Medelln
Abril de 2010
TABLA DE CONTENIDO
MUNICIPIO DE ZARAGOZA ANTIOQUIA........................................I
MEDELLN................................................................................... I
TABLA DE CONTENIDO................................................................II
LISTA DE PLANOS.......................................................................V
LISTA DE FIGURAS......................................................................V
LISTA DE FOTOS.......................................................................VII
3. GEOLOGIA Y GEOMORFOLOGIA................................................6
4. ESTUDIO HIDROLGICO.........................................................12
4.1 ESTIMACIN DE LOS CAUDALES MXIMOS DEL RO NECH........................................13
4.2 ESTIMACIN DE CAUDALES MXIMOS EN LAS QUEBRADAS JUAN VARA Y OC................16
5. MODELACIN HIDRULICA.....................................................21
5.1 TEORA DEL FLUJO GRADUALMENTE VARIADO..........................................................21
5.2 CONSIDERACIONES BSICAS DEL PROGRAMA HEC-RAS.............................................22
5.3 SIMULACIN HIDRAULICA................................................................................... 24
5.3.1 Calibracin del modelo.....................................................................................24
5.3.2 Anlisis Granulomtrico....................................................................................25
DESCRIPCION GENERAL.............................................................72
RECOMENDACIONES CONSTRUCTIVAS PARA LAS GEOESTRUCTURAS
............................................................................................... 73
7. PRESUPUESTO......................................................................75
ALTERNATIVA 1. PROTECCIN CRECIENTE 100 AOS..................75
ALTERNATIVA 2. PROTECCIN CRECIENTE 25 AOS....................76
8. ANALISIS DE PRECIOS UNITARIOS..........................................77
9. ESPECIFICACIONES TECNICAS................................................86
9.1 LOCALIZACION Y REPLANTEO......................................................................86
9.1.1 DESCRIPCIN.................................................................................................... 86
9.1.2 MEDIDA............................................................................................................. 86
9.1.3 PAGO................................................................................................................ 86
9.5.4 EQUIPO............................................................................................................. 96
9.5.5 EJECUCION DE LOS TRABAJOS...........................................................................96
9.5.5.1
9.5.5.2
9.5.5.3
9.5.5.4
9.5.5.5
9.5.5.6
9.5.6.1 Controles.................................................................................................................. 99
9.6.6
9.6.7
9.6.8
9.6.9
MEDIDA........................................................................................................... 106
FORMA DE PAGO............................................................................................. 106
ITEM DE PAGO................................................................................................. 106
ITEM DE PAGO................................................................................................. 106
9.7.11
9.7.12
9.7.13
9.7.14
9.7.15
9.7.16
9.7.17
9.7.18
9.7.19
9.7.20
9.7.21
9.7.22
9.7.23
Fundacin de la geoestructura......................................................................110
Alineamiento de la geoestructura.................................................................110
Cuidados especiales.....................................................................................110
Traslapos de geoestructuras.........................................................................110
Tubera de llenado........................................................................................110
Bombeo de slurry.......................................................................................... 111
Disposicin de geoestructuras......................................................................111
Cierre de puertos.......................................................................................... 112
Llenado de la geoestructura con material dragado.......................................112
Conexin entre geoestructuras.....................................................................113
Finalizacin................................................................................................... 113
Medida.......................................................................................................... 113
Item de pago................................................................................................ 114
DESCRIPCION.................................................................................................. 114
MATERIALES.................................................................................................... 114
EQUIPO........................................................................................................... 114
EJECUCION DE LOS TRABAJOS.........................................................................115
9.8.4.1
9.8.4.2
9.8.4.3
9.8.4.4
9.8.4.5
Separacin............................................................................................................. 115
Preparacin del terreno.......................................................................................... 115
Colocacin del geotextil......................................................................................... 115
Colocacin del material sobre el geotextil..............................................................116
Refuerzo del suelo Control de erosin TERRATRAC...............................................116
10. REFERENCIAS...................................................................119
11. FICHAS EBI.......................................................................120
12. CRONOGRAMA DE ACTIVIDADES/FLUJO DE FONDOS.............121
LISTA DE PLANOS
Plano 1/6
aos
Plano 2/6
Plano 3/6
Plano 4/6
Plano 5/6
Plano 6/6
LISTA DE FIGURAS
Figura 1 Ubicacin Municipio de Zaragoza..............................................................
Figura 2 Levantamiento de secciones transversales en el ro Nech y qdas.
Juan Vara y Oc, 2005...............................................................................
Figura 3 Cuenca del ro Nech en los puntos de inters........................................
Figura 4 Curvas de frecuencia de la serie de caudales mximos anuales.
Estacin San Juan....................................................................................
Figura 5 Cuenca de la quebrada Juan Vara...........................................................
Figura 6 Cuenca de la quebrada Oc....................................................................
Figura 7 Ubicacin de la estacin pluviogrfica Madreseca..................................
Figura 8 Curva IDF para la estacin MadreSeca (Cdigo 2702024).......................
Figura 9 Ubicacin de los puntos de toma de muestras de material del lecho
24
Figura 10 Curvas granulomtricas del lecho del ro Nech...................................
Figura 11 Curva granulomtrica Quebrada Oca...................................................
Figura 12 Curva granulomtrica Quebrada Juan Vara..........................................
Figura 13 Distribucin de secciones transversales en el ro Nech y en las
quebradas Juan Vara y Oca.....................................................................
Figura 14 Seccin 24 de la quebrada Oca, lmina correspondiente a Q = 9.3
m/s.........................................................................................................
Figura 15 Seccin 19 de la quebrada Oca, lmina correspondiente a Q = 9.3
m/s.........................................................................................................
Figura 16 Seccin 14.5 de la quebrada Oca, Puente Viejo,
lmina
correspondiente a Q = 9.3 m/s..............................................................
Figura 17 Seccin 8 de la quebrada Juan Vara, lmina correspondiente a Q
= 5.4 m/s...............................................................................................
Figura 18 Seccin 4 de la quebrada Juan Vara, lmina correspondiente a Q
= 5.4 m/s...............................................................................................
Figura 19 Seccin 1 de la quebrada Juan Vara, lmina correspondiente a Q
= 5.4 m/s...............................................................................................
Figura 20 Seccin 7 del ro Nech, lmina correspondiente a un caudal
estimado de 1095 m/s...........................................................................
Figura 21 Seccin 4 del ro Nech, lmina correspondiente a un caudal
estimado de 1095 m/s...........................................................................
Figura 22 Seccin 2 del ro Nech, lmina correspondiente a un caudal
estimado de 1095 m/s...........................................................................
LISTA DE FOTOS
Foto 1
Foto 2
Foto 3
Foto 4
Foto 5
Foto 6
Foto 7
LISTA DE TABLAS
Tabla 1 Informacin secundaria utilizada...............................................................
1. INTRODUCCIN
Las avenidas constituyen un proceso natural ligado a la dinmica
geomorfolgica, en las cuales la corriente habilita un cauce ms amplio
para almacenar el caudal y la carga, incrementados en momentos de flujos
altos.
El Municipio de Zaragoza (Departamento de Antioquia), ha sido vctima de
innumerables eventos de crecidas del ro Nech y las quebradas Juan Vara
y Oca a lo largo de su historia, los cuales han ocasionado inundaciones
tanto de la zona urbana como de algunos sectores del rea rural. Es por
esto que la actual administracin municipal ha hecho esfuerzos
grandsimos para lograr la financiacin de las obras de proteccin que
alivien o mitiguen los problemas de inundaciones que afectan a toda la
comunidad.
Son varias las poblaciones que se han visto afectadas por la dinmica del
ro Nech como lo son los Municipios de Zaragoza, El Bagre y Nech, que
aparte de ser un medio de desarrollo econmico para estas comunidades,
tambin es una gran amenaza por su impredecible dinmica fluvial.
La planificacin de los espacios fluviales del ro Nech y las quebradas Juan
Vara y Oca, constituye un ambicioso estudio del Municipio de Zaragoza en
su afn de velar por la seguridad de su casco urbano. El estudio se ha
basado en la aplicacin de metodologas que describen y caracterizan los
procesos naturales que definen el comportamiento de stas corrientes
desde lo alto de sus cuencas, determinando una visin integral de los
fenmenos hdricos y morfodinmicos del espacio fluvial.
El objetivo final de este estudio es disear las medidas de proteccin
contra las inundaciones de las quebradas Juan Vara y Oca en el municipio
de Zaragoza, las cuales se ven afectadas por las crecidas del ro Nech. El
control de la situacin se ha analizado en dos etapas y su construccin y
financiacin ser por consecuente con cada etapa: Una etapa, el control
de las inundaciones ocasionadas por el ro Nech y otra, el control de los
problemas de inundacin desde las quebradas Juan Vara y Oca. Esta
segunda fase es el tema de este informe.
Despus del captulo introductorio (captulo 1), a lo largo del informe se
presenta una descripcin de la informacin bsica (captulo 2) que sirvi
de apoyo para los estudios bsicos: geologa (captulo 3), hidrologa
(captulo 4) y Modelacin hidrulica (captulo 5), para luego pasar al diseo
Figura 1
2. INFORMACIN BSICA
2.1 INFORMACIN SECUNDARIA
La bsqueda de informacin secundaria inici con la identificacin de las
estaciones hidroclimticas cercanas a la zona de estudio, entre las cuales
se obtuvieron la estacin limnigrfica San Juan y las estaciones
Pluviogrficas Madre Seca y La cada, posteriormente se indag en las
bases de datos del Municipio y de la Corporacin Autnoma del Centro de
Antioquia (CORANTIOQUIA), con el objetivo de filtrar alguna informacin
que pudiera aportar al desarrollo del proyecto. Entre los estudios
Entidad
Formato
IDEAM
Digital
EPM
EPM
CORANTIOQUIA
CORANTIOQUIA
Digital
Digital
Digital
Digital
Figura 2
3. GEOLOGIA Y GEOMORFOLOGIA
La elaboracin de este estudio geolgico comienza a partir de una revisin
bibliogrfica, en la cual se analiza la informacin geolgica a escalas
regional y local (en caso de existir). Posteriormente se lleva a cabo una
completa fotointerpretacin, consultando las fotografas areas existentes
en las diferentes dependencias locales y departamentales, como la
Planoteca de Catastro Departamental, el Instituto Geogrfico Agustn
Codazzi (IGAC), lo mismo que la oficina de Planeacin y de Catastro del
municipio de Zaragoza, entre otros. Luego se realiza una cartografa
geolgica detallada del rea que comprende el casco urbano de Zaragoza
y zonas aledaas, definiendo las principales caractersticas geolgicas y
geomorfolgicas.
En el caso especfico que nos ocupa, para la descripcin de la geologa
regional, se encuentra el estudio Plan Bsico de Ordenamiento Territorial,
Municipio de Zaragoza 2000-2009, en cuyo diagnstico se hizo un
completo anlisis geolgico de todo el municipio, a partir tambin de la
consulta de informacin secundaria. En el presente estudio retomamos lo
realizado por el POT para el captulo de Geologa Regional, haciendo luego
ms nfasis en el trabajo en detalle para el casco urbano.
Finalmente se realiza la evaluacin y anlisis de la informacin primaria y
la elaboracin del informe final al igual que los mapas que acompaan
dicho informe.
Dentro del casco urbano y zonas aledaas, se pudieron diferenciar doce
unidades geomorfolgicas con caractersticas distintas a partir de la
composicin geolgica, unidades superficiales, relieve y procesos
morfodinmicos presentes. Estas unidades corresponden a las siguientes:
PL- Playas: corresponden a las zonas de acumulacin aluvial ubicadas
dentro de los canales del ro Nech y quebrada Juan Vara. reas de
pendientes planas localizadas en los lugares donde las corrientes tienen
-LAN- Llanuras aluviales del ro Nech: son zonas planas cuyo proceso
morfodinmico principal es la depositacin fluvial. Corresponde a reas
inundables, amplias, que en general tienen cobertura vegetal de pastos y
algunos rboles. En la margen izquierda del ro, y a la altura del rea
urbana, la llanura tiene una amplitud de unos 10 20 m en promedio. En la
margen derecha la zona es variable y se encuentra el casco urbano. El
material de la llanura presenta gravas y arenas finas.
Foto 4 Bancos de arena en el R. Nech y ubicacin del casco urbano con respecto
al nivel del ro.
4. ESTUDIO HIDROLGICO
El estudio hidrolgico se constituye en la herramienta fundamental del
proyecto que pretende controlar y prevenir las inundaciones fluviales en el
municipio de Zaragoza, ya que por medio de ste se determinan los
caudales mximos que transitan por las corrientes en estudio.
El estudio hidrolgico se realiz en 2 etapas; en la primera se estimaron
los caudales mximos del ro Nech por medio del anlisis de frecuencia de
la serie de caudales mximos anuales de la estacin limnigrfica San Juan
propiedad del IDEAM; en la segunda etapa se calcularon los caudales
mximos para las quebradas Juan Vara y Oc, mediante la aplicacin de los
modelos Lluvia-escorrenta, partiendo de la serie de datos continuos de las
estaciones pluviogrficas Madre Seca y La Cada propiedad de EPM.
Se adquirieron los registros de las estaciones limnigrficas Ermitao y
Bfalo, ubicadas sobre el ro Porce y Nech respectivamente (Tabla 2), las
cuales son propiedad de EPM para realizar un anlisis de las series de
caudales mximos y medios, con el fin de identificar las variaciones y
tendencias de cada serie. La informacin de las estaciones utilizadas se
muestra en la Tabla 2.
Tabla 2 Estaciones linmigrficas utilizadas para el anlisis de frecuencia de
eventos mximos en la cuenca del ro Nech.
CODIG
PROPIEDA
TIPO
O
D
NOMBRE
CORRIEN
TE
Norte
Este
AO
INST.
27037
03
LG
IDEAM
SAN JUAN
NECHI
131720
5
91142
1
1967
27017
68
LG
EPM
ERMITANO_EL_P
P_7
PORCE
130061
8
90955
1
1983
EPM
BUFALO_EL__PR
N_2
NECHI
129334
3
86535
5
1980
27027
20
LG
SAN JUAN
(m3/s)
PP- 7
ERMITAO
PRN - 2 BUFALO
(m3/s)
(m3/s)
Q promedio
multianual
367.90
288.70
95.30
VALOR
1521.54
290.05
-0.4184
-0.4655
Normal
Gumbel
Log Normal II
LogPearson III
2.33
1573.30
1521.85
1548.08
1678.14
1765.65
1730.22
1774.73
1757.76
10
1893.25
1899.92
1943.10
1809.20
25
2029.32
2114.35
2140.29
1840.40
50
2117.22
2273.43
2278.19
1850.67
100
2196.29
2431.33
2409.80
1858.31
Figura 3
Hasta la
estacin
San Juan
8358.28
6
221.25
3707
Hasta el sitio
del proyecto
8720.88
6
237.78
3707
Parmetro de la
cuenca del Ro Nech
Cota de la cuenca en el punto de inters
(msnm)
Permetro (km)
Pendiente media (%)
Hasta la
estacin
San Juan
Hasta el sitio
del proyecto
180
62
672.54
10.64
691.09
10.28
Ai Ap
Qp
Ap
* Qi
Ai
Qp 1.0434* Qi
Donde
Qp es el caudal mximo anual en el punto de inters que para
el caso es la zona urbana del municipio; Qi es el caudal mximo anual en
el punto instrumentado (donde est la estacin San Juan); Ai, el rea de la
cuenca del ro Nech hasta el punto instrumentado y Ap es el rea de la
cuenca del ro Nech hasta el casco urbano del municipio.
Los caudales mximos obtenidos se presentan en la Tabla 7:
Tabla 7 Caudales mximos anuales.
Tr
(Aos)
Normal
(m3/s )
2.33
1641.58
1842.28
10
1975.42
25
2117.39
50
2209.11
100
2291.61
Gumb
el
(m3/s
)
1587.
90
1805.
31
1982.
38
2206.
11
2372.
1
2536.
