Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
COD.
D E S C R I P C I O N
Cantidad
18,900.00
3
4
5
14,000.00
1,300.00
40,250.00
6
7
8
50.00
1,300.00
40,250.00
9
10
11
12
13
14
15
8.00
0.00
155.00
110.00
8.00
36.00
144.00
Contratista :
Calculado Por:
Aprobado PDVSA:
C.I.
C.I.
C.I.
FIRMA
1,000.00
FIRMA
FIRMA
VALUACION N 7-3
CTO
+396,18+555 DEL
CONTRATO N 4600015834
LUGAR
GASODUCTO 16" N20 - N30
FECHA DE EMISIN:
CONTRATISTA: JELECONIT,C.A.
Ejecutado en el Perodo
CONTRATO ORIGINAL
23/02/2015 AL 01/03/2015
Unid.
P. Unitario
M2
10.27
10,270.00
0.00
0.00
M2
15.00
283,500.00
0.00
0.00
M2
M3
29.66
2,006.36
415,240.00
2,608,268.00
0.00
0.00
0.00
0.00
0
0
M3
643.66
25,907,315.00
0.00
0.00
M3
M3
4,467.79
1,321.02
223,389.50
1,717,326.00
0.00
0.00
0.00
0.00
0
0
M3
610.06
24,554,915.00
11,700.00
7,137,702.00
29
M3
M3
M2
1,567.79
1,516.51
824.80
12,542.32
0.00
127,844.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
M2
1,626.06
178,866.60
0.00
0.00
ML
ML
40,734.38
25,928.81
325,875.04
933,437.16
0.00
0.00
0.00
0.00
0
0
ML
7,451.13
1,072,962.72
0.00
0.00
Total Contrato:
58,371,751.34
Cantidad
Total Periodo:
7,137,702.00
ECHA DE EMISIN:
3/23/2015
Ejecutado Acumulado
Cantidad Anterior
Cantidad
0.00
0.00
0.00
0.00
10,000.00
10,000.00
150,000.00
52.91
8,360.00
784.28
8,360.00
784.28
247,957.60
1,573,548.02
59.71
60.33
36,250.98
36,250.98
23,333,305.79
90.06
45.46
697.25
45.46
697.25
203,105.73
921,081.20
90.92
53.63
17,987.50
29,687.50
18,111,156.25
73.76
0.00
7.57
0.00
0.00
7.57
0.00
0.00
6,243.74
0.00
0.00
4.88
36.25
36.25
58,944.68
32.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
142.10
142.10
1,058,805.57
98.68
0.00
Total Acumulado:
45,664,148.57
RIF. J-30514179-7
OBRA: VALIDACIN Y CORRECCIN DE FALLA EN EL GASODUCTO COPAMACOYA 16" N20 Y N30 EN LAS PROGRESIVAS 18+025,1
UBICACIN:
CONTRATO N:
N DE FRENTES:
PARTIDA N
N 8
DESCRIPCIN
RELLENO
COMPACTACIN
CON
CANTIDAD
ORIGINAL
UNIDAD
40,250.00
M3
MATERIAL DE EXCAVACIN
CONTRATISTA:
INSPECTOR DE LA OB
____________________________
___________________
C.I.:
C.I.:
NOTA: LOS INSPECTORES AVALAN Y CERTIFICAN QUE LA OBRA ESTA EJECUTADA Y LAS MEDICIO
: DIAMETRO,
HOJA TESTIGOS
PZA
MEDICIONES
TIPOS
M2
M3
KG
DATOS
L
A
TOTAL
PERIODO
11,700.00
11,700.00
HOJA DE MEDICION
TOTAL
CROQUIS - TESTIGOS
11,700.00
__________________________
EJECUTADO HASTA
LA FECHA
POR EJECUTAR
29,687.50
10,562.50
29,687.50
10,562.50
23/02/2015 AL 01/03/2015
OBSERVACIONES
____________________________
C.I.:
PLANILLA DE M
CONTRATISTA: JELECONIT
CONTRATO N
OBRA:
RIF. J-30514179-7
DESCRIPCION
M2
M3
11,700.00
CALCULADO POR:
C.I.:
C.I.:
PZA
KG
ONTRATISTA: JELECONIT
ONTRATO N
PART. N: 8
4600015834
FECHA:23/03/2015
ML TOTAL
80.00
13.500
10.85
KG/MT
UNIDAD: M3
DESCRIPCION PARTIDA:
RELLENO Y COMPACTACIN CON MA
TOTAL
14,687.50
CANTIDAD ORIGINAL
RELACIONADO ANTERIORMENTE
RELACIONADO EN ESTA VALUACIN
AUMENTO / DISMINUCIN
POR EJECUTAR
REVISADO POR: PDVSA
C.I.:
T. N: 8
CODIGO: C-8
PZA:
CANTIDAD:
40,250.00
CRIPCION PARTIDA:
LENO Y COMPACTACIN CON MATERIAL DE EXCAVACIN
P.UNITARIO
610.06
TIDAD ORIGINAL
ACIONADO ANTERIORMENTE
ACIONADO EN ESTA VALUACIN
ENTO / DISMINUCIN
EJECUTAR
TOTAL
8,960,256.25
40,250.00
2,987.50
11,700.00
0.00
25,562.50