Sei sulla pagina 1di 13

APPLICANT INFORMATION REPORT

Applicant Name

MAXIMIANO T. VERGAS JR.

Position Applied
root pass

6G Welder Tig & Arc GTAW / SMAW / FCAW / GMAW stt


Alloy Sch. XXS P90, S/S, Duplex, Cupper Nickel, Aluminum, Chrome
Molly, Ni Alloy Titanium
(Oil and Gas Plant Petrochemical Refinery / Offshore and Tanker Vessel)

Address
Email add
Mobile Phone

:
:
:

SEAMANS BOOK No.:


PASSPORT No.:
Birth Date
Age
Height
Civil Status

:
:
:
:

Purok Makugihon Poblacion


+
B0775989
EBO381665

July 09, 1964


48
55
Marriage

Education
Vocational

Yr-To
2004-2005

High School

1979-1983

Elementary

1972-1979

Validity
Validity

: 26 Oct. 2009 / 25 Oct. 2014


: 12 June 2010 / 11 June 2015

Birth Place
Genders
Weight
Religion

:
:
:
:

Linamon Lanao Del Norte 9214


Male
70Klgs.
Roman Catholic

School / Address
Singapore American School
Woodland, Singapore
Our Lady of Perpetual Help
Academy
Linamon Lanao del Norte
Linamon Central School
Linamon Lanao del Norte

Course
Computer Level I, II, III
Secondary
Primary

SAFETY TRAININGS AND WELDING SEMINARS ATTENDED CERTIFICATION:


1.)

TESDA CERTIFICATION GAS TUNGSTEN ARC WELDING National Certificate Level II


Certificate No. 0913060263374 valid until October 07, 2014

2.) PWS- PHILIPPINE WELDING SOCIETY July 22, 2009


Telephone # +632-894-46-09 email add: philwedsoc@yahoo.com
PLASMA CUTTING PROCESS Certificate No. : PWS-FTS-0709-00341
Conducted by JACK BOEHRINGER Technical Expert ESAB ASIA / Pacific Pte Ltd.
3.) PWS- PHILIPPINE WELDING SOCIETY December 2, 2008 Certificate No. 0095
Telephone # +632-894-46-09 email add: philwedsoc@yahoo.com
a) Welding Guidelines for Duplex & Super Duplex Ferritic Austenitic Stainless Steel.
b) Welding Advanced CrMo Steels for Ultra Super Critical Power Plant - Concentrate on P91 with and
P92 with a background explaining why the materials are used.
4.) PWS- PHILIPPINE WELDING SOCIETY
Telephone # +632-894-46-09 email add: philwedsoc@yahoo.com
MEMBER No. 1-08-1229 January 15, 2008
5.) Fundamental of TIG (AG004) Practical & Theory
1

OJT System (ITE) Singapore 30 October 2001


6.) LATHTE MACHINE OPERATION
Certificate Number
: SLC 1203014
(March 19, 2012 to March 24, 2012)
SEAMAC International Training Institute, Inc.

SUMMARY OF QUALIFICATION

Over Six ten (16) years of hands on work experience as a Combination/Alloy Welder in a multi-national
environment.
Competent to perform welding techniques such as: GTAW / SMAW / FCAW / GMAW & STT ROOT
PASS. ( Surface Tension Transfer ) Super wave fixed in rotator.
Qualified to weld different kind of metal such as TIG super Root R316LT1-5 TGX, Super DUPLEX
steel DSS 11/11A- (ER2209/E2209), Stainless Steel (ER308L, ER309L, ER316L, and ER347),
Cupper Nickel (ERCUNI/NICU7) GTAW, E4043 ALLUMINUM, 6 Chrome Molly (ER NiCr-3)
GTAW, Carbon steel (Root E6010/Capping E7018) SMAW, TIG & SWET WELDING Ni Alloy
Titanium (Hast 0.030), AMS7986 (L605) (R142) (R80) A5.15 Ni 55/Fe45 ( Nickel/Ferrum ) Alloy
Sch. XXS P90
With ABS WQT Certificate January 06, 2010 with approved stamp of DNV UNITOR/ TUV WQT
Certificate May 08, 2009/ WQT, EWF European Welding Federation 2002,B.V WQT 200
Combination welder specialist have the knowledge, skills, and experience necessary to work from IFC
( Issued-for-Construction ) drawings, engineering drawings, or isometric drawings; in the field or in the
fabrication shop to perform specialized (ASME) section IX certification.
Responsible to inspect groves, angles or gap allowances using micrometer, caliper, and precision
measuring instrument before and after welding prior to turn over for non destructive testing.
Experience in Dry Duck, Aviation Aircraft Engine repair, large component Combustor CFM-56,
CFM56/33, -50 Vane, 80C and LPT low pressure turbine and ROLLS ROYCE parts.
Experienced in Fabrication shop, Installation, Commissioning & Shutdown.
Operation of Light Driver, Overhead Crane, Forklift, Rigging

SUMMARY OF WORKING EXPERIENCE


COMPANY (1)
Employment Date:
Name of Company:
Country:
Project Name:
Country:
Position:

May 10, 2012 to May 30, 2012


METALITE BUILDERS DEVELOPMENT CO., INC.
152 M. Sioson St. Dampalit-Moson, Malabon City
PETRON BATAAN REFINERY
Limay Bataan Philippines
ALLOY WELDER GTAW / SMAW

DUTIES AND RESPONSIBILITIES:


Assign in shutdown works project the BM -11-0120 of Simultaneous Catalyst Withdrawal at regenerator
(R-551) at Petron Bataan Refinery.
Qualified to weld 4 inch Sch. XXS Alloy pipe, used filler wire ER90S-B3 and E9016-B3 GTAW /
SMAW process. Heating 300 centigrade Root pass and Hot pass P.T Penetrant Test. Filling and Capping
100% U.T Ultrasonic Test / P.T Penetrant Test and MPI Magnetic Particle Inspection. 100% X-RAY
and last process, PWHT Post Weld Heat Treatment and Hydro testing.

COMPANY (2)
Employment Date:
Name of Company:
Vessel:
Country:

October 13, 2011 to December 14, 2011


PTC Philippine Transmarine Carriers, Inc. (FRATELLI COSULICH SPA)
FPSO CIDADE DE SAO PAOLO MV23 (Floating Production Storage Offload)
Word Wide China to Brazil (BAHAMAS)
2

Position:

DUTIES AND RESPONSIBILITIES:


Emphasized company rules and regulation and SAFETY implementation, and full cooperation to my
team member and co-workers.
Fitter/Welder, Responsible maintenance and operation of equipment and machinery in the Deck under
the guidance of Chief Mate.
Responsibility for the safe execution of deck activities in support of the construction work program in
accordance with the relevant legislation, company and project procedures. Responsible for ensuring that
familiar with the welding and cutting equipment, consumables, procedures and controls for welding and
burning. Responsible for the maintenance, storage and good housekeeping of all welding and burning
associated equipment and consumables.
Structural Fabricating works, Beveling plate and pipes. Welding mild steel, Stainless steel, Weld sticks
(SMAW), Oxy-acetylene OAW for Cuni Cupper tube and E4043 Aluminum and Tig welding (GTAW)
for small bore pipe used 316L, E7018.
Perform weld visual inspection before, during and after welding.
Also responsible for supporting of Quality, Safety and Productivity initiatives.

COMPANY (3)
Employment Date:
Name of Company:
Vessel:
Country:
Position:

FITTER/ WELDER

February 04, 2011 to August 04, 2011


Sharpe Sea Personnel, Inc.
MT NOAH (SULZER 7RTA 84T) VLCC / DUBAI DRYDUCK
Word Wide
FITTER/ WELDER

DUTIES AND RESPONSIBILITIES:


In Dubai dry duck, assist wartsila Technician to work in main engine ( SULZER ) check crank shop if
there is a crack. Change radiator and water pump cooler mechanical seal for emergency generator.
Fullwelding crack found in the main engine block, used Alloy Electrode as per requirements. And also
welding of angle bars and plate used GMAW welding process for productivity purposes.
As a Fitter/Welder, Responsible maintenance and operation of equipment and machinery in engine room
under the guidance of Chief Engineer and or 2nd Engineer. Maintenance and keep inventory of all tools
related to equipment/machinery in use in engine room and in the work shop.
Monitor the relevant consumable store/spare parts consumption and keep 2nd Engineer updated regarding
their replenishment. Assist Engineers in receiving stores spares, Lube Oil and Bunkers as directed.
Ensure that working practice is employed while carrying out any jobs in engine room and in the work
shop. Secure the area before (and after work) start the workforce SAFELY.
OAW for copper tubing and Tig welding (GTAW) for small bore pipe used 316L. Electrode E7018LH
for SMAW process and FCAW for semi automatic, Gas used CO2 coil wire HOBART 71T 1.2mm..
Cutting, Grinding welding point, before report to Chief mate. P.T Penetrant Test required as per advice.
All piping leakage rectified and change some piping lines. Used Tig welding for small bore from inch
to 2 inch pipe. Used filler wire TGS-50 and used Electrode E7018 for Arc welding from 4 inch pipe. P.T
Penetrant Test required as per advice. Electrode used for structural jobs, E7028, E7024, E316L,
E309, E6013, E7018, E4043 Aluminum.