85
Log
Normal II
(m3/s )
Log
Pearson III
(m3/s)
1615.27
1750.97
1851.75
1834.05
2027.43
1887.72
2233.18
1920.27
2377.06
1930.99
2514.39
1938.96
Figura 4
MXIMOS
EN
LAS
Cdigo
Madresec 270202
a
4
270109
La Cada
1
Tipo
PG
PG
Este
Norte
892,969. 1,293,664.
71
31
894,779. 1,278,525.
97
01
Ao
inicial
Aos
Ao
de
final registro
s
1981
2004
24
1980
1998
19
Quebrada Juan
Vara
16.76
14.50
184.00
60.00
Quebrada
Oc
59.13
67.05
300.00
60.00
0.67
18.66
2.62
10.46
10.23
7.91
0.22
39.57
5.85
0.94
20.26
9.28
7.91
9.28
Parmetro
Cota mayor ro (m)
Cota menor ro (m)
Figura 5
Quebrada Juan
Vara
167.00
59.7
Quebrada
Oc
250.00
57.90
Figura 6
Tabla 11
Cuenca de la quebrada Oc
JUAN VARA
(horas) (min)
Kirpich
1.61
Kirpich 2
1.89
Tmez
1.70
Ventura-Heras
1.11
Giandiotti
3.83
Bransby-Williams
2.72
96.88
113.1
7
102.1
0
66.30
229.9
9
163.3
7
OC
(horas) (min)
120.2
2.00
8
133.4
2.22
5
173.9
2.90
4
173.9
2.90
4
332.6
5.54
6
261.8
4.36
0
JUAN VARA
(horas) (min)
AUTOR
Johnstone
SELECCIONADO
1.57
2.00
OC
(horas) (min)
134.4
2.24
8
3.17
190
94.49
120
Id,Tr
EIdref 2
EIdref2
E Idref2
exp Tr ln
2
E
dref
dref
Donde
Tr : es el valor de la distribucin normal acumulada estndar inversa para
una probabilidad de no-excedencia Tr.
Id,Tr: Intensidad mxima para una duracin d y un periodo de retorno Tr.
Idref: Intensidad mxima para una duracin de referencia.
: Exponente de escalamiento.
Se determinaron las IDF para las estaciones Madreseca y La Cada, pero
finalmente para el clculo de los caudales mximos slo se utiliz la
primera estacin dada su proximidad a las cuencas en estudio. Dicha
estacin est localizada a una longitud aproximada de 30 km del casco
urbano del municipio de Zaragoza (Figura 7).
Los valores de las curvas IDF de cada periodo de retorno para la duracin
dada (Tc), finalmente son enunciados en la Tabla 12.
Tabla 12
Quebrada Juan
Vara
Quebrada Oc
(mm/h)
42.075
(mm)
84.15
(mm/h)
28.470
(mm)
90.155
Tr
(aos)
Quebrada Juan
Vara
Quebrada Oc
(mm/h)
(mm)
(mm/h)
49.058
33.195
10
54.318
25
60.551
50
64.953
100
69.184
200
73.298
500
78.613
98.116
108.63
7
121.10
2
129.90
5
138.36
9
146.59
7
157.22
6
(mm)
105.11
8
116.38
9
129.74
4
139.17
5
148.24
3
157.05
8
168.44
7
36.755
40.972
43.950
46.813
49.597
53.194
Figura 7
450
2.33 aos
400
5 aos
I
n
t
e
n
s
i
d
a
d
(
m
m
/
h
o
r
a
)
350
10 aos
25 aos
300
50 aos
250
100 aos
200
150
100
50
0
0
50
100
150
200
Duracin (Minutos)
Figura 8
Tr
(aos)
Snyder
2.33
28.54
33.61
39.69
46.73
10
48.72
57.34
25
59.99
70.60
50
68.27
80.49
100
76.44
90.26
SCS
45.6
3
63.9
5
78.7
9
97.3
3
110.
95
124.
40
Ro
Nech
Quebrada Oc
W-H
1547.74 87.21
120.2
1756.86
8
146.9
1912.09
5
180.1
2094.65
5
204.4
2222.95
7
228.4
2345.81
5
Snyder
SCS
87.99
118.73
120.87 164.28
147.30 200.98
180.32 246.62
204.79 280.06
228.92 313.00
5. MODELACIN HIDRULICA
En el desarrollo de sta captulo se renen los resultados de todas las
actividades anteriores con el fin de conformar el modelo final con el cual se
simular el comportamiento del ro bajo sus capacidades hidrulicas
actuales, de igual manera se simular una alternativa final para la
prevencin y el control de las inundaciones en el rea urbana del
Municipio.
Para llevar a cabo la actividad se emple el modelo unidimensional HEC
RAS 4, desarrollado por el Cuerpo de Ingenieros del Ejrcito de los Estados
Unidos, y la operacin conjunta de Hidrosig 4 y Arcgis 9.2 con los cuales se
gener el Modelo Digital del Terreno (MDT), que se utiliza para ingresar los
parmetros geomtricos de las corrientes en estudio como las secciones
transversales, bancas llenas y espaciamientos entre secciones.
2V22
V2
Ws1 1 1 he
2g
2g
V2 V2
he LSf C 2 2 1 1
2g
2g
Donde:
Ws1, Ws2: elevaciones (m) de la superficie del agua en los extremos del
tramo en consideracin.
V1, V2: Velocidades medias (m/s) en los extremos del tramo.
1 , 2 : Coeficientes de correccin de la carga de velocidad para los
extremos del tramo.
1 2/ 3 1/ 2
R S
n
Verificar, una vez calculada la superficie del agua para una seccin
transversal, que la elevacin est de acuerdo con el tipo de flujo (mayor
que la profundidad crtica en caso de flujo subcrtico o menor en caso de
flujo supercrtico), si esto no se cumple se asume la profundidad crtica
para la seccin transversal. Cuando no se logra convergencia para el
nmero de iteraciones especificadas, el programa asume que la
profundidad del flujo es crtica. Por estos motivos el anlisis de
resultados para los casos de profundidad crtica se debe realizar con
especial cuidado.
Figura 9
A partir de las muestras recogidas del lecho del ro (Tabla 14) se elaboraron
las curvas granulomtricas (Figura 10) que caracterizan el material del
fondo del ro.
Tabla 14
Dimetro
(mm)
3
2
1 1/2
1
3/8
4
10
20
40
80
100
140
200
76.2
50.8
38.1
25.4
19.1
12.7
9.5
4.76
2
0.84
0.42
0.24892
0.149
0.10414
0.074
% que
Muestra
1
100
100
100
100
96.61
86.55
81.77
70.15
57.04
32.25
14.86
2.91
2.07
1.09
0.77
pasa
Muestra
2
100
100
100
100
100
100
100
99.47
98.90
89.71
32.99
4.72
2.77
0.92
0.42
D90
14.8
8
0.88
Figura 10
Dimetro
(mm)
76.2
50.8
38.1
25.4
19.1
12.7
9.5
4.76
2
0.84
0.42
0.24892
0.149
0.10414
0.074
Figura 11
Tabla 17
D90
17.3
4
El material del lecho de la quebrada Juan Vara (Tabla 18) presenta una
distribucin granulomtrica mostrada en la Figura 12; a partir de esta
curva se obtuvieron los dimetros caractersticos mostrados en la Tabla 19
Tabla 18
Dimetro
(mm)
76.2
50.8
38.1
25.4
19.1
12.7
9.5
4.76
2
0.84
0.42
% que Pasa
Muestra 1
100
100
100
85.02
72.20
48.85
34.62
15.23
7.20
3.40
1.58
No. Tamiz
80
100
140
200
Tabla 19
Dimetro
(mm)
0.24892
0.149
0.10414
0.074
% que Pasa
Muestra 1
0.67
0.50
0.27
0.19
Figura 12
D90
29.6
2
Dimetro
Quebrada Juan
Vara
Quebrada Oca
D16
D50
D65
D84
D90
4.95
13.01
17.09
24.89
29.62
0.58
5.03
8.11
13.32
17.34
Muestra 1 Ro
Nech
Muestra 2 Ro
Nech
Promedio Nech
0.45
1.67
3.68
11.01
14.88
0.32
0.55
0.66
0.8
0.88
0.385
1.11
2.17
5.905
7.88
El sedimento transportado.
POSADA
GARDE & RAJU
MEYER-PETER & MULLER
RAUDKIVI
STRICKLER
YEN
CHOW
Ro Nech
Muestra 1 Muestra 1
0.0168
0.0139
0.0162
0.0134
0.0188
0.0118
0.0161
0.0121
0.0163
0.0136
0.0190
0.0119
0.0164
0.0123
Quebrada
Juan Vara
Quebrada
Oc
0.0236
0.0228
0.0211
0.0209
0.0230
0.0214
0.0212
0.0202
0.0195
0.0193
0.0184
0.0196
0.0195
0.0187
METODO
SIMONS Y SENTURK
HENDERSON
BRAY
PROMEDIO
Ro Nech
Muestra 1 Muestra 1
0.0134
0.0111
0.0143
0.0118
0.0204
0.0170
0.0168
0.0129
Quebrada
Juan Vara
Quebrada
Oc
0.0189
0.0201
0.0288
0.0222
0.0161
0.0171
0.0245
0.0193
Figura 13
Figura 14
Figura 15
Figura 16
Figura 17
Figura 18
Figura 19
Figura 20
Figura 21
Figura 22
Escenario
Escenario
Escenario
Escenario
Escenario
1
2
3
4
QN: Cauda ro
Nech
q: caudal
quebradas
QN100-q100
QN100-q2.33
QN2.33-q100
QN2.33-q2.33
Caudales (m/s)
Nech
2345.81
2345.81
1547.74
1547.74
Oca
256.79
97.98
256.79
97.98
Juan Vara
97.03
35.93
97.03
35.93
44
RECUPERACIN DE LA CAPACIDAD HIDRULICA DE LA QUEBRADA OCA Y JUAN VARA, MUNICIPIO DE ZARAGOZAANTIOQUIA
Tabla 23
ES
C
1
Escenario 1. Ro Nech con caudal de 100 aos y quebradas Juan Vara y Oc con un caudal de 100
aos de perodo de retorno.
Secci
n
Abscisa
Velocid
ad
(m/s)
rea
(m)
Ancho
Sup.
(m)
No.
Froud
e
Radio
H (m)
8.1
-200
3.99
591.99
139.9
0.61
4.16
8.0
-100
4.14
570.34
139.3
0.64
4.03
Juan Vara
9.1
60.00
0.37
331.05
220.0
0.08
1.49
Juan Vara
9.0
90.00
0.37
366.93
293.1
0.08
1.25
Juan Vara
8.0
164.48
0.75
186.89
150.0
0.15
1.24
Juan Vara
7.0
226.96
0.6
228.40
166.3
0.12
1.36
Juan Vara
6.5*
324.36
0.83
161.22
110.5
0.16
1.43
Juan Vara
6.0
421.75
1.18
100.12
53.9
0.22
1.77
Juan Vara
5.5*
506.69
0.8
140.17
60.2
0.14
2.25
Juan Vara
5.25*
549.16
0.7
165.23
76.5
0.12
2.13
Juan Vara
5.0
591.63
0.57
200.16
85.2
0.10
2.33
Juan Vara
Juan Vara
4.5*
4.0
638.42
685.21
0.55
0.55
230.81
256.30
113.9
149.1
0.10
0.09
2.01
1.69
Corriente
Nechi
Arriba
Nechi
Arriba
Sf
0.00163
6
0.00184
8
0.00003
2
0.00003
2
0.00011
4
0.00006
5
0.00011
1
0.00022
2
0.00009
0
0.00006
6
0.00004
3
0.00004
0
0.00004
Esfuerz Potenci
o
a
(N/m) (N/ms)
66.70
266.12
72.98
302.16
0.47
0.17
0.39
0.15
1.39
1.04
0.87
0.52
1.56
1.29
3.85
4.54
1.98
1.59
1.38
0.96
0.98
0.56
0.79
0.70
0.43
0.38
Q(Nech
= 256.8 m/s
ES
C
1
Corriente
Secci
n
Abscisa
Velocid
ad
(m/s)
rea
(m)
Ancho
Sup.
(m)
No.
Froud
e
Radio
H (m)
Juan Vara
3.7
731.25
0.57
247.00
147.0
0.10
1.65
Juan Vara
3.0
823.35
0.55
260.00
159.7
0.09
1.58
Juan Vara
2.5*
880.22
0.56
238.95
127.3
0.10
1.84
Juan Vara
2.0
937.10
0.5
298.73
195.4
0.08
1.51
Juan Vara
1.7
971.54
0.56
275.91
196.0
0.09
1.39
Juan Vara
1.0
1040.42
0.71
200.96
151.6
0.11
1.29
Nech
7.0
0.00
3.16
874.78
245.4
0.40
3.49
Nech
6.5*
95.28
3.27
820.58
279.0
0.43
2.91
Nech
6.25*
142.92
3.38
772.63
243.8
0.46
3.14
Nech
6.0
190.56
3.51
750.34
258.3
0.50
2.87
Nech
5.5*
273.03
3.18
834.43
270.8
0.41
3.03
Nech
5.25*
314.27
3.11
860.86
270.8
0.38
3.1
Nech
5.0
355.51
3.08
874.57
266.7
0.37
3.16
Nech
Nech
4.5*
4.25*
450.76
498.39
3.22
3.2
777.85
774.66
185.0
138.3
0.41
0.42
4.1
5.42
Sf
2
0.00004
7
0.00004
2
0.00004
1
0.00002
9
0.00003
7
0.00006
4
0.00063
1
0.00076
0
0.00088
9
0.00108
2
0.00068
1
0.00059
7
0.00055
5
0.00067
8
0.00070
6
Esfuerz Potenci
o
a
(N/m) (N/ms)
0.76
0.43
0.65
0.36
0.74
0.41
0.43
0.21
0.50
0.28
0.81
0.57
21.58
68.20
21.67
70.87
27.36
92.46
30.43
106.82
20.22
64.30
18.14
56.41
17.19
52.94
27.24
37.50
87.72
120.00
ES
C
1
Corriente
Secci
n
Abscisa
Velocid
ad
(m/s)
rea
(m)
Ancho
Sup.
(m)
No.
Froud
e
Radio
H (m)
Nech
4.0
546.02
3.16
783.37
143.0
0.42
5.29
Nech
3.7
642.37
3.56
703.75
153.6
0.47
4.47
Nech
3.5*
690.55
3.81
667.42
165.6
0.51
3.96
Nech
3.2
786.91
4.48
583.28
164.5
0.61
3.5
Nech
3.0
835.08
5.17
506.14
150.7
0.73
3.31
Nech
2.7
926.88
3.51
742.96
213.2
0.47
3.45
Nech
2.5*
972.79
3.02
224.7
0.39
3.77
Nech
2.2
1064.59
2.33
229.8
0.29
4.66
Nech
2.0
1110.49
2.09
858.95
1,090.7
2
1,209.5
1
232.3
0.26
5.09
Oca
24.1
60.00
2.52
143.50
99.0
0.44
1.42
Oca
24.0
90.00
2.56
140.96
98.4
0.45
1.4
Oca
23.0
152.02
1.8
215.52
138.4
0.31
1.54
Oca
22.0
206.38
1.27
279.62
163.3
0.22
1.7
Oca
21.0
255.52
3.5
103.60
81.6
0.64
1.24
Oca
Oca
20.0
19.0
304.67
443.84
2.68
1.13
150.37
295.15
120.7
175.3
0.48
0.19
1.23
1.66
Sf
0.00072
3
0.00091
7
0.00105
9
0.00155
3
0.00227
8
0.00088
7
0.00062
1
0.00034
1
0.00026
2
0.00060
0
0.00062
6
0.00028
3
0.00012
5
0.00131
7
0.00071
0
0.00019
Esfuerz Potenci
o
a
(N/m) (N/ms)
37.48
118.44
40.17
143.01
41.10
156.58
53.27
238.64
73.89
382.03
29.99
105.26
22.94
69.29
15.57
36.28
13.07
27.31
8.35
21.04
8.59
21.99
4.27
7.69
2.08
2.64
16.00
56.01
8.56
3.20
22.94
3.62
ES
C
1
Corriente
Secci
n
Abscisa
Velocid
ad
(m/s)
rea
(m)
Ancho
Sup.
