Sei sulla pagina 1di 1

12

11

10

25

14

INT 516

4 X 123.5 = 494

25

123.5

25

525

12

514

INT 413

500

11

7/16"

4 X 115.8 = 463

INT 429

115.8

3/16

F
25

F
412

INT 443

114

545

VISTA SUPERIOR
PE-DUC-01-003

13

VISTA FRONTAL
POS: 13

VISTA FRONTAL
POS: 12

ESC:1:7.5

ESC: 1 : 7.5

ESC: 1 : 7.5

ISOMETR A
PESO = 43,91 kg
CANT : 1
E

25

5 X 115.8 = 579

25

115.8
3/16

25

440

516

123.5

3/16"

7/16"

57

500

DETALLE A

DETALLE B

TIPICO PARA BRIDAS

TIPICO PARA LAMINAS

545

11

443

4 X 123.5 = 494

10

25

77

3/16"

528

402

545

630

SECCION A-A
VISTA FRONTAL
POS: 14

ESC:1:7.5

TOTAL
5%
SUB TOTAL

ESC: 1 : 7.5
14
13
12
11
10
POS

1
1
2
1
1
CANT

LAMINA 1/4" ASTM A-36


LAMINA 1/4" ASTM A-36
LAMINA 3/16" ASTM A-36
500
525
LAMINA 3/16" ASTM A-36
429
500
LAMINA 3/16" ASTM A-36
429
513
DESCRIPCION
ANCHO
LARGO
LISTA DE MATERIALES PE-DUC-01-003

5,4
4,8
8,8
8,0
8,2
PESO U/kg

46.11 kg
2.20 kg
43,912 kg
5,4
4,8
17,5
8,0
B
8,2
PESO T/kg

PROYECTO:

BATCH HOUSE UPGRADE


CONTIENE:

DUCTO PE-DUC-01-001

NOTAS:
CODIFICACION No:

1. TODAS LAS MEDIDAS EN mm A MENOS QUE SE INDIQUE OTRA UNIDAD.


2. TORNILLERIA = ASTM A-36
3. SOLDADURA: E 7018
4. VER UBICACI N Y MONTAJE EN PLANO: PE-ELE-01-001

MATERIAL:

PROYECT :

FIRMA APROBADO :

REVIS :
FECHA:

12

11

10

C. GAVILAN

J. ARIAS

CLIENTE:
DIMENSIONES:

01/09/2016

ISO

01/09/2016

A2

HOJA:

milimetros

3 DE 3

REVISION:

PLANO No. :

Peldar

CANTIDAD:

VER LISTA DE MATERIALES

CONTRATISTA:

Potrebbero piacerti anche