Sei sulla pagina 1di 29

PERFORACION Y VOLADURA MANO DE OBRA MATERIALES EXPLOSIVOS

BOLONERIA
ROCA FIJA

166.35
226.85

3.40
4.64

7.31
13.79

IMPLEMENTOS Y
HERRAMIENTAS

EQUIPOS

PU (S./ m3)

4.65
6.46

0.00
0.00

181.72
251.73

CALCULO DE BENEFICIOS SOCIALES


Proyecto: VOLADURA CONTROLADA DE ROCA / M3
DIAS CALENDARIO

365

DIAS NO TRABAJADOS

94

360
30

DIAS EFECTIVOS TRABAJADOS

271

330

BENEFICIOS DEL TRABAJADOR

OBREROS

CONCEPTO

DIAS

EMPLEADOS

PORCENTAJE PORCENTAJE

DESCANSO MEDICO

1.85%

DOMINICAL

48

17.71%

FERIADOS

11

4.06%

VACACIONES

30

11.07%

9.09%

GRATIFICACIONES

60

22.14%

18.18%

CTS

30

11.07%

9.09%

271

13.82%

13.82%

14.67

5.41%

4.45%

469.67

87.13%

54.63%

LEYES SOC. SOBRE BONIF.

3.84%

3.84%

3.84%

ESSALUD

9.00%

9.00%

9.00%

BUC

32.00%

32.00%

32.00%

SCTR PENSION

BONIF MOVI. ACUMUL


FERIADO TRABAJADOS
SUB-TOTAL

13.00%

13.00%

13.00%

SCTR SALUD

1.83%

1.83%

1.83%

AFP

2.00%

2.00%

2.00%

OVEROL

0.01%

0.01%

0.01%

BONIF POR ALTITUD

1.92%

2%

2%

59.76%

59.76%

146.89%

114.39%

SUB-TOTAL
TOTAL DE BENEFICIOS SOCIALES

CALCULO DE LA ASIGNACION FAMILIAR:


Mnimo Vital S/.:
Porcentaje :

650.00
10%

Asignacion Familiar Empleado

Total Mes:

65.00 S/. x mes

Asignacion Familiar Obrero

Total Da :

2.17 S/. x da

MANO DE OBRA
Proyecto: VOLADURA CONTROLADA DE ROCA / M3
CONCEPTO

SOLES
Sueldo

1 Perforista
2 Ayudante Perforista
3 Vigia
4 Compresorista
5 Desatador

S/. 2,500.00
S/. 1,563.00
S/. 6,000.00
S/. 5,000.00
S/. 4,000.00

6 Capataz
7 Chofer
8 Ing. Residente
9 Ing. Seguridad
10 Ing. Asistente

Jornal

S/. 52.10
S/. 44.10
S/. 39.40
S/. 52.10
S/. 39.40
S/. 83.33
S/. 52.10
S/. 200.00
S/. 166.67
S/. 133.33

SOLES
ASIG-FAM

S/. 2.17
S/. 2.17
S/. 2.17
S/. 2.17
S/. 2.17
S/. 2.17
S/. 2.17
S/. 2.17
S/. 2.17
S/. 2.17

11

Por Gda 8 hrs

Por Gda 11 hrs

S/. 54.27
S/. 46.27
S/. 41.57
S/. 54.27
S/. 41.57
S/. 85.50
S/. 54.27
S/. 202.17
S/. 168.84
S/. 135.50

S/. 74.62
S/. 63.62
S/. 57.16
S/. 74.62
S/. 57.16
S/. 117.57
S/. 74.62
S/. 277.98
S/. 232.15
S/. 186.32

Montos vigentes para el ao 2014 de la legislacion laboral; R.M. N 132-2013-TR

Leyes

Total

Sociales

Remuneracion

S/. x HORA
154.59%
153.29%
153.89%
154.59%
153.89%
114.39%
154.59%
114.39%
114.39%
114.39%

S/. 189.98
S/. 161.14
S/. 145.12
S/. 189.98
S/. 145.12
S/. 252.05
S/. 189.98
S/. 595.96
S/. 497.70
S/. 399.44

S/. 17.27
S/. 14.65
S/. 13.19
S/. 17.27
S/. 13.19
S/. 22.91
S/. 17.27
S/. 54.18
S/. 45.25
S/. 36.31

*
*
*

GASTOS GENERALES
Proyecto: VOLADURA CONTROLADA DE ROCA / M3

Obra-Meses
DESCRIPCION

Mensual S/.

Cantid

Meses

GASTOS GENERALES VARIABLES


1.-Remuneraciones y Beneficios
1.1.-Gerente General
1.2.-Ing. Residente
1.3.-Ing. Seguridad
1.4.-Ing. Asistente
1.5.-Capataz
1.6.-Chofer

Total S/.

