Sei sulla pagina 1di 27

UNIVERSIDAD PERUANA UNION

FACULTAD DE INGENIERIA Y ARQUITECTURA


EAP INGENIERIA CIVIL

PREDIMENSIONAMIENTO, Y ANLISIS DE UNA


ESTRUCTURA APORTICADA DE 6 EJES Y 4 PLANTAS

TRABAJO FINAL
Trabajo presentado en cumplimiento a la asignatura de Anlisis
Estructural
Alumno:
Sacramento Galeano Baith Jhestin

Docentes:
Ing. Pari Cusi Herson Duberly

CURSO:
Anlisis Estructural
Lima, 1 de julio de 2016

UNIVERSIDAD PERUANA UNIN


FACULTAD DE INGENIERA Y ARQUITECTURA
E. P. DE INGENIERA CIVIL
ANLISIS ESTRUCTURAL

_______________________________________________________________________________________________

ESTRUCTURACIN Y PREDIMENCIONAMIENTO

PLANTA PRIMER PISO


2

6,1

3,6

V1

RECIBO 7

5
3,6

6,1

RECIBO 8

V1

F
5
,
1

5
,
1

OFICINA 8
OFICINA 7

V2
V2

SS HH

SS HH

V2
V2

5
,
1

SS HH

5
,
1

SS HH

OFICINA 6
RECIBO 6

RECIBO 5
4
,
2

4
,
2

OFICINA 5
RECIBO 3

OFICINA 3

OFICINA 4

V2
V2

SS HH

5
,
1

5
,
1

RECIBO 4

SS HH

V2
V2

SS HH

OFICINA 2

OFICINA 1

A
1

5
,
1

5
,
1

SS HH

V1

RECIBO 1

6,1

3,6
2

RECIBO 2

V1

3,6

6,1

5
3

A
6

PLANTA TPICA DEL 2 AL 4 PISO

ANLISIS ESTRUCTURAL

UNIVERSIDAD PERUANA UNIN


FACULTAD DE INGENIERA Y ARQUITECTURA
E. P. DE INGENIERA CIVIL
ANLISIS ESTRUCTURAL

_______________________________________________________________________________________________

PLANTA TPICA DEL 2 AL 4 PISO


2

6,1

3,6

V1

RECIBO 7

5
3,6

6,1

V1 RECIBO 8

V1
5
,
1

5
,
1

OFICINA 8
OFICINA 7

V2
V2

SS HH

SS HH

V2
V2

SS HH

5
,
1

5
,
1

SS HH

OFICINA 6
RECIBO 6

RECIBO 5

4
,
2

4
,
2

OFICINA 5

RECIBO 3

SS HH

SS HH

5
,
1

SS HH

SS HH

OFICINA 2

V1

6,1
1

RECIBO 2

RECIBO 1

V1

V2

V2

OFICINA 1

OFICINA 4

V2

V2

3,6
2

5
,
1

OFICINA 3

V1

3,6

5
3

5
,
1

5
,
1

RECIBO 4

6,1
5

PLANTA TPICA 2 AL 4TO NIVEL


PLANTA
ELEVACIN:
Edificio de 04 niveles con una altura tpica de 2.80m
VENTANAS:

PUERTAS:

TIPO V1 Alfeizer 1.00m

TIPO P1 Ancho 1.00m

TIPO V2 Ventana alta de h=0.80m

TIPO P2 Ancho 0.80m

ANLISIS ESTRUCTURAL

2.1.

CRITERIOS DE ESTRUCTURACIN SISMO-RESISTENTES

Los principales criterios que son necesarios tomar en cuenta para lograr una
estructura sismo-resistente, son:

Simplicidad y Simetra.
Resistencia y Ductilidad.
Hiperestaticidad y Monolitismo.
Uniformidad y Continuidad de la Estructura.
Rigidez Lateral.
Existencia de Losas que permiten considerar a la estructura como una unidad

(diafragma rgido).
Elementos no Estructurales.
Sub-estructuras o Cimentacin.

2.2.

ESTRUCTURACIN

Se ha buscado una disposicin apropiada de los distintos elementos resistentes, de tal


forma que la estructura sea capaz de soportar todas las solicitaciones a las que sea
sujeta en su vida til y a la vez sea tambin esttica, funcional y econmica.
Se eligi usar losas aligeradas que son las ms usadas en el Per, por las siguientes
razones:
-El hecho de empotrar las tuberas de desage en la losa, lo cual obliga a usar como
mnimo espesores de 17 y/o 20 cm. Una losa maciza de este peralte es demasiado
cara y pesada.
-El hecho que la mano de obra sea relativamente econmica hace que el costo de la
colocacin del ladrillo hueco no influya en el costo total de la obra.
-El menor costo de un encofrado para losas aligeradas en relacin a los encofrados de
las dems losas.
-El criterio prctico y la experiencia adquirida por muchos expertos en diseo de
concreto armado indica que una losa aligerada es econmica hasta una luz de 7 m.
aproximadamente.
Se ha techado en la direccin de menor longitud, con la finalidad de evitar que los
esfuerzos por flexin y cortante y las deformaciones sean de gran magnitud.
Debido a la diversidad de peraltes que presentaran las vigas, se uniformiz el peralte
de stas para facilitar el anclaje del acero y la colocacin del encofrado.

Las vigas principales, las que cargarn el aligerado, estarn en la direccin de los ejes
de

letras

sern

las

ms

peraltadas

como

se

ver

en

la

parte

de

predimensionamiento.
Las vigas secundarias, las que no cargan el aligerado, estarn en la direccin de los
ejes de los nmeros y sern menos peraltadas.
En el presente proyecto, el peralte mayor de las columnas estar en la direccin de los
ejes principales, para resistir los efectos de las cargas de gravedad de la losa
trasmitidas por las vigas.

