Sei sulla pagina 1di 14

Name of Sub-Project :CONSTRUCTION OF WATER SYSTEM LEVEL II

Sub-project Type
Public Goods
Barangay/s
Municipality
Province
Region

Umalo
Libmanan
Camarines Sur
V

Supply
Demand

=
=

49.40 psi or 34.881m


Non peak hour pressure
20 psi or 14.06 m
Peak hour pressure
1.064 lps.

Criteria:
Particular
Number of Household
Average Household Member
Total Population
Average Population Growth Rate
Growth rate factor
Design Lifespan
Design Population
Average Daily Water Demand
per Capita per Day
PCWC
Average Daily Demand (ADD)
Average Demand per Second

Description
Actual number of household beneficiaries
(No. of HH)(Ave. HH Member)
Percent annualy
1+Growth rate^lifespan
No. of years
PP(1+GR)^Life Span
Ave. daily consumption per capita
average demand per day
ADD/24x60x60)
(Design population)(ADW DCD)
ADD/24x60x60)

Data
190
6
1,140.00
3
1.343916
10
1,532.06
60

Unit
HH
No.
No.
%
Years
No.
Liter

0.000694
91,924 Liter
1.064 LPS

II -PIPELINE DESIGN ANALYSIS:


A. Pipeline Design Input/Output
Pipeline
Section Household
Peak
Node
Pipe
Pipe
Headloss
Section
Node
Length
Served
Flow
Elev.
Diameter Diameter
per
from
to
Difference
Option
100 m.
(m)
(no.)
(lps)
(m)
(mm)
(mm)
(m)
1
2
3
4
5
6
7
8
9
10
1
tapping point 2
1888.67
190 2.6598345
14.06
69.0
100
0.137
2
2
3
62.8
180 2.5198432
11.50
35.6
100
0.13
3
3
4
58.75
170 2.3798519
11.56
34.3
100
0.122
4
4
7
50.61
80 1.1199303
11.63
24.6
100
0.109
5
7
8
871.19
70 0.979939
11.38
41.4
75
0.616
6
8
9
202.66
60 0.8399477
5.95
33.1
50
0.462
7
9
10
375.87
50 0.6999564
5.22
35.7
50
0.3292
8
10
11
46.2
40 0.5599652
4.10
22.5
50
0.221
9
11
12
47.910
30 0.4199739
4.06
20.3
38
0.515
10
12
13
59.17
20 0.2799826
3.95
18.1
38
0.217
11
13
14
150.09
10 0.1399913
3.45
17.0
31
0.168
12
4
16
138.21
80 1.1199303
11.53
30.1
75
0.109
13
16
17
120.82
10 0.1399913
11.57
12.8
19
1.975
14
15
t
118.61
60 0.8399477
9.26
27.2
50
0.221
15
t
21
18.1
40 0.5599652
9.14
15.9
38
0.881
16
21
22
50.3
30 0.4199739
9.11
17.4
25
3.723
17
22
23
79.55
20 0.2799826
7.25
17.0
25
1.756
18
23
24
88.55
10 0.1399913
6.03
13.7
19
1.975
19
t
19
74.52
20 0.2799826
9.00
16.1
25
1.756
20
19
18
101.73
10 0.1399913
7.71
13.4
19
1.975

B. Pipeline Analysis
Branch Node
1
tapping point
2
2
3
3
4
4
5
7
6
8
7
9
8
10
9
11
10
12
11
13
12
4
13
16
14
15
15
t
16
21
17
22
18
23
19
t
20
19

2
3
4
7
8
9
10
11
12
13
14
16
17
t
21
22
23
24
19
18

No. of Household
190
180
170
80
70
60
50
40
30
20
10
80
10
60
40
30
20
10
20
10

Total Headloss
Available Head
2.587478
<
14.06
0.08164
<
11.50252
0.071675
<
11.56088
0.055165
<
11.62921
5.36653
<
11.38404
0.936289
<
5.947512
1.237364
<
5.221223
0.102102
<
4.103859
0.246737
<
4.061757
0.128399
<
3.94502
0.252151
<
3.45
0.150649
<
11.53
2.386195
<
11.57
0.262128
<
9.26
0.159461
<
9.14
1.872669
<
9.11
1.396898
<
7.25
1.748863
<
6.03
1.308571
<
9.00
2.009168
<
7.71
Hr = Residual head

Column Description:

Hr
11.47
11.42
11.49
11.57
6.02
5.01
3.98
4.00
3.82
3.82
3.19
11.38
9.18
9.00
8.98
7.24
5.85
4.28
7.69
5.70

Column
1
2-3
4
5
6
7
8
9
10
11

Description
Pipe section under consideration
Node section under consideration
Length of pipe section under consideration (meter)
Number of household served
Computed Peak Flow (liter per second)
Difference in elevation between nodes under consideration (meter)
Computed Pipe Diameter (mm), using the Darcy Weisbach Formula
Nominal Diameter available in the market (mm)
Headloss per 100 meters (refer to table 9.2)
Actual Headloss

Formula:
Column 6:
PF
PF

= 2.5 x average flow


= 2.5 x GRF x N x Average Household Size x PCWC / 86,400

Where:
PF
GRF
N
PCWC

= Peak flow.
= Growth rate factor.
= Total number of household served by the pipe section.
= Per capita water consumption.

