Sei sulla pagina 1di 4

Jose A. Perez Jr.

Tel. no.: +
Cel. no.: +
E-mail :

Position Applied For :

Pipe Fitter

I. Personal Data
Place of Birth
Date of Birth
Civil Status
Nationality
Passport No.
Place of Issue
Date of Issue
Expiry Date
Educational Attainment

:
:
:
:
:
:
:
:

San PAscual,
January 22, 1973
Married
Filipino
EB1413508
DFA
19 Nov. 2010
18 Nov. 2015
College

II. Summary of Qualification


For almost 8 years experience of working within the engineering
construction industry on large capital plant like power station Nuclear / coal,
oil refineries, , petro chemical installations, industrial process installations etc.
That includes fabrication, installation and testing of safety critical pipe work
installation like pressure steam, chemical, pressurized piping of piping
carrying flammable, pre-commissioning and maintenance in plant operation.
PERIOD
June 2, 2009
To
July 27, 2009

Company/Address
Doosan Bobcock Energy
Hinkley Point B
Nuclear Power Station
NR. Bridgewater Somerset TA5 1UD
United Kingdom

Duties and Responsibilities

Interpretation of isometric and orthogonal engineering drawing.


Fabrication of pipework and assembly of stainless, nickel or aluminum
alloy pipe, fabricated fittings, forge fittings, and valves.
Cleaning of pipe bores and purging of pipe-work prior for welding.
Hydraulic and pneumatic pressure testing of assembled pipe-work.
Validation of quality records to ensure traceability of materials and
compliance with engineering drawings.
Manual handling and use of lifting equipment.

Use of powered and unpowered hand tools and rotating preparation


tools.
Flange jointing and bolt tensioning/torque setting of bolts.
Reinstatement of equipment work area to safe condition.
PERIOD

Company/Address

June 8, 2008
to

Doosan Babcock Energy


Birmingham
New Road,Tipton,
West Midlands,DY48YY,UK

Nov. 21, 2008


Duties and Responsibilities :

Interpretation of isometric and orthogonal engineering drawing.


Fabrication of pipework and assembly of stainless, nickel or aluminum
alloy pipe, fabricated fittings, forge fittings, and valves.
Cleaning of pipe bores and purging of pipe-work prior for welding.
Hydraulic and pneumatic pressure testing of assembled pipe-work.
Validation of quality records to ensure traceability of materials and
compliance with engineering drawings.
Manual handling and use of lifting equipment.
Use of powered and unpowered hand tools and rotating preparation
tools.
Flange jointing and bolt tensioning/torque setting of bolts.
Reinstatement of equipment work area to safe condition.
PERIOD

Dec. 21, 2006


To
Feb, 29, 2008

Company / Address
Petrofac E & C International Ltd.
Kauther Gas Plant Project
Kauther Oman, Sultanate of Oman

Duties and Responsibilities:

Fabrication of different isometric for on-shore piping


Erection of high pressure and low pressure piping per isometrics
Testing of high pressure and low pressure piping as per project quality
control program specification and standards
Preparation of system package for air blowing, water flushing, leak
checking and tightness test
Assist in plant maintenance and operation
Fit up of Flange from up to 42 Flange
Fit up reducer concentric and eccentric
Fit up of 45 and 90 elbow from to 42 All material are in carbon steel
and stainless steel

Period
Dec. 18, 2004
To
Dec. 14, 2005

Company / Address
Techint Cimimontubi Nig. Ltd.
TSKJ-NLNG Plus Project
Bonny Island, River State, Nigeria

Duties and Responsibilities

Erection of different piping components


Fabrication of dummy spool
Hot bolting of flange connection
Line checking
Preparation of system package for air blowing and tightness test
Installation of valves, spools and strainer
PERIOD

July 26.2001
To
July 26, 2003

Company / Address
INMA Steel Fabricators Co. Ltd.
Jubail Industrial City
K.S.A.

Duties and Responsibilities

Cutting of pipe spool as per isometric drawing


Preparation of different fitting tools that involved in the job
Fabricate sleeves for underground piping, tanks and vessel for
petrochemical plant
Fabricate sleeves from 8 to 36
Fit up of elbow 45 and 90 to 36
Fit up reducer and flange
All material are in carbon steel and stainless steel
PERIOD

June 20, 1999


To
August 30, 2000

Company / Address
MOHAMMAD AL-MOJIL
Kemya Olefins Project
Dammam K.S.A.

Duties and Responsibilities

Layout, fabricate and install pipe spool


Fabricate pipe support
Hydro testing, flushing of process piping
Fit- up fabricated spool from to 32
Fit up reducer concentric and eccentric from 4X2 up to 36 30

All material are in carbon steel and stainless steel

PERIOD
May 10, 1997
To
November 5, 1998

Company / Address
MOHAMMAD AL-MOJIL
RTRUP(Package #2 Utilities)
Dammam , K.S.A.

Duties and Responsibilities

Fabricate pipe support


Install pipe spool from boiler to pipe rack
Hydro testing and commissioning of process piping
Fit up of fabricate spool from 2 to 12
Fit up of flanges 2 to 12
Fit up of reducer from 2X to 12X10

Potrebbero piacerti anche