2.3.

PREDIMENSIONAMIENTO

2.3.1.

LOSAS

El Reglamento Nacional de Construcciones da peraltes mnimos para no 18 verificar


deflexiones: En losas aligeradas continas conformadas por viguetas de 10 cm. de
ancho, bloques de ladrillo de 30 cm. de ancho y losa superior de 5 cm., con
sobrecargas, el peralte debe cumplir:

h L / 25

L / 18

(1)

El armado de Losas se dar en el sentido secundario, de acuerdo a la configuracin


en planta.
As tenemos:

h 6.10 / 25
h 0.24m.

L 6.10m.

h 6.10 / 18
h 0.34m.

Como se deber considerar un peralte comercial tomaremos el peralte mnimo que es


de

0.30m.

1
6,1
F

V1

3,6

3,6

6,1

RECIBO 7

V1

RECIBO 8

V1
5,1

5,1

OFICINA 8
OFICINA 7

V2
V2

SS HH

SS HH

V2
V2

SS HH

5,1

5,1

SS HH

OFICINA 6
RECIBO 6

D
4,2

RECIBO 5

4,2

OFICINA 5

RECIBO 3

SS HH

RECIBO 2

OFICINA 2

OFICINA 1
V1

V1

6,1
1

3,6
2

5,1

SS HH
V2

V2

SS HH

RECIBO 1

V1

3,6

5
3

5,1

5,1

SS HH

5,1

OFICINA 4

V2

V2

2.3.2.

RECIBO 4

OFICINA 3

6,1
5

VIGAS

Al predimensionar las vigas, se tiene que considerar la accin de cargas de gravedad


y de sismo. Hay criterios prcticos que, de alguna manera, toman en cuenta la accin
de combinada de cargas verticales y de sismo, a continuacin, se muestra alguno de
estos criterios.

hvp L / 12
@
Para la viga principal

L/9

1
h
3

2
h
3

L 5.10m.

hvp 5.10 / 12
hvp 0.43m

bvp

5.10 / 9

0.57 m.

hvp 0.50m

Para la viga secundarias

hvs 6.10 / 14
hvs 0.44m 45

1
bvp 0.50
3
bvp 0.25
@

bvp 0.30

L 6.10m.

0.33

2
0.50
3

hvs 0.45m

bvs 0.25

De acuerdo a los criterios anteriores:

hvp 0.50m

bvp 0.30

hvs 0.45m

bvs 0.25

Vigas principales:

Vigas secundarias:
2.3.3.

COLUMNAS

Se sigui el criterio de dimensionamiento por carga vertical, pues en la edificacin se


ha usado el sistema mixto de prticos y muros de corte, el cual permite que los
momentos en las columnas debido a sismo se reduzcan muy considerablemente.
Para

este

tipo

de

edificio

se

recomiendan

los

siguientes

criterios

predimensionamiento:

Area

P
nf ' c

Tipo

Columnas Centrales

Columna
C1

1.1 Pe

0.30

Columnas Laterales

C2-C3

1.25 Pe

0.25

C4

1.50 Pe

0.20

Principal-Secundario
Columnas

en

Esquinas
Donde:
P: Peso sobre la columna
n: factor de tipo de columna
fc: Resistencia del concreto
Pe: Carga de servicio
TIPO

COLUMN

CARGA UNITARIA

PESO

COLUMNA

A MAS

TPICA

TRIBUTARIO

CRTICA

1.2tn / m 2

(PE)

1.2tn / m 2

29.688tn

C1

2B

AREA TRIBUTARIA

6.10 3.6 5.10 5.10


2

*
24.74m
2
2

de

C2

2A

6.10 3.6 5.10


2

*
12.37 m
2
2

1.2tn / m 2

14.844tn

C3

6B

6.10 5.10 5.10


2

*
15.56m
2
2

1.2tn / m 2

18.672tn

C4

1A

6.10 5.10
2

*
7.78m
2
2

1.2tn / m 2

9.336tn

TIPO DE

P [Kg]

bd

bxd

C1

0.30

1.1 29.688 32657 * 4

2073cm 2

30x70

C2

0.25

1.2514.844 18555 * 4

1414cm 2

30x50

C3

0.25

1.2518.672 23340 * 4

1778cm 2

25x75

C4

0.20

1.5 9.336 14004 * 4

1334cm 2

30x 45

2.3.4.

ESCALERAS

COLUMN
A

La escalera tiene las siguientes caractersticas: Una altura tpica de 2.80 m, es decir,
16 contrapasos de 0.175 m de altura y pasos de 0.25 m de longitud.
Para el dimensionamiento de la garganta de la escalera se emple, para una luz libre
es 4.20 m.

t L / 25
t 4.20 / 25
t 0.17m 0.15m
Se decidi emplear un espesor de garganta de 15 cm para disminuir peso

METRADO DE CARGAS
3.1.

IDEALIZACIN

Es una representacin grfica de los elementos estructurales que comprueban su


comportamiento satisfactorio.

3.1.1.