COMPANY (4-A)
Employment Date:
Name of Company:
Vessel:
Country:
Project Name:
Position:

Sept ember 26, 2010 to October 11, 2010


Western Shipping Southeast Asia Inc.
MT ELLIE LADY (MAN B&W engine)
Word Wide
AUXILIARY BOILER USLD PROJECT
FITTER/ WELDER RIDING GANG
3

COMPANY (4-B)
Employment Date:
Name of Company:
Vessel:
Country:
Project Name:
Position:

Sept ember 03, 2010 to September 25, 2010


Western Shipping Southeast Asia Inc.
MT ANALIPSI LADY (STX engine)
Word Wide
AUXILIARY BOILER USLD PROJECT
FITTER/ WELDER RIDING GANG

DUTIES AND RESPONSIBILITIES:


I am a member of riding team who were responsible in the pipe laying and Tig welding jobs in Auxiliary
boiler USLD modification project. Modification project is in line with the compliance of vessel to use
Low Sulfur Distillate Fuel as per EU Directive 2005/33EC.
Transferring all materials from midship to aft section cabin allocation. Bring Engine room all materials
for the project. Secure all argon bottles. Set up the necessary pipe length. Start cutting some angle bar to
be used as pipe bracket. Drilled a hole for the u-bolt on the pipe bracket. Prepare the area where the
bracket is to fixed ( over of the main engine ) Preparing other pipe and flange and check welding point
before full welding using Tig welding used TGS-50 wire. Welding bracket used E7018 for Carbon
Steel and E4043 Aluminum materials. Perform welding 100% x-ray.
Erection of all pipe members finished welding ready for erection, and installed all chain block sling and
rope lashing. Check all position before erection to safe performance of work.
House Keeping Before and after work, Always think SAFETY used fire blanket, Before welding,
Cutting, Grinding. Always followed company rules and regulation.
Used lathe machine (Machinery shop) to make a good bevel of pipe and perform good performance
speed of work to get the target of the project.

COMPANY (5-A)
Employment Date:
Name of Company:
Vessel:
Country:
Project Name:
Position:

May 04, 2010 to May 28, 2010


Heerema Marine Contractors, Nederland B.V.
BCD BALDER
Trinidad & Tobago Port of Spain
Marine Contractors, OFFSHORE
AUTOMATIC and STRUCTURAL WELDER

COMPANY (5-B)
Employment Date:
Name of Company:
Vessel:
Country:
Project Name:
Position:

January, 19, 2010 to April 01, 2010


Heerema Marine Contractors, Nederland B.V.
THIALF
Caland Canal Amsterdam, Netherland
Marine Contractors, OFFSHORE
AUTOMATIC and STRUCTURAL WELDER
DUTIES AND RESPONSIBILITIES:

Holder WQT Welding Qualification Test of ABS American Bureau of Shipping.


Assign in Installation and Repair, Perform welding and used Electrode AWS A5.5 E7018-G-H4R
Approvals ABS, BV, DNV, GL,TUV
Assign in Installation and Repair, Perform welding and used Electrode E7018LH for SMAW process and
FCAW for semi automatic, Gas used CO2 coil wire HOBART 71T 1.2mm.Approvals ABS, 100% U.T
Ultrasonic Test and MPI Magnetic Particle Inspection. Cutting, Gauging and Grinding welding point,
before turn over to welding foreman for N.D.T Inspection.
Perform welding of tubing pipe used OAW process in Cupper Nickel and E4043 for Aluminum
materials.
4

House Keeping Before and after work, Always think SAFETY used fire blanket, Before welding,
Cutting, Gauging and Grinding. Always followed company rules and regulation.

COMPANY (6)
Employment Date:
Name of Company:
Country:
Project Name:
Position:

DUTIES AND RESPONSIBILITIES:


Qualified of 2 inch pipe all tig process and 4 inch pipe tig and arc process, using filler wire ER70S-2 / E
7018 rod.
Assist pipe fitter to installed Boiler member and full welding of side wall pipe, supper heater,
economizer, Evaporator and other welding job for the Boiler. 100% X-RAY by WITCO Company.
Prepares welding cables, Torches, Argon Gas and other tools before starting welding works and always
think SAFETY. Always followed companys rules and regulations, Full cooperation to my team member,
supervisor and owner of the company.

COMPANY (7)
Employment Date:
Name of Company:
Country:
Project Name:
Country:
Position:

July 23, 2009 October 20, 2009


N- VIRO the Filipino corporation
Dadap, Luna, Isabela Philippines
Golden Season Grains center, Isabela plants, BIOMASS POWER PLANT
BOILER TIG WELDER GTAW / SMAW

May 08, 2009 to June 08, 2009


BOILERMAKER INC.
U301, MCR Industries Bldg. 495 Boni Ave. Mandaluyong City
QUEZON POWER PHILS. Ltd. Covanta Phils. Operating Inc.
Barangay Cagsiay 1, Mauban Quezon Philippines
ALLOY & BOILER WELDER GTAW / SMAW

DUTIES AND RESPONSIBILITIES:


