Sei sulla pagina 1di 79

SEASONAL SUMMARY REPORT

MAHA 2015 / 16

Seasonal Summary Report - Maha 2015/16


---------------------------------------------------------

SUMMARY

Page

1.

-Introduction

2.
2.1

-Overview of the Plan


-Hydrology
-Rainfall
-Macro-System Diversions
-Irrigation Systems
-Energy Generation

3.
3.1
3.2

-Comparison of Planning and Actual System Performance


-Macro System
-Irrigation Systems

5
5
6

4.
4.1
4.2
4.3

-Seasonal Highlights 2015/16 Maha season


-Macro System
-Diversion to Subsystems
-Irrigation Subsystems

7
7
8
9

2.1.1
2.2
2.3
2.4

3
4
4

APPENDIX 1

-Tables containing projected Macro system performance.

1.1

APPENDIX 2

-Tables containing projected irrigation system performance.

2.1

APPENDIX 3

-Graphical representation of projected and actual reservoir levels

3.1

APPENDIX 4

-Graphical representation of projected and actual tank levels.

4.1

1.

Introduction
----------------This review of the seasonal operating plan for Maha 2015/16 cropping season presents
the actual observations and performances of the system as against the plan which was
prepared at the beginning of the season.

2.

Overview of the plan


--------------------------The Seasonal Operating Plan has been prepared by adapting the following basis

2.1 Hydrology
--------------30 years of hydrologic records starting from 1983 had been used in examining
alternatives. As in the past '80% dry' hydrologic conditions were used to estimate the
reliable irrigation water supply, capable of supporting the planned crop with a high
degree of reliability. This has been done with the intention of giving a higher priority to
irrigation requirements. Diversions and energy generation has also been calculated on
the basis of 'Average' hydrologic conditions to indicate the effect of hydrologic variability.
2.1.1 Rainfall
-----------Average and dry monthly rainfall values with respect to each irrigation scheme have
been derived from the same data base that had been used in determining average and
dry sluice issues. The observed or recorded monthly rainfall of the past season with
respect to these same irrigation schemes is given as actual rainfall.
2.2 Macro-System Diversions
-----------------------------------The following assumptions, priorities and mandatory releases had been adopted in the
calculation of macro system diversions.
2.2.1 Assumptions
------------------ The uncontrolled river flows were assumed to be 90% effective in satisfying the
diversion requirements at structures with little head pond storage (Polgolla, Minipe,
Elahera, Angamedilla and Kandakadu).
The diversions at Polgolla would only be made to meet irrigation deficits along the
Amban Ganga.
The power plants would be operated in such a way that spilling at downstream
diversion points be minimized.
2.2.2 Priorities
-------------Generally, irrigation diversions in the Mahaweli complex had been given priority over
energy generation. Among irrigation Systems, those having no regulation facilities
(storage) were given the highest priority. Those areas with large regulation in relation to
cropped area were given the lowest priority.

2.3 Irrigation Systems


------------------------The following data and methodology had been adopted in calculating irrigation scheme
water requirements.
2.3.1 Crop Data
---------------Target cropping patterns, namely the crop type, extent of each type, starting dates and
duration were estimated initially by the irrigation management agencies (MASL & ID)
responsible for the particular irrigation scheme. These data may have been
subsequently altered to suit the overall availability of water.
2.3.2 Irrigation Requirements
---------------------------------The Irrigation requirements of each scheme were estimated on the basis of hydrology,
soil type, crop type, canal distribution system, and recent experience with water use
efficiency. This led to the estimation of sluice issue requirements for each scheme.
2.3.3 Diversion Requirements
---------------------------------Knowing the irrigation requirement from the sluice of each tank and the local runoff, tank
operation was simulated over the season. This yielded the requirement for diversion into
the tank and finally the requirement for diversion into the particular irrigation system.
2.4 Energy Generation
--------------------------The following procedure had been adopted in estimating the energy generation to be
expected from the Mahaweli complex hydropower stations.
2.4.1 Energy Demand
----------------------Energy demands on monthly basis over the season had been estimated by CEB prior to
the preparation of the plan.
2.4.2 Plant Availability
------------------------Plant availability with respect to each power plant also was provided by CEB according
to their maintenance program. However, the availability of new plants had been
assumed according to their respective commissioning schedules.
2.4.3 Generation
---------Expected energy generation was subject to uncertainty due to the variability of
catchment inflow supplying reservoirs and regulating ponds. The available hydro-electric
energy had been estimated initially based on projected irrigation requirements. The
potential for generating additional hydro energy without affecting the plan for irrigation
releases was then examined by imposing rule curves on the major reservoirs.

Comparison of planning and actual system performance


-------------------------------------------------------------------------In this section the actual performance of the macro and irrigation systems is compared
with the expected system performance, as presented in the Seasonal Operating Plan
and subsequent updates.

3.1 Macro System


------------------3.1.1 Diversions
----------------Table 1.1A compares projected and actual diversion at the following locations:

Polgolla
Bowatenne
Elahera
Angamedilla
Minipe
Kandakadu

3.1.2 Reservoir Behavior and Energy Generation


---------------------------------------------------------A comparison of planned and actual reservoir behaviours and energy generation are
given in the following tables.
Table 1.1B - System Energy Generation
Table 1.2A - Castlereagh
Table 1.2B - Moussakele
Table 1.2C - Samanalawewa
Table 1.2D - Kotmale
Table 1.2E - Polgolla
Table 1.2F - Victoria
Table 1.2G - Randenigala
Table 1.2H - Rantambe
Table 1.2I - Bowatenna
The following figures show the actual reservoir trajectories against the projected ones
for comparison.
Figure 3.11 - Castlereagh
Figure 3.12 - Moussakele
Figure 3.13 - Kotmale
Figure 3.14 - Victoria
Figure 3.15 - Randenigala
Figure 3.16 - Rantambe
Figure 3.17 - Bowatenna
Figure 3.18 Samanalawewa

3.2 Irrigation Systems


------------------------A comparison of planned and actual irrigation system performance is presented in
Appendix 2 of this report. The following systems are discussed.
Systems H, IH & MH
Systems D1 & G
System D2
System E
System B & C
System A
System walawe

3.2.1 Systems H, IH & MH


----------------------------The comparison of planned and actual diversions within the systems is given in Table
2.1A.and Table 2.2A. Comparison of performance scheme by scheme basis is given in
the following tables.
Table 2.1B - Dambulu Oya
Table 2.1C - KHFC
Table 2.1D - Kandalama
Table 2.1E - Kalawewa RB
Table 2.1F - Kalawewa YE
Table 2.1G - Kalawewa LB
Table 2.1H - Rajangana
Table 2.1I - Neela Bemma
Table 2.2B - Hurulu wewa
Table 2.2C - Nachchaduwa
Table 2.2D - Nuwarawewa
Table 2.2E - Tissawewa

The following figures show the actual tank trajectories. The planned trajectories are also
shown for comparison.
Figure 4.11 - Kandalama
Figure 4.12 - Kalawewa
Figure 4.13 - Rajangana
Figure 4.21 - Huruluwewa
Figure 4.22 - Nachchaduwa
Figure 4.23 - Nuwarawewa
Figure 4.24 - Tissawewa

3.2.2 Systems D1, D2 & G


-----------------------------The comparison of planned and actual diversions within the systems is given in Table
2.3A. Comparison of performance on a scheme by scheme basis is given in the
following tables.
Table 2.3B - Elahera
Table 2.3C - Giritale
Table 2.3D - Minneriya
Table 2.3E - Kaudulla
Table 2.3F - Kantale
Table 2.3G - PSS
The following figures show the actual tank trajectories. The planned trajectories are also
shown for comparison.
Figure 4.31 - Giritale
Figure 4.32 - Minneriya
Figure 4.33 - Kaudulla
Figure 4.34 - Kantale
Figure 4.35 - PSS
3.2.3 System E, C & B
-----------------------The comparison of planned and actual diversions within the systems is given in Table
2.4A. Comparison of performance on a scheme by scheme basis is given in the
following tables.
Table 2.4B Minipe LB
Table 2.4C - Sorabora
Table 2.4D - Mapakada
Table 2.4E - Dambarawa
Table 2.4F Ulhitiya/Rathkinda
Table 2.4G - Maduru oya LB
The following figures show the actual tank trajectories. The planned trajectories are also
shown for comparison.
Figure 4.41- Ulhitiya/Ratkinda
Figure 4.42- Maduru oya

3.2.4 System A
--------------The comparison of planned and actual diversions and performance are given in Table
2.5A and Table 2.5B respectively.

3.2.5 System Walawe


-----------------------The comparison of planned and actual diversions within the system is given in Table
2.6A. Comparison of performance on a scheme by scheme basis is given in the
following tables.
Table 2.6B Kaltota
Table 2.6C Uda Walawe RB
Table 2.6D Uda Walawe LB
Table 2.6E Lyangastota LB
Table 2.6F Liyangastota RB
The actual and planned trajectories of Uda Walawe reservoir is shown in Figure 4.51 for
comparison.
4

Seasonal Highlights 2015/16 Maha Season


---------------------------------------------------------

4.1 Macro System


------------------Hydrological situation in Mahaweli, Kelani and Walawe systems was favorable during the
2015/16 Maha season. Inter monsoon and North East monsoon rains brought heavy
inflows to all hydropower reservoirs except Victoria reservoir during first half of the
season. Hydrological situation in Randenigala reservoir was below the long term
average condition and that in other reservoirs in Mahaweli system was drier than 80%
exceedance level during the period of last two months of Maha 2015/16 season.
Seasonal inflow to Polgolla Barrage was 713 mcm and that was the highest inflow.
Refer the comparison of actual hydrological situation with statistical parameters table
4.1.
Reservoir spilling were occurred in Victoria, Randenigala and Rantambe reservoirs
during the month of December and Polgolla and Bowatenna reservoirs were spilling in
the first half of the season.
By the end of the season reservoir levels in Kotmale and Victoria in Mahaweli basin,
Castlereigh and Moussakele in Kelani basin and Samanalawewa and Udawalawe
reservoirs in Walawe basin were dropped while Randenigala reservoir in Mahaweli
basin was behaving at the top level.

Due to high inflows the total stored energy was increased from 79% to 94% by the end
of December and that was lowered 68% to facilitate necessary irrigation requirements in
downstream projects.
Hydro energy generation in Mahaweli system was 20%
19% from the total energy generation.

and other hydro systems was

Figure 4.1 Energy generation Maha 2015/16

4.2 Diversions to Subsystems


---------------------------------During the months of October and November, Polgolla diversions were made to bring
the downstream reservoir levels up in systems H, IH, MH & D1. In addition diversions
were increased to satisfy the downstream irrigation requirement in the period of January
and February 2016. With the onset of North East monsoon rains all macro and irrigation
reservoir levels increased up to the spill level.
Diversion to irrigation systems H, IH and MH was below the long term average value
planned in SOP. With the heavy inflows to Bowatenna reservoir during the period from
October to December diversions to system D1 and G had increased and that was
exceeded the long term average values in the SOP.
Diversion to System B and C was below the long term average condition due to high
water levels of Ulhitiya reservoir and diversion from Ulhitiya to Maduru Oya was made
throughout the season to store additional water in Maduruoya reservoir and to minimize
Ulhitiya spills.
4.3 Irrigation Sub Systems
---------------------------At the beginning of the season all downstream reservoirs were at low levels except
Kalawewa, Rajanganaya, Nuwarawewa and Parakrama Samudraya reservoirs which
had considerable storages.
With the onset of NE monsoon rains high inflows received to all irrigation reservoirs and
reservoir spilling were started during the period of November& December and reservoir
levels were behaving around full supply level during the latter part of the season.
Every irrigation scheme cultivated 100% during Maha 2015/16.

All irrigation schemes in system H, IH, and MH except Nachchaduwa and Nuwarawewa
established their cultivation during latter part of October and first week of November.
Nachchaduwa and Nuwarawewa commenced their cultivation on first half of October. In
st
EMYE system all irrigation schemes started their cultivation on 01 November and
nd
th
Kantale & Parakrama Samudraya started on 22 and 27 October respectively.
System E started on 5th October and Sorabora, Mapakada and Dambarawa systems
commenced their cultivation in the second half of October while other schemes in Minipe
system were starting the land preparation during first half of November.
In Walawe system cultivation was established in first half of November and Kalltota
Amuna started on 15th October 2015.

10

Table 4.1 - Comparison of Actual Hydrological Situation with statistical parameters - Maha 2015_16

Station
Kotmale

Polgolla

Victoria

Randenigala

Rantembe

Bowatenna

Moussakele

Castlereigh

Samanalawewa

Uda Walawe

Hydrology
average
80%Prob
20%Prob
Maha 2015/16
average
80%Prob
20%Prob
Maha 2015/16
average
80%Prob
20%Prob
Maha 2015/16
average
80%Prob
20%Prob
Maha 2015/16
average
80%Prob
20%Prob
Maha 2015/16
average
80%Prob
20%Prob
Maha 2015/16
average
80%Prob
20%Prob
Maha 2015/16
average
80%Prob
20%Prob
Maha 2015/16
average
80%Prob
20%Prob
Maha 2015/16
average
80%Prob
20%Prob
Maha 2015/16

Oct
Nov
Dec
Jan
Feb
Mar
Total
104.9
80.0
65.2
46.1 28.3
26.4
350.9
95.2
62.2
41.6
31.2 25.8
29.0
284.9
131.1
94.8
78.0
56.8 36.9
33.0
430.5
129.6
156.9
84.5
37.9 17.1
12.3
438.3
126.0
118.7
71.6
37.8 25.4
33.5
413.1
108.1
88.6
42.4
32.2 17.1
22.9
311.3
156.3
170.4
88.7
43.8 30.5
32.0
521.7
199.8
228.6
194.5
45.3 20.7
23.7
712.6
64.6
91.7
80.2
82.1 39.7
33.1
391.3
58.7
74.5
57.2
47.2 16.4
15.6
269.6
72.1
115.8
89.1 109.8 34.4
41.6
462.9
50.1
68.5
146.1
57.3
0.0
21.8
343.8
39.3
81.0
84.1 102.9 47.1
25.8
380.2
50.4
63.0
64.1
54.4 19.4
11.7
263.1
46.3
91.2
84.8 121.6 67.7
36.7
448.4
53.8
84.0
147.9 105.0 43.7
23.9
458.4
53.1
84.0
93.9
91.3 58.8
41.3
422.4
49.4
75.6
54.4
70.8 43.1
35.8
329.1
54.5
90.5
138.6 110.0 82.3
44.8
520.6
79.4
106.0
109.7
29.4 23.5
4.2
352.0
25.5
61.1
72.8
66.5 41.1
33.4
300.3
18.9
54.5
63.3
47.8 27.2
23.0
234.7
25.2
78.6
91.6
73.6 57.5
42.3
368.8
46.7
82.1
165.0
31.1
0.3
0.4
325.7
39.2
27.7
14.9
12.8
9.1
11.6
115.3
34.4
20.5
11.4
10.6
7.9
11.8
96.6
40.4
37.0
19.4
15.6 11.8
12.4
136.6
48.0
44.2
22.5
10.9
6.5
6.8
138.9
21.5
22.7
14.2
9.5
7.6
10.0
85.4
15.8
18.1
10.3
6.5
6.0
8.1
64.9
34.1
27.6
17.9
7.4
8.1
15.2
110.3
36.1
50.9
27.5
11.3
7.2
6.5
139.5
34.2
62.6
51.4
36.9 26.4
53.4
264.9
35.8
57.7
45.6
29.6 16.1
31.4
216.2
43.2
71.1
59.9
46.6 27.8
51.1
299.9
77.5
96.8
67.5
34.2 16.2
24.4
316.5
18.9
71.1
55.2
43.8 27.4
41.3
257.7
12.2
76.5
27.1
34.0
9.1
5.3
164.2
35.9
77.3
92.9
52.7 32.6
89.1
380.4
131.4
265.8
177.9
37.4 30.5
18.6
661.6

