JUANITO DAL BALANE JR.

Home Address
Contact No.
E-mail Add
POSITION DESIRED

:
:
:
: COMBINATION WELDER (Tig/SMAW/FCAW/Stainless Steel,
Copper Nickel/6GR Position. PASSED.)

JOB EXPERIENCED
Position
: Welder (GTAW/SMAW)
Inclusive Date
: JUNE 15, 2012 UP TO PRESENT
Company
: CAPE PHILIPPINES
Project
: MOPU PROJECT, LIHIR ISLAND
Address
: NEW IRELAND, LIHIR ISLAND
Qualification
: Passed & qualified to weld GTAW/SMAW pipes, from 2 up to 48
stainless/carbon steel pipes & structural supports. PASSED.
Duties & Responsibilities:
Assigned as tig and arc welder in MOPU Project, Lihir Island.
Responsible to welding high pressurize pipe and structure.
Responsible in safety awareness.
Uncommon ability to welding of stainless & carbon steel pipe 2 diameter and above.
Wailing to do any duties if required.
Position
: Welder (GTAW/SMAW/6GR/FCAW)
Inclusive Date
: JANUARY 17, 2012 UP TO JUNE 06, 2012
Company
: CAPE PHILIPPINES
Project
: KUMUL PLATFORM OFFSHORE
Address
: PORT MORSEBY, PAPUA NEW GUINEA
Qualification
: Passed & qualified to weld 6G/6GR pipes, from 2 up to 48
carbon steel, copper, nickel, structural support and jacket leg. PASSED.
Duties & Responsibilities:
Assigned as tig and arc welder in offshore Kumul Platform Terminal.
Responsible to welding high pressurize pipe and structure.
Responsible in safety awareness.
Uncommon ability to welding of copper nickel & carbon steel pipe 2 diameter and above.
Wailing to do any duties if required.
Position
Inclusive Date
Company

: Welder (GTAW/SMAW)
: AUGUST 11, 2009 UP TO AUGUST 11, 2011
: SKSWOODS SDN.BHD (under supervision of BRUNEI
SHELL PETROLEUM COMPANY)
Address
: Kuala Belait, NEGARA BRUNEI DARUSALLAM
Qualification
: Passed & qualified to weld 6G/6GR pipes, from 2 up to 48
carbon steel structural support and jacket leg. And also 2 duplex steel PASSED
Duties & Responsibilities:
Assigned as tig and arc welder in offshore facilities east and west area in Brunei Shell
Petroleum.
Page 1 of 4

Responsible to welding high pressurize pipe and structure.


Responsible in safety awareness.
Uncommon ability to welding duplex stainless steel pipe 2 diameter and above.
Wailing to do any duties if required.

Position
Inclusive date
Company
Address
Qualification

: Welder (GTAW/SMAW)
: August 09, 2008 MAY 31, 2009
: SAHID SENDIRIAN BERHAD
: Seria Belait, Negara Brunei Darussalam
: Passed & qualified to weld small bores pipes from 26G up to
48 big bores carbon steel. Also qualified to weld DSS 2 passed.

Duties & Responsibilities:


Welding of pipe support, pipe shoe & rack.
Also qualified and responsible in welding of. Carbon steel with different schedule and
thicknesses.
Involved in land tie-in project. Welding and emergency shutdown inside of BLNG power
plant.
Position
Inclusive date
Company
Address

:
:
:
:

Combination Welder (GTAW / SMAW)


April 13, 2007 June 30, 2008
CHIN WUI HENG WELDER ENTERPRISE
Seria Belait, Negara Brunei Darussalam

Qualification

: Passed & qualified to weld small bores pipes from and 2/6/6Gposition
; Also qualified to weld Low Temperature Carbon Steel.

Duties & Responsibilities:


Welding of carbon steel pipe from .2and 6G.

Up to 48 size with different schedules or thicknesses.


