SMITHSONIAN INSTITUTION
OFFICE OF PLANNING,, DESIGN AND CONSTRUCTION
Title:
Facility:
Project #
Based on
Date:
PRIME CONTRACTOR
DESCRIPTION
MATERIAL
%
Sales Tax-Material *
%
0
0%
Overhead *
SUBTOTAL
Profit *
0%
0
0%
SUBTOTAL
TOTAL
0
0
0%
Contingency *
TOTAL
%
0
0%
0
0
0%
0%
0
0
0
0%
0
0
0%
SUBTOTAL
Performance Bond *
0%
0%
0
$0
SUBTOTAL
Escalation *
TOTAL CONSTRUCTION COST
0
0%
TOTAL
0
0
0%
TOTAL
0
0%
0%
0
Sheet: 1of 27
TOTAL
EQUIPMENT
LABOR
MATERIAL
0
0
0
0%
TOTAL
0
0%
SUBTOTAL
EQUIPMENT
Labor Burden *
_____% Design
SUBCONTRACTOR
LABOR
TOTAL
DIRECT COSTS
Estimated By:
Based On
Estimated By:
Date:
PRIME CONTRACTOR
ITEM DESCRIPTION
_____% Design
Sheet: 2 of 27
SUBCONTRACTOR
MATERIAL
LABOR
EQUIPMENT
MATERIAL
LABOR
EQUIPMENT
TOTAL
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
COST
DIVISION 0
Procurement & Contracting Reqmts
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
DIVISION 1
General Requirements
DIVISION 2
Existing Conditions
DIVISION 3
Concrete
DIVISION 4
Masonry
DIVISION 5
Metals
DIVISION 6
Wood, Plastics and Composites
DIVISION 7
Thermal & Moisture Protection
DIVISION 8
Openings
DIVISION 9
Finishes
DIVISION 10
Specialties
DIVISION 11
Equipment
DIVISION 12
Furnishings
DIVISION 13
Special Construction
DIVISION 14
Conveying Systems
DIVISION 21
Fire Suppression
DIVISION 22
Plumbing
DIVISION 23
HVAC
DIVISION 25
Integrated Automation
DIVISION 26
Electrical
DIVISION 27
Communications
DIVISION 28
Electronic Safety & Security
DIVISION 31
Earthwork
DIVISION 32
Exterior Improvements
DIVISION 33
Utilities
SUBTOTALS COSTS
0.00
Location:
Project #:
QUANTITY
Unit
MATERIAL
Unit
LABOR
Total
Unit
MH
0.00
0.00
ITHSONIAN INSTITUTION
Based on
Estimated By:
_____% Design
Date:
Sheet: 3 of 27
SUBCONTRACTOR
EQUIPT
LABOR
Total
Total
MATERIAL
Unit
EQUIPT
LABOR
Total
Unit
MH
Total
Total
TOTAL
COST
Unit
Total
0.00
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
###
0.00
0.00
0.00
0.00
0.00
Location:
Estimated By:
Project #:
Date:
PRIME CONTRACTOR
SUBCONTRACTOR
ITEM
DESCRIPTION
QUANTITY
Unit
MATERIAL
Unit
Total
EQUIPT
LABOR
Unit
MH
Total
Total
MATERIAL
Unit
Total
EQUIPT
LABOR
Unit
MH
Total
Total
Div.1-Gen. Req.