APPENDIX 1
PROJECTED MACRO SYSTEM PERFORMANCE

Page : 1.1
Table no.
Title

:
:

1.1A
Mahaweli Complex Projected Diversions

-----------------------------------------------------------------------Diversions
| Hydro. |
Monthly Diversion Volume (MCM)
|
----------------| Condi
|---------------------------------------|
From
To
| -tion
|
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
----------------|---------|---------------------------------------|----Pol
Amban | Average |
21
21
25
40
55
13 | 175
golla
Ganga | Dry
|
28
36
49
71
73
10 | 266
| Actual |
45
70
33
68
72
50 | 339
----------------|---------|---------------------------------------|----Bowa
System | Average |
25
51
61
68
60
27 | 292
tenna
H,IH,MH| Dry
|
21
35
46
64
66
23 | 255
| Actual |
37
52
54
59
49
24 | 275
----------------|---------|---------------------------------------|----Elahera System | Average |
10
33
62
53
49
28 | 233
D1 & G | Dry
|
10
30
60
34
40
24 | 197
| Actual |
41
72
46
46
45
34 | 284
----------------|---------|---------------------------------------|----Angame
System | Average |
21
32
28
34
28
11 | 154
dilla
D2
| Dry
|
22
31
20
28
24
8 | 132
| Actual |
11
29
30
49
37
11 | 167
----------------|---------|---------------------------------------|----Minipe
System | Average |
14
30
26
25
12
4 | 111
LB
E
| Dry
|
15
28
16
22
10
4 |
94
| Actual |
2
18
15
46
22
11 | 115
----------------|---------|---------------------------------------|----Minipe
System | Average |
32
87
106
90
125
71 | 511
RB
B & C | Dry
|
16
80
88
33
104
49 | 371
| Actual |
36
36
48
67
106
33 | 326
----------------|---------|---------------------------------------|----Kandaka System | Average |
18
45
28
40
8
0 | 138
du
A
| Dry
|
17
42
27
30
7
0 | 122
| Actual |
N/A
N/A
N/A
N/A
N/A
N/A | N/A
-----------------------------------------------------------------------Note : 1 MCM = 0.81 T ac-ft

Page : 1.2
Table no.
Title

:
:

1.1B
System Energy Generation

-----------------------------------------------------------------------|
|Hydro.
|
Monthly energy generation (GWH)
|
System |Station |Condition|---------------------------------------|
|
|
|
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
-------|--------|---------|---------------------------------------|----|Kotmale | Average |
42
40
36
29
29
12 | 187
|
| Dry
|
31
31
29
22
31
10 | 154
|
| Actual |
66
86
60
21
28
17 | 278
|--------|---------|---------------------------------------|----M
|Victoria| Average |
76
59
64
53
50
46 | 348
a
|
| Dry
|
55
59
19
31
39
35 | 238
h
|
| Actual |
71
102
143
101
62
51 | 531
a
|--------|---------|---------------------------------------|----w
|Randeni | Average |
4
22
44
41
31
24 | 166
e
|gala
| Dry
|
3
16
20
23
25
17 | 104
l
|
| Actual |
10
37
87
66
32
20 | 253
i
|--------|---------|---------------------------------------|----|Rantembe| Average |
4
14
21
20
15
12 |
85
|
| Dry
|
3
11
12
13
12
7 |
58
|
| Actual |
10
24
38
30
15
9 | 126
|--------|---------|---------------------------------------|----|Ukuwela | Average |
4
4
5
7
10
3 |
33
|
| Dry
|
5
7
9
13
14
2 |
49
|
| Actual |
8
13
6
13
14
9 |
64
|--------|---------|---------------------------------------|----|Bowa
| Average |
0
1
1
2
3
0 |
6
|tenna
| Dry
|
0
1
1
0
0
0 |
2
|
| Actual |
1
11
15
5
2
2 |
37
|--------|---------|---------------------------------------|----|Sub
| Average |
130
139
171
151
138
96 | 824
|Total
| Dry
|
97
124
90
103
120
71 | 606
|
| Actual |
167
274
350
236
155
108 | 1289
------------------------------------------------------------------------

Page : 1.3
Table no.
Title

:
:

1.1B
( Contd. )
System Energy Generation

-----------------------------------------------------------------------|
|Hydro.
|
Monthly energy generation (GWH)
|
System |Station |Condition|---------------------------------------|
|
|
|
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
-------|--------|---------|---------------------------------------|----|Canyon | Average |
17
40
38
24
20
10 | 148
|
| Dry
|
13
39
32
17
16
6 | 122
|
| Actual |
9
13
15
11
15
18 |
80
|--------|---------|---------------------------------------|----K
|New
| Average |
60
2
3
3
4
3 |
74
e
|Laxapana| Dry
|
56
1
2
2
3
2 |
66
l
|
| Actual |
38
47
49
34
44
55 | 267
a
|--------|---------|---------------------------------------|----n
|Polpiti | Average |
51
30
33
33
30
32 | 209
i
|ya
| Dry
|
51
27
30
28
26
29 | 190
|
| Actual |
36
43
43
25
33
32 | 213
&
|--------|---------|---------------------------------------|----|Wimala | Average |
8
11
11
7
9
9 |
55
|surendra| Dry
|
7
9
11
5
7
7 |
44
|
| Actual |
10
24
16
7
12
7 |
78
|--------|---------|---------------------------------------|----|Laxapana| Average |
26
31
27
19
22
24 | 148
|
| Dry
|
22
28
21
17
19
21 | 128
|
| Actual |
29
37
36
18
27
18 | 166
|--------|---------|---------------------------------------|----|Samanala| Average |
26
37
5
22
48
6 | 144
|wewa
| Dry
|
25
37
1
22
35
3 | 123
|
| Actual |
29
53
60
38
30
49 | 258
|--------|---------|---------------------------------------|----|Kukule | Average |
40
38
24
20
10
10 | 141
|
| Dry
|
39
32
17
16
6
9 | 118
|
| Actual |
47
40
27
14
7
5 | 139
|--------|---------|---------------------------------------|----|Mini
| Average |
2
3
3
4
3
2 |
16
|Hydro
| Dry
|
1
2
2
3
2
2 |
12
|
| Actual |
3
8
10
8
4
2 |
34
|--------|---------|---------------------------------------|----|Sub
| Average |
230
191
143
131
145
96 | 936
|Total
| Dry
|
214
175
115
109
113
77 | 804
|
| Actual |
202
265
256
156
172
185 | 1236
-----------------------------------------------------------------------| Average |
359
330
313
283
283
192 | 1760
Total hydro
| Dry
|
311
300
205
212
233
149 | 1410
| Actual |
369
539
606
392
326
293 | 2525
------------------------------------------------------------------------

Page : 1.4
Table no.
Title

:
:

1.1B
( Contd. )
System Energy Generation

-----------------------------------------------------------------------|
|Hydro.
|
Monthly energy generation (GWH)
|
System |Station |Condition|---------------------------------------|
|
|
|
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
-------|--------|---------|---------------------------------------|----|Coal
| Average |
477
554
526
573
474
573 | 3176
|Power
| Dry
|
477
554
573
573
474
573 | 3223
|
| Actual |
N/A
N/A
N/A
N/A
N/A
N/A | N/A
|--------|---------|---------------------------------------|----T
|Diesel | Average |
76
14
0
45
67
74 | 277
h
|
| Dry
|
76
44
69
74
67
74 | 404
e
|
| Actual |
N/A
N/A
N/A
N/A
N/A
N/A | N/A
r
|--------|---------|---------------------------------------|----m
|Steam
| Average |
0
0
0
0
0
0 |
0
a
|
| Dry
|
0
0
0
0
0
0 |
0
l
|
| Actual |
N/A
N/A
N/A
N/A
N/A
N/A | N/A
|--------|---------|---------------------------------------|----|Gas
| Average |
46
0
0
0
42
121 | 209
|
| Dry
|
110
0
0
41
96
121 | 368
|
| Actual |
N/A
N/A
N/A
N/A
N/A
N/A | N/A
|--------|---------|---------------------------------------|----|Private | Average |
18
0
0
11
16
90 | 135
|Power
| Dry
|
18
16
0
18
16
132 | 200
|
| Actual |
N/A
N/A
N/A
N/A
N/A
N/A | N/A
|--------|---------|---------------------------------------|----|Sub
| Average |
617
568
526
629
599
858 | 3796
|Total
| Dry
|
682
614
641
706
653
900 | 4195
|
| Actual |
N/A
N/A
N/A
N/A
N/A
N/A | N/A
-----------------------------------------------------------------------Total
| Average |
976
898
840
911
882 1049 | 5556
Energy
| Dry
|
993
914
847
917
886 1048 | 5605
Generation
| Actual |
N/A
N/A
N/A
N/A
N/A
N/A | N/A
------------------------------------------------------------------------

Page : 1.5
Table no.
Title
Reservoir name

:
:
:

1.2A
Projected Macro System Reservoir Behaviour
Castlereagh

| Hydro. |
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
-----------------|--------|---------------------------------------|----Available plant | Plan
|
45
46
45
38
43
42 |
Capacity (MW)
| Actual |
50
50
50
50
50
50 |
-----------------|--------|---------------------------------------|----| Avg.
|
8
11
11
7
9
9 |
55
Energy Generation| Dry
|
7
9
11
5
7
7 |
44
(GWH)
| Actual |
10
24
16
7
12
7 |
78
-----------------|--------|---------------------------------------|----| Avg.
|
15
21
21
14
17
19 | 107
Power Flow (MCM) | Dry
|
13
16
20
9
14
15 |
87
| Actual |
21
48
32
15
23
15 | 154
-----------------|--------|---------------------------------------|----| Avg.
|
0
0
0
0
0
0 |
0
Spill/Downstream | Dry
|
0
0
0
0
0
0 |
0
Release (MCM)
| Actual |
0
3
0
0
0
0 |
3
-----------------|--------|---------------------------------------|----| Avg.
|
36
38
32
27
18
10 |
End Storage (MCM)| Dry
|
30
35
27
24
15
8 |
| Actual |
44
44
40
37
20
12 |
-----------------------------------------------------------------------Note : 1 MCM = 0.81 T ac-ft

Page : 1.6
Table no.
Title
Reservoir name

:
:
:

1.2B
Projected Macro System Reservoir Behaviour
Moussakele

| Hydro. |
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
-----------------|--------|---------------------------------------|----Available plant | Plan
|
54
54
55
54
53
51 |
Capacity (MW)
| Actual |
50
50
50
50
50
50 |
-----------------|--------|---------------------------------------|----| Avg.
|
17
40
38
24
20
10 | 148
Energy Generation| Dry
|
13
39
32
17
16
6 | 122
(GWH)
| Actual |
9
13
15
11
15
18 |
80
-----------------|--------|---------------------------------------|----| Avg.
|
36
4
24
33
27
28 | 152
Power Flow (MCM) | Dry
|
38
1
16
31
24
26 | 136
| Actual |
20
29
33
24
33
40 | 179
-----------------|--------|---------------------------------------|----| Avg.
|
0
0
0
0
0
0 |
0
Spill/Downstream | Dry
|
0
0
0
0
0
0 |
0
Release (MCM)
| Actual |
0
0
0
0
0
0 |
0
-----------------|--------|---------------------------------------|----| Avg.
|
80
104
94
73
55
37 |
End Storage (MCM)| Dry
|
70
92
89
70
54
39 |
| Actual |
104
119
109
96
69
37 |
-----------------------------------------------------------------------Note : 1 MCM = 0.81 T ac-ft

Page : 1.7
Table no.
Title
Reservoir name

:
:
:

1.2C
Projected Macro System Reservoir Behaviour
Samanalawewa

| Hydro. |
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
-----------------|--------|---------------------------------------|----Available plant | Plan
|
116
75
116
117
115
114 |
Capacity (MW)
| Actual |
120
120
120
120
120
120 |
-----------------|--------|---------------------------------------|----| Avg.
|
26
37
5
22
48
6 | 144
Energy Generation| Dry
|
25
37
1
22
35
3 | 123
(GWH)
| Actual |
29
53
60
38
30
49 | 258
-----------------|--------|---------------------------------------|----| Avg.
|
33
47
7
28
62
7 | 184
Power Flow (MCM) | Dry
|
32
48
1
28
44
4 | 157
| Actual |
36
64
72
47
37
61 | 318
-----------------|--------|---------------------------------------|----| Avg.
|
6
7
5
7
4
4 |
34
Spill/Downstream | Dry
|
5
5
4
5
4
4 |
29
Release (MCM)
| Actual |
6
7
7
7
6
6 |
40
-----------------|--------|---------------------------------------|----| Avg.
|
136
135
166
162
118
151 |
End Storage (MCM)| Dry
|
134
114
129
117
91
119 |
| Actual |
188
214
202
182
155
102 |
-----------------------------------------------------------------------Note : 1 MCM = 0.81 T ac-ft

Page : 1.8
Table no.
Title
Reservoir name

:
:
:

1.2D
Projected Macro System Reservoir Behaviour
Kotmale

| Hydro. |
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
-----------------|--------|---------------------------------------|----Available plant | Plan
|
201
201
201
134
134
168 |
Capacity (MW)
| Actual |
134
134
134
134
134
134 |
-----------------|--------|---------------------------------------|----| Avg.
|
42
40
36
29
29
12 | 187
Energy Generation| Dry
|
31
31
29
22
31
10 | 154
(GWH)
| Actual |
66
86
60
21
28
17 | 278
-----------------|--------|---------------------------------------|----| Avg.
|
80
76
67
54
57
23 | 357
Power Flow (MCM) | Dry
|
61
61
56
47
49
19 | 293
| Actual |
121
157
112
40
55
33 | 518
-----------------|--------|---------------------------------------|----| Avg.
|
0
0
0
0
0
0 |
0
Spill/Downstream | Dry
|
0
0
0
0
0
0 |
0
Release (MCM)
| Actual |
0
0
0
0
0
0 |
0
-----------------|--------|---------------------------------------|----| Avg.
|
169
173
170
162
132
135 |
End Storage (MCM)| Dry
|
170
172
170
150
84
79 |
| Actual |
151
150
123
121
83
63 |
-----------------------------------------------------------------------Note : 1 MCM = 0.81 T ac-ft

Page : 1.9
Table no.
Title
Reservoir name

:
:
:

1.2E
Projected Macro System Reservoir Behaviour
Polgolla

| Hydro. |
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
-----------------|--------|---------------------------------------|----Available plant | Plan
|
25
20
35
35
35
35 |
Capacity (MW)
| Actual |
40
40
40
40
40
40 |
-----------------|--------|---------------------------------------|----| Avg.
|
4
4
5
7
10
3 |
33
Energy Generation| Dry
|
5
7
9
13
14
2 |
49
(GWH)
| Actual |
8
13
6
13
14
9 |
64
-----------------|--------|---------------------------------------|----| Avg.
|
21
21
25
40
55
13 | 175
Power Flow (MCM) | Dry
|
28
36
49
71
73
10 | 266
| Actual |
45
70
33
68
72
50 | 339
-----------------|--------|---------------------------------------|----| Avg.
|
208
195
126
59
32
49 | 669
Spill/Downstream | Dry
|
152
140
76
28
15
18 | 428
Release (MCM)
| Actual |
276
316
273
17
3
6 | 891
-----------------|--------|---------------------------------------|----| Avg.
|
0
0
0
0
0
0 |
End Storage (MCM)| Dry
|
0
0
0
0
0
0 |
| Actual |
N/A
N/A
N/A
N/A
N/A
N/A |
-----------------------------------------------------------------------Note : 1 MCM = 0.81 T ac-ft

