SERVICES DEPARTMENT
Grid Solutions a GE and Alstom joint venture
Rev: 19/01/2016
ZAKHER (EAU )
SUBSTATION B105-6
BHT CONTRACT N : AH71
RDS 0006
DISTRIBUTION : After Sales dept., Site erection dept., Quality control site dept., Quality dept.
Established by : R. ASSIER
Checked by : C. CARLE Page : 1/15
MS 3014
Approved by : JC. BORNAND
GAS INSULATED SUBSTATIONS
SERVICES DEPARTMENT
Grid Solutions a GE and Alstom joint venture
Rev: 19/01/2016
SUMMARY
1- FIELD OF APPLICATION
2- GENERAL
3- GLOSSARY
7- SUPERVISOR COMPETENCES
Established by : R. ASSIER
Checked by : C. CARLE Page : 2/15
MS 3014
Approved by : JC. BORNAND
GAS INSULATED SUBSTATIONS
SERVICES DEPARTMENT
Grid Solutions a GE and Alstom joint venture
Rev: 19/01/2016
1- FIELD OF APPLICATION
The Quality plan is a document of quality insurance which defines: tasks, responsibilities, and documents attached to the substation erection or
maintenance, inspection and test operations.
2- GENERAL
The Quality plan is conform to the Environment & Quality Manual (MQ2000) and more precisely to the 2.2.3 Installation on site, work & site tests. It
precise the responsibilities about the quality, the documentation, the site training, the inspections and test. The treatment of non-conformities and the
corrective actions.
3- GLOSSARY
Abbreviation list
Established by : R. ASSIER
Checked by : C. CARLE Page : 3/15
MS 3014
Approved by : JC. BORNAND
GAS INSULATED SUBSTATIONS
SERVICES DEPARTMENT
Grid Solutions a GE and Alstom joint venture
Rev: 19/01/2016
Established by : R. ASSIER
Checked by : C. CARLE Page : 4/15
MS 3014
Approved by : JC. BORNAND
GAS INSULATED SUBSTATIONS
SERVICES DEPARTMENT
Grid Solutions a GE and Alstom joint venture
Rev: 19/01/2016
4 LISTING OF REFERENCES DOCUMENTS
List of quality document referring to the quality plan and used during site erection.
N Update DESIGNATION
29/09/11
SOFTWARE ON LINE
Manual on supervisor data base
Chapter 1 :
Site Opening
Chapter 2 :
Assembly preparation
Chapter 3 :
GIS Assembly
Chapter 4 :
Preparation for Assembly of Gas Insulated Bus (GIB)
Chapter 5 :
Assembly of Gas Insulated Bus (GIB)
Chapter 6 :
Particular assembly procedure
Chapter 7 :
Gas treatment
Chapter 8 :
Cable path and earth circuit
Chapter 9 :
Assembly of low voltage
Chapter 10 :
Commissioning
Chapter 11 :
Dielectric tests + Checking of surge arresters
Chapter 12 :
Cable box and liaison transformer connections
Chapter 13 :
Site closing
Established by : R. ASSIER
Checked by : C. CARLE Page : 5/15
MS 3014
Approved by : JC. BORNAND
GAS INSULATED SUBSTATIONS
SERVICES DEPARTMENT
Grid Solutions a GE and Alstom joint venture
Rev: 19/01/2016
5 MAIN HAZARD IDENTIFICATION & RISK ASSESSMENT FOR INTERVENTION (1/2)
Overall hazard for intervention FDPEHS 40004 : Safety during GIS operations
FG40010 : Safety instructions
Intervention on dismantling FG40010 item 7.2: Prior to remove the conductor makes sure that the
conductor conductors supports are earthed at both sides.
Intervention on cable box In case of cable box link dismantling, the cable must be
earthed at the closest from the dismantling link => cable
bushing on the cable box side.
Intervention on live substation : TEX N52 checked and formalized by supervisor & Lockout Tagout : individual padlocks & tags mandatory
Overhead energized lines. customer Wear PPE (helmet with face protection, gloves, insulation mat
LV Commissioning FG27025 :Rules for electrical operations & tools)
5min Safety : V.A.V. kit Working area delimited with Physical barriers
5min Safety : safety during LV commissioning Tags warnings the presence of danger.