Total mes

S/. 1,791.77
S/. 8,000.00
S/. 6,000.00
S/. 5,000.00
S/. 4,000.00
S/. 2,500.00
S/. 1,563.00

0.5
1
1
1
1
2

0.033
0.033
0.033
0.033
0.033
0.033

S/. 132.00
S/. 198.00
S/. 165.00
S/. 132.00
S/. 82.50
S/. 103.16
S/. 812.66

S/. 8,000.00
S/. 6,800.00
S/. 3,200.00
S/. 1,500.00
S/. 3,500.00
S/. 1,200.00
S/. 1,500.00
S/. 0.00
S/. 1,000.00
S/. 1,000.00
S/. 270.00
S/. 400.00

1
1
1
1
1
1
1
1
1
1
1
2

0.033
0.033
0.033
0.033
0.033
0.033
0.033
0.033
0.033
0.033
0.033
0.033

S/. 264.00
S/. 224.40
S/. 105.60
S/. 49.50
S/. 115.50
S/. 39.60
S/. 49.50
S/. 0.00
S/. 33.00
S/. 33.00
S/. 8.91
S/. 26.40

SUB TOTAL 1

2.-Movilidad de Personal y Servicios


2.1.-Camioneta
2.2.-Mini van
2.3.-Camion 6 Tn
2.4.-Movilidad y viaticos - Global
2.5.-Transporte de explosivos
2.6.-Custodia Camioneta
2.7.-Custodia Camion
2.8.-Custodia Polvorin
2.9.-Equipos de Seguridad
2.10.-Medidas de Seguridad y Capacit. de Personal
2.11.-Botiquin
2.12.-Extintores

S/. 949.41

SUB TOTAL 2

3.-Seguros y Gastos Financieros e Impuestos


3.1.-Seguro de Personal
3.2.-Seguro Dao a Terceros
3.3.-Sencico

S/. 400.00
S/. 500.00
S/. 0.00

1
1
1

0.033
0.033
0.033

S/. 29.70

SUB TOTAL 3

GASTOS GENERALES FIJOS


1.- Gastos Fijos en General
1.1.-Papeleria, Utiles de Escritorio
1.2.-Ploteo de Planos
1.3.-Muebles y enseres Obra
1.4.-Autorizacin Discamec
1.5.-Polvorin alquiler
1.6.-Capacitacion del personal
1.7.-Materiales preparacin de Chotanas
1.8.-Radios portatiles
1.9.-Pago por derec a explosivos a la DISCAMEC
1.10.-Pago por derecho a verificacion a la SUCAMEC
TOTAL DE GASTOS GENERALES
Duracion del trabajo

S/. 13.20
S/. 16.50
S/. 0.00

S/. 440.92
S/. 500.00
S/. 100.00
S/. 800.00
S/. 2,500.00
S/. 3,000.00
S/. 1,000.00
S/. 200.00
S/. 600.00
S/. 1,610.70
S/. 1,250.60

1
1
1
1
1
1
1
4
1
1

0.033
0.033
0.033
0.033
0.033
0.033
0.033
0.033
0.033
0.033
2.00

S/. 16.50
S/. 3.30
S/. 26.40
S/. 82.50
S/. 99.00
S/. 33.00
S/. 6.60
S/. 79.20
S/. 53.15
S/. 41.27
S/. 2,232.69
meses

66980.727

chotanas para desquinchar

S/. 17,161.30
34322.6
51483.9
68645.2

a descontar por 01 mes adicional de trabajo


a descontar por 02 meses adicionales de trabajo
a descontar por 03 meses adicionales de trabajo
a descontar por 04 meses adicionales de trabajo

HERRAMIENTAS
Proyecto: VOLADURA CONTROLADA DE ROCA / M3
Descripcion
ALAMBRE DE AMARRE N 16
ALAMBRE DE AMARRE N 8
LAMPA TROMANTINA
PICOS C/ MANGO TRAMONTINA
LLAVE FRANCESA
LLAVE STILSON #18
FLEXOMETRO ST 516 M.(10 pies)
CINTA AISLANTE
CINTA VULCANIZANTE
HOJA DE SIERRA
RAFIA
ATACADORES DE 8 PIES
BARRENOS DE 4'
BARRENOS DE 6'
BARRENOS DE 8'
COMBO 6 Lbs
SACA BARRENO
CUCHARILLA
PINTURA ESMALTE SINTETICO
THINER STANDAR
PINTURA EN SPRAY

um
KG
KG
UN
UN
PZ
PZ
UN
RL
RL
PZ
PZ
UN
UN
UN
UN
UN
UN
UN
GL
GL
UN

CantidadxMes
12.00
8.00
4.00
2.00
1.00
1.00
1.00
6.00
6.00
8.00
15.00
3.00
1.00
1.00
1.00
2.00
1.00
2.00
1.00
1.00
1.00

dia
0.400
0.267
0.133
0.067
0.033
0.033
0.033
0.200
0.200
0.267
0.500
0.100
0.033
0.033
0.033
0.067
0.033
0.067
0.033
0.033
0.033

