NC

ST

T
2-STY

NC
R

&

G(
L
CO

C
I
C

MASONRY

MASONRY
HA
BRICK

BL
ER)

LK
CO
N
PORCH

2-STY

2-STY
TT TR
O

SP

PU

A
C
Y

I
R)

HI(DA
T

W
A
/
S K

SS
25 D L 53
- I

DE
AT
C

W 0"

E
T
2

PH(D I
R

ET
I
6

A
1
B

-M "W IM
EE R)-9

'W

GR

R
C
2-STY 2-STY

R)
SP T14

75

N
8
64

O
BRICK CONCRETE

AT
DA

C
G(9

"(D
7

47
15

94
4-
41

GH
96

HI
4'
DC 7
8"

4
68 94
4H 14-
0
64
79

H
A
R
LA
(4 N
0
'
W P
ID A
S
LA
E C
dgn

P
H
P A E
U
B
L
T
,N
01Eastern Ave.NE - DDOT\CADD\pUT-E001_Eastern.

L
IC .W
S .
T
R
E
E
T
)

DATE: 11-2016 SCALE: 1"=20' EU-01


51AM

D.C. DEPARTMENT OF TRANSPORTATION


Thursday, Novem ber 03, 2016 AT 11:

INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION


on\121107.

PROJECT MANAGEMENT DIVISION


HORIZONTAL DATUM: MARYLAND STATE PLANE COORDINATE SYSTEM NAD 83/91 PROJECT ENG.
REHABILITATION OF EASTERN AVENUE, N.E. DESIGNED BY
VERTICAL DATUM: D.C. ENGINEERS SURVEY DATUM
\2016\Transportati

FROM WHITTIER STREET N.W. TO CHECKED BY

DRAWN BY
NEW HAMPSHIRE AVENUE N.E. PROJECT MGR.

DIVISION CHIEF

CONSULTING ENGINEERS - PLANNERS


EXISTNG UTILITY PLAN
2820 DORR AVENUE, SUITE 230
20' 0 20' 40' DATE -, 2016
FAIRFAX, VA 22031 NO. DESCRIPTION NAME DATE
STA. 100+00 TO STA. 104+50 FILE
PHONE: (571) 282-4099
T:

SCALE: 1"=20' REVISIONS SHEET 1 OF 6


SHEET TOTAL
STATE PROJECT
NO. SHEETS

N
D.C. DDOT - EASTERN AVENUE, N.E. 16 80

DATR)
DATR)
DATR)

DATR)
DATR)
DATR)

DATR)

DATR)
R)

DATR)
DATR)

DATR)

DATR)
DATR)

DATR)
DAT

G(
G(
G(

G(
G(
G(

G(
G(

G(
G(
G(

G(

G(
G(

G(
BRICK WALL
CONCRETE
CONCRETE WALK CONCRE CONCRE CONCRETE CONCRETE WALK CONCRE CONCRETE WALK CONCRETE CONCRETE CONCRETE CONCRETE WALK APRON
TE TE TE PAVERS BRICK CONCRETE WALK
APRON APRON APRON APRON APRON APRON APRON PAVERS

G
G(DATR) G(DATR) SPEED G(DATR) G(DATR) G(DATR)
G(DATR) G(DATR) 797413
CONCRETE CURB 797414-380250 HUMP 797414-450180 797414-500140 797414-550040 CONCRETE CURB 797413-640990 CONCRETE CURB
& GUTTER 5-MPH & GUTTER -700970 & GUTTER

G
EASTERN AVENUE, NE

G
G(DATR)
ASPHALT EASTERN AVENUE, NE EASTERN AVENUE, NE
ASPHALT ASPHALT
04

CONCRETE CURB & GUTTER CONCRETE CURB & GUTTER CONCRETE CURB & GUTTER
PT STA.104+93.

CONCRETE WALL CONCRETE WALL CONCRETE WALL

NO PARKING NO PARKING NO PARKING 18"


SPEED 7" 12"
HUMP 8" 9" 8" TWIN
5" 4" 10"
12" 5-MPH 5" 10" 5" 8"
SHRUBS 6"
20" 14" 12" 8" 6" GRASS
SHRUBS 12"
6"
12" GRASS 12" 6" MULTI SHRUBS 6"
10" 6" GRASS
8" 15" 13"
6" 10" 12" 3"
6" 7"
7"MULTI
NO PARKING RIGHT LANE TE CURB &
GRANI METRO BUS 22
NO PARKING STOP
CONCRETE GUTTER TRAV PT 107 GUARD RAIL

D
NARROWS AHEAD

S
CONCRETE CURB BROKEN CONCRETE CURB ROAD NARROWS/

DATR)
TE CURB &
GRANI

E
E

DATR)
CONCRETE GUTTER STOP AHEAD

NE - SEE SHEET 3
NE - SEE SHEET 1

G-ABND(

(
EASTERN AVENUE, N.W. EASTERN AVENUE, N.E.
+50 105 +50 106 +50 107 +50 108 +50 109 +50 110 +50
ASPHALT ASPHALT
69 68
18"(DATR) 18"(DATR) (B)
(90' WIDE PUBLIC STREET)

D
D

S
S

A)
(90' WIDE PUBLIC STREET) 18"(DATR) 18"(DATR) 21"(DATR) 21"(DATR) 21"(DATR)

(
)

S
R
S

S
W
S
10"(DATR) 10"(DATR) 10"(DATR) 10"(DATR)

T
10"(DATR) 10"(DATR) 10"(DATR) 10"(DATR)

DATR)
DATR)
56 70 55

DATR)
12"W(DATR)

(D
12"W(DATR)
12"W(DATR) 8"
W(DATR) 8"W(DATR) 8"W(DATR)

W
G(
DATR) 12"W(DATR)

W
G(DATR) G(DATR) TE CURB & G(DATR)797414-4407
GRANI
797414-4011

(
21

(
GRANI
TE CURB & CONCRE G(DATR) 797414-5992

W
G(DATR) G(DATR) G(DATR)

10"

(
TE GUTTE

18"
R /4H821DCA CONCRETE GUTTER /4H820DC GRANITE 3728A/4H819DC

21"
CONCRETE CURB /4H818DC CONCRETE CURB

DATR)
CONCRETE CONCRETE STOP

)
D

S
S

.
.
.M

.M
.M
.
W

R
G

W
W
.M
W

W
NO PARKING
W

STONE 797413-6685

W
APRON

T
.

W
APRON METRO BUS
.M

6"
.
.M
W

.
W

.
CONCRETE

.M

.M
CONCRETE WALK

A
W
.

W
.M
71

W
STONE WALL 4' HIGH RAIL STONE WALL

(D
WALL RAIL STONE WALL G(DATR) /4H817DC
APRON

G(
G
D
S
L

DATR)
L
ASPHALT

RAI

RAI
STONE WALL STONE WALL 3' HIGH CLF STONE WALL 4' HIGH 4' HIGH

PAVERS
7" COPING 2" GRASS GRASS

STONE
4" GRASS GRASS
CONCRETE

STONE WALL

GH
STOP
CLF

8"
GH

GH
GRASS GRASS 3' HIGH
GH

MATCH LI
GRASS 13"
MATCH LI

6'HI
DATR)

DATR)
6"
4'HI

GRASS

GH
3'HI
MULTI

W(
7" NO THRU

(D
GRAVEL
4'HI

CLF

GH
GRASS

BLOCK WALL
6"

CLF

CLF 3'HI

A
12"
3" TRUCKS

T
4'HI
GRASS GRASS RAIL RAIL MULTI 2" 30"

R
5" 6' HIGH

)
G(

G(
PORCH PORCH PORCH

D
4' HIGH

DATR)

S
CONCRETE

DATR)
DATR)

20
DATR)

PORCH PORCH RAIL

NG
D
S
PORCH

DATR)

COPI
PORCH

G(
4" PORCH WELCOME TO

DATR)
1-STY

DATR)

DATR)
PORCH

G(
1-STY
G(

WASHINGTON
G(

CONCRETE
CONCRETE

(
1-STY

21"
DATR)
1-STY 1-STY 1-STY

G(
GRASS
(

G(
CONCRETE

10"
1-STY MASONRY MASONRY CONCRETE
1-STY 1-STY
WOOD/MASONRY
BRICK MASONRY

(
18"

TOL STREET
NO THRU

GRASS

GUTTER
DATR)

C STREET)
G(
TRUCKS

CONCRETE WALK
3729M/

CONCRETE WALK
4H700DC

CONCRETE CURB &


ASPHALT

DE PUBLI
STOP

NORTH CAPI
AHEAD
RAIL

CONCRETE CURB

90'WI
GUTTER
BLOCK WALL

(
&
METRO BUS

ASPHALT
CONCRETE
APRON
DATR)
DATR)
dgn

(
W(

21"
12"
01Eastern Ave.NE - DDOT\CADD\pUT-E002_Eastern.

DATR)
G(
DATE: 11-2016 SCALE: 1"=20' EU-02
51AM

D.C. DEPARTMENT OF TRANSPORTATION


Thursday, Novem ber 03, 2016 AT 11:

INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION


on\121107.

PROJECT MANAGEMENT DIVISION


HORIZONTAL DATUM: MARYLAND STATE PLANE COORDINATE SYSTEM NAD 83/91 PROJECT ENG.
REHABILITATION OF EASTERN AVENUE, N.E. DESIGNED BY
VERTICAL DATUM: D.C. ENGINEERS SURVEY DATUM
\2016\Transportati

FROM WHITTIER STREET N.W. TO CHECKED BY

DRAWN BY
NEW HAMPSHIRE AVENUE N.E. PROJECT MGR.

