Sei sulla pagina 1di 6

A

5000

5000

5000

5000

5024

4976

5000

5000

5003

4997

3800

2555

FAB. LAB
25 SQM

- 5760 MM

RESEARCH
54 SQM

WORKSHOP
40 SQM

SMART STUDY
20 SQM

SMART STUDY
20 SQM

SMART STUDY
20 SQM

REFERENCE
50 SQM

- 5460 MM

VR LAB
20 SQM

1350

4013

- 6060 MM

BOOK STACKS + READING


376 SQM

1750

4738

- 6660 MM
LONGITUDINAL SECTION

- 5160 MM

2500

5
- 6760 MM

1750

MECH.
17 SQM

BOOK STR.
17 SQM

WC - F
11 SQM

STAIRCASE
22 SQM

- 5260 MM

WC - M
11 SQM

2100

10000

5000

3000

1500

500

1:100 [mm]

PROJECT NAME:

LOCATION:

PROJECT DESCRIPTION:

PAGE DESCRIPTION:

MUWAILIH
BIBLIOTHECA

UNIVERSITY ROAD, MUWAILIH


SHARJAH, UNITED ARAB EMIRATES

A SPECIALIZED LIBRARY CONSISTING OF FABRICATION LABS AND A


COMPLIMENTING PUBLIC LIBRARY SUPPORTED BY READING SPACES.

BASEMENT
1:100

MARK SHEHATA | FINAL REVIEW


ARC 301 | FALL 16
PROF. IGOR PERAZA

ELEV.

ELEV.

5000

D
5000

E
5000

F
5000

G
5024

STR. VIEW
ELEV.

4976

5000

5000

K
5003

L
4997

M
2555

1350

4013

TRANSVERSE SECTION

SIKKA

SECTIONAL PERSPECTIVE

PARK

2
EXIT

+ 150 MM

3800

MAIN
ENTRANCE

1750

4738

+ 1000 MM

SEATING SPACE
FOR LARGE
GROUP

SEATINGS

+/- 0 MM

- 5160 MM
LOBBY + RECEPTION
65 SQM
+ 600 MM

2500

CAFE
25 SQM

INFO
20 SQM

WC - F
11 SQM

1750

WC - M
11 SQM

+ 750 MM

STAIRCASE
22 SQM

2100

10000

5000

3000

1500

500

1:100 [mm]

PROJECT NAME:

LOCATION:

PROJECT DESCRIPTION:

PAGE DESCRIPTION:

MUWAILIH
BIBLIOTHECA

UNIVERSITY ROAD, MUWAILIH


SHARJAH, UNITED ARAB EMIRATES

A SPECIALIZED LIBRARY CONSISTING OF FABRICATION LABS AND A


COMPLIMENTING PUBLIC LIBRARY SUPPORTED BY READING SPACES.

ENTRY LEVEL PLAN


1:100

MARK SHEHATA | FINAL REVIEW


ARC 301 | FALL 16
PROF. IGOR PERAZA

5000

D
5000

E
5000

F
5000

G
5024

4976

5000

5000

5003

4997

M
2555

1350

4013

3800

1750

4738

MEETING
SQM

2500

5
+ 4800 MM

1750

OFFICE TYPE B
25 SQM

OFFICE TYPE A
15 SQM

KIT.
3 SQM

OFFICE TYPE A
15 SQM

WC
5 SQM

STAIRCASE
22 SQM

2100

10000

5000

3000

1500

500

1:100 [mm]

PROJECT NAME:

LOCATION:

PROJECT DESCRIPTION:

PAGE DESCRIPTION:

MUWAILIH
BIBLIOTHECA

UNIVERSITY ROAD, MUWAILIH


SHARJAH, UNITED ARAB EMIRATES

A SPECIALIZED LIBRARY CONSISTING OF FABRICATION LABS AND A


COMPLIMENTING PUBLIC LIBRARY SUPPORTED BY READING SPACES.

FIRST LEVEL
1:100

MARK SHEHATA | FINAL REVIEW


ARC 301 | FALL 16
PROF. IGOR PERAZA

5000

D
5000

E
5000

F
5000

G
5024

4976

5000

5000

5003

L
4997

M
2555

1350

4013

3800

1750

4738

PUBLIC
MEETING
46 SQM

2500

5
+ 9000 MM

1750

KIT.
3 SQM
WC
5 SQM

STAIRCASE
22 SQM

2100

10000

5000

3000

1500

500

1:100 [mm]

PROJECT NAME:

LOCATION:

PROJECT DESCRIPTION:

PAGE DESCRIPTION:

MUWAILIH
BIBLIOTHECA

UNIVERSITY ROAD, MUWAILIH


SHARJAH, UNITED ARAB EMIRATES

A SPECIALIZED LIBRARY CONSISTING OF FABRICATION LABS AND A


COMPLIMENTING PUBLIC LIBRARY SUPPORTED BY READING SPACES.

