For Propossed Residenttial Develop
pment at:
Baker Street
Alvaston
A
Derby
DE24
D 8SE
Job No
o: 11-424
Preepared by: Michael
M Evanns & Associiates Ltd
Rev:
R
Michael
M Evanns & Associiates Ltd
34 Station Road
Draycott
Derby DE72 3QB
Tel: 013322 871 840
Fax: 013322 871 841
www.mevans.co.uk
Michael Evans & Associates Ltd Tel. 01332 871840 Project No. Sheet No.
Local Planning Authority have advised against the use of soak-aways on this specific site. Ground conditions
on site are seen to be made up of heavy clayey soils which would indicate a generally poor rate of soil
infiltration.
It is also established that suitable areas for potential soak-away locations on site are restricted and do not
provide adequate clear distance to comply with Building Regulations (Approved Document) Part H.
No maximum allowable discharge rate has been imposed for the disposal of surface water on this site.
Suggest restriction of surface water discharge to approximately 5.0 l/s [or within IH124 1 in 100 year + 30%
climate change 'greenfield' runoff rate for this site - refer to Page 3.
Design Parameters:
Total area of site = 2035 m2 [0.2035ha ]
Proposed site impermeable Area = 1075 m2 [0.108ha ]
Accommodate below gound storage to 1 in 100 year + 30% climate change.
Rainfall
Data refers to 'Design and analysis of urban storm drainage - WALLINGFORD PROCEDURE Volume 4, The
Modified Rational Method'.
Figure A.1 : M5-60 = 19.5 mm
Figure A.2 : r = 0.40
COPYRIGHT
Michael Evans & Associates Ltd Tel. 01332 871840 Project No. Sheet No.
COPYRIGHT
Michael Evans & Associates Ltd Tel. 01332 871840 Project No. Sheet No.
Percentage Runoff equations to WALLINGFORD PROCEDURE Volume 4 'The Modified Rational Method '
Using The Rational formula :- Qp = CiA
Where:
Qp = discharge rate
C = Coefficient where C = Cv x Cr (Cv = volumetric coefficient & Cr = routing coefficient - formula 7.19)
i = rainfall intensity (mm/hr)
i = mean rainfall intensity (mm/hr)
A = Area (ha ) drained hard surfaces 1075 m2 = 0.108 ha
2
(Total site area = 2035 m = 0.203ha )
(Other site area = 560 m2 = 0.056 ha )
(Soft site area = 400 m2 = 0.040 ha )
Determine C:
Cv = 0.8 for urbanised catchment and Cr = 1.3
C = 1.04
COPYRIGHT
Michael Evans & Associates Ltd Tel. 01332 871840 Project No. Sheet No.
Peak rates:
1 year + 30% climate change = 21.90 l/s
30 year + 30% climate change = 51.34 l/s
100 year +30% climate change = 67.49 l/s
COPYRIGHT
Michael Evans & Associates Ltd Tel. 01332 871840 Project No. Sheet No.
2
Determine PIMP of total catchment: 2035 m
2
1075 m = 52.8 % of the site area connected to drainage system
Post development: PR = [0.829 x 52.8] + [25.0 x 0.45] + [0.078 x 70] - 20.7 = 39.8 %
PR Equation:- Volume of runoff = Rainfall (mm) / 1000 x Total Catchment Area (m 2) x PR / 100
Recommend POLYPROPYLENE CRATES / HYDRO STORAGE CELLS with minimum 95% void ratio to
provide 35.0m3 storage.