Hubli Dharwad Muncipal Corporation

RATE ANALYSIS
FOR
PROPOSED CONSTRUCTION WORKS CONVENTION CENTER AT HUBLI
Sl.
No.

PWD SR-DWDCIRCLE
P.No. I.No.

Name of work

Unit

* Add Area
Basic Rate
(PWD SR - weightage
2009-10)
4%

Total

JUNGLE CLEARANCE

1 Cutting of trunks
120 18.1

Sqm

101.00

4.04

105.04

120 18.1

Sqm

0.8712

0.03

0.91

120 17.8

Sqm

4.38

0.18

4.56

5 2.1

Cum

84.00

3.36

87.36

5 2.2

Cum

118.00

4.72

122.72

5 2.3

Cum

101.00

4.04

105.04

5 2.4

Cum

152.00

6.08

158.08

5 2.5

Cum

311.00

12.44

323.44

5 2.6

Cum

473.00

18.92

491.92

6 2.10

Cum

68.00

2.72

70.72

6 2.11

Cum

41.00

1.64

42.64

6 2.12

Cum

136.00

5.44

141.44

6 2.15

Cum

1062.00

42.48

1104.48

7 2.21

Cum

6.75

0.27

7.02

7 2.22

Cum

11.85

0.47

12.32

12 4.2

Cum

3401.00

136.04

3537.04

12 4.3

Cum

3125.00

125.00

3250.00

12 4.5

Cum

4433.00

177.32

4610.32

2 Clearing of grass & removal of rubbish


3 Thorny jungle
II

EARTH WORK

4 Earthwork excavation in ordinary soil


5 Earthwork excavation in hard soil
6 Earthwork excavation in ordinary soil
7 Earthwork excavation in hard soil
8 Earthwork excavn. in soft rock by blasting
9 Earthwork excavn. in soft rock without blasting
10 Filling with available earth
11 Refilling with available earth Pipeline Trenches
12 Earthwork excavn filling sides of foundation
13 Filling with Sand & Boulder
14 Excavation in loose/ soft or hard soil
15 Excavation in loose/ soft or hard rock

III

CONCRETE WORKS

16 P. C. C. 1:3:6
17 P. C. C. 1:4:8
18 P. C. C. 1:1.5:3

using
using
using

40 mm Metal
40 mm Metal
20 mm Metal

Aminbhavi & Hegde,


Consulting Engineers Pvt. Ltd.

Hubli Dharwad Muncipal Corporation

RATE ANALYSIS
FOR
PROPOSED CONSTRUCTION WORKS CONVENTION CENTER AT HUBLI
Sl.
No.

PWD SR-DWDCIRCLE
P.No. I.No.

Name of work

19 P. C. C. 1:2:4

using

Unit

* Add Area
Basic Rate
(PWD SR - weightage
2009-10)
4%

Total

20 mm Metal
12 4.6

Cum

4024.00

160.96

4184.96

12 4.7

Cum

3473.00

138.92

3611.92

12 4.11

Cum

4489.00

179.56

4668.56

13 4.12

Cum

4087.00

163.48

4250.48

13 4.17

Cum

4489.00

179.56

4668.56

13 4.19

Sqm

352.00

14.08

366.08

25 Centering, shuttering, strutting, propping


etc. for foundations
Coping/Sills, Column Footing, Plinth Beam

14 4.28

Sqm

141.00

5.64

146.64

26 Centering, shuttering, strutting, propping


etc. for suspended floors
Roof Slab

14 4.29

Sqm

207.00

8.28

215.28

27 Centering, shuttering, strutting, propping


etc. for vertical surface
Retaining Wall

14 4.31

Sqm

172.00

6.88

178.88

28 Centering, shuttering, strutting, propping


etc. for columns, square / rectangular
/polygon
Columns - Rectangular

15 4.32

Sqm

214.00

8.56

222.56

29 Centering, shuttering, strutting, propping


etc. for columns, pillars, piers, post and
struts,
circular
or curved
Columns
- Circular

15 4.33

Sqm

535.00

21.40

556.40

30 Centering, shuttering, strutting, propping


etc., beam haunchings, cantilever girders,
not exceeding 1m in depth
Lintel Beams, Roof Beams

15 4.34

Sqm

153.00

6.12

159.12

15 4.35

Sqm

202.00

8.08

210.08

15 4.36

Sqm

422.00

16.88

438.88

20 P. C. C. 1:3:6
21 R. C. C. 1:1.5:3
22 R. C. C. 1:2:4
23 R. C. C. 1:1.5:3
24 R. C. C. Chajja

IV

using
using
using
using
M -20

20 mm Metal
20 mm Metal
20 mm Metal
20 mm Metal
7.50 Cmsthick

CENTRING & SHUTTERING

31 Centering, shuttering, strutting, propping


etc., beam haunchings, cantilever girders,
exceeding 1m in depth
32 Centering, shuttering, strutting, propping for
edges of slabs and breaks in floor, cills,
plinth
33 Centering, shuttering, strutting, propping for
chajjas, corbles

Aminbhavi & Hegde,


Consulting Engineers Pvt. Ltd.