DIVISION CHIEF

CONSULTING ENGINEERS - PLANNERS


EXISTING UTILITY PLAN
2820 DORR AVENUE, SUITE 230
20' 0 20' 40' DATE -, 2016
FAIRFAX, VA 22031 NO. DESCRIPTION NAME DATE
STA. 104+50 TO STA. 110+50 FILE
PHONE: (571) 282-4099
T:

SCALE: 1"=20' REVISIONS SHEET 2 OF 6


SHEET TOTAL
STATE PROJECT
NO. SHEETS

N
D.C. DDOT - EASTERN AVENUE, N.E. 17 80

CONCRETE CURB

797413-780850

R)
GUTTER

R)

AT
DATR)

DATR)
DATR)

DATR)

DAT

G(D

CONCRETE WALL
NG
DATR)

DATR)

PI
10"

G(

DATR)
G(

34"

G(
CO
G(
&

G(
7"
6"

G(
G(
6"

G(

DATR)
10"

DA
W
5"

GH
12"RCP

G(
4"

W
CONCRETE WALK 27

4'HI
8" 14"

TR
6" 20"
D
S

34" 7"

G(
GH CLF

CONCRETE WALL
5"

A
GRASS

CONCRETE WALL
CK WALL
PARK

CONCRETE WALL
TAKOM
CONCRETE CURB 17" 14" 6"
GRASS

GH
& GUTTER 16" 3" 7"

CLF
4'HI

TE
4'HI

ASPHALT

ASPHALT
G(DATR) GRASS 5" 8"
G(DATR) 7"

G
G
11"

CRE
G(DATR) G(DATR) G(DATR)
G(DATR) 8" G(DATR) G(DATR) GRASS

TE
EASTERN AVENUE, NE 17" R)

BRI
DAT
G( GRASS
GRASS 6"

CRE

GH
CON
ASPHALT GRASS 16"
TWIN 8"

4'HI
CONCRETE WALK
7" GRASS
5"

CON
12" 12"
CONCRETE WALL

CK WALL
STREET 6" 6"

CONCRETE
NAME GRASS 5' HIGH 4' HIGH
14" 3" 5' HIGH 7" 8"

ASPHALT
GRASS GRASS 11" 5" 15" BRICK WALL GRASS GRASS
9" 9"

ASPHALT

ASPHALT
GRASS 14"

BRI
9"TWIN SHRUBS 15" 10" SHRUBS
7" GRASS 12"
GRASS 10" BRICK WALL
NE - SEE SHEET 2

NE - SEE SHEET 4
#797413-8572/
BRICK WALL 19 20" GRASS 30"
CONCRETE HIDDEN DRIVEWAY/
NO PARKING CONCRETE #797413-9563 GRASS
APRON NO PARKING
GUARD RAIL

D
CONCRETE APRON

DATR)
DATR)

CONCRETE CURB 797413-7780 APRON CONCRETE CURB 798413-0455/ 798413-1148 CONCRETE CURB
NO PARKING NO PARKING

DATR)

G-ABND(
(
21"

(
113 114 115 116 EASTERN AVENUE, N.E.
+50 111 +50 112 +50 +50 +50 +50 +50
67 ASPHALT
18"(DATR) 18"(DATR)

(B) (A)

D
54

S
D
S

21"(DATR) 53 (90' WIDE PUBLIC STREET)

S
S
10"(DATR) 10"(DATR) 10"(DATR) 10"(DATR) 10"(DATR) 10"(DATR) 10"(DATR) 10"(DATR)

DATR)
8"W(DATR) 8"W(DATR) 8"W(DATR) 8"W(DATR) 8"W(DATR)

W
797413-7279 G(DATR) WATCH FOR G(DATR)

G
G(DATR) G(DATR) G(DATR) G(DATR)

(
CONCRETE CURB CONCRETE CURB PEDESTRIANS CONCRETE CURB CONCRETE CURB
SIGNAL AHEAD
MATCH LI

MATCH LI
D
TRAV

.
.

.
.M
.M
S

.M

.
.
.
.

.M
.M

W
.M
.M

.M

.
.
BM 502

.M
.

.M

W
W
W

W
.M

CONCRETE WALK

W
W

.
W

.M
CONCRETE WALK 8"W(DATR)

W
G
TRAV 18

W
CONCRETE PT 105 CONCRETE WALK

M
G
STONE WALL STONE WALL

B
G

STONE WALL BRICK WALL BRICK WALL 2' HIGH BRICK WALL
G

PT 106 RAIL BRICK WALL


APRON

DATR)

DATR)
C

GH
CONCRTE

L
STONE WALL 5" BRICK WALL 2' HIGH C

RAI
6' HIGH 2' HIGH 2' HIGH O

L
C O

RAI

3'HI
L

O N N
RAI

GH
WALL C

GH
GRASS GRASS GRASS C GRASS

DATR)
C N GRASS

DATR)
GRASS GRASS O C R R

CLF
5"

4'HI
RAIL

GH
GRASS GRASS N E E

4'HI
R
L
L

RAIL STONE T

DATR)
C
RAI

T
RAI

G(
L
RA

G(
R E

6'HI
RAI
E T E
WALL IL T E
GRASS 12"

CK
GRASS

WALL
E

L
3"

G(
RAI

G(
RAI
5"

BRI
21" 28" RAIL "39

G(
GRASS BRICK BRICK

W
7"

DATR)
DATR)
DATR)
DATR)
DATR)

G(
G(
G(
G(

DATR)

DATR)
1-STY
G(

1-STY
1-STY 1-STY
2-STY 1-STY BRICK
2-STY 2-STY 1-STY BRICK
BRICK

G(
BRICK BRICK

G(
BRICK BRICK BRICK
BRICK

1-STY
1-STY 1-STY
BRICK
BRICK 1-STY BRICK
BRICK
dgn
01Eastern Ave.NE - DDOT\CADD\pUT-E003_Eastern.

DATE: 11-2016 SCALE: 1"=20' EU-03


51AM

D.C. DEPARTMENT OF TRANSPORTATION


Thursday, Novem ber 03, 2016 AT 11:

INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION


on\121107.

PROJECT MANAGEMENT DIVISION


HORIZONTAL DATUM: MARYLAND STATE PLANE COORDINATE SYSTEM NAD 83/91 PROJECT ENG.
REHABILITATION OF EASTERN AVENUE, N.E. DESIGNED BY
VERTICAL DATUM: D.C. ENGINEERS SURVEY DATUM
\2016\Transportati

FROM WHITTIER STREET N.W. TO CHECKED BY

DRAWN BY
NEW HAMPSHIRE AVENUE N.E. PROJECT MGR.

DIVISION CHIEF

CONSULTING ENGINEERS - PLANNERS


EXISTING UTILITY PLAN
2820 DORR AVENUE, SUITE 230
20' 0 20' 40' DATE -, 2016
FAIRFAX, VA 22031 NO. DESCRIPTION NAME DATE
STA. 110+50 TO 116+50 FILE
PHONE: (571) 282-4099
T:

SCALE: 1"=20' REVISIONS SHEET 3 OF 6


SHEET TOTAL
STATE PROJECT
NO. SHEETS

N
D.C. DDOT - EASTERN AVENUE, N.E. 18 80

DATR)

TC
12"
9"(

DATR)

DATR)
DATR)

DATR)
4'

DATR)
KANSAS LANE

G(

G(
G(
DATR)
GH

G(
DATR)

DATR)

DATR)
6"

G(
DATR)

DATR)

4'HI

DATR)
11"

DATR)
ASPHALT
11"

CONCRTE WALL

CONCRETE WALL
10"

G(

GUTTER
G(

G(

G(
G(

G(
10"

GUTTER
GH CLF
G(
CK

G(
WALL 27"

CONCRETE WALL
BRI

CONCRETE

GH
CONCRETE WALL

L
GUARDRAI
4"

h AVENUE
CLF
4'HI
APRON
2" CONCRETE 9" GRASS

CONCRETE CURB
GRASS CONCRETE MULTI
WALL

3'HI

CONCRETE CURB &

ASPHALT
GUTTER
8"

CONCRETE CURB &


SPEED LIMIT

TC
G(DATR) 6" 25-MPH

12"
G(DATR)
G(DATR)

G
G(DATR) CONCRETE 3" G(DATR)

SHRUBS
#798413-240400 G(DATR)

4t
SHRUBS

CONCRETE
MULTI

&
W

17

APRON
CONCRETE
50
6"

S
S
TWIN
MARYLAND

C
GRAVEL
CONCRETE

CM P
"T

CONCRETE
12

ASPHALT
GRASS NO THRU GRASS
6"

36"
GRASS
TRUCKS 5" GRASS GRASS
TWIN GRASS GRASS GRASS GRASS
TRAV
4" STOP GRASS 7"
8" 8"
PT 104 9"
10" 8" 8" #798413-500090/ CONCRETE CONCRETE
11 7"

E
16 9 28"
APRON APRON

E
4' HIGH 15" STREET 4P646DC
8"
NE - SEE SHEET 3

NE - SEE SHEET 5
BENCH NAME

D
D

S
S

#798413-430160
#798413-250340

DATR)
798413-190400 CONCRETE CURB #798513-310280 #798413-370220 CONCRETE CURB CONCRETE CURB CONCRETE CURB
BUS
STOP
DATR)

DATR)
(

TR)
9"

CM P
4'

(DA
(

(
EASTERN AVENUE, N.E.