Qualified of 2 inch pipe carbon steel schedule 160 for a Boiler tubing all Tig process, using filler wire
TGS-50. And Qualified of Heavy wall pipe Tig and Arc process for alloy pipe.
As an Alloy welder Perform welding of Carbon steel pipe Nipple, Certified by POTTS Welding &
Boiler Repair. Tig and Arc process, using filler wire TGS-50 / E7018 welding rod LB-52 under license
from KOBE STEEL inch heavy wall pipe unlimited. And also perform welding of 12 inch carbon
steel pipe heavy wall unlimited, Root pass and Hot pass 100% X-RAY. Filling and Cupping 100% U.T
Ultrasonic Test / P.T Penetrant Test and MPI Magnetic Particle Inspection. Perform welding Prea
Heating 200 centigrade.
Assign in alloy pipe control valve 6 inch heavy wall AUX STEAM main steam PESUR HEATER
TRESSURE. STEAM LINE. Using filler wire arc MOV-N TIG ER90S-B9 AWS. 5.28 And E90S-b15.
Prea Heating 200 centigrade Root pass and Hot pass 100% X-RAY. Filling and Capping 100% U.T
Ultrasonic Test / P.T Penetrant Test and MPI Magnetic Particle Inspection. Last NDT process 100% XRAY for two times.
All of this welding activities, Inspection by TUV SUD GruppeeV. Philippines Branch (Technisher
Uberwachung Verein) TUD SUD ROMANIA S.R.L. BUCURESTI and COVANTA energy personnel.

COMPANY (8-A)
Employment Date:
Name of Company:
Country:
Project Name:
Country:
Position:

April 02, 2009 to April 09, 2009


BETANS BOILER & REPAIR SERVICES
7341 A. Bonifacio Ext. San Dionecio, Paranaque City. Philippines
MASBATE GOLD POWER PLANT PROJECT
FILMINERA Resources Corporation
PURO, AROROY, Masbate Philippines
TIG WELDER GTAW
5

COMPANY (8-B)
Employment Date:
Name of Company:
Country:
Project Name:
Country:
Position:

DUTIES AND RESPONSIBILITIES:


Assign in fabrication shop, Assist Boiler Maker repair and assembled of Boiler Heater Economizer.
Fit-up and Full welding of U-BEND 180 degree BOILER TUBES, 1 inch. Thickness 3.6mm using
filler wire TGS-50 KOBELCO 2.4mm all Tig process 100% X-RAY By CIFRA Industrial Services
Corporation NDT and Heat Treatment Specialist. All welding joints passed for X-RAY and HYDRO
Testing.
Prepare all welding tools and equipment for jobs assignment in Super Heater Boiler, 728 joints 1
inch. 3.6mm thickness Boiler tubes. Cutting and Grinding Beveling of Boiler tubes.
Notes: All Boilers tubing U-BEND rejected By FOYRY Inspector. Due to that thickness of U-BEND not
in accordance with the procedures required.
Back to home Base and find other welding job.

COMPANY (9)
Employment Date:
Name of Company:
Country:
Project Name:
Country:
Position:

Position:

January 30, 2009 to February 11, 2009


J.I.T.S CORPORATION
4B HGL Building 554 Edsa Cor. Biglang Awa St. Caloocan City. Philippines
TEAM ENERGY strength in synergy
PAGBILAO POWER STATION
Pagbilao Quezon Province, Philippines
TIG WELDER GTAW / SMAW

DUTIES AND RESPONSIBILITIES


Preparation of welding machine cable wire to the area where we work on and assist pipe fitter.
Dismantling of depict pipe and replacement of new pipe spools such as flanges, tees, elbows, etc.
Cutting of pipe spools 10 inch. Carbon steel pipe schedule 40 pipes on SLURRY TANK area. Used
filler wire ER70S-6 and E7018 Tig & Arc process. PT Penetrant Test only.

COMPANY (10)
Employment Date:
Name of Company:
Country:
Project Name:

March 08, 2009 to March 28, 2009


BETANS BOILER & REPAIR SERVICES
7341 A. Bonifacio Ext. San Dionecio, Paranaque City. Philippines
CEBU PRIVATE POWER PLANT
VECO/CARBON Cebu City Philippines
TIG WELDER GTAW

March 28, 2008 to December 09, 2008


PAGE & MACRAE Ltd.
61 Aerodrome Road, P.O Box 4050, Mount Maungani, New Zealand
KAWERAU GEOTHERMAL POWER PLANT Ltd.
And FARICATION SHOP
TIG WELDER GTAW / SMAW/ FCAW / GMAW SST

DUTIES AND RESPONSIBILITIES:


Full cooperation to piping supervisor for the daily work assignments and give instruction the Pilipino
welders.
Responsible for safe performance of welding activities in accordance with procedures specification and
for optimizing productivity.
Brief welder and assign the welders in different station or Job assignment according to their
Qualification.
Ensure that all personnel working in the welding areas are suitably trained for the work they are to
perform.
6