Hubli Dharwad Muncipal Corporation

RATE ANALYSIS
FOR
PROPOSED CONSTRUCTION WORKS CONVENTION CENTER AT HUBLI
Sl.
No.

PWD SR-DWDCIRCLE
P.No. I.No.

Name of work

Chajja/Facia/Drops
34 Centering, shuttering, strutting, propping for
removal of form of work
for stairs
(excluding
landing)
except
spiral
staircase
Staircase
V

Unit

* Add Area
Basic Rate
(PWD SR - weightage
2009-10)
4%

Total

15 4.37

Sqm

159.00

6.36

165.36

15 4.38

Sqm

296.00

11.84

307.84

16 4.46

Kg

50.03

2.00

52.03

40 7.21

Kgs

80.00

3.20

83.20

235 36.58

Rmt

4020.00

160.80

4180.80

21 5.3

Cum

1748.00

69.92

1817.92

26 6.6

Cum

3681.00

147.24

3828.24

27 6.14

Cum

3048.00

121.92

3169.92

TMT STEEL & STRUCTURAL STEEL

35 TMT steel reinforcement for R.C.C. work


36 M.S. Trusses (Structural Steel)

37 P & F stainless steel hand rails for a height


of 900 mm

VI

MASONRY WORKS

38 UCR Masonry

CM

1:6

CM
39 Brick Masonry
Non Modular C -50

1:6

CM
40 Brick Masonry
Modular C -35

1:6

41 Brick Masonry
CM
Modular Paritionwall

1:4
C -35

28 6.25

Cum

400.00

16.00

416.00

42 Brick Masonry
CM
Modular Paritionwall

1:4
C -50

28 6.26

Cum

494.00

19.76

513.76

43 Brick Masonry
CM
Modular Paritionwall

1:4
C -35

28 6.27

Sqm

389.00

15.56

404.56

30 7.1

Sqm

2873.00

114.92

2987.92

31 7.7

Sqm

2580.00

103.20

2683.20

31 7.9

Kgs

63.00

2.52

65.52

47 Anodized Aluminium Windows & Ventilators


Double track

32 7.10

Sqm

2852.00

114.08

2966.08

48 Anodized Aluminium Windows & Ventilators


Three track

32 7.11

Sqm

2749.00

109.96

2858.96

33 7.14

Sqm

3582.00

143.28

3725.28

VII

DOORS & WINDOWS

44 Collapsible Steel Shutters


45 P & F Steel glazed Windows & Ventilators
46 P & F M.S. Grill Windows & Ventilators

49 Anodized Aluminium Partitions

Aminbhavi & Hegde,


Consulting Engineers Pvt. Ltd.

Hubli Dharwad Muncipal Corporation

RATE ANALYSIS
FOR
PROPOSED CONSTRUCTION WORKS CONVENTION CENTER AT HUBLI
Sl.
No.

PWD SR-DWDCIRCLE
P.No. I.No.

Name of work

Unit

* Add Area
Basic Rate
(PWD SR - weightage
2009-10)
4%

Total

50 Anodized Aluminium doors


35 7.17

Sqm

4329.00

173.16

4502.16

36 7.20

Sqm

4619.00

184.76

4803.76

45 9.12

Cum

41364.00

1654.56

43018.56

46 9.16

Sqm

2030.00

81.20

2111.20

46 9.18

Sqm

2474.00

98.96

2572.96

46 9.19

Sqm

1925.00

77.00

2002.00

46 9.21

Sqm

2328.00

93.12

2421.12

57 PVC Door Frame size of 50 x 47 mm


(PWD SR 2007-08)

52 9.84

Sqm

205.00

8.20

213.20

58 Prelam Panneled PVC Door Shutters


(PWD SR 2007-08)

52 9.85

Sqm

2000.00

80.00

2080.00

59 P & F GRP Sandwich Composit Door


Shutters
(PWD SR 2007-08)

54 9.94

Sqm

3000.00

120.00

3120.00

60 " Netlon " Mosquito Mesh


(PWD SR 2007-08)

60 9.100

Sqm

625.00

25.00

650.00

233 36.16

Sqm

548.00

21.92

569.92

41 8.3

Sqm

290.00

11.60

301.60

41 8.8

Rmt

227.00

9.08

236.08

42 8.15

Rmt

322.00

12.88

334.88

42 8.19

Rmt

421.00

16.84

437.84

51 P & F Structural glazing Alluminium Extrusions


52 Mathi / Nandi
windows

wood frames of doors,

53 Fully panelled
Mathi / Nandi wooden
shutters, for doors
54 Fully panelled Honne wooden shutters, for
doors
55 Fully panelled Nandi wooden shutters, for
doors
56 Fully panelled Honne wooden shutters, for
doors

61 P & F plain rolled glass 3 mm thick with Teak


wood beading of 10 mm thick.