PORTICOS

PORTICOS PRINCIPALES
P(A-A);P(F-F)

P(B-B);P(C-C);P(D-D);P(E-E)

Vs

Vs

Vs

Vs

Vs

Vs

Vs

Vs

Vs

Vs

Vs

Vs

C4

C2
6,1

C2

C2 C2

3,6

Vs

Vs

Vs

Vs

Vs

Vs

Vs

Vs

Vs

Vs

Vs

Vs

Vs

Vs

Vs

Vs

Vs

Vs

C3

C1 C1

C1 C1

C3

6,1

6,1
4

C4

3,6

Vs

2
,8

Vs

2
,8

Vs

2
,8

Vs

Vs

2
,8

Vs
2
,8

Vs

2
,8

Vs

2
,8

Vs

2
,8

Vs

3,6

3,6

6,1

PORTICOS SECUNDARIOS
P(1-1);P(6-6)

Vp

Vp

Vp

Vp

Vp

Vp

Vp

Vp
C3

5,1

Vp
C3

5,1
E

Vp
C3

4,2
D

Vp
C3

5,1
C

C4

Vp

Vp

Vp

Vp

Vp

Vp

Vp

Vp

Vp

Vp

Vp

Vp

Vp

Vp

Vp

Vp

C2

5,1
B

Vp

C1
5,1

C1
5,1

C1

4,2
D

C1
5,1

2
,8

Vp

Vp

2
,8

Vp

Vp

2
,8

Vp

Vp

C2
5,1

2
,8

Vp

2
,8

Vp

2
,8

Vp

2
,8

Vp

2
,8

Vp

C4

P(2-2);P(3-3);P(4-4);P(5-5)

Vp

3.1.2.

LOSAS

ENTRE (A Y B); (B Y C); (D Y E); (E Y F)

6,1

3,6

3,6

5
4

6,1
6

ENTRE C Y D

6,1

3,6

3,6

5
4

6,1
6

ENTRE (A Y B); (B Y C); (D Y E); (E Y F)

6,1
1

3,6

5
4

6,1
6

ESCALERAS

II

2,75
C

1,4

ESCALERAS
1,4

3.1.3.

3,6

2,75
D

3.2.

CARGAS

Procedemos a evaluar las cargas verticales actuantes en los diferentes elementos


estructurales que conforman el edificio.
Las cargas verticales se clasifican, por su naturaleza, en: Carga Muerta (W D) y Carga
Viva (WL).
3.2.1.

CARGA MUERTA

Es el peso de los materiales, dispositivos de servicio, equipos, tabiques y otros


elementos soportados por la edificacin, incluyendo su peso propio, que se propone
sean permanentes. (1)
Para calcular el peso de los elementos que conforman la estructura y el peso de los
materiales que debern soportar, se han tomado los siguientes pesos unitarios:(2)
Concreto armado2400kg/m3
Muros de Albailera, unidades arcilla cocida solido1800kg/m3
Piso terminado100 kg/m3
Aligerado de 20 cm de espesor...300 kg/m3
3.2.2.

CARGA VIVA

Es el peso de todos los ocupantes, materiales, equipos, muebles y otros elementos


movibles soportados por la edificacin. (3)
Para disear la edificacin se tomarn en cuenta cargas vivas repartidas,
concentradas o combinacin de ambas.
El RNC da los siguientes valores de cargas viva :(4)
Oficinas y baos250 kg/m2
Escaleras y corredores...400 kg/m2
Para azotea el RNC establece: La carga mnima para los techos con una inclinacin
hasta de 3 con relacin a la horizontal, es de 100Kg/m 2 (5), pero un buen criterio es
tomar 200 Kg/m2, esto se hace como medida de precaucin.
3.2.3.

REDUCCIN DE CARGA VIVA

Debido a la poca probabilidad de que el edificio se encuentre totalmente ocupado y


para evitar el sobredimensionamiento de los elementos estructurales, el RNC
establece: Para columnas y muros la reduccin de carga viva de pisos sern de 15
por ciento en el piso ms alto de la edificacin y de 5 por ciento adicional por cada piso

sucesivo, con una reduccin mxima de 50 por ciento, sin embargo, para el caso de
azoteas el reglamento no permite ningn tipo de reduccin. (6)

METRADO Y ANLISIS ESTRUCTURAL


Consideramos en el metrado de elementos:
El tipo de carga que asume cada elemento del edificio, sin tener en cuenta las
combinaciones de carga que causen los mximos esfuerzos, estas combinaciones se
considerarn en la parte de diseo.
En primer lugar, se realizar el metrado para una losa tpica de un nivel tpico
como se muestra en la construccin.

3.3.

ALIGERADOS

METRADO DE LOSAS (Para un ancho unitario)

LOSA MS CRTICA
6,1
1

3,6
2

3,6

5
3

6,1
5

CARGAS SOBRE LA LOSA


PERMANENTE:

WD Peso Pr opio Acabados muros

W propio 300 Kg / m 2 *1m 300 Kg / m


Wacabados 100 Kg / m 2 *1m 100 Kg / m

Pmuro 1800 Kg / m * 0.15m * 2.50m * 0.425m 287 Kg


W D 300 100 1075 Kg / m
CARGA VIVA

Para uso de oficinas y pasillos segn la NTP E-020 los valores recomendados son:

WL 250 Kg / m 2 * 1m 250 Kg / m
WL 400 Kg / m 2 * 1m 400 Kg / m

para oficinas

para corredores y escaleras

El modelo queda de la siguiente manera:

400Kg/m

287Kg
1075Kg/m

6,1
1

3.4.

3,6
2

287Kg
1075Kg/m
400Kg/m
400Kg/m

3,6

5
3

6,1
5

METRADOS DE PORTICOS

Para este caso se realiza el metrado para cada prtico.


