J OB N U M B E R : 0 3 E C1 6
REQU
UISITION STATUS
S
1
CC
CPP LOM
MBOK PE EAKER
130--150 MW
W
PT. WIJAY
AYA KARYA (PE
ERSERO), TBK
K.
PT. PLN
N (PERSERO)
C
CONTENTS
S
P
Page
1. GEN
NERAL
2. ITEM
M TO BE PU
URCHASED
D
3. REFERENCE
4. COD
DES & STAN
NDART
DER OF PRIORITY
5. ORD
6. SCO ORK & SUPPLY
OPE OF WO
7. SHO
OP INSPECT
TION AND
D TEST
8. SPARE PARTS
S
9. PRIC
CING
10. EXCEPTION, CLARIFICAT
C TION AND DEVIATION
D N
11. VENDOR'S DAT
TA REQUIR
REMENT
12. SPECIAL NOTE
ES
13. WAR
RRANTY AN
ND GUARA
ANTEE
2
CC
CPP LOM
MBOK PE EAKER
130--150 MW
W
PT. WIJAY
AYA KARYA (PE
ERSERO), TBK
K.
PT. PLN
N (PERSERO)
1. GENERAL
1.1. Definition
CLIENT:
PERSERO)
PT. PLN (P
PURCHAS SER:
PT. WIJAY
YA KARYA (P
PERSERO)), TBK.
VENDOR:
The party which
w supplies equipm orm the duties specified by PURC
ment to perfo CHASER
2. ITEM
M TO BE PU
URCHASED
D
NO SYST
TEM / PLAN
NT CAPACITY
Y QUA
ANTITY CATION
SPESIFIC
3
1 D
Demin Wate
er Tank 115 m 1 unit attached
3
2 H
HSD Fuel Oil
O Tank 1013 m 1 unit attached
3
3 D
Daily HSD Fuel
F Oil Tan
nk 201 m 1 unit attached
3
4 R
Raw Water Tank 687 m 1 unit attached
3. REFE
ERENCES
3
CC
CPP LOM
MBOK PE EAKER
130--150 MW
W
PT. WIJAY
AYA KARYA (PE
ERSERO), TBK
K.
PT. PLN
N (PERSERO)
No Doc
cument No Rev
v. No. Title
#1 See
e attachmentt 00 Tecchnical Speccification of Tank
T
03EC16-ENG-DS-20--001,002,00
03 00 Spec Fuel Oil and Wa
ater Tank
2th Edition
API 650 12
4. DES AND ST
COD TANDARDS
S
5. ORD
DER OF PRIIORITY
6. SCOPE OF WO
ORK & SUPPLY
6.1 General
In additionn to design, supply off materials, fabrication
n, shop tesst and inspe ection of th
he
equipmentt purchased d, the follo
owing VEN NDOR resp ponsibilities shall inclu
ude (but not
limited to);
(1) em Enginee
Syste ering.
(2) Supp
ply Equipme
ent and Bulk
k materials
(3) Perfo
ormance system.
(4) Cons
struction dra
awings.
(5) ulation and application software.
Calcu
(6) Pre-ccommission
ning.
(7) Commissioning Test.
(8) ory Accepta
Facto ance Test.
(9) Vend
dor data doccument and
d report.
(10) Perfo
ormance tessting on site
e.
(11) Shop
p painting, primary
p and finish coatss.
(12) Docu 1 of this requisition.
uments & drrawings as per para 11
(13) Expo
ort packing.
(14) Inland transporta
ation to a port of emba
arkation.
ch up paint in
(15) Touc i spray can
n.
(16) Proviisional acce
eptance and
d warranty.
(17) Rust prevention for shipment and outsside storage
e at site dura
able for 6 m
months.
struction and commissiioning spare
(18) Cons e parts
(X) Supplyy ( ) Recom
mmendation
(19) Speccial Tools
(X) Supplyy ( ) Recom
mmendation
(20) Operrational Spa
are Parts
( ) Supply (X) Recom
mmendation
- Spare partts for two (1) years ope
eration (to be
b separately quoted)
(21) Field supervision
n
7. SHOP INSPECT
TION AND TEST
The VENDOR shall arrange and carrry-out, as a minimum, the following tests annd inspectio
on
for tthe equipm ment, in co ompliance with the specification
s ns which mention in
n section 3,
beforre/after ship
pping from the
t VENDO ORs factory
7.1. Internal Te
est and Ins spection Puurchaser
The VEND DOR shall perform
p a preparation
p work and a complete System Fu unctional Te
est
before advvising the PURCHASE
P ER that thee overall sy
ystem is ready for PU URCHASER Rs
witnessed FAT. The VENDOR
V shall make a record of any compo onents faile
ed, etc durin
ng
al test. The VENDOR shall
the interna s keep a record of all breakdo
owns for PUURCHASER Rs
review. Thee VENDOR R shall provide the QA/QQC report for
f PURCHA ASERs revview.