VIII

ROOFING

62 P & F AC Sheet 6 mm ( Roofing)


63 P & F AC Sheet Ridges 8 mm ( Roofing)
64 P & F AC rain downtake pipes 100 mm dia
65 P & F HDPE rain downtake pipes 110 mm dia

Aminbhavi & Hegde,


Consulting Engineers Pvt. Ltd.

Hubli Dharwad Muncipal Corporation

RATE ANALYSIS
FOR
PROPOSED CONSTRUCTION WORKS CONVENTION CENTER AT HUBLI
Sl.
No.

PWD SR-DWDCIRCLE
P.No. I.No.

Name of work

Unit

* Add Area
Basic Rate
(PWD SR - weightage
2009-10)
4%

Total

IX FLOORING
66 Heavy duty Cobble stone 75 mm thick
88 14.7

Sqm

557.00

22.28

579.28

89 14.10

Sqm

310.00

12.40

322.40

89 14.14

Sqm

1589.00

63.56

1652.56

89 14.15

Sqm

656.00

26.24

682.24

90 14.16

Sqm

763.00

30.52

793.52

90 14.17

Sqm

692.00

27.68

719.68

93 14.36.2

Sqm

540.00

21.60

561.60

94 14.45

Sqm

830.00

33.20

863.20

94 14.47.2

Sqm

2007.00

80.28

2087.28

67 CC 1:2:4 Flooring 40 mm thick


68 CC 1:2:4 Flooring 50 mm thick
Metallic concrete hardner toping
69 Tandur blue stone Tiles Flooring
70 Shahabad Tiles Flooring
71 Cadapa Slab Flooring
72 Ceramic Tiles Flooring
73 Vetrified Tiles of size 60 x 60 cms.
74 P & F Granite Slab Kitchen Platform
X

PLASTERING & PAINTING

75 Internal wall Plaster


12 mm in CM

1:4

97 15.10

Sqm

91.00

3.64

94.64

76 Internal wall Plaster


15 mm in CM

1:4

97 15.13

Sqm

103.00

4.12

107.12

77 Ceiling Plaster
12 mm

in CM

1:3

98 15.21

Sqm

109.00

4.36

113.36

78 External wall Plaster


18 mm in CM

1:3

97 15.15

Sqm

138.00

5.52

143.52

79 External wall Plaster


18 mm in CM

1:4

98 15.16

Sqm

122.00

4.88

126.88

80 Extra - (Waterproofing Compound cement plaster)


(Water proof Qty.) 20 mm in CM 1:4
98 15.27

Sqm

8.15

0.33

8.48

99 15.33

Sqm

14.25

0.57

14.82

82 Oil Bound Washable Distemper


For Walls

101 15.49

Sqm

44.00

1.76

45.76

83 Oil Bound Washable Distemper


For Extra Ceilings

101 15.49.2

Sqm

2.55

0.10

2.65

101 15.51.2

Sqm

60.00

2.40

62.40

81 Lime rendering for plastering wall &


ceiling

84 Plastic Emulsion Paint with Primer


85 Waterproof Cement Paint 2 coats
Aminbhavi & Hegde,
Consulting Engineers Pvt. Ltd.

Hubli Dharwad Muncipal Corporation

RATE ANALYSIS
FOR
PROPOSED CONSTRUCTION WORKS CONVENTION CENTER AT HUBLI
Sl.
No.

PWD SR-DWDCIRCLE
P.No. I.No.

Name of work

86 Waterproof Cement Paint 2 coats


with primer

Unit

* Add Area
Basic Rate
(PWD SR - weightage
2009-10)
4%

Total

102 15.53.1

Sqm

31.00

1.24

32.24

102 15.53.2

Sqm

50.00

2.00

52.00

103 15.60.1

Sqm

76.00

3.04

79.04

57 10.30

Sqm

531.00

21.24

552.24

234 36.33

No.

960.00

60 11.1

Rmt

190.00

7.60

197.60

60 11.2

Rmt

306.00

12.24

318.24

60 11.10

Rmt

148.00

5.92

153.92

60 11.11

Rmt

250.00

10.00

260.00

61 11.37

No.

8425.00

337.00

8762.00

62 11.38

No.

12589.00

503.56

13092.56

63 11.50

No.

4666.00

186.64

4852.64

67 12.2

No.

3131.00

125.24

3256.24

67 12.3

No.

874.00

34.96

908.96

67 12.4

No.

1441.00

57.64

1498.64

67 12.5

No.

