Sei sulla pagina 1di 2

PT PUPUK INDONESIA ENERGI

GRESIK GAS COGENERATION PLANT PROJECT


Node
Review date

1
Monday, November 07, 2016

Facility
Section

Gas Cogeneration Plant


Fuel Gas System

Abbreviations

PI PT PUPUK INDONESIA ENERGI


RE PT REKAYASA ENGINEERING
PP
PAHH
PAH
PAL
SOP
PALL
LALL

PT PEMBANGUNAN PERUMAHAN
Pressure Alarm High - High
Pressure Alarm High
Pressure Alarm Low
Standard Operating Procedure
Pressure Alarm Low - Low
Level Alarm Low-Low

Design Intent
Comments
Op. Conditions Press:

Temp:

Drawing Title

Drawing No.

No.

Deviation

Item Number

Parameter: Flow
1.1

More Flow

1.1.1

1.2

Less Flow

1.2.1

1.3

No Flow

1.3.1

1.4

Reverse Flow

1.4.1

1.5

Misdirected Flow

1.5.1

Parameter: Pressure
1.6

More Pressure
Less Pressure

1.7
1.8

Vacuum

1.6.1
1.7.1
1.8.1

Parameter: Temperature
1.9

More Temperature

1.9.1

Parameter: Level
1.11

More Level

1.11.1

1.12

Less Level

1.12.1

1.13

Empty Level

1.13.1

Causes

Flow Capacity:

Consequences

Rev.

Safeguards

Recommendations

Action Party

Rec.
Number

Remarks

No.

Deviation

Item Number

Parameter: Impurities
1.14

Impurities

1.14.1

Parameter: Composition Change


1.15

Composition

1.15.1

Parameter: Errosion/Corrosion
1.16.1
1.16

Errosion / Corrosion
1.16.2

Parameter: Commisioning
1.17.1
1.17

Commisioning
1.17.2

Parameter: Maintenance
1.18

Maintenance

1.18.1

Parameter: Instrumentation/Control
1.19

Instrumentation / Control

1.19.1

Parameter: Start-up
1.20

Start-up

1.20.1

Parameter: Shutdown
1.21

Shutdown

1.21.1

Parameter: Testing/Sampling
1.22.1
1.22

Testing/Sampling
1.22.2

Parameter: Miscellaneous
1.23

Drawing

1.23.1

Causes

Consequences

Safeguards

Recommendations

Action Party

Rec.
Number

Remarks

Potrebbero piacerti anche