PORTICO PRINCIPAL (1-1) Y (6-6): Ancho tributario tramo (1-2) o (5-6) es
5.85/2=2.925m.
Viga (1-1) O (6-6) Nivel tpico.
Tramo AB, BC, CD, DE Y EF

Wlosa 300 * 2.925 877.5 Kg / m


Wacabados 100 * 2.925 292.5 Kg / m
Wmuro 1800 * 0.25 * 2.30 1035Kg / m
W propio 2400 * 0.50 * 0.45 540 Kg / m
WD 2745Kg / m

WL 250 Kg / m * 2.925 731.25 Kg / m


Viga (1-1) o (6-6) Nivel Azotea.

Wlosa 300 * 2.925 877.5 Kg / m


Wacabados 100 * 2.925 292.5 Kg / m
Wmuro 1800 * 0.25 * 1.55 697.5 Kg / m
W propio 2400 * 0.50 * 0.45 540 Kg / m

WL 200 Kg / m * 2.925 585 Kg / m

WD 2407.5 Kg / m

P(1-1);P(6-6)
WL=585Kg/m

WL=585Kg/m

WL=731.25Kg/m

WD=2745Kg/m

WD=2745Kg/m

WL=731.25Kg/m

WL=731.25Kg/m WL=731.25Kg/m WL=731.25Kg/m

WL=731.25Kg/m

WD=2745Kg/m

WD=2745Kg/m

WD=2745Kg/m

WL=731.25Kg/m

WL=731.25Kg/m WL=731.25Kg/m WL=731.25Kg/m

WL=731.25Kg/m

WD=2745Kg/m

WD=2745Kg/m

WD=2745Kg/m

C4

C3
5,1

WD=2745Kg/m

WD=2745Kg/m

WD=2745Kg/m

WD=2745Kg/m

C3
5,1

WD=2745Kg/m

WD=2745Kg/m

C3

4,2
C

C3
5,1

2,8

WL=731.25Kg/m WL=731.25Kg/m WL=731.25Kg/m

WD=2745Kg/m

2,8

WL=731.25Kg/m

2,8

WD=2407Kg/m

C4

2,8

WD=2407Kg/m

5,1
E

PORTICO PRINCIPAL (2-2): Ancho tributario tramo (1-2) es 5.85/2=2.925m y para el


tramo (2-3) es 3.35/2=1.675m.
Viga (2-2) Nivel tpico.
Tramo AB, BC, CD, DE Y EF

Wlosa 300 * (2.925 1.675) 1380 Kg / m


Wacabados 100 * (2.925 1.675) 460 Kg / m
Wmuro 1800 * 0.25 * 2.30 1035Kg / m
W propio 2400 * 0.50 * 0.45 540 Kg / m

Pmuros 1800 * 0.15 * 2.50 *1.725

WD 3415 Kg / m

Pmuros 1164.38 Kg

WL 250 Kg / m * (2.925 1.675) 1150 Kg / m


Viga (2-2) Nivel Azotea.

Wlosa 300 * (2.925 1.675) 1380 Kg / m


Wacabados 100 * (2.925 1.675) 460 Kg / m
W propio 2400 * 0.50 * 0.45 540 Kg / m
WD 2380 Kg / m
WL 200 Kg / m * (2.925 1.675) 920 Kg / m

P(2-2)
WL=920Kg/m

WD=2380Kg/m

P=1164.38Kg

P=1164.38Kg

P=1164.38Kg

WD=2380Kg/m
WD=2380Kg/m
P=1164.38Kg

P=1164.38Kg

2
,8

WL=920Kg/m

WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WD=3415Kg/m WD=2380Kg/m
WD=3415Kg/m
WD=3415Kg/m
WD=3415Kg/m
WD=2380Kg/m WD=3415Kg/m
WD=2380Kg/m
WD=2380Kg/m
WD=2380Kg/m
WD=2380Kg/m
P=1164.38Kg

P=1164.38Kg

P=1164.38Kg

P=1164.38Kg

2
,8

P=1164.38Kg

WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WD=3415Kg/m WD=2380Kg/m
WD=3415Kg/m
WD=3415Kg/m
WD=3415Kg/m
WD=2380Kg/m WD=3415Kg/m
WD=2380Kg/m
WD=2380Kg/m
WD=2380Kg/m
WD=2380Kg/m
P=1164.38Kg

P=1164.38Kg

P=1164.38Kg

P=1164.38Kg

2
,8

P=1164.38Kg

C2

C1
5,1

C1
5,1

C1

4,2
C

C1
5,1

C2

2
,8

WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WD=3415Kg/m
WD=3415Kg/m
WD=3415Kg/m
WD=3415Kg/m WD=2380Kg/m
WD=2380Kg/m WD=3415Kg/m
WD=2380Kg/m
WD=2380Kg/m
WD=2380Kg/m
WD=2380Kg/m

5,1
E

PORTICO PRINCIPAL (3-3): Ancho tributario tramo (2-3) es 3.35/2=1.675m y para el


tramo (3-4) es 4.75/2=2.375m.
Viga (3-3) Nivel tpico.
Tramo AB, BC, CD, DE Y EF

Wlosa 300 * (1.675 2.375) 1215Kg / m


Wacabados 100 * (1.675 2.375) 405 Kg / m
Wmuro 1800 * 0.25 * 2.30 1035 Kg / m
W propio 2400 * 0.50 * 0.45 540 Kg / m

Pmuros 1800 * 0.15 * 2.50 *1.725

WD 3195 Kg / m

Pmuros 1164.38 Kg

WL 250 Kg / m * 1.675 400 * 2.375 1368.75Kg / m


Viga (3-3) Nivel Azotea.