Simplifying:

Column 8:
HF
D^5

= f (L)(Q)^2/D^5
= f (L)(Q)^2/HF

HF

= Headloss or the difference in elevation between the pipe in


consideration.
= Coefficient of friction (approximately 0.02 for G.I. pipe).
= Length of pipe section in consideration.
= Water discharge.
=Pipe diameter (mm).

Where:

F
L
Q
D
Simplifying:
D^5

= (0.00165(L)(Q/1000)^2/HF)(1000)
(mm)
= (0.00165(Column 4)(Column 6/1000)^2/(Column 7))(1000)

Column 10:
From table 9.2, (interpolate when necessary).
Column 11:

Actual Headloss

= (Headloss per 100 M)(Section Length)/100


= (Column 10)(Column 4)/100

(m)

Actual
Headloss
(m)
11
2.587478
0.08164
0.071675
0.055165
5.36653
0.936289
1.237364
0.102102
0.246737
0.128399
0.252151
0.150649
2.386195
0.262128
0.159461
1.872669
1.396898
1.748863
1.308571
2.009168

Remarks
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok

Q
LPS
0.01
0.02
0.03
0.04
0.05
0.06
0.07
0.08
0.09
0.1
0.11
0.12
0.14
0.15
0.16
0.18
0.20
0.25
0.30
0.40
0.50
0.60
0.70
0.80
1.00
1.20
1.40
1.50
1.60
1.80
2.00
2.50
3.00
3.50
4.00
4.50
5.00
6.00
7.00
8.00
10.00

PIPE SIZE (mm)


13
19
0.1
0.4
0.8
0.11
1.4
0.19
2.1
0.3
3
0.41
4
0.5
5
0.65
6.3
0.82
7.6
1.06
9.1
1.18
10.7
1.5
2
2.1
2.5
3.1
3.8
5.8

25

0.1
0.13
0.17
0.22
0.26
0.31
0.36
0.48
0.55
0.62
0.77
0.94
1.42
2
3.4
5.1
7.2

31

0.11
0.13
0.17
0.18
0.22
0.27
0.32
0.48
0.67
1.15
1.74
2.4
3.2
4.1
6.3
8.8

FRICTION HEAD LOSS IN METERS PER 100 METERS


PLASTIC PIPE - PVC, PE, PB C = 50
TABLE 9.1
FRICTION HEAD LOSS IN PLASTIC PIPES

38

0.101
0.131
0.2
0.23
0.47
0.71
1
1.33
1.7
2.6
3.6
4.4
4.9
5.5
7.35
8.4

50

0.12
0.18
0.25
0.33
0.42
0.64
0.89
1.2
1.35
1.52
1.88
2.3
3.5
4.95
6.95
9.2
11.85

63

0.11
0.14
0.21
0.3
0.4
0.44
0.51
0.64
0.77
1.2
1.65
2.19
3
3.6
4.5
6.2
8.6

75

100

0.089
0.124
0.165
0.187
0.211
0.262
0.32
0.48
0.68
0.9
1.15
1.43
1.74
2.44
3.2
4.15
6.5

0.079
0.119
0.166
0.221
0.284
0.353
0.429
0.6
0.8
1.2
1.55

Q
LPS
0.01
0.02
0.03
0.04
0.05
0.06
0.07
0.08
0.09
0.10
0.11
0.12
0.14
0.15
0.16
0.18
0.20
0.25
0.30
0.40
0.50
0.60
0.70
0.80
1.00
1.20
1.40
1.50
1.60
1.80
2.00
2.50
3.00
3.50
4.00
4.50
5.00
6.00
7.00
8.00
10.00

PIPE SIZE (mm)


13
19
0.2
0.8
1.6
0.22
2.8
0.38
4.2
0.6
6
0.82
8
1
10
1.3
12.6
1.64
15.2
2.12
18.2
2.36
21.4
3
4
4.2
5
6.2
7.6
11.6

25

0.2
0.26
0.34
0.44
0.52
0.62
0.72
0.96
1.1
1.24
1.54
1.88
2.84
4
6.8
10.2
14.4

31

0.15
0.18
0.22
0.26
0.34
0.36
0.44
0.54
0.64
0.96
1.34
2.3
3.48
4.8
6.4
8.2
12.6
17.6

FRICTION HEAD LOSS IN METERS PER 100 METERS


GALVANIZED IRON PIPE (GIP)
TABLE 9.2

38

0.13
0.15
0.16
0.202
0.262
0.4
0.46
0.94
1.42
2
2.66
3.4
5.2
7.2
8.8
9.8
11
14.7
16.8

50

0.7
0.1
0.14
0.24
0.36
0.5
0.66
0.84
1.28
1.78
2.4
2.7
3.04
3.76
4.6
7
9.9
13.9
18.4
23.7

63

0.12
0.17
0.22
0.28
0.42
0.6
0.8
0.88
1.02
1.28
1.54
2.4
3.3
4.38
6
7.2
9
12.4
17.2

75

100

0.7
0.91
0.117
0.177
0.248
0.33
0.374
0.422
0.524
0.64
0.96
1.36
1.8
2.3
2.86
3.48
4.88
6.4
8.3
13

0.104
0.129
0.157
0.238
0.332
0.442
0.368
0.706
0.858
1.2
1.6
2.4
3.1

FRICTION HEAD LOSS IN GI PIPES

150

Interpolation
2.10
0.388
0.15 x
0.154
0.40
x=
x=

0.06
0.09
0.11
0.14
0.21

2.50
0.16

x-y, y = O5
0.01
0.00385 + O5
0.15385

150

0.12
0.17
0.22
0.28
0.42

Potrebbero piacerti anche