36"
+50 117 +50 118 +50 119 +50 120 +50 ASPHALT 121 +50 122
D

(90' WIDE PUBLIC STREET)


S

(
DATR)
DATR)

52

(
DATR) 49 48 47
(
C)
.
.H
M

(A) 18"(DATR) 18"(DATR) 18"(DATR) 18"(DATR) 18"(DATR) 18"(DATR) 18"(DATR) 18"(DATR)


D
(

DATR)SD
D
S

D
10

S
S
C
(B)

66 "T 65 18"(DATR)

"T

(D
C

12
DATR)

A
G(DATR) TRAV NO
4'9

T
WATCH FOR

(
#798413-380120

R
CONCRETE CURB CONCRETE CURB CONCRETE CURB PARKING CONCRETE CURB
PT 103

)
PEDESTRIANS
"(D

8"W(DATR)
G(

D
D

8"W(DATR)

S
S

CONCRETE
W

NO PARKING 4"
AT

8"W(DATR) GRASS 13" 10 BUS STOP GRASS GRASS 15" CONCRETE 4" GRASS 2" CONCRETE GRASS GRASS 8" 8"W(DATR)
MATCH LI

MATCH LI
8"W(DATR) 8"W(DATR) 4" 15"

.
8 8"W(DATR)

.M
APRON

W
CONCRETE

.M
15

W
APRON
R)

(B G(DATR) APRON
G(DATR) G(DATR)
APRON

G
)
DATR)

G(DATR) CONCRETE WALK G(DATR) G(DATR) CONCRETE WALK


G

(C) (A) 10"TC 10"TC 10"TC 10"TC G(DATR) 10"TC 31 10"TC G(DATR)
S 10"TC
S

S
S

S
S
(B)

L
10"TC 10"TC

CONCRETE
GRASS

L
RAI

CONCRETE
CONCRETE

RAI
8"W

8"W

35
W

ASPHALT
(A)

32

CK WALL

DATR)

DATR)

DATR)

DATR)
CONCRETE

CONCRETE

CONCRETE
33

CONCRETE WALL

L
BRICK

L
GH

CONCRETE

RAI
G(D

RAI
GRASS
G(

2"

CONCRETE
CLF
GRASS

CONC
GRASS

.
.M
W
GRASS
(DA

(DA

3'HI

CK

L
WALL

RAI
GRASS

CONCRETE WALL
ROU

W
.
.M

.
.M
GRASS

W
BI

GRASS

.
GRASS GRASS

.M
AT

BRI
GRASS

W
GRASS

CONCRETE
GRASS

.M
GRASS

CONCRETE
KE

LAMP
TR) C

TR)

.
GRASS

.M
W
G(

G(

G(

G(
CM P
LAMP GRASS
10"

R)

CONCRETE
E

RETE
TE

CONCRETE 3"

.
BRICK

BRI

.M
W

DATR)

DATR)
T

L
36"

RAI
4'9

10"

DATR)
WALL
D

L
DATR)
S

4"

RAI
RAIL

DATR)
GRASS

L
GRASS
TC

RAI

RAI
"(D

L
L

L
GRASS

RAI
GRASS

RAI
L

RAI
L

RAI
E

13
T

G(

G(
RAIL
AT

GRASS

G(
GRASS GRASS

G(
CONCRETE

.
GRASS

.M

.M
G

G
R)

G(
1-STY 51
D
S

.
.M
E
BRICK 2-STY

PORCH
2-SRY
D

12 2-STY
S

9" 2-STY
30"CMP 30"CMP BRICK 2-STY 2-STY
11"

BRICK BRICK BRICK


BRICK BRICK 2-STY 2-STY
24" 2-STY 2-STY
BRICK
BRICK BRICK
14 RAIL BRICK

.
.M
D

G
D
S

64 G(DATR)
S
KAN
(12

GRA
SAS SPHALT
0'

4'9

.
8"W

.M
W
NI

GRASS
WI

10"
"(D

TE

(DA
DE

TC
AT
AVE

CUR

TR)
8"W

GRA
PU

R)
BLI
(DA

NUE

SS
G(D
C
TR)

.
ST

,N.

.E
ASPHALT
AT

N
R

4'9

T,
R)
EET

E.

BUS

E
"(D

)
)

TR

T
AT

L
E
10"

E
T
STO

E
GRA

R
R)
TC

T
L
N

S
CO

#79

A
P
5"

A
NI

IC
#79

P
M
NC
TE

L
S
R

B
841

A
E

U
RET

841

P
K
CUR

3-1

E
ID
3-1

)U
E

RT

W
402
B

'
)
427

0
R
A

(6
T
(D
10"

A
70

(D
G

)
TC

"W

R
T
8
8"W

A
D
"(
10
dgn

(DA

S
S
TR)
01Eastern Ave.NE - DDOT\CADD\pUT-E004_Eastern.

DATE: 11-2016 SCALE: 1"=20' EU-04


51AM

D.C. DEPARTMENT OF TRANSPORTATION


Thursday, Novem ber 03, 2016 AT 11:

INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION


on\121107.

PROJECT MANAGEMENT DIVISION


HORIZONTAL DATUM: MARYLAND STATE PLANE COORDINATE SYSTEM NAD 83/91 PROJECT ENG.
REHABILITATION OF EASTERN AVENUE, N.E. DESIGNED BY
VERTICAL DATUM: D.C. ENGINEERS SURVEY DATUM
\2016\Transportati

FROM WHITTIER STREET N.W. TO CHECKED BY

DRAWN BY
NEW HAMPSHIRE AVENUE N.E. PROJECT MGR.

DIVISION CHIEF

CONSULTING ENGINEERS - PLANNERS


EXISTING UTILITY PLAN
2820 DORR AVENUE, SUITE 230
20' 0 20' 40' DATE -, 2016
FAIRFAX, VA 22031 NO. DESCRIPTION NAME DATE
STA. 116+50 TO STA. 122+25 FILE
PHONE: (571) 282-4099
T:

SCALE: 1"=20' REVISIONS SHEET 4 OF 6


SHEET TOTAL
STATE PROJECT
NO. SHEETS

D.C. DDOT - EASTERN AVENUE, N.E. 19 80

N
DATR)

DATR)

DATR)

DATR)

LLS ROAD
G(

G(

DATR)
G(
CONCRETE WALL

GUTTER

GUTTER
G(
DATR)

h AVENUE

G(
DATR)
12"
7"

DATR)
DATR)

ASPHALT
ASPHALT
CONCRETE CURB

DATR)
GRAVEL

CONCRETE WALK
G(
#798412-710940 C

GO MI
CONCRETE CURB
20" O
4" N

GUTTER
G(
C

CONCRETE CURB &

CONCRETE CURB &


GUTTER
R
E

G(
G(
5" T

G(
E
3"
7"

5t

SLI
&
G(DATR) 4" GRASS
G(DATR)

&
4" 20" G(DATR) G(DATR)
GRASS 6"
G(DATR) G(DATR) 4' HIGH CLF 5' HIGH CLF

E
8"
CONCRETE DC/MD

CONCRETE
CONCRETE WALL DC/MD
19" 7" CONCRETE
GRASS
GRASS GRASS GRASS STOP
8" GRASS

DATR)
CONCRETE
STOP TRAV
APRON
NE - SEE SHEET 4

NE - SEE SHEET 6
GRASS PT 102
HIDDEN CONCRETE WALK

G(
#799412-980610/
SPEED LIMIT 25/ 7
#798412-640950 18" DRIVEWAY 12" 19" 4P639DC
9" 19"
#798413-570020 BUS STOP

D
S
#798412-910680/
NO LEFT #798412-720870 CONCRETE CURB #798412-770820/ #798412-840750 CONCRETE CURB NO PARKING CONCRETE CURB
CONCRETE CURB 4P640DC
TURN 4P642DC CROSSWALK

DATR)
(
EASTERN AVENUE, N.E. 123 124 125 126 EASTERN AVENUE, N.E. 127 128
+50 +50 +50 +50 +50 +50 PEDESTRIAN
+50
ASPHALT ASPHALT PEDESTRIAN 43

S
S

S
S

S
(90' WIDE PUBLIC STREET) (90' WIDE PUBLIC STREET) 10"(DATR) 10"(DATR) 10"(DATR)

DATR)
45 44 40

DATR)
39
18"(DATR) 18"(DATR)

TC
D

DATR)

D
S

S
G(

10"
(
DO NOT

10"

)
R
T
6 TURN LEFT

(
MATCH LI

MATCH LI
A
CONCRETE CURB 10

D
CONCRETE CURB 09 CONCRETE CURB CONCRETE CURB

"(
59

18
2-

D
D
1
7"8"W(DATR) CONCRETE CONCRETE

S
INTERSECTION

S
4 8"W(DATR) 2" CONCRETE 8"W(DATR) 9" 8"W(DATR) CROSSWALK 8"W(DATR) GRASS
8"W(DATR) 8"W(DATR) 98
8"W(DATR)

.
.M

.M
W

W
#7

.
.M
BUS DO NOT APRON APRON

W
W

APRON 8"W(DATR)
G(DATR)

G
STOP TURN LEFT G(DATR) G(DATR) CONCRETE G(DATR)
CONCRETE WALK CONCRETE WALK G(DATR) 10"TC G(DATR) G(DATR) G(DATR) CONCRETE WALK G(DATR)
G

10"TC 10"TC 10"TC TRAV PT 101


29

S
)

S
S

L
R
)

10"TC

RAI

.
.M
G

W
T

CK W ALL
K D/

CONCRETE STOP
A

CONCRETE
T

DATR)
30

ASPHALT

CONCRETE

DATR)
BLOCK WALL 20"

DATR)
(D
U EA

L
L

I
RAI NG
(D
S

COPI
"W

GRASS

L
5" GRASS 2"

L
T AH

RA

RAI

RAI
G

GRASS
C

L
WINDOW

.
GRASS

RAI

.M

P
L
RAIL

W
GRASS

RAI
GRASS

O
R MP

3" C
R

CONCRETE
7' HIGH

G(
W(

DATR)
G(
NCE

T
WELL 3" WOOD FE O GRASS

BRI
PORCH

S
T HU

K N 2"
1

8"
WINDOW
P

C
U

L
0

R
O

A
5

.
D

.M
E
H

E
S W WELL
E

' T
S

2
A
M

.
.M
E

G(
G
E H E

'
R
B

24"
P

I B
O

T G

H
G

.
.M
S

E
M

E H W

DATR)

L
I
B

G
R A IC

L
46 1-STY

H
.E

C C

G
1-STY L K

A
C L
R

IN
O 1-STY L GRASS

W
GRASS BRICK GRASS GRASS
N

F
G

B
U

O N
A NO

K
BRICK
S

)
IN

T,

R
C

C C

E
BRICK
G

R
"

W #798412-8564
R

I
R
K

R A CK GRASS

N
A
G(
12

T
(D
G TE
) T

E
R

P
8"

O
A
E A

L
T

T
E

T
W

D
E

L
E "(D

T
P

"(

S
T
T
R

N
18
R
C
T

T 10

)
.M
S

W
R

O
"

&
18

C
S
A
N

2 RIC
H

42
S TE
A

-
IC
P

A RE

S
C

B
S

L
M

R NC

T
R

G 5"
A

CO

DATR)SD
G
R

Y
O

DATR)
I
U

S
) E

K
P

S R
R K

A A
E
R

R
A C

P
ID
T

G
(D U

.
A

.M
T

W
W

1/

D MP
O
G T

G(
'
(

N
9

18"
) 0
W

E HU
8
"

R 6

4
T (
8

L
C
-

L
D

A D
2

A
"
4 41

A
5

E
"
2

IC Y
A

W
6

E
15

H
"

B ST
8
D

TC
2

P
K
"(
4

K
P

S
1-
7
10

G
IC

2-STY

DATR)

10"
#

B
(D

DATR)
R

R
B

A S BRICK

U
)

T
E

)
C
R

R
T

R
41
T

)
P RE

R CONCRETE

T
A
.