(m)
No.
Froud
e
Radio
H (m)
Oca
18.3
518.05
1.03
345.74
203.8
0.17
1.68
Oca
18.0
555.16
0.95
386.30
230.1
0.16
1.67
Oca
17.3
640.16
0.95
406.19
268.1
0.16
1.5
Oca
17.0
682.66
0.8
481.65
312.3
0.13
1.53
Oca
16.0
741.79
0.76
500.68
307.8
0.12
1.62
Oca
15.3
794.33
1.56
245.65
205.4
0.26
1.19
Oca
Oca
15.0
14.5
820.60
828.60
1.71
206.04
169.1
0.29
1.21
Oca
14.2
838.60
1.75
200.61
167.6
0.30
1.19
Oca
14.1*
887.19
0.75
345.65
208.5
0.14
1.65
Oca
14.0
935.77
0.54
458.75
236.6
0.12
1.93
Oca
13.0
987.99
1.14
328.01
211.9
0.18
1.53
Oca
12.0
1038.55
1.07
343.93
204.5
0.17
1.66
Oca
11.3
1107.61
4.15
56.98
31.9
0.82
1.59
Oca
Oca
11.0
10.5
1142.14
1150.14
3.95
58.23
23.7
0.80
2.1
Sf
7
0.00013
8
0.00011
0
0.00010
8
0.00007
6
0.00006
7
0.00028
6
0.00035
4
0.00037
5
0.00008
7
0.00006
4
0.00014
2
0.00013
2
0.00377
4
0.00363
2
Esfuerz Potenci
o
a
(N/m) (N/ms)
2.27
2.34
1.80
1.71
1.59
1.51
1.14
0.91
1.06
0.81
3.34
5.20
4.20
7.18
4.37
7.65
1.41
1.06
1.21
0.65
2.13
2.43
2.15
2.30
58.81
244.05
74.75
295.25
ES
C
1
Corriente
Secci
n
Abscisa
Velocid
ad
(m/s)
rea
(m)
Ancho
Sup.
(m)
No.
Froud
e
Radio
H (m)
Oca
10.2
1160.14
4.65
49.48
22.9
1.01
1.86
Oca
10.0
1215.74
1.36
250.20
184.3
0.24
1.35
Oca
9.3
1299.57
1.41
235.14
154.6
0.25
1.49
Oca
9.0
1341.49
1.36
240.70
146.2
0.23
1.59
Oca
8.5*
1387.74
2.22
153.78
128.5
0.41
1.17
Oca
8.0
1433.99
3.49
71.72
31.1
0.64
2.09
Oca
7.3
1503.71
2.77
95.73
58.2
0.52
1.57
Oca
7.0
1538.56
2.15
124.49
66.4
0.38
1.74
Oca
6.5*
1575.70
3.65
71.96
53.5
0.73
1.28
Oca
6.0
1612.84
2.94
138.65
230.0
0.57
0.6
Oca
5.5*
1646.63
1.84
228.85
287.6
0.34
0.79
Oca
5.0
1680.42
1.48
286.01
329.6
0.26
0.86
Oca
4.0
1736.56
1.56
253.47
245.7
0.28
1.02
Oca
3.3
1825.39
3.14
121.30
165.1
0.59
0.72
Oca
Oca
3.0
2.3
1869.80
1959.94
3.08
2.46
120.47
147.93
166.9
145.1
0.58
0.46
0.71
1
Sf
0.00588
5
0.00025
5
0.00029
4
0.00027
0
0.00081
7
0.00193
0
0.00132
9
0.00075
0
0.00283
2
0.00176
7
0.00058
1
0.00033
5
0.00043
6
0.00176
1
0.00164
6
0.00101
Esfuerz Potenci
o
a
(N/m) (N/ms)
107.27
498.81
3.37
4.59
4.29
6.05
4.21
5.72
9.37
20.80
39.53
137.96
20.45
56.64
12.79
27.50
35.52
129.66
10.39
30.55
4.50
8.28
2.82
4.18
4.36
6.80
12.43
39.02
11.45
9.95
35.27
24.47
ES
C
1
Corriente
Secci
n
Abscisa
Velocid
ad
(m/s)
Ancho
Sup.
(m)
rea
(m)
No.
Froud
e
Radio
H (m)
Sf
Oca
2.0
2005.01
2.18
156.44
120.2
0.39
1.27
Oca
1.5*
2093.35
1.53
231.22
168.5
0.27
1.35
Oca
1.25*
2137.52
1.26
272.42
176.4
0.22
1.52
Oca
Nech
Abajo
Nech
Abajo
1.0
2181.68
1.03
316.74
181.6
0.18
1.71
1.0
1160.488
2.82
971.14
213.3
0.39
4.43
962.85
212.7
0.39Hec - Zaragoza100-2.33
4.4
Hec - Zaragoza100-2.33
72
Le gend
Esfuerz Potenci
o
a
(N/m) (N/ms)
5
0.00074
6
9.28
0.00034
5
4.56
0.00022
9
3.41
0.00015
3
2.56
0.00064
8
28.13
0.00066
4
28.63
Plan: Plan 02 24/09/2009
20.24
6.98
4.30
2.64
79.33
81.31
70
Le gend
WS PF 1
70
Ground
WS PF 1
Ground
68
Bank Sta
Bank Sta
Elevation (m)
Elevation (m)
68
66
66
64
64
62
62
60
-100
60
-100
-50
50
Station (m)
-50
0
Station (m)
50
100
100
150
ES
C
1
Corriente
Secci
n
Abscisa
Hec - Zaragoza100-2.33
Plan: Plan 02
Velocid
ad
(m/s)
rea
(m)
Ancho
Sup.
(m)
No.
Froud
e
24/09/2009
Radio
H (m)
Hec - Zaragoza100
Sf
Plan: Plan 02
Esfuerz Potenci
o
a
(N/m) (N/ms)
24/09/2009
Puente Nuevo
66
65
Le gend
Le gend
WS PF 1
65
WS PF 1
64
Ground
Ground
Bank Sta
Bank Sta
63
Cota (m)
Elevation (m)
64
63
62
62
61
61
60
60
-200
-150
-100
-50
0
Station (m)
Figura 23
50
100
150
200
59
-150
-100
-50
50
100
Abscisa (m)
Secciones 24, 19, 14.5 (Puente Nuevo) y seccin 3 de la quebrada Oca con la creciente de 100 aos,
escenario 1.
Hec - Zaragoza100
Plan: Plan 02
24/09/2009
Hec - Zaragoza100
64.0
Plan: Plan 02
24/09/2009
72
Le gend
Le gend
WS PF 1
63.5
WS PF 1
70
Ground
Ground
Levee
Bank Sta
68
Cota (m)
63.0
62.5
66
62.0
64
61.5
62
61.0
-100
-80
-60
-40
-20
20
60
-150
40
-100
-50
Abscisa (m)
50
100
Abscisa (m)
Seccin 8
Seccin 4
Hec - Zaragoza100
Plan: Plan 02
24/09/2009
Le gend
WS PF 1
Ground
63
Levee
Bank Sta
62
Cota (m)
Cota (m)
Bank Sta
61
60
59
-40
-20
20
40
Abscisa (m)
Figura 24
60
80
100
Seccin 1
150
Hec - Zaragoza100-2.33
Hec - Zaragoza100-2.33
68
66
Le gend
Le gend
WS PF 1
66
WS PF 1
Ground
64
Ground
Bank Sta
64
Bank Sta
Elevation (m)
Elevation (m)
62
62
60
60
58
58
56
56
54
-100
-50
50
100
150
54
-150
200
Station (m)
-100
-50
50
100
150
200
250
Station (m)
Le gend
WS PF 1
62
Ground
60
Bank Sta
Elevation (m)
Levee
58
56
54
52
-150
-100
-50
50
Station (m)
Figura 25
Tabla 24
100
150
200
250
,Secciones del ro Nech con la creciente de 100 aos Q = 2345.8 m/s, escenario 1.
Escenario 2. Ro Nech con un caudal de 100 aos de periodo de retorno y quebradas Juan Vara y Oc
con un caudal de 2.33 aos de perodo de retorno.
ES
C2
Corriente
Secci Abscis
n
a
Nech Arriba
Nech Arriba
Juan Vara
Juan Vara
Juan Vara
Juan Vara
Juan Vara
Juan Vara
Juan Vara
Juan Vara
Juan Vara
Juan Vara
Juan Vara
Juan Vara
Juan Vara
Juan Vara
Juan Vara
Juan Vara
8.1
8
9.1
9
8
7
6.5*
6
5.5*
5.25*
5
4.5*
4
3.7
3
2.5*
2
1.7*
Juan Vara
Nech
Nech
Nech
Nech
Nech
Nech
1
7
6.5*
6.25*
6
5.5*
5.25*
-200
-100
60.00
90.00
164.48
226.96
324.36
421.75
506.69
549.16
591.63
638.42
685.21
731.25
823.35
880.22
937.10
971.54
1040.4
2
0.00
95.28
142.92
190.56
273.03
314.27
Nech
Nech
5
4.5*
355.51
450.76
Velocid
ad
(m/s)
4.47
4.78
0.19
0.19
0.37
0.31
0.39
0.51
0.34
0.29
0.24
0.24
0.25
0.26
0.25
0.25
0.22
0.25
rea
(m)
Ancho
Sup (m)
528.56
493.27
250.36
250.29
137.37
158.28
119.59
84.32
121.78
142.32
174.19
195.93
210.87
202.27
211.63
200.24
239.48
214.93
138.45
137.84
220
220
139
136.56
85.82
49.83
59.77
65.25
78.04
106.04
136.67
135.27
146.57
123.37
172
158.67
No.
Frou
de
0.72
0.8
0.05
0.05
0.08
0.07
0.08
0.1
0.06
0.05
0.04
0.04
0.04
0.05
0.04
0.04
0.04
0.04
0.3
3.38
3.48
3.59
3.81
3.35
3.25
167.23
779.21
718.58
693.23
648.36
743.61
772.06
132
234.48
195.1
204.13
226.65
236.05
242.97
3.2
3.3
788.58
733.08
242.61
135.37
Esfuerz
Potenci
o
a (N/ms)
(N/m)
58.00
259.25
68.25
326.25
0.12
0.02
0.12
0.02
0.35
0.13
0.24
0.08
0.38
0.15
0.76
0.39
0.37
0.13
0.27
0.08
0.17
0.04
0.16
0.04
0.15
0.04
0.16
0.04
0.14
0.03
0.14
0.04
0.09
0.02
0.10
0.03
Radio
H (m)
Sf
3.76
3.53
1.13
1.13
0.98
1.13
1.35
1.61
1.98
2.14
2.2
1.83
1.51
1.47
1.4
1.59
1.37
1.33
0.001574
0.001973
0.000011
0.000011
0.000036
0.000022
0.000029
0.000048
0.000019
0.000013
0.000008
0.000009
0.00001
0.000011
0.00001
0.000009
0.000007
0.000008
0.05
0.44
0.48
0.51
0.57
0.44
0.41
1.21
3.26
3.64
3.36
2.82
3.09
3.09
0.000013
0.00052
0.000622
0.000731
0.000946
0.000541
0.000464
0.15
16.61
22.19
24.07
26.14
16.38
14.05
0.05
56.15
77.21
86.41
99.61
54.88
45.67
0.39
0.43
3.12
5.23
0.000425
0.000505
12.99
25.88
41.58
85.41
ES
C2
Corriente
Secci Abscis
n
a
Nech
Nech
Nech
Nech
Nech
Nech
Nech
Nech
4.25*
4
3.7*
3.5*
3.2*
3
2.7*
2.5*
Nech
2.2*
Nech
Oca
Oca
Oca
Oca
Oca
Oca
Oca
Oca
Oca
Oca
Oca
Oca
Oca
Oca
Oca
Oca
Oca
Oca
Oca
2
24.1
24
23
22
21
20
19
18.3*
18
17.3*
17
16
15.3*
15
14.5
14.2
14.1*
14
13
498.39
546.02
642.37
690.55
786.91
835.08
926.88
972.79
1064.5
9
1110.4
9
60.00
90.00
152.02
206.38
255.52
304.67
443.84
518.05
555.16
640.16
682.66
741.79
794.33
820.60
828.60
838.60
887.19
935.77
987.99
Velocid
ad
(m/s)
3.29
3.25
3.64
3.91
4.67
6.24
4.17
3.51
rea
(m)
Ancho
Sup (m)
734.1
742.51
666.44
625.74
536.81
390.6
579.66
687.42
136.83
142.4
132.31
143.54
148.64
110.77
144.05
161.55
No.
Frou
de
0.44
0.44
0.5
0.54
0.66
0.97
0.61
0.5
192.52
2.35
1.94
1.97
1.43
0.81
3.25
2.79
1.97
1.52
1.3
1.41
1.29
1.13
1.86
1.69
906.41
1021.5
1
62.95
61.51
98.97
160.29
33.2
44.72
77.76
100.4
116.38
102.64
115.08
133.43
49.03
53.83
1.69
0.67
0.6
1.26
53.64
137.58
154.46
95.15
2.65
Esfuerz
Potenci
o
a (N/ms)
(N/m)
26.96
88.69
26.82
87.16
32.51
118.33
33.14
129.59
42.07
196.49
96.71
603.49
41.28
172.13
28.50
100.02
Radio
H (m)
Sf
5.2
5.04
4.9
4.27
3.56
3.47
3.97
4.19
0.000529
0.000543
0.000677
0.000792
0.001206
0.002844
0.001061
0.000694
0.36
4.62
0.000352
15.94
42.23
210.1
67.13
66.39
97.55
107.17
44.53
56.82
118.3
130.47
141.12
138.74
166.24
172.12
27.41
27.8
0.31
0.4
0.41
0.3
0.16
0.74
0.62
0.43
0.32
0.27
0.3
0.27
0.24
0.42
0.38
4.77
0.91
0.9
1
1.49
0.72
0.76
0.64
0.76
0.82
0.73
0.68
0.77
1.72
1.85
0.000263
0.000562
0.000588
0.000283
0.000078
0.002061
0.001414
0.001156
0.000568
0.000391
0.00046
0.000386
0.00028
0.000898
0.000737
12.29
5.01
5.19
2.77
1.14
14.54
10.53
7.25
4.23
3.14
3.29
2.57
2.11
15.14
13.36
28.89
9.72
10.22
3.97
0.92
47.26
29.38
14.28
6.43
4.08
4.64
3.32
2.39
28.15
22.58
27.79
111.04
162.37
86.94
0.38
0.18
0.19
0.25
1.84
1.23
0.94
1.07
0.000745
0.000172
0.000232
0.00033
13.43
2.07
2.14
3.46
22.70
1.39
1.28
4.36
ES
C2
Corriente
Secci Abscis
n
a
Oca
12
Oca
11.3*
Oca
11
Oca
10.5
Oca
10.2
Oca
10
Oca
9.3*
Oca
Oca
8.5*
Oca
Oca
7.3*
Oca
Oca
6.5*
Oca
Oca
Oca
5.5*
5
1038.5
5
1107.6
1
1142.1
4
1150.1
4
1160.1
4
1215.7
4
1299.5
7
1341.4
9
1387.7
4
1433.9
9
1503.7
1
1538.5
6
1575.7
0
1612.8
4
1646.6
3
1680.4
Velocid
ad
(m/s)
rea
(m)
Ancho
Sup (m)
No.