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Based on
_____% Design
Sheet: 4 of 27
TOTAL
COST
Unit
Total
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
###
0.00
Location:
Estimated By:
Project #:
Date:
PRIME CONTRACTOR
SUBCONTRACTOR
ITEM
DESCRIPTION
QUANTITY
Unit
MATERIAL
Unit
Total
EQUIPT
LABOR
Unit
MH
Total
Total
MATERIAL
Unit
Total
Div.2-Exist. Cond.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
E WORKSHEET
ON
CONSTRUCTION
Based on
e in estimator's name
_____% Design
Sheet: 5 of 27
SUBCONTRACTOR
TOTAL
EQUIPT
LABOR
Unit
MH
0.00
Total
Total
COST
Unit
Total
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
###
0.00
Location:
Estimated By:
Project #:
Date:
PRIME CONTRACTOR
SUBCONTRACTOR
ITEM
DESCRIPTION
QUANTITY
Unit
MATERIAL
Unit
Total
EQUIPT
LABOR
Unit
MH
Total
Total
MATERIAL
Unit
Total
Div.3-Concrete
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
E WORKSHEET
ON
D CONSTRUCTION
Based on
e in estimator's name
_____% Design
Sheet: 6 of 27
SUBCONTRACTOR
TOTAL
EQUIPT
LABOR
Unit
MH
0.00
Total
Total
COST
Unit
Total
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
Location:
Estimated By:
Project #:
Date:
PRIME CONTRACTOR
SUBCONTRACTOR
ITEM
DESCRIPTION
QUANTITY
Unit
MATERIAL
Unit
Total
EQUIPT
LABOR
Unit
MH
Total
Total
MATERIAL
Unit
Total
Div.4-Masonry
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
LABOR
Unit
KSHEET
RUCTION
Based on
_____% Design
estimate was prepared
Sheet: 7 of 27
SUBCONTRACTOR
EQUIPT
LABOR
TOTAL
COST
MH
0.00
Total
Total
Unit
Total
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
###
0.00
Location:
Estimated By:
Project #:
Date:
PRIME CONTRACTOR
SUBCONTRACTOR
ITEM
DESCRIPTION
QUANTITY
Unit
MATERIAL
Unit
Total
EQUIPT
LABOR
Unit
MH
Total
Total
MATERIAL
Unit
Total
Div.5-Metals
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
E WORKSHEET
ON
CONSTRUCTION
Based on
e in estimator's name
_____% Design
Sheet: 8 of 27
SUBCONTRACTOR
TOTAL
EQUIPT
LABOR
Unit
MH
0.00
Total
Total
COST
Unit
Total
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
###
0.00
Location:
Estimated By:
Type in estimator's na
Project #:
Date:
PRIME CONTRACTOR
SUBCON
ITEM
DESCRIPTION
QUANTITY
Unit
MATERIAL
Unit
Total
EQUIPT
LABOR
Unit
MH
Total
Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL
0.00
0.00
0.00
0.00
0.00
MATERIAL
Unit
TE WORKSHEET
TION
ND CONSTRUCTION
Based on
Type in estimator's name
_____% Design
Sheet: 9 of 27
SUBCONTRACTOR
TOTAL
MATERIAL
Total
EQUIPT
LABOR
Unit
MH
Total
Total
COST
Unit
Total
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
###
0.00
0.00
0.00
0.00
Location:
Estimated By:
Project #:
Date:
PRIME CONTRACTOR
SUBCONTRACTO
ITEM
DESCRIPTION
QUANTITY
Unit
MATERIAL
Unit
Total
EQUIPT
LABOR
Unit
MH
Total
Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL
0.00
0.00
0.00
0.00
0.00
MATERIAL
Unit
MATE WORKSHEET
ITUTION
AND CONSTRUCTION
Based on
Type in estimator's name
_____% Design
Sheet: 10 of 27
SUBCONTRACTOR
TOTAL
MATERIAL
Total
EQUIPT
LABOR
Unit
MH
Total
Total
COST
Unit
Total
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
###
0.00
0.00
0.00
0.00
Location:
Estimated By:
Project #:
Date:
PRIME CONTRACTOR
SUBCONTRACTOR
ITEM
DESCRIPTION
QUANTITY
Unit
MATERIAL
Unit
Total
EQUIPT
LABOR
Unit
MH
Total
Total
MATERIAL
Unit
Total
Div.8-Openings
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
WORKSHEET
CONSTRUCTION
Based on
e in estimator's name
_____% Design
Sheet: 11 of 27
SUBCONTRACTOR
TOTAL
EQUIPT
LABOR
Unit
MH
0.00
Total
Total
COST
Unit
Total