S/und
S/. 4.20
S/. 4.20
S/. 30.00
S/. 28.00
S/. 45.00
S/. 42.00
S/. 65.00
S/. 1.20
S/. 1.60
S/. 3.20
S/. 2.00
S/. 120.00
S/. 560.00
S/. 650.00
S/. 780.00
S/. 18.00
S/. 36.00
S/. 54.00
S/. 30.00
S/. 12.00
S/. 8.00

S/und
S/. 4.20
S/. 4.20
S/. 30.00
S/. 28.00
S/. 45.00
S/. 42.00
S/. 65.00
S/. 1.20
S/. 1.60
S/. 3.20
S/. 2.00
S/. 120.00
S/. 560.00
S/. 650.00
S/. 780.00
S/. 18.00
S/. 36.00
S/. 54.00
S/. 30.00
S/. 12.00
S/. 8.00
S/dia

importe
S/. 50.40
S/. 33.60
S/. 120.00
S/. 56.00
S/. 45.00
S/. 42.00
S/. 65.00
S/. 7.20
S/. 9.60
S/. 25.60
S/. 30.00
S/. 360.00
S/. 560.00
S/. 650.00
S/. 780.00
S/. 36.00
S/. 36.00
S/. 108.00
S/. 30.00
S/. 12.00
S/. 8.00

S/dia
S/. 1.68
S/. 1.12
S/. 4.00
S/. 1.87
S/. 1.50
S/. 1.40
S/. 2.17
S/. 0.24
S/. 0.32
S/. 0.85
S/. 1.00
S/. 12.00
S/. 18.67
S/. 21.67
S/. 26.00
S/. 1.20
S/. 1.20
S/. 3.60
S/. 1.00
S/. 0.40
S/. 0.27
S/. 102.15

IMPLEMENTOS DE SEGURIDAD
Proyecto: VOLADURA CONTROLADA DE ROCA / M3
CONCEPTO
Casco
Mameluco
Botas
Zapatos
Correa de seguridad
Chaleco
Guantes Neoprene
Barbiquejo
Tafilete
Tapones de oido
Lentes
Respirador 3M 7502
Cartuchos de respirador polvo
Filtro de respirador
Arnes de seguridad
Cuerdas de seguridad

CANTIDAD
1
1
1
1
1
1
1
1
1
1
1
1
1
2
6
4

VIDA UTIL
HRS.
1248
832
832
832
832
832
104
416
416
208
208
416
208
52
832
832

Costo total
Ropa de jebe

624

COSTO
S./
S/. 36.22
S/. 105.00
S/. 70.64
S/. 105.20
S/. 16.54
S/. 61.50
S/. 22.00
S/. 2.50
S/. 7.20
S/. 5.98
S/. 6.19
S/. 71.36
S/. 11.39
S/. 1.60
S/. 80.56
S/. 60.50
S/. 664.38
S/hr.
160.5

COSTO

S/ HR.

S/. 0.03
S/. 0.13
S/. 0.08
S/. 0.13
S/. 0.02
S/. 0.07
S/. 0.21
S/. 0.01
S/. 0.02
S/. 0.03
S/. 0.03
S/. 0.17
S/. 0.05
S/. 0.03
S/. 0.10
S/. 0.07

Meses
6
4
4
4
4
4
0.5
2
2
1
1
2
1
0.25
4.00
4.00

1.18
0.25721

Proyecto: VOLADURA CONTROLADA DE ROCA / M3


ANALISIS DE PRECIO UNITARIO - COMPRESORA DIESEL DE 375 CFM
PARTIDA :
INCLUYE :
ITEM

DESCRIPCION

1.00
1.10

MANO DE OBRA
OPERADOR

2.00

COMBUSTIBLE

2.10

Petroleo D2

2.00

MANTENIMIENTO

2.10
2.20

Mantenimiento (50% 3.1)


Llantas

3.00
3.10
3.20
3.30

EQUIPO
Costo adquisicion
Intereses
Seguros

COMPRESORA
Mantenimiento y posecion
Cantidad

Unidad

P.U.(US$)

Parcial

SubTotal

TOTAL(US$)

1.0000

h/h

3.53

3.53

3.53

3.53

10%

4.2800

Gln

5.00

21.40

21.40

21.40

60%

1.0000
0.0005

pza/hr

3.04
540.00

3.04
0.27

3.04
0.27

3.31
9%

1.0000
1.0000
1.0000

h-m
h-m
h-m

6.09
1.41
0.16

6.09
1.41
0.16

COSTO DIRECTO

6.09
1.41
0.16

7.66

21%

$/Hr.
S/hr.

