CONSTRUCTION COST ESTIMATE SUMMARY

SMITHSONIAN INSTITUTION
OFFICE OF PLANNING,, DESIGN AND CONSTRUCTION
Title:
Facility:
Project #

Type in project title


Type in facility name
Type in project number

Based on
Date:

PRIME CONTRACTOR
DESCRIPTION

MATERIAL
%

Sales Tax-Material *

%
0

0%

Overhead *
SUBTOTAL
Profit *

0%

0
0%

SUBTOTAL

TOTAL

0
0

0%

Contingency *

TOTAL

%
0

0%

0
0

0%
0%

0
0
0

0%

0
0

0%

SUBTOTAL
Performance Bond *

0%

0%

0
$0

SUBTOTAL

Escalation *
TOTAL CONSTRUCTION COST

0
0%

TOTAL

0
0

0%

TOTAL
0

0%

0%
0

Sheet: 1of 27

TOTAL

EQUIPMENT

LABOR

Prime Commission on Sub *


SUBTOTAL

MATERIAL

0
0

0
0%

TOTAL
0

0%

SUBTOTAL

EQUIPMENT

Labor Burden *

_____% Design

SUBCONTRACTOR

LABOR

TOTAL

DIRECT COSTS

Type in estimator's name


Type in date estimate was prepare

Estimated By:

CONSTRUCTION COST ESTIMATE WORKSHEET


SMITHSONIAN INSTITUTION
OFFICE OF ENGINEERING, DESIGN AND CONSTRUCTION
Title:
Facility:
Project #:

Type in project title


Type in facility name
Type in project number

Based On
Estimated By:
Date:

PRIME CONTRACTOR
ITEM DESCRIPTION

Type in estimator's name


Type in date estimate was prepared

_____% Design
Sheet: 2 of 27

SUBCONTRACTOR

MATERIAL

LABOR

EQUIPMENT

MATERIAL

LABOR

EQUIPMENT

TOTAL

Sub-Total

Sub-Total

Sub-Total

Sub-Total

Sub-Total

Sub-Total

COST

DIVISION 0
Procurement & Contracting Reqmts

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

DIVISION 1
General Requirements
DIVISION 2
Existing Conditions
DIVISION 3
Concrete
DIVISION 4
Masonry
DIVISION 5
Metals
DIVISION 6
Wood, Plastics and Composites
DIVISION 7
Thermal & Moisture Protection
DIVISION 8
Openings
DIVISION 9
Finishes
DIVISION 10
Specialties
DIVISION 11
Equipment
DIVISION 12
Furnishings
DIVISION 13
Special Construction
DIVISION 14
Conveying Systems
DIVISION 21
Fire Suppression
DIVISION 22
Plumbing
DIVISION 23
HVAC
DIVISION 25
Integrated Automation
DIVISION 26
Electrical
DIVISION 27
Communications
DIVISION 28
Electronic Safety & Security
DIVISION 31
Earthwork
DIVISION 32
Exterior Improvements
DIVISION 33
Utilities
SUBTOTALS COSTS

0.00

CONSTRUCTION COST ESTIMATE WORKS


SMITHSONIAN INSTITUTION

OFFICE OF ENGINEERING, DESIGN AND CONSTRUC


Title :

Type in project title

Location:

Type in facility name

Project #:

Type in project number


PRIME CONTRACTOR
ITEM
DESCRIPTION

QUANTITY

Unit

MATERIAL
Unit

LABOR

Total

Unit

MH

Div.0-Procurement & Contractin Requirements


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL

0.00

0.00

N COST ESTIMATE WORKSHEET

ITHSONIAN INSTITUTION

NEERING, DESIGN AND CONSTRUCTION

Based on
Estimated By:

Type in estimator's name

_____% Design

Date:

Type in date estimate was prepared

Sheet: 3 of 27

SUBCONTRACTOR
EQUIPT

LABOR
Total

Total

MATERIAL
Unit

EQUIPT

LABOR

Total

Unit

MH

Total

Total

TOTAL
COST
Unit

Total

0.00

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

###

0.00

0.00

0.00

0.00

0.00

CONSTRUCTION COST ESTIMATE WORKSHEET


SMITHSONIAN INSTITUTION
OFFICE OF ENGINEERING, DESIGN AND CONSTRUCTION
Title :

