SURFFACE WATE

ER DR
RAINA
AGE
CA
ALCULATIO
ONS
For Propossed Residenttial Develop
pment at:
Baker Street
Alvaston
A
Derby
DE24
D 8SE

Job No
o: 11-424
Preepared by: Michael
M Evanns & Associiates Ltd
Rev:
R

Michael
M Evanns & Associiates Ltd
34 Station Road
Draycott
Derby DE72 3QB
Tel: 013322 871 840
Fax: 013322 871 841
www.mevans.co.uk
Michael Evans & Associates Ltd Tel. 01332 871840 Project No. Sheet No.

Fax. 01332 871841


CONSULTING CIVIL & STRUCTURAL ENGINEERS Date. 11-424 1 of 5
34 Station Road, Draycott, Derbyshire, DE72 3QB.
Oct 2011
Project. By. Checked. Revision
BAKER STEET - SW DRAINAGE CALCULATIONS BJJ ME

Surface Water Drainage

Consider Soakaway Method

Local Planning Authority have advised against the use of soak-aways on this specific site. Ground conditions
on site are seen to be made up of heavy clayey soils which would indicate a generally poor rate of soil
infiltration.

It is also established that suitable areas for potential soak-away locations on site are restricted and do not
provide adequate clear distance to comply with Building Regulations (Approved Document) Part H.

Consider Surface Water Attenuation Method

No maximum allowable discharge rate has been imposed for the disposal of surface water on this site.

Suggest restriction of surface water discharge to approximately 5.0 l/s [or within IH124 1 in 100 year + 30%
climate change 'greenfield' runoff rate for this site - refer to Page 3.

Design Parameters:
Total area of site = 2035 m2 [0.2035ha ]
Proposed site impermeable Area = 1075 m2 [0.108ha ]
Accommodate below gound storage to 1 in 100 year + 30% climate change.

Rainfall

Data refers to 'Design and analysis of urban storm drainage - WALLINGFORD PROCEDURE Volume 4, The
Modified Rational Method'.
Figure A.1 : M5-60 = 19.5 mm
Figure A.2 : r = 0.40

Using Figure A.3b:


STORM Z1 RAINFALL (MM)
M5-5 0.38 7.4
M5-10 0.53 10.3
M5-15 0.63 12.3
M5-30 0.80 15.6
M5-60 1.00 19.5
M5-120 1.19 23.2
M5-240 1.39 27.1
M5-360 1.59 31.0
M5-600 1.79 34.9
M5-1440 2.19 42.7

COPYRIGHT
Michael Evans & Associates Ltd Tel. 01332 871840 Project No. Sheet No.

Fax. 01332 871841


CONSULTING CIVIL & STRUCTURAL ENGINEERS Date. 11-424 2 of 5
34 Station Road, Draycott, Derbyshire, DE72 3QB.
Oct 2011
Project. By. Checked. Revision
BAKER STEET - SW DRAINAGE CALCULATIONS BJJ ME

Using Table A1 for 1 in 30 year storm:


STORM Z2 RAINFALL (MM)
M30-5 1.43 10.6
M30-10 1.48 15.3
M30-15 1.53 18.8
M30-30 1.53 23.9
M30-60 1.54 30.0
M30-120 1.53 35.5
M30-240 1.52 41.2
M30-360 1.51 46.8
M30-600 1.49 52.0
M30-1440 1.47 62.8

Using Table A1 for 1 in 100 year storm:


STORM Z2 RAINFALL (MM) PLUS 30% (MM)
M100-5 1.88 13.9 18.1
M100-10 1.92 19.8 25.8
M100-15 1.94 23.8 31.0
M100-30 1.99 31.0 40.4
M100-60 2.02 39.4 51.2
M100-120 2.01 46.6 60.6
M100-240 1.98 53.7 69.8
M100-360 1.96 60.8 79.0
M100-600 1.93 67.4 87.6
M100-1440 1.86 79.4 103.3

COPYRIGHT
Michael Evans & Associates Ltd Tel. 01332 871840 Project No. Sheet No.

Fax. 01332 871841


CONSULTING CIVIL & STRUCTURAL ENGINEERS Date. 11-424 3 of 5
34 Station Road, Draycott, Derbyshire, DE72 3QB.
Oct 2011
Project. By. Checked. Revision
BAKER STEET - SW DRAINAGE CALCULATIONS BJJ ME

Greenfield Run-off rates - site pre-development

Using Microdrainage application of IH124 (Method) to establish greenfield run-off rates:

1 year = 1.4 l/s plus 30% climate change: = 1.82 l/s


30 year = 3.3 l/s plus 30% climate change: = 4.29 l/s
100 year = 4.3 l/s plus 30% climate change: = 5.59 l/s

Calculated using the following parameters: Area of Site = 0.2035ha


SAAR = 691
Soil = 0.45

Peak Run-off Rate - Post Development

Percentage Runoff equations to WALLINGFORD PROCEDURE Volume 4 'The Modified Rational Method '
Using The Rational formula :- Qp = CiA

Where:
Qp = discharge rate
C = Coefficient where C = Cv x Cr (Cv = volumetric coefficient & Cr = routing coefficient - formula 7.19)
i = rainfall intensity (mm/hr)
i = mean rainfall intensity (mm/hr)
A = Area (ha ) drained hard surfaces 1075 m2 = 0.108 ha
2
(Total site area = 2035 m = 0.203ha )
(Other site area = 560 m2 = 0.056 ha )
(Soft site area = 400 m2 = 0.040 ha )

For Qp in l/s (litres per second) apply 0.36 to formula :- Qp = CiA0.36

Determine C:
Cv = 0.8 for urbanised catchment and Cr = 1.3
C = 1.04

Determine i (1 year return period storm):


M5-60min - 19.5 mm (FSR maps)
r - 0.40 (FSR maps)
D - 5 min (rainfall duration appropriate to time of concentration)
T - 1 year (return period)
Determine M5-D: (formula 6.4)

Z1 - 0.38 (from Fig. 6.3b Wallingford Procedure Vol.1)


:- M5-5 = 0.38 x 19.5
= 7.41 mm

COPYRIGHT
Michael Evans & Associates Ltd Tel. 01332 871840 Project No. Sheet No.