3740.00

149.60

3889.60

67 12.6

No.

3621.00

144.84

3765.84

2156.00

86.24

2242.24

1813.00

72.52

1885.52

87 Enamel Paint (Excluding priming coat)


88 Integral cement based Water Proofing
89 P& F Hydraulic Door closer - with mounting

XI

960.00

SANITORY WORKS

90 P & L Glazed Stoneware Pipes


91 P & L Glazed Stoneware Pipes
92 P & L CC 1:4:8 for Sullage Line
93 P & L CC 1:4:8 for Sewage Line

100 mm dia
150 mm dia
100 mm dia
150 mm dia

94 Manhole 0.91 m dia at bottom 0.91 m depth


95 Manhole 0.91 m dia at bottom 1.67 m depth
96 Inspection Chamber 455 x 610mm
97 P & F Water Closet (Orissa pattern) Ingegral type
98 P & F Water Closet (Squatting pan) Indian type
99 P & F Water Closet Indian type
### P & F Water Closet European type P trap
### P & F Water Closet European type S trap
### P & F Lipped front urinal basin 5 ltr. PVC automatic flushing cistern
No.
68 12.7
### P & F Wash Basin 600 x 480mm
69 12.28

No.

### P & F Kitchen Sink 750 x 450 x 250 mm

Aminbhavi & Hegde,


Consulting Engineers Pvt. Ltd.

Hubli Dharwad Muncipal Corporation

RATE ANALYSIS
FOR
PROPOSED CONSTRUCTION WORKS CONVENTION CENTER AT HUBLI
Sl.
No.

PWD SR-DWDCIRCLE
P.No. I.No.

Name of work

Unit

* Add Area
Basic Rate
(PWD SR - weightage
2009-10)
4%

Total

70 12.33

No.

2596.00

103.84

2699.84

71 12.40

No.

578.00

23.12

601.12

71 12.45

No.

717.00

28.68

745.68

71 12.46

No.

656.00

26.24

682.24

### P & L Gully trap


(PWD SR 2007-08)

77 12.111.2

No.

250.00

10.00

260.00

### P & L Nahani trap


(PWD SR 2007-08)

77 12.113.2

No.

270.00

10.80

280.80

71 12.47

Rmt

579.00

23.16

602.16

71 12.48

Rmt

503.00

20.12

523.12

71 12.50

Rmt

415.00

16.60

431.60

71 12.53

No.

377.00

15.08

392.08

114 P & F G.I Pipes 15 mm dia


(medium grade weight 1.27 kg/mtr)

79 13.1

Rmt

120.00

4.80

124.80

115 P & F G.I Pipes 20 mm dia


(medium grade weight 1.65 kg/mtr)

79 13.2

Rmt

149.00

5.96

154.96

116 P & F G.I Pipes 25 mm dia


(medium grade weight 2.51 kg/mtr)

79 13.3

Rmt

208.00

8.32

216.32

117 P & F G.I Pipes 32 mm dia


(medium grade weight 3.23 kg/mtr)

79 13.4

Rmt

227.00

9.08

236.08

118 P & F G.I Pipes 40 mm dia


(medium grade weight 3.72 kg/mtr)

79 13.5

Rmt

299.00

11.96

310.96

80 13.23

No.

138.00

5.52

143.52

80 13.24

No.

172.00

6.88

178.88

80 13.33

No.

383.00

15.32

398.32

81 13.34

No.

546.00

21.84

567.84

81 13.35

No.

784.00

31.36

815.36

81 13.36

No.

987.00

39.48

1026.48

### P & F circular shape Mirror 450 mm dia


### P & F Towel rail 740 mm
### P & F Towel rail 600 mm

110 P & F CI pipes 100 mm dia


111 P & F CI pipes 75 mm dia
112 P & F CI Bend 100 mm dia (door)
113 P & F CI plain bend 100 mm dia
XII

WATER SUPPLY WORKS

119 P & F Bib Cock

15 mm dia

### P & F Brass stop Cock

20 mm dia

### P & F Gate Valve 20 mm dia


### P & F Gate Valve 25 mm dia
### P & F Gate Valve 32 mm dia
### P & F Gate Valve 40 mm dia

Aminbhavi & Hegde,


Consulting Engineers Pvt. Ltd.

Hubli Dharwad Muncipal Corporation

RATE ANALYSIS
FOR
PROPOSED CONSTRUCTION WORKS CONVENTION CENTER AT HUBLI
Sl.
No.

PWD SR-DWDCIRCLE
P.No. I.No.

Name of work

### P & F Brass Ball Valve

Unit

* Add Area
Basic Rate
(PWD SR - weightage
2009-10)
4%

Total

20 mm dia
81 13.41

No.

396.00

15.84

411.84

81 13.42

No.

526.00

21.04

547.04

81 13.51

No.

