Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
PID NO.
REMARKS
AFTER MODIFY
BEFORE MODIFY
PPM07-SP001
Outlet 1st broke screen & recovered stock Outlet 1st broke screen & recovered stock
pump transferred to mixing chest
pump transferred to header suction
(5121605)
sweetener pump ( 5121509)
PPM07-SP001
PPM07-SP001
PPM07-SP002
PPM07-SP003
PPM07-SP004
PPM3 pure water header connected to trim Trim cutter water tank supplied from cooled
cutter water tank (6121618)
condensate
PPM07 - CH003
PPM07 - CH003
From truck supply the GCC storage tank to From truck supply the GCC storage tank
mixing tank use vibrating screen (2pcs)
direct transferred to mixing tank
PPM07 - CH005
10
PPM07 - CH009
1 of 10
Future installation
Date :
Position
No.
Description Line
PID NO.
PPM07SP002
Size
(mm)
Start
End
Column
Column
%
Progress
Lines
??/
200
Note :
MV = Manual Valve
HV = Control Valve
ST = Steam Trap
OV = On - Off Valve
TE = Temperature Transmitter
FE = Flow Transmitter
PE = Pressure Transmitter
LE = Level Transmitter
PI = Pressure Gauge
RV = Check Valve
FH = Flexible Hose
SG = Sigh Glass
29-Dec-16
Installation
Man. Valve
Total
Install
Gauge Indication
Tag. No
Install
Install
Transmitter
Tag. No
Install
Install
Freeness
Tag. No
Install
pH Meter
Tag. No
61288
61289
PIC
Checking
Date
Remark
Install
Ph indicator & charge analyser
Date :
Position
No.
43
Description Line
PID NO.
Size
(mm)
PPM07 80/ 50
CH004
29-Dec-16
Installation
Piping (PIC : PJD-CR (Poltak))
Start
End
Column
Column
%
Progress
Lines
1st fl. B
10 ~ 11
Man. Valve
Total
6 MV
Install
Gauge Indication
Tag. No
PI-42077
Install
Install
Transmitter
Tag. No
Install
Install
Freeness
Tag. No
Install
pH Meter
Tag. No
PIC
Checking
Date
Remark
Install
FE-42076
Note :
MV = Manual Valve
HV = Control Valve
ST = Steam Trap
OV = On - Off Valve
TE = Temperature Transmitter
FE = Flow Transmitter
PE = Pressure Transmitter
LE = Level Transmitter
PI = Pressure Gauge
RV = Check Valve
FH = Flexible Hose
SG = Sigh Glass
3/10
Date :
No.
Description Line
PID NO.
PPM07 UT005
Size
(mm)
29-Dec-16
Installation
Position
Start
End
Column
Column
%
Progress
Lines
Man. Valve
Total
Install
Gauge Indication
Tag. No
Tag. No
Install
Install
Transmitter
Tag. No
Install
Install
Freeness
Tag. No
Install
pH Meter
Tag. No
PIC
Checking
Date
Remark
Install
80/10
0
Note :
MV = Manual Valve
HV = Control Valve
ST = Steam Trap
OV = On - Off Valve
TE = Temperature Transmitter
FE = Flow Transmitter
PE = Pressure Transmitter
LE = Level Transmitter
PI = Pressure Gauge
RV = Check Valve
4/10
Date :
No.
Description Line
PID NO.
Size
(mm)
29-Dec-16
Installation
Position
Start
End
Column
Column
%
Progress
Lines
Man. Valve
Total
Install
Gauge Indication
Tag. No
Tag. No
Install
Install
Transmitter
Tag. No
Install
Install
Freeness
Tag. No
Install
pH Meter
Tag. No
PIC
Checking
Date
Remark
Install
FH = Flexible Hose
SG = Sigh Glass
5/10
NO
DESCRIPTION
CONSUMPTION
CONDITION
NORMAL
MAXIMUM
80 L/S
300 L/S
2-3 Bar
PULP CONSUMPTION
520 T/D
620 T/D
2.8 -3,0 %
200 L/S
300 L/S
0,10 %
STEAM CONSUMPTION
40 T/H
90.2 T/H
3.5-5.5 Bar
CONDENSATE RETURN
36 M3/H
73 M3/H
70 -80 o C
POWER
REMARK
NO
DESCRIPTION
SIZE
(mm)
POSITION
FROM
(COLUMN)
TO
(COLUMN)
CHECKED
DATE
PICTURE
29-Dec-16
REMARKS
300
B 14
Outside
building
11-Aug-09
300
Outside
building
B 14
11-Aug-09
Sprinkler shower
100
Outside
building
B 13
11-Aug-09
150
Outside
building
B 18
11-Aug-09
100
Outside
building
B 23
11-Aug-09
200
B -4
B 18
11-Aug-09
350
B -6
B 18
11-Aug-09
250
B0
B -6
11-Aug-09
250
B0
B -8
11-Aug-09
7 of 10
NO
DESCRIPTION
SIZE
(mm)
10
11
POSITION
CHECKED
DATE
PICTURE
29-Dec-16
REMARKS
FROM
(COLUMN)
TO
(COLUMN)
250
K -5
B -6
11-Aug-09
350
Outside
building
B 18
11-Aug-09
12
Sealing water
100
Outside
building
B 18
11-Aug-09
13
400
V -5
F -6
12-Aug-09
14
350
B -5
J -4
12-Aug-09
15
250
B -9
J -4
12-Aug-09
16
350
K 18
J1
12-Aug-09
17
350
J4
J1
12-Aug-09
18
800
QH3
QH1
12-Aug-09
8 of 10
NO
DESCRIPTION
SIZE
(mm)
POSITION
FROM
(COLUMN)
TO
(COLUMN)
CHECKED
DATE
PICTURE
29-Dec-16
REMARKS
19
900
QH1
HF1
12-Aug-09
20
800
QH1
QH1
12-Aug-09
21
600
H2
HF1
12-Aug-09
22
250
H -3
H -1
12-Aug-09
23
200
FK
-4 -5
V -6
12-Aug-09
24
150
FK
-4 -5
F -3
12-Aug-09
25
200
FK
-4 -5
F -1
12-Aug-09
26
150
FK
-4 -5
F -3
12-Aug-09
27
LP steam mainline
500
H -8
H 17
12-Aug-09
9 of 10
NO
DESCRIPTION
SIZE
(mm)
POSITION
FROM
(COLUMN)
TO
(COLUMN)
CHECKED
DATE
PICTURE
29-Dec-16
REMARKS
28
150
H -8
H -2
12-Aug-09
29
150
H4
H7
12-Aug-09
30
150
H7
H 14
12-Aug-09
31
150
H 13
H 14
12-Aug-09
32
250
H7
H 10
12-Aug-09
10 of 10