Lifting operations FG27028 Lifting manual Operator must be trained & competent
5min safety slinging recommendations Lifting plan for particular slinging (hooking points, weight to
be lifted)
Vehicle movement ALSTOM EHS 009 Circulation of mobile equipment & pedestrian must be
5min safety Vehicle movement separated (2m)
High visibility jacket for vehicle drivers & on construction
forklift & trucks maneuvering areas
Installation of traffic signs
Established by : R. ASSIER
Checked by : C. CARLE Page : 6/15
MS 3014
Approved by : JC. BORNAND
GAS INSULATED SUBSTATIONS
SERVICES DEPARTMENT
Grid Solutions a GE and Alstom joint venture
Rev: 19/01/2016
Gas treatment FG40011 : EHS rules applicable during gas Operator trained for gas treatment (SF6 & pressure)
treatments on site Visible Tags on compartments
Work being closed insulator need factory approval
FG40118 : Treatment of compartment on site
FG27027 Pressure safety
5min safety 10 main safety rules
Polluted SF6 FG40011 : EHS rules applicable during gas Compartment must be identified
treatments on site PPE during removal of the polluted compartment :
FG40042 : compartments which can contains Gloves
polluted SF6. Cartridge mask ABEKP
5min safety Polluted SF6 Disposable coverall
Machine safety (safety) : FG27025 : Rules for electrical & mechanical CB mechanism out of voltage and spring is discharge
Hydraulic intervention operations
CB Mechanism 5min safety FK Mechanism
Other : 5min EHS Chemical Hazard Wear PPE defined by the safety data sheet.
Chemical products - asbestos 5min safety : rupture disk with asbestos
Confined spaces FG28018 confined spaces
Excavation works 5min EHS protection of floor opening
Established by : R. ASSIER
Checked by : C. CARLE Page : 7/15
MS 3014
Approved by : JC. BORNAND
GAS INSULATED SUBSTATIONS
SERVICES DEPARTMENT
Grid Solutions a GE and Alstom joint venture
Rev: 19/01/2016
5 ACCESS ON SUBSTATION
on bay 09 R phase
B105-EF6 / 13 / AH71
on bay 06
B105-EF6 / 4 / AH71
Established by : R. ASSIER
Checked by : C. CARLE Page : 8/15
MS 3014
Approved by : JC. BORNAND
GAS INSULATED SUBSTATIONS
SERVICES DEPARTMENT
Grid Solutions a GE and Alstom joint venture
Rev: 19/01/2016
2 -Dismantle the operating
mechanism
3 -Dismantle the support
Established by : R. ASSIER
Checked by : C. CARLE Page : 9/15
MS 3014
Approved by : JC. BORNAND
GAS INSULATED SUBSTATIONS
SERVICES DEPARTMENT
Grid Solutions a GE and Alstom joint venture
Rev: 19/01/2016
1 Pallet truck
Scaffolding
1 mobile access platform
BHT TOOLS:
Established by : R. ASSIER
Checked by : C. CARLE Page : 10/15
MS 3014
Approved by : JC. BORNAND
GAS INSULATED SUBSTATIONS
SERVICES DEPARTMENT
Grid Solutions a GE and Alstom joint venture
Rev: 19/01/2016
7 SUPERVISOR COMPETENCES
Established by : R. ASSIER
Checked by : C. CARLE Page : 11/15
MS 3014
Approved by : JC. BORNAND
GAS INSULATED SUBSTATIONS
SERVICES DEPARTMENT
Grid Solutions a GE and Alstom joint venture
Rev: 19/01/2016
8 DETAILED CHART FOR ACTIVITIES & FOR CONTROLS OPERATIONS
FES REPLACEMENT
CUSTOMER SCOPE
1 Checking of Electrical Lockout Appendix 1 M.S TEX N52 checked and TEX N52 checked and formalized by
formalized by supervisor & supervisor & customer
customer
Established by : R. ASSIER
Checked by : C. CARLE Page : 12/15