Page : 1.10
Table no.
Title
Reservoir name

:
:
:

1.2F
Projected Macro System Reservoir Behaviour
Victoria

| Hydro. |
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
-----------------|--------|---------------------------------------|----Available plant | Plan
|
196
206
209
175
175
208 |
Capacity (MW)
| Actual |
210
210
210
210
210
210 |
-----------------|--------|---------------------------------------|----| Avg.
|
76
59
64
53
50
46 | 348
Energy Generation| Dry
|
55
59
19
31
39
35 | 238
(GWH)
| Actual |
71
102
143
101
62
51 | 531
-----------------|--------|---------------------------------------|----| Avg.
|
171
127
133
110
104
96 | 740
Power Flow (MCM) | Dry
|
122
130
42
66
83
74 | 517
| Actual |
153
207
288
205
132
111 | 1097
-----------------|--------|---------------------------------------|----| Avg.
|
0
0
6
12
3
0 |
21
Spill/Downstream | Dry
|
0
0
0
0
0
0 |
0
Release (MCM)
| Actual |
0
12
127
0
0
0 | 138
-----------------|--------|---------------------------------------|----| Avg.
|
464
607
659
662
617
594 |
End Storage (MCM)| Dry
|
448
501
581
573
534
513 |
| Actual |
549
714
719
588
454
373 |
-----------------------------------------------------------------------Note : 1 MCM = 0.81 T ac-ft

Page : 1.11
Table no.
Title
Reservoir name

:
:
:

1.2G
Projected Macro System Reservoir Behaviour
Randenigala

| Hydro. |
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
-----------------|--------|---------------------------------------|----Available plant | Plan
|
104
60
120
120
120
119 |
Capacity (MW)
| Actual |
120
120
120
120
120
120 |
-----------------|--------|---------------------------------------|----| Avg.
|
4
22
44
41
31
24 | 166
Energy Generation| Dry
|
3
16
20
23
25
17 | 104
(GWH)
| Actual |
10
37
87
66
32
20 | 253
-----------------|--------|---------------------------------------|----| Avg.
|
20
112
220
205
155
119 | 832
Power Flow (MCM) | Dry
|
18
81
102
112
122
83 | 518
| Actual |
60
207
463
356
177
107 | 1369
-----------------|--------|---------------------------------------|----| Avg.
|
0
12
6
21
6
0 |
44
Spill/Downstream | Dry
|
0
0
0
0
0
0 |
0
Release (MCM)
| Actual |
0
0
66
0
0
0 |
66
-----------------|--------|---------------------------------------|----| Avg.
|
774
860
860
860
851
851 |
End Storage (MCM)| Dry
|
689
861
861
861
861
861 |
| Actual |
725
822
856
810
809
838 |
-----------------------------------------------------------------------Note : 1 MCM = 0.81 T ac-ft

Page : 1.12
Table no.
Title
Reservoir name

:
:
:

1.2H
Projected Macro System Reservoir Behaviour
Rantembe

| Hydro. |
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
-----------------|--------|---------------------------------------|----Available plant | Plan
|
25
48
49
49
49
49 |
Capacity (MW)
| Actual |
50
50
50
50
50
50 |
-----------------|--------|---------------------------------------|----| Avg.
|
4
14
21
20
15
12 |
85
Energy Generation| Dry
|
3
11
12
13
12
7 |
58
(GWH)
| Actual |
10
24
38
30
15
9 | 126
-----------------|--------|---------------------------------------|----| Avg.
|
46
167
260
244
184
140 | 1042
Power Flow (MCM) | Dry
|
35
119
141
158
155
96 | 704
| Actual |
136
311
463
388
199
114 | 1611
-----------------|--------|---------------------------------------|----| Avg.
|
0
1
15
30
8
1 |
55
Spill/Downstream | Dry
|
0
0
0
0
0
0 |
0
Release (MCM)
| Actual |
3
0
174
0
0
0 | 177
-----------------|--------|---------------------------------------|----| Avg.
|
6
7
7
7
7
7 |
End Storage (MCM)| Dry
|
6
7
7
7
7
7 |
| Actual |
4
6
7
5
5
4 |
-----------------------------------------------------------------------Note : 1 MCM = 0.81 T ac-ft

Page : 1.13
Table no.
Title
Reservoir name

:
:
:

1.2I
Projected Macro System Reservoir Behaviour
Bowatenna

| Hydro. |
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
-----------------|--------|---------------------------------------|----Available plant | Plan
|
0
40
40
40
40
40 |
Capacity (MW)
| Actual |
40
40
40
40
40
40 |
-----------------|--------|---------------------------------------|----| Avg.
|
0
1
1
2
3
0 |
6
Energy Generation| Dry
|
0
1
1
0
0
0 |
2
(GWH)
| Actual |
1
11
15
5
2
2 |
37
-----------------|--------|---------------------------------------|----| Avg.
|
0
4
7
12
20
4 |
46
Power Flow (MCM) | Dry
|
0
5
4
3
3
3 |
18
| Actual |
12
97
127
40
20
19 | 314
-----------------|--------|---------------------------------------|----| Avg.
|
3
2
2
2
2
2 |
12
Spill/Downstream | Dry
|
2
2
2
2
2
2 |
11
Release (MCM)
| Actual |
42
4
12
4
4
3 |
69
-----------------|--------|---------------------------------------|----| Avg.
|
21
23
23
22
21
22 |
End Storage (MCM)| Dry
|
21
22
24
20
18
19 |
| Actual |
13
12
17
14
14
17 |
-----------------------------------------------------------------------Note : 1 MCM = 0.81 T ac-ft

APPENDIX 2
PROJECTED IRRIGATION SYSTEM PERFORMANCE

Page : 2.1
Table no.
:
Title
:
Irrigation System :

2.1A
Projected Irrigation System Diversions
System H

-----------------------------------------------------------------------Diversions
| Hydro. |
Monthly diversion volume (MCM)
|
----------------|Condition|---------------------------------------|
From
To
|
|
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
----------------|---------|---------------------------------------|----Bowa
Dambulu| Average |
24.7 34.7 44.1 47.5 41.3 17.6 |209.9
tenna
Oya
| Dry
|
27.4 23.4 35.3 37.1 39.9 10.0 |173.1
| Actual |
36.9 41.9 36.2 46.2 33.6 12.3 |207.0
----------------|---------|---------------------------------------|----Bowa
KHF
| Average |
.0 16.5 17.1 20.6 18.5
9.1 | 81.8
tenna
Canal | Dry
|
.0 16.2 17.1 18.0 16.5
7.0 | 74.8
| Actual |
.0 10.6 17.7 13.0 15.3 11.6 | 68.2
----------------|---------|---------------------------------------|----KHFC @
Kandala| Average |
.0
9.3
1.1
6.2
3.5
3.6 | 23.7
KHB
ma
| Dry
|
.0
7.5
.6
4.2
4.0
2.7 | 19.0
| Actual |
.0
7.6
7.1
1.4
.0
4.0 | 20.2
----------------|---------|---------------------------------------|----Dambulu Kala
| Average |
40.8 65.4 68.7 57.3 47.8 24.7 |304.7
Oya
wewa
| Dry
|
38.4 58.4 62.2 48.9 39.0 17.4 |264.3
| Actual |
46.6 87.4 80.7 230.8 39.9 19.3 |504.7
-----------------------------------------------------------------------Note : 1 MCM = 0.81 TAF

Page : 2.2
Table no.
Title
Scheme name

:
:
:

2.1B
Projected Irrigation System Water use
Dambulu Oya

(i) Cropping Data


-----------------------------------------------------------------------------------|
Extent of crop
| First day of
| Last day of
Type of crop |
( Ha )
| water issue
| water issue
|---------------------|-----------------|----------------| Proposed | Actual |Proposed| Actual |Proposed| Actual
--------------|----------|----------|--------|--------|--------|-------Paddy
|
2235
|
2172 | Nov 01 | Nov 3 | Feb 20 | Mar 7
Upland crops |
65
|
128 |
| Nov 3 |
| Mar 7
Total
|
2300
|
2300 |
|
|
|
|
|
|
|
|
|
------------------------------------------------------------------------

(ii) Performance
---------------------------------------------------------------------------------| Hydro.|
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
------------------|-------|---------------------------------------|----| Avg
|
.0
6.3
3.4
5.2
2.8
.0 | 17.7
Water Issues (MCM)| Dry
|
.0
6.0
2.3
4.6
2.5
.0 | 15.4
| Actual|
.0
4.8
2.0
5.4
5.5
.7 | 18.4
------------------|-------|---------------------------------------|----| Avg. |
.00
.28
.15
.22
.12
.00 | .77
Water duty (M)
| Dry
|
.00
.26
.10
.20
.11
.00 | .67
| Actual|
.00
.21
.09
.23
.24
.03 | .80
------------------|-------|---------------------------------------|----| Avg. |
|
End Storage (MCM) | Dry
|
Not Estimated
|
| Actual|
|
-----------------------------------------------------------------------| Avg. | 223.9 234.7 146.8 74.0 56.4 73.4 | 809.2
Rain fall (mm)
| Dry
| 172.5 176.1 130.3 22.9 12.8 63.0 | 577.6
| Actual| 349.5 400.4 298.5 38.2 68.7 65.0 |1220.3
-----------------------------------------------------------------------NOTE : ACTUAL WATER
Note : 1 MCM = 0.81
1 Ha = 2.47
1 M
= 3.28

ISSUES/DUTY AS PER ACTUAL CROP SEASON


TAF
Acres
Ft

Page : 2.3
Table no.
Title
Scheme name

:
:
:

2.1C
Projected Irrigation System Water use
KHFC Scheme

(i) Cropping Data


-----------------------------------------------------------------------------------|
Extent of crop
| First day of
| Last day of
Type of crop |
( Ha )
| water issue
| water issue
|---------------------|-----------------|----------------| Proposed | Actual |Proposed| Actual |Proposed| Actual
--------------|----------|----------|--------|--------|--------|-------Paddy
|
2105
|
1713 | Nov 20 | Nov 24 | Mar 10 | Mar 21
Upland crops |
0
|
537 |
| Nov 24 |
| Mar 21
Total
|
2105
|
2250 |
|
|
|
|
|
|
|
|
|
------------------------------------------------------------------------

(ii) Performance
---------------------------------------------------------------------------------| Hydro.|
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
------------------|-------|---------------------------------------|----| Avg
|
.0
4.0
9.3
6.8
9.2
.6 | 29.9
Water Issues (MCM)| Dry
|
.0
4.1
7.8
5.2
6.9
.7 | 24.7
| Actual|
N/A
N/A
N/A
N/A
N/A
N/A | N/A
------------------|-------|---------------------------------------|----| Avg. |
.00
.19
.44
.32
.44
.03 | 1.42
Water duty (M)
| Dry
|
.00
.19
.37
.25
.33
.03 | 1.17
| Actual|
N/A
N/A
N/A
N/A
N/A
N/A | N/A
-----------------------------------------------------------------------| Avg. | 223.9 234.7 146.8 74.0 56.4 73.4 | 809.2
Rain fall (mm)
| Dry
| 172.5 176.1 130.3 22.9 12.8 63.0 | 577.6
| Actual|
N/A
N/A
N/A
N/A
N/A
N/A | N/A
-----------------------------------------------------------------------NOTE : ACTUAL WATER
Note : 1 MCM = 0.81
1 Ha = 2.47
1 M
= 3.28

ISSUES/DUTY AS PER ACTUAL CROP SEASON


TAF
Acres
Ft

Page : 2.4
Table no.
Title
Scheme name

:
:
:

2.1D
Projected Irrigation System Water use
Kandalama

(i) Cropping Data


-----------------------------------------------------------------------------------|
Extent of crop
| First day of
| Last day of
Type of crop |
( Ha )
| water issue
| water issue
|---------------------|-----------------|----------------| Proposed | Actual |Proposed| Actual |Proposed| Actual
--------------|----------|----------|--------|--------|--------|-------Paddy
|
4435
|
4466 | Nov 05 | Nov 7 | Mar 01 | Mar 6
Upland crops |
65
|
84 |
| Nov 7 |
| Mar 6
Total
|
4500
|
4550 |
|
|
|
|
|
|
|
|
|
------------------------------------------------------------------------

(ii) Performance
---------------------------------------------------------------------------------| Hydro.|
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
------------------|-------|---------------------------------------|----| Avg
|
.0 10.4
8.8 10.5
7.6
.0 | 37.3
Water Issues (MCM)| Dry
|
.0
9.8
6.5
9.3
7.1
.0 | 32.7
| Actual|
.0 10.2
6.8 11.6 13.1
4.0 | 45.6
------------------|-------|---------------------------------------|----| Avg. |
.00
.23
.19
.23
.17
.00 | .82
Water duty (M)
| Dry
|
.00
.22
.15
.21
.16
.00 | .74
| Actual|
.00
.22
.15
.25
.29
.09 | 1.00
------------------|-------|---------------------------------------|----| Avg. |
16.0 24.1 23.3 23.0 21.2 25.2 |
End Storage (MCM) | Dry
|
15.4 23.9 17.4 14.1 11.8 17.1 |
| Actual|
14.4 26.3 35.8 28.8 19.1 19.3 |
-----------------------------------------------------------------------| Avg. | 223.9 234.7 146.8 74.0 56.4 73.4 | 809.2
Rain fall (mm)
| Dry
| 172.5 176.1 130.3 22.9 12.8 63.0 | 577.6
| Actual| 231.7 407.5 264.2 46.7 69.0 68.3 |1087.4
-----------------------------------------------------------------------NOTE : ACTUAL WATER
Note : 1 MCM = 0.81
1 Ha = 2.47
1 M
= 3.28

ISSUES/DUTY AS PER ACTUAL CROP SEASON


TAF
Acres
Ft

Page : 2.5
Table no.
Title
Scheme name

:
:
:

2.1E
Projected Irrigation System Water use
Kalawewa RB

(i) Cropping Data


-----------------------------------------------------------------------------------|
Extent of crop
| First day of
| Last day of
Type of crop |
( Ha )
| water issue
| water issue
|---------------------|-----------------|----------------| Proposed | Actual |Proposed| Actual |Proposed| Actual
--------------|----------|----------|--------|--------|--------|-------Paddy
| 12332
|
12676 | Nov 05 | Nov 5 | Mar 05 | Mar 19
Upland crops |
1675
|
1346 |
| Nov 5 |
| Mar 19
Total
| 14007
|
14022 |
|
|
|
|
|
|
|
|
|
------------------------------------------------------------------------

(ii) Performance
---------------------------------------------------------------------------------| Hydro.|
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
------------------|-------|---------------------------------------|----| Avg
|
.0 39.2 42.2 47.3 44.1
2.5 |175.3
Water Issues (MCM)| Dry
|
.0 37.1 32.6 41.2 40.8
2.6 |154.3
| Actual|
2.0 41.5 32.7 51.1 49.2 34.7 |211.2
------------------|-------|---------------------------------------|----| Avg. |
.00
.28
.30
.34
.31
.02 | 1.25
Water duty (M)
| Dry
|
.00
.26
.23
.29
.29
.02 | 1.09
| Actual|
.01
.30
.23
.36
.35
.25 | 1.51
------------------|-------|---------------------------------------|----| Avg. | 114.5 116.4 112.1 92.5 73.0 86.3 |
End Storage (MCM) | Dry
| 117.4 123.3 105.8 59.5 41.8 45.2 |
| Actual| 127.8 123.2 124.7 103.1 83.2 68.7 |
-----------------------------------------------------------------------| Avg. | 223.9 234.7 146.8 74.0 56.4 73.4 | 809.2
Rain fall (mm)
| Dry
| 172.5 176.1 130.3 22.9 12.8 63.0 | 577.6
| Actual| 388.9 405.9 243.7 34.5 36.3 11.5 |1120.8
-----------------------------------------------------------------------Irrigation issues only.
NOTE : ACTUAL WATER ISSUES/DUTY AS PER ACTUAL CROP SEASON
Note : 1 MCM = 0.81 TAF
1 Ha = 2.47 Acres
1 M
= 3.28 Ft