The VEND DORs insppection andd test plan will be disscussed an d at the pre-
nd finalized
inspection meeting to be held at the VENDOORs shop. Inspection and test pla
an should be
b
performed with the miinimum requirement ass follows:
erial Inspec
7.2.2 Mate ction
7.2.2 FAT
etermination
a. De n of efficiency and lossses Review
wed by PUR
RCHASER
b. Sim
mulation of failure Review
wed by PUR
RCHASER
c. Ma
anufacturers standard test Review
wed by PUR
RCHASER
6
CC
CPP LOM
MBOK PE EAKER
130--150 MW
W
PT. WIJAY
AYA KARYA (PE
ERSERO), TBK
K.
PT. PLN
N (PERSERO)
7.3. PURCHAS
SER Witnes
sses Inspe
ection
8. SPAR
RE PARTS
S
The VEND DOR shall quote reccommended d spare pa arts which are necesssary durin
ng
constructio
on, pre-com
mmissioning and commissioning.
8.2 Recomme ended Sparre Parts
9. CING
PRIC
9.2. VENDOR'S
S Supervis
sor
Number of
7
CC
CPP LOM
MBOK PE EAKER
130--150 MW
W
PT. WIJAY
AYA KARYA (PE
ERSERO), TBK
K.
PT. PLN
N (PERSERO)
Purpose Supervis
sors Duration Expected Schedule
Req. or Spec E
Exception,
m
Item Cost & Schedule
Paragraph Require
ement Clarification
C Reaso
on
Noo. Im
mpact
No. & Deviation
SAMPLE
11.1 General
The VEND
DOR shall provide all do
ocuments as
a specified in para.11..3
8
CC
CPP LOM
MBOK PE EAKER
130--150 MW
W
PT. WIJAY
AYA KARYA (PE
ERSERO), TBK
K.
PT. PLN
N (PERSERO)
11.3. VENDOR's
s Data Req
quirement Sheet
S
No. DOCUMEN
NTS For For For For
Quotation Approval on
Informatio Recorrd
1 Ge eneral
1.1 Veendor Organization & contact
c Poin
nt X
1.2 Eqquipment re eference listt, cataloguee and X
technical bulletin
1.3 Deetailed Mannufacturing Schedule
S X
1.4 Lisst of Exception, Clarificcation and X
Deeviation
1.5 Prrice list X
1.6 Suub VENDOR R list X X
1.7 Bill of materia
al X X X (*)
1.8 Unnit Shippingg Drawing with
w X X (*)
W
Weight/Dimension
1.9 Material Take eoff X
2 Eqquipment Data
D & calcculation
2.1 Teechnical Claarification to
o the Requissition X X
2.2 Teechnical Claarification to
o the X X
Sppecification
2.3 Daata sheets X X X(*)
2.4 Peerformance Data X X(*)
3 Drrawings
3.1 Diimensioned d Outline Drawings and d X X X (*)
W
Weight
9
CC
CPP LOM
MBOK PE EAKER
130--150 MW
W
PT. WIJAY
AYA KARYA (PE
ERSERO), TBK
K.
PT. PLN
N (PERSERO)
1. T
The VENDO OR should attach
a confirmation lettter for a minimum ope erating life of
o 1 year annd
availability of spare partts for 1 year.
2. T
The VENDO OR may pro opose an alternative
a features otther than base
b scope if VENDO OR
co
onsiders that the use of that alte ernative wou uld improve e performan
nce or redu uce cost. Th
he
alternative proposed
p sh
hall still meeet the basse requirem ments. The VENDOR m must provid
de
unit price forr base scope and altern native in the
eir proposall.
3. T
The VENDO OR should arrange
a and
d perform a shop inspection and test plan n requirement
fo
or the follow
wing items, which are witnessed
w a
and/or revie
ewed by PURCHASER R.
13. WARRRANTY AN ND GUARA ANTEE
10
CC
CPP LOM
MBOK PE EAKER
130--150 MW
W
PT. WIJAY
AYA KARYA (PE
ERSERO), TBK
K.
PT. PLN
N (PERSERO)
All equipm
ment and co omponent parts
p shall be warrantted by the vendor against desig gn,
defective or
o improper material, poor
p workma anship and failure due to normal usage for thhe
period stip
pulated in Purchase
P Order. The equipment
e s
shall be guaaranteed fo
or satisfacto
ory
operation under all conditions
c specified on
o data sheets. Vend dor shall guarantee th he
performanc ce of equipment and project
p requiirement com
mpliance.
13.2 Redress
13.2.1 Maake all nece essary repa airs, alteratiions and or replacements for fre ee of chargge,
freight pre-paid to the Pu urchasers joob site. Thee cost of an
ny field labo
or required to
perrform repairr work will be
b chargeab ble to the ve
endor.
11