ARNEL CERVANTES PAGAPULAR

Contact Details

Profile
OBJECTIVE: Seeking a challenging job in a progressive organization, to
be able to contribute to the development of the company as well as the
satisfaction of the clients and to be able to learn and develop new
knowledge and skills.

Qualification Highlights
9 - Years of experience in construction, industrials, gas/oil, refi neries ,
petrochemical plants & shipping container.
8 - Years in Saudi Arabia with Mohammad Al-Mojil Group
1 Years in Singapore with BAUHENIA MARINE PTE LTD.

PERSONAL DATA:
Birthdate
Birthplace
Age
Citizenship
Religion

:
:
:
:
:

September 30, 1973


Jasaan Misamis Oriental
37 Years old
Filipino
Roman Catholic

EDUCATION:
College

Course
Vocational

;
:

Cagayan de Oro Capitol College


College Level
Cagayan de Or o City
Mechanical Engineering
National Manpower Youth Council ( NMYC) as TESDA
Tagoloan, Misamis Oriental

Course
:
High School :
Elementary :

Machine Shop and Welding


Jasaan National High School
Jasaan Misamis Oriental
Jasaan Central School
Jasaan Misamis Oriental

Graduated
Graduated

Working Experience/ Skills


Company

MOHAMMAD AL-MOJIL GROUP


Saudi Arabia

Project

Manifa Core Hydrocarbon Facility (CHF)


Saudi Aramco Project

Position

FOREMAN-PIPING

Duration

January 2011 Present

Job Description

Implementing of plans and schedule given by


superior
Providing of my men with productivity and
quality targets
Providing a specific work instructions and
guidelines needed to carry out work
assignments and meet targets
Pushing and motivating the group to attain
schedules and productivity target
Monitoring and reporting of daily work
accomplishment and corresponding man-hour
and equipment-hour utilized
Evaluating work progress and take action to
correct unfavorable deviation
Explaining and enforcing of company rules and
regulation, quality and safety requirements

Company

MOHAMMAD AL-MOJIL GROUP


Saudi Arabia

Project

Petrochemicals- CHEVRON
NCP- Daelim Project

Position

FOREMAN-PIPING

Duration

March, 2010 January 2011

Job Description

Plan, organize and direct the activities to the unit


Preparing of detailed 2 weeks look ahead schedule
Determine the manpower, equipment & tools, materials and drawings needed to

meet the target


Prioritizing, allocating, monitoring and expediting of equipment, tools and
manpower needed in unit and ensure availability of the same at the point of use
on time
Evaluating of productivity and work progress and taking preventive and
corrective action
Coordinating with other groups on matters needed to ensure smooth interfacing
of activities
Reviewing and approving of Daily Accomplishment Report submitted by
foremen
Strictly enforced company rules and regulations, quality and safety policies

Conduct training on subordinates

Company

MOHAMMAD AL-MOJIL GROUP

Project

SAUDI ARAMCO SHELL REFINERY (SASREF) BOP


Ultra Low Sulfur Diesel (ULSD) Project

Position

FOREMAN-PIPING

Duration

June, 2009 February , 2010

Job Description

Implementing of plans and schedule given by


superior
Providing of my men with productivity and
quality targets
Providing a specific work instructions and
guidelines needed to carry out work
assignments and meet targets
Pushing and motivating the group to attain
schedules and productivity target
Monitoring and reporting of daily work
accomplishment and corresponding man-hour
and equipment-hour utilized
Evaluating work progress and take action to
correct unfavorable deviation
Explaining and enforcing of company rules and
regulation, quality and safety requirements

Company

MOHAMMAD AL-MOJIL GROUP


Saudi Arabia

Project

KHURAIS CRUDE CONTRACT


SAUDI ARAMACO Project

Position

FOREMAN-PIPING

Duration

January, 2009 June , 2009

Job Description

Implementing of plans and schedule given by

superior
Providing of my men with productivity and
quality targets
Providing a specific work instructions and
guidelines needed to carry out work
assignments and meet targets
Pushing and motivating the group to attain
schedules and productivity target
Monitoring and reporting of daily work
accomplishment and corresponding man-hour
and equipment-hour utilized
Evaluating work progress and take action to
correct unfavorable deviation
Explaining and enforcing of company rules and
regulation, quality and safety requirements