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
###
0.00
Location:
Estimated By:
Project #:
Date:
PRIME CONTRACTOR
SUBCONTRACTOR
ITEM
DESCRIPTION
QUANTITY
Unit
MATERIAL
Unit
Total
EQUIPT
LABOR
Unit
MH
Total
Total
MATERIAL
Unit
Total
Div.9-Finishes
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
E WORKSHEET
ON
CONSTRUCTION
Based on
e in estimator's name
_____% Design
Sheet: 12 of 27
SUBCONTRACTOR
TOTAL
EQUIPT
LABOR
Unit
MH
0.00
Total
Total
COST
Unit
Total
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
###
0.00
Location:
Estimated By:
Project #:
Date:
PRIME CONTRACTOR
SUBCONTRACTOR
ITEM
DESCRIPTION
QUANTITY
Unit
MATERIAL
Unit
Total
EQUIPT
LABOR
Unit
MH
Total
Total
MATERIAL
Unit
Total
Div.10-Specialties
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
E WORKSHEET
ON
CONSTRUCTION
Based on
e in estimator's name
_____% Design
Sheet: 13 of 27
SUBCONTRACTOR
TOTAL
EQUIPT
LABOR
Unit
MH
0.00
Total
Total
COST
Unit
Total
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
###
0.00
Location:
Estimated By:
Project #:
Date:
PRIME CONTRACTOR
SUBCONTRACTOR
ITEM
DESCRIPTION
QUANTITY
Unit
MATERIAL
Unit
Total
EQUIPT
LABOR
Unit
MH
Total
Total
MATERIAL
Unit
Total
Div.11-Equipment
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
E WORKSHEET
ON
CONSTRUCTION
Based on
e in estimator's name
_____% Design
Sheet: 14 of 27
SUBCONTRACTOR
TOTAL
EQUIPT
LABOR
Unit
MH
0.00
Total
Total
COST
Unit
Total
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
###
0.00
Location:
Estimated By:
Project #:
Date:
PRIME CONTRACTOR
SUBCONTRACTOR
ITEM
DESCRIPTION
QUANTITY
Unit
MATERIAL
Unit
Total
EQUIPT
LABOR
Unit
MH
Total
Total
MATERIAL
Unit
Total
Div.12-Furnishings
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
E WORKSHEET
ON
CONSTRUCTION
Based on
e in estimator's name
_____% Design
Sheet: 15 of 27
SUBCONTRACTOR
TOTAL
EQUIPT
LABOR
Unit
MH
0.00
Total
Total
COST
Unit
Total
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
###
0.00
Location:
Estimated By:
Project #:
Date:
PRIME CONTRACTOR
SUBCONTRACT
ITEM
DESCRIPTION
QUANTITY
Unit
MATERIAL
Unit
Total
EQUIPT
LABOR
Unit
MH
Total
Total
Div.13-Special Construction
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL
0.00
0.00
0.00
0.00
0.00
MATERIAL
Unit
MATE WORKSHEET
ITUTION
N AND CONSTRUCTION
Based on
Type in estimator's name
_____% Design
Sheet: 16 of 27
SUBCONTRACTOR
TOTAL
MATERIAL
Total
EQUIPT
LABOR
Unit
MH
Total
Total
COST
Unit
Total
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
###
0.00
0.00
0.00
0.00
Location:
Estimated By:
Project #:
Date:
PRIME CONTRACTOR
SUBCONTRACTO
ITEM
DESCRIPTION
QUANTITY
Unit
MATERIAL
Unit
Total
EQUIPT
LABOR
Unit
MH
Total
Total
Div.14-Conveying Systems
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL
0.00
0.00
0.00
0.00
0.00
MATERIAL
Unit
MATE WORKSHEET
TITUTION
N AND CONSTRUCTION
Based on
Type in estimator's name
_____% Design
Sheet: 17 of 27
SUBCONTRACTOR
TOTAL
MATERIAL
Total
EQUIPT
LABOR
Unit
MH
Total
Total
COST
Unit
Total
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
###
0.00
0.00
0.00
0.00
Location:
Estimated By:
Project #:
Date:
PRIME CONTRACTOR
SUBCONTRACTOR
ITEM
DESCRIPTION
QUANTITY
Unit
MATERIAL
Unit
Total
EQUIPT
LABOR
Unit
MH
Total
Total
MATERIAL
Unit
Total
Div.21-Fire Suppression
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
WORKSHEET
NSTRUCTION
Based on
e in estimator's name
_____% Design
Sheet: 18 of 27
SUBCONTRACTOR
TOTAL
EQUIPT
LABOR
Unit
MH
0.00
Total
Total
COST
Unit
Total
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00 #DIV/0!