Wlosa 300 * (1.675 2.375) 1215Kg / m


Wacabados 100 * (1.675 2.375) 405 Kg / m
W propio 2400 * 0.50 * 0.45 540 Kg / m
WD 2160 Kg / m
WL 200 Kg / m * (1.675 2.375) 810 Kg / m

P(3-3)
WL=810Kg/m
WD=2160Kg/m

P=1164.38Kg
P=1164.38Kg
WL=950Kg/m WL=1368.75Kg/m
WD=3195Kg/m
WD=2525Kg/m

P=1164.38Kg
P=1164.38Kg
P=1164.38Kg
WL=1368.75Kg/m
WL=1368.75Kg/m
WL=950Kg/m
WD=3195Kg/m
WD=3195Kg/m WD=2525Kg/m

P=1164.38Kg
P=1164.38Kg
WL=950Kg/m WL=1368.75Kg/m
WD=3195Kg/m
WD=2525Kg/m

C2

C1
5,1

C1
5,1

C1

4,2
C

C1
5,1

C2

2,8

P=1164.38Kg
P=1164.38Kg
P=1164.38Kg
WL=1368.75Kg/m
WL=1368.75Kg/m
WL=950Kg/m
WD=3195Kg/m
WD=3195Kg/m WD=2525Kg/m

2,8

P=1164.38Kg
P=1164.38Kg
WL=950Kg/m WL=1368.75Kg/m
WD=3195Kg/m
WD=2525Kg/m

2,8

P=1164.38Kg
P=1164.38Kg
P=1164.38Kg
WL=1368.75Kg/m
WL=1368.75Kg/m
WL=950Kg/m
WD=3195Kg/m
WD=3195Kg/m WD=2525Kg/m

2,8

WL=810Kg/m
WD=2160Kg/m

5,1
E

PORTICO PRINCIPAL (4-4): Ancho tributario tramo (3-4) es 4.75/2=2.375m y para el


tramo (5-6) es 3.35/2=1.675m.
Viga (4-4) Nivel tpico.
Tramo AB, BC, CD, DE Y EF

Wlosa 300 * (2.375 1.675) 1215Kg / m


Wacabados 100 * (2.375 1.675) 405 Kg / m
Wmuro 1800 * 0.25 * 2.30 1035 Kg / m
W propio 2400 * 0.50 * 0.45 540 Kg / m

Pmuros 1800 * 0.15 * 2.50 *1.725

WD 3195 Kg / m

Pmuros 1164.38 Kg

WL 400 * 2.375 250 Kg / m * 1.675 1368.75Kg / m


Viga (4-4) Nivel Azotea.

Wlosa 300 * (2.375 1.675) 1215Kg / m


Wacabados 100 * (2.375 1.675) 405Kg / m
W propio 2400 * 0.50 * 0.45 540 Kg / m
WD 2160 Kg / m
WL 200 Kg / m * (2.375 1.675) 810 Kg / m

P(4-4)
WL=475Kg/m

WD=2160Kg/m

WL=810Kg/m
WD=2160Kg/m

2,8

WL=810Kg/m

2,8

P=1164.38Kg
P=1164.38Kg
P=1164.38Kg
P=1164.38Kg
WL=1368.75Kg/m
WL=1368.75Kg/m
WL=1368.75Kg/m WL=950Kg/m
WL=1368.75Kg/m
WL=1368.75Kg/m
WL=950Kg/m
WL=950Kg/m
WD=3195Kg/m
WD=2160Kg/m
WD=2525Kg/m
WD=2160Kg/m
WD=2525Kg/m
WD=2160Kg/m WD=2525Kg/m WD=2160Kg/m
WD=3195Kg/m
WD=3195Kg/m
WD=3195Kg/m

2,8

P=1164.38Kg
P=1164.38Kg
P=1164.38Kg
P=1164.38Kg
WL=1368.75Kg/m
WL=1368.75Kg/m
WL=1368.75Kg/m WL=950Kg/m
WL=1368.75Kg/m
WL=1368.75Kg/m
WL=950Kg/m
WL=950Kg/m
WD=3195Kg/m
WD=2160Kg/m
WD=2525Kg/m
WD=2160Kg/m
WD=2525Kg/m
WD=2160Kg/m WD=2525Kg/m WD=2160Kg/m
WD=3195Kg/m
WD=3195Kg/m
WD=3195Kg/m

C2

C1
5,1

C1
5,1

C1

4,2
C

C1
5,1

C2

2,8

P=1164.38Kg
P=1164.38Kg
P=1164.38Kg
P=1164.38Kg
WL=1368.75Kg/m
WL=1368.75Kg/m
WL=1368.75Kg/m WL=950Kg/m
WL=1368.75Kg/m
WL=1368.75Kg/m
WL=950Kg/m
WL=950Kg/m
WD=3195Kg/m
WD=2160Kg/m
WD=2525Kg/m
WD=2160Kg/m
WD=2525Kg/m
WD=2160Kg/m WD=2525Kg/m WD=2160Kg/m
WD=3195Kg/m
WD=3195Kg/m
WD=3195Kg/m

5,1
E

PORTICO PRINCIPAL (5-5): Ancho tributario tramo (4-5) es 3.35/2=1.675m y para el


tramo (5-6) es 5.85/2=2.925m.
Viga (5-5) Nivel tpico.