(
G
A

28
N

10"
(D

S
W(
C

D
.E

E
O

S
(D
)

S
L
N

R
G

R
R

.
"W
O
N

TC
C

8"
T

.E
C
T,

N
15
A

8
A

10"
D

"(

D
A

,N

S
"(

C
D
E

N
IL

A
10

C
E

T
R T
)

R 4
TR

10"

E
E
T

E
T
E

)
S

E
E

T
B
"
R

DATR)
T

E
7

R
T

K
T

E
IC

S
L
N

T
R

L
S

G(DATR)
C

R
A

L
G(DATR)
A

A
A

T
H

A
IL
IC

S
O

N
W
P
M

E.
S
L

P
S

A
A

P
E S
R

IC

G(
A

S
R

A
IC Y

ID
E

LLS ROAD,N.
L
L

A
E
A

R
B ST

C STREET)

CONCRETE CURB
P

B
K

R G
IL

R
N G

GH CLF
C
1-
C

E
C (D

P
N
R
ID

R
TU

H
O E A

E
W

S
T T

ID
'

GRASS
E
0

W
S )
(6

'
S
C

5'HI
0
A I

(9
R / FF P

GH
G

ASPHALT
P O

DE PUBLI
O RA T

CLF
4'HI
T T S 5

D
S

S
S T
S NO
O

GO MI
R S
C E
O
D

90'WI
dgn

SLI

(
PUBLIC ALLEY
01Eastern Ave.NE - DDOT\CADD\pUT-E005_Eastern.

(16' WIDE)

DATR)
DATR)

W(
8"

DATR)

TC
(
10"

10"
G(
DATE: 11-2016 SCALE: 1"=20' EU-05
51AM

D.C. DEPARTMENT OF TRANSPORTATION


Thursday, Novem ber 03, 2016 AT 11:

INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION


on\121107.

PROJECT MANAGEMENT DIVISION


HORIZONTAL DATUM: MARYLAND STATE PLANE COORDINATE SYSTEM NAD 83/91 PROJECT ENG.
REHABILITATION OF EASTERN AVENUE, N.E. DESIGNED BY
VERTICAL DATUM: D.C. ENGINEERS SURVEY DATUM
\2016\Transportati

FROM WHITTIER STREET N.W. TO CHECKED BY

DRAWN BY
NEW HAMPSHIRE AVENUE N.E. PROJECT MGR.

DIVISION CHIEF

CONSULTING ENGINEERS - PLANNERS


EXISTING UTILITY PLAN
2820 DORR AVENUE, SUITE 230
20' 0 20' 40' DATE -, 2016
FAIRFAX, VA 22031 NO. DESCRIPTION NAME DATE
STA. 122+25 TO STA. 128+50 FILE
PHONE: (571) 282-4099
T:

SCALE: 1"=20' REVISIONS SHEET 5 OF 6


SHEET TOTAL
STATE PROJECT
NO. SHEETS
R)
(DAT
-ABND
G D.C. DDOT - EASTERN AVENUE, N.E. 20 80

CON

N
CRE

NEW
TE
CUR
FO(

HA
B &
CON

(12
DAT

G-A

M P SPHAL
0'
CRE
R)

BND
GUT

WI

SHI
DE
TEG-

A
(DA
TER

RE
PU
WA

TR)
AB

BL
LN

AVE
KD(

T
I
C
DAT

ST

NU
TRAFFIC CONTROL

R
R)

EE
CABINET

E,N
T)
COMUNICATION

.
E.
FIBER OPTIC

53
1

POT STA.133+20.
5' HIGH CLF 15"

CONCRETE

D
B
J

L
WALL
GH

IL
T

E
U

I
L
RAI
3'HI

B
Y

R
GRASS
GRASS K

U
F
O AR

C
R
P

E
U E
Y

T
T
IT A

T
DATR)

E
C M G(

R
O

G
C
DATR)
G( K

E
CONCRETE WALK A NO LEFT TURN

&
T

L
C

E
T
O
24" 24"

(D
6" GRASS GRASS #799412-1841
NE - SEE SHEET 5

A
T
R
#799412-1841/ CONCRETE CURB

)
CONCRETE CURB #799412-0554/ 2
TRAV
4P638DC 4P637DC
PT 100

PAVEMENT
CONCRETE

G(D
FO(DATR)

AT

FO(

G-A
R)
EASTERN AVENUE, N.E. EASTERN AVENUE, N.E.

DAT
131 132 133

BND
+50 129 ASPHALT +50 130 +50 +50 +50
CONCRETE PAVEMENT

R)

(DA
S
S
(90' WIDE PUBLIC STREET) 10"(DATR) (90' WIDE PUBLIC STREET)

TR)
10"(DATR) 10"(DATR)
37
38

63

D
S
18"(DATR) 18"(DATR)

10"(
18"(DATR) 18"(DATR)

P
RC

DAT
NO PARKING/

15"
NEIGHBORHOOD WATCH CONCRETE CURB CONCRETE CURB 3

R)
12"W(DATR)

D
8"W(DATR)

D
GRASS 8"W(DATR) 8"W(DATR)GRASS

S
S
GRASS GRASS GRASS

S
4"

.
2" 27" 2"

.M
.

GRASS
.M

W
27"
W

.
.M
.
.M

.
W

.M
W
MATCH LI

21"
G(D
NO LEFT

G
CONCRETE WALK G(DATR) G(DATR) G(DATR) CONCRETE WALK G(DATR)

FO(

(DA
TURN

AT
STONE

DATR)
DATR)

WE

DAT
E

TR
R)
STONE STONE

WA
WALL CONCRETE BRICK
DATR)

DATR)

GH
CONCRETE

LC

)
CONCRETE
WALL WALL

CONCRETE
CONCRETE

DATR)

WALL WALL 5"

3'H
CONCRETE

SH
E

R)
3'HI

10"(
CLF
G(

OM
G(

IN
GRASS GRASS GRASS GRASS GRASS GRASS

I
G(

G(

DAT
GRASS GRASS GRASS GRASS

GH

GRA

E T
GT
GRASS
G(

NEW
O
R) CO
CLF

O
SS
ASPHALT

N
GRASS

RA
L

4"
RAI

L
RAI

L
L

8"W
L
RAI

(12
L

RAI

NCR
L
RAI

RAI
2"

I
RAI

RAI

HA
0'
GRASS

(DA
CK WALL

ETE
A/C

MP
WI
CONCRETE
2"

B
CONCRETE

TR)

DE

AS
PO
CLF

SHI
PORCH

CON
PORCH PORCH PORCH L LK

WA

GRA
GH
HI RAI WA

PH
BM
CLF

RCH
6' ETE

PU
R

LK
3' HIGH C

AL
CON
BRI

CRG

RE
NI
BM
3' HIGH

BL
500
2-STY STY

TE

T
2-
DATR)

E(

I
2-STY

C
2-STY CK

T
BRICK
B I

DAT
2-STY 2-STY R L
RAI

AVE
E G
DATR)

27"

M US

CUR
BRICK BRICK

ST
DATR)
BRICK BRICK

R)
LEF
GRA
G(

DATR)

RE
UT
T T

B &

NU
GRASS

ET
G(

TER
G

T L
SS
G(

(D

E,N
URN

)
A GRASS
G(

ANE
R
)

.
LEF

E.
T

FO(

21"
10"(

DAT

(DA
DAT

R)

TR
)
R)

8"W
(DA
TR)
dgn
01Eastern Ave.NE - DDOT\CADD\pUT-E006_Eastern.

DATE: 11-2016 SCALE: 1"=20' EU-06


51AM

D.C. DEPARTMENT OF TRANSPORTATION


Thursday, Novem ber 03, 2016 AT 11:

INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION


on\121107.

PROJECT MANAGEMENT DIVISION


HORIZONTAL DATUM: MARYLAND STATE PLANE COORDINATE SYSTEM NAD 83/91 PROJECT ENG.
REHABILITATION OF EASTERN AVENUE, N.E. DESIGNED BY
VERTICAL DATUM: D.C. ENGINEERS SURVEY DATUM
\2016\Transportati

FROM WHITTIER STREET N.W. TO CHECKED BY

DRAWN BY
NEW HAMPSHIRE AVENUE N.E. PROJECT MGR.

