Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Project Title:
Group No.:
Date:
Drawing No. and Revision:
Node No.:
Node Description:
Design Intent:
Item
Guide Word
1 No Flow
"Project title should be the same as the project title in your drawings"
Group 13
31/Mar/2015
"P&ID drawing number and Revision". Example: P-0005 (SHT 1 of 3), Rev. 1
1
Example: Furnace F-100 includes coil from oil inlet (before flow measurement) to vapour outlet (after tempe
Example: Liquid oil flows from the feed line is heated in the furnace. Oil is vaporize, superheat and transfer
Deviation
No oil flow
Possible Causes
Consequences
1) Supply failure
2) FCV-100 failed to open
1) Plugging of coil
2) Blockage downstream of
vaporizer
No natural gas
flow
1) Supply failure
2) PRV-100 failed to open
1 More Flow
xxx
Page 1 of 8
HAZOP Worksheets
Project Title:
Group No.:
Date:
Drawing No. and Revision:
Node No.:
Node Description:
Design Intent:
Item
Guide Word
1
1
1
3
3
3
1 Less Flow
2
3
1 Reserved Flow
1 High Pressure
1 Low Pressure
1 High Temperature
1 Low Temperature
1 High Level
10
1 Low Level
"Project title should be the same as the project title in your drawings"
Group 13
31/Mar/2015
"P&ID drawing number and Revision". Example: P-0005 (SHT 1 of 3), Rev. 1
1
Example: Furnace F-100 includes coil from oil inlet (before flow measurement) to vapour outlet (after tempe
Example: Liquid oil flows from the feed line is heated in the furnace. Oil is vaporize, superheat and transfer
Deviation
Possible Causes
Page 2 of 8
Consequences
HAZOP Worksheets
ent) to vapour outlet (after temperature control) and natural gas to burners
vaporize, superheat and transfer oil vapour to the process.
Safeguards
Recommendations
Party
Responsible
Consultant
Client
None
Consultant
None
Consultant
xxx
xxx
Page 3 of 8
HAZOP Worksheets
ent) to vapour outlet (after temperature control) and natural gas to burners
vaporize, superheat and transfer oil vapour to the process.
Safeguards
Recommendations
Page 4 of 8
Party
Responsible
HAZOP Worksheets
Project Title:
Group No.:
Date:
Drawing No. and Revision:
Node No.:
Node Description:
Design Intent:
Item
Guide Word
2
2
2
1
1
1
1 No Flow
2
3
2
2
2
2
1 More Flow
2
2
2
3
3
1 Less Flow
2
1 Reserved Flow
1 High Pressure
1 Low Pressure
1 High Temperature
1 Low Temperature
1 High Level
"Project title should be the same as the project title in your drawings"
Group 13
31/Mar/2015
"P&ID drawing number and Revision". Example: P-0005 (SHT 1 of 3), Rev. 1
2
xxx
xxx
Deviation
Possible Causes
Page 5 of 8
Consequences
HAZOP Worksheets
Project Title:
Group No.:
Date:
Drawing No. and Revision:
Node No.:
Node Description:
Design Intent:
Item
2
10
Guide Word
"Project title should be the same as the project title in your drawings"
Group 13
31/Mar/2015
"P&ID drawing number and Revision". Example: P-0005 (SHT 1 of 3), Rev. 1
2
xxx
xxx
Deviation
Possible Causes
1 Low Level
Page 6 of 8
Consequences
HAZOP Worksheets
Safeguards
Recommendations
Page 7 of 8
Party
Responsible
HAZOP Worksheets
Safeguards
Recommendations
Page 8 of 8
Party
Responsible