Tramo AB, BC, CD, DE Y EF

Wlosa 300 * (1.675 2.925) 1380 Kg / m


Wacabados 100 * (1.675 2.925) 460 Kg / m
Wmuro 1800 * 0.25 * 2.30 1035Kg / m
W propio 2400 * 0.50 * 0.45 540 Kg / m

Pmuros 1800 * 0.15 * 2.50 *1.725

WD 3415 Kg / m

Pmuros 1164.38 Kg

WL 250 Kg / m * (2.925 1.675) 1150 Kg / m


Viga (5-5) Nivel Azotea.

Wlosa 300 * (1.675 2.925) 1380 Kg / m


Wacabados 100 * (1.675 2.925) 460 Kg / m
W propio 2400 * 0.50 * 0.45 540 Kg / m
WD 2380 Kg / m
WL 200 Kg / m * (1.675 2.925) 920 Kg / m

P(5-5)
WL=920Kg/m

WD=2380Kg/m

P=1164.38Kg

P=1164.38Kg

WD=2380Kg/m
WD=2380Kg/m
P=1164.38Kg

2,8

WL=920Kg/m

P=1164.38Kg

P=1164.38Kg

P=1164.38Kg

P=1164.38Kg

2,8

WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WD=3415Kg/m WD=2380Kg/m
WD=3415Kg/m
WD=3415Kg/m
WD=3415Kg/m
WD=2380Kg/m WD=3415Kg/m
WD=2380Kg/m
WD=2380Kg/m
WD=2380Kg/m
WD=2380Kg/m
P=1164.38Kg

P=1164.38Kg

P=1164.38Kg

P=1164.38Kg

2,8

WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WD=3415Kg/m WD=2380Kg/m
WD=3415Kg/m
WD=3415Kg/m
WD=3415Kg/m
WD=2380Kg/m WD=3415Kg/m
WD=2380Kg/m
WD=2380Kg/m
WD=2380Kg/m
WD=2380Kg/m
P=1164.38Kg

C2

C1
5,1

C1
5,1

C1

4,2
C

C1
5,1

C2
5,1

2,8

WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WL=1150Kg/m
WD=3415Kg/m WD=2380Kg/m
WD=3415Kg/m
WD=3415Kg/m
WD=3415Kg/m
WD=2380Kg/m WD=3415Kg/m
WD=2380Kg/m
WD=2380Kg/m
WD=2380Kg/m
WD=2380Kg/m

PORTICO SECUNDARIO (A-A) Y (F-F): Ancho tributario de 1m, con 0.50m a cada
lado con fines de seguridad.
Viga (A-A) o (F-F) Nivel tpico.
Tramo 12, 23, 34, 45 Y 56

Wlosa 300 * 1 300 Kg / m


Wacabados 100 * 1 100 Kg / m
Wmuro 1800 * 0.25 * 2.35 1057.5 Kg / m
W propio 2400 * 0.45 * 0.25 270 Kg / m
WD 1727.5 Kg / m

WL 250 Kg / m * 1m 250 Kg / m

Viga (A-A) o (F-F) Nivel Azotea.

Wlosa 300 * 1 300 Kg / m


Wacabados 100 *1 100 Kg / m
Wmuro 1800 * 0.25 *1.55 697.5 Kg / m
W propio 2400 * 0.45 * 0.25 270 Kg / m
WD 1367.5 Kg / m

WL 200 Kg / m * 1m 200 Kg / m

P(A-A);P(F-F)
WL=200Kg/m

WL=200Kg/m

WL=250Kg/m
WD=1727.5Kg/m

WL=250Kg/m

WL=400Kg/m

WL=250Kg/m

WD=1727.5Kg/m

WD=1727.5Kg/m

WD=1727.5Kg/m

WL=250Kg/m

WL=400Kg/m

WL=250Kg/m

WD=1727.5Kg/m

WD=1727.5Kg/m

WD=1727.5Kg/m

C4

C2
6,1

C2
3,6

C2

3,6

5
3

C2

2,8

WL=400Kg/m
WD=1727.5Kg/m

2,8

WL=250Kg/m
WD=1727.5Kg/m

2,8

WD=1367.5Kg/m

C4

2,8

WD=1367.5Kg/m

6,1
5

PORTICO SECUNDARIO (B-B) Y (E-E): Ancho tributario de 1m, con 0.50m a cada
lado con fines de seguridad.
Viga (B-B) o (E-E) Nivel tpico.
Tramo 12, 23, 45 Y 56

Tramo 34

Wlosa 300 * 1 300 Kg / m


Wacabados 100 * 1 100 Kg / m

Wlosa 300 *1 300 Kg / m

Wmuro 1800 * 0.25 * 2.35 1057.5 Kg / m

Wacabados 100 * 1 100 Kg / m

W propio 2400 * 0.45 * 0.25 270 Kg / m

W propio 2400 * 0.45 * 0.25 270 Kg / m

WD 1727.5 Kg / m

WD 670 Kg / m

WL 250 Kg / m * 1m 250 Kg / m

WL 400 Kg / m * 1m 400 Kg / m

Viga (B-B) o (F-F) Nivel Azotea.