Page : 2.6
Table no.
Title
Scheme name

:
:
:

2.1F
Projected Irrigation System Water use
Kalawewa YE

(i) Cropping Data


-----------------------------------------------------------------------------------|
Extent of crop
| First day of
| Last day of
Type of crop |
( Ha )
| water issue
| water issue
|---------------------|-----------------|----------------| Proposed | Actual |Proposed| Actual |Proposed| Actual
--------------|----------|----------|--------|--------|--------|-------Paddy
|
4481
|
4404 | Oct 25 | Nov 1 | Feb 15 | Mar 4
Upland crops |
240
|
304 |
| Nov 1 |
| Mar 4
Total
|
4721
|
4708 |
|
|
|
|
|
|
|
|
|
------------------------------------------------------------------------

(ii) Performance
---------------------------------------------------------------------------------| Hydro.|
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
------------------|-------|---------------------------------------|----| Avg
|
2.0 10.3
6.8
9.2
4.4
.0 | 32.7
Water Issues (MCM)| Dry
|
2.1 10.3
5.4
7.8
3.6
.0 | 29.2
| Actual|
2.3 12.3
6.5
8.0
8.1
2.5 | 39.8
------------------|-------|---------------------------------------|----| Avg. |
.04
.22
.14
.19
.09
.00 | .68
Water duty (M)
| Dry
|
.04
.22
.11
.17
.08
.00 | .62
| Actual|
.05
.26
.14
.17
.17
.05 | .84
-----------------------------------------------------------------------| Avg. | 223.9 234.7 146.8 74.0 56.4 73.4 | 809.2
Rain fall (mm)
| Dry
| 172.5 176.1 130.3 22.9 12.8 63.0 | 577.6
| Actual| 388.9 405.9 243.7 34.5 36.3 11.5 |1120.8
-----------------------------------------------------------------------NOTE : ACTUAL WATER
Note : 1 MCM = 0.81
1 Ha = 2.47
1 M
= 3.28

ISSUES/DUTY AS PER ACTUAL CROP SEASON


TAF
Acres
Ft

Page : 2.7
Table no.
Title
Scheme name

:
:
:

2.1G
Projected Irrigation System Water use
Kalawewa LB

(i) Cropping Data


-----------------------------------------------------------------------------------|
Extent of crop
| First day of
| Last day of
Type of crop |
( Ha )
| water issue
| water issue
|---------------------|-----------------|----------------| Proposed | Actual |Proposed| Actual |Proposed| Actual
--------------|----------|----------|--------|--------|--------|-------Paddy
|
5852
|
6310 | Nov 01 | Oct 25 | Feb 20 | Mar 5
Upland crops |
785
|
346 |
| Oct 20 |
| Mar 5
Total
|
6637
|
6656 |
|
|
|
|
|
|
|
|
|
------------------------------------------------------------------------

(ii) Performance
---------------------------------------------------------------------------------| Hydro.|
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
------------------|-------|---------------------------------------|----| Avg
|
.0 22.3 11.5 18.3 10.7
.0 | 62.8
Water Issues (MCM)| Dry
|
.0 21.0
7.7 15.8
9.3
.0 | 53.8
| Actual|
.7 21.0 13.7 20.5 17.5
4.0 | 77.4
------------------|-------|---------------------------------------|----| Avg. |
.00
.34
.17
.28
.16
.00 | .95
Water duty (M)
| Dry
|
.00
.32
.12
.24
.14
.00 | .82
| Actual|
.01
.32
.21
.31
.26
.06 | 1.16
-----------------------------------------------------------------------| Avg. | 223.9 234.7 146.8 74.0 56.4 73.4 | 809.2
Rain fall (mm)
| Dry
| 172.5 176.1 130.3 22.9 12.8 63.0 | 577.6
| Actual| 388.9 405.9 243.7 34.5 36.3 11.5 |1120.8
-----------------------------------------------------------------------NOTE : ACTUAL WATER
Note : 1 MCM = 0.81
1 Ha = 2.47
1 M
= 3.28

ISSUES/DUTY AS PER ACTUAL CROP SEASON


TAF
Acres
Ft

Page : 2.8
Table no.
Title
Scheme name

:
:
:

2.1H
Projected Irrigation System Water use
Rajangana

(i) Cropping Data


-----------------------------------------------------------------------------------|
Extent of crop
| First day of
| Last day of
Type of crop |
( Ha )
| water issue
| water issue
|---------------------|-----------------|----------------| Proposed | Actual |Proposed| Actual |Proposed| Actual
--------------|----------|----------|--------|--------|--------|-------Paddy
|
5914
|
6514 | Oct 25 | Oct 25 | Feb 25 | Mar 2
Upland crops |
1300
|
697 |
| Oct 25 |
| Mar 2
Total
|
7214
|
7211 |
|
|
|
|
|
|
|
|
|
------------------------------------------------------------------------

(ii) Performance
---------------------------------------------------------------------------------| Hydro.|
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
------------------|-------|---------------------------------------|----| Avg
|
9.6 26.3 18.4 29.3 12.2
.0 | 95.8
Water Issues (MCM)| Dry
|
9.7 24.8 10.6 27.5 11.0
.0 | 83.6
| Actual|
5.0 28.9 15.5 22.9 23.7
6.0 |101.9
------------------|-------|---------------------------------------|----| Avg. |
.13
.36
.25
.41
.17
.00 | 1.32
Water duty (M)
| Dry
|
.13
.34
.15
.38
.15
.00 | 1.15
| Actual|
.07
.40
.22
.32
.33
.08 | 1.41
------------------|-------|---------------------------------------|----| Avg. |
82.9 91.3 95.9 95.1 95.2 95.6 |
End Storage (MCM) | Dry
|
73.9 76.2 91.2 91.3 93.7 93.8 |
| Actual|
98.0 91.8 94.2 77.7 98.9 95.6 |
-----------------------------------------------------------------------| Avg. | 197.6 215.1 136.6 59.6 45.7 64.5 | 719.1
Rain fall (mm)
| Dry
| 165.2 167.3 89.0
7.9
2.6 39.6 | 471.6
| Actual| 203.1 306.4 223.9 29.4
8.2
6.2 | 777.2
-----------------------------------------------------------------------NOTE : ACTUAL WATER
Note : 1 MCM = 0.81
1 Ha = 2.47
1 M
= 3.28

ISSUES/DUTY AS PER ACTUAL CROP SEASON


TAF
Acres
Ft

Page : 2.9
Table no.
Title
Scheme name

:
:
:

2.1I
Projected Irrigation System Water use
Neela Bemma

(i) Cropping Data


-----------------------------------------------------------------------------------|
Extent of crop
| First day of
| Last day of
Type of crop |
( Ha )
| water issue
| water issue
|---------------------|-----------------|----------------| Proposed | Actual |Proposed| Actual |Proposed| Actual
--------------|----------|----------|--------|--------|--------|-------Paddy
|
570
|
290 | Oct 22 | Oct 25 | Feb 10 | Jan 22
Upland crops |
120
|
400 |
| Oct 25 |
| Jan 22
Total
|
690
|
690 |
|
|
|
|
|
|
|
|
|
------------------------------------------------------------------------

(ii) Performance
---------------------------------------------------------------------------------| Hydro.|
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
------------------|-------|---------------------------------------|----| Avg
|
1.7
1.5
1.7
2.2
.4
.0 | 7.5
Water Issues (MCM)| Dry
|
1.7
1.4
1.0
2.1
.4
.0 | 6.6
| Actual|
N/A
N/A
N/A
N/A
N/A
N/A | N/A
------------------|-------|---------------------------------------|----| Avg. |
.25
.22
.25
.32
.07
.00 | 1.11
Water duty (M)
| Dry
|
.25
.21
.15
.30
.06
.00 | .97
| Actual|
N/A
N/A
N/A
N/A
N/A
N/A | N/A
-----------------------------------------------------------------------| Avg. | 197.6 215.1 136.6 59.6 45.7 64.5 | 719.1
Rain fall (mm)
| Dry
| 165.2 167.3 89.0
7.9
2.6 39.6 | 471.6
| Actual|
N/A
N/A
N/A
N/A
N/A
N/A |
N/A
-----------------------------------------------------------------------Note : 1 MCM = 0.81 TAF
1 Ha = 2.47 Acres
1 M
= 3.28 Ft

Page : 2.10
Table no.
:
Title
:
Irrigation System :

2.2A
Projected Irrigation System Diversions
System MH+IH

-----------------------------------------------------------------------Diversions
| Hydro. |
Monthly diversion volume (MCM)
|
----------------|Condition|---------------------------------------|
From
To
|
|
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
----------------|---------|---------------------------------------|----KHFC @
Huruluw| Average |
.0
3.2
6.7
7.6
5.8
4.9 | 28.2
SM
ewa
| Dry
|
.0
1.2
5.9
6.6
6.7
4.4 | 24.8
| Actual |
.0
.8
4.9
3.8
1.4
.7 | 11.6
----------------|---------|---------------------------------------|----Kalawew Nachcha| Average |
.0
6.8
4.4
5.8
3.8
3.7 | 24.5
a
duwa
| Dry
|
.0
5.0
.1
3.5
1.6
3.5 | 13.7
| Actual |
.0
.0
.0
.0
.0
.0 |
.0
----------------|---------|---------------------------------------|----Kalawew Tissawe| Average |
.0
3.6
2.4
2.0
1.0
.9 | 9.9
a
wa
| Dry
|
.0
3.6
2.3
1.8
.8
.8 | 9.3
| Actual |
N/A
N/A
N/A
N/A
N/A
N/A | N/A
----------------|---------|---------------------------------------|----Nachcha Nuwaraw| Average |
.0
.0
3.3
3.0
2.7
2.8 | 11.8
duwa
ewa
| Dry
|
.0
.0
2.8
1.8
1.5
2.6 | 8.7
| Actual |
.0
.0
.0
.0
.1
.3 |
.4
-----------------------------------------------------------------------Note : 1 MCM = 0.81 TAF

Page : 2.11
Table no.
Title
Scheme name

:
:
:

2.2B
Projected Irrigation System Water use
Hurulu Wewa

(i) Cropping Data


-----------------------------------------------------------------------------------|
Extent of crop
| First day of
| Last day of
Type of crop |
( Ha )
| water issue
| water issue
|---------------------|-----------------|----------------| Proposed | Actual |Proposed| Actual |Proposed| Actual
--------------|----------|----------|--------|--------|--------|-------Paddy
|
4300
|
4210 | Nov 20 | Nov 9 | Mar 10 | Mar 11
Total
|
4300
|
4210 |
|
|
|
|
|
|
|
|
|
------------------------------------------------------------------------

(ii) Performance
---------------------------------------------------------------------------------| Hydro.|
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
------------------|-------|---------------------------------------|----| Avg
|
.0
4.5
7.3
6.6
8.4
2.0 | 28.8
Water Issues (MCM)| Dry
|
.0
4.5
6.2
5.3
8.2
2.0 | 26.2
| Actual|
.0
4.4
3.8 10.3
7.7
.9 | 27.1
------------------|-------|---------------------------------------|----| Avg. |
.00
.10
.17
.15
.20
.05 | .67
Water duty (M)
| Dry
|
.00
.10
.14
.12
.19
.05 | .60
| Actual|
.00
.11
.09
.24
.18
.02 | .64
------------------|-------|---------------------------------------|----| Avg. |
23.7 29.0 33.3 35.7 32.9 35.2 |
End Storage (MCM) | Dry
|
22.8 26.9 25.3 23.6 19.7 22.5 |
| Actual|
24.5 42.4 68.9 64.9 57.5 55.0 |
-----------------------------------------------------------------------| Avg. | 209.3 254.5 233.7 108.2 57.9 73.6 | 937.2
Rain fall (mm)
| Dry
| 204.4 241.5 176.6 45.0
7.1 39.6 | 714.2
| Actual| 240.7 486.7 262.9 53.2 29.6 127.0 |1200.1
-----------------------------------------------------------------------NOTE : ACTUAL WATER
Note : 1 MCM = 0.81
1 Ha = 2.47
1 M
= 3.28

ISSUES/DUTY AS PER ACTUAL CROP SEASON


TAF
Acres
Ft

Page : 2.12
Table no.
Title
Scheme name

:
:
:

2.2C
Projected Irrigation System Water use
Nachchaduwa

(i) Cropping Data


-----------------------------------------------------------------------------------|
Extent of crop
| First day of
| Last day of
Type of crop |
( Ha )
| water issue
| water issue
|---------------------|-----------------|----------------| Proposed | Actual |Proposed| Actual |Proposed| Actual
--------------|----------|----------|--------|--------|--------|-------Paddy
|
2970
|
2819 | Oct 15 | Oct 10 | Feb 15 | Feb 20
Upland crops |
0
|
202 |
| Oct 10 |
| Feb 20
Total
|
2970
|
3022 |
|
|
|
|
|
|
|
|
|
------------------------------------------------------------------------

(ii) Performance
---------------------------------------------------------------------------------| Hydro.|
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
------------------|-------|---------------------------------------|----| Avg
|
3.1
8.6
6.0
7.7
1.5
.0 | 26.9
Water Issues (MCM)| Dry
|
3.3
8.0
4.8
6.4
1.5
.0 | 24.0
| Actual|
.0
4.7
.0
5.2
4.3
.1 | 14.3
------------------|-------|---------------------------------------|----| Avg. |
.10
.29
.20
.26
.05
.00 | .90
Water duty (M)
| Dry
|
.11
.27
.16
.21
.05
.00 | .80
| Actual|
.00
.16
.00
.17
.14
.00 | .47
------------------|-------|---------------------------------------|----| Avg. |
30.2 47.3 50.6 48.6 47.9 48.2 |
End Storage (MCM) | Dry
|
30.6 40.6 45.4 42.0 39.5 40.1 |
| Actual|
49.9 46.3 54.4 48.2 44.3 42.2 |
-----------------------------------------------------------------------| Avg. | 205.6 236.0 164.9 81.4 49.8 60.0 | 797.7
Rain fall (mm)
| Dry
| 207.6 182.7 85.8 38.1 17.6 48.2 | 580.0
| Actual| 353.1 640.8 216.6 57.1 37.0 29.3 |1333.8
-----------------------------------------------------------------------NOTE : ACTUAL WATER
Note : 1 MCM = 0.81
1 Ha = 2.47
1 M
= 3.28

ISSUES/DUTY AS PER ACTUAL CROP SEASON


TAF
Acres
Ft

Page : 2.13
Table no.
Title
Scheme name

:
:
:

2.2D
Projected Irrigation System Water use
Nuwara Wewa

(i) Cropping Data


-----------------------------------------------------------------------------------|
Extent of crop
| First day of
| Last day of
Type of crop |
( Ha )
| water issue
| water issue
|---------------------|-----------------|----------------| Proposed | Actual |Proposed| Actual |Proposed| Actual
--------------|----------|----------|--------|--------|--------|-------Paddy
|
1020
|
1052 | Oct 15 | Oct 15 | Feb 15 | Feb 29
Total
|
1020
|
1052 |
|
|
|
|
|
|
|
|
|
------------------------------------------------------------------------