Frou
de
Radio
H (m)
Sf
Esfuerz
Potenci
o
a (N/ms)
(N/m)
1.49
94.54
108.36
0.3
0.85
0.00049
4.08
6.08
2.79
32.23
20.01
0.7
1.43
0.003014
42.24
117.84
2.68
33.54
20.69
0.67
1.42
0.002818
39.22
105.10
2.74
32.88
20.04
0.68
1.43
0.002896
40.58
111.20
1.15
95.23
94.84
0.25
0.99
0.000322
3.12
3.59
1.27
93.87
96.23
0.27
0.95
0.00038
3.54
4.49
1.19
102.52
97.88
0.24
1.01
0.000321
3.18
3.78
2.21
43.35
29.36
0.5
1.38
0.001408
19.04
42.08
1.85
51.03
26.99
0.39
1.72
0.000775
13.06
24.17
1.59
59.06
37.35
0.35
1.48
0.000646
9.37
14.90
1.26
76.33
51.72
0.26
1.36
0.000364
4.85
6.11
1.8
52.34
41.67
0.39
1.18
0.000847
9.79
17.63
2.59
34.77
17.68
0.59
1.7
0.002065
34.40
89.10
1.97
1.44
47.63
77.28
81.37
201.36
0.43
0.29
0.57
0.38
0.00102
0.000451
5.70
1.68
11.22
2.42
ES
C2
Corriente
Secci Abscis
n
a
Oca
Oca
3.3*
Oca
Oca
2.3*
Oca
Oca
1.5*
Oca
1.25*
Oca
Nech Abajo
Nech Abajo
0.3
2
1736.5
6
1825.3
9
1869.8
0
1959.9
4
2005.0
1
2093.3
5
2137.5
2
2181.6
8
1160.4
9
1260.4
9
Velocid
ad
(m/s)
rea
(m)
Ancho
Sup (m)
No.
Frou
de
Radio
H (m)
Sf
Esfuerz
Potenci
o
a (N/ms)
(N/m)
2.78
39.06
54.1
0.63
0.69
0.00244
16.50
45.87
2.41
39.18
29.37
0.54
1.24
0.001608
19.54
47.09
2.1
46.48
34.26
0.45
1.27
0.001127
14.03
29.46
1.94
57.96
84.1
0.42
0.67
0.00094
6.17
11.97
1.58
76.8
90.93
0.33
0.82
0.000559
4.49
7.10
1.1
123.11
127.85
0.22
0.94
0.000247
2.28
2.50
0.89
152.67
148.78
0.17
1.01
0.00016
1.58
1.41
0.72
188.21
165.03
0.14
1.12
0.000103
1.13
0.81
3.08
805.76
180.04
0.46
4.34
0.000638
27.14
83.58
3.11
798.52
178.32
0.47
4.34
0.000657
27.94
86.90
Hec - Zaragoza100-2.33
Plan: Plan 02
28/09/2009
Hec - Zaragoza100-2.33
Plan: Plan 02
28/09/2009
70
Le gend
Le gend
WS PF 1
70
WS PF 1
Ground
Ground
68
Bank Sta
Bank Sta
Elevation (m)
Elevation (m)
68
66
66
64
64
62
62
60
-100
-50
50
60
-100
100
-50
Station (m)
50
Seccin 24
Hec - Zaragoza100-2.33
100
150
Station (m)
Seccin 19
Plan: Plan 02
28/09/2009
Hec - Zaragoza100-2.33
Plan: Plan 02
28/09/2009
Puente Nuevo
66
65
Le gend
Le gend
WS PF 1
65
WS PF 1
64
Ground
Ground
Bank Sta
Bank Sta
63
Elevation (m)
Elevation (m)
64
63
62
62
61
61
60
60
-200
-150
-100
-50
50
100
150
200
Station (m)
Figura 26
59
-150
-100
-50
50
100
Station (m)
Seccin 3
Secciones 24, 19, 14.5 y 3 de la quebrada Oca con la creciente de 2.33 aos. Escenario 2.
Hec - Zaragoza100-2.33
Plan: Plan 02
28/09/2009
Hec - Zaragoza100-2.33
64.0
Plan: Plan 02
28/09/2009
72
Le gend
Le gend
WS PF 1
63.5
WS PF 1
70
Ground
Ground
Levee
Bank Sta
68
Elevation (m)
63.0
62.5
66
62.0
64
61.5
62
61.0
-100
-80
-60
-40
-20
20
60
-150
40
-100
-50
50
100
150
Station (m)
Station (m)
Seccin 8
Seccin 4
Hec - Zaragoza100-2.33
Plan: Plan 02
28/09/2009
Le gend
WS PF 1
Ground
63
Levee
Bank Sta
Elevation (m)
Elevation (m)
Bank Sta
62
61
60
Figura 27
Tabla 25
59
-40
-20
20
40
Station (m)
60
80
100
Seccin 1
Secciones 8, 4 y 1 de la quebrada Juan Vara con lmina de agua para un Tr de 2.33, escenario 2
Escenario 3. Ro Nech con un caudal de 2.33 aos y quebradas Juan Vara y Oc con un caudal de
100 aos de perodo de retorno.
ES
C3
Corriente
Secci
n
Abscis
a
Velocid
ad
(m/s)
Nech Arriba
8.1
-200
3.91
Nech Arriba
-100
4.62
Juan Vara
9.1
60.00
0.77
9
8
7
6.5*
6
5.5*
5.25*
90.00
164.48
226.96
324.36
421.75
506.69
549.16
0.78
1.75
1.37
1.89
2.73
1.59
1.29
591.63
1.05
4.5*
4
3.7*
3
2.5*
2
1.7*
1
638.42
685.21
731.25
823.35
880.22
937.10
971.54
1040.42
1.2
1.56
1.87
1.91
1.88
1.58
1.74
1.96
Nech
0.00
2.95
Nech
Nech
6.5*
6.25*
95.28
142.92
3.07
3.25
Juan
Juan
Juan
Juan
Juan
Juan
Juan
Vara
Vara
Vara
Vara
Vara
Vara
Vara
Juan Vara
Juan
Juan
Juan
Juan
Juan
Juan
Juan
Juan
Vara
Vara
Vara
Vara
Vara
Vara
Vara
Vara
rea
(m)
396.7
4
335.3
5
175.7
3
174.0
6
79.67
84.62
62.79
37.89
68.12
83.87
104.2
7
102.1
7
89.81
73.85
63.84
63.74
73
65.19
54.13
567.1
6
539.8
7
508.6
9
No.
Ancho
Frou
Sup. (m)
de
Radio
H (m)
Sf
Esfuerz Potenci
o
a
(N/m) (N/ms)
136.18
0.73
2.89
0.001756
49.73
194.46
135.11
0.93
2.46
0.003061
73.79
340.93
220
0.21
0.8
0.000233
1.83
1.41
220
100.44
77.77
85.6
38.78
50.53
56.13
0.21
0.44
0.33
0.44
0.67
0.37
0.29
0.79
0.79
1.06
0.72
0.94
1.32
1.48
0.000239
0.001082
0.000581
0.001025
0.002547
0.000709
0.000434
1.85
8.38
6.04
7.23
23.46
9.17
6.29
1.44
14.66
8.27
13.67
64.05
14.58
8.12
68.4
0.23
1.51
0.000271
4.01
4.21
84.38
96.91
92.21
75.22
70.82
65.18
58.51
41.38
0.27
0.34
0.44
0.42
0.43
0.34
0.38
0.42
1.2
0.9
0.78
0.81
0.88
1.09
1.08
1.19
0.000367
0.00064
0.001086
0.00105
0.001011
0.00061
0.00076
0.001032
4.32
5.64
8.30
8.33
8.72
6.52
8.04
12.04
5.18
8.81
15.52
15.92
16.39
10.30
14.00
23.59
129.62
0.42
4.23
0.000521
21.60
63.71
133.85
135.18
0.47
0.53
3.96
3.71
0.000662
0.000851
25.69
30.94
78.87
100.56
ES
C3
Corriente
Secci
n
Abscis
a
Velocid
ad
(m/s)
Nech
190.56
3.62
Nech
5.5*
273.03
2.92
Nech
5.25*
314.27
2.77
Nech
355.51
2.7
Nech
4.5*
450.76
2.85
Nech
4.25*
498.39
2.89
Nech
Nech
4
3.7*
546.02
642.37
2.88
3.21
Nech
3.5*
690.55
3.44
Nech
3.2*
786.91
4.15
Nech
835.08
5.12
Nech
Nech
2.7*
2.5*
926.88
972.79
3.23
2.74
Nech
2.2
1064.59
2.07
Nech
1110.49
1.83
Oca
Oca
24.1
24
60.00
90.00
2.52
2.56
rea
(m)
456.2
9
564.7
8
595.7
4
614.1
3
579.7
6
573.0
7
573.4
6
515.9
482.9
9
400.9
9
323.1
2
511.0
3
602.2
796.5
3
900.8
7
143.4
8
140.9
No.
Ancho
Frou
Sup. (m)
de
Radio
H (m)
Sf
Esfuerz Potenci
o
a
(N/m) (N/ms)
140.08
0.63
3.2
0.001296
40.64
147.13
126.91
0.43
4.31
0.000561
23.70
69.19
121.02
0.39
4.67
0.000446
20.41
56.54
117.67
0.36
4.83
0.000387
18.32
49.46
126.51
0.42
4.44
0.000505
21.97
62.62
132.11
0.43
4.22
0.000557
23.04
66.57
137.95
125.68
0.44
0.49
4.04
4.02
0.000594
0.000727
23.52
28.64
67.73
91.94
120.65
0.53
3.93
0.000837
32.24
110.89
108.42
0.66
3.64
0.00131
46.73
193.93
99.71
0.87
3.19
0.002387
74.62
382.07
129.48
141.66
0.5
0.41
3.89
4.19
0.00074
0.000494
28.21
20.28
91.12
55.58
163.17
0.3
4.79
0.000252
11.83
24.49
177.51
0.26
4.97
0.000187
9.11
16.67
98.98
98.36
0.44
0.45
1.42
1.4
0.0006
0.000626
8.35
8.59
21.04
21.99
ES
C3
Corriente
Secci
n
Abscis
a
Velocid
ad
(m/s)
Oca
23
152.02
1.8
Oca
Oca
22
21
206.38
255.52
1.25
3.5
Oca
20
304.67
2.68
Oca
19
443.84
1.13
Oca
Oca
18.3*
18
518.05
555.16
1.03
0.95
Oca
17.3*
640.16
0.95
Oca
17
682.66
0.8
Oca
16
741.79
0.76
Oca
15.3*
794.33
1.56
Oca
Oca
15
14.5
820.60
828.60
1.71
Oca
14.2
838.60
1.75
Oca
14.1*
887.19
0.75
Oca
14
935.77
0.54
Oca
13
987.99
1.14
rea
(m)
4
215.5
279.1
7
103.6
150.3
7
295.1
5
345.7
4
386.3
406.1
9
481.6
5
500.6
8
245.6
5
206.0
4
200.6
1
345.6
5
458.7
5
328.0
1
No.
Ancho
Frou
Sup. (m)
de
Radio
H (m)
Sf
Esfuerz Potenci
o
a
(N/m) (N/ms)
138.43
0.31
1.54
0.000283
4.27
7.69
159.04
81.64
0.21
0.64
1.74
1.24
0.000122
0.001317
2.08
16.00
2.60
56.01
120.7
0.48
1.23
0.00071
8.56
22.94
175.26
0.19
1.66
0.000197
3.20
3.62
203.83
230.07
0.17
0.16
1.68
1.67
0.000138
0.00011
2.27
1.80
2.34
1.71
268.14
0.16
1.5
0.000108
1.59
1.51
312.33
0.13
1.53
0.000076
1.14
0.91
307.77
0.12
1.62
0.000067
1.06
0.81
205.35
0.26
1.19
0.000286
3.34
5.20
169.12
0.29
1.21
0.000354
4.20
7.18
167.6
0.3
1.19
0.000375
4.37
7.65
208.54
0.14
1.65
0.000087
1.41
1.06
236.55
0.12
1.93
0.000064
1.21
0.65
211.89
0.18
1.53
0.000142
2.13
2.43
ES
C3
Velocid
ad
(m/s)
Corriente
Secci
n
Abscis
a
Oca
Oca
Oca
Oca
Oca
12
11.3*
11
10.5
10.2
1038.55
1107.61
1142.14
1150.14
1160.14
1.07
4.15
3.95
Oca
10
1215.74
1.35
Oca
9.3*
1299.57
1.4
Oca
1341.49
1.35
Oca
Oca
Oca
8.5*
8
7.3*
1387.74
1433.99
1503.71
2.21
3.48
2.77
Oca
Oca
7
6.5*
1538.56
1575.70
2.15
3.95
Oca
1612.84
2.58
Oca
5.5*
1646.63
1.88
Oca
Oca
5
4
1680.42
1736.56
1.44
1.62
Oca
3.3*
1825.39
3.09
Oca
Oca
3
2.3*
1869.80
1959.94
3.08
3.28
4.65
rea
(m)
343.9
3
56.98
58.23
49.48
250.3
2
235.2
8
240.7
2
153.9
2
71.76
95.83
124.5
9
64.79
155.1
3
212.8
5
271.5
7
231.7
122.5
6
120.4
7
106.4
No.
Ancho
Frou
Sup. (m)
de
Radio
H (m)
Sf
Esfuerz Potenci
o
a
(N/m) (N/ms)
204.46
31.9
23.68
0.17
0.82
0.8
1.66
1.59
2.1
0.000132
0.003774
0.003632
2.15
58.81
74.75
2.30
244.05
295.25
22.85
1.01
1.86
0.005885
107.27
498.81
184.32
0.24
1.35
0.000255
3.37
4.55
152.03
0.25
1.52
0.00029
4.32
6.05
142.48
0.23
1.63
0.000265
4.23
5.71
128.54
31.1
58.22
0.41
0.63
0.52
1.17
2.09
1.57
0.000815
0.001926
0.001325
9.34
39.45
20.39
20.65
137.28
56.47
66.37
49.52
0.38
0.81
1.74
1.24
0.000748
0.003539
12.75
43.01
27.42
169.87
220
0.5
0.69
0.001352
9.14
23.59
240
0.35
0.87
0.000608
5.18
9.75
260
200
0.26
0.3
1.03
1.13
0.000319
0.000468
3.22
5.18
4.64
8.40
158.45
0.58
0.76
0.001689
12.58
38.87
166.94
129.1
0.58
0.65
0.71
0.81
0.001646
0.002098
11.45
16.65
35.27
54.62
ES
C3
Corriente
Oca
Secci Abscis
n
a
2
2005.01
Oca
1.5*
2093.35
3.3
Oca
1.25*
2137.52
3.25
Oca
2181.68
3.19
Nech Abajo
1160.49
2.76
Nech Abajo
0.3
1260.49
2.79
Tabla 26
Q(Juan
Q(Nech
Vara)=
)= 1547.7
35.9 m/s,
m/s
ES
C.
4
Velocid
ad
(m/s)
3.42
rea
(m)
96.24
102.3
5
105.2
8
108.2
9
687.8
3
680.8
3
No.
Ancho
Frou
Sup. (m)
de
106.95
0.68
Radio
H (m)
0.88
Esfuerz Potenci
o
a
Sf
(N/m) (N/ms)
0.002359
20.34
69.58
119.28
0.68
0.84
0.002454
20.20
66.66
127.67
0.68
0.81
0.002537
20.14
65.45
135.49
0.68
0.78
0.00263
20.10
64.13
177.25
0.45
3.78
0.000629
23.30
64.31
177.21
0.45
3.74
0.00065
23.82
66.47
Escenario 4. Ro Nech y quebradas Juan Vara y Oca con un caudal asociado a 2.33 aos de perodo
de retorno.
Velocid
Ancho
No.
Esfuer Potenci
Secci Abscis
ad
rea
Sup.
Froud Radio
zo
a
Corriente
n
a
(m/s)
(m)
(m)
e
H (m)
Sf
(N/m) (N/ms)
400.1
Nech Arriba
8.1
-200
3.88
5
136.24
0.72
2.91
0.001708 48.71
188.99
319.7
Nech Arriba
8
-100
4.85
1
134.83
1
2.36
0.003586 82.94
402.24
Juan Vara
9.1
60.00
0.78
63.56 163.61
0.26
0.39
0.000447
1.71
1.33
Juan Vara
9
90.00
0.81
60.91 158.81
0.28
0.38
0.000494
1.84
1.49
Juan Vara
8
164.48
2.54
14.45
23.44
0.89
0.61
0.005306 31.72
80.57
Juan Vara
7
226.96
0.98
41.14
54.33
0.3
0.74
0.000564
4.09
4.01
Juan Vara
6.5*
324.36
1.1
34.06
39.89
0.31
0.83
0.000582
4.73
5.21
Juan Vara
6
421.75
1.24
28.86
20.24
0.33
1.33
0.000661
8.62
10.68
Juan Vara
5.5*
506.69
0.77
50.61
46.13
0.2
1.08
0.000221
2.34
1.80
Juan Vara
5.25* 549.16
0.61
63.96
51.72
0.16
1.22
0.000131
1.57
0.96
Q(Nech )=
Q(Oca) = 98 m/s
ES
C.
