Sei sulla pagina 1di 3

VARIACION PORCENTUAL

ALTERNATIVA VACT 5% 10% 15% 20% 25%


1.05 1.10 1.15 1.20 1.25
ALTERANTIVA 1 357,013.36 374,864.03 392,714.70 410,565.37 428,416.04 446,266.70
ALTERANTIVA 2 364,037.26 382,239.12 400,440.99 418,642.85 436,844.71 455,046.58
-5% -10% -15% -20% -25%
0.95 0.90 0.85 0.80 0.75
ALTERANTIVA 1 357,013.36 339,162.70 321,312.03 303,461.36 285,610.69 267,760.02
ALTERANTIVA 2 364,037.26 345,835.40 327,633.53 309,431.67 291,229.81 273,027.95
Cdigo
Correlativo
SISTEMA NACIONAL DE INVERSION PUBLICA Elaborado
Actualizado
FORMATO 12
ANALISIS DE SENSIBILIDAD
ALTERNATIVA 1 y 2
MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA I. E.
NOMBRE RESUMIDO DEL PROYECTO
N 82774 "SANTA ROSA"
VACT A PRECIOS SOCIALES INDICADOR DE RATIO COSTO/EFECTIVIDAD
VARIACION
ALT. N 1 ALT. N 2 RESULTADO ALT. N 1 ALT. N 2
-25% 267760.02 273027.95 997 269 274
-20% 285610.69 291229.81 997 286 292
-15% 303461.36 309431.67 997 304 310
-10% 321312.03 327633.53 997 322 329
-5% 339162.70 345835.40 997 340 347
0% 357013.36 364037.26 997 358 365
5% 374864.03 382239.12 997 376 383
10% 392714.70 400440.99 997 394 402
15% 410565.37 418642.85 997 412 420
20% 428416.04 436844.71 997 430 438
25% 446266.70 455046.58 997 448 456
C O S TO EFEC TIVIDAD

ANALISIS DE SENSIBILIDAD

440

360

-20% -15% -10% -5% 0% 5% 10% 15% 20% 25%

280
VARIAC IO N DE LA INVERS IO N

ALT. N 1 ALT. N 2

Potrebbero piacerti anche