DIVISION CHIEF

CONSULTING ENGINEERS - PLANNERS


EXISTING UTILITY PLAN
2820 DORR AVENUE, SUITE 230
20' 0 20' 40' DATE -, 2016
FAIRFAX, VA 22031 NO. DESCRIPTION NAME DATE
STA. 128+50 TO STA. 133+20.53 FILE
PHONE: (571) 282-4099
T:

SCALE: 1"=20' REVISIONS SHEET 6 OF 6


SHEET TOTAL
STATE PROJECT
NO. SHEETS

B D.C. DDOT - EASTERN AVENUE, N.E. 21 80


L CONSTR. EASTERN AVE. NE

EX RW
MI
DC LI TS
90' EXISTING DDOT RIGHT-OF-WAY

20' 20'

1' 6' 0'-6' * 7' 12'-13' ** 0'-6' 12' 7' 6'


SIDEWALK GRASS PARKING SHARED USE PAINTED SHARED USE SIDEWALK
PARKING
BUFFER LANE MEDIAN LANE

PGE / PGL
2
.0% 2
.0% 2% EXISTING GROUND
VARIES VARIES VARIES VARIES
:
41

EX. RETAINING WALL


CONSTRUCT PROP. PCC CURB & GUTTER PROP. PCC CURB & GUTTER
NEW SIDEWALK RECONSTRUCT
EXISTING GROUND WITH COMPOSITE PAVEMENT WITH COMPOSITE PAVEMENT
STD. DWG. NO. SIDEWALK
605.01 STD. DWG. NO.
FULL DEPTH RECONSTRUCTION 605.01
*STA. 112+52 TO STA. 114+73
- SEE PAVEMENT DETAILS
**STA. 114+73 TO STA. 116+90

TYPICAL SECTION
PROPOSED CONDITION
STA. 111+50 TO STA. 117+50
SCALE: 1"=5'

B
LCONSTR. EASTERN AVE. NW

EX RW
MITS
90' EXISTING DDOT RIGHT-OF-WAY

DC LI
13' 20'

1' 6' 12' 12' 7' 6'

SIDEWALK SHARED USE LANE SHARED USE LANE PARKING SIDEWALK

REPLACE EX. GUIDERAIL STA. 108+00 TO STA. 110+75 EXISTING GROUND

PGE / PGL
2
.0% 2%
VARIES VARIES VARIES
EX. RETAINING WALL
C
LEASTERN AVE.

EXISTING GROUND PROP. PCC CURB PROP. PCC CURB & GUTTER
CONSTRUCT & GUTTER WITH WITH COMPOSITE PAVEMENT
NEW SIDEWALK COMPOSITE PAVEMENT RECONSTRUCT
EX. CONC. CURB STD. DWG. NO. SIDEWALK
605.01 FULL DEPTH RECONSTRUCTION
AND GUTTER STD. DWG. NO.
- SEE PAVEMENT DETAILS
TO BE REMOVED 605.01
EX. RETAINING
WALL

TYPICAL SECTION
PROPOSED CONDITION
STA. 108+00 TO STA. 111+50
SCALE: 1"=5'

B
LCONSTR. EASTERN AVE. NW

EX RW
MITS

EXISTING DDOT RIGHT-OF-WAY VARIES 75' TO 90'


DC LI

20' 20'
dgn
01Eastern Ave.NE - DDOT\CADD\pHT-X002_Eastern.

6'-8' 12' 12' 7' 6'

BIKE LANE THRU LANE SHARED USE LANE PARKING EX. SIDEWALK

EXISTING GROUND

EX. RETAINING WALL


PGE / PGL
VARIES
VARIES VARIES VARIES VARIES
EX. RETAINING WALL
C
LEASTERN AVE.

EXISTING
EX. GRANITE CURB & CONC. GUTTER EX. GRANITE CURB & CONC. GUTTER

EXISTING GROUND
FULL DEPTH RECONSTRUCTION
- SEE PAVEMENT DETAILS

TYPICAL SECTION DATE: 11-2016 SCALE: 1"=5' TS-02


51AM

PROPOSED CONDITION
STA. 100+00 TO STA. 108+00 D.C. DEPARTMENT OF TRANSPORTATION
Thursday, Novem ber 03, 2016 AT 11:

SCALE: 1"=5'
INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION
on\121107.

PROJECT MANAGEMENT DIVISION


HORIZONTAL DATUM: MARYLAND STATE PLANE COORDINATE SYSTEM NAD 83/91 PROJECT ENG.
REHABILITATION OF EASTERN AVENUE, N.E. DESIGNED BY
VERTICAL DATUM: D.C. ENGINEERS SURVEY DATUM
\2016\Transportati

FROM WHITTIER STREET N.W. TO CHECKED BY

DRAWN BY
NEW HAMPSHIRE AVENUE N.E. PROJECT MGR.

CONTRACTOR SHALL BE PERMITTED TO ADJUST SIDE SLOPES DIVISION CHIEF

FROM THE DESIRABLE 4:1 TO A MAXIMUM 2:1 IN ORDER TO


CONSULTING ENGINEERS - PLANNERS
AVOID DAMAGING THE LANDSCAPE PLANTING AND DECORATIVE 2820 DORR AVENUE, SUITE 230 PROPOSED TYPICAL SECTIONS DATE -, 2016
FAIRFAX, VA 22031 NO. DESCRIPTION NAME DATE
WALLS AT RESIDENCES.
FILE
PHONE: (571) 282-4099
T:

REVISIONS SHEET 1 OF 2
SHEET TOTAL
STATE PROJECT
NO. SHEETS

B
L CONSTR. EASTERN AVE. NE
D.C. DDOT - EASTERN AVENUE, N.E. 22 80

EX RW
MI
DC LI TS
90' EXISTING DDOT RIGHT-OF-WAY

20' 20'

1' 6' 6' 9' 10' 10' 9' 5' 4.5'-6'


SIDEWALK GRASS GRASS SIDEWALK
THRU / MERGE THRU LANE
BUFFER BUFFER
LANE

PGE / PGL
2
.0% 2
.0% VARIES VARIES EXISTING GROUND
VARIES VARIES VARIES VARIES
AX
21M
:
EX. RETAINING WALL
PROP. PCC CURB & GUTTER PROP. PCC CURB & GUTTER EXISTING
RECONSTRUCT WITH COMPOSITE PAVEMENT WITH COMPOSITE PAVEMENT
SIDEWALK
STD. DWG. NO.
EXISTING MILL & OVERLAY WITH PATCHING FROM STA. 127+50 TO STA. 128+40
605.01
GROUND FULL DEPTH RECONSTRUCTION FROM STA. 128+40 TO STA. 131+05
- SEE PAVEMENT DETAILS
TYPICAL SECTION
PROPOSED CONDITION
STA. 127+50 TO STA. 131+50
SCALE: 1"=5'

B
L CONSTR. EASTERN AVE. NE

EX RW
MI
DC LI TS

90' EXISTING DDOT RIGHT-OF-WAY

20' 20'

1' 6' 6' 5' 10' 10' 5' 8' 5'-6' 4'-6'

THRU LANE GRASS SIDEWALK


SIDEWALK GRASS BIKE LANE THRU BIKE LANE PARKING
BUFFER
BUFFER LANE

PGE / PGL
2
.0% 2
.0% VARIES VARIES
VARIES VARIES VARIES VARIES
:
41

EXISTING
PROP. PCC CURB & GUTTER PROP. PCC CURB & GUTTER
CONSTRUCT EXISTING GROUND
WITH COMPOSITE PAVEMENT WITH COMPOSITE PAVEMENT
NEW SIDEWALK
EXISTING GROUND
STD. DWG. NO. MILL & OVERLAY WITH PATCHING
605.01 - SEE PAVEMENT DETAILS

TYPICAL SECTION
PROPOSED CONDITION
STA. 120+50 TO STA. 127+50
SCALE: 1"=5'

B
L CONSTR. EASTERN AVE. NE

EX RW
MI
DC LI TS

90' EXISTING DDOT RIGHT-OF-WAY

20' 20'
dgn

5'-6' 4'-6'
01Eastern Ave.NE - DDOT\CADD\pHT-X003_Eastern.

1' 6' 6' 13' 9' 11'-12' 5'


SIDEWALK GRASS SHARED USE TURN GRASS SIDEWALK
SHARED USE BIKE
BUFFER LANE LANE BUFFER
LANE LANE

PGE / PGL
2
.0% 2
.0% VARIES VARIES
VARIES VARIES VARIES VARIES
:
41

EXISTING
PROP. PCC CURB & GUTTER PROP. PCC CURB & GUTTER
CONSTRUCT EXISTING GROUND
WITH COMPOSITE PAVEMENT WITH COMPOSITE PAVEMENT
NEW SIDEWALK
EXISTING GROUND
STD. DWG. NO.
FULL DEPTH RECONSTRUCTION FROM STA. 117+50 TO STA. 117+65
605.01
MILL & OVERLAY WITH PATCHING FROM STA. 117+65 TO STA. 120+50
- SEE PAVEMENT DETAILS

TYPICAL SECTION
PROPOSED CONDITION
STA. 117+50 TO STA. 120+50 DATE: 11-2016 SCALE: 1"=5' TS-02
SCALE: 1"=5'
51AM

D.C. DEPARTMENT OF TRANSPORTATION


Thursday, Novem ber 03, 2016 AT 11:

INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION


on\121107.