(ii) Performance
---------------------------------------------------------------------------------| Hydro.|
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
------------------|-------|---------------------------------------|----| Avg
|
1.2
3.1
2.3
3.1
1.2
.0 | 10.9
Water Issues (MCM)| Dry
|
1.4
3.0
1.9
2.3
1.1
.0 | 9.7
| Actual|
2.5
3.3
4.1
4.1
3.3
.5 | 17.7
------------------|-------|---------------------------------------|----| Avg. |
.12
.30
.22
.30
.12
.00 | 1.06
Water duty (M)
| Dry
|
.13
.30
.18
.23
.11
.00 | .95
| Actual|
.24
.31
.39
.39
.31
.05 | 1.69
------------------|-------|---------------------------------------|----| Avg. |
28.7 27.0 28.7 27.6 27.8 29.2 |
End Storage (MCM) | Dry
|
28.3 25.2 23.7 22.1 21.4 22.9 |
| Actual|
31.5 42.7 42.4 43.4 40.1 36.7 |
-----------------------------------------------------------------------| Avg. | 205.6 236.0 164.9 81.4 49.8 60.0 | 797.7
Rain fall (mm)
| Dry
| 207.6 182.7 85.8 38.1 17.6 48.2 | 580.0
| Actual| 353.1 640.8 216.6 57.1 37.0 29.3 |1333.8
-----------------------------------------------------------------------NOTE : ACTUAL WATER
Note : 1 MCM = 0.81
1 Ha = 2.47
1 M
= 3.28

ISSUES/DUTY AS PER ACTUAL CROP SEASON


TAF
Acres
Ft

Page : 2.14
Table no.
Title
Scheme name

:
:
:

2.2E
Projected Irrigation System Water use
Tissawewa

(i) Cropping Data


-----------------------------------------------------------------------------------|
Extent of crop
| First day of
| Last day of
Type of crop |
( Ha )
| water issue
| water issue
|---------------------|-----------------|----------------| Proposed | Actual |Proposed| Actual |Proposed| Actual
--------------|----------|----------|--------|--------|--------|-------Paddy
|
520
|
521 | Oct 20 | Oct 25 | Feb 10 | Mar 11
Total
|
520
|
521 |
|
|
|
|
|
|
|
|
|
------------------------------------------------------------------------

(ii) Performance
---------------------------------------------------------------------------------| Hydro.|
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
------------------|-------|---------------------------------------|----| Avg
|
.5
1.4
1.0
1.4
.5
.0 | 4.8
Water Issues (MCM)| Dry
|
.6
1.4
.9
1.1
.5
.0 | 4.5
| Actual|
.2
.9
1.2
.9
.9
.1 | 4.1
------------------|-------|---------------------------------------|----| Avg. |
.10
.27
.20
.27
.10
.00 | .94
Water duty (M)
| Dry
|
.11
.27
.16
.20
.10
.00 | .84
| Actual|
.03
.16
.22
.17
.17
.02 | .78
------------------|-------|---------------------------------------|----| Avg. |
1.1
3.2
4.1
4.0
3.8
4.2 |
End Storage (MCM) | Dry
|
1.1
3.0
4.1
3.7
3.2
4.2 |
| Actual|
2.7
4.2
4.0
3.7
3.1
2.7 |
-----------------------------------------------------------------------| Avg. | 205.6 236.0 164.9 81.4 49.8 60.0 | 797.7
Rain fall (mm)
| Dry
| 207.6 182.7 85.8 38.1 17.6 48.2 | 580.0
| Actual| 353.1 640.8 216.6 57.1 37.0 29.3 |1333.8
-----------------------------------------------------------------------NOTE : ACTUAL WATER
Note : 1 MCM = 0.81
1 Ha = 2.47
1 M
= 3.28

ISSUES/DUTY AS PER ACTUAL CROP SEASON


TAF
Acres
Ft

Page : 2.15
Table no.
:
Title
:
Irrigation System :

2.3A
Projected Irrigation System Diversions
System D & G

-----------------------------------------------------------------------Diversions
| Hydro. |
Monthly diversion volume (MCM)
|
----------------|Condition|---------------------------------------|
From
To
|
|
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
----------------|---------|---------------------------------------|----Elahera System | Average |
9.6 32.5 61.7 53.2 48.6 27.5 |233.1
D1 & G | Dry
|
9.5 29.7 60.2 33.6 39.8 24.0 |196.8
| Actual |
40.8 71.7 45.8 46.1 45.1 34.2 |283.7
----------------|---------|---------------------------------------|----Diyabed Girital| Average |
9.1
7.4
2.6
8.6
8.3
2.8 | 38.8
uma
e
| Dry
|
9.3
6.5
2.8
7.7
6.6
1.3 | 34.2
| Actual |
.0 16.0
4.9
4.4
.0 10.5 | 35.8
----------------|---------|---------------------------------------|----Diyabed Minneri| Average |
.0
.0 37.7 21.2 17.5 23.3 | 99.7
uma
ya
| Dry
|
.0
.0 31.9
7.2 15.3 21.2 | 75.6
| Actual |
43.2 30.3 16.1 12.6 19.2 10.4 |131.8
----------------|---------|---------------------------------------|----Minneri Kaudull| Average |
.0
.0
.0
.0
.0 19.3 | 19.3
ya
a
| Dry
|
.0
.0
.0
.0
.0
5.6 | 5.6
| Actual |
9.4 40.9 16.5 17.0 11.9
.0 | 95.7
----------------|---------|---------------------------------------|----Minneri Kantale| Average |
.0
.0
.0
.0
.0
.0 |
.0
ya
| Dry
|
.0
.0
.0
.0
.0
.0 |
.0
| Actual |
.0
.0
.0
.0
.0
.0 |
.0
----------------|---------|---------------------------------------|----Angamed System | Average |
21.4 32.4 28.1 33.9 27.7 10.9 |154.4
illa
D2
| Dry
|
21.9 31.3 19.7 27.5 24.0
7.6 |132.0
| Actual |
11.5 29.0 30.2 48.6 37.0 10.5 |166.8
-----------------------------------------------------------------------Note : 1 MCM = 0.81 TAF

Page : 2.16
Table no.
Title
Scheme name

:
:
:

2.3B
Projected Irrigation System Water use
Elahera

(i) Cropping Data


-----------------------------------------------------------------------------------|
Extent of crop
| First day of
| Last day of
Type of crop |
( Ha )
| water issue
| water issue
|---------------------|-----------------|----------------| Proposed | Actual |Proposed| Actual |Proposed| Actual
--------------|----------|----------|--------|--------|--------|-------Paddy
|
6030
|
6700 | Nov 01 | Nov 1 | Mar 01 | Mar 20
Total
|
6030
|
6700 |
|
|
|
|
|
|
|
|
|
------------------------------------------------------------------------

(ii) Performance
---------------------------------------------------------------------------------| Hydro.|
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
------------------|-------|---------------------------------------|----| Avg
|
.0 24.7 19.3 21.8 21.4
.0 | 87.2
Water Issues (MCM)| Dry
|
.0 23.3 18.3 18.5 16.5
.0 | 76.6
| Actual|
.0 30.2 21.7 24.2 20.5
8.3 |105.0
------------------|-------|---------------------------------------|----| Avg. |
.00
.41
.32
.36
.36
.00 | 1.45
Water duty (M)
| Dry
|
.00
.39
.30
.31
.27
.00 | 1.27
| Actual|
.00
.45
.32
.36
.31
.12 | 1.57
------------------|-------|---------------------------------------|----| Avg. |
|
End Storage (MCM) | Dry
|
No Storage Available
|
| Actual|
|
-----------------------------------------------------------------------| Avg. | 208.6 312.6 341.6 217.6 131.1 92.6 |1304.1
Rain fall (mm)
| Dry
| 212.4 195.6 165.6 185.2 72.2 107.9 | 938.9
| Actual| 287.2 570.1 498.8 112.6 138.1 102.6 |1709.4
-----------------------------------------------------------------------NOTE : ACTUAL WATER
Note : 1 MCM = 0.81
1 Ha = 2.47
1 M
= 3.28

ISSUES/DUTY AS PER ACTUAL CROP SEASON


TAF
Acres
Ft

Page : 2.17
Table no.
Title
Scheme name

:
:
:

2.3C
Projected Irrigation System Water use
Giritale

(i) Cropping Data


-----------------------------------------------------------------------------------|
Extent of crop
| First day of
| Last day of
Type of crop |
( Ha )
| water issue
| water issue
|---------------------|-----------------|----------------| Proposed | Actual |Proposed| Actual |Proposed| Actual
--------------|----------|----------|--------|--------|--------|-------Paddy
|
3500
|
3076 | Nov 01 | Nov 1 | Mar 01 | Mar 6
Total
|
3500
|
3076 |
|
|
|
|
|
|
|
|
|
------------------------------------------------------------------------

(ii) Performance
---------------------------------------------------------------------------------| Hydro.|
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
------------------|-------|---------------------------------------|----| Avg
|
.0 10.3
9.4
8.3
9.1
.0 | 37.1
Water Issues (MCM)| Dry
|
.0 10.5
8.6
6.7
6.7
.0 | 32.5
| Actual|
1.0
9.9
3.7
6.8
5.5
.7 | 27.6
------------------|-------|---------------------------------------|----| Avg. |
.00
.29
.27
.24
.26
.00 | 1.06
Water duty (M)
| Dry
|
.00
.30
.24
.19
.19
.00 | .92
| Actual|
.03
.32
.12
.22
.18
.02 | .90
------------------|-------|---------------------------------------|----| Avg. |
23.9 23.1 18.7 19.8 19.0 21.5 |
End Storage (MCM) | Dry
|
23.9 22.7 13.6 16.2 14.5 18.3 |
| Actual|
16.2 21.8 26.7 26.1 20.5 25.7 |
-----------------------------------------------------------------------| Avg. | 196.6 303.6 314.6 164.9 95.1 64.5 |1139.3
Rain fall (mm)
| Dry
| 160.2 267.2 158.4 100.5 35.5 66.4 | 788.2
| Actual| 262.0 363.2 423.5 69.8 27.2 27.0 |1172.7
-----------------------------------------------------------------------NOTE : ACTUAL WATER
Note : 1 MCM = 0.81
1 Ha = 2.47
1 M
= 3.28

ISSUES/DUTY AS PER ACTUAL CROP SEASON


TAF
Acres
Ft

Page : 2.18
Table no.
Title
Scheme name

:
:
:

2.3D
Projected Irrigation System Water use
Minneriya

(i) Cropping Data


-----------------------------------------------------------------------------------|
Extent of crop
| First day of
| Last day of
Type of crop |
( Ha )
| water issue
| water issue
|---------------------|-----------------|----------------| Proposed | Actual |Proposed| Actual |Proposed| Actual
--------------|----------|----------|--------|--------|--------|-------Paddy
|
9825
|
9099 | Nov 01 | Nov 1 | Mar 01 | Mar 10
Total
|
9825
|
9099 |
|
|
|
|
|
|
|
|
|
------------------------------------------------------------------------

(ii) Performance
---------------------------------------------------------------------------------| Hydro.|
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
------------------|-------|---------------------------------------|----| Avg
|
.0 17.0 17.0 16.1 17.7
.0 | 67.8
Water Issues (MCM)| Dry
|
.0 17.4 15.7 13.0 12.9
.0 | 59.0
| Actual|
.0 16.7
7.6 12.1 14.4
6.1 | 57.0
------------------|-------|---------------------------------------|----| Avg. |
.00
.17
.17
.16
.18
.00 | .68
Water duty (M)
| Dry
|
.00
.18
.16
.13
.13
.00 | .60
| Actual|
.00
.18
.08
.13
.16
.07 | .63
------------------|-------|---------------------------------------|----| Avg. |
65.0 68.6 111.9 124.3 124.7 126.3 |
End Storage (MCM) | Dry
|
61.5 58.2 91.5 114.1 112.5 109.1 |
| Actual|
97.9 86.8 128.6 130.1 121.9 124.1 |
-----------------------------------------------------------------------| Avg. | 196.6 303.6 314.6 164.9 95.1 64.5 |1139.3
Rain fall (mm)
| Dry
| 160.2 267.2 158.4 100.5 35.5 66.4 | 788.2
| Actual| 281.0 340.0 506.0 76.0 11.0 42.0 |1256.0
-----------------------------------------------------------------------NOTE : ACTUAL WATER
Note : 1 MCM = 0.81
1 Ha = 2.47
1 M
= 3.28

ISSUES/DUTY AS PER ACTUAL CROP SEASON


TAF
Acres
Ft

Page : 2.19
Table no.
Title
Scheme name

:
:
:

2.3E
Projected Irrigation System Water use
Kaudulla

(i) Cropping Data


-----------------------------------------------------------------------------------|
Extent of crop
| First day of
| Last day of
Type of crop |
( Ha )
| water issue
| water issue
|---------------------|-----------------|----------------| Proposed | Actual |Proposed| Actual |Proposed| Actual
--------------|----------|----------|--------|--------|--------|-------Paddy
|
5060
|
5465 | Nov 01 | Nov 1 | Mar 01 | Mar 14
Total
|
5060
|
5465 |
|
|
|
|
|
|
|
|
|
------------------------------------------------------------------------

(ii) Performance
---------------------------------------------------------------------------------| Hydro.|
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
------------------|-------|---------------------------------------|----| Avg
|
.0
8.5
8.5
8.0
8.6
.0 | 33.6
Water Issues (MCM)| Dry
|
.0
8.7
7.9
6.5
6.5
.0 | 29.6
| Actual|
.0 10.0
6.2
7.1
7.4
.7 | 31.4
------------------|-------|---------------------------------------|----| Avg. |
.00
.17
.17
.16
.17
.00 | .67
Water duty (M)
| Dry
|
.00
.17
.16
.13
.13
.00 | .59
| Actual|
.00
.18
.11
.13
.14
.01 | .58
------------------|-------|---------------------------------------|----| Avg. |
47.9 58.5 72.9 71.4 64.3 81.4 |
End Storage (MCM) | Dry
|
43.9 50.7 52.3 46.9 35.3 58.2 |
| Actual|
52.0 102.1 121.3 125.0 122.4 117.6 |
-----------------------------------------------------------------------| Avg. | 196.6 303.6 314.6 164.9 95.1 64.5 |1139.3
Rain fall (mm)
| Dry
| 160.2 267.2 158.4 100.5 35.5 66.4 | 788.2
| Actual| 220.8 371.7 482.6 126.8
.0 34.3 |1236.2
-----------------------------------------------------------------------NOTE : ACTUAL WATER
Note : 1 MCM = 0.81
1 Ha = 2.47
1 M
= 3.28

ISSUES/DUTY AS PER ACTUAL CROP SEASON


TAF
Acres
Ft

Page : 2.20
Table no.
Title
Scheme name

:
:
:

2.3F
Projected Irrigation System Water use
Kantale

(i) Cropping Data


-----------------------------------------------------------------------------------|
Extent of crop
| First day of
| Last day of
Type of crop |
( Ha )
| water issue
| water issue
|---------------------|-----------------|----------------| Proposed | Actual |Proposed| Actual |Proposed| Actual
--------------|----------|----------|--------|--------|--------|-------Paddy
|
8860
|
8222 | Oct 20 | Oct 22 | Feb 20 | Feb 25
Total
|
8860
|
8222 |
|
|
|
|
|
|
|
|
|
------------------------------------------------------------------------