0.00
0.00
0.00
###
0.00
Location:
Estimated By:
Project #:
Date:
PRIME CONTRACTOR
SUBCONTRACTOR
ITEM
DESCRIPTION
QUANTITY
Unit
MATERIAL
Unit
Total
EQUIPT
LABOR
Unit
MH
Total
Total
MATERIAL
Unit
Total
Div.22-Plumbing
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
E WORKSHEET
ON
CONSTRUCTION
Based on
e in estimator's name
_____% Design
Sheet: 19 of 27
SUBCONTRACTOR
TOTAL
EQUIPT
LABOR
Unit
MH
0.00
Total
Total
COST
Unit
Total
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
###
0.00
Location:
Estimated By:
Project #:
Date:
PRIME CONTRACTOR
ITEM
DESCRIPTION
QUANTITY
Unit
MATERIAL
Unit
EQUIPT
LABOR
Total
Unit
MH
Total
Total
Div.23-HVAC
0
SUBTOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
T ESTIMATE WORKSHEET
AN INSTITUTION
DESIGN AND CONSTRUCTION
Based on
Type in estimator's name
_____% Design
Sheet: 20 of 27
SUBCONTRACTOR
TOTAL
MATERIAL
Unit
EQUIPT
LABOR
Total
Unit
MH
Total
Total
COST
Unit
Total
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
Location:
Estimated By:
Project #:
Date:
PRIME CONTRACTOR
ITEM
DESCRIPTION
QUANTITY
Unit
MATERIAL
Unit
LABOR
Total
Unit
MH
Total
Div.25-Integrated Automation
0
SUBTOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
THSONIAN INSTITUTION
Based on
Estimated By:
_____% Design
Sheet: 21 of 27
SUBCONTRACTOR
TOTAL
EQUIPT
Total
0.00
MATERIAL
Unit
EQUIPT
LABOR
Total
Unit
MH
Total
Total
COST
Unit
Total
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
Location:
Estimated By:
Project #:
Date:
PRIME CONTRACTOR
ITEM
DESCRIPTION
QUANTITY
Unit
MATERIAL
Unit
LABOR
Total
Unit
MH
Total
Div.26-Electrical
0.00
SUBTOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
MITHSONIAN INSTITUTION
Based on
Estimated By:
_____% Design
Sheet: 22 of 27
SUBCONTRACTOR
TOTAL
EQUIPT
Total
0.00
MATERIAL
Unit
EQUIPT
LABOR
Total
Unit
MH
Total
Total
COST
Unit
Total
0.00
0.00
5.05
0.10
0.00
0.00
#DIV/0!
0.00
0.00
0.00
6.20
0.12
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.22
Location:
Estimated By:
Project #:
Date:
PRIME CONTRACTOR
ITEM
DESCRIPTION
QUANTITY
Unit
MATERIAL
Unit
Total
EQUIPT
LABOR
Unit
MH
Total
Total
Div.27-Communications
0
SUBTOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
ST ESTIMATE WORKSHEET
IAN INSTITUTION
Based on
Type in estimator's name
_____% Design
Sheet: 23 of 27
SUBCONTRACTOR
TOTAL
MATERIAL
Unit
EQUIPT
LABOR
Total
Unit
MH
Total
Total
COST
Unit
Total
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
Location:
Estimated By:
Project #:
Date:
PRIME CONTRACTOR
ITEM
DESCRIPTION
QUANTITY
Unit
MATERIAL
Unit
LABOR
Total
Unit
MH
Total
SUBTOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
ITHSONIAN INSTITUTION
Based on
Estimated By:
_____% Design
Sheet: 24 of 27
SUBCONTRACTOR
TOTAL
EQUIPT
Total
0.00
MATERIAL
Unit
EQUIPT
LABOR
Total
Unit
MH
Total
Total
COST
Unit
Total
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
Location:
Estimated By:
Project #:
Date:
PRIME CONTRACTOR
ITEM
DESCRIPTION
QUANTITY
Unit
MATERIAL
Unit
EQUIPT
LABOR
Total
Unit
MH
Total
Total
Div.31-Earthwork
0
SUBTOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
ST ESTIMATE WORKSHEET
NIAN INSTITUTION
Based on
Type in estimator's name
_____% Design
Sheet: 25 of 27
SUBCONTRACTOR
TOTAL
MATERIAL
Unit
EQUIPT
LABOR
Total
Unit
MH
Total
Total
COST
Unit
Total
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
Location:
Estimated By:
Project #:
Date:
PRIME CONTRACTOR
ITEM
DESCRIPTION
QUANTITY
Unit
MATERIAL
Unit
LABOR
Total
Unit
MH
Total
Div.32-Exterior Improvements
0
SUBTOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
MITHSONIAN INSTITUTION
Based on
Estimated By:
_____% Design
Sheet: 26 of 27
SUBCONTRACTOR
TOTAL
EQUIPT
Total
0.00
MATERIAL
Unit
EQUIPT
LABOR
Total
Unit
MH
Total
Total
COST
Unit
Total
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
Location:
Estimated By:
Project #:
Date:
PRIME CONTRACTOR
ITEM
DESCRIPTION
QUANTITY
Unit
MATERIAL
Unit
EQUIPT
LABOR
Total
Unit
MH
Total
Total
Div.33-Utilities
0
SUBTOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
ST ESTIMATE WORKSHEET
IAN INSTITUTION
Based on
Type in estimator's name
_____% Design
Sheet: 27 of 27
SUBCONTRACTOR
TOTAL
MATERIAL
Unit
EQUIPT
LABOR
Total
Unit
MH
Total
Total
COST
Unit
Total
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00