Sei sulla pagina 1di 18

International Power Quality

Discussion Forum

Power Quality Tools - Disturbance


Name :
Tel. :

Date

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

Time

Outside environmental
conditions

Power Quality
orum
Power Quality Tools - Disturbance Log Sheet
Company and address:
Info:

Disturbed loads

Disturbance
description

List of alarms

Denis Ruest, P.Eng.


November 2012

Total downtime

List of generated
scrap material

Estimate of scrap
material

Persons-hours
affected

Cost of manpower
losses

Other information

International Power Quality


Discussion Forum

Power Quality Tools - L


Cost of losses for event
type 1
ex. Voltage sag
Part - 1 - Materials
Scrap:
Second quality products:
Remanufacturing costs:
Other (Specify):
Total:

1,500.00 $
500.00 $
0.00 $
0.00 $
2,000.00 $

Improductives:
Cleaning
Process restart:
Overtime to catch-up:
Other (Specify):
Total:

100.00 $
100.00 $
50.00 $
150.00 $
0.00 $
400.00 $

Part - 2 - Workforce

Part - 3 - Lost of Sales


0.00 $
Total:

0.00 $

Damages:
Repairs:
Replacement:
Other (Specify):
Total:

0.00 $
0.00 $
0.00 $
0.00 $
0.00 $

Contract Lost:
Litigations:
Delivery:
Penalities:
Other (Specify):
Total:

0.00 $
0.00 $
0.00 $
0.00 $
0.00 $
0.00 $

Grand Total (GTn):

2,400.00 $

Estimated number of annual events (NbE):

10

Part - 4 - Equipements

Part - 5 - Risks

Estimated Annual Losses


(EAL):

75,000.00 $

Denis Ruest, P.Eng.


November 2012

Quality Tools - Losses Evaluation Sheet


Cost of losses for event
type 2

Cost of losses for event


type 3

Cost of losses for event


type 4

ex. voltage transient

ex. Short interruption

ex. Interruption

1,000.00 $
300.00 $
0.00 $
0.00 $
1,300.00 $

0.00 $
0.00 $
0.00 $
0.00 $
0.00 $

0.00 $
0.00 $
0.00 $
0.00 $
0.00 $

100.00 $
100.00 $
50.00 $
150.00 $
0.00 $
400.00 $

0.00 $
0.00 $
0.00 $
0.00 $
0.00 $
0.00 $

0.00 $
0.00 $
0.00 $
0.00 $
0.00 $
0.00 $

0.00 $

0.00 $

0.00 $

0.00 $

0.00 $

0.00 $

0.00 $
0.00 $
0.00 $
0.00 $
0.00 $

0.00 $
0.00 $
0.00 $
0.00 $
0.00 $

0.00 $
0.00 $
0.00 $
0.00 $
0.00 $

0.00 $
0.00 $
0.00 $
0.00 $
0.00 $
0.00 $

0.00 $
0.00 $
0.00 $
0.00 $
0.00 $
0.00 $

0.00 $
0.00 $
0.00 $
0.00 $
0.00 $
0.00 $

1,700.00 $

0.00 $

0.00 $

30

=_(=1)^4
_ " " _

International Power Quality


Discussion Forum

Part - 1 - Equipment and Comissionning


Acquisition:
Commissionning:
Other (specify):
Total:

Part - 2 - Auxiliairies
Swithgear or Panel:
Transformer:
Labor:
Other (specify):
Total:
Total Acquisition and Installation Cost:

Part - 3 - Annual Maintenance


Parts:
Labor (inspection, cleaning, etc.):
Long Term Maintenance (batteries, etc):
Other (specify):
Total:

Part - 4 - Solution effectiveness to solve problem


Estimated Effectiveness for Event type 1 in % (EE%1)
Estimated Effectiveness for Event type 2 in % (EE%2)
Estimated Effectiveness for Event type 3 in % (EE%3)
Estimated Effectiveness for Event type 4 in % (EE%4)
Estimated Global Effectiveness (%) (EE%):

Part - 5 - Electrical Efficiency Level


Power rating in kVA:
Efficiency Level (%):
Electricy Cost ($/kWh):

Duty cycle (average usage):


Annual Electric Losses:

Part - 6 - Payback (simple method)


Annual Losses (Losses Evaluation):
Annual Maintenance Cost:
Cost of passtrought disturbances:
Annual Electrical Losses:

Annual Savings:

Payback period (years):

Note 1 :

To calculate estimated solution effectiveness add the effectiveness of each solutions (=Effectiv
the estimated annual losses.

Note 2 :

The payback period in years is the total acquisition and installation cost divided by the annual

Describe Objectives: Need to increase ride throught capacity of 200 HP Drive for voltage sags and cap

Solution
No. 1

Comments
3% Input Inductor

7,500.00 $
500.00 $
8,000.00 $
1,500.00 $

Box for inductors

0.00 $
2,000.00 $
200.00 $

2 days
connectors, etc.

3,700.00 $
11,700.00 $

100.00 $
50.00 $
150.00 $

(See Note 1)
0%
90%
0%
0%
61%
6.00
97.00
0.120

100 % switching 0% sag

50%
94.61 $
75,000.00 $
-150.00 $
-28,921.91 $
-94.61 $

45,833.48 $

0.26

(See Note 2)

ctiveness of each solutions (=Effectiveness in % * Cost per event * number annual events) and divide this sum by

nstallation cost divided by the annual savings

Denis Ruest, P.Eng.


November 2012 - rev mai
2013

city of 200 HP Drive for voltage sags and capacitor switchings.


Solution
No. 2

Comments

0.00 $

0.00 $
0.00 $

0.00 $
0%
0%
0%
0%
0%

0.00 $
0.00 $
0.00 $
0.00 $
0.00 $

0.00 $

N/A

ual events) and divide this sum by

%=(_(=1)^4
% _ _ " "
_)/

Solution
No. 3

Comments

0.00 $

0.00 $
0.00 $

0.00 $

0%

0.00 $
0.00 $
0.00 $
0.00 $
0.00 $

0.00 $

N/A

Solution
No. 4

Comments

0.00 $

0.00 $
0.00 $

0.00 $

0%

0.00 $
0.00 $
0.00 $
0.00 $
0.00 $

0.00 $

N/A

Potrebbero piacerti anche