PROJECT MANAGEMENT DIVISION


HORIZONTAL DATUM: MARYLAND STATE PLANE COORDINATE SYSTEM NAD 83/91 PROJECT ENG.
REHABILITATION OF EASTERN AVENUE, N.E. DESIGNED BY
VERTICAL DATUM: D.C. ENGINEERS SURVEY DATUM
\2016\Transportati

FROM WHITTIER STREET N.W. TO CHECKED BY

DRAWN BY
NEW HAMPSHIRE AVENUE N.E. PROJECT MGR.
CONTRACTOR SHALL BE PERMITTED TO ADJUST SIDE SLOPES
FROM THE DESIRABLE 4:1 TO A MAXIMUM 2:1 IN ORDER TO DIVISION CHIEF

AVOID DAMAGING THE LANDSCAPE PLANTING AND DECORATIVE CONSULTING ENGINEERS - PLANNERS
WALLS AT RESIDENCES. 2820 DORR AVENUE, SUITE 230 PROPOSED TYPICAL SECTIONS DATE -, 2016
5' 0 5' 10'
FAIRFAX, VA 22031 NO. DESCRIPTION NAME DATE
FILE
PHONE: (571) 282-4099
T:

SCALE: 1"=5' REVISIONS SHEET 2 OF 2


SHEET TOTAL
STATE PROJECT
NO. SHEETS

PAVEMENT LEGEND
D.C. DDOT - EASTERN AVENUE, N.E. 23 80

1 3" HMA SURFACE COURSE, 9.5 mm

2 1.5" HMA SURFACE COURSE, 9.5 mm

3 2.5" HMA BASE COURSE, 19.0 mm

1 7
4 9" PORTLAND CEMENT CONCRETE BASE 8
1

5 4" AGGREGATE BASE COURSE

6 6" AGGREGATE BASE COURSE

6"
7 PCC CURB AND GUTTER
EXISTING PAVEMENT

8 TOP OF EXISTING PAVEMENT AFTER 3" PAVEMENT PROFILING (MILLING)

9 TOP OF SUBGRADE AND LIMIT OF EXCAVATION

MILLING AND RESURFACING


10 FULL-DEPTH SAW CUT INCIDENTAL TO FULL-DEPTH PATCH, CURB AND
GUTTER AND EXCAVATION ITEMS 4 6
9
NOTE: WHEREVER RESURFACING MEETS EXISTING,
THE CONTRACTOR SHALL SAW CUT AND REMOVE
ASPHALT TO THE FULL 2" DEPTH PRIOR TO RESURFACING
FULL DEPTH PAVEMENT

1 8 7 2 3

1' MAXIMUM

EXISTING
6"
PAVEMENT
EXISTING PAVEMENT

5 9 10
10 4 6 9

ASPHALT DRIVEWAY TIE-IN


NEW CURB AND GUTTER PLACEMENT
dgn
01Eastern Ave.NE - DDOT\CADD\pDE-0001_Eastern.

DATE: 11-2016 SCALE: N/A DE-01


51AM

D.C. DEPARTMENT OF TRANSPORTATION


Thursday, Novem ber 03, 2016 AT 11:

INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION


on\121107.

PROJECT MANAGEMENT DIVISION


HORIZONTAL DATUM: MARYLAND STATE PLANE COORDINATE SYSTEM NAD 83/91 PROJECT ENG.
REHABILITATION OF EASTERN AVENUE, N.E. DESIGNED BY
VERTICAL DATUM: D.C. ENGINEERS SURVEY DATUM
\2016\Transportati

FROM WHITTIER STREET N.W. TO CHECKED BY

DRAWN BY
NEW HAMPSHIRE AVENUE N.E. PROJECT MGR.

DIVISION CHIEF

CONSULTING ENGINEERS - PLANNERS


2820 DORR AVENUE, SUITE 230 PAVEMENT DETAILS DATE -, 2016
FAIRFAX, VA 22031 NO. DESCRIPTION NAME DATE
FILE
PHONE: (571) 282-4099
T:

REVISIONS SHEET 1 OF 6
1
SHEET TOTAL
STATE PROJECT
NO. SHEETS
E

0
5
1
LIMIT OF WORK

3
3 D.C. DDOT - EASTERN AVENUE, N.E. 24 80

5
0

N
9

4
5
5

N
DCKA-2013-T-0067 0

EASTERN AVENUE N.W.


STA. 100+65.00

DATR)
DATR)

DATR)
DATR)

DATR)

DATR)

DATR)

DATR)

DATR)
DATR)
DATR)
DATR)
00

G(
G(

G(
G(
DATR)
POT STA.100+00.

G(

G(

G(

G(

G(
G(
G(
G(
SPEED

MATCH LI
G(
HUMP CONCRETE WALK
CONCRETE WALK

CONCRETE WALK CONCRETE WALK

CONCRETE
APRON

5-MPH CONCRETE
APRON

G(DATR)
CONCRETE CONCRETE CONCRETE CONCRETE CONCRETE
APRON APRON APRON APRON APRON

G
G(DATR) G(DATR) G(DATR)
797414-080650
797414-140490 RESERVED PARKING CONCRETE CURB
797414-300340 CONCRETE CURB
& GUTTER & GUTTER
CONCRETE CURB
& GUTTER

797414-230400
INSTALL SAFETY FENCE

DATR)
DO NOT DAMAGE EXISTING GRANITE
LIMIT OF FULL DEPTH ON STRUCTURE
EASTERN AVE MAR
NUE ( YLAND) CURB & CONCRETE GUTTER

34
ASPHALT

CONSTRUCTION SEE FENCING DETAIL

G(

.
ASPHALT ASPHALT

.103+18

NE STA.1
04
STA. 100+65.00 CONCRETE CURB & GUTTER

NO PARKING
CONCRETE CURB & GUTTER

DISTRICT OF COLUMBIA LIMITS DISTRICT OF COLUMBIA LIMITS

PT STA.104+93.
CONCRETE WALL

BM 503
JERSEY WALL CONCRETE WALL

BM

08'
JERSEY WALL

V SPE ED NO PARKING 8"


A 12"MULTI 4"
R 09 8"
SHRUBS

T LI
MIT 5"

13.
1 SHRUBS

7'
T 1

PC STA
G(DATR) 5-MPH 6" 12"

75'ROW
G(DATR) P 9"
+50
SHRUBS

ASPHALT

G(DATR) SPEED 20"


9" 8"
1
01 LIMI
T
42'ROW

GRANI
TE CURB
&
CONCRETE GUTT
ER

25-

12'
MPH 9"

E
(40' WIDE PUBLIC STREET)

24
+5

R)
9'
0

05+ 00 - SEE DW G.NO.RP-02


ABANDON NO PARKING RIGHT LANE

T
G-ABND(DATR)

18.
ASPHALT

D
DA
1

D
02

S
60 CONDUI NARROWS AHEAD

S
G-ABND(DATR)

S
T

D(
10"(DATR) 10"(DATR) 61 SD SD

BN

7'
+5
(
75'WI
DE PUBL
I
C STREET)

12'

90'ROW
D
S

E
A
18"(DATR) 18"(DATR)

PC STA.100+36.
GRANITE CURB &
CONCRET GUTTER

G-
PT STA
1
03

DATR)
12"W(DATR) 59
1
2 EASTE

R)
"W(

W
DATR) RN AV

S
S
R)
E

12'
12"W(DATR) 12"W(DATR) NUE NW +50

W
T
CONCRETE WALK

1
0"(
DATR)

T
DA
1
04

7'
DA

(
G(
ASPHALT

797 +5
4 0 105

R)
1
4-0350

"(
G
1
0"

AT

10
GRANI
TE CURB
CONCRETE GUTT
&
ER

(
DATR)

.100+58
97414
EXIST. R/W -1
04

(D
3
(
75'WI
DE PUBL
I
C STREET)

DATR)
NO PARK 1
2"W(
DATR) 58
57 18"(DATR)

12'
I
NG 4H B
LC

D
67 ONS

W
9

S
G(
DATR) DC TRU

8"
NO PARK CTI
ON
CONCRETE

G
APRON

I
NG ME EASTERN A

S
TRO BUS

(D
1

S
VE 0"(
DATR)
.NW

A
ROAD

)
CONCRETE WALK

(
G(
DATR) 10"(DATR)

15"

DATR
G(
DATR) 797 1
2 "
W(

R
NARROW 41
4-1 DATR)

.
26 43

.M
8/4 12"W(DATR)

W
S H

)
824DC

.
L

.M
CONCRETE

S
G(
APRON

( DATR) STOP

W
DAT

RAI

7'
R) GRANITE CURB
& CONCRETE GUTTER

G(
DATR)

P
.
62

(
16
G( AHEAD

93

R)

O
DATR)

D
TRAV PT 108

W
S
GRASS

2-

SD SD797413-2130

ST
STOR
BR
ICK Y

GRANITE CURB & CONCRETE GUTTER

D
S
T
29 8"

L
CONCRETE
3"

.
30"

RAI

.M
CONCRE
TE WAL
L

W
DA
' (

R)
D

D
S
GRASS

S
A
STONE WALL

G(

D
CONCRETE

S
APRON

T CONCRETE

AT

G
APRON

R 25

W
3" 23

CONCRETE
)
GRASS

.
.M
GRASS

RAI
W

W
GRASS

CONCRETE
"(D

D
S
STONE WALL

.N
R)

15
GRASS

STONE
WALL

L
STONE
WALL

RAI
AT

ST
4"

.
.M

ASPHALT
W
EXIST. R/W

(D
2" MULTI

GH
CO
NC GRASS

ASPHALT
AP RE
RO TE

G
N

DATR)
L

DATR)
RAI
W

DATR)
(D

4'HI
8"
5"

ER

A
T
RA

TI

R
IL DO NOT DAMAGE EXISTING GRANITE 5"

G(
G(
G(
IT

ER
GUTT
G(

&
B
CUR
GRASS

CURB & CONCRETE GUTTER

E
T
RE
CONC
DA 27"
GRASS GRASS

TR

DATR)
H

GH
40" ) GRASS

CURB
ER
ETE
GUTT
.

NCR
.M

&
CO

6'HI
W

W
4"

LK
A
W
E
ET
R
NC
O
C
PORCH

G(
2-STY
BRICK

R)
PORCH

T
AL
PH

)
ET
AS

RE
ST
IC
BL
PU
DE
I
'W
(75
T
0

R)

DA
/

M ASONRY

M ASONRY
2-STY

2-STY
5

1-STY

25 D L 53
WOOD/MASONRY

"(
STY K
2- C
BRI

AT
3

PH(D T
W MI
5

10

K
AL
W
6

E
ET
ONCR
SS
A

C
GR
7

8" I
EE -9
4

SP 414
N

-M
6
79

E
E 1
1 3
3 0
0 9
9 5
2 5
7 0
5

0
5
0
5
7
4
N
dgn
01Eastern Ave.NE - DDOT\CADD\pHD-P001_Eastern.