Qualified of 1/2 Diameter Pipe 2.77mm Thickness C/S Carbon Steel and S/S Stainless Steel 6G
Position all Tig GTAW Process. Qualified of 2 Diameter Pipe 3.91mm Thickness C/S Carbon Steel
and S/S Stainless Steel all Tig GTAW Process 6G Position. Qualified of 6 Diameter Pipe 7.11mm
Thickness C/S Carbon Steel Tig and Arc GTAW / SMAW Process 6G Position. Qualified of 6
Diameter Pipe 8.2mm Thickness. FCAW / GMAW MIG STT solid wire for root pass used Argon
shield and flux cored wire used CO2 for cupping 1G Rotated Position. Qualified of INNER
SHIELD welding downhill and horizontal position. Qualified for Plate 20mm Thickness NZS4711
for the following code HD- HX- HV- HO all stick SMAW Process and Qualified for Plate 12mm
Thickness NZS4711 for the following code FD- FX- FV- FO all FCAW Process Gas used CO2 coil
wire HOBART 71T 1.2mm.
Assign in Fabrication shop, Full welding of Different kind of metal and Different kind size of pipe
small Bore to Big Bore. Responsible to sate up all the welding equipment and responsible to Rigging
the Pipe or plate, used overhead crane.
All of this pipe for the project of KAWERAU GEOTHERMAL POWER PLANT LIMITED under
by the Supervised of SUMITOMO JAPAN COMPANY.
Assign in GRAB (9 pcs.) For Southern stevedores and GBAB parts, full welding for FCAW
procedure Description carbon steel Flux cored wire HOBART 71T coil wire. Gas used CO2. Heating
first before proceed to weld used oxygen and acetylene. Responsible to rigging the GRAB and GRAB
parts.
EXPERIENCE IN FABRICATION SHOP ( Used overhead crane )

COMPANY (11-A)
Date Employment:
Name of Agency:
Country:
Name of Company:
Project Name:
Position:

DUTIES AND RESPONSIBILITIES


Qualified FCAW S/S 308 and C/S. For All Tig welding process qualified S/S ER308 for Tig and Arc
welding process GTAW / SMAW ER70S / E7018 100% X-RAY Radiography test.
Assign in GT gas station Unloading Yard.. Perform welding stainless steel Pipe All Tig process ER308
from Diameter 2, 6, 12, 20, 26 schedule 10. For Carbon steel Pipe Tig and Arc process from
Diameter 2, 4, 5, 16, 20 used filler wire ER70S-6 / E7018 100% X-RAY RT.
Specific Training Course: Health Works Medical Group, Reciprocal Courses Basic Plus 05/08.
Respirator Fit Test. Environmental Training for the Freeport LNG Quintana Terminal Project.

COMPANY (11-B)
Employment Date:
Name of Agency:
Country:
Name of Company:
Country:
Position:

May 14, 2007 to August 05, 2007


IPS INTERNATIONAL PLANT SERVICES
101 C-1 Old Underwood Rd. La Porte Texas U.S.A.
INSERV / ZACHRY Construction Corporation (TECHNIP-SAIPEM)
FREEPORT LNG QUINTANA ISLAND, TEXAS U.S.A
TIG & ARC WELDER GTAW / SMAW / FCAW

September 07, 2006 to April 26. 2007


IPS INTERNATIONAL PLANT SERVICES
101 C-1 Old Underwood Rd. La Porte Texas U.S.A.
INSERV Integrated Service Company LLC (COF CUST-O-FAB)
Tulsa, OKLAHOMA, U.S.A
TIG & ARC WELDER GTAW / SMAW / FCAW / GMAW

DUTIES AND RESPONSIBILITIES:


NIGHT SHIFT WORKER, Full cooperation to American Fabrication shop in-charge, and wait
instruction for the Job assignments of Pilipino welders.
Coordinating activities of welders involved in cutting and welding products and structure or Piping
jobs, performance as required by WPS.
Perform weld visual inspection before, during and after welding.
Also responsible for supporting of Quality, Safety and Productivity initiatives.
7

Assign in FABRICATION SHOP of CUST-O-FAB. Perform welding different kind of metal such as
carbon steel ER70S-6 / E7018 1 chrome ER 80S-1 / E8018- B2 2 chrome 1 molly 5A ER90S-B3 /
E9018-B3. Chrome molly must be heating before start to weld and always check Temperature. 100% XRAX R.T, U.T, and P.T. From small bore pipe to Big Bore pipe and plate welding for vessel Tank alloy.
Also qualified to weld of S/S stainless steel ER309 / E309XX ER308 / E308-XX, ER316 / E316-XX,
ER347 / E347-XX and Nickel Alloy ER Nicr-3 and 25/35 s/s Filler wire. 100% X-RAY R.T, U.T. and
P.T. from small Bore pipe to Big Bore pipe.
Also Perform welding FCAW/GMAW used wire 308HT-1 Dia. 0.045 1.2mm used Gas Argon and
Helium mix 90/10, 75/25, 50/50 for Nickel Depend by the client requirement.
Welders responsibility, Alloys check filler wire, Because of the many variables encountered with these
alloys consult approved weld procedure for filler and rod selection.
EXPERIENCE IN FABRICATION SHOP operate overhead crane.

COMPANY (11-C)
Employment Date:
Name of Agency:
Country:
Name of Company:
Project Name:
Position:

DUTIES AND RESPONSIBILITIES:


Qualified for 1G, 2G, 3G, 4G, all smaw process position E 8018 and 1G, 2G, 3G, 4G, all smaw process
position for Plate Copper Nickel ( inconnel monnel )
Assign inside and outside of Vessel tank for build-up undercut weldment or undercut excessive grinding.
Repair of High pressure vessel Coker drum, gouging and welding for 8018 electrode and inconnel
monnel electrode for overlay.
Full welding of nozzle joint used Electrode wire E8018. Before perform of welding always check first
Temperature of metal welding point. Temperature of chrome 8018 to be 300F and 149C . For inconel
Temperature 500F and 260C. This welding process, all smaw with 100% x-ray Radiography test
and UT Ultrasonic Test.
Specific Training Course: Basic plus Reciprocal Courses for Safety Council. 19 FIT1-06/07, 19
PFT-Respirator Test Fit. 19 Wyatt-06/07, 15 COP-CONOCO Philips.