Type in project title

Location:

Type in facility name

Estimated By:

Type in estimator's name

Project #:

Type in project number

Date:

Type in date estimate was prepared

PRIME CONTRACTOR

SUBCONTRACTOR

ITEM
DESCRIPTION

QUANTITY

Unit

MATERIAL
Unit

Total

EQUIPT

LABOR
Unit

MH

Total

Total

MATERIAL
Unit

Total

EQUIPT

LABOR
Unit

MH

Total

Total

Div.1-Gen. Req.
0

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
SUBTOTAL

0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00

Based on
_____% Design
Sheet: 4 of 27

TOTAL
COST
Unit

Total

#DIV/0!

0.00

#DIV/0!

0.00

#DIV/0!

0.00

#DIV/0!

0.00

#DIV/0!

0.00

#DIV/0!

0.00

#DIV/0!

0.00

#DIV/0!

0.00

#DIV/0!

0.00

#DIV/0!

0.00

#DIV/0!

0.00

#DIV/0!

0.00

#DIV/0!

0.00

#DIV/0!

0.00

#DIV/0!

0.00

#DIV/0!

0.00

#DIV/0!

0.00

#DIV/0!

0.00

###

0.00

CONSTRUCTION COST ESTIMATE WORKSHEET


SMITHSONIAN INSTITUTION
OFFICE OF ENGINEERING, DESIGN AND CONSTRUCTION
Title :

Type in project title

Location:

Type in facility name

Estimated By:

Type in estimator's name

Project #:

Type in project number

Date:

Type in date estimate was prepared

PRIME CONTRACTOR

SUBCONTRACTOR

ITEM
DESCRIPTION

QUANTITY

Unit

MATERIAL
Unit

Total

EQUIPT

LABOR
Unit

MH

Total

Total

MATERIAL
Unit

Total

Div.2-Exist. Cond.
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
SUBTOTAL

0.00

0.00

0.00

0.00

0.00
0.00

0.00

E WORKSHEET

ON
CONSTRUCTION

Based on

e in estimator's name

_____% Design

e in date estimate was prepared

Sheet: 5 of 27

SUBCONTRACTOR
TOTAL
EQUIPT

LABOR
Unit

MH

0.00

Total

Total

COST
Unit

Total

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

###

0.00

CONSTRUCTION COST ESTIMATE WORKSHEET


SMITHSONIAN INSTITUTION
OFFICE OF ENGINEERING, DESIGN AND CONSTRUCTION
Title :

Type in project title

Location:

Type in facility name

Estimated By:

Type in estimator's name

Project #:

Type in project number

Date:

Type in date estimate was prepared

PRIME CONTRACTOR

SUBCONTRACTOR

ITEM
DESCRIPTION

QUANTITY

Unit

MATERIAL
Unit

Total

EQUIPT

LABOR
Unit

MH

Total

Total

MATERIAL
Unit

Total

Div.3-Concrete
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
SUBTOTAL

0.00

0.00

0.00

0.00

0.00
0.00

0.00

E WORKSHEET

ON

D CONSTRUCTION

Based on

e in estimator's name

_____% Design

e in date estimate was prepared

Sheet: 6 of 27

SUBCONTRACTOR
TOTAL
EQUIPT

LABOR
Unit

MH

0.00

Total

Total

COST
Unit

Total

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

CONSTRUCTION COST ESTIMATE WORKSHEET


SMITHSONIAN INSTITUTION
OFFICE OF ENGINEERING, DESIGN AND CONSTRUCTION
Title :

Type in project title

Location:

Type in facility name

Estimated By:

Type in estimator's name

Project #:

Type in project number

Date:

Type in date estimate was prepared

PRIME CONTRACTOR

SUBCONTRACTOR

ITEM
DESCRIPTION

QUANTITY

Unit

MATERIAL
Unit

Total

EQUIPT

LABOR
Unit

MH

Total

Total

MATERIAL
Unit

Total

Div.4-Masonry
0

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
SUBTOTAL

0.00

0.00

0.00

0.00

0.00
0.00

0.00

LABOR
Unit

KSHEET

RUCTION

Based on
_____% Design
estimate was prepared

Sheet: 7 of 27

SUBCONTRACTOR
EQUIPT

LABOR

TOTAL
COST

MH

0.00

Total

Total

Unit

Total

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

###

0.00

CONSTRUCTION COST ESTIMATE WORKSHEET


SMITHSONIAN INSTITUTION
OFFICE OF ENGINEERING, DESIGN AND CONSTRUCTION
Title :