35.91
93.35

100%

ANALISIS DE PRECIO UNITARIO - MOTOPERFORADORA


PARTIDA :
INCLUYE :
ITEM

DESCRIPCION

1.00
1.10

MANO DE OBRA
OPERADOR

2.00

COMBUSTIBLE

2.10

Petroleo D2

2.00

MANTENIMIENTO

2.10
2.20

Mantenimiento (50% 3.1)


Equipo

3.00
3.10
3.20
3.30

EQUIPO
Costo adquisicion
Intereses
Seguros

MOTOPERFORADORA PIONJAR
Mantenimiento y posesion
Cantidad

Unidad

P.U.(US$)

Parcial

SubTotal

TOTAL(US$)

1.0000

h/h

3.53

3.53

3.53

3.53

10%

4.2800

Gln

3.30

14.12

14.12

14.12

39%

1.0000
0.0005

pza/hr

0.00
135.00

0.00
0.07

0.00
0.07

0.07
0%

1.0000
1.0000
1.0000

h-m
h-m
h-m

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00

0%

COSTO DIRECTO

$/Hr.
S/hr.

17.72
46.08

49%

COSTO DE POSESION DE EQUIPOS


EQUIPO:
FECHA DE ACTUALIZACION :

COMPRESORA - IR 375
Nov-14
CANTIDAD DE LLANTAS:
COSTO POR LLANTA:

DESCRIPCION

4.00
135.00

pza
$/pza

UNID
hr/dia
dia/ mes
aos
hrs/ao
hrs

ALT.1
10
26.00
3.00
3120
9360

Precio de adquisicion stock Lima


Menos costo de reemplazo de juego de llantas
Precio de adquisicion stock Lima, sin llantas

$/und
$/und
$/und

60,000
540
59,460

Valor residual en porcentaje


Menos costo residual al reemplazo del equipo

%
$/und

5%
3,000

Valor a ser recuperado atravez del trabajo


Costo horario

$/und
$/hr

57,000
6.09

61%

%
$/hr

11%
1.41

14%

%
$/hr

1.25%
0.16

2%

$/hr

7.66

77%

S/hr

19.92

1.00
1.10
1.20
1.30

ESTIMACION DE VIDA DEL EQUIPO


Periodo de vida estimado del equipo
Utilizacion del equipo estimada
Utilizacion total estimada del equipo

2.00
2.10
2.11
2.12
2.13

COSTO DE POSECION
PRECIO DE ADQUISICION

2.20
2.21
2.22

VALOR RESIDUAL

2.30
2.31
2.32

VALOR A RECUPERAR

2.40
2.41
2.42

COSTO DEL INTERES


Tasa de interes (Costo de oportunidad)
Intereses segn formula:

N+1 x i x Valor Adquisicion


2N
Horas Estimadas Vida

2.50
2.51
2.52

COSTO DEL SEGURO


Tasa de seguro
Seguro segn formula:
N+1 x i x Valor Adquisicion
2N
Horas Estimadas Vida

TOTAL COSTO DE POSECION

Proyecto: VOLADURA CONTROLADA DE ROCA / M3

PERFORACION
CODIGOS

DESCRIPCION

Und.

09-128-010
09-122-025

Barra perforacion MF 14'


Barra perforacion MF 12'
Barra perforacion MF 10'
Brocas de 38 mm
Brocas de 45 mm
Shank Adapter
Coopling
Rimadora de 2 1/2"
Rimadora de 89 mm
Rimadora de 4Pulg. O 102 mm
Adapter piloto
Copas de Afilado
Aguzadora de copas
Afiladora de barrenos
Barrenos integrales 10
Barrenos integrales 8
Barrenos integrales 6
Barrenos integrales 4
Barra conica 3
Barra conica 4
Barra conica 6
Barra conica 8
Broca de 36 mm
Broca de 38 mm
Broca de 41 mm
Mangas de Ventilacion 24"
Cncamos
Manguera de 2" ( 100 m)
Manguera de 1" (300 m)
Manguera de 1/2" ( 300 m)
Manguera de 1" ( 50 m)
Manguera de 1/2" ( 50 m)
Maq. Perforadora Jackleg
Maq. Perforadora Stopper
Aceite para perforacion Torculla

pie
pie
pie
pie
pie
pie
pie
pie
pie
pie
pie
pie
pie
pie
pie
pie
pie
pie
pie
pie
pie
pie
pie
pie
pie
ml
Und.
ml
ml
ml
pp
pp
Pp
Pp
pp

