Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
DC MACHINES
2300XPC
50
TON CLASS
AC MACHINES
4100C
4100C BOSS
90
2800XPC
70
4100XPC
115
also 4100XPB
4100C BOSS
90
4100XPC
120
DC NOMINAL COMPENSATION
@ 600 VAC, 50/60 HZ
Steps
IDLE kW
IDLE kVARS
200 kW
-150 kVAR
200 kW
-150 kVAR
225 kW
-200 kVAR
250 kW
-200 kVAR
225 kW
-200 kVAR
250 kW
-200 kVAR
PEAK kW CONSUMED
APPROX.
DURATION OF PEAK
> 1 SEC.
1 SEC.
< 1 SEC.
2250 kW
2800 kW
3150 kW
2600 kW
2300 kW
3600 kW
3100 kW
3700 kW
4125 kW
3225 kW
3850 kW
4300 kW
3100 kW
3700 kW
4125 kW
3225 kW
3850 kW
4300 kW
POTENTIAL MAX.
CALCULATED
3650 kW
4100 kW
4800 kW
5000 kW
4800 kW
5000 kW
CONSERVATIVE EST.
QUOTE
2800 kW
3300 kW
3700 kW
3850 kW
3700 kW
3850 kW
REGENERATED POWER
TYPICAL
1400 kW
1700 kW
1800 kW
1900 kW
1800 kW
1900 kW
PEAK
1600 kW
1800 kW
2000 kW
2100 kW
2000 kW
2100 kW
400 - 800 kW
600 - 1000 kW
800 - 1250 kW
920 - 1450 kW
800 - 1250 kW
920 - 1450 kW
600 kW
800 kW
975 kW
1150 kW
975 kW
1150 kW
AVERAGE kW CONSUMED
AVERAGE RANGE
TYPICAL
.996 LAG
.996 LAG
-0.95
-0.95
-0.95
-0.95
-0.98
-0.98
2000 KVA
2750 KVA
3300 KVA
3750 KVA
3300 KVA
3750 KVA
16 MVA
22 MVA
25 MVA
30 MVA
25 MVA
30 MVA
RECOMMENDATIONS
SUB-STATION
MINIMUM SHORT
CIRCUIT AVAILABLE
@ SHOVEL
NOTES:
The numbers are conservative estimates based on calculation and field data.
All numbers should be considered approximate with a tolerance of +/- 10%
Power parameters greatly depend on digging conditions, operator techniques and proficiency and general pit operating conditions.
DEFINITIONS:
POTENTIAL MAX. CALCULATED
HOIST + CROWD + SWING OPERATING @ THEIR POTENTIAL PEAK POWER.
This condition will not likely occur in a truck loading situation. The maximum potential peak power for a loading situation is based on the HOIST +
CROWD operating at peak power + Swing @ 1/2 MAX. speed. The occurrence is momentary; > 1 SEC.
AVERAGE kW CONSUMED
AVERAGE RANGE
The range is given because of the wide range of operational and digging conditions.
TYPICAL
The typical value is most likely to be encountered.
Demand values are based on the highest average kW, for a set interval of time, over a longer period of time.
Source: ER 39.05.05.10
15 min. Demand
30 min. Demand
Revised: 12/10/08