(ii) Performance
---------------------------------------------------------------------------------| Hydro.|
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
------------------|-------|---------------------------------------|----| Avg
|
1.4 10.9 16.6 21.3
8.8
.0 | 59.0
Water Issues (MCM)| Dry
|
1.4 10.8 15.6 17.5
6.5
.0 | 51.8
| Actual|
2.1 15.6 66.3 21.4 13.4
.0 |118.8
------------------|-------|---------------------------------------|----| Avg. |
.02
.12
.19
.24
.10
.00 | .67
Water duty (M)
| Dry
|
.02
.12
.18
.20
.07
.00 | .59
| Actual|
.03
.19
.81
.26
.16
.00 | 1.44
------------------|-------|---------------------------------------|----| Avg. |
57.8 76.9 90.1 79.5 73.3 73.7 |
End Storage (MCM) | Dry
|
49.4 53.4 55.9 39.9 29.9 30.3 |
| Actual|
60.1 94.3 122.5 124.1 116.3 114.2 |
-----------------------------------------------------------------------| Avg. | 196.6 303.6 314.6 164.9 95.1 64.5 |1139.3
Rain fall (mm)
| Dry
| 160.2 267.2 158.4 100.5 35.5 66.4 | 788.2
| Actual| 275.4 243.3 284.5 331.3 53.8 12.9 |1201.2
-----------------------------------------------------------------------NOTE : ACTUAL WATER
Note : 1 MCM = 0.81
1 Ha = 2.47
1 M
= 3.28

ISSUES/DUTY AS PER ACTUAL CROP SEASON


TAF
Acres
Ft

Page : 2.21
Table no.
Title
Scheme name

:
:
:

2.3G
Projected Irrigation System Water use
Parakrama Samudra

(i) Cropping Data


-----------------------------------------------------------------------------------|
Extent of crop
| First day of
| Last day of
Type of crop |
( Ha )
| water issue
| water issue
|---------------------|-----------------|----------------| Proposed | Actual |Proposed| Actual |Proposed| Actual
--------------|----------|----------|--------|--------|--------|-------Paddy
| 10365
|
10197 | Oct 25 | Oct 27 | Feb 25 | Mar 11
Total
| 10365
|
10197 |
|
|
|
|
|
|
|
|
|
------------------------------------------------------------------------

(ii) Performance
---------------------------------------------------------------------------------| Hydro.|
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
------------------|-------|---------------------------------------|----| Avg
|
14.1 29.5 21.8 24.6 26.8
.0 |116.8
Water Issues (MCM)| Dry
|
12.4 26.8 20.4 23.0 21.3
.0 |103.9
| Actual|
1.8 35.8 22.9 29.6 28.0
2.1 |120.2
------------------|-------|---------------------------------------|----| Avg. |
.14
.28
.21
.24
.26
.00 | 1.13
Water duty (M)
| Dry
|
.12
.26
.20
.22
.21
.00 | 1.01
| Actual|
.02
.35
.22
.29
.28
.02 | 1.18
------------------|-------|---------------------------------------|----| Avg. | 110.4 116.3 127.6 134.1 129.6 134.3 |
End Storage (MCM) | Dry
|
98.4 102.0 118.7 134.7 131.0 134.1 |
| Actual| 117.2 113.8 126.2 139.2 142.3 146.3 |
-----------------------------------------------------------------------| Avg. | 203.8 296.8 302.2 183.5 114.7 68.5 |1169.5
Rain fall (mm)
| Dry
| 154.3 190.9 253.6 132.7 44.9 38.7 | 815.1
| Actual| 471.5 403.5 517.0 169.5 111.5
5.0 |1678.0
-----------------------------------------------------------------------NOTE : ACTUAL WATER
Note : 1 MCM = 0.81
1 Ha = 2.47
1 M
= 3.28

ISSUES/DUTY AS PER ACTUAL CROP SEASON


TAF
Acres
Ft

Page : 2.22
Table no.
:
Title
:
Irrigation System :

2.4A
Projected Irrigation System Diversions
System E, C & B

-----------------------------------------------------------------------Diversions
| Hydro. |
Monthly diversion volume (MCM)
|
----------------|Condition|---------------------------------------|
From
To
|
|
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
----------------|---------|---------------------------------------|----Minipe
System | Average |
14.2 29.7 25.9 25.3 11.9
4.2 |111.2
E
| Dry
|
14.6 28.1 15.6 22.0
9.9
4.2 | 94.4
| Actual |
1.8 18.0 15.4 45.7 22.5 11.1 |114.5
----------------|---------|---------------------------------------|----Minipe
System | Average |
32.0 87.0 105.6 90.0 124.7 71.2 |510.5
C & B | Dry
|
16.4 79.7 88.4 33.1 104.4 49.4 |371.4
| Actual |
35.6 35.7 48.3 67.2 105.9 33.4 |326.0
----------------|---------|---------------------------------------|----Minipe
Sorabor| Average |
.9
3.2
2.6
2.8
3.6
.0 | 13.1
RB
a Wewa | Dry
|
.9
3.2
2.6
2.8
3.6
.0 | 13.1
| Actual |
.0
1.1
1.5
1.1
1.0
.5 | 5.4
----------------|---------|---------------------------------------|----Minipe
Mapakad| Average |
.8
2.6
1.5
.4
.5
.0 | 5.8
RB
a Wewa | Dry
|
.8
2.6
1.5
.4
.5
.0 | 5.8
| Actual |
.0
.0
.0
3.6
4.4
.0 | 8.0
----------------|---------|---------------------------------------|----Minipe
Dambara| Average |
.9
2.7
1.2
.2
.3
.0 | 5.3
RB
wa Wewa| Dry
|
.9
2.7
1.2
.2
.3
.0 | 5.3
| Actual |
.0
.0
.0
.0
.0
.0 |
.0
----------------|---------|---------------------------------------|----Minipe
Ulhitiy| Average |
29.3 78.6 100.3 86.6 120.3 71.2 |486.3
RB
a
| Dry
|
13.8 71.3 83.0 29.7 100.0 49.4 |347.2
| Actual |
64.4 123.5 98.4 111.3 137.4 53.7 |588.6
----------------|---------|---------------------------------------|----Ulhitiy Maduru | Average |
12.2 42.9 88.8 68.1 59.0 42.9 |313.9
a
Oya
| Dry
|
7.8 38.3 85.6 25.4 42.8 19.9 |219.8
| Actual |
24.3 84.3 89.9 69.5 36.0 41.9 |345.8
-----------------------------------------------------------------------Note : 1 MCM = 0.81 TAF

Page : 2.23
Table no.
Title
Scheme name

:
:
:

2.4B
Projected Irrigation System Water use
System E - Minipe LB

(i) Cropping Data


-----------------------------------------------------------------------------------|
Extent of crop
| First day of
| Last day of
Type of crop |
( Ha )
| water issue
| water issue
|---------------------|-----------------|----------------| Proposed | Actual |Proposed| Actual |Proposed| Actual
--------------|----------|----------|--------|--------|--------|-------Paddy
|
7530
|
7020 | Oct 20 | Oct 5 | Mar 05 | Mar 10
Total
|
7530
|
7020 |
|
|
|
|
|
|
|
|
|
------------------------------------------------------------------------

(ii) Performance
---------------------------------------------------------------------------------| Hydro.|
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
------------------|-------|---------------------------------------|----| Avg
|
17.4 32.4 22.9 25.3 16.3
1.0 |115.3
Water Issues (MCM)| Dry
|
18.0 30.3 22.4 23.1 12.8
.9 |107.5
| Actual|
1.8 18.0 15.4 45.7 22.5 11.1 |114.5
------------------|-------|---------------------------------------|----| Avg. |
.23
.43
.30
.34
.22
.01 | 1.53
Water duty (M)
| Dry
|
.24
.40
.30
.31
.17
.01 | 1.43
| Actual|
.03
.26
.22
.65
.32
.16 | 1.63
------------------|-------|---------------------------------------|----| Avg. |
|
End Storage (MCM) | Dry
|
No Storage Available
|
| Actual|
|
-----------------------------------------------------------------------| Avg. | 230.3 426.0 474.1 372.1 179.9 131.9 |1814.3
Rain fall (mm)
| Dry
| 248.2 347.4 345.6 301.6 106.1 70.3 |1419.2
| Actual| 340.9 413.8 423.3 149.7 139.2 60.7 |1536.6
-----------------------------------------------------------------------NOTE : ACTUAL WATER
Note : 1 MCM = 0.81
1 Ha = 2.47
1 M
= 3.28

ISSUES/DUTY AS PER ACTUAL CROP SEASON


TAF
Acres
Ft

Page : 2.24
Table no.
Title
Scheme name

:
:
:

2.4C
Projected Irrigation System Water use
Sorabora wewa

(i) Cropping Data


-----------------------------------------------------------------------------------|
Extent of crop
| First day of
| Last day of
Type of crop |
( Ha )
| water issue
| water issue
|---------------------|-----------------|----------------| Proposed | Actual |Proposed| Actual |Proposed| Actual
--------------|----------|----------|--------|--------|--------|-------Paddy
|
810
|
810 | Oct 20 | Oct 15 | Feb 15 | Feb 17
Total
|
810
|
810 |
|
|
|
|
|
|
|
|
|
------------------------------------------------------------------------

Note : 1 MCM = 0.81 TAF


1 Ha = 2.47 Acres
1 M
= 3.28 Ft

Page : 2.25
Table no.
Title
Scheme name

:
:
:

2.4D
Projected Irrigation System Water use
Mapakada wewa

(i) Cropping Data


-----------------------------------------------------------------------------------|
Extent of crop
| First day of
| Last day of
Type of crop |
( Ha )
| water issue
| water issue
|---------------------|-----------------|----------------| Proposed | Actual |Proposed| Actual |Proposed| Actual
--------------|----------|----------|--------|--------|--------|-------Paddy
|
550
|
607 | Oct 20 | Oct 20 | Feb 15 | Feb 18
Total
|
550
|
607 |
|
|
|
|
|
|
|
|
|
------------------------------------------------------------------------

Note : 1 MCM = 0.81 TAF


1 Ha = 2.47 Acres
1 M
= 3.28 Ft

Page : 2.26
Table no.
Title
Scheme name

:
:
:

2.4E
Projected Irrigation System Water use
Dambarawa wewa

(i) Cropping Data


-----------------------------------------------------------------------------------|
Extent of crop
| First day of
| Last day of
Type of crop |
( Ha )
| water issue
| water issue
|---------------------|-----------------|----------------| Proposed | Actual |Proposed| Actual |Proposed| Actual
--------------|----------|----------|--------|--------|--------|-------Paddy
|
610
|
607 | Oct 20 | Oct 20 | Feb 15 | Feb 16
Total
|
610
|
607 |
|
|
|
|
|
|
|
|
|
------------------------------------------------------------------------

Note : 1 MCM = 0.81 TAF


1 Ha = 2.47 Acres
1 M
= 3.28 Ft

Page : 2.27
Table no.
Title
Scheme name

:
:
:

2.4F
Projected Irrigation System Water use
Ulhitiya

(i) Cropping Data


-----------------------------------------------------------------------------------|
Extent of crop
| First day of
| Last day of
Type of crop |
( Ha )
| water issue
| water issue
|---------------------|-----------------|----------------| Proposed | Actual |Proposed| Actual |Proposed| Actual
--------------|----------|----------|--------|--------|--------|-------Paddy
| 22601
|
22801 | Nov 10 | Nov 5 | Mar 10 | Mar 3
Upland crops |
200
|
0 |
|
|
|
Total
| 22801
|
22801 |
|
|
|
|
|
|
|
|
|
------------------------------------------------------------------------

(ii) Performance
---------------------------------------------------------------------------------| Hydro.|
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
------------------|-------|---------------------------------------|----| Avg
|
.0 51.1 68.9 58.4 81.5 29.2 |289.1
Water Issues (MCM)| Dry
|
.0 50.5 64.9 52.8 61.1 27.2 |256.5
| Actual|
.0 67.7 57.3 71.1 77.0 17.6 |290.7
------------------|-------|---------------------------------------|----| Avg. |
.00
.22
.30
.26
.36
.13 | 1.27
Water duty (M)
| Dry
|
.00
.22
.28
.23
.27
.12 | 1.12
| Actual|
.00
.30
.25
.31
.34
.08 | 1.27
------------------|-------|---------------------------------------|----| Avg. | 116.9 140.8 144.0 143.5 139.3 143.6 |
End Storage (MCM) | Dry
| 115.2 131.1 141.7 141.7 135.9 141.3 |
| Actual| 142.9 133.1 138.8 138.9 144.0 143.8 |
-----------------------------------------------------------------------| Avg. | 205.2 359.2 409.7 300.8 155.5 107.5 |1537.9
Rain fall (mm)
| Dry
| 221.6 311.4 243.3 195.6 126.9 85.3 |1184.1
| Actual| 496.4 437.5 614.5 119.7 81.7 78.3 |1828.1
-----------------------------------------------------------------------NOTE : ACTUAL WATER
Note : 1 MCM = 0.81
1 Ha = 2.47
1 M
= 3.28

ISSUES/DUTY AS PER ACTUAL CROP SEASON


TAF
Acres
Ft

Page : 2.28
Table no.
Title
Scheme name

:
:
:

2.4G
Projected Irrigation System Water use
Maduru Oya LB

(i) Cropping Data


-----------------------------------------------------------------------------------|
Extent of crop
| First day of
| Last day of
Type of crop |
( Ha )
| water issue
| water issue
|---------------------|-----------------|----------------| Proposed | Actual |Proposed| Actual |Proposed| Actual
--------------|----------|----------|--------|--------|--------|-------Paddy
| 18555
|
18980 | Nov 15 | Nov 16 | Mar 15 | Mar 1
Upland crops |
90
|
282 |
| Nov 16 |
| Mar 1
Total
| 18645
|
19262 |
|
|
|
|
|
|
|
|
|
------------------------------------------------------------------------

(ii) Performance
---------------------------------------------------------------------------------| Hydro.|
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
------------------|-------|---------------------------------------|----| Avg
|
.0 21.5 58.4 47.8 73.4 20.8 |221.9
Water Issues (MCM)| Dry
|
.0 20.5 51.8 40.6 65.8 20.7 |199.4
| Actual|
8.5 31.0 50.8 67.3 69.7 27.9 |255.2
------------------|-------|---------------------------------------|----| Avg. |
.00
.12
.31
.26
.39
.11 | 1.19
Water duty (M)
| Dry
|
.00
.11
.28
.22
.35
.11 | 1.07
| Actual|
.04
.16
.26
.35
.36
.14 | 1.33
------------------|-------|---------------------------------------|----| Avg. | 276.9 351.0 455.0 528.7 528.3 553.2 |
End Storage (MCM) | Dry
| 272.0 344.1 395.1 459.9 447.1 503.4 |
| Actual| 317.9 456.5 619.3 581.7 532.3 518.0 |
-----------------------------------------------------------------------| Avg. | 186.4 299.6 341.4 208.1 88.9 57.7 |1182.1
Rain fall (mm)
| Dry
| 222.3 199.2 184.8 114.0 36.4 58.3 | 815.0
| Actual| 586.0 351.0 456.3 131.7 122.5 14.0 |1661.5
-----------------------------------------------------------------------NOTE : ACTUAL WATER
Note : 1 MCM = 0.81
1 Ha = 2.47
1 M
= 3.28

ISSUES/DUTY AS PER ACTUAL CROP SEASON


TAF
Acres
Ft

Page : 2.29
Table no.
:
Title
:
Irrigation System :

2.5A
Projected Irrigation System Diversions
System A

-----------------------------------------------------------------------Diversions
| Hydro. |
Monthly diversion volume (MCM)
|
----------------|Condition|---------------------------------------|
From
To
|
|
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
----------------|---------|---------------------------------------|----KANDAKA SYSTEM | Average |
17.5 44.8 28.2 39.6
8.2
.0 |138.3
DU
A - ALL| Dry
|
16.5 41.8 26.5 29.6
7.1
.0 |121.5
AI| Actual |
N/A
N/A
N/A
N/A
N/A
N/A | N/A
-----------------------------------------------------------------------Note : 1 MCM = 0.81 TAF