4
Corriente
Juan Vara
Juan Vara
Juan Vara
Juan Vara
Juan Vara
Juan Vara
Juan Vara
Juan Vara
Juan Vara
Secci Abscis
n
a
5
591.63
4.5*
638.42
4
685.21
3.7
731.25
3
823.35
2.5*
880.22
2
937.10
1.7
971.54
1
1040.42
Velocid
ad
(m/s)
0.5
0.6
0.84
0.98
0.8
0.76
0.62
0.66
0.7
Nech
0.00
2.9
Nech
6.5*
95.28
3.02
Nech
6.25*
142.92
3.21
Nech
190.56
3.6
Nech
5.5*
273.03
2.88
Nech
5.25*
314.27
2.73
Nech
Nech
5
4.5*
355.51
450.76
2.65
2.81
Nech
4.25*
498.39
2.85
Nech
546.02
2.85
Nech
Nech
3.7
3.5*
642.37
690.55
3.17
3.39
rea
(m)
79.52
73.44
59.96
49.97
53.58
56.98
67.42
62.86
56.93
554.5
9
526.7
8
495.1
3
441.1
5
551.4
5
583.1
1
601.9
4
566.5
559.0
6
558.6
7
502.7
9
470.7
Ancho
Sup.
(m)
63.74
74.52
82.62
79.51
66.1
65.92
61.89
57.59
41.98
No.
Froud
e
0.12
0.15
0.2
0.25
0.18
0.18
0.14
0.15
0.15
Radio
H (m)
1.24
0.97
0.7
0.62
0.77
0.84
1.06
1.06
1.24
Sf
0.00008
0.00012
0.000228
0.000369
0.000202
0.000175
0.000099
0.000113
0.000126
Esfuer
zo
(N/m)
0.97
1.14
1.56
2.24
1.52
1.44
1.03
1.17
1.53
Potenci
a
(N/ms)
0.49
0.68
1.31
2.20
1.22
1.09
0.64
0.77
1.07
128.31
0.42
4.18
0.000517
21.18
61.42
131.87
0.47
3.93
0.000663
25.53
77.12
134.79
0.53
3.62
0.000861
30.54
98.05
139.73
0.64
3.11
0.001342
40.90
147.25
126.42
0.43
4.22
0.000562
23.24
66.94
120.35
0.39
4.6
0.000443
19.97
54.52
116.48
125.91
0.36
0.41
4.78
4.36
0.000382
0.000505
17.89
21.58
47.42
60.63
131.62
0.43
4.14
0.00056
22.72
64.75
137.54
0.44
3.95
0.000599
23.19
66.08
125.14
119.23
0.49
0.53
3.93
3.87
0.000732
0.000842
28.19
31.93
89.37
108.26
ES
C.
4
Corriente
Secci
n
Abscis
a
Velocid
ad
(m/s)
Nech
Nech
3.2
3
786.91
835.08
4.09
5.61
Nech
2.7
926.88
3.38
Nech
2.5*
972.79
2.85
Nech
2.2
1064.59
2.13
Nech
Oca
Oca
Oca
2
24.1
24
23
1110.49
60.00
90.00
152.02
1.88
1.94
1.97
1.43
Oca
Oca
Oca
Oca
Oca
22
21
20
19
18.3
206.38
255.52
304.67
443.84
518.05
0.81
3.25
2.79
1.98
1.52
Oca
18
555.16
1.31
Oca
17.3
640.16
1.41
Oca
17
682.66
1.3
Oca
Oca
Oca
16
15.3
15
741.79
794.33
820.60
1.13
1.87
1.69
rea
(m)
3
390.6
4
282.4
468.2
2
556.5
9
743.4
5
843.3
5
62.95
61.51
98.97
160.2
9
33.2
44.76
77.43
100
115.9
5
102.1
1
114.4
1
132.7
4
48.89
53.68
Ancho
Sup.
(m)
No.
Froud
e
Radio
H (m)
Sf
Esfuer
zo
(N/m)
Potenci
a
(N/ms)
107.8
89.53
0.66
1.01
3.57
3.11
0.001317
0.003355
46.08
102.25
188.45
573.64
121.64
0.54
3.8
0.000905
33.70
113.91
134.12
0.44
4.09
0.000592
23.73
67.63
162.83
0.32
4.49
0.000293
12.89
27.46
177.18
67.13
66.39
97.55
0.27
0.4
0.41
0.3
4.67
0.91
0.9
1
0.000216
0.000562
0.000588
0.000283
9.89
5.01
5.19
2.77
18.58
9.72
10.22
3.97
107.17
44.53
56.85
118.07
130.2
0.16
0.74
0.62
0.43
0.32
1.49
0.72
0.76
0.64
0.76
0.000078
0.002061
0.001411
0.001168
0.000573
1.14
14.54
10.51
7.33
4.27
0.92
47.26
29.32
14.50
6.49
140.84
0.27
0.81
0.000395
3.14
4.11
138.34
0.3
0.73
0.000465
3.33
4.69
165.8
0.27
0.68
0.000391
2.61
3.39
171.57
27.28
27.79
0.24
0.42
0.38
0.77
1.72
1.84
0.000283
0.000905
0.000743
2.14
15.25
13.40
2.41
28.53
22.64
ES
C.
4
Velocid
ad
(m/s)
Corriente
Oca
Oca
Secci
n
14.5
14.2
Abscis
a
828.60
838.60
Oca
14.1*
887.19
0.67
Oca
Oca
Oca
Oca
Oca
Oca
Oca
Oca
Oca
14
13
12
11.3
11
10.5
10.2
10
9.3
935.77
987.99
1038.55
1107.61
1142.14
1150.14
1160.14
1215.74
1299.57
0.6
1.26
1.5
2.82
2.71
Oca
Oca
Oca
Oca
Oca
Oca
Oca
Oca
Oca
Oca
Oca
Oca
Oca
Oca
Oca
Oca
9
8.5*
8
7.3
7
6.5*
6
5.5*
5
4
3.3
3
2.3
2
1.5*
1.25*
1341.49
1387.74
1433.99
1503.71
1538.56
1575.70
1612.84
1646.63
1680.42
1736.56
1825.39
1869.80
1959.94
2005.01
2093.35
2137.52
1.21
2.24
1.88
1.61
1.27
1.84
2.65
2.02
1.49
3.18
2.83
2.53
2.94
2.69
2.7
2.68
1.7
2.77
1.16
1.28
rea
(m)
53.5
137.0
3
153.6
3
94.64
93.8
31.91
33.16
32.49
93.76
92.18
100.7
7
42.61
50.36
58.06
74.95
51.01
33.96
44.88
68.54
31.42
32.14
36.71
30.96
34.09
34.65
36
Ancho
Sup.
(m)
No.
Froud
e
Radio
H (m)
Sf
Esfuer
zo
(N/m)
Potenci
a
(N/ms)
27.77
0.38
1.84
0.000751
13.54
23.02
110.83
0.18
1.22
0.000174
2.08
1.39
162.13
86.65
107.94
19.96
20.31
0.19
0.25
0.3
0.71
0.68
0.94
1.06
0.85
1.42
1.43
0.000236
0.000334
0.000499
0.003106
0.002864
2.17
3.47
4.16
43.22
40.14
1.30
4.37
6.24
121.89
108.77
19.65
93.59
95.32
0.69
0.26
0.27
1.44
0.99
0.94
0.002942
0.000332
0.000395
41.52
3.22
3.64
115.00
3.74
4.66
97.1
29.04
26.84
36.83
51.24
40.75
17.59
39.11
155.7
35.1
20.36
27.02
24.42
28.15
38.52
47.42
0.24
0.51
0.39
0.35
0.26
0.4
0.61
0.44
0.3
0.76
0.68
0.59
0.75
0.67
0.68
0.67
1
1.37
1.71
1.47
1.35
1.17
1.67
1.08
0.43
0.83
1.42
1.25
1.18
1.12
0.84
0.72
0.000333
0.001471
0.000805
0.000675
0.000379
0.000893
0.002213
0.001097
0.000499
0.003602
0.002686
0.002017
0.003373
0.002612
0.002811
0.002796
3.26
19.75
13.49
9.72
5.01
10.24
36.22
11.61
2.10
29.30
37.38
24.71
39.01
28.67
23.14
19.73
3.95
44.24
25.36
15.66
6.37
18.84
95.98
23.45
3.13
93.17
105.78
62.51
114.68
77.12
62.48
52.87
ES
C.
4
Corriente
Oca
Secci Abscis
n
a
1
2181.68
Velocid
ad
(m/s)
3.55
Nech Abajo
1160.49
2.63
Nech Abajo
0.3
1260.49
2.66
Hec - Zaragoza100-2.33
Plan: Plan 02
rea
(m)
25.34
639.3
8
632.4
7
Ancho
Sup.
(m)
20.21
No.
Froud
e
1.01
Radio
H (m)
1.1
176.97
0.44
176.93
0.45
24/09/2009
Sf
0.006956
Esfuer
zo
(N/m)
74.99
Potenci
a
(N/ms)
266.20
3.52
0.000624
21.53
56.61
3.49
0.000647
22.13
58.86
Hec - Zaragoza100-2.33
Plan: Plan 02
24/09/2009
70
Le gend
Le gend
WS PF 1
70
WS PF 1
Ground
Ground
68
Bank Sta
Bank Sta
Elevation (m)
Elevation (m)
68
66
66
64
64
62
62
60
-100
-50
0
Station (m)
50
100
60
-100
-50
50
Station (m)
100
150
Seccin 24
Hec - Zaragoza100-2.33
Plan: Plan 02
Seccin 19
24/09/2009
Hec - Zaragoza100-2.33
Plan: Plan 02
24/09/2009
Puente Nuevo
66
65
Le gend
Le gend
WS PF 1
65
WS PF 1
64
Ground
Ground
Bank Sta
Bank Sta
63
Elevation (m)
Elevation (m)
64
63
62
62
61
61
60
60
-200
-150
-100
-50
50
100
150
Station (m)
Figura 28
200
59
-150
-100
-50
50
100
Station (m)
Seccin 3
Secciones 24, 19, 14.5 y 3 de la quebrada Oca para un caudal de 2.33 aos, escenario 4.
Hec - Zaragoza100-2.33
Plan: Plan 02
24/09/2009
Hec - Zaragoza100-2.33
63.5
Plan: Plan 02
24/09/2009
72
Le gend
Le gend
WS PF 1
WS PF 1
70
Ground
63.0
Ground
Levee
Bank Sta
68
Elevation (m)
62.0
66
64
61.5
61.0
-100
62
-80
-60
-40
-20
20
60
-150
40
-100
-50
Station (m)
50
100
Station (m)
Seccin 8
Seccin 4
Hec - Zaragoza100-2.33
Plan: Plan 02
24/09/2009
Le gend
WS PF 1
Ground
63
Levee
Bank Sta
Elevation (m)
Elevation (m)
Bank Sta
62.5
62
61
60
59
-40
-20
20
40
Station (m)
Figura 29
60
80
100
Seccin 1
150
Hec - Zaragoza100-2.33
Plan: Plan 02
24/09/2009
Hec - Zaragoza100-2.33
Plan: Plan 02
24/09/2009
68
66
Le gend
Le gend
WS PF 1
66
WS PF 1
64
Ground
Ground
Bank Sta
64
Bank Sta
Elevation (m)
60
60
58
58
56
56
54
-100
-50
50
100
150
54
-150
200
-100
-50
Station (m)
50
100
150
200
250
Station (m)
Seccin 7
Seccin 4
Hec - Zaragoza100-2.33
Plan: Plan 02
24/09/2009
Le gend
WS PF 1
62
Ground
60
Bank Sta
Levee
Elevation (m)
Elevation (m)
62
62
58
56
54
52
-150
-100
-50
50
Station (m)
Figura 30
100
150
200
250
Seccin 2
71
ESTUDIOS Y DISEOS PARA EL CONTROL DE INUNDACIONES EN EL CASCO URBANO
DEL MUNICIPIO DE ZARAGOZA
6. DISEO DE OBRAS
72
RECUPERACIN DE LA CAPACIDAD HIDRULICA DE LA QUEBRADA OCA Y JUAN
VARA, MUNICIPIO DE ZARAGOZA- ANTIOQUIA
Figura 31
73
RECUPERACIN DE LA CAPACIDAD HIDRULICA DE LA QUEBRADA OCA Y JUAN
VARA, MUNICIPIO DE ZARAGOZA- ANTIOQUIA
6.1 ALTERNATIVA 1
Canal ampliado de seccin trapezoidal compuesta para evacuar la
creciente de los 100 aos.
Esta alternativa contempla la proteccin de los taludes con un sistema de
geotubos de 3.0 m X 2.1 m x 10 m de longitud, los cuales se colocan
longitudinalmente a lo largo de ambas mrgenes. Con una doble funcin:
servir de estructura de contencin para mejorar la estabilidad del talud
inclinado 1H:1V.
La geoestructura se convierte en una pared de alta resistencia a la erosin;
a su vez, la geoestructura contiene el material fino que se ha dragado y
excavado, por lo cual se evita el transporte de gran parte de material hacia
74
RECUPERACIN DE LA CAPACIDAD HIDRULICA DE LA QUEBRADA OCA Y JUAN
VARA, MUNICIPIO DE ZARAGOZA- ANTIOQUIA
botaderos o zonas de disposicin del material que se extrae del canal para
ampliar su capacidad. El material extra que por su tamao - no pueda
ser utilizado para el llenado de los geotubos deber disponerse en las
depresiones del terreno, en los canales rectificados y en zonas que
disponga el interventor.
Las cantidades de obra de las actividades que incluye esta alternativa se
presentan en la Tabla 27 y su costo total se presenta en el captulo 7
Presupuesto, por un valor total de $ 6.634.881.778 (nueve mil setecientos
cincuenta y nueve millones setecientos cincuenta y seis mil quinientos
cincuenta y cinco pesos). Los resultados de la modelacin hidrulica con
la seccin ampliada para la creciente de 100 aos se presentan en la Tabla
29
Tabla 27
6.2 ALTERNATIVA 2
Canal ampliado de seccin trapezoidal compuesta para evacuar la
creciente de 25 aos.
75
RECUPERACIN DE LA CAPACIDAD HIDRULICA DE LA QUEBRADA OCA Y JUAN
VARA, MUNICIPIO DE ZARAGOZA- ANTIOQUIA
Figura 32
76
RECUPERACIN DE LA CAPACIDAD HIDRULICA DE LA QUEBRADA OCA Y JUAN VARA, MUNICIPIO DE ZARAGOZA- ANTIOQUIA
Tabla 29
ESC.
100
ao
s
Simulacin del flujo para la creciente de 100 aos, con una seccin ampliada de seccin trapezoidal
compuesta
Corriente
Secci
n
Nech Arriba
8.1
Nech Arriba
Juan Vara
Abscis
a
rea
(m)
Ancho
Sup.
(m)
2345.8
3.99
591.99
-100
2345.8
4.14
570.34
9.1
60.00
97
0.39
317.71
Juan Vara
90.00
97
0.42
346.6
Juan Vara
164.48
97
0.56
238.8
Juan Vara
226.96
97
0.45
306.45
Juan Vara
6.5*
324.36
97
0.49
Juan Vara
421.75
97
Juan Vara
5.5*
506.69
Juan Vara
5.25*
Juan Vara
Juan Vara
5
4.5*
-200
Velocid
ad
(m/s)
No.