09-324/325
09-324/325
09-120/121
09-120
09-.004/324
09-004/324
09-324/325
09-323

09-080-120
09-080-100
09-080-080

23-541-080
02-074
01-408-033
01-408-020
01-408-010
01-408-020
01-408-010

Estndar
pie / und
1,000.00
6,000.00

Costo
S/.
S/. 1,095.74
S/. 1,002.46

C. Unit
S/Pp
1.096
0.167

1,500.00
S/. 218.30
0.146
800.00
S/. 284.65
0.356
10,000.00
S/. 349.62
0.035
10,000.00
S/. 253.08
0.025
1,500.00
S/. 315.09
0.210
1,500.00
S/. 519.21
0.346
1,500.00 S/. 1,361.36
0.908
1,500.00
S/. 523.24
0.349
10,000.00
S/. 442.44
0.044
400,000 S/. 4,826.64
0.012
400,000 S/. 2,860.00
0.007
700.00
S/. 229.40
0.328
700.00
S/. 202.80
0.290
700.00
S/. 349.62
0.499
700.00
S/. 315.59
0.451
800.00
S/. 152.70
0.191
800.00
S/. 249.90
0.312
800.00
S/. 318.22
0.398
800.00
S/. 297.02
0.371
500.00
S/. 65.00
0.130
500.00
S/. 76.64
0.153
500.00
S/. 159.39
0.319
1.00
S/. 6.27
6.266
1.00
S/. 12.00
12.000
600.00
S/. 600.00
1.000
300.00
S/. 300.00
1.000
160.00
S/. 160.00
1.000
361.00
S/. 361.40
1.001
50.00
S/. 193.70
3.874
1.00 S/. 24,960.00 24960.000
1.00 S/. 24,960.00 24960.000
1.00
S/. 165.00
165.000

Real

4,500
1,800
6,500

Proyecto: VOLADURA CONTROLADA DE ROCA / M3

EXPLOSIVOS
CODIGOS
EXADIT

DESCRIPCION

Und.

Explosivos
kg/caja
25

cart/caja
328

kg/cart
0.08

S/caja
99.23

S/kg
0.30

04009078
04009100
04009080

DINAMITA EXADIT 45 %, 7/8" X 7"


DINAMITA EXADIT 60 %, 1 1/2" X 8"
DINAMITA EXADIT 65 %, 7/8" X 7"

Cj
Cj
Cj

25
25
25

328
100
320

0.08
0.25
0.08

285.23
290.23
321.45

0.87
2.90
1.00

SEMEXSA
04009020
04009055
04009070
04009063
04009064
04009058
04009060
04009062

DINAMITA SEMEXSA, 45 %, 7/8" X 7"


DINAMITA SEMEXSA, 65 %, 7/8" X 7"
DINAMITA SEMEXSA 80%, 1 1/8" X 8"
DINAMITA SEMEXSA, 65%, 1 1/4" X 8"
DINAMITA SEMEXSA, 65%, 1 1/4" X 12"
DINAMITA SEMEXSA, 65 %, 1 1/2" X 8"
DINAMITA SEMEXSA, 65 %, 1 1/2" X 12"
DINAMITA SEMEXSA, 65 %, 1 1/2" X 16"

Cj
Cj
Cj
Cj
Cj
Cj
Cj
Cj

25
25
25
25
25
25
25
25

316
312
164
136
94
96
68
50

0.08
0.08
0.15
0.18
0.27
0.26
0.37
0.50

270.00
283.00
299.56
325.12
340.20
360.25
385.60
409.50

0.85
11.32
11.98
13.00
13.61
14.41
15.42
16.38

DINAMITA GELATINA 75%, 7/8" X 7"

Cj
Cj
Cj

25
25
25

284
144
56

0.09
0.17
0.45

275.65
290.45
330.15

11.03

DINAMITA GELATINA 75%, 1 1/8" X 8"


DINAMITA GELATINA 75%, 1 1/2" X 12"