PAVEMENT LEGEND

FULL DEPTH DATE: 11-2016 SCALE: 1"=20' RP-01


51AM

D.C. DEPARTMENT OF TRANSPORTATION


Thursday, Novem ber 03, 2016 AT 11:

MILL AND OVERLAY


INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION
on\121107.

PCC SIDEWALK PROJECT MANAGEMENT DIVISION


HORIZONTAL DATUM: MARYLAND STATE PLANE COORDINATE SYSTEM NAD 83/91 PROJECT ENG.
REHABILITATION OF EASTERN AVENUE, N.E. DESIGNED BY
PCC DRIVEWAY ENTRANCE VERTICAL DATUM: D.C. ENGINEERS SURVEY DATUM
\2016\Transportati

FROM WHITTIER STREET N.W. TO CHECKED BY

DRAWN BY
NEW HAMPSHIRE AVENUE N.E. PROJECT MGR.
ASPHALT DRIVEWAY TIE-IN
DIVISION CHIEF

PERVIOUS CONCRETE PAVEMENT CONSULTING ENGINEERS - PLANNERS ROADWAY PLAN


2820 DORR AVENUE, SUITE 230
20' 0 20' 40' DATE -, 2016
FAIRFAX, VA 22031 NO. DESCRIPTION NAME DATE STA. 100+00 TO STA. 104+50
FILE
PAVEMENT AND SIDEWALK REMOVAL PHONE: (571) 282-4099
T:

SCALE: 1"=20' REVISIONS SHEET 1 OF 6


SHEET TOTAL
STATE PROJECT
NO. SHEETS

N
D.C. DDOT - EASTERN AVENUE, N.E. 25 80
E

0
0
1

9
3

4
0

7
9

4
9
7

N
5

DATR)
DATR)
DATR)

DATR)
DATR)
DATR)

DATR)

DATR)
R)

DATR)
DATR)

DATR)

DATR)

DATR)
DAT

G(
G(
G(

G(
G(
G(

G(
G(

G(
G(
G(

G(

G(

G(
BRICK WALL
CONCRETE
05+ 00 - SEE DW G.NO.RP-01 CONCRETE CONCRETE CONCRETE WALK CONCRETE PAVERS BRICK CONCRETE WALK CONCRETE CONCRETE CONCRETE CONCRETE WALK APRON CONCRETE WALK 27

D
S
APRON APRON APRON APRON APRON APRON PAVERS

G
G(DATR) SPEED G(DATR) G(DATR) G(DATR)
G(DATR) G(DATR) 797413
797414-380250 HUMP 797414-450180 797414-500140 797414-550040 CONCRETE CURB 797413-640990 CONCRETE CURB CONCRETE CURB
-700970
CONSTRUCT STAIRWAY
5-MPH & GUTTER & GUTTER & GUTTER
DO NOT DAMAGE EXISTING GRANITE PCC CURB AND GUTTER WITH
STD. DWG. NO. 602.04

G
CURB & CONCRETE GUTTER COMPOSITE PAVEMENT (TYP.) G(DATR)

MATCH LI
EASTERN AVENUE (MARYLAND)
STD. DWG. NO. 608.01 ASPHALT PROPOSED CONCRETE SIDEWALK ASPHALT
PROPOSED PEDESTRIAN BUS PAD INSTALL GUIDERAIL TRAILING END
STD. DWG. NO. 605.01
04

DISTRICT OF COLUMBIA LIMITS STD. DWG. NO. 506.03 CONCRETE CURB & GUTTER SECTION STD. DWG. NO. 603.08 CONCRETE CURB & GUTTER
DISTRICT OF COLUMBIA LIMITS
PT STA.104+93.

CONCRETE WALL CONCRETE WALL CONCRETE WALL

NO PARKING NO PARKING NO PARKING 18"


SPEED 7" 12"
ADA CURB RAMP
HUMP 8" 9" 8" TWIN

5-MPH
5" 4"
5"
STD. DWG. NO. 606.09 5" REMOVE EX. GUIDERAIL AND INSTALL 10"
SHRUBS 10" 6" 8"
14" 12" 8" 6" GRASS
106+57.68 SHRUBS 12" NEW GUIDERAIL STD. DWG. NO. 603.02

NE STA.11
6"
12" 106+27.68 GRASS 12" 6" MULTI SHRUBS 6" INSTALL GUIDERAIL TANGENT
10" 20.69 LT PCC BUS PAD 1' BEHIND
6" NEW SIDEWALK GRASS
7"
6" 8"
10" 20.68 LT
15" 107+94.39 12" 13" 3" APPROACH END TERMINAL
STD. DWG. NO. 506.01 108+21.90 7"MULTI
6" 7"
RIGHT LANE TE CURB &
GRANI METRO BUS
NO PARKING
22 19.96 LT STOP STD. DWG. NO. 603.27
CONCRETE GUTTER TRAV PT 107 20.05 LT GUARD RAIL

D
NARROWS AHEAD

6'

6'
CONCRETE CURB BROKEN CONCRETE CURB ROAD NARROWS/ CONCRETE CURB

DATR)
SD SD TE CURB &
GRANI
7'

E
7'
E

DATR)
107+02.68 CONCRETE GUTTER 6'R STOP AHEAD
106+22.68
108+00.76
8.96 LT

G-ABND(
8.96 LT

12'
108+08.89

2'
12'
(
13.37 LT B
L CONSTRUCTION EASTERN AVENUE NE EASTERN AVENUE NE
12'

12'

0+ 75 - SEE DW G.NO.RP-03
1
105 106 +50 107 +50 13.36 LT 108 +50 109 +50 110 +50
+50 ASPHALT
68 ASPHALT
69
18"(DATR) (B)
NE STA.1

18"(DATR) (90' WIDE PUBLIC STREET) 109+52.03

D
D

12'
12'
S
S

A)
(90' WIDE PUBLIC STREET)

12'
18"(DATR) 18"(DATR) 21"(DATR) 21"(DATR) 21"(DATR)
108+08.97 108+33.02 108+49.73 108+72.03

12'

(
109+80.76
12'

9.31 RT

S
R
S

S
W
S
10"(DATR) 10"(DATR) 10"(DATR) 10"(DATR)

T
10"(DATR) 10"(DATR) 10"(DATR) 10"(DATR) 17.27 RT
14.27 RT 14.31 RT 9.37 RT 20.24 RT

A
EASTERN AVENUE NW

DATR)
DATR)
56 ADA CURB RAMP 70 55

DATR)
(D
12"W(DATR)
12"W(DATR) 8"
W(DATR) 6'R 109+10.61 8"W(DATR)
15'R

7'
7'
8"W(DATR)

W
STD. DWG. NO. 606.09
12"W(DATR)

W
G(DATR) G(DATR) TE CURB & G(DATR)797414-4407
7'

7'
797414-4011 GRANI
6'R 5"
1 RCP 20.42 RT

(
21

(
GRANI
TE CURB & CONCRE G(DATR) 797414-5992

W
G(DATR) G(DATR) G(DATR)

10"

(
TE GUTTE

18"
R /4H821DCA CONCRETE GUTTER /4H820DC GRANITE
SD SD 3728A/4H819DC

21"
107+93.97 SD SD CONCRETE CURB
CONCRETE CURB /4H818DC

DATR)
CONCRETE STOP

)
D

S
S

.
28.44 RT

.
.M

.M
.M
.
W

W
W
.M
W

W
NO PARKING
W

STONE 797413-6685 TRAV

T
.

W
APRON METRO BUS
.M

6"
.
.M
W

.
W

.
CONCRETE

.M
MATCH LI

.M
CONCRETE WALK

A
W
.

W
.M
71

W
4' HIGH RAIL STONE WALL

(D
WALL RAIL STONE WALL G(DATR) /4H817DC PT 106
APRON

G(
G
D
S
L

DATR)
L
STONE WALL
RAI

RAI
STONE WALL STONE WALL 3' HIGH CLF STONE WALL 4' HIGH 10.5' 4' HIGH
11'

PAVERS
7" COPING 2" GRASS BUSGRASS 10.5'

STONE
GRASS 108+67.13 GRASS PCC PAD
CONCRETE

STONE WALL

GH
STOP
CLF

8"
GH

109+91.64 110+44.75
GH

GRASS GRASS 13" 3' HIGH

6'HI
DATR)

109+00.22 STD.
6" DWG. NO. 506.01

DATR)
4'HI

GRASS

GH
3'HI

MULTI 20.36 RT

W(
7" NO THRU

(D
GRAVEL
CLF

GH
GRASS

BLOCK WALL
6"

CLF
20.28 RT 20.25 RT

CLF 3'HI

A
40' GRASS

12"
3" TRUCKS

T
4'HI
GRASS GRASS RAIL RAIL MULTI 2" 20.42 RT 30"

R
6' HIGH

)
G(

G(
PORCH PORCH PORCH

D
107+93.32 4' HIGH

DATR)

S
CONCRETE

DATR)
20
DATR)

PORCH PORCH RAIL 40.30 RT

NG
EXIST. R/W

D
EXIST. R/W DRIVEWAY ENTRANCE

S
TO L ST.NW
PORCH 110+57.90

DATR)

COPI
PORCH

G(
PORCH WELCOME TO

DATR)
1-STY

DATR)

DATR)
TYPE 'C' (TYP.)

G(
1-STY
WASHINGTON 20.20 RT
G(

CONCRETE
CONCRETE
STD. DWG. NO. 504.03

(
1-STY
E

21"
DATR)
1-STY 1-STY 1-STY

G(
GRASS
(

G(
CONCRETE
0

10"
MASONRY MASONRY CONCRETE
0

1-STY 1-STY 3
9

0
4

BRICK MASONRY 9

(
7

18"
9 RECONSTRUCT CONCRETE SIDEWALK
4

7
DO NOT DAMAGE 5

CAPI
STD. DWG. NO. 605.01
N

NO THRU

GRASS

GUTTER
DATR)

C STREET)
G(
EXISTING GRANITE TRUCKS
PCC CURB AND GUTTER WITH

CONCRETE WALK
3729M/
E CURB & CONCRETE

CONCRETE WALK
PCC CURB AND GUTTER

0
4H700DC COMPOSITE PAVEMENT (TYP.)

