Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Small intestines
Large intestines
Stomach
Esophagus
Heart
Blood Vessels
Arteries
Capillaries
The main function is for the lungs to take in the oxygen and
to take out carbon dioxide.
Lungs
Trachea
Nose and Mouth
Diaphragm
Interesting fact: The right lung is slightly larger than the left lung.
Nervous System
Function of the system necessary for life:
Brain
Nerves
Spinal Cord
Interesting fact: The left side of the brain controls the right side
of your body and the right side of your brain controls the left
side of your body.
Skeletal System
Function of the system necessary for life
Bones
Cartilage
Ligaments
Muscles
Tendons
1. Nerves work together by massaging the other organs that can send it to the
brain which message your body.
2.Your skeletal and muscular system work together when each bone is connected to
each other and the muscles help one another move.
3.Your respiratory system and your circulatory system work together when your
lungs provide your circulatory system with oxygen for it to take around your body.
Body System Organs Answer Key
Circulatory System (heart, blood, vessels)