11.62
13.21

Cj
Cj
Cj
Cj
Cj
Cj

25
25
25
25
25
25

88
78
96
62
260
330

0.28
0.32
0.26
0.40
0.10
0.08

150.63
160.30
165.23
195.63
205.30

6.03
6.41
6.61
7.83
8.21

kgr
und
und
und
und
mt
mt
und
Pza
mt

5
100
200
150

2.80
70.75
728.00
657.72

1000
1500
300
500
1500

566.00
1,680.00
470.40
350.00
1,008.00

2.8
0.71
3.64
4.38
0.20
0.57
1.12
1.57
0.70
0.67

GELATINA
04008020
04008050
04008055

EMULSION
04007100 EMULSION EXAGEL 65%, 1 1/2" X 8"
04007098 EMULSION EXAGEL E 65 %, 1 1/8" X 16"
04007105 EMULSION SEMEXSA E 65 %, 1 1/2" X 8"
Emulnor 5000 1 1/2" x 12
Emulnor 3000 1x7
Detonita 3000 1x7
04-001/002 ANFO
04-080-040 Fulminante corriente No 8
04Fanel 2.80 m
Fanel 4.20 m
04-004-060 Conectores 45 mm
04-140-050 Guia de seguridad
04-005-050 Mecha rapida
Carmex 2.10 m.
Fulmelec (Fulminante electrico)
04-006
Cordon detonante

Proyecto: VOLADURA CONTROLADA DE ROCA / M3


BASE DE DATOS
Factor De Esponjamiento
30%
MANO DE OBRA
OBREROS
Perforista
Ayudante Perforista
Vigia
Compresorista
Desatador
EMPLEADOS
Capataz
Chofer
Ing. Residente
Ing. Seguridad
Ing. Asistente

17.27
14.65
13.19
17.27
13.19

S/HH
S/HH
S/HH
S/HH
S/HH

22.91339
17.27053
54.17799
45.24525
36.3125

S/HH
S/HH
S/HH
S/HH
S/HH

IMPLEMENTOS DE SEGURIDAD Y HERRAMIENTAS


Herramientas
12.77 S/hh
Implementos de Seguridad
1.18 S/hh
Ropa de Agua
0.26 S/hh
MATERIALES
Barrenos integrales 4
Barrenos integrales 6
Barrenos integrales 8
Barrenos integrales 10
Barra conica 3
Barreno de 3'
Barreno de 6'
Barreno de 8'
Broca de 36 mm
Broca de 38 mm
Broca de 41 mm
Manguera 1" (50m)
Manguera 1/2" (50m)
Mangas de Ventilacion 24"
Cancamos
Aceite de perforacin
Afiladora de barrenos
Brocas de 45 mm
Brocas de 51 mm
Barras de perforacion 12'
Shank Adapter
Coopling
Aguzadora de copas
Copas de Afilado
Manguera de 1" ( 300 m)
Manguera de 1/2" ( 100 m)
Rimadora de 89 mm
Adapter piloto
EQUIPOS
Motoperforadora Pionjar
Perforadora Jackleg
Aceite para perforacion Torculla
Perforadora Stopper

0.45
0.50
0.29
0.33
0.19
0.31
0.40
0.37
0.13
0.15
0.32
1.001
3.874
6.266
12.000
70.00
0.007
0.36
0.15
0.17
0.03
0.03
0.01
0.04
1.00
3.87
0.35
0.35

S/pp
S/pp
S/pp
S/pp
S/pp
S/pp
S/pp
S/pp
S/pp
S/pp
S/pp
S/pp
S/pp
m
und
gal
pp
und
und
und
und
und
und
jgo
ml
ml
und
und

46.08
24960
165.00
24960

S/H-m
S/Pp
S/pp
S/Pp

Compresora Diesel de 375 CFM

93.35 S/H-m

Proyecto: VOLADURA CONTROLADA DE ROCA / M3

ANALISIS DE PRECIOS UNITARIOS


PARTIDA :

Desatado

ELABORADO POR :

Ing.

OBRA

Carretera Sihuas

Rendimiento :

20.00

m3

Horas por guardia :

8.00

Hr / guardia

Total US$

INCLUYE:
FECHA DE ELABORACION :

DESCRIPCION

ITEM

1.0

2012

Cantidad

Unidad

P.U.(S./)

Parcial

SubTotal

2.0

h/h

13.19

26.39

10.55

MANO DE OBRA
Desatador

10.55
2.0

3.0

EPP y HERRAMIENTAS
Implementos de Seguridad

1.0

h-h

1.18

1.18

0.47

Ropa de Agua

0.0

h-h

0.26

0.00

0.00

Herramientas

1.0

Gh

12.77

12.77

5.11

5.58

0.0

h-h

1.00

0.00

0.00

0.00

EQUIPOS
Cargador de lmparas

COSTO DIRECTO

16.13

Proyecto: VOLADURA CONTROLADA DE ROCA / M3

ANALISIS DE PRECIOS UNITARIOS BOLONERIAS


PARTIDA :

BOLONERIA

CANTIDAD DE BOLONERIA

UNIDAD DE MEDIDA :

M3

Pie / taladro

Longitud efectiva :

2.00

Pie / taladro

ELABORADO POR :

Ing.

