1)
2)
3)
4)
5)
6)
b) Accidental damage
d) All
7)
Continuing capability of the a/c to perform in a satisfactory manner the flight operations
for which it was designed.
a) Maintenance
b) Overhaul
c) Airworthiness
d) Damage
tolerant
8)
9)
10)
11)
d) All
c) Condition monitoring
c) condition monitoring
d) None
c) Bench test
d) None
12)
13)
14)
15)
In condition monitoring
a) A special maintenance task is required to evaluate condition
b) Components have no overall control and operated to failure
c) Replacement of parts done at regular intervals
d) All
16)
c) Six monthly
d) Either b or c
17)
MTCS
a) unscheduled removal of components must be a confirmed failure
b) Mechanical delays to scheduled service does not include cancellation of flight
c) Delays one classified ATA systematic
d) All
18)
d) None
19)
Policy and procedure of operating engines beyond manufactures laid down TBOs, spelt
out in
a) QC manual
b) MS manual
c) Operational manual
d)
None
20)
21)
22)
23)
24)
25)
26)
MTCS
a) Alert values will be fixed in consultation with RAO.
b) Alert values will acceptance limit
c) Alert values will be given by DGCA Hqrs.
d) All.
Corrective maintenance action when alert values are reached is spelt out in.
a) QC manual .
b) QA manual.
c) MS manual.
d) All.
27)
28)
29)
30)
Average fuel and oil consumption of piston engine should be recorded in.
a) Engine log book b) Airframe log book c) Operational log book d) Journey log book
31)
32)
33)
MICS
a) Operator can change from one maintenance process to another
b) As in a & approved by RAO
c) As in b & programmed documented in QC cum MS manual
d) It can be approved by RAO only if they have a sound maintenance programme.
34)
d) DGCA Hqrs.
35)
TBOs and maintenance schedule must be expressed in terms of calendar period for a/c
of
a) Public Transport category
b) Private cat.
c) Low utilization
d) High utilization
36)
d) All
CM components are
a) Operated to failure
b) replaced at fixed interval
c) Maintenance task is required to evaluate life
d) All.
Operator submitted life development programme for approval
a) RAO
b) Sub RAO
c) DGCA Hqrs.
d) RAO/Sub RAO
d) RAO/Sub RAO
37)
38)
39)
40)
41)
If owner and operator of an a/c are not same party who will responsible to ensure the a/c
has a valid C of A
a) Owner
b) Operator
c) Any one of a & b d) DGCA
42)
43)
44)
Hard time
a) Primary maintenance process
b) failure preventive process
c) Require inspection of a/c components at fixed interval d) All
45)
MTCS
a) Failure of CM items not affecting the safety of a/c
b) Component of ON condition item need to dismantle
c) On condition is the philosophy of fit and forget
d) All
46)
MTCS
a) Total no. of engine hour = Total no. of airframe hour x 2 (No. of engine)
b) Number of mechanical delay not includes the cancelled flight
c) No. of delay and no. of scheduled service worked out on 7 basis would provide a
parameter called dispatch reliability
d) All
47)
48)
49)
50)
51)
52)
d) None
53)
54)
55)
56)
MEL is applicable to
a) Scheduled operator
c) Private operator
MEL
a) based on MMEL
c) means maximum equipment list
57)
MTCS
a) Philosphy of MEL should be authorize continuation of flight with inoperative
item only if it does not render the a/c unairworthy.
b) This is a philosophy which permits reduced safety to fly to a base where repair can be
made
c) It is a philosophy which permits safet operation for a take off from a main maintenance
base to enroute stop
d) All
58)
MICS
a) MEL is intended to provide for continued operation of the a/c for extended
period with MEL item unserviceable
b) a/c should not dispatched with multiple MEL items inoperative
c) Unserviceable MEL items should be repaired at first station where repair facility is
available
d) None
59)
60)
61)
b) Q.C. Manual
d) None
62)
63)
Who is responsible to ensure that no a/c is dispatched with multiple items inoperative.
a) QCM
b) Owner
c) RAO/sub RAO
D) Chief Engineer
64)
b) Embodiment of modification
d) All
65)
66)
67)
d) Cat D
68)
Major defect
a) Should be intimated immediately on telephone to RAO
b) as in a & written information does not required
c) as in b & it is responsibility of operation/organization
d) None
69)
70)
Periodicity of review of the defect reported by operation other than scheduled operator
a) Daily review
b) Periodicity decided by operator in consultation with RAO
c) Periodicity decided by QC department
d) Periodicity decided by manufacturer
71)
72)
Investigation of all defects likely to take longer than one month progress
a) Report should be submitted to RAO every month
b) As in a & till the finalization of report
c) All effort must be taken to complete the investigation within three month and as
in b
d) Report completion beyond three month is not acceptable
73)
74)
MTCS
a) Effort of investigator should be to determine the cause of defect
b) Effort of investigator should be to determine who caused it.
c) Disciplinary action against erning person should be taken in consultation with DGCA
to provide duplicate panel action
d) All
75)
76)
d) 2 yrs.
77)
78)
79)
In case of training a/c making series of flight of the day, defects should be recorded