The material used shall be new and best of its kind available and shall
conform to relevant Indian and International Standards.
01.02
01.03
The guarantee shall also cover faulty design/ materials/ workmanship. All
rectification or replacement under the guarantee shall be done by the
Supplier free of cost.
01.04
01.05
01.06
The Tenderer should study the specification and satisfy himself regarding
the workability of the proposed system and shall take full responsibility for
the design of the equipment, quality of the material, workmanship,
guaranteed operation and smooth performance etc. of the equipment.
This technical specification is only guidance to the Tenderer and hence all
the items necessary for safe and satisfactory operation and guaranteed
performance of the proposed equipment shall be included in the scope of
supply, though this might not have been specifically mentioned in the
technical specification.
01.07
01.08
Page 1 of 4
01.09
01.10
01.11
Any other observation / test felt necessary for judging the performance of
the machines and mutually agreed between Contractor and Purchasers
shall be carried out.
01.12
01.13
01.14
01.15
Design capacity of crusher output is delivered with all its drives and
accessories functioning properly over a minimum period of eight
(8) hours of continuous run.
Page 2 of 4
ii)
01.16
All the equipment, tools and tackles required for the successful
completion of the performance tests shall be supplied by the successful
Tenderer.
01.17
All the instruments for the performance tests as required shall be supplied
by the successful Tenderer and shall be retained by him till the
satisfactory conclusion of all tests at site. All costs associated with the
supply, calibration, installation and return of test instruments shall be
included in the scope of supply. All test instruments shall be as per
standards approved by Purchaser.
01.18
01.19
01.20
01.21