Longitud efectiva :

0.61

mt / taladro

OBRA

Carretera Sihuas

Velocidad de perforacion:

18.29

mt / hr

FECHA DE ELABORACION :

Nov-14

Factor de potencia:

1.20

kg/m3

MANO DE OBRA
Perforista
Ayudante perforista
Vigia
Desatador
Perforista

pies/unid

Tiempos muertos en perforacion:

Tiempos muertos en perforacion:

0.0333

min/taladro
hr/taladro

Cantidad

Und

P.U.(US$)

Parcial

SubTotal

TOTAL(S./)

1.00
1.00
0.00
1.00
1.00

h/h
h/h
h/h
h/h
h/h

17.27
14.65
13.19
13.19
17.27

17.27
14.65
0.00
13.19
17.27

46.05
39.07
0.00
35.18
46.05

166.35

1.00
0.00
0.00
3.00
1.00
0.00
0.00

und
und
und
und
und
m
m

0.31
0.40
0.37
0.32
0.01
1.00
3.87

0.31
0.00
0.00
0.96
0.01
0.00
0.00

0.83
0.00
0.00
2.55
0.02
0.00
0.00

3.40

Cordon detonante

1.12
0.25
0.20
3.00
10.00

kg
kg
und
mt
mt

11.32
2.80
0.71
0.57
0.67

12.68
0.70
0.14
1.70
6.72

4.23
0.23
0.05
0.57
2.24

7.31

IMPLEMENTOS Y HERRAMIENTAS
Implementos de Seguridad
Ropa de Agua
Herramientas

1.00
0.00
1.00

s/h
s/h
Gdia

1.18
0.26
12.77

1.18
0.00
12.77

0.39
0.00
4.26

4.65

1.00
0.00
0.00
0.00

h-m
h-m
gl
h-m

46.08
93.35
165.00
36.71

46.08
0.00
0.00
0.00

15.36
0.00
0.00
0.00

0.00

MATERIALES
Barreno de 3'
Barreno de 6'
Barreno de 8'
Broca de 41 mm
Afiladora de barrenos
Manguera de 1" ( 300 m)
Manguera 1/2" (50m)
EXPLOSIVOS
DINAMITA SEMEXSA, 65 %, 7/8" X 7"
ANFO
Fulminante corriente No 8
Guia de seguridad

3.00

tal / frente

VOLUMEN PROMEDIO DE CADA BOLONE


1.00

1.00

2.30

m3 / disparo

3.00

DESCRIPCION

2.20

No taladros perforados :

3.00

Longitud del taladro :

ITEM

2.10

Rendimiento :

EQUIPOS
Motoperforadora Pionjar
Compresora Diesel de 375 CFM
Aceite para perforacion Torculla
Perforadora Jackleg
OTROS

COSTO DIRECTO

181.72

0.0801
1.121794872

0.166666667
4.00

gl

Proyecto: VOLADURA CONTROLADA DE ROCA / M3

ANALISIS DE PRECIOS UNITARIOS ROCA FIJA


PARTIDA :

ROCA FIJA

BURDEN(m)

0.50

No taladros perforados :

ESPACIAMIENTO(m)

0.65

Longitud del taladro :

3.00

UNIDAD DE MEDIDA :

M3

Longitud efectiva :

2.00

ELABORADO POR :

Ing.

Longitud efectiva :

0.61

OBRA

Carretera Sihuas

Velocidad de perforacion:

18.29

FECHA DE ELABORACION :

Nov-14

Factor de potencia:

2.80

ITEM

DESCRIPCION

1.00

MANO DE OBRA
Perforista
Ayudante perforista
Vigia
Desatador
Perforista

2.10

Cordon detonante
2.30

3.00

IMPLEMENTOS Y HERRAMIENTAS
Implementos de Seguridad
Ropa de Agua
Herramientas
EQUIPOS
Motoperforadora Pionjar
Compresora Diesel de 375 CFM
Aceite para perforacion Torculla
Perforadora Jackleg

COSTO DIRECTO

Tiempos muertos en perforacion:

0.0500

Cantidad

Unidad

P.U.(US$)