COMPANY (11-D)
Employment Date:
Name of Agency:
Country:
Name of Company:
Project Name:
Position:

June 08, 2006 to June 22, 2006


IPS INTERNATIONAL PLANT SERVICES
101 C-1 Old Underwood Rd. La Porte Texas U.S.A.
WYATT FIELD SERVICES COMPANY Conoco Phillips
Conoco Phillips VDU/BORGER REFINERY AMARILLO, TEXAS U.S.A
SPECIALTY WELDER SMAW (Turn around Vessel Tank Welder)

May 03, 2006 to May 23, 2006


IPS INTERNATIONAL PLANT SERVICES
101 C-1 Old Underwood Rd. La Porte Texas U.S.A.
TURNER INDUSTRIES GROUP, L.L.C.
SASOL North America, Lake Charles Chemical Complex,
LOUISIANA U.S.A
SPECIALTY WELDER TIG & ARC GTAW / SMAW
(Turn Around Combination Welder)

DUTIES AND RESPONSIBILITIES


Assign in Heater (ETHYLENE HEATER) Full welding of coil pipe carbon
Steel Dia. 5 used filler wire ER70s. Dissimilar pipe joining from red carbon steel to Hunter green
chrome molly, used filler wire ER80S-B2 and temperature free Heating required 300F and 149C with
Argon gas purging. Hunter green chrome molly to Blue chrome molly, filler wire used ER90S-B3 Free
Heating required 350F and 177C with Argon gas purging. 100%x-ray PT penetrant test, UT ultrasonic
test and PWHT post weld heat treatment.
8

Also full welding of yellow stainless steel ER308H Dia. 3, 6 pipe 100x-ray and also assign in welding
repair by the order of my welding foreman and the QA/QC. Always check Filler wire used for welding.
Specific Training Course: 19Basic Plus for Safety Council SWLA. 19 Basic Plus for Reciprocal
Course. NCCER- National Center for Construction and Research.
EXPERIENCE IN INSTALLATION SHOTDOWN.

COMPANY (12)
Employment Date: July 23, 2004 to February 10, 2006
Name of Company: G.E. GENERAL ELECTRIC
AVIATION SERVICES OPERATION PTE. LTD.
Area Name:
CFM-56 / Component 33 VANES
Country:
23 LOYANG WAY, SINGAPORE
Position:
TIG WELDING Nickel-ALLOY
TIG SWET WELDING (R80 & R142) (Aircraft Engine Repair)

DUTIES AND RESPONSIBILITIES


Emphasized company rules and regulation and SAFETY implementation, and full cooperation to my
team member and co-workers.
Before perform welding works must think always filler wire to used and always followed by Engineer
procedure for work technique and think QUALITY customer needs.
Welding of CFM 56/33 Vanes incoming parts OP outer platform assemble, Final parts From EDM
Machinist and Airfoil member. Using filler wire R142 / L605 / HAST-X. sweet welding recommended
preheat 175F minimum.
Assist to other Component like -50 vane / 80C and LPT low pressure turbine and sometime weld
ROLLS ROYCE parts.
Willing to assign any kind of work such as Grit Blasting, Airfoil and willing to assist to other cell
especially I can handle the work.
All Process Must pass to FUI florescent ultrasonic inspection UT ultrasonic test and 100% in CLIENT
STANTANDARD.

COMPANY (13)
Employment Date:
Name of Company:
Office Address:
Project Name:
Country:
Position:

February 23, 2002 to March 08, 2004


PETROFAC INTERNATIONAL LTD. / ABB LUMMUS
Petrofac House, Al-soor Street, P.O. Box 23467, Sharjah, UAE
BHP PETROLEUM INTL EXPLORATION LTD.
SONATRACT OHANET, ALGERIA LIQUIFIED NATURAL GAS
DEVELOPMENT PROJECT
ALGERIA
TIG & ARC WELDER GTAW / SMAW (Welding Repair Man)

DUTIES AND RESPONSIBILITIES:


Interpret isometric drawing for welding repair of DUPLEX , S/S stainless steel and Carbon Steel Pipe.
Always followed QA/QC and ASME IX procedure for welding technique. Always check heat
Temperature of metal and think always electrode filler wire used for welding.
Perform welding of DUPLEX Tig and Arc process small bore to big bore using wire ER2209 / E2209
100% x-ray. And also full welding of stainless steel small bore to Big bore Tig & Arc Process using
ER308-L / E308-L 100%x-ray. For Carbon steel 30% to 100% x-ray Tig & Arc process small bore to big
bore pipe used ER70S-6 / E7018.
PQR stainless steel pipe used TGX / R316T1-5 for super root. This Procedure for WELDING
REPAIR only 100% x-ray. And also qualified 6Molly ER NicrMo-3 all Tig process from Diameter 4 to
36 pipe 100% x-ray and UT.
9