544.00

21.76

565.76

82 13.69

Rmt

157.00

6.28

163.28

82 13.70

Rmt

197.00

7.88

204.88

82 13.78

No.

6048.00

241.92

6289.92

### Dismantling CI or AC Rain water pipes with


fittings & clamps and stacking the material
within the raidous of 50 M.

234 36.44

Rmt

7.00

0.28

7.28

### Dismantling weather proof course and


removing and conveying the debris to a
distance upto 200 M.

235 36.45

Cum

312.00

12.48

324.48

235 36.47

Sqm

100.00

4.00

104.00

235 36.48

Cum

100.00

4.00

104.00

235 36.51

Sqm

17.00

0.68

17.68

235 36.52

Sqm

13.00

0.52

13.52

235 36.53

Sqm

33.00

1.32

34.32

### P & F Brass Ball Valve


### P & F Shower Rose.

25 mm dia
150 mm dia

### P & F L.D polythylene pipes 40 mm dia


### P & F L.D polythylene pipes 50 mm dia
### P & F H.(/L.) D.P.E. water storate tanks 1000 Ltr

XIII

DISMANTLING

### Dismantling stone slab roofing over wooden


reepers or RCC battens (dismantling reeper
and battens to be paid for seperately)
including stacking of erviceable materials &
of unserviceable
200 M
### disposal
Dismantling
Burnt Brick with
Masonry
in lead
clay
(with
in
average
thickness
of
10
cms).
mortar / lime mortar / cement mortar and
stacking the bricks within the raidous of 50 M
removing the debries to a distance upto 200
M.
### Dismantling the tile work in floor & roof laid
in Cement or surki mortar including &
stacking the materials with in 50 M lead of
tiles thickness 10 mm to 25 mm.
### Dismantling Plastering removing the debries
with a lead upto 200 M.

### Dismantling CC Concrete Flooring or Plain


Cement Concrete work including removing
and conveying the debris to distance upto
200 M. (within average thickness of 15 Cm).
XIV

BOREWELL

Aminbhavi & Hegde,


Consulting Engineers Pvt. Ltd.

Hubli Dharwad Muncipal Corporation

RATE ANALYSIS
FOR
PROPOSED CONSTRUCTION WORKS CONVENTION CENTER AT HUBLI
Sl.
No.

PWD SR-DWDCIRCLE
P.No. I.No.

Name of work

### PVC pipes & specials & labor


(RDED.SR. 2006-07 I.No. 4 - P.No. 40)
75 mm dia 6 Kg/Cms2
63 mm dia 6 Kg/Cms2

Unit

* Add Area
Basic Rate
(PWD SR - weightage
2009-10)
4%

Total

40 4

Rmt
Rmt

97.50
69.50

3.90
2.78

101.40
72.28

### Sinking of bore well of 150 mm dia


(RDED.SR. 2006-07 I.No. 1 - P.No. 89)
(a) 0 to 50 M depth
(b) Above 50 M and upto 100 M depth
(c) Above 100 M and upto 150 M depth
(d) Above 150 M and upto 200 M depth

89
89
89
89

Rmt
Rmt
Rmt
Rmt

215.00
270.00
320.00
350.00

8.60
10.80
12.80
14.00

223.60
280.80
332.80
364.00

### Casing pipes beyond 20 mm


(RDED.SR. 2006-07 I.No. 1 (a & b) - P.No. 91)
(a) Above 20 M and upto 30 M @ 15%
(b) Above 30 M and upto 50 M @ 30%
(c) Above 50 M and upto 100 M @ 30%

91 1 (a & b) Rmt
91 1 (a & b) Rmt
91 1 (a & b) Rmt

32.25
64.50
81.00

1.29
2.58
3.24

33.54
67.08
84.24

### Geophysical investigation of site for sinking


(RDED.SR. 2006-07 I.No. 3 - P.No. 91)

91 3

Nos.

13.00

0.52

13.52

### Yiel testing of borewell at a final depth


(RDED.SR. 2006-07 I.No. 8 - P.No. 93)

93 8

Nos.

6058.00

242.32

6300.32

40 4

1
1
1
1

Aminbhavi & Hegde,


Consulting Engineers Pvt. Ltd.