Wlosa 300 *1 300 Kg / m

Wlosa 300 * 1 300 Kg / m

Wacabados 100 * 1 100 Kg / m

Wacabados 100 * 1 100 Kg / m

W propio 2400 * 0.45 * 0.25 270 Kg / m

W propio 2400 * 0.45 * 0.25 270 Kg / m

WD 670 Kg / m

WD 670 Kg / m

WL 200 Kg / m * 1m 200 Kg / m

WL 200 Kg / m * 1m 200 Kg / m

P(B-B);P(E-E)
WL=200Kg/m

WL=200Kg/m

WL=250Kg/m

WL=400Kg/m

WL=250Kg/m

WL=250Kg/m

WL=400Kg/m

WD=1727.5Kg/m

WD=1727.5Kg/m

WD=670Kg/m

WL=250Kg/m

WL=400Kg/m

WL=250Kg/m

WD=1727.5Kg/m

WD=670Kg/m

WD=1727.5Kg/m

C3

C2
6,1

C1
3,6

C1

C1
3,6

5
3

2,8

WD=1727.5Kg/m

WD=670Kg/m

2,8

WL=250Kg/m
WD=1727.5Kg/m

2,8

WD=670Kg/m

C3

2,8

WD=670Kg/m

6,1
5

PORTICO SECUNDARIO (C-C): Ancho tributario de 1m, con 0.50m a cada lado con
fines de seguridad.
Viga (C-C) Nivel tpico.
Tramo 12, Y 56

Tramo 23

Wlosa 300 * 1 300 Kg / m


Wacabados 100 * 1 100 Kg / m

Wlosa 300 *1 300 Kg / m

Wmuro 1800 * 0.25 * 2.35 1057.5 Kg / m

Wacabados 100 * 1 100 Kg / m

W propio 2400 * 0.45 * 0.25 270 Kg / m

W propio 2400 * 0.45 * 0.25 270 Kg / m

WD 1727.5 Kg / m

WD 670 Kg / m

WL 250 Kg / m * 1m 250 Kg / m

WL 250 Kg / m * 1m 250 Kg / m

Viga (B-B) o (F-F) Nivel Azotea.

Wlosa 300 *1 300 Kg / m

Wlosa 300 * 1 300 Kg / m

Wacabados 100 * 1 100 Kg / m

Wacabados 100 * 1 100 Kg / m

W propio 2400 * 0.45 * 0.25 270 Kg / m

W propio 2400 * 0.45 * 0.25 270 Kg / m

WD 670 Kg / m

WD 670 Kg / m

WL 200 Kg / m * 1m 200 Kg / m

WL 200 Kg / m * 1m 200 Kg / m

Tramo 34

Tramo 45

Wlosa 300 *1 300 Kg / m


Wacabados 100 * 1 100 Kg / m
W propio 2400 * 0.45 * 0.25 270 Kg / m
WD 670 Kg / m

Wlosa 300 * 1 300 Kg / m


Wacabados 100 * 1 100 Kg / m
W propio 2400 * 0.45 * 0.25 270 Kg / m
Wescalera 2400 Kg / m 3 * 0.6265 1503.6 Kg / m
WD 2173.6 Kg / m
WL 400 Kg / m * 1m 400 Kg / m

WL 400 Kg / m * 1m 400 Kg / m

Viga (C-C) Nivel Azotea.

Wlosa 300 * 1 300 Kg / m


Wlosa 300 *1 300 Kg / m
Wacabados 100 * 1 100 Kg / m

Wacabados 100 * 1 100 Kg / m


W propio 2400 * 0.45 * 0.25 270 Kg / m

W propio 2400 * 0.45 * 0.25 270 Kg / m Wescalera 2400 Kg / m 3 * 0.6265 1503.6 Kg / m


WD 670 Kg / m
WL 200 Kg / m * 1m 200 Kg / m

WD 2173.6 Kg / m
WL 400 Kg / m * 1m 400 Kg / m

EJE
C

0,25
0
,1
7
5

AREA TRIBURATARIA
PARA EL PORTICO C

CC

AREA TRIBURATARIA
PARA EL PORTICO D

x
0.15m
El area sombreada corresponde a la carga
sobre el portico B y el resto corresponde al
portico A
rea de garganta=1.75 * 0.183=0.3203m2
x=> Cos(CC)=0.15/x x=0.15/coscc=0.183

CC

rea de Peldaos=7* 0.25*0.175=0.3062m2

REA TRIBUTARIA DE ESCALERA=0.6265m2

CC=Atan(1.4m / 2.00m) EJE


D
CC=34.992
0,548

P(C-C)

WL=250Kg/m WL=400Kg/m WL=400Kg/m WL=250Kg/m


WD=2173.6Kg/mWD=1727.5Kg/m
WD=670Kg/m

WL=250Kg/m
WD=1727.5Kg/m

WL=250Kg/m WL=400Kg/m WL=400Kg/m WL=250Kg/m


WD=2173.6Kg/mWD=1727.5Kg/m
WD=670Kg/m

C2
6,1

C1
3,6

C1

3,6

5
3

C1

2,8

WL=250Kg/m
WD=1727.5Kg/m

2,8

WL=250Kg/m WL=400Kg/m WL=400Kg/m WL=250Kg/m


WD=2173.6Kg/mWD=1727.5Kg/m
WD=670Kg/m

2,8

WL=250Kg/m
WD=1727.5Kg/m

C3

WL=200Kg/m
WD=670Kg/m

C3
6,1

2,8

WL=400Kg/m
WD=2173.6Kg/m

WL=200Kg/m
WD=670Kg/m

PORTICO SECUNDARIO (D-D): Ancho tributario de 1m, con 0.50m a cada lado con
fines de seguridad.
Viga (D-D) Nivel tpico.
Tramo 12, 23, Y 56

Tramo 34

Wlosa 300 * 1 300 Kg / m

Wlosa 300 *1 300 Kg / m

Wacabados 100 * 1 100 Kg / m

Wacabados 100 * 1 100 Kg / m

W propio 2400 * 0.45 * 0.25 270 Kg / m

W propio 2400 * 0.45 * 0.25 270 Kg / m

WD 670 Kg / m

WD 670 Kg / m

WL 250 Kg / m * 1m 250 Kg / m

WL 400 Kg / m * 1m 400 Kg / m

Viga (D-D) Nivel Azotea.