Parcial

SubTotal

1.00
1.00
0.00
1.00
1.00

h/h
h/h
h/h
h/h
h/h

17.27
14.65
13.19
13.19
17.27

17.27
14.65
0.00
13.19
17.27

62.80
53.27
0.00
47.97
62.80

1.00
0.00
0.00
3.00
1.00
0.00
0.00

pp
pp
pp
pp
pp
pp
pp

0.31
0.40
0.37
0.32
0.01
1.00
3.87

0.31
0.00
0.00
0.96
0.01
0.00
0.00

1.14
0.00
0.00
3.48
0.03
0.00
0.00

1.80
0.50
0.20
3.00
10.00

kg
kg
und
mt
mt

11.32
2.80
0.71
0.57
0.67

20.38
1.40
0.14
1.70
6.72

9.26
0.64
0.06
0.77
3.05

1.0
1.0
1.0

s/h
s/h
Gdia

1.18
0.26
12.77

1.18
0.26
12.77

0.54
0.12
5.80

1.0000
0.0000
0.00
0.00

h-m
h-m
gl
h-m

46.08
93.35
165.00
36.71

46.08
0.00
0.00
0.00

20.94
0.00
0.00
0.00

EXPLOSIVOS
DINAMITA SEMEXSA, 65 %, 7/8" X 7"
ANFO
Fulminante corriente No 8
Guia de seguridad

2.20

Tiempos muertos en perforacion:

MATERIALES
Barreno de 3'
Barreno de 6'
Barreno de 8'
Broca de 41 mm
Afiladora de barrenos
Manguera de 1" ( 300 m)
Manguera 1/2" (50m)

2.20

pies/unid

Rendimiento :

m3 / disparo
tal / frente

15 minutos por taladro

Pie / taladro

0.25 5 horas de trabajo

Pie / taladro

1.25

mt / taladro
mt / hr
kg/m3
min/taladro
hr/taladro

TOTAL(S./)

226.85

4.64

13.79

6.46

6.00
0.00

251.73

gal

Proyecto: VOLADURA CONTROLADA DE ROCA / M3


ROCA FIJA (m3)
DESCRIPCION
Roca dura
0+000 - 0+600
0+000 - 0+600
0+600 - 1+700
0+600 - 1+700
Total

LARGO

ANCHO

ALTO

TOTAL
3

2
2
2
2

2
2
2
2

3.5
3.5
3.5
3.5

14
14
14
14
56

2
1.8

Roca dura fisurada


BOLONERIA (m3)
Descripcion
boloneria sobre plataforma de canal
boloneria en caja de canal
boloneria en bermas de canal

Seccion tipica de roca a volar

LARGO

ANCHO
2
2
2
2

ALTO
2
2
2.0
2.0

INCID
3.5
3.5
3.5
3.5

TOTAL
1
1
1
1

14 1
14
14
14
56

T otal

40"
0.4

0.6

1.2
1.3

Desatado de roca fracturada

3.5

0.5

Secion tipica de canal


en boloneria

TRAMO

TIPO DE ROCA A VOLAR

0+000 - 0+600 Roca fija


0+600 - 1+700 Roca fija
boloneria sobre plataforma de canal
boloneria en caja de canal
boloneria en bermas de canal
Boloneria Masiva

VOLUMEN
VOLUMEN
GEOLOGIA DEL
% de Roca En
(m3) CORTE
(m3) CORTE PU (S./ m3)
TERRENO
el corte
TOTAL
ROCA

TOTAL (S./)

Roca Cuarcita

56.00

100.00%

56.00

251.73

14,097.07

Roca Cuarcita
Roca Cuarcita
Roca Cuarcita
Roca Cuarcita

14.00
14.00
14.00
0.00

100.00%
100.00%
100.00%
60.00%

14.00
14.00
14.00
0.00

181.72
181.72
181.72
181.72

2,544.07
2,544.07
2,544.07
0.00
21,729.28

Roca Fija
Boloneria

56.00
42.00

m3
m3

Talud que necesita desate

7.00

m3

Proyecto: VOLADURA CONTROLADA DE ROCA / M3


PRESUPUESTO
Presupuesto:
Tramo:
Cliente:
BLUE
Lugar:
ANCASH-SIHUAS - HUAYLLABAMBA
Item
Descripcion

Costo al:
Und.

Metrado Precio S/.

MOVIMIENTO DE TIERRAS
ROCA FIJA ALTERADA (PERFORACION Y VOLADURA)
BOLONERIA (PERFORACION Y VOLADURA)
DESATADO Y PEINADO DE TALUDES

Parcial S/.
S/. 21,842.22

m3
m3
m3

Costo Directo
Gastos Generales
Utilidad

534.74%
10.00%

Sub Total
IGV (18%)

18.00%

Presupuesto total

11/1/2014

56.00
42.00
7.00

251.73
181.72
16.13

S/. 14,097.07
S/. 7,632.22
S/. 112.93
S/. 21,842.22
S/. 116,800.15
S/. 2,184.22
S/. 140,826.60
S/. 25,348.79
S/. 166,175.38

Potrebbero piacerti anche