MS 3014
Approved by : JC. BORNAND
GAS INSULATED SUBSTATIONS
SERVICES DEPARTMENT
Grid Solutions a GE and Alstom joint venture
Rev: 19/01/2016
DAY / REFERENCE DOCUMENTS REFERENCE DOCUMENTS
DESCRIPTION OF TASKS HAZARDS / PREVENTION MEASURES
bay FOR SUPERVISOR FOR CUSTOMER
2 RDC Measurement. NOT 400 4010 : RDC measurement Record values on DRC
Note values on DRC Record values on DRC
3 Re-filling of SF6 on GIS compartments FG40118 FG40011 : EHS rules applicable during gas
Filling SF6 NOT 200.4021 treatments on site
Established by : R. ASSIER
Checked by : C. CARLE Page : 13/15
MS 3014
Approved by : JC. BORNAND
GAS INSULATED SUBSTATIONS
SERVICES DEPARTMENT
Grid Solutions a GE and Alstom joint venture
Rev: 19/01/2016
DAY / REFERENCE DOCUMENTS REFERENCE DOCUMENTS
DESCRIPTION OF TASKS HAZARDS / PREVENTION MEASURES
bay FOR SUPERVISOR FOR CUSTOMER
3 Pressure, Temperature, Moisture content & % SF6 Moisture content SF6 NOT FG40011 : EHS rules applicable during gas
gas measurement 200.4052 treatments on site
Checking of filling pressure NOT
200.4060
CUSTOMER SCOPE
4 Checking of Electrical Lockout Appendix 3 TEX N52 checked and TEX N52 checked and formalized by
formalized by supervisor & supervisor & customer
customer
6 Gas recovery from GIS compartments. Appendix 1 M.S FG40011 : EHS rules applicable during gas
FG40118. treatments on site
7 Re-filling of SF6 on GIS compartments FG40118 FG40011 : EHS rules applicable during gas
Filling SF6 NOT 200.4021 treatments on site
Established by : R. ASSIER
Checked by : C. CARLE Page : 14/15
MS 3014
Approved by : JC. BORNAND
GAS INSULATED SUBSTATIONS
SERVICES DEPARTMENT
Grid Solutions a GE and Alstom joint venture
Rev: 19/01/2016
DAY / REFERENCE DOCUMENTS REFERENCE DOCUMENTS
DESCRIPTION OF TASKS HAZARDS / PREVENTION MEASURES
bay FOR SUPERVISOR FOR CUSTOMER
8 Pressure, Temperature, Moisture content & % SF6 Moisture content SF6 NOT FG40011 : EHS rules applicable during gas
gas measurement 200.4052 treatments on site
Checking of filling pressure NOT
200.4060
8 Cancellation of PTW Intervention report TEX N09 to be Intervention report TEX N09 to
signed by client be signed by client
Site test results (DRC) to be signed Site test results (DRC) to be
by client signed by client
Established by : R. ASSIER
Checked by : C. CARLE Page : 15/15
MS 3014
Approved by : JC. BORNAND
Apparatus locked in closed position Compartment at reduced pressure SF6 (< 0,3b rel)
Appendix 1 MS 3014
Fast Earthing Switch Apparatus locked in open position Compartment opened to the atmosphere
BAY : 08+09 Comp: G4 Phase : R Earth Mandatory Compartment at nominal pressure of SF6
B105-EF6 / 10 / AH71
B105-EF6 / 13 / AH71
Apparatus locked in closed position Compartment at reduced pressure SF6 (< 0,3b rel)
Appendix 1 MS 3014
Fast Earthing Switch Apparatus locked in open position Compartment opened to the atmosphere
BAY : 06 Comp: G4 Phase : ? Earth Mandatory Compartment at nominal pressure of SF6
B105-EF6 / 4 / AH71
Apparatus locked in closed position HV Test section
Appendix 3 MS 3014
Consignation & Gas treatment for HV test Apparatus locked in open position Earth section
Fast Earthing Switch Earth Mandatory
BAY : 08+09 Comp: G4 Phase : R Injection point
OUTAGE OF BB 1A-2A