5
1 GUTTER

6
3 STD. DWG. NO. 608.01 WITH CONCRETE PAVEMENT

CONCRETE CURB &

4
RTH
0

7
ASPHALT
9

DE PUBLI

4
7 STOP STD. DWG. NO. 608.01
2

N
AHEAD
5

NO
90'WI
(
PCC CURB AND / OR GUTTER, LF (STD. ITEM NO. 606002, 606004, 606020) PCC SIDEWALK, 4 INCH, SY (STD. ITEM NO. 605006) PCC DRIVEWAY / ALLEY ENTRANCE, 7 INCH, SY (STD. ITEM NO. 504012)

B
L CONSTR. BEGIN STA. / OFFSET END STA. / OFFSET LENGTH (LF) HEIGTH (IN) REMARKS B
L CONSTR. BEGIN STA. / OFFSET END STA. / OFFSET AREA (SY) REMARKS B
L CONSTR. STA. / OFFSET AREA (SY) REMARKS

EASTERN AVE. NE 107+94.39, 19.36' LT 110+75, 12.95' LT 284.13' 7 REFER TO STD. NO. 606.01 EASTERN AVE. NE 106+27.68, 20.68' LT 106+57.68, 20.69' LT 20 SEE STD. NO. 605.01 EASTERN AVE. NE 109+05.42, 20.43' RT 8 SEE STD. NO. 504.03

EASTERN AVE. NE 107+93.31, 40.35' RT 109+00.22, 20.42' RT 126.65' 7 / VARIES DEPRESSED CURB AT RAMPS EASTERN AVE. NE 108+09.90, 20.07' LT 110+75, 12.95' LT 178 SEE STD. NO. 605.01 EASTERN AVE. NE 109+86.25, 20.26' RT 9 SEE STD. NO. 504.03

EASTERN AVE. NE 109+10.61 20.42' RT 109+80.78, 20.23' RT 70.18' 7 REFER TO STD. NO. 606.01 EASTERN AVE. NE 107+94.02, 40.37' RT 109+00.22, 21.13' RT 82 SEE STD. NO. 605.01 EASTERN AVE. NE 110+50.98, 20.22' RT 10 SEE STD. NO. 504.03

EASTERN AVE. NE 109+91.62 20.28' RT 110+44.75, 20.25' RT 53.12' 7 REFER TO STD. NO. 606.01 EASTERN AVE. NE 109+10.61, 21.13' RT 109+80.76, 20.94' RT 47 SEE STD. NO. 605.01

EASTERN AVE. NE 110+44.75 20.25' RT 110+75, 20.18' RT 17.13' 7 REFER TO STD. NO. 606.01 EASTERN AVE. NE 109+91.62, 21.00' RT 110+44.75, 20.96' RT 38 SEE STD. NO. 605.01

EASTERN AVE. NE 108+08.89, 13.36' LT 108+21.90, 20.05' LT 20.42' 7 PAY ITEM 606002 EASTERN AVE. NE 110+57.87 20.90' RT 110+75, 20.88' RT 13 SEE STD. NO. 605.01
dgn
01Eastern Ave.NE - DDOT\CADD\pHD-P002_Eastern.

PAVEMENT LEGEND

FULL DEPTH DATE: 11-2016 SCALE: 1"=20' RP-02


51AM

D.C. DEPARTMENT OF TRANSPORTATION


Thursday, Novem ber 03, 2016 AT 11:

MILL AND OVERLAY


INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION
on\121107.

PCC SIDEWALK PROJECT MANAGEMENT DIVISION


HORIZONTAL DATUM: MARYLAND STATE PLANE COORDINATE SYSTEM NAD 83/91 PROJECT ENG.
REHABILITATION OF EASTERN AVENUE, N.E. DESIGNED BY
PCC DRIVEWAY ENTRANCE VERTICAL DATUM: D.C. ENGINEERS SURVEY DATUM
\2016\Transportati

FROM WHITTIER STREET N.W. TO CHECKED BY

DRAWN BY
NEW HAMPSHIRE AVENUE N.E. PROJECT MGR.
ASPHALT DRIVEWAY TIE-IN
DIVISION CHIEF

PERVIOUS CONCRETE PAVEMENT CONSULTING ENGINEERS - PLANNERS


ROADWAY PLAN
2820 DORR AVENUE, SUITE 230
20' 0 20' 40' DATE -, 2016
FAIRFAX, VA 22031 NO. DESCRIPTION NAME DATE
STA. 104+50 TO STA. 110+50 FILE
PAVEMENT AND SIDEWALK REMOVAL PHONE: (571) 282-4099
T:

SCALE: 1"=20' REVISIONS SHEET 2 OF 6


SHEET TOTAL
STATE PROJECT
E NO. SHEETS

N
0
1

5
3

4
1 D.C. DDOT - EASTERN AVENUE, N.E. 26 80

7
0

4
4 DRIVEWAY ENTRANCE WITH
0

N
0 CURB RETURNS TYPE 'A' (TYP.)
STD. DWG. NO. 504.01 PROPOSED CONCRETE
CONSTRUCT
SIDEWALK (TYP.) STD.
STAIRWAY
PCC CURB AND GUTTER WITH DWG. NO. 605.01
STD. DWG. REMOVE EX. GUIDERAIL BETWEEN REMOVE BRICK WALL
COMPOSITE PAVEMENT (TYP.)
NO. 602.04 STA. 110+75 AND STA. 111+40 TO 1' BACK FROM
STD. DWG. NO. 608.01 RECONSTRUCT
NEW SIDEWALK

CONCRETE CURB
STEPS STD.

797413-780850

R)
GUTTER
DWG. NO.

R)

AT

DATR)
DATR)

DATR)

DAT

G(D

CONCRETE WALL
602.04

NG
DATR)

DATR)

PI
10"

G(
34"

G(
CO
G(
&

G(
7"
6"

G(
G(
6"

G(

DATR)
10"

DA
W
5"

GH
12"RCP 4"

4'HI
8" 14"

TR
6" 20"
34" 7"

MATCH LI
G(
GH CLF

)
5"

A
GRASS

CK WALL
PARK
TAKOM
CONCRETE CURB 17" 14" 6"
GRASS

GH
10+ 75 - SEE DW G.NO.RP-02
16" 3" 7"

CLF
4'HI

TE
4'HI

ASPHALT

ASPHALT
G(DATR) GRASS 5" 8"
G(DATR) 7"

G
G
11"

CRE
G(DATR) G(DATR)
G(DATR) 8" G(DATR) G(DATR) GRASS

TE
17" R)

BRI
DAT
G( GRASS
GRASS 6"

CRE

GH
CON
GRASS 16"
TWIN 8"

4'HI
CONCRETE WALK
7" GRASS
112+37.10 113+20.50 113+56.55 5"

CON
12" 12"
DISTRICT OF COLUMBIA LIMITS 32.77 LT 26.75 LT 26.75 LT DISTRICT OF COLUMBIA LIMITS

NE STA.1
CK WALL
STREET 111+52.17 DO NOT 112+24.77 6" 6"
NAME GRASS 112+95.393" 11' 12' 113+68.30
5' HIGH 4' HIGH 115+32.61 12'
26.54 LT 14" 112+87.39 8' 113+31.61 5' HIGH 7" 8" 115+44.61

ASPHALT
DISTURB 26.60 LT 26.74 LT 5" 15" 26.72 LT GRASS
9" 26.76 LT
GRASS GRASS 11" 9" BRICK WALL

ASPHALT
GRASS 26.76 LT 26.75 LT 14"
26.71 LT

BRI
9"TWIN 111+38.19 SHRUBS 12' BRICK WALLS 15" SHRUBS

6' 6'
10"

6' 6'
GRASS 12"
GRASS 19.56 LT 10" BRICK WALL
#797413-8572/

6'
BRICK WALL 19 20" GRASS
CONCRETE HIDDEN DRIVEWAY/
NO PARKING CONCRETE #797413-9563 GRASS
APRON NO PARKING
GUARD RAIL

D
CONCRETE APRON

DATR)

1
DATR)

CONCRETE CURB 797413-7780 SD APRON CONCRETE CURB 798413-0455/ 798413-1148 CONCRETE CURB
SD

7'

6+ 00 - SEE DW G NO.RP-04
7'
NO PARKING 111+70.05 112+81.37 NO PARKING

DATR)
113+01.37 113+37.65 113+50.60 113+74.29 115+26.60 115+50.63

13'
G-ABND(
112+16.40
(

20.53 LT 112+02.91 19.85 LT


21"

19.97 LT 19.86 LT 19.95 LT 19.92 LT

12'
12'
2'

6'R 19.99 LT 19.72 LT 19.79 LT


111+58.05

(
111+51.04 19.87 LT 113+14.48
1

111 12.83 LT +50 20.54 LT 112 +50 113 19.94 LT +50 114 +50 115 +50 116

6'
67
18"(DATR) 18"(DATR)

(B) (A) 112+16.90

D
54

S
D

2'
12'
12'

21"(DATR) 53

1
20.15 RT

2'
S
S
10"(DATR) 10"(DATR) 10"(DATR) 10"(DATR) 10"(DATR) 10"(DATR) 10"(DATR)
EASTERN AVENUE NE

DATR)
8"W(DATR) 8"W(DATR) 8"W(DATR) 8"W(DATR)
NE STA.1

8"W(DATR)

7'
7'
7'

7'
797413-7279 G(DATR) WATCH FOR G(DATR)

G
G(DATR) G(DATR) G(DATR)

(
CONCRETE CURB SD SD CONCRETE CURB PEDESTRIANS CONCRETE CURB
SIGNAL AHEAD

D
TRAV

.
.

.
.M
.M
S

.M

.
.
.
.

.M
.M

W
.M
.M

.M

W
.
BM 502

Potrebbero piacerti anche