SECOND LEVEL
1:100

MARK SHEHATA | FINAL REVIEW


ARC 301 | FALL 16
PROF. IGOR PERAZA

5000

D
5000

E
5000

F
5000

G
5024

4976

5000

J
5000

K
5003

L
4997

M
2555

1350

4013

3800

1750

4738

2500

STAIRCASE
22 SQM

2100

1750

+ 13000 MM

10000

5000

3000

1500

500

1:100 [mm]

PROJECT NAME:

LOCATION:

PROJECT DESCRIPTION:

PAGE DESCRIPTION:

MUWAILIH
BIBLIOTHECA

UNIVERSITY ROAD, MUWAILIH


SHARJAH, UNITED ARAB EMIRATES

A SPECIALIZED LIBRARY CONSISTING OF FABRICATION LABS AND A


COMPLIMENTING PUBLIC LIBRARY SUPPORTED BY READING SPACES.

ROOF
1:100

MARK SHEHATA | FINAL REVIEW


ARC 301 | FALL 16
PROF. IGOR PERAZA

DETAILING

MARK SHEHATA | FINAL REVIEW | ARC 301 | FALL 16

KEY
1 GLASS FITTING
2 RECTANGULAR STEEL TUBE
3 ALUMINUM CASING
2 & 3 are always separated by an insulative barrier
to avoid galvanic action.
4 DOUBLE GLAZED PANEL
5 ALUMINUM CASING
6 WATER TIGHT SEAL
2 & 5 are always separated by an insulative barrier
to avoid galvanic action.
2 & 6 have a watertight caulking between them.
7 REINFORCING PIECES
8 BOLTS + WASHERS + NUTS
9 ALUMINUM COPING
10 FLASHING
11 RUBBER COUNTER FLASHING
12 CONCRETE MASONRY UNIT [CMU]
13 BATT INSULATION
14 REINFORCING INFILL
15 REVEAL
16 DOUBLE GYP BOARD
17 BATT INSULATION
10 & 11 should overlap together in a way that makes
water infiltration physically impossible.
18 REINFORCED CONCRETE LAYER - SLOPING 1 DEGREE
19 CORRUGATED STEEL
20 RIGID INSULATION
21 STEEL I BEAM
22 STEEL ANGLE
21 & 22 have a watertight membrane between them.
should be fully function at the time the concrete is poured.
23 STEEL PLATE
24 STEEL I BEAM
23 & 24 are welded together.
25 STEEL WEB JOIST
26 STEEL HAT CHANNEL
27 THERMATEX ACOUSTIC - DECKENSTSEME
28 NAIL
28 should be aligned with the rest of the nails.
29 TOPPERFO TYPE CLOU - AMERICAN CHERRY FINISH
30 DIMENSIONAL LUMBER
31 REVEAL
32 LIGHT FIXTURE
33 C CHANNEL + STUD CHASSIS
34 CORNER BEAD
35 IMBEDDED STEEL PLATE
36 J BOLTS

42 HAT CHANNEL
43 C CHANNEL

5
6
1

4
3

7
2

42 & 43 are tied together creating a grid.

41
15
13
16
17
22
18
19
20
21
23
24

44 WIRE
45 STRUT
46 MAIN DUCT
47 DUCT
48 DIFFUSER
49 METAL STUD WALL
50 GYP BOARD + LEVEL 5 FINISH
51 KNOCKOUTS FOR WIRING
52 BRACKETS
53 FIBRE CEMENT PIECE
54 STEEL TUBE
55 IMBEDDED LIGHT FIXTURE
56 ACRYLIC DIFFUSER
57 ALUMINUM WRIGLET
58 GYP BOARD + LEVEL 5 FINISH
59 METAL STUD
60 WOOD SIDING [NAILED]
61 ACRYLIC DIFFUSER [OPERABLE]
62 C CHANNEL
63 REVEAL
64 CONCRETE BEAM
65 C CHANNEL + METAL STUD CHASSIS
66 METAL STUD
67 FIRE RATED SEALANT
68 TYPE X GYPBOARD
69 WATER RESISTANT FIRE RATED SEALANT
70 STAIR PAN CONNECTION
71 STEEL ANGLE

9
12

40

10
14
11

DETAILED SECTION 1:40 [HIGH DETAIL]


37
38
36
25

26
28

39

35
30

44

31

27 29

47

33
34

45

43

42
48
49
50
51

52

55
56
57
58
59

53
54
61

60
62

63

64

70 & 71 are welded together.


72 C CHANNEL STEEL MEMBERS
72 consist of 2 steel channels bolted together.
67
65

73 LIGHT FIXTURE
74 GYPBOARD ON CHASSIS + LEVEL 5 FINISH
75 CORNER TRIM
76 C CHANNEL + METAL STUD CHASSIS
77 STEAL I BEAM

66
68

77 has a plate welded to it from both sides.


77 if not needed for structural rigidity, can be removed.
78 STAIR PAN
79 FIBRE CEMENT TREAD
80 SEATING AREA
81 STEM WALL
82 PROTECTIVE LAYER
83 ENGINEERED FILL
84 EARTH
85 TOPPING SLAB
86 FOOTING

69

79

35 & 36 are welded.

78

70
71
72
77

37 WEEP HOLE
38 SOLID CORE
39 RIGID INSULATION
40 COPING FIX PIECE
41 COPING TOP PIECE

46

32

76

73

74

75

40 & 41 snap into each other.


85

80

TRANSVERSE SECTION 1:200 [LOW DETAIL]

81
83
82

86

Potrebbero piacerti anche