Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Materials:
stitches:
,S
.A
TI
A
Cast on sts, moss st, stockinette st, net st, decrease, bind
(cast) off.
Gauge:
KA
op
yr
ig
ht
FI
1) knit front
13 (33cm) in Stockinette St
4R in Moss St
MOSS ST:
NETST:
to the last
2) knit back
Bind (cast) off sts
4R in Moss st.
B
4 sts
17 sts
3 sts 3 sts
Work 5 1/8 (13cm) dividing the sts as indicated in the diagram: Work
the 3 STS and the 4 STS at the edges in Moss St and the 17 central
STS at each side in Net St.
17 sts
4 sts
Bind (cast) off the central stitch and work each side, A and B, separately.
1 sts
,S
.A
TI
A
KA
3) Sew the pieces together by matching the colours and the each tape to
the point marked with an x
FI
BACK
ht
op
yr
ig
8 5/8
8 5/8
1 5/8
without
seam
3/4
without
seam
FRONT
8 5/8