Wlosa 300 *1 300 Kg / m

Wlosa 300 * 1 300 Kg / m

Wacabados 100 * 1 100 Kg / m

Wacabados 100 * 1 100 Kg / m

W propio 2400 * 0.45 * 0.25 270 Kg / m

W propio 2400 * 0.45 * 0.25 270 Kg / m

WD 670 Kg / m

WD 670 Kg / m

WL 200 Kg / m * 1m 200 Kg / m

WL 200 Kg / m * 1m 200 Kg / m

Tramo 45

Wlosa 300 * 1 300 Kg / m


Wacabados 100 * 1 100 Kg / m
Wmuro 1800 * 0.25 * 2.35 1057.5 Kg / m
W propio 2400 * 0.45 * 0.25 270 Kg / m
WD 1727.5 Kg / m

WL 250 Kg / m * 1m 250 Kg / m

Viga (D-D) Nivel Azotea.

Wlosa 300 *1 300 Kg / m


Wacabados 100 * 1 100 Kg / m
W propio 2400 * 0.45 * 0.25 270 Kg / m
WD 670 Kg / m

WL 200 Kg / m * 1m 200 Kg / m

P(D-D)
WL=200Kg/m

WL=200Kg/m

WL=250Kg/m

C3

WL=250Kg/m
WD=670Kg/m

WL=400Kg/m

WL=250Kg/m
WD=670Kg/m

WL=400Kg/m

C2
6,1

WL=250Kg/m
WD=1727.5Kg/m
WL=250Kg/m
WD=1727.5Kg/m

C1
3,6

WL=250Kg/m
WD=1727.5Kg/m

C1

WL=250Kg/m
WD=670Kg/m

WL=250Kg/m
WD=670Kg/m

WL=250Kg/m
WD=670Kg/m

C1
3,6

2,8

WL=400Kg/m

2,8

WL=250Kg/m

WL=250Kg/m
WD=670Kg/m

2,8

WL=250Kg/m

WD=670Kg/m

C3

2,8

WD=670Kg/m

6,1
5

METRADO DE CARGAS DE SISMO

Este metrado depende del Peso del edificio.


PESO DE LOSAS / NIVEL
rea Neta=rea Bruta rea escalera rea vigas

rea

Neta

( 24.65 * 24.85) (4.05 * 3.45) (6 * (24.85 * 0.30)) (6 * (23.15 * 0.25))

rea Neta

519.125m 2

Peso cada losa

Peso Acabados

300kg / m 2 * 519.125m 2 155737.5 Kg


100kg / m 2 * 519.125m 2 51912.5 Kg

Total

207650 Kg

PESO VIGAS / NIVEL

Vigas principales

6 * (24.85 6 * 0.25) * 0.50 * 0.30 * 2400 50436 Kg

Vigas Secundarias

6 * (24.65 6 * 0.25) * 0.45 * 0.25 * 2400 37503Kg

Total

87939 Kg

PESO MURO / NIVEL


Muros de cabeza en viga principal

143.275m * 0.25 * 2.30m * 1800 Kg / m 3 148289.625 Kg


Muro de cabeza en viga secundaria

45m * 0.25 *1m *1800 14.8m * 0.25 * 1.7 * 1800 31572 Kg

Muro debajo o sobre losa directamente

Total

45.85m * 0.15 * 2.35 * 1800 29091.825 Kg

208953.45 Kg

PESO DE COLUMNA / NIVEL


rea total de columnas

12 * 0.30 * 0.70 8 * 0.30 * 0.50 8 * 0.25 * 0.75 4 * 0.30 * 0.45 5.76m 2

Peso total de columnas

5.76m 2 * 2.8m * 2400 Kg / m 3 38707 kg

PESO ESCALERAS / NIVEL


Es una seccin interior se ha definido el rea para una parte del tramo tpico de
escalera. El rea de la otra parte ser.
rea = Garganta +Peldao + descanso=0.183*0.25+0.25+0.175+0.15*0.5=0.1645m2

Peso escalera para tramo tpico

Peso escalera cada nivel

(0.6265 0.1645) *1.725 * 2400 Kg / m 3 3275Kg

2 * 3275 6550 Kg

[Excepto Azotea]

Peso de sobrecarga. El peso de la sobrecarga representada el 25% de la carga viva

Sobrecarga losas

519.125m 2 * 250 Kg / m 2 129781.25Kg


519.125m 2 * 200 Kg / m 2 103825 Kg

Sobrecarga escalera

S/C

S/C

4.05 * 3.45 * 400 5589 Kg

Nivel Tpico

Nivel Azotea

Todos los Niveles

0.25(129781.25 5589) 33842.563Kg


0.25(103825 5589 / 2) 26654.875 Kg

(Nivel Tpico)

(Nivel Azotea)

RESUMEN DE PESOS POR NIVELES


NIVEL 1

NIVEL 2

NIVEL 3

NIVEL 4

207650
87939
38707
208953
6550
33842.56

207650
87939
38707
208953
6550
33842.56

207650
87939
38707
208953
6550
33842.56

207650
87939
12053
62217
3275
26654.88

830600
351756
128174
689076
22925
128182.56

583641.5

583641.56

583641.5

399788.88

2150713.5

(AZOTEA)

LOSAS
VIGAS
COLUMNAS
MUROS
ESCALERAS
SOBRECARG
A

6
6
Por lo tanto, el peso total del edificio viene a ser P=2150,713.56Kg.