COMPANY (14)
Employment Date: July 18, 2001 to October 05, 2001
Name of Company: G.E. GENERAL ELECTRIC
AVIATION SERVICE OPERATION PTE. LTD. AEROSPEC
Area Name:
AIRCRAFT LARGE COMPONENT-COMBUSTOR Cfm-56
Country:
23 LOYANG WAY, SINGAPORE
Position:
CR TECHNICIAN TIG WELDING Ni- ALLOY
(Aircraft Engine Repair CFM Combustor)
DUTIES AND RESPONSIBILITIES:
Report directly to my production Team Leader waiting for the Job assignment and fully cooperate to my
team members. Disassembly the combustor CFM-56. Remove swirlers in inner and outer line must send
to the other process. Water jet, heat treatment solution, Grit blasting and send CI Component Inspection
for Inspection.
Always Think Filler to be used for welding and always follow Client Standard at all times. All process
must pass FUI florescent ultrasonic inspection UT ultrasonic test.

(The company strictly implements this critical inspection for the quality assurance)
a. Water Jet
h. Check size dia. Dimension
b. Solution Heat Treatment
i. (Ht) Stress Relieve
c. Grit Blast
j. Second FPI (U.T)
d. First FPI (UT)
k. Final Grit blast
e. Team Review Blend Louver
l. Pre plasma inspection
f. Welding
m. Plasma spray
g. Routing
n. Final Inspection

COMPANY (15)
Employment Date: March 02, 2000 to March 04, 2001
Name of Company: METITO ARABIA INDUSTRIES
Project Name:
KHUFF GAS CORROSION INHIBITOR INJECTION PUMP
ARAMCO PROJECT
Country:
DAMMAM, KINGDOM OF SAUDI ARABIA
Position:
STAINLESS STEEL TIG WELDER / FCAW (Welding Repair Man)

DUTIES AND RESPONSIBILITIES:


Directly report to the Fabrication Supervisor for job assignment especially welding repair and full
cooperation all co-workers.
Perform welding of stainless Butt joint from Diameter , 1, 2, 4, 6 using filler wire ER316L &
DUPLEX filler wire 22-9-31 / A1461 ASTM A815 / A815M-9L AWS 318080-3 all Tig process used in
RO reverse osmosis ARAMCO project high pressure pump 100%x-ray. And also full welding socket
joint fillet welding from diameter , 1, 2 used wire ER316 for Khuff Gas corrosion inhibitor
injection pump. 100%x-ray.
Full welding of fabricated tank Big bore pipe such as 36 to 120 Diameter. Root pass E6010 Filling
capping used FCAW Manual process. Must pass by UT and X-RAY PT.
EPERIENCE FABRICATION SHOP operated overhead crane and Fork lip.

COMPANY (16)
Employment Date:
Name of Company:
Project Name:
Country:
Position:

April 17, 1999 to January 05, 2000


SAMSUNG ENGINEERING & CONSTRUCTION CO. LTD.
FORMOSA PETROCHEMICAL PROJECT
MALIAO TAIWAN, REPUBLIC OF CHINA
TIG & ARC WELDER GTAW / SMAW (Welding Repair Man)
DUTIES AND RESPONSIBILITIES:
10

Directly report Thailand Foreman for job assignment, repair all welding defect rejection according
to ASME IX procedure from small bore to big bore pipe Carbon steel 2 up to 48 inch pipe. Using filler
wire ER70S-6 and / E 7016 Tig & Arc process 100% X-RAY.
Assign at stainless steel Fabrication shop, Report directly to Korean supervisor. Perform welding of
S/S stainless steel Pipe Butt joint from diameter 2 up to 12 inch pipe. Using filler wire ER308L all Tig
process 100% X-RAY.
EXPERIENCE IN FABRICATION SHOP.

COMPANY (17)
Employment Date: November 27, 1997 to August 23, 1998
Name of Company: HANJUNG KOREA HEAVY INDUSTRIES & CONSTRUCTION CO., LTD.
Project Name:
AL-SHOAIBA POWER PLANT DESALINATION PROJECT
PHASE 2 LOT 1B
Country:
JEDDAH, KINGDOM OF SAUDI ARABIA
Position:
TIG & ARC WELDER GTAW / SMAW

DUTIES AND RESPONSIBILITIES:


Full welding of stainless steel, copper nickel, low alloy, carbon steel butt joint to small bore and Big
bore. Welding inside the pipe root pass Tig process Arc welding for preparation and Tig process for
capping of copper nickel from Diameter 36 up to 120 using filler wire ER70S-2 / E7018 / ER
CUNI / NICU7. 100% X-RAY.
Full welding of structural beam, plate and pipe support carbon steel material and perform of P.T.
Penetrant test.
EXPERIENCE IN INSTALLATION

COMPANY (18)
Employment Date:
Name of Company:
Project Name:
Country:
Position:

May 30, 1997 to November 22, 1997


AMBIT TRADING AND TECHNICAL SERVICES, INC.
NATIONAL POWER CORP. S X300 MEGA WATTS PROJECT
MASINLOC ZAMBALES, PHILIPPINES
TIG & ARC WELDER GTAW / SMAW

DUTIES AND RESPONSIBILITIES:


Directly report to Pipe fitter foreman for job assignment, assign in Fabrication shop perform welding of
carbon steel pipe butt joint dia. 6, 8 used ER70S-6 / E7018. And also assign in pipe rack, perform
welding of carbon steel pipe from diameter 1/2, 1, 2, 4 all TIG process 10% to 20% X-ray.