Froud
e
139.8
6
139.3
2
Radio
H (m)
Sf
0.61
4.16
0.64
4.03
0.09
1.43
0.09
1.2
0.1
1.58
0.08
1.76
253.23
220
288.5
6
149.2
3
171.9
8
124.9
6
0.08
1.99
0.53
221.2
91.61
0.09
2.34
97
0.5
233.22
88.98
0.08
2.56
549.16
97
0.48
242.8
90.5
0.08
2.63
591.63
638.42
97
97
0.43
0.37
279.13
341.97
96.51
132.3
8
0.07
0.06
2.81
2.54
Esfuer
zo
(N/m)
0.0016
36
0.0018
48
0.0000
36
0.0000
37
0.0000
52
0.0000
25
0.0000
31
0.0000
36
0.0000
29
0.0000
26
0.0000
19
0.0000
14
Potenci
a
(N/ms)
66.70
72.98
0.50
0.44
0.81
0.43
0.60
0.83
0.73
0.67
0.52
0.35
77
RECUPERACIN DE LA CAPACIDAD HIDRULICA DE LA QUEBRADA OCA Y JUAN VARA, MUNICIPIO DE
ZARAGOZA- ANTIOQUIA
ESC.
100
ao
s
Corriente
Secci
n
Abscis
a
Velocid
ad
(m/s)
rea
(m)
Ancho
Sup.
(m)
Juan Vara
685.21
97
0.33
399.82
Juan Vara
3.7*
731.25
97
0.34
408.46
Juan Vara
823.35
97
0.34
419.96
Juan Vara
2.5*
880.22
97
0.33
414.38
Juan Vara
937.10
97
0.35
425.11
Juan Vara
1.7*
971.54
97
0.36
402.83
Juan Vara
1040.42
97
0.4
348.67
Nech
0.00
2442.8
3.16
874.78
Nech
6.5*
95.28
2442.8
3.27
820.59
Nech
6.25*
142.92
2442.8
3.38
772.63
Nech
190.56
2442.8
3.51
750.34
Nech
5.5*
273.03
2442.8
3.18
834.43
Nech
Nech
5.25*
5
314.27
355.51
2442.8
2442.8
3.11
3.08
860.87
874.57
No.
Froud
e
171.5
7
181.0
9
198.9
8
171.5
3
195.4
5
181.2
4
152.0
4
245.3
7
278.9
5
243.7
6
258.3
4
270.8
4
270.7
8
266.7
Radio
H (m)
Sf
0.05
2.3
0.05
2.23
0.05
2.09
0.05
2.39
0.05
2.15
0.05
2.2
0.06
2.25
0.4
3.49
0.43
2.91
0.46
3.14
0.5
2.87
0.41
3.03
0.38
0.37
3.1
3.16
Esfuer
zo
(N/m)
0.0000
11
0.0000
11
0.0000
11
0.0000
1
0.0000
1
0.0000
1
0.0000
13
0.0006
31
0.0007
6
0.0008
89
0.0010
82
0.0006
81
0.0005
97
0.0005
Potenci
a
(N/ms)
0.25
0.24
0.23
0.23
0.21
0.22
0.29
21.58
21.67
27.36
30.43
20.22
18.14
17.19
ESC.
100
ao
s
78
RECUPERACIN DE LA CAPACIDAD HIDRULICA DE LA QUEBRADA OCA Y JUAN VARA, MUNICIPIO DE
ZARAGOZA- ANTIOQUIA
Corriente
Secci
n
Abscis
a
Velocid
ad
(m/s)
rea
(m)
Ancho
Sup.
(m)
No.
Froud
e
Nech
4.5*
450.76
2442.8
3.22
777.85
Nech
4.25*
498.39
2442.8
3.2
774.66
Nech
546.02
2442.8
3.16
783.37
Nech
3.76*
642.37
2442.8
3.56
703.75
Nech
3.5*
690.55
2442.8
3.81
667.42
Nech
3.2*
786.91
2442.8
4.48
583.28
Nech
835.08
2442.8
5.17
506.14
Nech
2.7*
926.88
2442.8
3.51
742.96
Nech
2.5*
972.79
2442.8
3.02
858.94
Nech
2.2*
1064.59
2442.8
2.33
1090.72
Nech
1110.49
2442.8
2.09
1209.51
184.9
6
138.2
7
142.9
5
153.5
9
165.6
3
164.5
2
150.7
4
213.2
4
224.7
1
229.7
9
232.3
1
Oca
Oca
24.1
24
60.00
90.00
230
230
3.86
2.39
87.04
123.8
78.39
88.69
Radio
H (m)
Sf
0.41
4.1
0.42
5.42
0.42
5.29
0.47
4.47
0.51
3.96
0.61
3.5
0.73
3.31
0.47
3.45
0.39
3.77
0.29
4.66
0.26
5.09
0.75
0.55
1.08
1.38
Esfuer
zo
(N/m)
55
0.0006
78
0.0007
06
0.0007
23
0.0009
17
0.0010
59
0.0015
53
0.0022
78
0.0008
87
0.0006
21
0.0003
41
0.0002
62
0.0018
68
0.0010
89
Potenci
a
(N/ms)
27.24
37.50
37.48
40.17
41.10
53.27
73.89
29.99
22.94
15.57
13.07
19.77
14.73
79
RECUPERACIN DE LA CAPACIDAD HIDRULICA DE LA QUEBRADA OCA Y JUAN VARA, MUNICIPIO DE
ZARAGOZA- ANTIOQUIA
ESC.
100
ao
s
Corriente
Secci
n
Abscis
a
Velocid
ad
(m/s)
rea
(m)
Ancho
Sup.
(m)
No.
Froud
e
Radio
H (m)
Sf
Oca
23
152.02
230
2.3
131.16
94.4
0.52
1.37
Oca
22
206.38
230
2.09
146.84
96.63
0.46
1.5
Oca
21
255.52
230
2.4
123.78
90.4
0.53
1.34
Oca
20
304.67
230
2.25
134.41
0.49
1.35
Oca
19
443.84
230
2.02
154.47
0.42
1.17
Oca
18.3*
518.05
230
1.85
170.57
0.37
1.26
Oca
18
555.16
230
1.74
180.02
0.35
1.32
Oca
17.3*
640.16
230
1.41
229.85
0.27
1.39
Oca
17
682.66
230
1.38
245.74
0.26
1.24
Oca
16
741.79
230
1.14
289.73
0.21
1.42
Oca
15.3*
794.33
230
1.44
215.05
0.26
1.59
Oca
Oca
Oca
15
14.5
14.2
820.60
828.60
838.60
230
Bridge
230
1.39
209.98
98.24
130.7
9
134.4
7
135.0
8
164.0
8
196.2
6
202.2
4
133.6
5
105.1
6
0.25
1.95
1.56
185.78
101.1
0.29
1.8
Esfuer
zo
(N/m)
0.0009
53
0.0006
58
0.0010
66
0.0009
02
0.0008
86
0.0006
65
0.0005
73
0.0003
51
0.0003
28
0.0002
16
0.0003
23
0.0002
79
0.0003
89
Potenci
a
(N/ms)
12.79
9.67
14.00
11.93
10.16
8.21
7.41
4.78
3.99
3.01
5.03
5.33
6.86
80
RECUPERACIN DE LA CAPACIDAD HIDRULICA DE LA QUEBRADA OCA Y JUAN VARA, MUNICIPIO DE
ZARAGOZA- ANTIOQUIA
ESC.
100
ao
s
Corriente
Secci
n
Abscis
a
Velocid
ad
(m/s)
rea
(m)
Ancho
Sup.
(m)
Oca
14.1*
887.19
230
1.47
181.54
Oca
14
935.77
230
1.16
232.05
Oca
13
987.99
230
2.7
85.33
Oca
12
1038.55
230
1.55
Oca
11.3*
1107.61
230
Oca
Oca
11
10.5
1142.14
1150.14
Oca
10.2
Oca
No.
Froud
e
111.7
1
160.5
5
Radio
H (m)
Sf
0.3
1.6
0.25
1.43
0.5
2.71
188.82
28.73
102.0
4
0.28
1.81
2.79
82.37
28.52
0.52
2.64
230
Bridge
2.8
82.26
28.51
0.53
2.64
1160.14
230
1.59
182.93
97.39
0.29
1.83
10
1215.74
230
1.79
165.42
99.34
0.33
1.62
Oca
9.3*
1299.57
230
1.76
165.63
0.32
1.63
Oca
1341.49
230
1.57
188.14
99.27
108.6
4
0.28
1.69
Oca
8.5*
1387.74
230
1.65
168.16
80.48
0.29
2.03
Oca
Oca
8
7.3*
1433.99
1503.71
230
230
1.32
1.32
213.34
220.29
87.76
97.92
0.22
0.22
2.35
2.2
Esfuer
zo
(N/m)
0.0003
91
0.0003
19
0.0010
68
0.0003
65
0.0013
6
0.0011
95
0.0003
89
0.0004
65
0.0004
69
0.0003
65
0.0003
88
0.0002
19
0.0002
08
Potenci
a
(N/ms)
6.13
4.47
28.36
6.47
35.19
30.92
6.98
7.38
7.49
6.05
7.72
5.04
4.48
81
RECUPERACIN DE LA CAPACIDAD HIDRULICA DE LA QUEBRADA OCA Y JUAN VARA, MUNICIPIO DE
ZARAGOZA- ANTIOQUIA
ESC.
100
ao
s
Corriente
Secci
n
Abscis
a
Velocid
ad
(m/s)
rea
(m)
Ancho
Sup.
(m)
Oca
1538.56
230
1.25
233.84
Oca
6.5*
1575.70
230
1.32
234.46
Oca
1612.84
230
1.32
237.76
Oca
5.5*
1646.63
230
1.4
260.48
Oca
1680.42
230
1.36
283.88
Oca
1736.56
230
1.22
296.47
Oca
3.3*
1825.39
230
1.48
216.63
Oca
1869.80
230
1.45
222.54
Oca
2.3*
1959.94
230
1.23
269.66
Oca
2005.01
230
1.04
313.06
Oca
1.5*
2093.35
230
0.82
408.37
Oca
1.25*
2137.52
230
0.71
468.52
Oca
Nech Abajo
1
1
2181.68
+100
230
2699.6
0.63
2.82
535.41
971.14
No.
Froud
e
100.1
5
117.2
1
127.5
5
213.5
7
269.5
5
220.7
3
161.3
1
172.2
6
163.4
9
150.0
3
177.3
7
188.7
2
199.5
9
213.2
Radio
H (m)
Sf
0.21
2.28
0.22
1.97
0.21
1.83
0.23
1.21
0.22
1.04
0.2
1.33
0.24
1.32
0.24
1.27
0.19
1.62
0.16
2.05
0.12
2.28
0.1
2.45
0.09
0.39
2.64
4.43
Esfuer
zo
(N/m)
Potenci
a
(N/ms)
0.0001
82
4.07
0.0002
0.0002
08
0.0002
19
0.0002
09
0.0001
68
0.0002
66
0.0002
56
0.0001
61
0.0001
02
0.0000
56
0.0000
4
0.0000
28
0.0006
3.86
3.73
2.60
2.13
2.19
3.44
3.19
2.56
2.05
1.25
0.96
0.72
28.13
82
RECUPERACIN DE LA CAPACIDAD HIDRULICA DE LA QUEBRADA OCA Y JUAN VARA, MUNICIPIO DE
ZARAGOZA- ANTIOQUIA
ESC.
100
ao
s
Corriente
Secci
n
Nech Abajo
Tabla 30
ESC
. 25
ao
s
0.3
Abscis
a
+200
Velocid
ad
(m/s)
2699.6
rea
(m)
2.84
Ancho
Sup.
(m)
No.
Froud
e
962.85
7
212.7
1
Radio
H (m)
0.39
Sf
4.4
Esfuer
zo
(N/m)
Potenci
a
(N/ms)
48
0.0006
64
28.63
Simulacin del flujo para la creciente de 100 aos, con una seccin ampliada de seccin trapezoidal
compuesta
Corriente
Nech
Arriba
Secci Abscis
n
a
8.1
-200
Veloci
dad
(m/s)
Ancho
Sup.
(m)
No.
Frou
de
Radio
H (m)
3.93
536.2
4
138.58
0.63
3.81
0.00180
1
67.25
264.28
0.68
3.64
0.00211
8
75.55
312.04
0.12
0.99
0.00007
3
0.71
0.33
rea
(m)
Sf
Esfuer Potenc
zo
ia
(N/m) (N/ms)
Nech
Arriba
-100
4.13
510.3
8
138.14
Juan Vara
9.1
60.00
0.47
219.0
1
Juan Vara
90.00
0.52
224.1 255.14
0.12
0.88
0.00007
9
0.68
0.35
Juan Vara
164.48
0.61
173.9 138.19
0.12
1.24
0.00007
7
0.94
0.57
Juan Vara
Juan Vara
7
6.5*
226.96
324.36
0.47
0.5
231.8
5
158.22
198.3 118.66
7
0.09
0.09
1.45
1.64
0.47
0.61
0.22
0.31
220
0.00003
3
0.00003
8
83
RECUPERACIN DE LA CAPACIDAD HIDRULICA DE LA QUEBRADA OCA Y JUAN VARA, MUNICIPIO DE
ZARAGOZA- ANTIOQUIA
ESC
. 25
ao
s
Corriente
Secci Abscis
n
a
Veloci
dad
(m/s)
rea
(m)
Ancho
Sup.
(m)
No.
Frou
de
Radio
H (m)
Sf
Esfuer Potenc
zo
ia
(N/m) (N/ms)
Juan Vara
421.75
0.51
180.7
4
Juan Vara
5.5*
549.16
0.47
194.1
4
84.63
0.08
2.24
0.00003
1
0.68
0.32
Juan Vara
5.25*
591.63
0.45
203.2
8
85.11
0.08
2.34
0.00002
7
0.62
0.28
Juan Vara
638.42
0.39
236.9
6
90.37
0.07
2.55
0.00001
8
0.45
0.18
Juan Vara
4.5*
685.21
0.35
284.0
2
123.46
0.06
2.27
0.00001
4
0.31
0.11
Juan Vara
731.25
0.32
324.3
5
162.28
0.05
1.97
0.00001
2
0.23
0.07
0.05
1.91
0.00001
2
0.22
0.07
87.66
0.09
0.00003
9
0.76
0.39
Juan Vara
3.7
823.35
0.33
328.9
3
170.63
Juan Vara
880.22
0.34
332.9 185.82
0.05
1.77
0.00001
2
0.21
0.07
Juan Vara
2.5*
937.10
0.32
338.7
3
163.17
0.05
2.05
0.00001
0.20
0.06
Juan Vara
Juan Vara
2
1.7
971.54
1040.4
2
0.33
0.34
0.05
0.05
1.91
1.97
0.00001
0.00001
1
0.19
0.21
0.06
0.07
340.9
4
176.58
325.0 162.5
7
84
RECUPERACIN DE LA CAPACIDAD HIDRULICA DE LA QUEBRADA OCA Y JUAN VARA, MUNICIPIO DE
ZARAGOZA- ANTIOQUIA
Q(Nechi )=
ESC
. 25
ao
s
Corriente
Secci Abscis
n
a
Veloci
dad
(m/s)
rea
(m)
Ancho
Sup.
(m)
No.
Frou
de
Radio
H (m)
Sf
Esfuer Potenc
zo
ia
(N/m) (N/ms)
Juan Vara
0.00
0.37
284.3
7
133.74
Nech
47.64
3.1
768.7
4
233.26
0.4
3.23
0.00066
5
21.05
65.25
Nech
6.5*
142.92
3.2
707.3
7
187.59
0.44
3.72
0.00080
6
29.38
94.03
Nech
6.25*
190.56
3.31
679.7
9
198.53
0.47
3.38
0.00095
6
31.67
104.82
Nech
231.79
3.53
633.0
9
0.53
2.9
0.00124
7
35.44
125.10
Nech
5.5*
314.27
3.11
719.6
5
210.16
0.42
3.35
0.00072
2
23.70
73.72
0.39
3.38
0.00062
20.54
62.02
215
0.06
2.08
0.00001
2
0.24
0.09
Nech
5.25*
355.51
3.02
745.2
2
Nech
403.14
2.98
760.4
1
211.83
0.37
3.43
0.00056
7
19.06
56.80
Nech
4.5*
498.39
3.08
715.1
5
132.09
0.41
5.23
0.00068
34.85
107.35
Nech
Nech
4.25*
4
546.02
594.20
3.08
3.05
714.1
8
136.45
720 142.09
0.42
0.42
5.07
4.9
0.00072
2
0.00074
8
35.87
35.92
110.49
109.55
213.5
85
RECUPERACIN DE LA CAPACIDAD HIDRULICA DE LA QUEBRADA OCA Y JUAN VARA, MUNICIPIO DE
ZARAGOZA- ANTIOQUIA
ESC
. 25
ao
s
Corriente
Secci Abscis
n
a
Veloci
dad
(m/s)
rea
(m)
Ancho
Sup.