Page : 2.30
Table no.
Title
Scheme name

:
:
:

2.5B
Projected Irrigation System Water use
System A - Allai

(i) Cropping Data


-----------------------------------------------------------------------------------|
Extent of crop
| First day of
| Last day of
Type of crop |
( Ha )
| water issue
| water issue
|---------------------|-----------------|----------------| Proposed | Actual |Proposed| Actual |Proposed| Actual
--------------|----------|----------|--------|--------|--------|-------Paddy
|
7050
|
N/A
| Oct 20 |
| Feb 20 |
Total
|
7050
|
|
|
|
|
|
|
|
|
|
|
------------------------------------------------------------------------

(ii) Performance
---------------------------------------------------------------------------------| Hydro.|
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
------------------|-------|---------------------------------------|----| Avg
|
17.5 44.8 28.2 39.6
8.2
.0 |138.3
Water Issues (MCM)| Dry
|
16.5 41.8 26.5 29.6
7.1
.0 |121.5
| Actual|
N/A
N/A
N/A
N/A
N/A
N/A | N/A
------------------|-------|---------------------------------------|----| Avg. |
.25
.64
.40
.56
.12
.00 | 1.97
Water duty (M)
| Dry
|
.23
.59
.38
.42
.10
.00 | 1.72
| Actual|
N/A
N/A
N/A
N/A
N/A
N/A | N/A
------------------|-------|---------------------------------------|----| Avg. |
|
End Storage (MCM) | Dry
|
No Storage Available
|
| Actual|
|
-----------------------------------------------------------------------| Avg. | 156.9 348.4 364.1 131.9 76.5 55.7 |1133.5
Rain fall (mm)
| Dry
| 182.2 259.9 200.9 77.9 44.5 45.0 | 810.4
| Actual|
N/A
N/A
N/A
N/A
N/A
N/A |
N/A
-----------------------------------------------------------------------Note : 1 MCM = 0.81 TAF
1 Ha = 2.47 Acres
1 M
= 3.28 Ft

Page : 2.31
Table no.
:
Title
:
Irrigation System :

2.6A
Projected Irrigation System Diversions
System WALAWE (

-----------------------------------------------------------------------Diversions
| Hydro. |
Monthly diversion volume (MCM)
|
----------------|Condition|---------------------------------------|
From
To
|
|
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
----------------|---------|---------------------------------------|----KALTOTA LB & RB| Average |
7.1
9.0
6.6 10.9
.9
.0 | 34.5
AMUNA
CANALS| Dry
|
6.6
8.2
5.3
9.1
.8
.0 | 30.0
| Actual |
N/A
N/A
N/A
N/A
N/A
N/A | N/A
----------------|---------|---------------------------------------|----LIYANGA LB CANA| Average |
.0 17.2 12.5 14.6
8.3
.0 | 52.6
STOTA
L
| Dry
|
.0 16.0 10.7 12.8
7.8
.0 | 47.3
| Actual |
N/A
N/A
N/A
N/A
N/A
N/A | N/A
----------------|---------|---------------------------------------|----LIYANGA RB CANA| Average |
.0 18.1 12.9 15.2
8.7
.0 | 54.9
STOTA
L
| Dry
|
.0 16.6 11.1 13.3
8.1
.0 | 49.1
| Actual |
N/A
N/A
N/A
N/A
N/A
N/A | N/A
-----------------------------------------------------------------------Note : 1 MCM = 0.81 TAF

Page : 2.32
Table no.
Title
Scheme name

:
:
:

2.6B
Projected Irrigation System Water use
Kaltota Amuna

(i) Cropping Data


-----------------------------------------------------------------------------------|
Extent of crop
| First day of
| Last day of
Type of crop |
( Ha )
| water issue
| water issue
|---------------------|-----------------|----------------| Proposed | Actual |Proposed| Actual |Proposed| Actual
--------------|----------|----------|--------|--------|--------|-------Paddy
|
915
|
915 | Oct 15 | Oct 15 | Feb 15 | Mar 2
Total
|
915
|
915 |
|
|
|
|
|
|
|
|
|
------------------------------------------------------------------------

(ii) Performance
---------------------------------------------------------------------------------| Hydro.|
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
------------------|-------|---------------------------------------|----| Avg
|
7.1
9.0
6.6 10.9
.9
.0 | 34.5
Water Issues (MCM)| Dry
|
6.6
8.2
5.3
9.1
.8
.0 | 30.0
| Actual|
N/A
N/A
N/A
N/A
N/A
N/A | N/A
------------------|-------|---------------------------------------|----| Avg. |
.77
.99
.72 1.19
.10
.00 | 3.77
Water duty (M)
| Dry
|
.72
.89
.58 1.00
.09
.00 | 3.28
| Actual|
N/A
N/A
N/A
N/A
N/A
N/A | N/A
-----------------------------------------------------------------------| Avg. | 243.9 335.6 186.9 98.5 119.8 230.4 |1215.1
Rain fall (mm)
| Dry
| 156.4 338.6 120.0 65.9 80.0 136.7 | 897.6
| Actual|
N/A
N/A
N/A
N/A
N/A
N/A |
N/A
-----------------------------------------------------------------------Note : 1 MCM = 0.81 TAF
1 Ha = 2.47 Acres
1 M
= 3.28 Ft

Page : 2.33
Table no.
Title
Scheme name

:
:
:

2.6C
Projected Irrigation System Water use
Udawalawe RB

(i) Cropping Data


-----------------------------------------------------------------------------------|
Extent of crop
| First day of
| Last day of
Type of crop |
( Ha )
| water issue
| water issue
|---------------------|-----------------|----------------| Proposed | Actual |Proposed| Actual |Proposed| Actual
--------------|----------|----------|--------|--------|--------|-------Paddy
|
7731
|
7653 | Nov 01 | Nov 1 | Feb 28 | Mar 5
Upland crops |
3445
|
4169 |
| Nov 1 |
| Mar 5
Sugarcane
|
86
|
86 | Oct 01 | Nov 1 | Mar 31 | Mar 5
Total
| 11262
|
11908 |
|
|
|
|
|
|
|
|
|
------------------------------------------------------------------------

(ii) Performance
---------------------------------------------------------------------------------| Hydro.|
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
------------------|-------|---------------------------------------|----| Avg
|
.0 43.4 40.8 48.8 40.5
.1 |173.6
Water Issues (MCM)| Dry
|
.1 42.4 32.5 40.7 36.5
.1 |152.3
| Actual|
2.9 48.3 43.8 54.4 36.4 22.8 |208.6
------------------|-------|---------------------------------------|----| Avg. |
.00
.39
.36
.43
.36
.00 | 1.54
Water duty (M)
| Dry
|
.00
.38
.29
.36
.32
.00 | 1.35
| Actual|
.02
.41
.37
.46
.31
.19 | 1.75
------------------|-------|---------------------------------------|----| Avg. | 177.6 240.6 208.0 190.2 192.4 200.4 |
End Storage (MCM) | Dry
| 174.2 248.6 195.9 152.7 121.6 132.8 |
| Actual| 271.7 274.2 269.5 245.1 228.1 249.7 |
-----------------------------------------------------------------------| Avg. | 208.1 285.7 151.3 85.0 84.2 145.8 | 960.1
Rain fall (mm)
| Dry
| 156.3 255.0 114.4 49.1 50.7 115.0 | 740.5
| Actual| 537.3 443.0 125.8
.0
.0 39.0 |1145.1
-----------------------------------------------------------------------NOTE : ACTUAL WATER
Note : 1 MCM = 0.81
1 Ha = 2.47
1 M
= 3.28

ISSUES/DUTY AS PER ACTUAL CROP SEASON


TAF
Acres
Ft

Page : 2.34
Table no.
Title
Scheme name

:
:
:

2.6D
Projected Irrigation System Water use
Udawalawe LB

(i) Cropping Data


-----------------------------------------------------------------------------------|
Extent of crop
| First day of
| Last day of
Type of crop |
( Ha )
| water issue
| water issue
|---------------------|-----------------|----------------| Proposed | Actual |Proposed| Actual |Proposed| Actual
--------------|----------|----------|--------|--------|--------|-------Paddy
|
5194
|
5192 | Nov 10 | Nov 1 | Mar 10 | Mar 5
Upland crops |
3880
|
4453 |
| Nov 1 |
| Mar 5
Sugarcane
|
1894
|
1586 | Oct 01 | Nov 1 | Mar 31 | Mar 5
Total
| 10968
|
11231 |
|
|
|
|
|
|
|
|
|
------------------------------------------------------------------------

(ii) Performance
---------------------------------------------------------------------------------| Hydro.|
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
------------------|-------|---------------------------------------|----| Avg
|
1.8 12.8 49.7 42.0 44.0 15.9 |166.2
Water Issues (MCM)| Dry
|
2.7 12.4 41.7 35.3 34.7 13.4 |140.2
| Actual|
8.9 36.1 35.9 54.1 48.1 29.3 |212.4
------------------|-------|---------------------------------------|----| Avg. |
.02
.12
.45
.38
.40
.14 | 1.51
Water duty (M)
| Dry
|
.02
.11
.38
.32
.32
.12 | 1.27
| Actual|
.08
.32
.32
.48
.43
.26 | 1.89
-----------------------------------------------------------------------| Avg. | 208.1 285.7 151.3 85.0 84.2 145.8 | 960.1
Rain fall (mm)
| Dry
| 156.3 255.0 114.4 49.1 50.7 115.0 | 740.5
| Actual| 537.3 443.0 125.8
.0
.0 39.0 |1145.1
-----------------------------------------------------------------------NOTE : ACTUAL WATER
Note : 1 MCM = 0.81
1 Ha = 2.47
1 M
= 3.28

ISSUES/DUTY AS PER ACTUAL CROP SEASON


TAF
Acres
Ft

Page : 2.35
Table no.
Title
Scheme name

:
:
:

2.6E
Projected Irrigation System Water use
Liyangastota LB

(i) Cropping Data


-----------------------------------------------------------------------------------|
Extent of crop
| First day of
| Last day of
Type of crop |
( Ha )
| water issue
| water issue
|---------------------|-----------------|----------------| Proposed | Actual |Proposed| Actual |Proposed| Actual
--------------|----------|----------|--------|--------|--------|-------Paddy
|
3440
|
3449 | Nov 10 | Nov 10 | Feb 28 | Mar 14
Total
|
3440
|
3449 |
|
|
|
|
|
|
|
|
|
------------------------------------------------------------------------

(ii) Performance
---------------------------------------------------------------------------------| Hydro.|
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
------------------|-------|---------------------------------------|----| Avg
|
.0 17.2 12.5 14.6
8.3
.0 | 52.6
Water Issues (MCM)| Dry
|
.0 16.0 10.7 12.8
7.8
.0 | 47.3
| Actual|
N/A
N/A
N/A
N/A
N/A
N/A | N/A
------------------|-------|---------------------------------------|----| Avg. |
.00
.50
.36
.43
.24
.00 | 1.53
Water duty (M)
| Dry
|
.00
.47
.31
.37
.23
.00 | 1.38
| Actual|
N/A
N/A
N/A
N/A
N/A
N/A | N/A
-----------------------------------------------------------------------| Avg. | 154.8 246.1 110.8 65.4 42.7 83.5 | 703.3
Rain fall (mm)
| Dry
| 121.6 174.3 72.8 27.8 19.7 78.9 | 495.1
| Actual|
N/A
N/A
N/A
N/A
N/A
N/A |
N/A
-----------------------------------------------------------------------Note : 1 MCM = 0.81 TAF
1 Ha = 2.47 Acres
1 M
= 3.28 Ft

Page : 2.36
Table no.
Title
Scheme name

:
:
:

2.6F
Projected Irrigation System Water use
Liyangastota RB

(i) Cropping Data


-----------------------------------------------------------------------------------|
Extent of crop
| First day of
| Last day of
Type of crop |
( Ha )
| water issue
| water issue
|---------------------|-----------------|----------------| Proposed | Actual |Proposed| Actual |Proposed| Actual
--------------|----------|----------|--------|--------|--------|-------Paddy
|
3265
|
3266 | Nov 01 | Nov 11 | Feb 20 | Mar 10
Total
|
3265
|
3266 |
|
|
|
|
|
|
|
|
|
------------------------------------------------------------------------

(ii) Performance
---------------------------------------------------------------------------------| Hydro.|
Monthly Values
|
Item description | Condi |---------------------------------------|
| -tion |
Oct
Nov
Dec
Jan
Feb
Mar
| Tot
------------------|-------|---------------------------------------|----| Avg
|
.0 18.1 12.9 15.2
8.7
.0 | 54.9
Water Issues (MCM)| Dry
|
.0 16.6 11.1 13.3
8.1
.0 | 49.1
| Actual|
N/A
N/A
N/A
N/A
N/A
N/A | N/A
------------------|-------|---------------------------------------|----| Avg. |
.00
.55
.40
.47
.27
.00 | 1.69
Water duty (M)
| Dry
|
.00
.51
.34
.41
.25
.00 | 1.51
| Actual|
N/A
N/A
N/A
N/A
N/A
N/A | N/A
-----------------------------------------------------------------------| Avg. | 154.8 246.1 110.8 65.4 42.7 83.5 | 703.3
Rain fall (mm)
| Dry
| 121.6 174.3 72.8 27.8 19.7 78.9 | 495.1
| Actual|
N/A
N/A
N/A
N/A
N/A
N/A |
N/A
-----------------------------------------------------------------------Note : 1 MCM = 0.81 TAF
1 Ha = 2.47 Acres
1 M
= 3.28 Ft

TABLE 1 : SUMMARY OF CROPPING DATA


-------SYSTEM

-----------SCHEME

----AVAIL
AREA
(HA)

----------ACTUAL CROP
----------TYPE
%

--------

------------

-----

-----------

Dambulu Oya

2290

KHFC Scheme

2250

Kandalama

4500

MH+IH

Kalawewa RB

14007

Kalawewa YE

4721

Kalawewa LB

6637

Rajangana

7214

Neela Bemma

690

Hurulu Wewa
Nachchaduwa

4300
2970

Nuwara Wewa
Tissawewa

1020
520

Paddy
Upland
Paddy
Upland
Paddy
Upland
Paddy
Upland
Paddy
Upland
Paddy
Upland
Paddy
Upland
Paddy
Upland

94
5
76
23
99
1
90
9
93
6
95
5
90
9
42
57

Paddy
Paddy
Upland
Paddy
Paddy

97
94
6
103
100

-----------------------WATER ISSUE
-----------------------1ST DATE LST DATE DUTY
(M)
-----------------------Nov

Mar

.80

Nov 24

Mar 21

N/A

Nov

Mar

1.00

Nov

Mar 19

1.51

Nov

Mar

.84

Oct 25
Oct 20
Oct 25

Mar

1.16

Mar

1.41

Oct 25

Jan 22

N/A

Nov 9
Oct 10

Mar 11
Feb 20

.64
.47

Oct 15
Oct 25

Feb 29
Mar 11

1.69
.78

TABLE 1 : (Continued)
-------SYSTEM

-----------SCHEME

----AVAIL
AREA
(HA)

----------ACTUAL CROP
----------TYPE
%

--------

------------

-----

-----------

D & G

Elahera
Giritale
Minneriya
Kaudulla
Kantale
Parakrama
Samudra

6700
3500
9825
5060
8860
10365

Paddy
Paddy
Paddy
Paddy
Paddy
Paddy

100
87
92
108
92
98

E, C & B

System E Minipe LB
Sorabora
wewa
Mapakada
wewa
Dambarawa
wewa
Ulhitiya

7530

Paddy

93

810

Paddy

550
610
22801

-----------------------WATER ISSUE
-----------------------1ST DATE LST DATE DUTY
(M)
-----------------------Nov 1
Nov 1
Nov 1
Nov 1
Oct 22
Oct 27