Company

MOHAMMAD AL-MOJIL GROUP


Saudi Arabia

Project

SAUDI ARAMCO HARADH GOSP 2


Gas Plant & Water Injection Pump Supply

Position

FOREMAN-PIPING

Duration

July 26, 2007 November 17, 2008

Job Description:

Implementing of plans and schedule given by


superior
Providing of my men with productivity and
quality targets
Providing a specific work instructions and

guidelines needed to carry out work


assignments and meet targets
Pushing and motivating the group to attain
schedules and productivity target
Monitoring and reporting of daily work
accomplishment and corresponding man-hour
and equipment-hour utilized
Evaluating work progress and take action to
correct unfavorable deviation
Explaining and enforcing of company rules and
regulation, quality and safety requirements

Company

MOHAMMAD AL-MOJIL GROUP


Saudi Arabia

Project

HADDED STEEL PLANT ( Expansion Plant )

Position

LEAD MAN PIPING

Duration

May 11, 2006 May 19, 2007

Job Description

Ensure all pipe fitters / pipe fabricators are


suitable, trained and
knowledge on the work Scope and Quality as
per client standard.

Withdraw, transport and prepare all necessary


pipe materials at
fabrication shop area.

Inform/advise the QA-QC piping inspector to


have an actual
inspection and check up of the pre-fit up and
assembled pipe

spools prior to full welding or bonding of all


pipes joint as per
approved isometric drawing.

Make a necessary documents of the


inspected/completed pipe
spools basing on the isometric drawing and to
be handed over
to our supervisor for final record and ready
for transport to the
field.

Examine and check the work man ship of the


completed pipe
spools on the give approved drawing for pipe
supports.

Liasons with the Quality Assurance Quality


Control (QA-QC)
group to ensure the quality requirements are
implemented in
expedient manner.

Complete any necessary application for passes


or permit required
by the particular project and assigned to the
scoop of work.

Company

MOHAMMAD AL-MOJIL GROUP


Saudi Arabia

Project

SAUDI FERTILIZER CORPORATION ( SAFCO ) IV


Expansion Plant
Jabail Saudi Arabia

Position

LEAD MAN PIPING

Duration

January 22, 2005 March 26, 2006

Job Description

Works under supervision of my superior


Erection and fit-up of pipe spools both for small
bores and big bores (Carbon Steel, Stainless Steel,
Low Temp, p9 and p11)
Installing of pipe supports and valves to complete the
line
Rectify punch list issued by superior prior to hydrotest
the line
Installing of steam tracing line covered with bending and
heating activities
Familiarizing on P&ID, piping arrangement and isometric
drawing on order to
finish the line with quality
Bolt torque for pre-commissioning
Follow the company rules and safety rules

Company

:
MOHAMMAD AL-MOJIL GROUP
Saudi Arabia

Project

( JUPC ) UNITED OLEFINS COMPLEX PROJECT


Jubail Industrial City, Saudi Arabia

Position

PIPE FITTER

Duration

December 23, 2002 May 16, 2004

Job Description

Conduct analysis and review of the isometric


drawing of the
pertinent prior to fabrication and assembly.

Ensure /properly check exact measurement of


pipe spools and to
be cut accordingly in order to avoid wastage of
pipe materials and
fittings.

Counter check all materials used before fabrication


work whether it is correct basing on the bill of
materials on each isometric drawing.
Counter check the delivered pipe spools and verify
the code number
as per given isometric drawing reference and to be
installed basing
on the general piping arrangement for mechanical
piping group.

Inform directly to the assigned foreman and


supervisor in-charge,
if there is some relevant discrepancy of the pipe
tools during the
actual installation at the field basing on the
given general piping
arrangement drawing.
In charge on initial checking of the location,
levelness and alignment

of pipe spools/joints prior to final welding


basing the general piping
arrangement drawing fie mechanical piping work.

Responsible on installation of pipe supports of


the installed pipe
spools basing on the give
approved drawing for pipe supports.

Company

BAUHENIA MARINE PTE LTD.


Singapore

Project

SHIPPING CONTAINER

Position

FITTER / WELDER / LATHE MACHINE OPERATOR

Duration

June 10, 1998 June 13, 1999

Job Description

Revised line as per job order request from Chief


Engineer.

Repair of pipe line fresh water and waste pipe


line

Fabricate support, welding and installed

Assist of all engineers assigned on duty

Fabricate of bushing and fitting of bolts for


spare.

Repair of hydraulic pipe line

Installed of valve