PakistanSiddiqsons350MWCoalfiredPowerPlant

HydroStructure

ChinaTCC

No.

ItemNumber

Building
andstructuredescription

EarthWork

T15R17BQ

unit

total

Fieldlevelling

m2

51235

Excavation

m3

169554.85

itemname

Transportationofsoil(Distanceisnotmorethan1Km)

62137.5

Backfill in the sea


Backfillinthesea

m3

65011.46

Backfill

m3

27360.7

Mechanicalrollercompactedsoil

m3

45120

100mmthicknesssiltsand

15960

100mmthicknesssiltsoil

m3

15960

500mmgranularcrushedstone

m3

19600

stonewithbigsize

66640

stonewillsmallersize

m3

31825

1mmthicknessHDPEmembrane

m2

159600

Dambodywork

500g/m2geotextiles

13300

C15leanconcrete

m3

766

granularcrushedstone

m3

79800

Slopeprotectionwithgrass

T15R17BQofHydroStructure/hydrostructure

1/4

3800

PakistanSiddiqsons350MWCoalfiredPowerPlant
HydroStructure

ChinaTCC

No.

T15R17BQ

unit

total

WindScreen,4mheight

m2

6400

Stoneandgravelmixturerreplacement

m3

18181.5

Soilgroundimprovementforashpond

m2

159600

itemname

ItemNumber

Subground
work

Soilgroundimprovementforbuilding

1199.25

Sand Bedding Course


SandBeddingCourse

m3

300

Crushedstonefoundationbed

m3

780

Concretefoundationbed

m3

538.994

C20concrete(HPC)foundationbed

m3

39.2

CastinSiteR.C.isolatedFoundation

m3

168

CastinSiteR.C.EquipmentFoundation

m3

444.451

AdhesivebitumenprimerCoatingforUndergroundFoundation

m2

9311.42

BitumenCoatingforUndergroundFoundation

m2

83806.96

Retainingwallunderground

m3

2355

Paving

m2

250

CastinSiteRectangleColumn

m3

42

CastinSiteGroundBeam,GroundRingBeam

m3

24.096

CastinSiteRectangleBeam

m3

23.7

CastinSiteSlab(withbeam)

m3

68.568

CastinSiteR.C.Pond

m3

foundationwork

T15R17BQofHydroStructure/hydrostructure

2/4

PakistanSiddiqsons350MWCoalfiredPowerPlant
HydroStructure

ChinaTCC

No.

T15R17BQ

unit

total

CastinSiteR.C.SmallComponents

m3

Pecastconcreteboxculvert

m3

11880

Roundprecastconcretewaterintakingstructure

m3

587.808

Roundprecastconcretewaterintakingcoverplate

m3

88.3125

BottomslabofCastinSiteR.C.Pond

m3

1499.7663

WallofCastinSiteR.C.Pond

m3

3263.716

TopslabofCastinSiteR.C.Pond

m3

66.98

Bolt

1.2

EmbededSteelMember

20.9

SteelColumnProductionandInstallation

37

CranebeamProductionandInstallationlessthan5t

HShapeSteelBeamProductionandInstallationlessthan3t

28.5

itemname

ItemNumber

precast
concretestructure
engineering

Special
StructureWorkk

SteelIron
Work

SteelStructure
Work

T15R17BQofHydroStructure/hydrostructure

3/4

PakistanSiddiqsons350MWCoalfiredPowerPlant
HydroStructure

ChinaTCC

No.

10

T15R17BQ

unit

total

SteelRoofTrussProductionandInstallationlessthan3t

14.5

SteelBraceProductionandInstallation

SteelPlatformProductionandInstallation

1.5

HandrailProductionandInstallation

105.5

SteelStairProductionandInstallation

5.5

LadderProductionandInstallation

3.9

Steelgrating

m2

43

Bottomslabofditch

m3

Wallofditch

m3

Masonryditch

m3

1480

itemname

ItemNumber

Outdoorworks

Note:thisBQtableincludesthematerialquantityforashpond,breakwaterembankment,seawaterintake&
discharge,complexwaterpumpstation,sanitarywastertreatmentunit,oilywastewatertreatmentunit,reused
waterpumpstation,coalblackwatertreatmentunit.

T15R17BQofHydroStructure/hydrostructure

4/4