Mar
Mar
Mar
Mar
Feb
Mar

20
6
10
14
25
11

1.57
.90
.63
.58
1.44
1.18

Oct

Mar 10

1.63

100

Oct 15

Feb 17

N/A

Paddy

110

Oct 20

Feb 18

N/A

Paddy

99

Oct 20

Feb 16

N/A

Nov

Mar

1.27

Nov 16

Mar

1.33

Paddy
Upland
Paddy
Upland

100
0
101
1

Maduru Oya
LB

18645

System A Allai

7050

Paddy

N/A

WALAWE (

Kaltota
Amuna
Udawalawe
RB

915

Paddy

100

Oct 15

Mar

N/A

67
37
0
47
40
14
100

Nov

Mar

1.75

Nov

Mar

1.89

3440

Paddy
Upland
Sugarc
Paddy
Upland
Sugarc
Paddy

Nov 10

Mar 14

N/A

3265

Paddy

100

Nov 11

Mar 10

N/A

Udawalawe
LB
Liyangastota
LB
Liyangastota
RB

11262
10968

N/A

TABLE 2 : SUMMARY OF ENERGY GENERATION


-------SYSTEM

-----------------------Power Station

--------

------------------------

Mahaweli

Kotmale
Victoria
Randeni gala
Rantembe
Ukuwela
Bowa
tenna

134
210
61
50
36
40

277
530
252
126
63
37

SUB-TOTAL

531

1289

Canyon
New
Laxapana
Polpiti ya
Wimala surendra
Laxapana
Samanalawewa
Kukule
Mini
Hydro

30
100
75
50
50
120
70
20

79
267
213
77
166
258
139
34

SUB-TOTAL

515

1235

Coal
Power
Diesel
Steam
Gas
Private Power

810
144
0
282
736

N/A
N/A
N/A
N/A
N/A

1972

N/A

Kelani &

Thermal

SUB-TOTAL
--------

-----------------------SYSTEM TOTAL

-------Avail
Capacity
(MW)
--------

-------3018

-----------Total Energy
(GWH)
------------

-----------N/A

APPENDIX 3
GRAPHICAL REPRESENTATION OF PROJECTED AND ACTUAL RESERVOIR LEVELS

2015-16 MAHA SEASON

Fig: 3.11 - CASTLEREIGH


60.00

1096.4

FSL=1095.7 M ( 48.3 MCM)

40.00

1092.9

30.00

1089.3

20.00

1085.2

10.00

1082.2

Elevation in M (above from MSL)

Storage (MCM)

50.00

MOL=1075.9 M (3.9 MCM)


1060.0

Average

80%Dry

1-Apr-16

1-Mar-16

1-Feb-16

1-Jan-16

1-Dec-15

1-Nov-15

1-Oct-15

0.00

Actual

Fig: 3.12 - MOUSSAKELE


160
1171.2

140

1169.3

100

1164.4

80

1161.6

60

1158.5

40

1154.8

20

1150.4

Elevation in M (above from MSL)

1167.0

MOL=1145.4 M (2.0 MCM)

Average

80%Dry

Actual

1-Apr-16

1-Mar-16

1-Feb-16

1-Jan-16

1-Nov-15

1-Dec-15

1136.0

1-Oct-15

Storage (MCM)

FSL=1167.4 M (123.6 MCM)

120

WMS/MASL

2015-16 MAHA SEASON


Fig: 3.13 - GAMINI DISSANAYAKE RESERVOIR ( KOTMALE )
200.00

707.1

FSL=703.0 M ( 172.9 MCM)

175.00

703.4

150.00

694.8

Storage (MCM)

125.00

689.7

100.00

75.00

683.9

50.00

676.7

Elevation in M (above from MSL)

699.3

666.6

25.00
MOL=665.0 M (22.2 MCM)

630.0

Average

80%Dry

1-Apr-16

1-Mar-16

1-Feb-16

1-Jan-16

1-Dec-15

1-Nov-15

1-Oct-15

0.00

Actual

Fig: 3.14 - VICTORIA


800.00
441.3

FSL=438.0 M (721.2 MCM)

700.00

437.1

600.00

427.5

400.00
421.7

300.00
414.5

200.00
405.0

100.00
389.6

MOL=370.0 M (34 MCM)

Average

80%Dry

1-Apr-16

1-Mar-16

1-Feb-16

1-Jan-16

1-Dec-15

1-Nov-15

0.00
1-Oct-15

Storage (MCM)

500.00

Elevation in M (above from MSL)

432.6

340.0

Actual

WMS/MASL

2015-16 MAHA SEASON

Fig: 3.15 - RANDENIGALA


1000.00

237.6

900.00

233.6

FSL=232.0 M ( 861.4 MCM)

800.00

700.00

225.0

Storage (MCM)

600.00
220.3

500.00
215.1

400.00
MOL=209.0 M (393.4 MCM)

209.4

Elevation in M (above from MSL)

229.4

300.00
202.8

Average

1-Feb-16

80%Dry

1-Apr-16

145.0

1-Mar-16

0.00
1-Jan-16

186.6

1-Dec-15

100.00

1-Nov-15

194.9

1-Oct-15

200.00

Actual

Fig: 3.16 - RANTEMBE

152.0

6.00

151.1

5.00

150.0

4.00

148.6

3.00

146.9

2.00

144.8

141.9

1.00
MOL=140.0 M (0.6 MCM)

127.0

Average

80%Dry

1-Apr-16

1-Mar-16

1-Feb-16

1-Jan-16

1-Dec-15

1-Nov-15

0.00
1-Oct-15

Storage (MCM )

FSL=152.0 M (7.0 MCM)

7.00

Elevation in M (above from MSL)

8.00

Actual

WMS/MASL

2015-16 MAHA SEASON

Fig: 3.17 - BOWATENNA


25.00
FSL=251.8 M ( 23.5 MCM)

20.00

15.00
249.5

10.00

248.5

5.00

246.0

Elevation in M (above from MSL)

Storage (MCM)

251.0

MOL=243.8 M (2.3 MCM)

0.00

Average

80%Dry

1-Apr-16

1-Mar-16

1-Feb-16

1-Jan-16

1-Dec-15

1-Nov-15

1-Oct-15

236.0

Actual

Fig: 3.18 - SAMANALAWEWA


300.00
462.8

FSL=460.0 M (278.0 MCM)

250.00
457.8

200.00

443.4

100.00

434.0

MOL=424.0 M (60.0 MCM)

50.00

420.0

Average

80%Dry

1-Apr-16

1-Mar-16

1-Feb-16

1-Jan-16

1-Nov-15

1-Dec-15

0.00

Elevation in M (above from MSL)

150.00

1-Oct-15

Storage ( MCM )

451.3

390.0

Actual

WMS/MASL

APPENDIX 4
GRAPHICAL REPRESENTATION OF PROJECTED AND ACTUAL TANK LEVELS

2015-16 MAHA SEASON

Fig: 4.11 - KANDALAMA


45.00

177.4

40.00

177.1

176.4

FSL=176.2 M ( 33.8 MCM)

30.00

175.6

25.00

174.8

20.00

173.9

15.00

172.8

10.00

171.6

5.00

Elevation in M (above from MSL)

Storage (MCM)

35.00

169.8

MOL=169.2 M (3.8 MCM)


167.7

Average

80%Dry

1-Apr-16

1-Mar-16

1-Feb-16

1-Jan-16

1-Dec-15

1-Nov-15

1-Oct-15

0.00

Actual

Fig: 4.12 - KALAWEWA


129.7

140.00

100.00

128.4

Elevation in M (above from MSL)

129.1

60.00

127.6

126.7

40.00

125.5

123.9

20.00
MOL=123.42 M ( 15.0 MCM)

0.00

Average

80%Dry

Actual

1-Apr-16

1-Mar-16

MOL=123.42 M (15.0 MCM)

1-Feb-16

1-Jan-16

1-Dec-15

1-Nov-15

118.9

1-Oct-15

Storage (MCM)

80.00

Elevation in M (above from MSL)

FSL=129.24 M ( 123.7 MCM)

120.00

WMS/MASL

2015-16 MAHA SEASON

Fig: 4.13 - RAJANGANA


FSL=68.3 M ( 100.7 MCM)

100.00

68.2

90.00

Elevation in M (above from MSL)

67.6

60.00

50.00

66.2

65.3

64.4

40.00

63.6

30.00

62.1

20.00

60.6

MOL=59.11 M (12.0 MCM)


58.6

10.00

Average

80%Dry

1-Apr-16

1-Mar-16

1-Feb-16

1-Jan-16

1-Dec-15

1-Nov-15

1-Oct-15

0.00

Actual

Fig: 4.21 - HURULUWEWA


80

132.4

70

60

131.8

50

131.0

130.2

40

30

129.2

20

127.8

Elevation in M (above from MSL)

FSL=132.27 M (67.8 MCM)

126.1

10
MOL=126.3 M (11.0 MCM)

123.8

Average

80%Dry

1-Apr-16

1-Mar-16

1-Feb-16

1-Jan-16

1-Dec-15

1-Nov-15

0
1-Oct-15

Storage ( MCM )

Storage ( MCM )

70.00

67.0

Elevation in M (above from MSL)

80.00

Actual

WMS/MASL

2015-16 MAHA SEASON

Fig: 4.22 - NACHCHADUWA


80.00

102.9

70.00

102.4

60.00

101.9

101.2

40.00

100.6

30.00

99.9

20.00

98.5

Elevation in M (above from MSL)

50.00

MOL=98.61 M (17.9 MCM)

10.00

97.7

Average

80%Dry

1-Apr-16

1-Mar-16

1-Feb-16

1-Jan-16

1-Dec-15

1-Oct-15

1-Nov-15

0.00
94.0

Actual

Fig: 4.23 - NUWARAWEWA


60.00

88.6

FSL=87.40 M ( 44.5 MCM)

87.0

40.00

86.0

30.00

Elevation in M (above from MSL)

87.9

50.00

84.9

20.00

83.3

10.00
MOL=82.81 M (7.4 MCM)

80.4

Average

80%Dry

1-Apr-16

1-Mar-16

1-Feb-16

1-Jan-16

1-Dec-15

1-Nov-15

0.00

1-Oct-15

Storage (MCM)

Storage ( MCM )

FSL=101.68 M (55.7 MCM)

Actual

WMS/MASL

2015-16 MAHA SEASON

Fig: 4.24 - TISSAWEWA


5.00

92.5

FSL= 91.53 M (4.3 MCM)

91.2

3.00

90.5

2.00

89.8

Elevation in M (above from MSL)

Storage ( MCM )

4.00

MOL=88.79 M (1.0 MCM)

1.00

88.6

85.6

Average

80%Dry

1-Apr-16

1-Mar-16

1-Feb-16

1-Jan-16

1-Dec-15

1-Nov-15

1-Oct-15

0.00

Actual

Fig: 4.31 - GIRITALE


30.00

FSL=92.96 M ( 26.8 MCM)


92.4

25.00

10.00

87.1

5.00

84.6

MOL=81.99 M (1.7 MCM)


79.0

Average

80%Dry

1-Apr-16

1-Mar-16

1-Feb-16

1-Jan-16

1-Dec-15

1-Nov-15

0.00
1-Oct-15

Storage (MCM)

89.0

15.00

Elevation in M (above from MSL)

90.8

20.00

Actual

WMS/MASL

2015-16 MAHA SEASON

Fig: 4.32 - MINNERIYA


175.00

95.2

150.00

94.2

125.00

93.2

100.00

92.1

75.00

90.8

50.00

89.3

Elevation in M (above from MSL)

Storage ( MCM )

FSL=93.70 M (135.7 MCM)

87.3

25.00
MOL=85.34 M (9.2 MCM)

82.0

Average

80%Dry

1-Apr-16

1-Mar-16

1-Feb-16

1-Jan-16

1-Dec-15

1-Nov-15

1-Oct-15

0.00

Actual

Fig: 4.33 - KAUDULLA


140.00

73.6

FSL=73.15 M ( 128.3 MCM)

120.00

71.9

80.00

71.0

60.00

69.8

40.00

68.4

MOL=67.06 M (25.4 MCM)

20.00

64.4

64.0

Average

80%Dry

1-Apr-16

1-Mar-16

1-Feb-16

1-Jan-16

1-Nov-15

1-Dec-15

0.00
1-Oct-15

Storage (MCM)

100.00

Elevation in M (above from MSL)

72.8

Actual

WMS/MASL

2015-16 MAHA SEASON

Fig: 4.34 - KANTALE


160.00

FSL=59.28 M (135.7 MCM)

120.00

58.37

Elevation in M (above from MSL)

59.27

Storage ( MCM )

100.00

80.00

57.37

Elevation in M (above from MSL)

FSL=59.28 M (140.6 MCM)

140.00

56.28

60.00

54.96

40.00

53.57

20.00

51.68

MOL=48.99 M (2.5 MCM)

0.00

Average

80%Dry

1-Apr-16

1-Mar-16

1-Feb-16

1-Jan-16

1-Dec-15

1-Nov-15

1-Oct-15

47.47

Actual

Fig: 4.35 - PARAKRAMA SAMUDRAYA


160.00

120.00

58.5

100.00

57.7

80.00

56.7

60.00

55.5

Elevation in M (above from MSL)

59.3

54.1

40.00
MOL=53.34 M (31.6 MCM)

80%Dry

1-Apr-16

1-Nov-15
Average

1-Mar-16

50.0

1-Feb-16

0.00
1-Jan-16

51.9

1-Dec-15

20.00

1-Oct-15

Storage (MCM)

FSL=59.4 M ( 144.3 MCM)

140.00

Actual

WMS/MASL

2015-16 MAHA SEASON

Fig: 4.41 - ULHITIYA / RATKINDA


160.00

107.4

FSL=106.66 M (145.3 MCM)

140.00

Elevation in M (above from MSL)

106.5

MOL=104.42 M (98.3 MCM)

80.00

104.5

103.3

0.00

90.0

Average

1-Feb-16
80%Dry

1-Apr-16

97.7

1-Mar-16

20.00

1-Jan-16

100.0

1-Dec-15

40.00

1-Nov-15

101.8

1-Oct-15

60.00

Actual

Fig: 4.42 - MADURU OYA


800.00

98.5

700.00

97.6

600.00

500.00

94.5

400.00

92.6

90.3

300.00

87.5

200.00

Elevation in M (above from MSL)

96.1

FSL=96.0 M ( 596.6 MCM)

Storage ( MCM )

MOL=84.5 M (119.0 MCM)


83.4

100.00

70.1

Average

80%Dry

1-Apr-16

1-Mar-16

1-Feb-16

1-Jan-16

1-Dec-15

1-Nov-15

0.00
1-Oct-15

Storage ( MCM )

100.00

105.6

Elevation in M (above from MSL)

120.00

Actual

WMS/MASL

2015-16 MAHA SEASON

Fig: 4.51 - UDAWALAWE


300.00

89.3

87.8

200.00

86.2

150.00

84.1

100.00

81.5

50.00

Elevation in M (above from MSL)

250.00

77.6

MOL=74.98 M (28.2 MCM)

0.00

Average

80%Dry

1-Apr-16

1-Mar-16

1-Feb-16

1-Jan-16

1-Nov-15

1-Dec-15

62.5

1-Oct-15

Storage ( MCM )

FSL=88.69 M (278.2 MCM)

Actual

WMS/MASL