Type in project title

Location:

Type in facility name

Estimated By:

Type in estimator's name

Project #:

Type in project number

Date:

Type in date estimate was prepared

PRIME CONTRACTOR

SUBCONTRACTOR

ITEM
DESCRIPTION

QUANTITY

Unit

MATERIAL
Unit

Total

EQUIPT

LABOR
Unit

MH

Total

Total

MATERIAL
Unit

Total

Div.5-Metals
0

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
SUBTOTAL

0.00

0.00

0.00

0.00

0.00
0.00

0.00

E WORKSHEET

ON
CONSTRUCTION

Based on

e in estimator's name

_____% Design

e in date estimate was prepared

Sheet: 8 of 27

SUBCONTRACTOR
TOTAL
EQUIPT

LABOR
Unit

MH

0.00

Total

Total

COST
Unit

Total

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

###

0.00

CONSTRUCTION COST ESTIMATE WORKSHEET


SMITHSONIAN INSTITUTION
OFFICE OF ENGINEERING, DESIGN AND CONSTRUCTION
Title :

Type in project title

Location:

Type in facility name

Estimated By:

Type in estimator's na

Project #:

Type in project number

Date:

Type in date estimate

PRIME CONTRACTOR

SUBCON

ITEM
DESCRIPTION

QUANTITY

Unit

MATERIAL
Unit

Total

EQUIPT

LABOR
Unit

MH

Total

Total

Div.6-Wood, Plastics & Composites


0

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
SUBTOTAL

0.00

0.00

0.00

0.00

0.00

MATERIAL
Unit

TE WORKSHEET

TION

ND CONSTRUCTION

Based on
Type in estimator's name

_____% Design

Type in date estimate was prepared

Sheet: 9 of 27

SUBCONTRACTOR
TOTAL
MATERIAL
Total

EQUIPT

LABOR
Unit

MH

Total

Total

COST
Unit

Total

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

###

0.00

0.00
0.00

0.00

CONSTRUCTION COST ESTIMATE WORKSHEET


SMITHSONIAN INSTITUTION
OFFICE OF ENGINEERING, DESIGN AND CONSTRUCTION
Title :

Type in project title

Location:

Type in facility name

Estimated By:

Type in estimator's name

Project #:

Type in project number

Date:

Type in date estimate was pre

PRIME CONTRACTOR

SUBCONTRACTO

ITEM
DESCRIPTION

QUANTITY

Unit

MATERIAL
Unit

Total

EQUIPT

LABOR
Unit

MH

Total

Total

Div.7-Thermal & Moist. Prot.


0

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
SUBTOTAL

0.00

0.00

0.00

0.00

0.00

MATERIAL
Unit

MATE WORKSHEET

ITUTION
AND CONSTRUCTION

Based on
Type in estimator's name

_____% Design

Type in date estimate was prepared

Sheet: 10 of 27

SUBCONTRACTOR
TOTAL
MATERIAL
Total

EQUIPT

LABOR
Unit

MH

Total

Total

COST
Unit

Total

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

###

0.00

0.00
0.00

0.00

CONSTRUCTION COST ESTIMATE WORKSHEET


SMITHSONIAN INSTITUTION
OFFICE OF ENGINEERING, DESIGN AND CONSTRUCTION
Title :

Type in project title

Location:

Type in facility name

Estimated By:

Type in estimator's name

Project #:

Type in project number

Date:

Type in date estimate was prepared

PRIME CONTRACTOR

SUBCONTRACTOR

ITEM
DESCRIPTION

QUANTITY

Unit

MATERIAL
Unit

Total

EQUIPT

LABOR
Unit

MH

Total

Total

MATERIAL
Unit

Total

Div.8-Openings
0

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
SUBTOTAL

0.00

0.00

0.00

0.00

0.00
0.00

0.00

WORKSHEET

CONSTRUCTION

Based on

e in estimator's name

_____% Design

e in date estimate was prepared

Sheet: 11 of 27

SUBCONTRACTOR
TOTAL
EQUIPT

LABOR
Unit

MH

0.00

Total

Total

COST
Unit

Total

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

###

0.00

CONSTRUCTION COST ESTIMATE WORKSHEET


SMITHSONIAN INSTITUTION
OFFICE OF ENGINEERING, DESIGN AND CONSTRUCTION
Title :

Type in project title

Location:

Type in facility name

Estimated By:

Type in estimator's name

Project #:

Type in project number

Date:

Type in date estimate was prepared

PRIME CONTRACTOR

SUBCONTRACTOR

ITEM
DESCRIPTION

QUANTITY

Unit

MATERIAL
Unit

Total

EQUIPT

LABOR
Unit

MH

Total

Total

MATERIAL
Unit

Total

Div.9-Finishes
0

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
SUBTOTAL

0.00

0.00

0.00

0.00

0.00
0.00

0.00

E WORKSHEET

ON
CONSTRUCTION

Based on

e in estimator's name

_____% Design

e in date estimate was prepared

Sheet: 12 of 27

SUBCONTRACTOR
TOTAL
EQUIPT

LABOR
Unit

MH

0.00

Total

Total

COST
Unit

Total

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

###

0.00

CONSTRUCTION COST ESTIMATE WORKSHEET


SMITHSONIAN INSTITUTION
OFFICE OF ENGINEERING, DESIGN AND CONSTRUCTION
Title :

Type in project title

Location:

Type in facility name

Estimated By:

Type in estimator's name

Project #:

Type in project number

Date:

Type in date estimate was prepared

PRIME CONTRACTOR

SUBCONTRACTOR

ITEM
DESCRIPTION

QUANTITY

Unit

MATERIAL
Unit

Total

EQUIPT

LABOR
Unit

MH

Total

Total

MATERIAL
Unit

Total

Div.10-Specialties
0

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
SUBTOTAL

0.00

0.00

0.00

0.00

0.00
0.00

0.00

E WORKSHEET

ON

CONSTRUCTION

Based on

e in estimator's name

_____% Design

e in date estimate was prepared

Sheet: 13 of 27

SUBCONTRACTOR
TOTAL
EQUIPT

LABOR
Unit

MH

0.00

Total

Total

COST
Unit

Total

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

###

0.00

CONSTRUCTION COST ESTIMATE WORKSHEET


SMITHSONIAN INSTITUTION
OFFICE OF ENGINEERING, DESIGN AND CONSTRUCTION
Title :

Type in project title

Location:

Type in facility name

Estimated By:

Type in estimator's name

Project #:

Type in project number

Date:

Type in date estimate was prepared

PRIME CONTRACTOR

SUBCONTRACTOR

ITEM
DESCRIPTION

QUANTITY

Unit

MATERIAL
Unit

Total

EQUIPT

LABOR
Unit

MH

Total

Total

MATERIAL
Unit

Total

Div.11-Equipment
0

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
SUBTOTAL

0.00

0.00

0.00

0.00

0.00
0.00

0.00

E WORKSHEET

ON
CONSTRUCTION

Based on

e in estimator's name

_____% Design

e in date estimate was prepared

Sheet: 14 of 27

SUBCONTRACTOR
TOTAL
EQUIPT

LABOR
Unit

MH

0.00

Total

Total

COST
Unit

Total

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

###

0.00

CONSTRUCTION COST ESTIMATE WORKSHEET


SMITHSONIAN INSTITUTION
OFFICE OF ENGINEERING, DESIGN AND CONSTRUCTION
Title :

Type in project title

Location:

Type in facility name

Estimated By:

Type in estimator's name

Project #:

Type in project number

Date:

Type in date estimate was prepared

PRIME CONTRACTOR

SUBCONTRACTOR

ITEM
DESCRIPTION

QUANTITY

Unit

MATERIAL
Unit

Total

EQUIPT

LABOR
Unit

MH

Total

Total

MATERIAL
Unit

Total

Div.12-Furnishings
0

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
SUBTOTAL

0.00

0.00

0.00

0.00

0.00
0.00

0.00

E WORKSHEET

ON
CONSTRUCTION

Based on

e in estimator's name

_____% Design

e in date estimate was prepared

Sheet: 15 of 27

SUBCONTRACTOR
TOTAL
EQUIPT

LABOR
Unit

MH

0.00

Total

Total

COST
Unit

Total

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

###

0.00

CONSTRUCTION COST ESTIMATE WORKSHEET


SMITHSONIAN INSTITUTION
OFFICE OF ENGINEERING, DESIGN AND CONSTRUCTION
Title :

Type in project title

Location:

Type in facility name

Estimated By:

Type in estimator's name

Project #:

Type in project number

Date:

Type in date estimate was pre

PRIME CONTRACTOR

SUBCONTRACT

ITEM
DESCRIPTION

QUANTITY

Unit

MATERIAL
Unit

Total

EQUIPT

LABOR
Unit

MH

Total

Total

Div.13-Special Construction
0

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
SUBTOTAL

0.00

0.00

0.00

0.00

0.00

MATERIAL
Unit

MATE WORKSHEET

ITUTION

N AND CONSTRUCTION

Based on
Type in estimator's name

_____% Design

Type in date estimate was prepared

Sheet: 16 of 27

SUBCONTRACTOR
TOTAL
MATERIAL
Total

EQUIPT

LABOR
Unit

MH

Total

Total

COST
Unit

Total

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

###

0.00

0.00
0.00

0.00

CONSTRUCTION COST ESTIMATE WORKSHEET


SMITHSONIAN INSTITUTION
OFFICE OF ENGINEERING, DESIGN AND CONSTRUCTION
Title :

Type in project title

Location:

Type in facility name

Estimated By:

Type in estimator's name

Project #:

Type in project number

Date:

Type in date estimate was prep

PRIME CONTRACTOR

SUBCONTRACTO

ITEM
DESCRIPTION

QUANTITY

Unit

MATERIAL
Unit

Total

EQUIPT

LABOR
Unit

MH

Total

Total

Div.14-Conveying Systems
0

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
SUBTOTAL

0.00

0.00

0.00

0.00

0.00

MATERIAL
Unit

MATE WORKSHEET

TITUTION

N AND CONSTRUCTION

Based on
Type in estimator's name

_____% Design

Type in date estimate was prepared

Sheet: 17 of 27

SUBCONTRACTOR
TOTAL
MATERIAL
Total

EQUIPT

LABOR
Unit

MH

Total

Total

COST
Unit

Total

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

###

0.00

0.00
0.00

0.00

CONSTRUCTION COST ESTIMATE WORKSHEET


SMITHSONIAN INSTITUTION
OFFICE OF ENGINEERING, DESIGN AND CONSTRUCTION
Title :

Type in project title

Location:

Type in facility name

Estimated By:

Type in estimator's name

Project #:

Type in project number

Date:

Type in date estimate was prepa

PRIME CONTRACTOR

SUBCONTRACTOR

ITEM
DESCRIPTION

QUANTITY

Unit

MATERIAL
Unit

Total

EQUIPT

LABOR
Unit

MH

Total

Total

MATERIAL
Unit

Total

Div.21-Fire Suppression
0

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
SUBTOTAL

0.00

0.00

0.00

0.00

0.00
0.00

0.00

WORKSHEET

NSTRUCTION

Based on

e in estimator's name

_____% Design

e in date estimate was prepared

Sheet: 18 of 27

SUBCONTRACTOR
TOTAL
EQUIPT

LABOR
Unit

MH

0.00

Total

Total

COST
Unit

Total

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00 #DIV/0!