THE ESTATE OFFICER


UNIVERSITY OF AGRICULTURAL SCIENCES
DHARWAD

ESTIMATION
FOR

CONSTRUCTION
OF

CONCRETE ROAD
AT
DHARWAD

Consultants :

AMINBHAVI & HEGDE


Consulting Engineers Pvt. Ltd
I Floor, U.C.B.Complex,
Station Road, Malmaddi,

DHARWAD
PH : (0836) 2747308, FAX NO: 91-836-2796241
e-mail : aminbhavihegde@sify.com
e-mail : info@ahcepl.com
web site : www.ahcepl.com

BHORAMDEO SAHAKARI SHAKKAR KARKHANA MARYADIT

CONSTRUCTION OF CONCRETE ROAD WITH U SHAPE SIDE DRAIN &


RCC V SHAPE OUT FALL DRAIN FOR BSSUK LTD. KAWARDHA
SUMMERY OF ABSTRACT
Sl
No
1

Description

Amount
Rs

CONSTRUCTION OF CONCREATE ROAD AT INTERNAL &


EXTERNAL SIDE OF FACTORY
L=825M W=5M

CONSTRUCTION OF ROADSIDE RCC U SHAPE DRAIN


SIZE =0.45MX0.75M L=825 X2=1650M

CONSTRUCTION OF CONCRETE V SHAPE OUTFALL DRAIN


SIZE =0.5MX0.8M & H=1M L=750M
Total Rs

Aminbhavi & Hegde Consulting Engineers Pvt. Ltd. Dharwad

CONSTRUCTION OF CD WORK

ESTIMATION
S.N
o.
I

Description

No.

Qty.

Unit

Rate

Amount

EXCAVATION AND FILLING WORKS


1 KSRRB M300-9 : Excavation for roadway by manual means in

Ordinery & Hard soil involving an average horizontal throw up to


meters & an average lift up to 0.5m, excavated surface levelled and
sides neatly dressed the disposed earth to be levelled neatly after
beaking of clods
complete as per specifications. MORTH
Specification chapter.3

Head wall
PIPE

1
1

2
1

1.70
7.50

0.90
1.00

1.5
1.5

4.59
11.25
15.84 Cum

#REF!

#REF!

0.59 Cum

#REF!

#REF!

7.92 Cum

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

1200.00

9,000.00

2 Providing murum or sand filling including watering and


consolidation by punners, etc complete with all leads and lifts
300 M
Head wall

1.50

0.80

0.15

0.36

PIPE

1.50

1.00

0.15

0.23

3 KSRB 2 .3 : Filling available excavated earth (excluding rock)in

sides of foundations up to plinth in layers not exceeding 20cm in


depth,compacting each deposited layer by raming after watering
with lead up to 0M the lift up to 1.5M including cost of all
materials,labour complete as per specifications. (Specification No.
KBS 2.9)
Excavation Qty
15.84
@ 50% of Excavation

Cum
15.84

0.5

1.50
7.50

0.80
0.60

0.15
0.3

4 KSRB 4 - 1.3 : Providing and laying in position plain cement


concrete of mix 1:3:6 (M - 10) using 40 mm and down size graded
granite/Trap/Basalt metal, machine mixed, concrete laid in layers
not exceeding 15 cms. Thick, well compacted, in foundation and
plinth, including cost of all materials,labour, HOM of machinery,
curing complete as per specifications. (Specification No. KBS 4.1,
4.2)
Head wall
PIPE

1
1

2
1

0.36
1.35

1.71 Cum
5 KSRB 4 - 9.2 : Providing TMT steel reinforcement for R.C.C. work
including straightening, cutting, bending, hooking, placing in
position, lapping and / or welding wherever required, tying with
binding wire and anchoring to the adjoining members wherever
necessary complete as per design (laps and wastage shall not be
measured and paid) cost of materials, labour, HOM of machinery
complete as per specifications. (Specification No. KBS 4.6.3)

For Headwall Surface reinforcement

3.12

20.00 kg/cum

62.40
62.40 Kg

6 Providing, hauling & laying NP 2 class RCC Hume pipes in position


care fuly & jointing with a CM 1 : 2 & curing etc., complete.
(including the cost of pipe).
450 mm dia NP-2 Class pipe

7.50

7.50
7.50 m

7 KSRB 4 - 1.7 : Providing and laying in position plain cement


concrete of mix 1:2:4 (M - 15) using 20 mm and down size
graded granite/Trap/Basalt metal, machine mixed, concrete
laid in layers not exceeding 15 cms. Thick, well compacted,
in foundation and plinth, including cost of all
materials,labour, HOM of machinery, curing complete as per
specifications. (Specification No. KBS 4.1, 4.2)

For head wall

1
1

2
2

1.50
1.50

0.60
0.45

0.6
1

1.08
1.35

S.N
o.

Description

No.

1.50

0.23

Qty.

Unit

0.69
3.12 Cum

Rate

Amount

5000.00

15600.00

#REF!

#REF!

8 KSRB 4 - 6.1 to 4 - 6.11 : Providing and removing centering,


shuttering, strutting, propping etc., and removal of form
work for foundations, footings, bases of columns, roofs
landings, columns, pillars, circular or curved, sides and soffits
of beams, beam haunchings, lintels & Chajja, cills, plinth, and
staircase steps, suspended floors, roofs, balconies including
cost of all materials, labour complete as per specification.
(Specification No. KBS 4.6.2)

Head wall
PCC

1
1

2
2

4.20
7.5

2.7
0.15

22.68
2.25

24.93 Sqm
Total
G. Total

#REF!
#REF!