Fax. 01332 871841


CONSULTING CIVIL & STRUCTURAL ENGINEERS Date. 11-424 4 of 5
34 Station Road, Draycott, Derbyshire, DE72 3QB.
Oct 2011
Project. By. Checked. Revision
BAKER STEET - SW DRAINAGE CALCULATIONS BJJ ME

Determine MT-D: (formula 6.5)


Z2 - 0.61 for M1 (from Table 6.2 for M5 (WALLINGFORD PROCEDURE Vol.1))
:- M1-5 = 0.61 x 7.41
= 4.5201 mm
Determine i for drainage design: (formula 6.7)
i = MT-D = 4.5201
D (hrs) 560
i = 54.2412 mm/hr

Determine i (30 year return period storm):


M5-D applies as previous: 7.41 mm

Determine MT-D: (formula 6.5)


Z2 - 1.430 for M30 (interpolated from Table 6.2 for M5 (WALLINGFORD PROCEDURE Vol.1))
:- M30-5 = 1.43 x 7.41
= 10.596 mm
Determine i for drainage design: (formula 6.7)
i = MT-D = 10.596
D (hrs) 3060
i = 127.156 mm/hr

Determine i (100 year return period storm):


M5-D applies as previous: 7.41 mm
Determine MT-D: (formula 6.5)
Z2 - 1.880 for M100 (interpolated from Table 6.2 for M5 (WALLINGFORD PROCEDURE Vol.1))
:- M100-5 = 1.88 x 7.41
= 13.9308 mm
Determine i for drainage design:
i = MT-D = 13.931
D (hrs) 560
i = 167.1696 mm/hr

:- 1 year Qp = CiA 0.36 = 1.04 x 54.24 x 0.108 0.36 = 16.845 l/s


:- 30 year Qp = CiA 0.36 = 1.04 x 127.16 x 0.108 0.36 = 39.489 l/s
:- 100 year Qp = CiA 0.36 = 1.04 x 167.17 x 0.108 0.36 = 51.915 l/s

Peak rates:
1 year + 30% climate change = 21.90 l/s
30 year + 30% climate change = 51.34 l/s
100 year +30% climate change = 67.49 l/s

COPYRIGHT
Michael Evans & Associates Ltd Tel. 01332 871840 Project No. Sheet No.

Fax. 01332 871841


CONSULTING CIVIL & STRUCTURAL ENGINEERS Date. 11-424 5 of 5
34 Station Road, Draycott, Derbyshire, DE72 3QB.
Oct 2011
Project. By. Checked. Revision
BAKER STEET - SW DRAINAGE CALCULATIONS BJJ ME

Run-off Volume (100 year 6 hour duration) - Post Development


Percentage Runoff equation - formula 7.3 of WALLINGFORD PROCEDURE Volume 1.
Using The Rational formula :- PR = 0.829 PIMP + 25.0 SOIL + 0.078 UCWI - 20.7
Where:
PR = percentage run-off
PIMP = percentage of impermeable area (hard surfacing)
SOIL = soil type (from FSR maps)
UCWI = urban catchment wetness index (using Wallingford Procedure Fig. 9.7 for SAAR)
* Note: in formula 7.3 where PR < 40% PIMP, PR to be made equal to 40% PIMP

2
Determine PIMP of total catchment: 2035 m
2
1075 m = 52.8 % of the site area connected to drainage system

Post development: PR = [0.829 x 52.8] + [25.0 x 0.45] + [0.078 x 70] - 20.7 = 39.8 %

Determine 100yr return period 6hr duration event:

M5-60min - 19.5 mm (FSR maps)


r - 0.40 (FSR maps)
D - 360 min (rainfall duration)
T - 100 year (return period)
Determine M5-D:
Z1 - 1.55 (from Fig. 6.3b Wallingford Procedure Vol.1)
:- M5-360 = 1.55 x 19.5
= 30.23 mm
Determine MT-D:
Z2 - 1.81 for M100 (interpolated from Table 6.2 for M5 (Wallingford Procedure Vol.1))
:- M100-360 = 1.81 x 30.23
= 54.7073 mm

Allowance for + 30% climate change:


M100-360 + 30% = 54.7073 x 1.3 = 71.1194 mm

PR Equation:- Volume of runoff = Rainfall (mm) / 1000 x Total Catchment Area (m 2) x PR / 100

Run-off volume for site area with run-off: 39.8 %


3
Total volume of rainfall :- 71.12 / 1000 x 1075 x 0.40 = 30.43 m

Recommend POLYPROPYLENE CRATES / HYDRO STORAGE CELLS with minimum 95% void ratio to
provide 35.0m3 storage.