0.00

0.00

0.00

###

0.00

CONSTRUCTION COST ESTIMATE WORKSHEET


SMITHSONIAN INSTITUTION
OFFICE OF ENGINEERING, DESIGN AND CONSTRUCTION
Title :

Type in project title

Location:

Type in facility name

Estimated By:

Type in estimator's name

Project #:

Type in project number

Date:

Type in date estimate was prepared

PRIME CONTRACTOR

SUBCONTRACTOR

ITEM
DESCRIPTION

QUANTITY

Unit

MATERIAL
Unit

Total

EQUIPT

LABOR
Unit

MH

Total

Total

MATERIAL
Unit

Total

Div.22-Plumbing
0

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
SUBTOTAL

0.00

0.00

0.00

0.00

0.00
0.00

0.00

E WORKSHEET

ON
CONSTRUCTION

Based on

e in estimator's name

_____% Design

e in date estimate was prepared

Sheet: 19 of 27

SUBCONTRACTOR
TOTAL
EQUIPT

LABOR
Unit

MH

0.00

Total

Total

COST
Unit

Total

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

###

0.00

CONSTRUCTION COST ESTIMATE WORKSH


SMITHSONIAN INSTITUTION

OFFICE OF ENGINEERING, DESIGN AND CONSTRUC


Title :

Type in project title

Location:

Type in facility name

Estimated By:

Project #:

Type in project number

Date:
PRIME CONTRACTOR

ITEM
DESCRIPTION

QUANTITY

Unit

MATERIAL
Unit

EQUIPT

LABOR

Total

Unit

MH

Total

Total

Div.23-HVAC
0

SUBTOTAL

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

T ESTIMATE WORKSHEET

AN INSTITUTION
DESIGN AND CONSTRUCTION

Based on
Type in estimator's name

_____% Design

Type in date estimate was prepared

Sheet: 20 of 27

SUBCONTRACTOR
TOTAL
MATERIAL
Unit

EQUIPT

LABOR

Total

Unit

MH

Total

Total

COST
Unit

Total

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

CONSTRUCTION COST ESTIMATE WORK


SMITHSONIAN INSTITUTION

OFFICE OF ENGINEERING, DESIGN AND CONSTR


Title :

Type in project title

Location:

Type in facility name

Estimated By:

Project #:

Type in project number

Date:
PRIME CONTRACTOR

ITEM
DESCRIPTION

QUANTITY

Unit

MATERIAL
Unit

LABOR

Total

Unit

MH

Total

Div.25-Integrated Automation
0

SUBTOTAL

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

N COST ESTIMATE WORKSHEET

THSONIAN INSTITUTION

EERING, DESIGN AND CONSTRUCTION

Based on
Estimated By:

Type in estimator's name

_____% Design

Type in date estimate was prepared

Sheet: 21 of 27

SUBCONTRACTOR
TOTAL
EQUIPT
Total

0.00

MATERIAL
Unit

EQUIPT

LABOR

Total

Unit

MH

Total

Total

COST
Unit

Total

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

CONSTRUCTION COST ESTIMATE WORKS


SMITHSONIAN INSTITUTION

OFFICE OF ENGINEERING, DESIGN AND CONSTRU


Title :

Type in project title

Location:

Type in facility name

Estimated By:

Project #:

Type in project number

Date:
PRIME CONTRACTOR

ITEM
DESCRIPTION

QUANTITY

Unit

MATERIAL
Unit

LABOR

Total

Unit

MH

Total

Div.26-Electrical
0.00

SUBTOTAL

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

ON COST ESTIMATE WORKSHEET

MITHSONIAN INSTITUTION

NEERING, DESIGN AND CONSTRUCTION

Based on
Estimated By:

Type in estimator's name

_____% Design

Type in date estimate was prepared

Sheet: 22 of 27

SUBCONTRACTOR
TOTAL
EQUIPT
Total

0.00

MATERIAL
Unit

EQUIPT

LABOR

Total

Unit

MH

Total

Total

COST
Unit

Total

0.00

0.00

5.05

0.10

0.00

0.00

#DIV/0!

0.00

0.00

0.00

6.20

0.12

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.22

CONSTRUCTION COST ESTIMATE WORKSHEE


SMITHSONIAN INSTITUTION

OFFICE OF ENGINEERING, DESIGN AND CONSTRUCTIO


Title :

Type in project title

Location:

Type in facility name

Estimated By:

Project #:

Type in project number

Date:
PRIME CONTRACTOR

ITEM
DESCRIPTION

QUANTITY

Unit

MATERIAL
Unit

Total

EQUIPT

LABOR
Unit

MH

Total

Total

Div.27-Communications
0

SUBTOTAL

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

ST ESTIMATE WORKSHEET

IAN INSTITUTION

G, DESIGN AND CONSTRUCTION

Based on
Type in estimator's name

_____% Design

Type in date estimate was prepared

Sheet: 23 of 27

SUBCONTRACTOR
TOTAL
MATERIAL
Unit

EQUIPT

LABOR

Total

Unit

MH

Total

Total

COST
Unit

Total

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

CONSTRUCTION COST ESTIMATE WORK


SMITHSONIAN INSTITUTION

OFFICE OF ENGINEERING, DESIGN AND CONSTR


Title :

Type in project title

Location:

Type in facility name

Estimated By:

Project #:

Type in project number

Date:
PRIME CONTRACTOR

ITEM
DESCRIPTION

QUANTITY

Unit

MATERIAL
Unit

LABOR

Total

Unit

MH

Total

Div.28-Electronic Safety & Security


0

SUBTOTAL

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

ON COST ESTIMATE WORKSHEET

ITHSONIAN INSTITUTION

NEERING, DESIGN AND CONSTRUCTION

Based on
Estimated By:

Type in estimator's name

_____% Design

Type in date estimate was prepared

Sheet: 24 of 27

SUBCONTRACTOR
TOTAL
EQUIPT
Total

0.00

MATERIAL
Unit

EQUIPT

LABOR

Total

Unit

MH

Total

Total

COST
Unit

Total

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

CONSTRUCTION COST ESTIMATE WORKSHE


SMITHSONIAN INSTITUTION

OFFICE OF ENGINEERING, DESIGN AND CONSTRUCTI


Title :

Type in project title

Location:

Type in facility name

Estimated By:

Project #:

Type in project number

Date:
PRIME CONTRACTOR

ITEM
DESCRIPTION

QUANTITY

Unit

MATERIAL
Unit

EQUIPT

LABOR

Total

Unit

MH

Total

Total

Div.31-Earthwork
0

SUBTOTAL

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

ST ESTIMATE WORKSHEET

NIAN INSTITUTION

G, DESIGN AND CONSTRUCTION

Based on
Type in estimator's name

_____% Design

Type in date estimate was prepared

Sheet: 25 of 27

SUBCONTRACTOR
TOTAL
MATERIAL
Unit

EQUIPT

LABOR

Total

Unit

MH

Total

Total

COST
Unit

Total

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

CONSTRUCTION COST ESTIMATE WORKS


SMITHSONIAN INSTITUTION

OFFICE OF ENGINEERING, DESIGN AND CONSTRU


Title :

Type in project title

Location:

Type in facility name

Estimated By:

Project #:

Type in project number

Date:
PRIME CONTRACTOR

ITEM
DESCRIPTION

QUANTITY

Unit

MATERIAL
Unit

LABOR

Total

Unit

MH

Total

Div.32-Exterior Improvements
0

SUBTOTAL

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

ON COST ESTIMATE WORKSHEET

MITHSONIAN INSTITUTION

INEERING, DESIGN AND CONSTRUCTION

Based on
Estimated By:

Type in estimator's name

_____% Design

Type in date estimate was prepared

Sheet: 26 of 27

SUBCONTRACTOR
TOTAL
EQUIPT
Total

0.00

MATERIAL
Unit

EQUIPT

LABOR

Total

Unit

MH

Total

Total

COST
Unit

Total

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

CONSTRUCTION COST ESTIMATE WORKSH


SMITHSONIAN INSTITUTION

OFFICE OF ENGINEERING, DESIGN AND CONSTRUCT


Title :

Type in project title

Location:

Type in facility name

Estimated By:

Project #:

Type in project number

Date:
PRIME CONTRACTOR

ITEM
DESCRIPTION

QUANTITY

Unit

MATERIAL
Unit

EQUIPT

LABOR

Total

Unit

MH

Total

Total

Div.33-Utilities
0

SUBTOTAL

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

ST ESTIMATE WORKSHEET

IAN INSTITUTION

G, DESIGN AND CONSTRUCTION

Based on
Type in estimator's name

_____% Design

Type in date estimate was prepared

Sheet: 27 of 27

SUBCONTRACTOR
TOTAL
MATERIAL
Unit

EQUIPT

LABOR

Total

Unit

MH

Total

Total

COST
Unit

Total

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

Potrebbero piacerti anche