BHORAMDEO SAHAKARI SHAKKAR KARKHANA MARYADIT

CONSTRUCTION OF CONCRETE ROAD AT BSSUK LTD. KAWARDHA


Length =

825m

BILL OF QUANTITIES
Sl.N
o.

Description

Qty.

Unit

1 Detailed survey of existing road including chaining , levelling with cross section at
25m intervals & closing survey each days work, fixing bench marks, painting, taking
trail pits & submission of road cross sections , L-sections quantity statements in
computerised prints in five copies in proper files & all type of compliance required
by the engineer in charge.
0.825

km

4125.00

m3

2062.50

m3

1856.25

m3

618.75
412.50
412.50

m3
m3
m3

618.75

m3

1031.25

m3

2 Excavation for roadway in soil using including loading in truck for carrying of cut
earth to embankment site with all lifts and lead upto 1000 meters as per relevant
clauses of section 300
3 Compacting Original Ground Supporting sub grade Loosening of the ground
upto a level of 500 mm below the sub grade level, watered, graded and compacted in
layers to meet requirement of table 300 - 2 for sub grade construction
4 Construction of approved murum sub grade with Material Obtained from
Borrow Pits (Construction of embankment with approved material / selected soil
having C. B. R. > 5 (unless specified otherwise in the contract) obtained from borrow
pits with all lifts and leads, transporting to site, spreading, grading to required slope
and compacting to meet requirement of table 300 - 2)

5 Granular Sub - Base as per Table:- 400-1


Construction of granular sub base by providing close graded Material, carriage of mixed Material to work site,
spreading in uniform layers with motor grader on prepared surface watering, rolling
and compacting with vibratory power roller at OMC to achieve the desired density,
complete as per clause 401.
For Grading - I Material
For Grading - II Material
For Grading - III Material
6 Rolled Cement Concrete Base (Construction of rolled cement concrete base course
with coarse and fine aggregate conforming to IS:383, the size of coarse aggregate not
exceeding 25 mm with minimum, aggregate cement ratio 15:1 and minimum cement
content of 200 kg / cum, aggregate gradation to be as per table 600 - 4 after blending,
mixing in batching plant at optimum moisture content, transporting to site, laying
with a paver with electronic sensor, compacting with 8 - 10 tonnes smooth wheeled
vibratory roller to achieve, the designed flexural strength, finishing and curing).

7 Cement - Fly ash concrete pavement. (Construction reinforced - reinforced, dowel


jointed, plain cement concrete pavement over a prepared sub base with 43 grade
cement, coarse and fine aggregate conforming to IS 383, maximum size of coarse
aggregate not exceeding 25 mm, replacing cement by fly ash to the extent of 15% and
sand by 10%, mixed in a batching and mixing plant as per approved mix design,
transported to site , laid with a fixed form or slip form paver, spread, compacted and
finished in a continuous operation including provision provision of contraction,
expansion, construction and longitudinal joints, joint filler, separation membrane,
sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as
approved, curing compound, finishing to lines and grades as per drawing)

Aminbhavi & Hegde Consulting Engineers Pvt. Ltd. Dharwad

Rate

Amount

BHORAMDEO SAHAKARI SHAKKAR KARKHANA MARYADIT


Sl.N
o.

Description

Qty.

Unit

Rate

8 Providing TMT steel reinforcement for R.C.C. work including straightening, cutting,
bending, hooking, placing in position, lapping and / or welding wherever required,
tying with binding wire and anchoring to the adjoining members wherever necessary
complete as per design (laps and wastage shall not be measured and paid) cost of
materials, labour, HOM of machinery complete as per specifications.
20625.00 Kg
Total
Say Rs

Aminbhavi & Hegde Consulting Engineers Pvt. Ltd. Dharwad

Amount

BHORAMDEO SAHAKARI SHAKKAR KARKHANA MARYADIT

CONSTRUCTION OF ROAD SIDE RCC U SHAPE DRAIN AT BSSUK LTD. KAWARDHA


T.Length=825x2= 1650m

BILL OF QUANTITIES
S.No
.
1

Description

Qty.

Unit

Excavation for roadway in soil using including loading in truck for carrying of cut
earth to embankment site with all lifts and lead upto 1000 meters as per relevant
clauses of section 300
2062.50 Cum

2 Construction of Embankment / sub grade with Material Obtained from Borrow


Pits (Construction of embankment with approved material / selected soil having C. B.
R. > 5 (unless specified otherwise in the contract) obtained from borrow pits with all
lifts and leads, transporting to site, spreading, grading to required slope and
compacting to meet requirement of table 300 - 2)
420.75 Cum
3

Filling available excavated earth (excluding rock)in sides of foundations up to plinth


in layers not exceeding 20cm in depth,compacting each deposited layer by raming
after watering with lead up to 0M the lift up to 1.5M including cost of all
materials,labour complete as per specifications.
515.63 Cum

4 Providing and laying in position plain cement concrete of mix 1:3:6 (M - 10) using 40

mm and down size graded granite/Trap/Basalt metal, machine mixed, concrete laid in
layers not exceeding 15 cms. Thick, well compacted, in foundation and plinth,
including cost of all materials,labour, HOM of machinery, curing complete as per
specifications.