Welding of pipe support, pipe shoe, rack, & other structures used smaw process. For Brunei
LNG Power Plant project.
Position
Inclusive date
Company
Address

: Welder (GTAW & SMAW)


: August 27, 2006 until March 5, 2007
: AM.EM.JV EMCO CO.
: Ras Laffan Industrial City, Qatar

Duties & Responsibilities:


Welding of 2and 6G up to 48 size of pipe with different schedules.
Welding of pipe support, pipe rack, pipe shoe, and other structures used for Ras Laffan B.
Power & Desalination Plant Project.
Position
Inclusive date
Company
Address

:
:
:
:

Welder (2G/3G SMAW)


Feb. 5, 2006 Aug. 26, 2006
SHI-QATAR
Ras Laffan Industrial City, Qatar

Duties & Responsibilities:


Welding of tank in 2G/3G position, box column, cross column trusses, butt joint and T-joint.
Repair of air ducting under Dolphin Upstream Compression Facilities Contractor.
Position
Inclusive date
Company

:
:
:

Welder 2G/3G (GMAW)


March 28, 2005 Feb. 2, 2006
STEEL CENTRE PHILS. INC.PHILS.
Page 2 of 4

Duties & Responsibilities:


Welding of box column, tank, trusses, and other structures for different project using 2G/ 3G
positions.
Position
Inclusive date
Company

:
:
:

Welder III (3G SMAW)


Oct. 12, 2004 until January 5, 2005
GRAND SPAN DEVELOPMENT CORP.PHILS.

Duties & Responsibilities:


Welding of box column, tank, trusses, and other structures for different project using 3G
positions.
Position
Inclusive date
Company

:
:
:

Combination Welder (Tig & Arc)


July 24, 2003 until September 5, 2004
NASSER S. AL-HAJRI CORP.SAUDE ARABIA.

Duties & Responsibilities:


Welding of 26G up to 48 size of pipe with different schedules.
Welding of tank and pressure vessel using 6G position
Welding of pipe support, pipe rack, pipe shoe, and other structures for different project.
Position
Inclusive date
Company

:
:
:

GTAW / SMAW 6G TIG Welder


October 30, 2000 October 30, 2002
Al-Gaswa Support Co. LTD.KSA.

Duties & Responsibilities:


Full welding of pipe, stainless steel 1 pass and 6 pass.
Carbon steel 2 pass up to 18
Any sizes & types of metal pipes stainless steel and carbon steel.

Position
Inclusive date
Company

:
:
:

2G & 3G Plate Welder (FCAW/GMAW/SMAW)


Oct. 1997 until Oct. 2000
BF METAL CORPORATION.PHILS.

Duties & Responsibilities:


Welding of box column, tank, trusses, and other structures for different project using 2G/ 3G
position.
Welding and repair of air ducting for Geothermal Power Plant under MHI Project.
SPECIAL SKILLS
Combination welding (Tig & Arc), driving,
PERSONAL DATA
Nationality
Date of Birth
Place of Birth
Civil Status
Height
Sex

:
:
:
:
:
:

Filipino
June 17, 1971
Pumat Jasa-a
SINGLE.
5 1
Male
Page 3 of 4

Religion
Contact Person

:
:

Born Again Christian


Marice Maul

EDUCATIONAL BACKGROUND
Secondary
Address
Year Graduated

:
:
:

Jasa-an,National High School


Misamis Oriental
1984 - 1988

Primary
Address
Year Graduated

:
:
:

Danao Elementary School


Danao Jasaan Misamis Oriental, Phils.
1977 - 1984

CHARACTER REFERENCES
Bobby John R. Arcenal Sr.
Mechanical Designer
Email
Jesus Gutlay
Engineering Designer
BLNG Oil and Gas Powerplant
Lumut, Brunei Darussalam
Tel no: +
Ben Trinidad
Quality Control Manager
SKSWOOD
Kuala Belait, Brunei Darussalam
Tel no
Certification available upon request.

Page 4 of 4