(m)
No.
Frou
de
Radio
H (m)
Sf
Esfuer Potenc
zo
ia
(N/m) (N/ms)
Nech
3.7
690.55
3.41
645.3
2
129.64
Nech
3.5*
738.73
3.67
603.5
6
130.97
0.51
4.51
0.00109
4
48.35
177.45
Nech
3.2
835.08
4.41
511.7
5
139.33
0.63
3.62
0.00169
8
60.24
265.65
Nech
880.98
5.28
426.0
1
123.64
0.79
3.39
0.00279
92.69
489.40
Nech
2.7
972.79
3.49
640.5
3
164.22
0.49
3.85
0.00100
8
38.03
132.73
Nech
2.5*
1018.6
9
2.99
743.8
8
179.85
0.41
4.08
0.00069
8
27.91
83.45
Nech
2.2
1110.4
9
2.3
962.1
3
224.28
0.3
4.22
0.00037
4
15.47
35.57
Nech
0.00
2.04
1079.
36
231.78
0.27
4.57
0.00028
4
12.72
25.95
La Oca
24.1
90.00
3.62
68.97
70.11
0.74
0.95
0.00186
8
17.39
62.96
La Oca
La Oca
24
23
152.02
206.38
2.34
2.28
100.1
9
104.5
3
87.5
92.77
0.58
0.55
1.13
1.11
13.92
12.37
32.57
28.20
0.47
4.85
0.00093
5
44.44
151.54
0.00125
7
0.00113
7
86
RECUPERACIN DE LA CAPACIDAD HIDRULICA DE LA QUEBRADA OCA Y JUAN VARA, MUNICIPIO DE
ZARAGOZA- ANTIOQUIA
m/s
ESC
. 25
ao
s
Corriente
Secci Abscis
n
a
Veloci
dad
(m/s)
rea
(m)
Ancho
Sup.
(m)
No.
Frou
de
Radio
H (m)
Sf
Esfuer Potenc
zo
ia
(N/m) (N/ms)
La Oca
22
255.52
2.03
119.4
2
La Oca
21
304.67
2.51
93.72
89.44
0.6
1.03
0.00144
1
14.55
36.51
La Oca
20
351.06
2.37
100.3
2
94.8
0.56
1.04
0.00125
1
12.75
30.22
La Oca
19
480.95
2.31
101.8
1
105
0.53
0.96
0.00151
9
14.29
33.01
La Oca
18.3*
555.16
2.09
113.4
2
105.72
0.47
1.06
0.00110
9
11.52
24.08
La Oca
18
597.66
1.93
122.0
4
105.93
0.43
1.14
0.00091
8
10.26
19.79
0.36
1.04
0.00064
8
6.60
11.03
95.02
0.48
1.24
0.00074
3
9.03
18.33
La Oca
17.3*
682.66
1.67
151.2
8
143.78
La Oca
17
741.79
1.49
164.5
6
136.49
0.31
1.19
0.0005
5.83
8.69
La Oca
16
768.06
1.35
191.6
9
173.76
0.28
1.09
0.00039
4
4.21
5.68
La Oca
La Oca
15.3*
15
820.60
828.60
1.5
1.5
0.31
0.3
1.39
1.48
6.23
6.00
9.34
9.01
155.5
8
110.19
154.9 102.93
5
0.00045
7
0.00041
4
87
RECUPERACIN DE LA CAPACIDAD HIDRULICA DE LA QUEBRADA OCA Y JUAN VARA, MUNICIPIO DE
ZARAGOZA- ANTIOQUIA
Q(Juan
Q(Nechi
Vara)=
)= 2170.62
75.97 m/s
ESC
. 25
ao
s
Corriente
Secci Abscis
n
a
Veloci
dad
(m/s)
rea
(m)
Ancho
Sup.
(m)
No.
Frou
de
Radio
H (m)
Sf
Esfuer Potenc
zo
ia
(N/m) (N/ms)
La Oca
14.5
838.60
La Oca
14.2
887.19
1.73
132.5
5
97.65
0.35
1.33
0.00062
3
8.12
14.05
La Oca
14.1*
935.77
1.63
125.0
5
86.29
0.37
1.43
0.00063
6
8.91
14.53
La Oca
14
987.99
1.39
147.5
5
139.62
0.33
1.04
0.00063
8
6.50
9.04
La Oca
13
1038.5
5
2.52
71.35
27.74
0.5
2.37
0.00113
5
26.36
66.43
La Oca
12
1073.0
8
1.66
136.4
4
92.06
0.33
1.45
0.00053
9
7.66
12.71
La Oca
11.3*
1142.1
4
2.61
68.96
27.57
0.53
2.31
0.00141
8
32.10
83.78
La Oca
11
1150.1
4
2.62
68.76
27.55
0.53
2.3
0.00128
8
29.03
76.06
La Oca
10.5
1160.1
4
La Oca
La Oca
10.2
10
1.75
1.95
131.1
7
114.6
7
95.44
87.74
0.35
0.39
1.34
1.27
8.05
8.75
14.09
17.06
1215.7
4
1257.6
6
0.00061
3
0.00070
3
88
RECUPERACIN DE LA CAPACIDAD HIDRULICA DE LA QUEBRADA OCA Y JUAN VARA, MUNICIPIO DE
ZARAGOZA- ANTIOQUIA
ESC
. 25
ao
s
Corriente
Secci Abscis
n
a
Veloci
dad
(m/s)
rea
(m)
Ancho
Sup.
(m)
No.
Frou
de
0.35
Esfuer Potenc
zo
ia
(N/m) (N/ms)
La Oca
9.3*
La Oca
1387.7
4
1.62
134.8
7
84.14
0.32
1.56
0.00048
7
7.45
12.06
La Oca
8.5*
1433.9
9
1.6
130.8
8
65.75
0.3
1.93
0.00044
8.32
13.32
La Oca
1468.8
5
1.34
166.1
4
85.2
0.25
1.89
0.00028
1
5.20
6.97
La Oca
7.3*
1538.5
6
1.35
168.4
8
90.76
0.24
1.82
0.00027
3
4.87
6.57
La Oca
1575.7
0
1.27
179.8
8
94.09
0.23
1.87
0.00023
4
4.29
5.45
La Oca
6.5*
1612.8
4
1.37
171.7
7
100.01
0.24
1.69
0.00026
5
4.39
6.01
La Oca
1646.6
3
1.29
177.6
3
0.23
1.84
0.00024
6
4.44
5.72
La Oca
5.5*
1680.4
2
1.3
0.23
1.66
0.00023
1
3.76
4.89
La Oca
La Oca
5
4
0.22
0.22
1.83
1.61
3.91
3.50
4.89
4.45
69.96
Sf
1341.4
9
1736.5
6
1780.9
7
1.77
119.6
1
Radio
H (m)
1.25
1.27
94.21
184.1
7
108.85
185.0
8
99.05
188.9 114.78
3
1.66
0.00058
9
9.58
16.96
0.00021
8
0.00022
2
89
RECUPERACIN DE LA CAPACIDAD HIDRULICA DE LA QUEBRADA OCA Y JUAN VARA, MUNICIPIO DE
ZARAGOZA- ANTIOQUIA
ESC
. 25
ao
s
Corriente
Secci Abscis
n
a
Veloci
dad
(m/s)
rea
(m)
Ancho
Sup.
(m)
No.
Frou
de
3.3*
La Oca
1914.8
7
1.35
153.4
7
La Oca
2.3*
2005.0
1
1.33
181.1
5
135.65
0.22
1.31
0.00023
2.95
3.93
La Oca
2049.1
8
1.08
230.5
6
135.39
0.17
1.67
0.00013
3
2.18
2.35
La Oca
1.5*
2137.5
2
0.85
309.5
3
166.62
0.13
1.84
0.00007
2
1.30
1.10
La Oca
1.25*
2181.6
8
0.73
362.6
7
179.76
0.11
1.99
0.00004
9
0.96
0.70
0.63
422.9
6
193.43
0.09
2.15
0.00003
3
0.70
0.44
2.63
865.9 193.78
0.38
4.34
0.00064
5
27.43
72.15
2.66
858.5
1
192.14
0.39
4.34
0.00066
2
28.16
74.90
Nech Abajo
Nech Abajo
0.3
+100
+200
0.24
67.47
Esfuer Potenc
zo
ia
(N/m) (N/ms)
La Oca
66.51
Sf
1869.8
0
La Oca
1.39
149.8
1
Radio
H (m)
2.16
0.00027
8
5.88
8.18
0.24
2.18
0.00026
6
5.68
7.67
90
RECUPERACIN DE LA CAPACIDAD HIDRULICA DE LA QUEBRADA OCA Y JUAN VARA, MUNICIPIO DE
ZARAGOZA- ANTIOQUIA
ESC
. 25
ao
s
Corriente
Veloci
dad
(m/s)
Secci Abscis
n
a
Hec - Zaragoza100
Plan: Plan 15
rea
(m)
Ancho
Sup.
(m)
No.
Frou
de
Radio
H (m)
Hec - Zaragoza100
27/10/2009
Plan: Plan 15
27/10/2009
Seccion 8
Seccion 9
64.5
Legend 64.5
Legend
64.0
WS N Q10064.0
N Q100
WS N Q25 63.5
N Q25
63.5
WS N Dia Batimetria
63.0
Ground
62.5
Levee
63.0
62.5
Terreno
Banca
62.0
61.5
-150
N Dia Batimetria
Cota (m)
Cota (m)
Esfuer Potenc
zo
ia
(N/m) (N/ms)
Sf
61.5
-100
-50
0
Abscisa (m)
50
100
150
61.0
-120
-100
-80
-60
-40
Abscisa (m)
-20
20
40
91
RECUPERACIN DE LA CAPACIDAD HIDRULICA DE LA QUEBRADA OCA Y JUAN VARA, MUNICIPIO DE
ZARAGOZA- ANTIOQUIA
ESC
. 25
ao
s
Corriente
Secci Abscis
n
a
Hec - Zaragoza100
Veloci
dad
(m/s)
Plan: Plan 15
rea
(m)
Ancho
Sup.
(m)
No.
Frou
de
Radio
H (m)
Hec - Zaragoza100
27/10/2009
74
27/10/2009
Legend
76
Legend
74
72
N Q100
70
N Q25 72
N Q100
N Q25
70
N Dia Batimetria
N Dia Batimetria
Cota (m)
Cota (m)
Plan: Plan 15
Seccion 6
Seccion 7
68
66
64
Terreno 68
Terreno
Banca 66
Banca
64
62
60
-150
Esfuer Potenc
zo
ia
(N/m) (N/ms)
Sf
62
-100
-50
Abscisa (m)
50
100
60
-40
-20
20
40
60
80
100
120
140
Abscisa (m)
Figura 23. Secciones transversales quebrada Juan Vara, con niveles de crecientes de 100 y 25 aos y
nivel 08/05/09.
92
RECUPERACIN DE LA CAPACIDAD HIDRULICA DE LA QUEBRADA OCA Y JUAN VARA, MUNICIPIO DE
ZARAGOZA- ANTIOQUIA
ESC
. 25
ao
s
Corriente
Secci Abscis
n
a
Hec - Zaragoza100
Plan: Plan 15
Veloci
dad
(m/s)
rea
(m)
Ancho
Sup.
(m)
No.
Frou
de
Radio
H (m)
Hec - Zaragoza100
27/10/2009
Seccion 24
Legend
70
N Q100
27/10/2009
70
Banca
64
Cota (m)
Terreno
N Q100
N Q25
N Dia Batimetria
66
Legend
68
N Q25
68
Cota (m)
Plan: Plan 15
Seccion 19
72
N Dia Batimetria
66
Terreno
64
Banca
62
62
60
-100
Esfuer Potenc
zo
ia
(N/m) (N/ms)
Sf
-50
0
Abscisa (m)
50
100
60
-100
-50
50
Abscisa (m)
100
150
93
RECUPERACIN DE LA CAPACIDAD HIDRULICA DE LA QUEBRADA OCA Y JUAN VARA, MUNICIPIO DE
ZARAGOZA- ANTIOQUIA
ESC
. 25
ao
s
Corriente
Secci Abscis
n
a
Hec - Zaragoza100
Plan: Plan 15
Veloci
dad
(m/s)
rea
(m)
Ancho
Sup.
(m)
No.
Frou
de
Radio
H (m)
Hec - Zaragoza100
27/10/2009
66
Legend
65
N Q100
N Q25
64
N Dia Batimetria
Terreno
63
Banca
62
Cota (m)
Cota (m)
Plan: Plan 15
27/10/2009
Seccion 3
Puente Viejo
65
Legend
64
N Q100
N Q25
63
N Dia Batimetria
Terreno
62
Banca
61
60
61
60
-200
Esfuer Potenc
zo
ia
(N/m) (N/ms)
Sf
-150
-100
-50
0
Abscisa (m)
50
100
150
200
59
-150
-100
-50
50
100
Abscisa (m)
Figura 24. Secciones transversales quebrada Oca, con niveles de crecientes de 100 y 25 aos y nivel
08/05/09
94
RECUPERACIN DE LA CAPACIDAD HIDRULICA DE LA QUEBRADA OCA Y JUAN VARA, MUNICIPIO DE
ZARAGOZA- ANTIOQUIA
Hec - Zaragoza100
Plan: Plan 15
Hec - Zaragoza100
27/10/2009
27/10/2009
64
68
Legend
66
N Q100
64
N Q25
N Q25
N Dia Batimetria
N Dia Batimetria
62
Terreno
60
Banca
Legend
N Q100
62
Cota (m)
Cota (m)
Plan: Plan 15
Seccion 6
Seccion 7
58
60
Terreno
58
Banca
56
56
54
-100
-50
50
100
150
54
-150
200
-100
-50
50
Abscisa (m)
Hec - Zaragoza100
Plan: Plan 15
27/10/2009
Hec - Zaragoza100
Seccion 5
150
200
250
Plan: Plan 15
27/10/2009
Seccion 4
66
64
62
Legend
66
Legend
N Q100
64
N Q100
N Q25
60
N Dia Batimetria
58
Terreno
56
Banca
N Q25
62
Cota (m)
Cota (m)
100
Abscisa (m)
N Dia Batimetria
Terreno
60
Banca
58
54
56
52
50
-150
-100
-50
50
Abscisa (m)
100
150
200
54
-150
-100
-50
50
Abscisa (m)
100
150
200
250
95
RECUPERACIN DE LA CAPACIDAD HIDRULICA DE LA QUEBRADA OCA Y JUAN VARA, MUNICIPIO DE
ZARAGOZA- ANTIOQUIA
Figura 25. Secciones transversales ro Nech con niveles de crecientes de 100 y 25 aos y nivel 08/05/09
Hec - Zaragoza100
Plan: Plan 15
27/10/2009
Hec - Zaragoza100
Seccion 3
27/10/2009
66
Legend
64
Legend
64
N Q100
62
N Q100
N Q25
62
N Dia Batimetria
Terreno
60
Banca
58
N Q25
60
N Dia Batimetria
Terreno
58
Banca
56
56
54
-150
Cota (m)
Cota (m)
Plan: Plan 15
Seccion 2
54
-100
-50
50
Abscisa (m)
100
150
200
250
52
-150
-100
-50
50
100
150
200
250
Abscisa (m)
Figura 25. Secciones transversales ro Nech con niveles de crecientes de 100 y 25 aos y nivel 08/05/09,
continuacin
96
RECUPERACIN DE LA CAPACIDAD HIDRULICA DE LA QUEBRADA OCA Y JUAN
VARA,
MUNICIPIO DE ZARAGOZA- ANTIOQUIA
DESCRIPCION GENERAL
1. Las obras consisten en una contencin longitudinal conformada por
geoestructuras de 3.0 m x 2.10 m x 10 m de longitud menor
longitud segn sea el caso, colocadas en la pata del talud (1H:1V)
del canal excavado. Sobre esta estructura se coloca una capa de
terratrac o geotextil de alta resistencia para ofrecer una mayor
proteccin contra los rayos ultravioleta en el caso de que el nivel del
agua no sobrepase la geoestructura (poca de sequas).