140.25 Cum

5 Providing and laying in position reinforced cement concrete of nominal mix 1:1.5:3

(M - 20) with 20 mm and down size graded metal, machine mixed, concrete laid in
layers not exceeding 15 cms. thick, vibrated for all works in foundation plinth and
ground floor level for roof slab, staircase, lintels, retaining walls, return walls, walls
(any thickness) including attached plasters, columns, piers, abutments, pillars, posts,
struts, buttresses, string or lacing courses, parapets, coping, bed blocks, plain window
cills, fillets etc., including cost of all materials,labour, HOM of machinery, curing
complete as per specifications.
508.64 Cum
6 Providing TMT steel reinforcement for R.C.C. work including straightening, cutting,

bending, hooking, placing in position, lapping and / or welding wherever required,


tying with binding wire and anchoring to the adjoining members wherever necessary
complete as per design (laps and wastage shall not be measured and paid) cost of
materials, labour, HOM of machinery complete as per specifications.

14531.45 Kg
7 Providing and removing centering, shuttering, strutting, propping etc., and removal of

form work for Gutters for mass concreting including cost of all materials, labour
complete as per specification.
6517.50
Total
G. Total

Aminbhavi & Hegde Consulting Engineers Pvt. Ltd. Dharwad

###

Rate

Amount

BHORAMDEO SAHAKARI SHAKKAR KARKHANA MARYADIT

CONSTRUCTION OF CONCRETE V SHAPE OUT FALL DRAIN AT BSSUK LTD. KAWARDHA


TOTAL LENGTH =

750 M

BILL OF QUANTITIES
S.N
Description
o.
1 Excavation for roadway in soil using including loading in truck for
carrying of cut earth to embankment site with all lifts and lead upto 1000
meters as per relevant clauses of section 300

Qty.

Unit

1125.00 Cum
2 Construction of Embankment / sub grade with Material Obtained from
Borrow Pits (Construction of embankment with approved material / selected
soil having C. B. R. > 5 (unless specified otherwise in the contract) obtained
from borrow pits with all lifts and leads, transporting to site, spreading,
grading to required slope and compacting to meet requirement of table 300 2)
202.50 Cum
3 Filling available excavated earth (excluding rock)in sides of foundations up
to plinth in layers not exceeding 20cm in depth,compacting each deposited
layer by raming after watering with lead up to 0M the lift up to 1.5M
including cost of all materials,labour complete as per specifications.
281.25 Cum
4 Providing and laying in position plain cement concrete of mix 1:3:6 (M - 10)
using 40 mm and down size graded granite/Trap/Basalt metal, machine
mixed, concrete laid in layers not exceeding 15 cms. Thick, well compacted,
in foundation and plinth, including cost of all materials,labour, HOM of
machinery, curing complete as per specifications.
67.50 Cum
5 Providing and laying in position reinforced cement concrete of nominal
mix 1:1.5:3 (M - 20) with 20 mm and down size graded metal, machine
mixed, concrete laid in layers not exceeding 15 cms. thick, vibrated for all
works in foundation plinth and ground floor level for roof slab, staircase,
lintels, retaining walls, return walls, walls (any thickness) including attached
plasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or
lacing courses, parapets, coping, bed blocks, plain window cills, fillets etc.,
including cost of all materials,labour, HOM of machinery, curing complete as
per specifications.
220.50 Cum
6 Providing TMT steel reinforcement for R.C.C. work including straightening,
cutting, bending, hooking, placing in position, lapping and / or welding
wherever required, tying with binding wire and anchoring to the adjoining
members wherever necessary complete as per design (laps and wastage shall
not be measured and paid) cost of materials, labour, HOM of machinery
complete as per specifications.
20392.75 Kg
7 Providing and removing centering, shuttering, strutting, propping etc., and
removal of form work for Gutters for mass concreting including cost of all
materials, labour complete as per specification.
3300.00 Sqm
Total
G. Total

Aminbhavi & Hegde Consulting Engineers Pvt. Ltd. Dharwad

Rate

Amount

S.N
o.

BHORAMDEO SAHAKARI SHAKKAR KARKHANA MARYADIT


Description
Qty.
Unit

Aminbhavi & Hegde Consulting Engineers Pvt. Ltd. Dharwad

Rate

Amount