PRESUPUESTO (1 PLANTA)
ITEM
1.00
DESCRIPCION
OBRAS PROVISIONALES
UND
1.01
1.02
2.00
TRABAJOS PRELIMINARES
2.01
2.02
3.00
MOVIMIENTO DE TIERRAS
3.01
3.02
UND
COLUMNAS
ML
4.00
4.01
UND
4.00
4.01
4.02
4.03
5.00
5.01
VACIADO DE ZAPATAS
VACIADO DE COLUMNAS (incluye encofrado y desencofrado)
5.02
10.00
1.00
5.00
50.00
50.00
50.00
GL
GL
150.00
150.00
1.00
2.00
150.00
300.00
20.00
40.00
800.00
285.00
10.00
2850.00
20.00
180.00
3600.00
M3
ML
2.00
285.00
25.00
5.00
50.00
1425.00
ML
285.00
7.00
1995.00
UND
20.00
10.00
200.00
UND
20.00
125.00
2500.00
15.00
270.00
12.00
10.00
180.00
2700.00
3650.00
2700.00
7.00
ESCALERA
7.01
2880.00
M2
M2
750.00
1.00
750.00
750.00
ML
ML
M2
ML
ML
60.00
50.00
136.66
60.00
50.00
12.00
10.00
10.00
14.00
10.00
720.00
500.00
1366.60
840.00
500.00
M2
GL
136.66
1.00
10.00
220.00
1366.60
220.00
INSTALACIONES SANITARIAS
VACIADO GENERAL DE 1 PLANTA
GL
M2
1.00
136.66
170.00
10.00
170.00
1366.60
GL
1.00
400.00
400.00
SUPERVISION DE OBRA
GL
1.00
2000.00
1800.00
1800.00
2000.00
9.00
TECHADO 1 PLANTA
9.01
9.02
9.03
9.04
9.05
10.01
11.00
11.01
3600.00
3470.00
6.01
6.02
10.00
TOTAL
100.00
450.00
MUROS
9.07
9.08
9.10
ML
GL
6.00
9.06
METRADO
TECHADO 1 PLANTA
7049.80
400.00
1800.00
MAQUINARIAS
GL
1.00
las maquinarias a utilizar para la obra seran un mezclador trompito para trabajos
menores y una winche y mezcladro Tolba para trabajos mayores.
El horario de
disposicion de las maquinarias seran de acuerdo a la programacion de los trabajos
cuando sea necesario.
2000.00
NOTA: El presente presupuesto esta desarrollado de acuerdo a los costos que se manejan en nuestra constructora ya que la desarrollamos de
acuerdo a nuestra calidad eficiencia y puntualidad. El cual tiene una validez durabnte los 30 dias siguientes despues de haberce emitido el
mismo.
S/.
28849.80