COMPANY (19)
Employment Date: January 11, 1996 to January 10, 1997
Name of Company: P.E.C PLANT ENGINEERING CONSTRUCTION PTE. LTD.
Project Name:
SERAYA ISLAND PETROCHEMICAL PROJECT SHELL SHIYODA
CORPORATION
Country:
Block 134 # 03-307 L Jurong east streets 13, SINGAPORE 600134
Position:
TIG & ARC WELDER GTAW / SMAW

DUTIES AND RESPONSIBILITIES:


Always wearing safety (PPE) especially during working time and ensure proper shielding of work area
starting to weld used of fire blanket, etc.
Assign at S/S Fabrication shop full welding of stainless steel from diameter up to above 36 using
filler wire ER316L Tig & Arc Process. And also assign in pipe rack perform welding of stainless steel,
chrome molly, carbon steel, socket fittings, fillet welding, pipe support and structural members.
11

Qualified for limitation of SWS Singapore Welding Society CWQS test No. WQT-P1B / CWQS test
no. WQT-P1A / CWQS test No. WQT-P5A / CWQS test no. WQT-P8A.
EXPERIENCE FABRICATION AND INSTALLATION

COMPANY (20)
Employment Date: March 02, 1995 to November 30, 1995
Name of Company: MOHAMMAD AL-MOJIL GROUP
Project Name:
MTBE SADAFT EXPANSION PETROCHEMICAL PROJECT
BROWN & ROOT SAUDI, LTD. CO.
Country:
JUBAIL, KINGDOM OF SAUDI ARABIA
Position:
TIG & ARC WELDER GTAW / SMAW
DUTIES AND RESPONSIBILITIES:
Assign in pipe rack full welding of stainless steel, chrome molly, carbon steel, socket fillet weld pipe
support and structural members using filler ER308L / ER90S-6 / E7018 Tig & Arc process Small Bore to
Big Bore Pipe 100% x-ray.
Prepares welding cables, Torches, Argon Gas and other tools before starting welding works and always
think SAFETY used fire blanket. Always followed company rules and regulation.
COMPANY (21)
Employment Date: July 14, 1993 to January 14, 1995
Name of Company: HYUNDAI DOZ (M) SDN. BHD.
Project Name:
MLNG MALAYSIA LIQUIFIED NATURAL GAS DUA PLANT PROJECT JGC /
KELOGG, JMSB-KMSB-SIME CONSORTIUM
Country:
BINTULO, SARAWAK, EAST MALAYSIA
Position:
TIG & ARC WELDER GTAW / SMAW
DUTIES AND RESPONSIBILITIES:

Assign in pipe rack full welding of carbon steel fillet welding of structural member pipe support
member carbon steel and stainless steel materials. Used rod E7018 and E316L. TIG welding process
used wire ER70S-6 / E7018 / E7016 small to big bore pipe 100% X-ray.

FAMILY PERSONAL DATA


Beneficiary
Passport No.
Date Issued
Address
Email add
Occupation

: Winnie S. Vergas (Wife)


Birth date
: November 15, 1964
: XX2709798
: 17 Dec 2008 Validity
: 16 Dec 2013 Place issued : Cagayan de Oro
: KNHS Kapatagan National High School
Kapatagan Lanao Del Norte 9214
: winnie_vergas@yahoo.com
: Science Secondary Teacher

Daughter
: Lei Allura S. Vergas
Passport No. : XX2710390
Date Issued : 17 Dec 2008 Validity
Son
: Grant Jhun S. Vergas
Passport No. : XX2695525
Date Issued : 17 Dec 2008 Validity

Birth date

: December 25, 1997

: 16 Dec 2013 Place issued : Cagayan de Oro


Birth date

: August 12, 1999

: 16 Dec 2013 Place issued : Cagayan de Oro

CHARACTER REFERENCES
Dexter Serindo
Piping Foreman
Metalite Builders Devepment Co., Inc.

Porperio Liscano
Welding Supervisor
12

Jason Lam
Supervisor
G.E. Singapore

Linda Sim
HR Department
G.E. Singapore

Alina Dorofeyeva
Personnel Officer
Petrofac, UAE

Willis Paiso
Piping Supervisor
Petrofac, UAE

I hereby certify that the above information is true and correct to the best of my knowledge and belief.
Maximiano T. Vergas Jr

13

Potrebbero piacerti anche