2.
97
a)
Preparacin del sitio: no se requiere preparacin
especial para iniciar la colocacin de las geoestructuras, sin
embargo se debe realizar una batimetra por el eje de los
diques antes de iniciar su colocacin con el fin de hacer los
ajustes necesarios a las secciones de diseo, especficamente
para verificar la longitud de los tubos y de las geoestructuras y
asegurarse que no existan irregularidades en el fondo
(hexpodos, troncos, bloques de concreto, etc.) que puedan
romper la geoestructura.
b)
Colocacin de la geoestructura. La geoestructura deber
ser desenrollada y puesta en posicin de llenado mediante las
guas provistas por el fabricante, con los puertos de entrada y
salida en la parte superior del tubo.
c)
Llenado de la geoestructura con material dragado. Los
puertos de inyeccin son fabricados del mismo tipo de material
con el que es fabricada la geoestructura; generalmente tienen
de 1 a 2 m de longitud y de 12 a 18 pulgadas de dimetro, es
por esto que la tubera utilizada para el llenado no debe
superar este valor. Generalmente se utiliza una tubera entre 8
y 12 pulgadas de dimetro para que sta entre en los puertos
de inyeccin. Esta tubera debe entrar aproximadamente 2/3
partes de la longitud del puerto y debe estar asegurada con
abrazaderas.
Las geoestructuras tienen varios puertos de inyeccin
dependiendo de su longitud, generalmente estn alineados en
la parte superior de la geoestructura y distanciados entre si,
una distancia no mayor a 15 metros. Los puertos son utilizados
tanto para llenado como para aliviar los esfuerzos de tensin
generados por el exceso de agua.
Dependiendo del espaciamiento del material a utilizar como
llenado, de la capacidad de la draga o tolva, algunos de los
98
99
100
DESCRIPCIN
UNI
D
CANT
VR
UNITARIO
VR. TOTAL
20
$447.500
$ 8.950.000
LOCALIZACION Y
REPLANTEO
Dia
DESMONTE Y LIMPIEZA
m2
CAMPAMENTO
50,00
0
45
DEMOLICIONES
un
4,00
EXCAVACIN
m3
285.2
00
7
7.1
7.2
8
9
10
11
12
$ 2.590
$ 61.655
$
2.251.793
$ 11.291
COSTO DIRECTO
AIU
30%
$
129.500.000
$ 2.774.475
$ 9.007.172
$
2.371.110.00
0
$ 5.131.700
$
198.792.000
$
353.898.000
$
508.352.000
$ 71.467.500
$ 15.000.000
$
136.000.000
$
4.807.885.3
47
$
1.442.365.6
04
101
Interventora
8%
TOTAL
$
384.630.82
7
$
6.634.881.7
78
DESMONTE Y LIMPIEZA
m2
35.00
0
$ 2.590
CAMPAMENTO
45
$ 61.655
$ 2.774.475
m3
162.9
20
$ 11.291
$
1.839.590.815
CONFORMACION DE
TALUDES (terrapln)
m2
1.350
$ 7.331
$ 9.896.850
EMPRADIZACION DE
TALUDES
m2
5.500
$ 9.036
$ 49.698.000
GEOESTRUCTURAS 3*2*10
m
6.500
$ 88.110
GEOTEXTIL
11.50
0
$ 7.524
$ 90.650.000
$ 572.715.000
$ 86.526.000
102
TERRATRAC
11.50
0
COSTO DIRECTO
AIU
Interventora
30%
10%
$ 14.514
$ 166.914.833
$
2.825.478.473
$ 847.643.542
$ 367.312.202
$
4.040.434.217
TOTAL
MANTENIMIENTO
Limpieza de las quebradas
un
$
$ 15.000.000
7.500.000
103
104
105
106
107
108
109
110
111
112
9. ESPECIFICACIONES TECNICAS
9.1 LOCALIZACION Y REPLANTEO
9.1.1 DESCRIPCIN
La localizacin y el Replanteo Topogrfico consiste en la localizacin,
nivelacin y control permanente de las obras por ejecutar, con la previa
aprobacin del Interventor y siguiendo las referencias del proyecto, de tal
manera que ocupen la posicin indicada con relacin a las edificaciones
existentes y los accidentes topogrficos.
La localizacin del proyecto se apoyar en los sistemas altimtricos y
planimtricos indicados en los planos o suministrados por el Interventor.
El mximo error de cierre admisible de las poligonales o triangulaciones de
los levantamientos de replanteo ser de 1:1.500 y e = aN, en ngulo,
siendo "N" el nmero de vrtices de la poligonal y "a" la aproximacin del
aparato. El mximo error de cierre en las nivelaciones expresado en
milmetros, ser de e = K, siendo "K" la longitud en kilmetros de las
lneas de nivelacin. Las carteras de campo y los clculos de coordenadas
y nivelaciones, sern presentados por el Contratista al Interventor para su
revisin.
La aprobacin por parte del Interventor de los trabajos topogrficos de
replanteo y de control de las obras y los datos aproximados de localizacin
dados en los planos de construccin, no relevan al Contratista de su
responsabilidad sobre los defectos de construccin o incrementos en
cantidades de obra, por efecto de errores topogrficos de localizacin y
replanteo de las obras
9.1.2 MEDIDA
El replanteo y control topogrfico no se medirn para efectos de pago.
9.1.3 PAGO
El replanteo como los levantamientos de control de las obras se pagar al
Contratista al precio global consignado en el formulario "Lista de
Cantidades de Obra, Precios Unitarios y Valor Total de la Propuesta", para
el concepto de trabajo: Item, Localizacion y Replanteo
EMILIO GIL GIRALDO,
LTDA
113
Unidad
Global
114
115
116
117
118
119
120
121
9.4.10 PAGO
Los trabajos de dragado se pagarn a los precios unitarios del Contrato de
acuerdo con su clasificacin, y debern cubrir todos los costos de
excavacin y transporte del material hasta las zonas de relleno o de
desecho hasta 1.000 m de distancia, de acuerdo al plan aprobado de
excavacin y disposicin del material; los costos de rellenos hidrulicos
para conformacin de diques; los de conservacin y operacin de las
dragas, equipos auxiliares y accesorios; los de estaciones de bombeo
adicionales; los de regulacin del trfico fluvial; los de excavaciones fuera
de las lneas de proyecto; los de extraccin de obstculos menores para la
operacin de los equipos; los de reparacin de daos causados o taludes
y/o estructuras; y todos los dems costos directos e indirectos y riesgos
necesarios para la correcta ejecucin de los trabajos, as como la
administracin, los imprevistos y la utilidad para el tem.
9.4.11 ITEM DE PAGO
Excavacin de material de ro para llenado de geoestructuras
122
Suelos
Seleccionados
Adecuados
Tolerables
Aplicacin
Corona, Ncleo,
Cimiento
Corona, Ncleo,
Cimiento
Ncleo,
Cimiento
Tamao mximo
75 mm
100 mm
150 mm
25% en peso
35% en peso
35% en peso
C.B.R. de laboratorio
10
0%
2%
2%
Contenido de materia
orgnica
0%
1%
2%
Lmite lquido
30
40
40
Indice plstico
10
15
75 m (No.200) se
segn norma de
con lo indicado en
orgnica, segn lo
123
124
125
126
127
128
129
130
131
No habr medida ni pago para los terraplenes por fuera de las lneas del
proyecto o de las establecidas por el Interventor, efectuados por el
Constructor, ya sea por negligencia o por conveniencia, para la operacin
de sus equipos.
Los rellenos con materiales sobrantes de excavacin o de derrumbes que
se coloquen sobre taludes de terraplenes terminados no se medirn; su
conformacin y compactacin debe ser cubierta con los "Excavacin de la
Explanacin, Canales y Prstamos", , "Remocin de Derrumbes". No se
medirn los terraplenes que se efecten en trabajos de zonas laterales y
las de prstamo y desecho.
No se medirn los terraplenes que haga el Constructor en sus caminos de
construccin y obras auxiliares que no formen parte de las obras del
proyecto.
9.5.9 FORMA DE PAGO
El trabajo de terraplenes se pagar al precio unitario del contrato, por toda
obra ejecutada satisfactoriamente de acuerdo con la presente
especificacin y aceptada por el Interventor.
El precio unitario deber cubrir los costos de escarificacin, nivelacin,
conformacin, compactacin y dems trabajos preparatorios de las reas
en donde se haya de construir un terrapln nuevo; deber cubrir, adems,
la colocacin,
conformacin, humedecimiento o secamiento y
compactacin de los materiales utilizados en la construccin de
terraplenes; y, en general, todo costo relacionado con la correcta
construccin de los terraplenes, de acuerdo con esta especificacin, los
planos y las instrucciones del Interventor.
132
9.6.2 MATERIALES
La empradizacin podr efectuarse con bloques de csped o con tierra
orgnica y semillas.
Las caractersticas, en cada caso, sern las
siguientes:
9.6.2.1 Bloques de csped
Para el riego peridico del csped se emplear agua que en el sitio de los
trabajos se considere aceptable para esta actividad.
9.6.2.4 Fertilizantes e insecticidas
133
134
135
136
137
138
9.7.9 INSTALACIN
9.7.10 PREPARACIN DEL SITIO
Antes de colocar la geoestructura en el sitio, el rea de ser posible se
prepara generalmente utilizando equipo liviano de compactacin.
9.7.10.1 Colocacin de la Geoestructura y el manto contra socavacin
139
A) material de relleno
El material de llenado ser del
arena fina. El material no deber
el tamiz No 200, esto con el
consolidacin del material dentro
140
141
142
143
es llenado. Este mtodo de instalacin crea una pequea rea entre las
dos geoestructuras en las partes redondeadas que es asociado con esta
tecnologa.
9.7.21 FINALIZACIN
Cuando se ha terminado la instalacin de los tubos es necesario asegurar
los puertos de inyeccin de tal manera que no se abran durante eventos
debidos al oleaje.
Es posible cortar parte de los puertos (2/3 partes) y la ltima se cierra
utilizando anillos resistentes a la corrosin. Luego de algn tiempo de
llenado la geoestructura estos continuarn sacando el agua de exceso y
los slidos comienzan a consolidarse. Este tiempo vara segn el tipo de
geotextil utilizado y el tipo de material bombeado dentro del tubo
9.7.22 MEDIDA
La unidad de medida ser el metro lineal de geoestructura conformada y
colocada de acuerdo con los planos, las especificaciones y las
instrucciones del Interventor.
El pago cubre el suministro y colocacin de geoestructuras de acuerdo a la
informacin suministrada por los planos y a las instrucciones del
Interventor. Por tanto cubre el suministro de la totalidad de los materiales
necesarios para la construccin de geoestructuras en el sitio de la obra, el
costo de la construccin y la colocacin de los mismos en los sitios
especificados. Tambin cubre la preparacin del terreno donde se deben
colocar. Igualmente cubre la mano de obra y los equipos necesarios y en
general la totalidad de los costos en que incurra el Contratista para la
correcta ejecucin de la obra.
9.7.23 ITEM DE PAGO
tem
Suministro y colocacin de geoestructuras
Lineal
Unidad
Metro
144
9.8 GEOTEXTILES
9.8.1 DESCRIPCION
Este trabajo consiste en el suministro y colocacin de geotextiles en los
lugares indicados en los planos del proyecto o donde lo seale el
Interventor.
9.8.2 MATERIALES
El tipo de geotextil por utilizar depender de la funcin prevista para l y
estar indicado en los planos del proyecto o en las especificaciones
correspondientes a los trabajos por efectuar. Sus caractersticas se
verifican, por lo general, mediante las pruebas que se relacionan a
continuacin:
Relacin peso/rea
145
TRASLAPO NO COSIDO
TRASLAPO COSIDO
(mm)
1200
(mm)
100
1-2
900
100
146
2-3
>3
750
600
100
100
147
148
Colocacin
El Interventor se abstendr de aceptar geotextiles colocados que
presenten daos a simple vista o cuyos traslapos no cumplan con los
requisitos de esta especificacin y las condiciones adicionales que
establezca el fabricante.
Por ningn motivo se autorizar la colocacin de la capa suprayacente al
geotextil si, a juicio del Interventor, aquel presenta defectos de calidad o
de instalacin. Todas las deficiencias que excedan las tolerancias
admitidas, debern ser corregidas por el Constructor, a su costa, a plena
satisfaccin del Interventor.
9.8.6 MEDIDA
La unidad de medida del geotextil ser el metro cuadrado
(m2),
aproximado al dcimo, de geotextil colocado de acuerdo con los planos y
esta especificacin, a plena satisfaccin del Interventor. No se incluirn en
la medida reas de geotextil ni volmenes de ligante que se hayan
aplicado por fuera de los lmites autorizados por el Interventor.
9.8.7 FORMA DE PAGO
El pago del geotextil se har al respectivo precio unitario del contrato, por
todo trabajo ejecutado de acuerdo con esta especificacin y aceptado por
el Interventor.
El precio unitario deber incluir todos los costos por concepto de
suministro, transporte, almacenamiento, colocacin y desperdicios del
geotextil correctamente instalado en reas aprobadas; limpieza de la zona
de los trabajos y disposicin de los materiales sobrantes; sealizacin
preventiva de la va durante la ejecucin de los trabajos y ordenamiento
del trnsito automotor y, en general, todo costo adicional relacionado con
la correcta ejecucin de las obras especificadas.
Las excavaciones, rellenos y dems operaciones complementarias para la
colocacin del geotextil en sus diferentes funciones, se pagarn de
acuerdo con las especificaciones correspondientes.
9.8.8 ITEM DE PAGO
tem
Unidad
149
Geotextil NT1600
150
10. REFERENCIAS
Hydrologic Engineering Center, U.S. Army Corps of Engineers, Manual de
usuario de HEC RAS, Versin 3.1.3, 2006.
Hydrologic Engineering Center, U.S. Army Corps of Engineers, Manual de
usuario de HEC GeoRAS, Versin 4.1, 2006.
Plan Maestro de Acueducto y Alcantarillado del Municipio de Zaragoza.
2004.
Revista Empresas Publicas de Medelln Vol. 5, 1983. Control de Corrientes
Urbanas, Octubre-Diciembre.
Plan Bsico de Ordenamiento Territorial, Municipio de Zaragoza. 2000.
Ven Te Chow. Hidrologa Aplicada. 1994.
Eduard Naudascher. Hidrulica de canales. 2000.
Wilches, Santiago. Estudio de las propiedades de invarianza de las
precipitaciones mximas puntuales en el departamento de Antioquia. Tesis
de Maestra. 2001.
151
152
MES 1
6.381.37
5
35.353.5
00
1.298.70
0
MES 2
EMPRADIZACION DE TALUDES
GEOESTRUCTURAS 3*2*10 m
GEOTEXTIL
TERRATRAC
MES 4
MES 5
MES 6
TOTAL
ACTIVIDAD
6.381.375
35.353.5
00
486.783.
130
1.442.72
7
7.602.23
8
43.397.4
20
15.942.6
80
42.386.2
40
MES 3
70.707.000
1.298.700
1.947.132.5
18
486.783.1 486.783.1
30
30
486.783.1
30
1.442.727 1.442.727
1.442.727 1.442.727
7.602.238
43.397.42
0
15.942.68
0
42.386.24
0
7.602.238
43.397.42
0
15.942.68
0
42.386.24
0
7.602.238
43.397.42
0
15.942.68
0
42.386.24
0
7.602.238
43.397.42
0
15.942.68
0
42.386.24
0
7.213.635
38.011.188
216.987.09
8
79.713.400
211.931.20
0
0
198.413.54
7
Interventoria
33.068.9
25
33.068.92 33.068.92
5
5
TOTAL MES
76.102.5
00
153
Mantenimiento anual $
15.000.000